Risk Assessment - Air Conditioning SAMPLE. Risk before any controls in place. vicinity of ducting outlet. commissioning
|
|
|
- Simon Page
- 9 years ago
- Views:
Transcription
1 Assessment - Air Conditioning Installation of a New Air Conditioning System 1 Commissioning System 2 Exposure to dust/debris Installation of Air Conditioning Plant 3 Handling plant 4 5 Installing plant at height 6 7 Lifting plant with mechanical equipment Poor handling technique Sharp or jagged edges Fall of Person Unintended falls of material/tools/debris Fall of material/equipment/tools Cuts, abrasions, eye injuries and breathing difficulties Muscular skeletal injuries Cuts/abrasions Persons at Those in the immediate vicinity of ducting outlet Persons at Operatives and passing below before any Med / Med / before any Med / Med / Persons not required to be in the vicinity of the duct outlets will be kept out of the Ducting system cleaned on a regular basis during installation and immediately prior to Manual Handling assessment carried out Refer to risk assessment for specific access Dust masks, gloves and eye protection to be worn by in the vicinity of duct outlets during Warning signs to be placed around duct outlets during system Appropriate gloves suita for the task provided ligi ligi Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
2 Installation of Air Conditioning Ductwork 8 Installing ductwork Contact with sealants 9 Installing ductwork at height Fall of Person Unintended falls of material/tools/debris Air Conditioning - Record comments and variations here. Long term health proms - fatal Assessment - Air Conditioning Persons at and in the immediate before any Med / Refer to COSHH assessment for use of sealants Refer to risk assessment for specific access Only competent persons will carry out these works Barriers and signage will be positioned to exclude persons from the below the works Loose materials and equipment will be cleared regularly Name... Position... Date ligi Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
3 Assessment - Extract/Supply Installation of a New Supply/Extract System 13 Commissioning System 14 Exposure to dust/debris Installation of Extract/Supply Plant 15 Handling plant 16 Poor handling technique Sharp or jagged edges Installation of Supply/Extraction Ductwork 17 Installing ductwork Contact with sealants 18 Installing ductwork at height Fall of Person Unintended falls of material/tools/debris Cuts, abrasions, eye injuries and breathing difficulties Muscular skeletal injuries Cuts/abrasions Long term health proms - fatal Persons at Those in the immediate vicinity of ducting outlet Persons at Persons at and in the immediate before any Med / Med / before any Med / Med / before any Med / Persons not required to be in the vicinity of the duct outlets will be kept out of the Ducting system cleaned on a regular basis during installation and immediately prior to Manual Handling assessment carried out Refer to COSHH assessment for use of sealants Refer to risk assessment for specific access Only competent persons will carry out these works Barriers and signage will be positioned to exclude persons from the below the works Dust masks, gloves and eye protection to be worn by in the vicinity of duct outlets during Warning signs to be placed around duct outlets during system Appropriate gloves suita for the task provided Loose materials and equipment will be cleared regularly ligi / ligi Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
4 Extract/Supply - Record comments and variations here. Assessment - Extract/Supply Name... Position... Date Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
5 Assessment - Tower Scaffolds Using Mobile towers 22 Erecting a tower 23 Moving the tower Using tower exceeding recommended least base to height ratio Collapse due to incorrectly erected tower Fall of material/equipment/tools Overturning of tower Overturning/collapse of tower Working on a tower scaffold Collapse of tower through overloading Fall of material/equipment/tools Fall of Person Fall of person due to unintended movement of tower Overturning of tower Tower Scaffolds - Record comments and variations here. Persons at All persons in the work Persons working on tower and below Any person on tower while it is being moved and below before any Med / Med / Erection of tower must be supervised by a competent person. Manufacturers assembly instructions must be made availa and followed. Materials and equipment not to be left on the tower whilst it is being moved Persons not allowed to travel on the tower while it is being moved All persons in the work Tower tied to structure ensuring stability / All persons in the work The safe working load will not be exceeded ligi Persons working on tower and below / No ligi Toeboards and guardrails fixed in place Loose materials and equipment to be cleared / regularly and not thrown from the platform Guardrails and toeboards fitted where operatives can fall more than 2 metres Wheel or caster brakes applied when tower is in use Additional fall protection e.g. safety harness provided where guardrails/toeboards impractical All persons in the work Med / Only trained persons will use the tower / Name... Position... Date / / Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
6 Assessment - Power Tools Using Abrasive Wheels 31 Using an abrasive wheel General use Using Hand Tools Contact with the disc during use Disc shattering due to incorrect mounting Flying debris during a grinding process Damaged or inappropriate tool Using Electrically Powered Hand Tools Operating electrically powered hand tools Electric shock Power Tools - Record comments and variations here. Death/Permanent Disability Persons at Persons at before any before any Fully trained and experienced operatives only carry out this work The correct abrasive wheel is selected for the particular application Only fully trained and experienced persons change the disc Only competent, trained persons to carry out this work. A check of equipment guards, etc, is carried out before work starts Disc speed is always greater than the tool speed Carry out a check of equipment before work starts PPE including eye protection must be worn Major cuts/bruises, etc Only trained persons to use the equipment The correct tool for the job is used, tools are / maintained regularly, damaged tools are not used Persons at Major - life Person using tool and anyone in the immediate before any Hand tools must be inspected prior to each use. Reduced voltage where practica (110v) Damaged tools are not to be used Extension, trailing leads kept to a minimum, tool unplugged when not in use. Name... Position... Date / / / Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
7 Assessment - The Site Site adjacent to an Occupied Building Working adjacent to an occupied building Dust and Fumes Fire as a result of work activities/nature of materials Noise The Site - Record comments and variations here. Stress/anxiety Death/severe burns Persons at Occupants of adjacent building before any Med / Controls for activity creating the dust/fumes Site fire plan includes co-ordination with building occupants and allows for alterations changes to their existing emergency procedures Works programmed to reduce the number of people exposed Sufficient numbers of appropriate fire extinguishers. Stress/anxiety Noise Assessment carried out Works programmed to reduce the number of ligi people exposed Name... Position... Date ligi Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project