1 12.Insurance Schedule Schedule for Construction All-Risks Insurance ( CAR Insurance ) COBRAcable Written by Willis acting as insurance brokers under the Authority given collectively by TenneT and Energinet.dk Doc. 15/ /59
2 CONSTRUCTION ALL RISK INSURANCE Schedule Project Site Principal Insured COBRAcable Holland, Germany, Denmark onand offshore and including domestic and international waters. TenneT and Energinet.dk Any person or company performing activities on behalf of the Project and any person or company the Employer is obliged by agreement to include as the Insured, f.x. (nonexhaustive listing): Additionally Insured Contractors including subcontractors of any tier and/or their parent companies and subsidiary companies, Suppliers including sub suppliers for their site activities only Engineers, Advisors, Supervisors. Each for their respective rights and interests. Base Wording Munich Re Comprehensive Project Insurance (CPI) E E ( ) Doc. 15/ /59
3 Term Territorial Scope Insured Locations The Works (and the Property Insured) This definition is Incremental to the Base Wording. Refer to definition of Incremental below. The term Insured in this Schedule and in the Base Wording it means the Principal Insured and all Additionally Insured s collectively. Worldwide excluding the USA and Canada Any areas within the Territorial Scope owned, used or occupied by the Insured Parties for the purpose of conducting the Works. Subject to the insuring agreements, applicable terms, conditions and exclusions, this insurance covers the following activities undertaken in the course of the Project provided such activities are within the reinsured values. Covered activities includes but are not limited to: Procurement, fabrication, construction, load out, loading/unloading, transportation by land, sea or air (including call(s) at port(s) or place(s) as may be required), storage, towage, mating, installation, burying, hook-up, connection and/or tie-in operations, testing and commissioning, existence, initial operations and maintenance, project studies, engineering, design, project management, testing, trials, cable- /pipe laying, trenching, and commissioning. Doc. 15/ /59
4 This insurance covers works executed anywhere (restricted only by the Territorial Scope) in the performance of all contracts relating to the Project including but not limited to (provided they are included in the contract values declared to Underwriters and insured herein): materials, components, parts, machinery, fixtures, equipment and any other property destined to become a part of the completed project, or used up or consumed in the completion of the Project. This insurance shall also cover all temporary works, plant, equipment, machinery, materials, outfits and all property associated therewith, whether such items are intended to form a permanent part of the works or not, including site preparatory work and subsequent operational risks. It is understood and agreed that any insured equipment and/or property that is not for incorporation into the contract works shall be insured by the contractor whilst it is being utilised in the Project and whilst in transit from the Project site(s) until the earlier of the date of arrival at its final destination or the 30th day Doc. 15/ /59
5 after its removal from the Project site(s). CONTRACTS, PERIOD OF INSURANCE AND BASE WORDING Insured Contracts Indemnification Any contract entered by the Principal Insured in relation to the completion of the Project and any contract entered between two third-parties of which at least one of those are under contract with the Principal Insured related to the completion of Project. The insurer shall indemnify the insured for any physical loss of or damage to the property insured which occurs within the territorial limits at any time during the period of insurance due to any cause not specifically excluded and which results in property insured needing to be repaired or replaced. Construction and Erection Period (incl. Hot Testing): Period of Insurance From even though the acceptance of the quote will be notified to insurer(s) Doc. 15/ /59
6 From to both days included, and followed by an Extended Maintenance Period of 60 (sixty) months. TERRITORIAL LIMITS, SUMS INSURED AND DEDUCTIBLES (Any numeric section references are made to the Base Wording) Section 1a, Property Sum Insured Section 1a 3.1 Property belonging to or held in the care, custody or control of the insured Section 1a 3.2 Professional Fees Section 1a 3.3 Plans, Documents and Data Section 1a 3.4 Removal of Debris Section 1a 3.5 Expediting Expenses Section 1a 3.6 Off-site Storage Section 1a 3 Inland Transit Full contract value EUR 539,998,618 EUR 100,000,000 EEO ( EEO is the abbreviation for Each and Every Occurrence throughout this Exibitit) EUR 10,000,000 EEO EUR 10,000,000 EEO EUR 100,000,000 EEO EUR 20,000,000 EEO EUR 10,000,000 EEO EUR 10,000,000 per conveyance anywhere within the Territorial Scope (and not restricted to Doc. 15/ /59
7 Inland ). Section 1a 4.2 Escalation Section 1a, Property Deductibles Section 1a, Property Deductibles Special deductibles for On shore Civil works 25% allowed without Additional Premium. When exceeding 25% the remaining overflow is subject to an additional premium proportionally calculated. Any claim off-shore: EUR 1,000,000 EEO Any claim on-shore: EUR 500,000 EEO Claims arising from the works originating from any Contract related to On shore Civil Works project parts see item 9.6 above for a further description. Any claim: EUR 25,000 EEO Section 2, Third Party Liability Limit of Indemnity EUR 75,000,000 EEO and in total for the Period of Insurance. As for any Additionally Insured this Third Party Liability coverage Section 2, Third Party Liability Secondary Coverage and DIC drop-down i) acts as secondary coverage to said parties own third party liability insurances (which is separately required, and must have independent limits of indemnification of no less than Doc. 15/ /59
8 EUR 25,000,000 EEO and in total for the entire duration of said parties contracts with the Principal Insured. However a limit of EUR 2,700,000 applies for on shore civil works contracts mentioned in 9.6 above. and ii) extends DIC (Difference-In- Conditions) coverage to said parties limited only by the deductible (and as mentioned in the Deductibles paragraph below). EUR 5,000,000 (excl. on shore Civil Works ref. 9.6 where a deductible on EUR 2,700,000 applies) each and every claim except for liability incurred by any of the two Principal Insureds which carries the following deductibles: Section 2, Third Party Liability Deductibles EUR 500,000 each and every claim, except for accidental death or bodily injury to or illness of any third parties in which cases the deductible is EUR 100,000. In the event of a claim involving several tortfeasors in their capacity as insured parties under this policy, the policy s deductible Doc. 15/ /59
9 will apply only once and with the lowest of the above mentioned deductibles applicable. Note on both section 1a and 2 Deductibles In the event of any one occurrence affecting more than one of the Insured, the Deductible shall be apportioned between the affected insured parties in proportion to the total amount of their admissible losses. WORDING (Amendments superseding and/or endorsing the above mentioned Base Wording follow below) (Any numeric section or para references below are made to the Base Wording) Law of the Policy and Jurisdiction It is understood and agreed by the Insured and the Insurers that any dispute between them concerning the construction, effect and interpretation of this insurance is to be subject to Danish Law (and irrespective of the location of the involved damage loss or incident). Section: Exclusions applicable to all sections (Any numeric references are made to the Base Wording) Para 1.6 Weapons Clarification: Para 1.6 in the Base Wording excludes coverage for any weapon of war employing atomic force or matter. For the avoidance of doubt, conventional munitions of war (e.g. remaining and Doc. 15/ /59
10 unexploded munitions from WW II) are specifically not excluded or by definition considered war risks in the context of the Policy. Base Wording Section: Conditions applicable to all sections clarifications Clarification: Para 9 Fraudulent Claims Para 11 Other Insurances Fraudulent claims originating from any Insured party will be void according to para 9. For the avoidance of doubt the Policy itself will never become void under this clause as a consequence of a fraudulent claim, unless such fraudulent claim originates fully or partly from the Principal Insured. This clause will be deleted and replaced by primary cover except for the Third Party Liability Cover to be taken out by the Contractor(s) Clarification: Para 12 Entire Agreement Irrespective of para 12 this Schedule is deemed part of the Policy of Insurance, and supersedes the policy where applicable. Other passages are specifically marked as Incremental. Refer to definition below. Doc. 15/ /59
11 Para 13 Dispute Resolution The term Incremental Language of Communication is English, and any dispute must be resolved in the greater Copenhagen area, Denmark. The use of the term Incremental in this Schedule constitutes an alteration effecting the Base Wording, whereas the original Base Wording stands, but is extended with the Incremental Clause. For the avoidance of doubt it should be noted that an Incremental Clause or Endorsement can only add to the coverage provided, and can never be deemed to reduce or limit the coverage granted by the relevant passages in the Base Wording. Section 1a Project Works Para 9.1 in replaced by LEG 3/96 which applies for the Period of Insurance specifically including the Defects Liability Period. Para 9 Exclusions The Insurer(s) shall not be liable for All costs rendered necessary by defect of material workmanship design plan specification and should damage occur to any portion of the Insured Property containing any of the said defects the cost of replacement or Doc. 15/ /59
12 rectification which is hereby excluded is that cost incurred to improve the original material workmanship design plan or specification For the purpose of this policy and not merely this exclusion it is understood and agreed that any portion of the Insured Property shall not be regarded as damaged solely by virtue of the existence of any defect of material workmanship design plan or specification. Limit EUR 300,000,000 EEO Endorsements to the Base Wording (Section 1a) Endorsement 1202 Special Insurance Cover: property insured taken into use or operation Comprising all insured Property and within the Period of Insurance. Endorsement 1203 Special Insurance Cover: liability consequent upon vibration, removal or weakening of support Endorsement 1204 Special Insurance Cover: guarantee maintenance cover during defects liability period (60 months) Doc. 15/ /59
13 Endorsement 1208 Special Insurance Cover: costs for leak search Endorsement 1260: Special Conditions: contract time schedule Endorsement 1264: Special Conditions: open trenches, pipes, cables and ducts Aggregate Limit of indemnity: EUR 10,000,000 Limit of indemnity per section being tested: The Aggregate Limit applies Percentage of X-rayed welding seams: no data Time Schedule Deviation Period: 9 months (=270 days) Open trench length: m. the trench is open for a duration of approx. 72 hours. Endorsement 1266: Special conditions: directional drilling Endorsement 1267: Special conditions: serial losses Endorsement 1269: Special conditions: marine 50/50 loss sharing Endorsement: Authority Intervention Clause Limit of indemnity: EUR 100,000,000 Deductible: as for Section 1a generally Endorsement forms part of section 1a 100% of the first 2 loss amounts 75% of the 3 rd and 4 th loss amounts 50% of the 5 th loss amount and any subsequent losses Endorsement forms part of section 1a Subject to the terms and conditions of the Policy, this insurance covers physical loss of or physical damage to the Doc. 15/ /59
14 property insured hereunder directly caused by any governmental authority acting under the powers vested in them to prevent or mitigate a pollution hazard, or threat thereof, provided such act of governmental authority has not resulted from want of due diligence by the operator for the Principal Assureds to prevent or mitigate such hazard or threat. Coverage provided by the above paragraph shall also extend to cover any other physical loss or physical damage caused or inflicted by order of any governmental body or agency after consultation with officials and engineers of the Assured relating to the insured project but only in respect of interests covered by Section I, and always subsequent to physical loss and physical damage resulting from a peril insured against. Limit of indemnity: EUR 25,000,000 SPECIAL OFFSHORE CLAUSES ( SOC ) WITH A SHARED OVERALL AGGREGATE An aggregate of EUR 25,000,000 for the full Period of Insurance will apply to the collective portfolio of the below SOC clauses. Doc. 15/ /59
15 (If applicable a sub limit below define an individual maximum indemnification from such clause EEO) SOC MARINE WARRANTY SURVEY Marine Warranty Survey (MWS) work: The costs of the MWS work required by the insurers of the physical damage element of the offshore construction is refundable with no limits by Insurers assuming no undue prototypical specifications or changes of the vessel contracting mid-term. SOC PRE MATURE HANDING OVER Contract works and/or supplies handed over to the Employer prior to commencement of commercial operation are included in the Insurance until such commencement and also in the following extended maintenance period (defect liability period). SOC GENERAL AVERAGE AND SALVAGE CHARGES General Average and Salvage charges are payable as provided in the contract of affreightment, or if there be no contract of affreightment according to York/Antwerp Rules 1990 amended. In the event the contributory value for the purpose of contribution to General Average or Salvage charges exceed the insured value, it is agreed that such General Average or Salvage charges shall nevertheless be paid Doc. 15/ /59
16 in full by Underwriters hereon, provided always that the amount recoverable under Section I in respect of partial loss arising from any one casualty shall not exceed the value applicable to the item. General Average deposits are payable on production of General Average Deposit receipts. Underwriters agree, if required, to provide General Average guarantees or Salvage security in respect of property insured by the Policy. SOC FORWARDING CHARGES CLAUSE In respect of transit(s) insured hereunder, if as a result of an Occurrence covered by the terms of Section I, the insured transit is terminated at a port or place other than that to which the property insured is covered under this insurance, Underwriters will reimburse the Assured for any extra charges properly and reasonably incurred in unloading, storing and forwarding the property insured to the destination to which it is insured hereunder. Sub limit of EUR 10,000,000 EEO. Doc. 15/ /59
17 SOC STAND-BY CHARGES Underwriters shall indemnify the Assureds for the cost of stand-by time on vessels and/or craft and/or equipment actively engaged in the course of repair following an Occurrence covered under Section I, where the Assureds are prevented from working in, around or about the damaged property by adverse weather, including named hurricanes. Sub limit of EUR 10,000,000 EEO in excess of 72 hours of self retention. SOC ADDITIONAL WORK In the event that the structure or insured property is set down or wrongly positioned, which is the direct result of a peril insured against, Underwriters shall indemnify the Assureds for the cost of additional work that is required in respect of positioning or repositioning, sinking, submerging and stabilising the property insured herein insofar as such cost does not fall within the cover afforded by the sue and labour clause. However Underwriters liability under this clause shall not exceed the percentage amount that would be recoverable under the sue and labour clause and then only to the Doc. 15/ /59
18 extent that the Policy Limit is not exhausted by a claim under the sue and labour clause. Sub limit of EUR 10,000,000 EEO. SOC SUE AND LABOUR CLAUSE It is further agreed that in the case of any imminent physical loss or physical damage to the property insured hereunder, which is the direct result of a peril insured against, the Assureds, their servants and their agents may sue, labour and travel for, in and about the defence, safeguard and recovery of the subject matters insured without prejudice to this insurance and may incur reasonable expenses in efforts to avert or minimise a loss which may fall under Section I. The expense so incurred shall be borne by the Assureds and Underwriters proportionately to the extent of their respective interests. No acts of Underwriters or the Assureds in recovering, saving or preserving the property insured shall be considered as a waiver or acceptance of abandonment. Sub limit EUR 10,000,000 EEO. SOC POLLUTION HAZARD Subject to the terms and Doc. 15/ /59
19 CLAUSE conditions of the Policy, this insurance covers physical loss of or physical damage to the property insured hereunder directly caused by any governmental authority acting under the powers vested in them to prevent or mitigate a pollution hazard, or threat thereof, provided such act of governmental authority has not resulted from want of due diligence by the operator for the Principal Assureds to prevent or mitigate such hazard or threat. Coverage provided by the above paragraph shall also extend to cover any other physical loss or physical damage caused or inflicted by order of any governmental body or agency after consultation with officials and engineers of the Assured relating to the insured project but only in respect of interests covered by Section I, and always subsequent to physical loss and physical damage resulting from a peril insured against. SOC TESTING/RETESTING If it becomes necessary to repeat any test(s) and/or trial(s) or to carry out subsequent test(s) and/or trial(s) as a result of a physical loss or physical damage Doc. 15/ /59
20 to the insured property arising from an Occurrence covered under Section I, Underwriters will bear the cost of any such repeated and/or subsequent test(s) and/or trial(s) subject to a sub-limit of EUR 10,000,000 EEO. SOC OFFSHORE CANCELLATION COSTS Underwriters shall indemnify the Principal Assured(s) in respect of cancellation costs on offshore vessels and construction equipment under contract in relation to the project (including but not limited to, heavy lift vessels, derrick barges, tugs, barges and supply vessels) and/or extra expenses to hire offshore vessels and construction equipment to complete the project and/or operations in respect of which such costs are incurred arising directly from a peril insured against giving rise to a claim under this Policy, deductible application notwithstanding. Notwithstanding the foregoing, it is understood and agreed that Underwriters shall not be liable for costs and/or expenses of alterations in procedures which may be employed following such loss or damage. The amount recoverable under Doc. 15/ /59
21 this clause, in respect of any one Occurrence and in the aggregate over the Policy Period shall not exceed a sub-limit of EUR 10,000,000 EEO. SOC OPERATIONAL TESTING The Insurance is extended to cover loss or damage attributable to hot testing or operational testing for a maximum of 30 days (720 hours). SOC REMOVAL OF WRECK, WRECKAGE AND/OR DEBRIS Following an Occurrence covered by Section I, Underwriters shall indemnify the Assureds for all costs of or incidental to the actual or attempted raising, removal or destruction of the wreckage and/or debris of the insured property, or the provision and maintenance of lights, markings, audible warnings for such wreckage and/or debris when the incurring of such costs is compulsory by any law, ordinance or regulation or when the Assured hereunder is liable for such costs under written contract or when such wreckage and/or debris interferes with the Assured's normal operations. Underwriters' limit of liability under this clause shall be 25% of the scheduled value at time of loss of the item or items which are Doc. 15/ /59
22 the subject of such removal of wreckage and/or debris. SOC EXTRA CHARGES Within the sum insured the insurance covers extra charges incurred following a recoverable loss for the purpose of; speeding up delivery of materials, equipment etc. alleviating the consequences of such loss Extra charges include air freight, travelling expenses, overtime (night, weekend, etc.), hiring material and equipment/labour/services, and associated administrative costs. Sub limit of EUR 10,000,000 EEO SOC CLAIMS PREPARATION EXPENSES Sub limit EUR 1,000,000 EEO SOC CUTTING CLAUSE This Policy shall cover: a) the cost incurred if the cable has to be cut by reason of an imminent threat to the safety of persons engaged on the cable laying vessel and/or the cable as determined by the Master of the vessel and/or the Cable Master engaged in that cable laying operation-as the case may be; b) the cost incurred to reinstate the cable laying operation to Doc. 15/ /59
23 the same position that had existed prior to the event. c) Repair and all necessary costs incurred if damage to the cable occurs which is repairable from the suppliers point of view, warranted that spare cable is delivered with the initial cable supply. Provided that the Master and/or officers and/or Cable Master shall monitor and take account of file weather and sea conditions forecast around the erection site of the Project commencing at least seven days prior to the planned start of the particular operation until the completion and obtain regular forecasts on board the cable laying vessel and take note of the trend of any storm and shall interrupt the Work or take such precautions as may be necessary to minimise loss to same and to the cable. As in the case of the whole of the present contract of insurance, it is however made clear that material damage to the said vessel is excluded from any indemnity by the Insurer. Section 2 Third Party Liability Para 1 Para 1 is replaced by: Doc. 15/ /59
24 Indemnification Insurers hereon agree that if the Insured become legally liable to pay any sum or sums in respect of any responsibility, claim, demand and/or expenses, arising from or occasioned either directly or indirectly by the Insured s operations in connection with the Project, in respect of: a) accidental loss of life, personal injury (including illness, shock, mental anguish, mental injury or disease) to be contracted by any person, including care and loss of service resulting there from; b) accidental loss of or damage to or loss of use of property or any kind or description (including obstruction, loss of amenity or use of any land, building, property or right og way, trespass, nuisance or any like cause than that which is the unavoidable result of executing the insured contracts in accordance with the plans and specifications), including all other direct or indirect or consequential loss resulting from loss of or damage to the property when such liability happens within the Territorial Limits during the Period of Insurance. Doc. 15/ /59
25 At the request of the Principal Insured the Insures will extend the indemnity granted by this Section 2 to Incremental Endorsement: Additional Indemnities (a) any of the Insured s directors, partners, officers or employees in their personal capacity in circumstances which could constitute the basis of a claim upon any of the Insured within the terms of this Section (b) any employee of the Insured or any other person hired or borrowed by the Insured for the purposes of the Project (c)any officer or member of any canteen, social, sports, welfare, fire, first aid or ambulance services and any other services or associations specifically formed for the Project (d) any director or employee of the Insured or any person accompanying such director or employee whilst travelling in connection with the Project and any personal liability of such persons insofar as such liability is not covered by any other policy (e) any guest at any function or occasion to which such guest has been invited by the Insured Provided that nothing in the above Doc. 15/ /59
26 shall be deemed to increase the Limit of Indemnity in respect of any one occurrence as stated in the Schedule. Doc. 15/ /59
27 Endorsements to the Base Wording (Section 2) Endorsement 1203 Special Insurance Cover: liability consequent upon vibration, removal or weakening of support Endorsement 1262: Special Conditions: underground services Endorsement: Public Relations and Opening Ceremonies Endorsement carries the general Limit and Deductibles as applying to Section 2 Endorsement carries the general Limit and Deductibles as applying to Section 2 It is noted and agreed that in the course of the Project the Insured may have Exhibition Centre(s) and Publicity Events and Site visits and demonstrations and Opening Ceremonies before the commercial operation of the Project and all of these activities shall be regarded as activities in the performance of the Project. General Memoranda Incremental Endorsement: Preventive Measures This Policy extends to include the Insured s liability for costs necessarily and reasonably incurred as a result of emergency action taken where loss or damage or death or bodily injury is imminent or following loss or damage or death or bodily injury in order to prevent or minimise further loss or damage or death or bodily injury to the interest insured. The sub limit under this Doc. 15/ /59
28 endorsement shall not exceed EUR 10,000,000 each and every occurrence. Incremental Endorsement: Temporary Repairs This Policy extends to include indemnity in respect of the cost of effecting temporary repairs following loss or damage or in order that work on the Project may continue provides that such temporary repairs do not increase the overall cost of repairs. The sub limit under this endorsement shall not exceed EUR 20,000,000 each and every occurrence. Onshore: Onshore shall mean all locations at or inland from the first main connection joint after landfall of the sub-sea cable. Definitions: Civil Works: Discipline that deals with the design, construction, and maintenance of the physical and naturally built environment, including works like roads, bridges, canals, dams, and buildings. Off shore: All locations below the low-water mark at mean low tide along that portion of the coast of the land within the territorial limits contained herein that is in direct contact with the open seas and below the line marking the seaward limit of inland waters Doc. 15/ /59
29 Schedule ends Doc. 15/ /59
Public and Product Liability - General
Section 3E Public and Product Liability - General Definitions Business The business stated in the specification to this section and includes: a) the provision and management of canteen, sports, social,
How To Insure A Project In The Uk
Schedule 15A: Insurance Part 1 Required Insurances Sub-part 1 Design and Construction Phase The policies to be taken out by the Contractor, or caused to be taken out by the Major Sub-contractor, and maintained
Policy Schedule. Construction/Erection All Risks and Third Party Liability insurance
Policy Schedule TYPE: Construction/Erection All Risks and Third Party Liability insurance PRINCIPAL INSURED: [Eni Iraq BV] and all subsidiary (including subsidiaries thereof), affiliated, associated and
Schedule 12 - Insurances
RFP Version There are two parts to this Schedule 12: Part A Insurances applicable to the D&C Phase; and Part B Insurances during the O&M Phase. [State Note: The State in its discretion may procure any
ARIEL AIRPORT OWNERS AND OPERATORS LIABILITY INSURANCE
ARIEL AIRPORT OWNERS AND OPERATORS LIABILITY INSURANCE The Insurers hereby agree to the extent and in the manner hereinafter provided, to pay on behalf of the Insured all sums which the Insured shall become
Insurance of Mobile Offshore Units Construction All Risk insurance (MOU/CAR)
The Nordic Association of Marine Insurers (Cefor) Insurance of Mobile Offshore Units Construction All Risk insurance (MOU/CAR) Introduction Application of the Nordic Marine Insurance Plan of 2013 The rules
MARINE INSURANCE CONDITIONS COVERING LOSS OF INCOME OF SEA-GOING VESSELS
These clauses are for illustrative purposes only and different terms and conditions may be agreed in particular where any clause excludes losses or makes cover subject to certain conditions. MARINE INSURANCE
PUBLIC & PRODUCTS LIABILITY INSURANCE
PUBLIC & PRODUCTS LIABILITY INSURANCE ASSURED: SCHEDULE TO THE POLICY POLICY NUMBER: BUSINESS: PERIOD OF INSURANCE: From: To: (both dates inclusive) INDEMNITY LIMITS: Section: A: Section B: Section C:
SPECIMEN COPY OF KEY CLAUSES/CONDITIONS OF PUBLIC LIABILITY POLICY
SPECIMEN COPY OF KEY CLAUSES/CONDITIONS OF PUBLIC LIABILITY POLICY WHEREAS the Insured by a proposal which shall be the basis of this insurance policy and be held as incorporated herein, has applied to
EXHIBIT 17 INSURANCE COVERAGE REQUIREMENTS
EXHIBIT 17 INSURANCE COVERAGE REQUIREMENTS 1. Builder s Risk Insurance During Construction At all times during the period from the Operating Commencement Date until the last Service Commencement Date and
SPECIMEN COPY OF KEY CLAUSES/CONDITIONS OF PUBLIC LIABILITY POLICY
SPECIMEN COPY OF KEY CLAUSES/CONDITIONS OF PUBLIC LIABILITY POLICY Appendix 7b 1 WHEREAS the Insured by a proposal which shall be the basis of this Contract and be held as incorporated herein has applied
PUBLIC AND PRODUCTS LIABILITY INSURANCE SCHEDULE TO THE POLICY
PUBLIC AND PRODUCTS LIABILITY INSURANCE SCHEDULE TO THE POLICY INSURED: POLICY NO: BUSINESS: PERIOD OF INSURANCE: From: To: (both dates inclusive) INDEMNITY LIMITS: Section A: Section B: Section C: EXCESS:
Contractors All Risks Policy
Contractors All Risks Policy Whereas the Insured named in the Schedule hereto has made to the Etiqa Insurance Pte. Ltd. (hereinafter called the Company ) a written proposal by completing a Questionnaire
SCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INSURANCE REQUIREMENTS... 1
SCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INSURANCE REQUIREMENTS... 1 1.1 Project Specific Construction Period Insurance... 1 1.2 Additional Construction Period Insurance... 1 1.3 Operating Period Insurance
AUSTRALIAN INSURANCE SOLUTIONS PTY LTD
AUSTRALIAN INSURANCE SOLUTIONS PTY LTD ABN 64 088 550 074 ACN: 088 550 074 AFS Licence # 246939 1st Floor PO Box 2812 Tel: 07 55935522 24 Junction Road BURLEIGH DC QLD 4220 Fax: 07 55935533 BURLEIGH QLD
PUBLIC LIABILITY INSURANCE POLICY
PUBLIC LIABILITY INSURANCE POLICY IT IS AGREED THAT subject to the Terms Exceptions and Conditions contained herein or endorsed hereon the Company will during the Period of Insurance stated in the said
INDIA MOTOR TARIFF w.e.f 01.07.2002 - Policy wording STANDARD POLICY FORM FOR MOTOR TRADE INTERNAL RISKS
INDIA MOTOR TARIFF w.e.f 01.07.2002 - Policy wording STANDARD POLICY FORM FOR MOTOR TRADE INTERNAL RISKS Whereas the insured by a proposal and declaration dated as stated in the Schedule which shall be
Employers Liability Policy of Insurance
Employers Liability Policy of Insurance EMPLOYERS' LIABILITY POLICY OF INSURANCE MSI Corporate Capital Limited as the Underwriting Member of MIT Syndicate 3210 at Lloyd s hereinafter referred to as the
CONTRACTORS ALL RISKS POLICY
Insurance CONTRACTORS ALL RISKS POLICY Whereas the Insured named in the Schedule hereto has made to the ETIQA INSURANCE BERHAD (hereinafter called the Company ) a written proposal by completing a Questionnaire
PRODUCT LIABILITY INSURANCE (Richard Oliver Version)
(Richard Oliver Version) OPERATIVE CLAUSE The Underwriters will indemnify the Assured against their legal liability, whether by way of claims made against them or by way of loss or expense incurred by
Contractors Plant and Equipment Insurance Policy
Contractors Plant and Equipment Insurance Policy Please read this Policy carefully to ensure that it meets your requirements This policy the Schedule (including any Schedule issued in substitution) and
Contract Works and What you need to Know
ACN 002 566 743 Brookvale Insurance Brokers Pty Ltd Contract Works and What you need to Know 1. The Need for Contract Works Insurance The growth of large-scale construction projects has been accompanied
WAR RISKS P&I EXCESS COVER DIRECTORS RESOLUTION OF 26TH JANUARY 2015
JANUARY 2015 WAR RISKS P&I EXCESS COVER SPECIAL COVER UNDER PROVISO TO RULE 5E DIRECTORS RESOLUTION OF 26TH JANUARY 2015 WHEREAS, in accordance with Rule 5E of the Association s Rules coverage for certain
Protection & Indemnity Insurance 2016/2017 Part 2 final
P&I 2608/2016 15 January 2016 Protection & Indemnity Insurance 2016/2017 Part 2 final This is the second circular letter in respect of 2016/2017 policy year including updated information. The information
WELCAR 2001 OFFSHORE CONSTRUCTION PROJECT POLICY INDEX
WELCAR 2001 OFFSHORE CONSTRUCTION PROJECT POLICY INDEX PAGE NO. INDEX 1-3 SCOPE OF INSURANCE 4 1. ASSUREDS 4 2. SPECIAL CONDITIONS FOR OTHER ASSUREDS 5 3. LOSS PAYEE 5 4. POLICY PERIOD 5 GENERAL TERMS
INSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS ABOVE $25,000
Page 1 of 9 DOCUMENT 00850 INDEMNIFICATION AND INSURANCE REQUIREMENTS EXHIBIT B-1 INSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS ABOVE $25,000 Indemnity The Contractor shall indemnify, defend, and hold
MOTOR TRADE INSURANCE POLICY
MOTOR TRADE INSURANCE POLICY WHEREAS the Insured by a proposal and declaration which shall be the basis of this contract and is deemed to be incorporated herein has applied to the Company for the insurance
Insurer Thistle Underwriting acting in an underwriting capacity on behalf of those Lloyd s Underwriters subscribing to the above policy.
CONTRACTORS & ENGINEERS POLICY Please read this document carefully This is a summary of the cover provided by your Policy. It contains references to the key features and benefits of the Policy as well
Period of Cover. General Conditions
South China Insurance Contractors' All Risks Policy (B) 100.10.31 (100) 華 產 企 字 第 821 號 函 備 查 Contractors All Risks Policy - No. Whereas the Insured named in the Schedule hereto has made to the South China
ACTIVITIES INDUSTRY MUTUAL LIMITED EMPLOYERS LIABILITY COVER WORDING
ACTIVITIES INDUSTRY MUTUAL LIMITED EMPLOYERS LIABILITY COVER WORDING Activities Industry Mutual Limited Registered in England No. 05372198. Registered Office: 7 Maltings Place, 169 Tower Bridge Road, London
CONTRACTORS ALL RISKS INSURANCE POLICY
CONTRACTORS ALL RISKS INSURANCE POLICY WHEREAS THE INSURED named in the Schedule hereto has made to Cumberland Insurance & Reinsurance Company Limited (hereinafter called "the Insurers") a written proposal
SYNDICATE 340 HULL DEDUCTIBLE WORDING
SYNDICATE 340 HULL DEDUCTIBLE WORDING WHEREAS: there is in force, for the benefit of the Insured, a Policy of hull all risks insurance (referred to below as the "Hull Policy") and in accordance with the
EXHIBIT Y INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR
EXHIBIT Y INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Required Prior to Final Completion of the Project Assets Except as set forth below,
At minimum, Project Co will be required to ensure the following insurance coverage in relation to the D&C Phase:
Schedule 9 - Insurance Part A - D&C Phase insurance requirements Project Co will be required to effect or cause to be effected such appropriate insurances during the D&C Phase in accordance with Clause
APPENDIX 8 INSURANCE REQUIREMENTS
APPENDIX 8 INSURANCE REQUIREMENTS Policy Term: Policy Limit: Sub Limits: Coverage Extensions / Conditions: Insured Perils: FDOT Self Insurance BUILDERS RISK Required when performing Construction Work Builders
CONTRACTORS ALL RISKS INSURANCE POLICY
CONTRACTORS ALL RISKS INSURANCE POLICY WHEREAS the Insured named in the Schedule by a proposal and declaration which shall be the basis of this contract and is deemed to be incorporated herein has applied
MARINE HULL INSURANCE CONDITIONS COVERING WAR, PIRACY, TERRORISM AND SIMILAR RISKS
These clauses are for illustrative purposes only and different terms and conditions may be agreed in particular where any clause excludes losses or makes cover subject to certain conditions. MARINE HULL
Comprehensive project (CP) insurance Policy No.
Comprehensive project (CP) insurance Policy No. This policy of insurance is made between 1. the insuring party and 2. the insurer The insuring party has submitted to the insurer a proposal requesting insurance
MINNESOTA STATE COLLEGES AND UNIVERSITIES General Insurance Requirements for Contractors & Vendors
Certificate of Liability Insurance, Form ACORD25: Following are the insurance requirements of the State of Minnesota acting through its Board of Trustees of the Minnesota State Colleges and Universities,
UAS Liability Insurance Policy Wording
UAS Liability Insurance Policy Wording Headings and marginal captions are inserted for the purpose of convenient reference only and are not to be deemed part of this Policy. Certain words and phrases used
K YROUS R EALTY G ROUP, I NC.
K YROUS R EALTY G ROUP, I NC. 263 West 38 th Street Suite 15E New York, NY 10018 Phone: 212.302.1500 Fax: 212.302.3855 500 Greenwich Street Condominium-Alteration Policy The following documents must be
HEALTH OWNER INSURED CONSTRUCTION PROJECTS
HEALTH OWNER INSURED CONSTRUCTION PROJECTS Insurance and Indemnification Clauses (to be included in Supplementary Conditions to the Design - Build Stipulated Price Contract 14-2000 for Health projects
Memorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information
Memorandum Important information related to requirements of state or local laws to include additional provisions in residential construction contracts Potentially Affected AIA Contract Documents AIA Document
The Cover. Additional Increase in Cost of Working. BIGRNP(SI)_7 Ace Package Policy 2013 ix.12
Section 2 - Business Interruption Fire and Specified Perils If any building or other property used by the Insured at the Premises for the purpose of the Business is lost, destroyed or damaged by any Specified
EMPLOYERS LIABILITY INSURANCE POLICY
EMPLOYERS LIABILITY INSURANCE POLICY GENERAL PROVISIONS This Policy is evidence of the contract between the Insured and the Insurers. The Insured by a Proposal and Declaration which shall be the basis
SCHEDULE 9: INSURANCE REQUIREMENTS
SCHEDULE 9: INSURANCE REQUIREMENTS Part 1: General Requirements 1 Public Liability and Products Liability 1.1 Cover Legal liability of the Insured Party (being the parties listed in paragraph 1.2 of this
Work Injury Compensation Insurance (Contract)
Work Injury Compensation Insurance (Contract) Policy Wordings Please read this insurance Policy carefully to ensure that you understand the terms and conditions and that this Policy meets your requirements.
Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer
Conditions of Offer A1 The offer documents comprise the offer form, letter of invitation to offer (if any), these Conditions of Offer and Conditions of Contract (Works & Services), the Working with Queensland
Contractors All Risks Policy
Policy Whereas the Insured named in the Schedule hereto has made to the (hereinafter called the Insurers ) a written proposal by completing a questionnaire which together with any other statements made
SELLING TERMS AND CONDITIONS
SELLING TERMS AND CONDITIONS 1. The Agreement. All sales by Sterling Machinery, Inc., an Arkansas corporation (the Seller ) to the purchaser of Seller s Goods (the Buyer ) shall be governed by the following
INSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS
INSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS 1. GENERAL PROVISIONS A. Indemnification. The Contractor shall indemnify and save harmless the City of Lincoln, Nebraska from and against all losses, claims,
Employers Liability Section
Employers Liability Section Definitions 1 lnjury Bodily injury, death, disease, illness, mental injury, mental anguish or nervous shock 2 Employee A B Any person under a contract of service or apprenticeship
Headings and marginal captions are inserted for the purpose of convenient reference only and are not to be deemed part of this Policy.
UNMANNED AIRCRAFT SYSTEM LIABILITY INSURANCE Headings and marginal captions are inserted for the purpose of convenient reference only and are not to be deemed part of this Policy. Certain words and phrases
AIG Taiwan Insurance Hull Deductible Policy
查 詢 本 公 司 資 訊 公 開 說 明 文 件, 請 上 本 公 司 網 站, 網 址 :www.aig.com.tw, 或 至 本 公 司 索 取 免 費 申 訴 電 話 :0800-866588 AIG Taiwan Insurance Hull Deductible Policy 96.06.29(96) 邦 保 商 企 字 第 020 號 函 備 查 96.08.31 依 行 政 院 金
INSTITUTE CARGO CLAUSES (A)
Bajaj Allianz General Insurance Company Limited Issuing Office MARINE INSURANCE POLICY INSTITUTE CARGO CLAUSES (A) RISKS COVERED 1. Risks Clause This insurance covers all risks of loss of or damage to
SCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INTERPRETATION... 1. 1.1 Definitions... 1 2. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS...
SCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INTERPRETATION... 1 1.1 Definitions... 1 2. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS... 1 2.1 Wrap-Up Liability Insurance... 1 2.2 Course of Construction Coverage...
CONSEQUENTIAL LOSS (FIRE) INSURANCE POLICY CONDITIONS
CONSEQUENTIAL LOSS (FIRE) INSURANCE POLICY In consideration of the Insured named in the Schedule hereto having paid to the LIBERTY VIDEOCON GENERAL INSURANCE COMPANY LIMITED (hereinafter called the Company),
the predecessors in business of the said firm in respect of whom insurance coverage is expressly provided in the Schedule
PROFESSIONAL INDEMNITY ERRORS & OMISSIONS INSURANCE FOR CHARTERED ACCOUNTANTS/ FINANCIAL ACCOUNTANTS/MANAGEMENT CONSULTANTS/LAWYERS/ ADVOCATES/ SOLICITORS/ COUNSELS 1. OPERATIVE CLAUSE: WHEREAS the insured
CONTRACTOR'S ALL RISKS INSURANCE POLICY
CONTRACTOR'S ALL RISKS INSURANCE POLICY WHEREAS the insured named in the schedule hereto had made to Liberty Videocon General Insurance Co Ltd. (hereinafter called "the Company") a written proposal by
INSTITUTE TIME CLAUSES - HULLS DISBURSEMENTS AND INCREASED VALUE (Total Loss only, including Excess Liabilities)
INSTITUTE TIME CLAUSES - HULLS DISBURSEMENTS AND INCREASED VALUE (Total Loss only, including Excess Liabilities) This insurance is subject to English law and practice 1. NAVIGATION 1.1 The subject-matter
EDUCATION (K-12) OWNER INSURED CONSTRUCTION PROJECTS
EDUCATION (K-12) OWNER INSURED CONSTRUCTION PROJECTS Insurance and Indemnification Clauses (to be included in Supplementary Conditions to the CCDC 2 2008 Contracts for Education (K-12) projects insured
Contractors. Policy Summary
Contractors Policy Summary 2 Contractors Policy Summary Contractors Policy Summary Your Tower Insurance Contractors Policy is an annual contract underwritten by Tower Insurance Company Limited which may
Medical Liability Insurance Related Problems and Damages in Medical Malpractice Lawsuits Stephen Ballantine
Medical Liability Insurance Related Problems and Damages in Medical Malpractice Lawsuits Stephen Ballantine 3 rd Arab Conference on Medical Liability Workshop 12 November 2014 1 INTRODUCTION 1. Objectives
Description Contract or Yard No. Provisionally valued at To be built at / by
1/6/88 INSTITUTE CLAUSES FOR BUILDERS RISKS (This insurance is subject to English law and practice) VESSEL.........Contract or Yard No....... BUILDERS.................. BUILDERS YARDS.................
Real Estate Errors & Omissions Indemnity Plan
B R I T I S H C O L U M B I A Real Estate Errors & Omissions Indemnity Plan No. RE0398 Issued by Real Estate Errors and Omissions Insurance Corporation (Herein called the Corporation ) Pursuant to the
Infineon Technologies North America Corp. Terms and Conditions of Sale
Infineon Technologies North America Corp. Terms and Conditions of Sale 1. GENERAL 1.1 Contract Terms. These Terms and Conditions of Sale (the Agreement ) shall apply to any offer made by Infineon Technologies
EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR
EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Prior to Project Completion Except as set forth below, the Developer will obtain and
MAIN CIVIL WORKS CONTRACT SCHEDULE 13 INSURANCE TABLE OF CONTENTS
MAIN CIVIL WORKS CONTRACT SCHEDULE 13 INSURANCE TABLE OF CONTENTS 1 INTERPRETATION... 1 1.1 Definitions... 1 2 CONTRACTOR PROVIDED INSURANCE COVERAGE... 1 3 BC HYDRO PROVIDED INSURANCE COVERAGE... 2 4
IMPORTANT! - Please use the attached Application for Payment. All payment requests must be submitted on our form. Thank you!
` SUBCONTRACTOR: PHONE PROJECT: LOCATION: Page 1 of 6 SUBCONTRACT (SHORT FORM) JOB NO.: COST CODE: PRICE: This agreement is made and effective, by and between SUN CONSTRUCTION & FACILITY SERVICES, INC.
Work Injury Compensation Insurance (Annual)
Work Injury Compensation Insurance (Annual) Policy Wordings Please read this insurance Policy carefully to ensure that you understand the terms and conditions and that this Policy meets your requirements.
EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR
EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Prior to Project Completion Except as set forth below, the Developer will obtain and
QUEST - QBE COMPREHENSIVE MOTOR INSURANCE MASTER POLICY
QUEST - QBE COMPREHENSIVE MOTOR INSURANCE MASTER POLICY CONTENTS PAGE SECTION 1: LOSS OR DAMAGE TO VEHICLE 1 INSURING CLAUSE 1 AUTOMATIC EXTENSION 1 LIMIT OF INDEMNITY 1 EXCLUSIONS 1 EXCESS FOR SECTION
Excess Lawyers Professional Liability Policy DECLARATIONS. Attaching to and forming part of
Excess Lawyers Professional Liability Policy DECLARATIONS Attaching to and forming part of THIS IS A CLAIMS MADE EXCESS PROFESSIONAL LIABILITY INSURANCE - PLEASE READ CAREFULLY AND DISCUSS WITH YOUR INSURANCE
ATTACHMENT A.6 INSURANCE REQUIREMENTS ROUTINE CONSTRUCTION, MAINTENANCE AND REPAIR PROJECTS
ATTACHMENT A.6 INSURANCE REQUIREMENTS ROUTINE CONSTRUCTION, MAINTENANCE AND REPAIR PROJECTS Contractor shall obtain insurance of the types and in the amounts listed below. A. COMMERCIAL GENERAL AND UMBRELLA
CONTRACTOR'S ALL RISKS INSURANCE POLICY WORDING
CONTRACTOR'S ALL RISKS INSURANCE POLICY WORDING 1 CONTRACTOR'S ALL RISKS INSURANCE POLICY WHEREAS the insured named in the schedule hereto had made to Magma HDI General Insurance Co. Ltd. (here in after
How To Work For A City Of Germany Project
CONSULTING SERVICES AGREEMENT This Consulting Services Agreement ( Agreement ) is made and entered into this day of, 2013, by and between the City of Clovis, a Municipal Corporation, hereinafter called
SANTAM UMBRELLA LIABILITY
SANTAM UMBRELLA LIABILITY DEFINED EVENTS 1. Damages, costs, fees and expenses which the insured shall become legally liable to pay consequent upon Injury, Damage, Malice or Negligent Advice which occur
SAMPLE SERVICES CONTRACT
SAMPLE SERVICES CONTRACT The parties to this contract are the SAN DIEGO COUNTY WATER AUTHORITY, a county water authority, (the Water Authority) and, [a / an], having its principal place of business at
SUE AND LABOUR. 24 February 2010 4242608.1 LILLEHAMMER 2010 GRAEME BAIRD CLYDE & CO LLP
SUE AND LABOUR LILLEHAMMER 2010 GRAEME BAIRD CLYDE & CO LLP 24 February 2010 Legal concepts associated with the shipping industry General Average Hague Visby Rules Clause Paramount Maritime Liens Tonnage
Terms and Conditions of Sale
Broadberry Data Systems Limited ("The Company") Terms and Conditions of Sale 1. General a) Unless otherwise expressly agreed in writing by a Director (or authorised executive) of the Company all goods
Printed by The BIMCO Charter Party Editor
1. Date and Place of Agreement INTERNATIONAL WRECK REMOVAL AND MARINE SERVICES AGREEMENT (DAILY HIRE) CODE NAME: "WRECKHIRE 99" 2. Contractor/Place of Business 3. Company/Place of Business PART I 4. Vessel
AGREEMENT FOR FINANCIAL AND ACCOUNTING CONSULTATION SERVICES
AGREEMENT FOR FINANCIAL AND ACCOUNTING CONSULTATION SERVICES THIS AGREEMENT is made as of December 1, 2003, by and between the San Francisquito Creek Joint Powers Authority, a body corporate and politic
MEDICAL ESTABLISHMENT - PROFESSIONAL NEGLIGENCE ERRORS & OMISSIONS INSURANCE POLICY 1. OPERATIVE CLAUSE:
MEDICAL ESTABLISHMENT - PROFESSIONAL NEGLIGENCE ERRORS & OMISSIONS INSURANCE POLICY 1. OPERATIVE CLAUSE: WHEREAS the insured named in the Schedule hereto and carrying on the business/profession described
SECTION 3 AWARD AND EXECUTION OF CONTRACT
SECTION 3 AWARD AND EXECUTION OF CONTRACT 3.01 CONSIDERATION OF BIDS: After the Proposals are opened and read, the approximate estimated quantity of each item multiplied by the unit price bid for that
Professional Indemnity & Infidelity Insurance For Stock Brokers, Investment Consultants, Underwriters, Portfolio or Fund Managers
Professional Indemnity & Infidelity Insurance For Stock Brokers, Investment Consultants, Underwriters, Portfolio or Fund Managers Whereas the Insured as herein defined has submitted a written proposal,
THINKING RELOCATION? THINK INTERDEAN. Lump Sum Insurance Documentation. We make it easy.
THINKING RELOCATION? THINK INTERDEAN. Lump Sum Insurance Documentation We make it easy. INSURANCE GUIDANCE NOTES Here at Interdean, you can be assured that every care is taken by us to protect your goods
INDEPENDENT CONTRACTORS AGREEMENT
INDEPENDENT CONTRACTORS AGREEMENT THIS AGREEMENT entered into by and between (hereafter the Contractor ) and the Park District of Highland Park (hereafter Park District ). WHEREAS, Contractor will be performing
Exhibit D CRANE AUCTION INDEMNIFICATION AND INSURANCE REQUIREMENTS
Exhibit D CRANE AUCTION INDEMNIFICATION AND INSURANCE REQUIREMENTS The insurance requirements below are dependent on the actions to be taken by the successful vendor(s) following the Port of Los Angeles
Policy Wording. Professional Indemnity Insurance. Issued to Eligible Emergency Resource Providers by VMIA
Policy Wording Professional Indemnity Insurance Issued to Eligible Emergency Resource Providers by VMIA For the period date 30 June 2015 to 30 June 2016 Contents Professional Indemnity Policy... 3 Definitions...
PUBLIC LIABILITY INSURANCE POLICY
PUBLIC LIABILITY INSURANCE POLICY GENERAL PROVISIONS This Policy is evidence of the contract between the Insured and the Insurers. The Insured by a Proposal and Declaration which shall be the basis of
Standard conditions of purchase
Standard conditions of purchase 1 OFFER AND ACCEPTANCE 2 PROPERTY, RISK & DELIVERY 3 PRICES & RATES The Supplier shall provide all Goods and Services in accordance with the terms and conditions set out
HOME WARRANTY Insurance Policy [VICTORIA]
HOME WARRANTY Insurance Policy [VICTORIA] In consideration of the payment by the Builder of the premiums specified in the Schedule to this policy, the Insurer will provide insurance cover to the Building
Contractors All Risks