1 Page 1 of 15 Emergency Management Plan Section 1 Arrangements Revision 4 - March 2016

2 Page 2 of 15 Contents 1.0 ARRANGEMENTS 1.1 Introduction 1.2 Purpose & Scope 1.3 University Location & Population 1.4 Definitions of Levels of Emergency 1.5 Phases of Emergency Management Plan (EMP) 1.6 Emergency Management Emergency Incident Manager (EIM) Emergency Management Team (EMT) Availability and Call-Out Financial implications and authorisation for expenditure Emergency Control Centres (ECC) Incident Control Point (ICP) Media Handling 1.7 Emergency Contacts 1.8 Revision of Emergency Plan 1.9 Instructions for the use of this plan in the event of an emergency 1.10 Emergency Plan Implementation Flowchart 1.11 Document Control Procedure

3 Page 3 of Arrangements 1.1 Introduction Emergency planning ensures early recovery from an unforeseen incident that maximises safety, minimises problems and enables operations to continue should the need arise. This document will assist the University to manage such incidents rather than just merely respond to them. An incident may occur at any time of the day, night or weekend, with little or no warning. As it is not possible to predict the chain of events that may occur when an incident takes place, published emergency management plans can serve only as guidance and/or a checklist, requiring modification and adaptation whilst in operation to meet the requirements of individual situations. 1.2 Purpose & Scope Two distinct levels of incident fall within the scope of the University s Emergency Management Plan, details of which may be found in Section 1.4. The University s primary purpose when an emergency occurs is to ensure the safety and well-being of its staff/student community and to safeguard the environment. Thereafter, early recovery from an unforeseen incident will be the priority and will require the full co-operation of all people and organisations involved. This Emergency Management Plan covers those areas that are within the management remit of the University. In some instances, the incidents may occur away from the Preston Campus (e.g. fatality). It is not intended that this plan applies to partner colleges or off-site locations under the control of others, whether workplaces or private residences. 1.3 University Location & Population The University s main campus is situated primarily on either side of Fylde Road in the centre of Preston. The University s estate is both extensive and diverse and includes such facilities as Observatories at Moor Park and Alston Hall, and UCLan Sports Arena at Cottam. The University s accommodation includes teaching rooms, laboratories, workshops, offices, lecture theatres, student residences (including purpose built halls of residence), sports facilities, car parks, Library, Arts Centre and Students Union. Appendix 1 contains a campus map. 1.4 Definitions of Levels of Emergency Local Incidents Local incidents are non-emergencies causing no serious physical threat to people or property. They result in only a limited disruption of services, involve no legal ramifications and pose no threat to the reputation or status of the University. Local managers are responsible for assessing, dealing with, and recording such incidents. N.B. LOCAL INCIDENTS DO NOT FALL WITHIN THE REMIT OF THIS PLAN Minor Incidents Minor incidents are situations (actual or potential) that pose a threat to people or property. Whilst not seriously affecting the overall functional capacity of the

4 Page 4 of 15 University, they may threaten its reputation, status and/or have potential legal ramifications. Minor incidents may involve the isolation and/or evacuation of part of a building and require assistance from the external Emergency Services as well as the University s own support services. The University s Emergency Incident Manager (EIM) will manage the University s response to minor incidents, including contacting the external Emergency Services if necessary, and will keep records of their occurrence and management. Local managers are responsible for immediately reporting (via the most appropriate method) any occurrence of a minor incident to the Emergency Incident Manager. Major Incidents Major incidents are situations (actual or potential) that significantly affect the University. They may affect an entire building or buildings and may involve the isolation and/or evacuation of a whole building or group of buildings. Major incidents may disrupt or halt the overall operations of the University. Strategic efforts from the University s own support services as well as from external Emergency Services will be required. If an incident escalates to disaster level, the external emergency services will take overall control of the situation. Once the Emergency Services have been contacted (if applicable), the University s Emergency Management Team (EMT) will be assembled. The Emergency Management Team will manage the University s response to major incidents. Local managers are responsible for immediately reporting the occurrence of all incidents to the Emergency Incident Manager, who will keep a record of the occurrence and management of major incidents. The Emergency Incident Manager is responsible for determining the level of emergency.

5 Page 5 of Phases of Emergency Management Plan Early Warning Phase Steps taken when early warning of the potential occurrence of an incident is received Incident Occurs Trigger Phase The assessment, reporting and decision making required immediately upon discovery of an incident in order to minimise danger/risk and to maximise the effectiveness of the immediate response Control Phase Pre-determined steps designed to minimise danger/risk and to bring an incident under control Recovery Phase Reacting effectively after an incident has been brought under control, in order to return to full or partial operations at the earliest safe time Incident Over Review Phase Debriefing, analysis and review of operations that take place after an incident has occurred

6 Page 6 of Emergency Management Emergency Incident Manager (EIM) The EIM s are as follows: Table 1 Scenario Fatality (staff and visitor) Epidemics Meningitis EIM Director of HR or nominated deputy Director of FM or nominated deputy Director of LIS or nominated deputy (Minor and Major incidents) Psychological Incidents Fatality (student) Loss of Communications Computer Crime Loss of Records/Data Loss of Records/Data (appendix 1) NOTE: For incidents involving loss of personal data and a breach of Data Protection legislation: All other scenarios Director of LIS or nominated deputy (Minor and Major incidents) Director of LIS or nominated deputy (Minor and Major incidents) Information Governance Officer (IGO) Director of FM For Minor incidents the Emergency Incident Manager is: One of the On-Call FM Emergency Management Team. i.e. o Security Manager (escalate if appropriate); o Accommodation and Buildings Manager; o Development, Maintenance & Estates Manager; o FM Business Services Manager; o Safety, Health and Environment Manager. For Major incidents the Emergency Incident Manager is: Director of Facilities Management or the nominated Deputy.

7 Page 7 of 15 Purpose: The Emergency Incident Manager is responsible for managing the University s response to both minor and major incidents and co-ordinating the activities of all parties involved. The Emergency Incident Manager will be the ultimate decision maker for the University during minor incidents and co-ordinate the instructions of the Emergency Management Team for major incidents. The Emergency Incident Manager is responsible for utilising the operational emergency plan checklists in Section 2 and recording all actions taken during incidents. The relevant Director of FM, HR, or LIS will nominate a deputy to act in their absence as the Emergency Incident Manager when necessary. Role: On being notified of an emergency, the role of the Emergency Incident Manager (or nominated deputy) is to: Control and co-ordinate the University s response to the emergency; Organise and operate the Emergency Control Centre; Work towards the strategic aim of returning the University to normal operation; Liaise with the Emergency Services and other external agencies; Implement the decisions of the Emergency Management Team during major incidents. Responsibilities: Determine the level of emergency; Choose the location for, and establish the Emergency Control Centre; Appoint an Emergency Management Team for major incidents; Inform the Vice-Chancellor of major incidents only; Attend the Emergency Control Centre and convene a meeting of the Emergency Management Team; Utilise relevant actions detailed within the Operational Emergency Plan Checklists (Section 2) and record all actions and expenditure during an emergency; Determine when the incident is closed; Complete an incident report; Review the effectiveness of the plan following an incident. Training and Competency: The Emergency Incident Manager and the nominated deputies will require training to ensure competence in the following areas: Familiarity with the contents of the University Emergency Management Plan; Their roles and responsibilities for both minor and major incidents; How to activate and utilise the plan; Familiarity with the campus and activities undertaken within each area;

8 Page 8 of 15 Management of risks to health and safety; Availability of resources and call-out arrangements; Management of communications; Interfacing with the Emergency Services and other external organisations (e.g. NHS, Public Health England etc.); Arrangements for dealing with the media. Training will take the form of: Online Training in Emergency Management and Business Continuity arrangements at the University; Desk-top exercises Emergency Management Team (EMT) Purpose: The Emergency Management Team may be called upon to manage the University s response to major incidents. Composition: Membership will vary depending upon the nature of the incident being managed and the Emergency Incident Manager will determine the initial membership at commencement of a major incident. However, the core membership will consist of some (or all) of the following: Emergency Incident Manager (Director of Facilities Management or nominated deputy) Vice-Chancellor; Relevant Pro Vice-Chancellor(s) or Director(s); Relevant Executive Dean(s) of College; Director of HR (or nominee); Development, Maintenance & Estates Manager (or nominee); Director of Marketing and Communications (or nominee); Director of LIS; Safety, Health & Environment Manager (or nominee); Local Manager(s) from those parts of the University affected by the incident; Senior PR and Corporate Events Officer. Role: (MAJOR incidents only) To utilise collective areas of expertise to effectively co-ordinate a proportionate emergency response with the strategic aim of returning the University to normal service; Communicate decisions to the Emergency Incident Manager for implementation. Responsibilities: Establish and constantly assess a co-ordinated and proportionate response to the emergency;

9 Page 9 of 15 Ensure adequate staff, resources and premises are available for the duration of the emergency; Provide authorisation for immediate expenditure requirements and actions; Co-ordinate communication with the general University population and neighbouring organisations that may be affected; Prepare press releases to the Media; Monitor and advise on adequate health & safety precautions Availability and Call-Out For Scenarios where the Director of FM is the EIM. See table 1 The Security Team operate around the clock, 365 days/year and will usually be the initial responder in an emergency. During normal working hours (08:00 to 17:00, Mon to Fri) The formal line management communication routes will be utilised during normal working hours. Outside normal working hours (Evenings, weekends and bank holidays) There are 3 call out rotas in operation within FM:- Student Accommodation Management; Student Accommodation Housekeeping; Maintenance Officers. Full details of these rotas are to be held by the Security Team and for many FM related issues these rotas will be called upon first to resolve related issues. If the above call-out rotas are not suitable or applicable, the Security Team will call (in the order shown) one of the following FM Emergency Management Team members for all emergencies considered to be at minor or major level. This may have first been in consultation with the FM Security Manager to agree escalation of the incident, if appropriate, to major level. Security Manager (escalate if appropriate); Director of Facilities Management; Accommodation and Buildings Manager; Development, Maintenance & Estates Manager; FM Business Services Manager; Safety, Health and Environment Manager; One of these Managers will act as the Emergency Incident Manager for Minor incidents. These FM Managers hold a cascade list of key staff contact details in each College/School/Service who can be called upon for assistance. This list is updated and issued by the Security Manager. (Appendix 3)

10 Page 10 of 15 If the emergency escalates to a major incident, the Director of FM (or nominee) will be contacted by on-campus Security and their attendance at the scene requested. The Director of FM (or nominee) will then assume the role of Emergency Incident Manager. If the Director of FM is unavailable, the cascade list for nominees is as follows: 1 st Accommodation and Buildings Manager 2 nd Development, Maintenance & Estates Manager 3 rd FM Business Services Manager 4 th Safety, Health & Environment Manager For scenarios where the Director of HR, or LIS is the EIM. See table 1 During normal working hours (08:00 to 17:00, Mon to Fri) The formal line management communication routes will be utilised during normal working hours. Outside normal working hours (Evenings, weekends and bank holidays) Security Services hold contact details of key staff in Appendix 3 of this plan and will contact the relevant member of staff to act as EIM Financial implications and authorisation for expenditure The Financial Regulations for UCLan have a 5000 threshold, above which 3 competitive quotes are required. During an emergency there may be a requirement to purchase equipment or organise repairs/remediation and this may involve expenditure which has not be budgeted for. In these instances the Financial Regulations state that: For all purchases over 5000 it may, in exceptional circumstances, not be appropriate to obtain competitive quotations. This may arise where there is a requirement for emergency, statutory or reactive maintenance and repairs. Where such conditions apply a waiver request is required to be submitted before ordering. Approval of the Executive Director of Finance is required for orders over 50,000, or Head of Purchasing for under 50,000. All financial expenditure during an incident must be reported as soon as possible to the insurers via the Head of Purchasing for consideration of asset protection for the University. Retrospective approval for expenditure can be sought for contracting the services of any organisation on the Key Contractors List. The Emergency Incident Manager is responsible for making a sound justification for purchasing in an emergency situation in order to meet the Financial Regulations. Justifications may be able to be made on the following grounds: Instructions from Emergency Services; Instructions from Regulators (HSE, EA, Home Office etc.); Preventing further damage to equipment, property or the environment;

11 Page 11 of 15 Providing for, or reducing the risk to, the health, safety and welfare of staff, students, and others who may be affected by the emergency situation. Anything that cannot be justified must wait for approval from Financial Services Emergency Control Centres The Emergency Incident Manager, on declaring a major emergency will establish an Emergency Control Centre (ECC). Depending on the location and nature of the emergency, the Emergency Control Centre will be one of the following locations. On-site locations: Security Control Lodge - Harrington Building Telephone: Vernon Building - Room 301 Telephone: Off-site location: UCLan Sports Arena Telephone: The following basic equipment is required for the Emergency Control Centre: A current version of the emergency management plan; Telephone contact lists; Flip chart stands and paper; Telephones (landline and mobiles); Site plans and maps; Stationary items; Networked PC/Laptop with the ability to send ; Site radio sets; Fax machine; CCTV (only available in Harrington Security Lodge); Incident Boxes located at: o Mezzanine SHE store in Vernon Building; o Security Control Room in Harrington Building; o UCLan Sports Arena. The contents of these Incident Boxes are as follows: o Signage Building closed Flood Authorised personnel only No water

12 Page 12 of 15 Wet floor o Emergency procedures Senior members of staff cascade list Contractors callout list Building isolation points o Hardware Loud hailer Torches Hi-visibility vests Hard hats Safety goggles Hazard tape During an emergency, all communications, instructions and actions should be recorded on the operational checklists and addendums Incident Control Point An incident control point is simply a location close to an incident where a member of staff will be posted. The incident control point will facilitate communications between the Emergency Management Team, the people at the scene and the emergency services (as appropriate). During some types of emergency, an incident control point may not be necessary Media Handling The Marketing, Communications and Engagement Team is responsible for ALL press releases and other media communications external to the University. The office is based in Chandler Building. The Marketing, Communications and Engagement Team have their own internal procedures for dealing with media interest following an emergency. If telephone helplines are considered necessary during an emergency, this is arranged via LIS in conjunction with the Marketing, Communications and Engagement Team. 1.7 Emergency Contacts Key contacts are detailed in individual emergency plans, for assistance during an incident. Managers within Colleges/Schools/Services should develop and maintain detailed emergency contact lists identifying key individuals (and nominees), with details of how they may be contacted 24 hours a day and how they may assist with the incident (e.g. areas of expertise). 1.8 Revision of Emergency Plan The Emergency Management Plan for the University will be reviewed periodically and appropriately after each minor and major incident by the Safety, Heath & Environment Section of Facilities Management.

13 Page 13 of Instructions for the use of this plan in the event of an emergency Section 1 Arrangements The arrangements section gives guidance on: Assessing the level of emergency and the appropriate response; Responsibility for managing the incident; The composition of the Emergency Management Team; Section 2 Operational Emergency Plan checklists. The checklists in section 2 are intended to be used as a guide for the Emergency Incident Manager for each of the identified scenarios. Every incident will be different; therefore some of the items on the checklist may not be applicable to every scenario. It is the responsibility of the Emergency Incident Manager to decide what is applicable in relation to the circumstances of the individual event. Equally, in the event of a complex emergency, the Emergency Incident Manager may decide that several checklists are relevant (e.g. fire and fatality checklists). Each checklist can be used as a record of the incident. The following information may be recorded on the checklist: Identification of relevant actions; Allocation of delegated responsibility; Resources utilised; A record of completed actions; Justification of decisions. NB: Checklists are not exhaustive! The checklists identify actions that may be relevant for each phase of the emergency as it develops (as detailed in section 1.5) and are designed to prevent an escalation of the emergency.

14 Page 14 of Emergency Plan Implementation Flowchart Notification of incident 333 verbal staff/student/visitor/public external source/contact e.g. Emergency Services Initial Responder Could be: Security Buildings staff Local Manager Realistically could be anyone! The following people may consider that a situation/incident warrants the emergency plan to be put into operation: University Executive Team FM Emergency Management Team Security M18 Initiate Emergency Plan MINOR Determine incident level Decide on appropriate EIM and notify? MAJOR Outside normal hours FM Emergency Management Team Director of FM/HR/LIS/IGO (see 1.6.1) Identify/appoint support team Determine when incident is closed i.e. no longer a minor/major incident Follow relevant plan in Section 2 of Emergency Plan file and regularly review level if things Complete incident report Appoint Emergency Management Team to include relevant local managers Review Review emergency plan and update/modify if required

15 Page 15 of Document Control Procedure The Safety, Health and Environment Manager is the document controller for this plan (except Appendix 3 see note*). As such, this person will receive and distribute amendments to the plan and will hold the master copy. Every holder of the plan is responsible for keeping their plan current. Executive Deans, Deans, Directors, Heads, Managers and Supervisors at all levels are responsible for notifying the document controller of amendments to this plan. The document controller will maintain a list of all the locations and holders of every plan distributed, including those issued to external organisations. The ability to edit electronic versions of the plan will be restricted to the document controller Amending the Plan Executive Deans, Deans, Directors, Heads, Managers and Supervisors will notify the document controller, in writing, of amendments to the plan by reference to the section number as soon as possible; The document controller will issue new amended pages to all holders of the plan; Plan holders will replace pages and record amendments on the Record of Revisions page in appendix 8 of their copy of the plan; Plan holders will confirm in writing to the document controller that their plan has been amended; The document controller will monitor confirmations and maintain a list of amendments made. *Notes: The Security Manager is responsible for regularly updating and issuing Appendix 3 Internal Emergency Contact details to all plan holders and additional copies of the plan. Appendix 3 is not subject to the document control process detailed in this section. The Information Governance Officer is responsible for updating and issuing the Information Governance Incident Procedure (Section 2.4.2, Appendix 1) to the SHE Section for distribution to all plan holders. This procedure is not subject to the document control process in this document.

Emergency Management Plan. Section 1. Arrangements

Emergency Management Plan. Section 1. Arrangements Page 1 of 14 Emergency Management Plan Section 1 Arrangements Revision 0 - September 2007 Page 2 of 14 Contents 1.0 ARRANGEMENTS 1.1 Introduction 1.2 Purpose & Scope 1.3 University Location & Population

More information

University of Hong Kong. Emergency Management Plan

University of Hong Kong. Emergency Management Plan University of Hong Kong Emergency Management Plan (HKU emergency hotline: 3917 2882) Version 1.0 Oct 2014 (Issued by Safety Office) (Appendix 3 not included) UNIVERSITY OF HONG KONG EMERGENCY MANAGEMENT

More information

BUSINESS CONTINUITY MANAGEMENT PLAN

BUSINESS CONTINUITY MANAGEMENT PLAN BUSINESS CONTINUITY MANAGEMENT PLAN For Thistley Hough Academy Detailing arrangements for Recovery and Resumption of Normal Academy Activity Table of Contents Section Content 1.0 About this Plan 1.1 Document

More information

University Emergency Management Plan

University Emergency Management Plan University Emergency Management Plan This plan has been designed to be consistent with the format of the Emergency Action Plans held by the departments and buildings of the University. This will enable

More information

Emergency Control Organisation

Emergency Control Organisation Emergency Control Organisation Mission To provide guidance to the management and staff of the campus to enable them to quickly and decisively respond to an actual or potential emergency which could threaten

More information

Critical Incident Management Policy

Critical Incident Management Policy Name of Policy Critical Incident Management Policy Description of Policy This policy outlines ACU s commitment to effectively respond and manage incidents and critical incidents. Students, staff, contractors

More information

HEALTH AND SAFETY POLICY AND PROCEDURES

HEALTH AND SAFETY POLICY AND PROCEDURES HEALTH AND SAFETY POLICY AND PROCEDURES 1 Introduction 1. The Health and Safety at Work etc. Act 1974 places a legal duty on the University to prepare and revise as often as may be appropriate, a written

More information

business continuity plan for:

business continuity plan for: business continuity plan for: Insert your company name here Our statement of Business Continuity is: > To ensure all employees are competent to do their tasks, and to provide adequate training > To review

More information

Major Incident Management Plan

Major Incident Management Plan Reference: 3.40 Edition Date: 25 Jan 2011 Page 1 of 7 Major Incident Management Plan 1. PURPOSE 1.1 This plan is intended to deal with major incidents with the aim to assist and manage the initial stages

More information

University of Nottingham Emergency Procedures and Recovery Policy

University of Nottingham Emergency Procedures and Recovery Policy University of Nottingham Emergency Procedures and Recovery Policy Guidelines for High Hazard Schools and Departments 1. Introduction The University of Nottingham is committed to the identification and

More information

Incident Management Plan

Incident Management Plan Incident Management Plan Document Control Version 1 Name of Document NHS Guildford and Waverley CCG Incident Management Plan Version Date 1st December 2015 Owner Director of Governance and Compliance [Accountable

More information

University of Prince Edward Island. Emergency Management Plan

University of Prince Edward Island. Emergency Management Plan Emergency Management Plan March 2012 ON CAMPUS Emergency Dial Security Assistance Dial 566-0384 OFF CAMPUS SUPPORT AGENCIES Fire & Ambulance... 9-1-1 Charlottetown Fire Department... 566-5548 Fire Marshal...

More information

BUSINESS CONTINUITY POLICY RM03

BUSINESS CONTINUITY POLICY RM03 BUSINESS CONTINUITY POLICY RM03 Applies to: All NHS LA employees, contractors, secondees and consultants, contractors and/or any other parties who will carry out duties on behalf of the NHS LA Version:

More information

Emergency Recovery. Corporate Business Continuity Plan

Emergency Recovery. Corporate Business Continuity Plan ` Emergency Recovery Corporate Business Continuity Plan Section Summary: This document is for use when an incident or emergency affects our ability to provide a normal service to our partner responders

More information

Aylesford School. and Sixth Form College. wonder aspiration respect discipline RISK MANAGEMENT POLICY. Finance and Premises Committee

Aylesford School. and Sixth Form College. wonder aspiration respect discipline RISK MANAGEMENT POLICY. Finance and Premises Committee Aylesford School and Sixth Form College wonder aspiration respect discipline RISK MANAGEMENT POLICY Written: January 2015 Review Date: January 2017 Lead: Site Manager Via: Finance and Premises Committee

More information

CRITICAL/NON CRITICAL INCIDENT MANAGEMENT AND REPORTING PROCEDURE

CRITICAL/NON CRITICAL INCIDENT MANAGEMENT AND REPORTING PROCEDURE CRITICAL/NON CRITICAL INCIDENT MANAGEMENT AND REPORTING PROCEDURE This procedure must be read in conjunction and interpreted in line with the Critical/Non Critical Incident Management and Reporting policy.

More information

WEDNESFIELD HIGH SCHOOL A SPECIALIST ENGINEERING COLLEGE

WEDNESFIELD HIGH SCHOOL A SPECIALIST ENGINEERING COLLEGE WEDNESFIELD HIGH SCHOOL A SPECIALIST ENGINEERING COLLEGE HEALTH AND SAFETY POLICY Health and Safety Policy December 2012 Page 1 CONTENTS PAGE Statement 4 Organisation Governors Headteacher Leadership Team

More information

REPORT 4 FOR DECISION. This report will be considered in public

REPORT 4 FOR DECISION. This report will be considered in public REPORT 4 Subject: Safety Readiness for the Summer 2013 Events Programme Agenda item: Public Item 7 Report No: 4 Meeting date: 28 May 2013 Report to: Board Report of: Mark Camley, Interim Executive Director

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy October 2014 1 October 2014 Contents: Introduction 1. STATEMENT OF INTENT AND POLICY OBJECTIVES 2. RESPONSIBILITIES AND ACCOUNTABILITIES FOR HEALTH AND SAFETY 2.1 The Director

More information

SCHOOLS BUSINESS CONTINUITY PLANNING GUIDANCE

SCHOOLS BUSINESS CONTINUITY PLANNING GUIDANCE SCHOOLS BUSINESS CONTINUITY PLANNING GUIDANCE This guidance is to be used as a tool to support you in your business continuity planning and aligns to the schools business continuity plan template provided.

More information

Health & Safety Policy For Locations Hosting Film Production Companies

Health & Safety Policy For Locations Hosting Film Production Companies Health & Safety Policy For Locations Hosting Film Production Companies Throughout this document, the location will be referred to as The Venue and the film production company as The Contractor. The following

More information

LOCAL CONTINGENCY PLANS

LOCAL CONTINGENCY PLANS LOCAL CONTINGENCY PLANS PLAN TEMPLATE This template will help to ensure that Local Contingency Plans meet the requirements of the University as identified in the University s Emergency Management Plan.

More information

NHS Lancashire North CCG Business Continuity Management Policy and Plan

NHS Lancashire North CCG Business Continuity Management Policy and Plan Agenda Item 12.0. NHS Lancashire North CCG Business Continuity Management Policy and Plan Version 2 Page 1 of 25 Version Control Version Reason for update 1.0 Draft for consideration by Executive Committee

More information

Business Continuity Management For Small to Medium-Sized Businesses

Business Continuity Management For Small to Medium-Sized Businesses Business Continuity Management For Small to Medium-Sized Businesses Produced by NORMIT and Norfolk County Council Resilience Team For an electronic copy of this document visit www.normit.org Telephone

More information

Directorate of Estates and Facilities EPM FM5. Estates Emergency Incident Response Procedure

Directorate of Estates and Facilities EPM FM5. Estates Emergency Incident Response Procedure Directorate of Estates and Facilities EPM FM5 Estates Emergency Incident Response Procedure By: Document Originated Issue Number 1 Number of pages: Peter Kershaw 10 + Appendices Approved by TBD Status:

More information

Critical Incident Policy. Document Sponsor: Dr Stephen Weller Deputy Vice-Chancellor, University Services and Head of Campus, Cairns

Critical Incident Policy. Document Sponsor: Dr Stephen Weller Deputy Vice-Chancellor, University Services and Head of Campus, Cairns Critical Incident Policy Document Sponsor: Dr Stephen Weller Deputy Vice-Chancellor, University Services and Head of Campus, Cairns Document Date: 14 September 2011 Contents Intent... 1 Scope... 1 Definitions...

More information

Asbestos Management Policy (Version 3)

Asbestos Management Policy (Version 3) Asbestos Management Policy (Version 3) Contents Page Introduction 3 College Policy Statement for Asbestos Management 3 Objectives (of this Policy and Procedure) 3 Application of Policy 4 Licensed Asbestos

More information

Policy and Procedure. Managing Attendance. Policy and Procedure

Policy and Procedure. Managing Attendance. Policy and Procedure Managing Attendance Policy and Procedure Agreed at CNG on 25 th April 2007 Managing Attendance Policy and Procedure Table of contents: TABLE OF CONTENTS Section 1 The Policy 3 Aim of the Process 3 Key

More information

Greenways Primary School

Greenways Primary School Greenways Primary School Crisis Response and Disaster recovery Policy: 2014-2016 Mission Statement At Greenways Primary School, our mission is to challenge each child to reach their full intellectual,

More information

Title: Sickness Absence Management Policy and Procedure. CONTENT SECTION DESCRIPTION PAGE. 1 Introduction 2. 2 Policy statement 2.

Title: Sickness Absence Management Policy and Procedure. CONTENT SECTION DESCRIPTION PAGE. 1 Introduction 2. 2 Policy statement 2. Title: Sickness Absence Management Policy and Procedure. Date Approved: 17 June 2014 Approved by: JSPF Date of review: June 2016 Policy Ref: Issue: 1 Division/Department: Human Resources Author (post-holder):

More information

OAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure

OAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure OAKPARK SECURITY SYSTEMS LIMITED Requests or suggestions for amendment to this procedure should be submitted to the owner of the process PROCESS OWNER: MANAGEMENT TEAM Current version: PREVIOUS VERSION

More information

University of Sunderland Business Assurance Information Security Policy

University of Sunderland Business Assurance Information Security Policy University of Sunderland Business Assurance Information Security Policy Document Classification: Public Policy Reference Central Register Policy Reference Faculty / Service IG 003 Policy Owner Assistant

More information

BUSINESS CONTINUITY POLICY

BUSINESS CONTINUITY POLICY BUSINESS CONTINUITY POLICY Last Review Date Approving Body n/a Audit Committee Date of Approval 9 th January 2014 Date of Implementation 1 st February 2014 Next Review Date February 2017 Review Responsibility

More information

Business Continuity Plan For Disaster Recovery in the event of a Critical Incident

Business Continuity Plan For Disaster Recovery in the event of a Critical Incident Business Continuity Plan For Disaster Recovery in the event of a Critical Incident April 2013 Table of Contents 1.0 Introduction... 3 2.0 Definitions... 3 3.0 General Information... 3 3.1 Review and Training...

More information

SAFETY ADVISORY GROUP. Event Management Plan Template

SAFETY ADVISORY GROUP. Event Management Plan Template SAFETY ADVISORY GROUP Event Management Plan Template VERSION 1-2015 Introduction This template has been produced to aid event organisers in planning safe and exciting events. By using this document as

More information

WORK HEALTH AND SAFETY

WORK HEALTH AND SAFETY WORK HEALTH AND SAFETY SCOPE POLICY Work Health and Safety System Work Health and Safety Objectives Roles and Responsibilities Executive Responsibilities Manager Responsibilities Worker Responsibilities

More information

Business Continuity Management Policy and Plan

Business Continuity Management Policy and Plan Business Continuity Management Policy and Plan 1 Page No: Contents 1.0 Introduction 3 2.0 Purpose 3 3.0 Definitions 4 4.0 Roles, Duties & Responsibilities 4 4.1 Legal And Statutory Duties, Responsibilities

More information

Guidance for the Operation of the Emergency Mass Text Procedure

Guidance for the Operation of the Emergency Mass Text Procedure Guidance for the Operation of the Emergency Mass Text Procedure 1 Contents Page No. 1. Introduction 3 2. Definitions 3 3. Responsibilities and Authorisations 3 4. Circumstances of Use 6 5. Initiating an

More information

SPACE MANAGEMENT POLICY

SPACE MANAGEMENT POLICY SPACE MANAGEMENT POLICY Originated by Assistant Director, Management Services: October 2010 Impact Assessment: 11 November 2010 Recommended by Estates Committee: 1 November 2010 Approved by Council: 22

More information

Corporate Health and Safety Policy

Corporate Health and Safety Policy Corporate Health and Safety Policy November 2013 Ref: HSP/V01/13 EALING COUNCIL Table of Contents PART 1: POLICY STATEMENT... 3 PART 2: ORGANISATION... 4 2.1 THE COUNCIL:... 4 2.2 ALLOCATION OF RESPONSIBILITY...

More information

EMERGENCY PREPAREDNESS AND CRISIS MANAGEMENT PLAN

EMERGENCY PREPAREDNESS AND CRISIS MANAGEMENT PLAN EMERGENCY PREPAREDNESS AND CRISIS MANAGEMENT PLAN MAY 2009 Public Web Version Getting Help Immediately Any situation requiring immediate response from police, fire, or emergency medical services to preserve

More information

University of St Andrews Out of Hours Protocol Appendices: A- CCTV Code of Practice B- Service Level Statement

University of St Andrews Out of Hours Protocol Appendices: A- CCTV Code of Practice B- Service Level Statement University of St Andrews Out of Hours Protocol Appendices: A- CCTV Code of Practice B- Service Level Statement 1. Context The University security service provides night and weekend cover throughout the

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John

More information

Manchester Metropolitan University. Policy for the Reporting and Investigation of Accidents and Incidents

Manchester Metropolitan University. Policy for the Reporting and Investigation of Accidents and Incidents Manchester Metropolitan University Policy for the Reporting and Investigation of Accidents and Incidents 1 Contents Section 1 Introduction 1.1 Purpose 1.2 Scope & Definitions 1.3 Roles and Responsibilities

More information

Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES

Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES EVENT PLANNING GUIDANCE NOTES 1 Event Planning Guidance Notes Important issues This documentation is not a full and authoritative statement of the law, statutory guidance or best practice in planning,

More information

HEALTH & SAFETY POLICY

HEALTH & SAFETY POLICY HEALTH & SAFETY POLICY 1. STATEMENT OF INTENT & POLICY OBJECTIVES The Council, as the governing body of the School, recognises and accepts the responsibilities placed on it as 'Employer' by the Health

More information

Emergency Response Plan

Emergency Response Plan Emergency Response Plan Public Version Contents INTRODUCTION... 4 SCOPE... 5 DEFINITION OF AN EMERGENCY... 5 AUTHORITY... 6 ACTION PRIOR TO DECLARATION... 6 FREEDOM OF INFORMATION & PRIVACY PROTECTION...

More information

CRITICAL INCIDENT POLICY

CRITICAL INCIDENT POLICY CRITICAL INCIDENT POLICY Endorsed September 2009 Next Review November 2011 Gymnastics Queensland Critical Incident Policy Version 1 (September 2009) 1 Contents 1. Position statement... 3 2. Purpose...

More information

BUSINESS CONTINUITY PLAN

BUSINESS CONTINUITY PLAN GLEBE ACADEMY BUSINESS CONTINUITY PLAN To be used in conjunction with the Major Incident Policy and the Major Incident Emergency Kit The Governing Body of Glebe Academy recognises the need to have a Business

More information

Critical Incident Policy Version: 1.01 Date: 11/04/2012

Critical Incident Policy Version: 1.01 Date: 11/04/2012 Title: Critical Incident Policy Version: 1.01 Date: 11/04/2012 Policy Area: Academic Governance Approval: Chairperson, Academic Board Next Review: 02/2013 Signature: [NOTE: Vose College has not yet been

More information

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy ASBESTOS POLICY Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy This is a controlled document. It should not be altered in any way without the express permission of the author or their representative.

More information

Incident Response and Investigation Procedure

Incident Response and Investigation Procedure Incident Response and Investigation Procedure Related Policies Work Health and Safety Policy Responsible Executive Director, Human Resources Approved by Executive Director, Human Resources Approved and

More information

Business Continuity Management Policy and Plan

Business Continuity Management Policy and Plan Business Continuity Management Policy and Plan Version No Author Date of Update 0.3 Allan Jude and Charmaine Grundy 05/06/2015 1 P a g e Contents Contents... 2 1. Introduction... 3 2. Purpose... 4 3. Definitions...

More information

GUIDANCE ON THE COMPILATION OF BUSINESS CONTINUITY PLANS. Front cover Add your logo, company name and the date the plan was last amended.

GUIDANCE ON THE COMPILATION OF BUSINESS CONTINUITY PLANS. Front cover Add your logo, company name and the date the plan was last amended. LINCOLNSHIRE SUPPORTING PEOPLE GUIDANCE ON THE COMPILATION OF BUSINESS CONTINUITY PLANS Front cover Add your logo, company name and the date the plan was last amended. Distribution list List who has a

More information

How To Manage A Disruption Event

How To Manage A Disruption Event BUSINESS CONTINUITY FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Manager Organisational

More information

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee LIFT MANAGEMENT Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee This is a controlled document. It should not be altered in any way without the express permission of the author

More information

How To Manage A Business Continuity Strategy

How To Manage A Business Continuity Strategy Business continuity strategy 2009 2012 Table of contents 1 Why this strategy is needed 3 2 Aim of the strategy 4 3 Our approach to business continuity 4 PROCESS 4 STRUCTURE 5 DOCUMENTATION 6 DISRUPTION

More information

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004 Estates Division Imperial College London Room 503 Sherfield Building South Kensington Campus London SW7 2AZ, UK Tel: +44 (0)20 7594 9832 Fax: +44 (0)20 7594 9050 r.mayne@imperial.ac.uk www.imperial.ac.uk

More information

BUSINESS CONTINUITY PLAN

BUSINESS CONTINUITY PLAN Business Logo Here BUSINESS CONTINUITY PLAN FOR SMALL TO MEDIUM SIZED BUSINESSES DATE :??? VERSION:?? PRODUCED BY DURHAM CIVIL CONTINGENCIES UNIT BUSINESS CONTINUITY PLAN LIST OF CONTENTS 1. DISCLAIMER...4

More information

UNION COLLEGE INCIDENT RESPONSE PLAN

UNION COLLEGE INCIDENT RESPONSE PLAN UNION COLLEGE INCIDENT RESPONSE PLAN The college is committed to supporting the safety and welfare of all its students, faculty, staff and visitors. It also consists of academic, research and other facilities,

More information

AUDIT OF DET ASBESTOS MANAGEMENT IN QUEENSLAND SCHOOLS

AUDIT OF DET ASBESTOS MANAGEMENT IN QUEENSLAND SCHOOLS AUDIT OF DET ASBESTOS MANAGEMENT IN QUEENSLAND SCHOOLS Conducted By GASKIN CONSTRUCTION SERVICES PTY LTD TABLE OF CONTENTS SECTIONS Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7

More information

Health and safety guidance for research undertaken in the community

Health and safety guidance for research undertaken in the community Health and safety guidance for research undertaken in the community Document control information Published document name: research-comm-gn.pdf Date issued: September 2012 Version: 3.0 Previous review dates:

More information

Corporate Business Continuity Plan

Corporate Business Continuity Plan Corporate Business Continuity Plan Prepared and Emergency Resilience Team Version: 5.0 issued by: Date: June 2015 Review Date: April 2018 CONTENTS Page No Foreword 3 Distribution 4 Revision History 5 Record

More information

EMERGENCY MANAGEMENT PLAN (revised June 2012)

EMERGENCY MANAGEMENT PLAN (revised June 2012) EMERGENCY MANAGEMENT PLAN (revised June 2012) TABLE OF CONTENTS Introduction... 2 1. Objectives and Priorities 2. Review and Assessment Authority... 3 Supporting Documentation... 4 Key Terms and Roles...

More information

NHS Leeds West Clinical Commissioning Group Business Continuity Plan (BCP)

NHS Leeds West Clinical Commissioning Group Business Continuity Plan (BCP) NHS Leeds West Clinical Commissioning Group Business Continuity Plan (BCP) Plan ID: BCP 1 Directorate: Plan Owner (Chief Officer): BCM Contact: 1 (Senior Manager) Controlled Hard Copy Issue List Document

More information

Risk Management Policy

Risk Management Policy Principles Through a process of Risk Management, the University seeks to reduce the frequency and impact of Adverse Events that may affect the achievement of its objectives. In particular, Risk Management

More information

UNION COLLEGE SCHENECTADY, NY 12308 EMERGENCY MANAGEMENT PROCEDURES

UNION COLLEGE SCHENECTADY, NY 12308 EMERGENCY MANAGEMENT PROCEDURES UNION COLLEGE SCHENECTADY, NY 12308 EMERGENCY MANAGEMENT PROCEDURES Departments involved in fulfilling the obligations of these Emergency Management Procedures include: President s Office (Executive Assistant

More information

SANDYMOOR SCHOOL CRISIS MANAGEMENT POLICY

SANDYMOOR SCHOOL CRISIS MANAGEMENT POLICY SANDYMOOR SCHOOL CRISIS MANAGEMENT POLICY Crisis Management Policy Contents Version History... 2 1. Introduction... 3 2. Aims and Objectives of this Policy... 4 3. Roles and Responsibilities... 4 4. Emergency

More information

BOARD OF DIRECTORS PAPER COVER SHEET. Meeting date: 22 February 2006. Title: Information Security Policy

BOARD OF DIRECTORS PAPER COVER SHEET. Meeting date: 22 February 2006. Title: Information Security Policy BOARD OF DIRECTORS PAPER COVER SHEET Meeting date: 22 February 2006 Agenda item:7 Title: Purpose: The Trust Board to approve the updated Summary: The Trust is required to have and update each year a policy

More information

Perton Middle School Business Continuity Plan

Perton Middle School Business Continuity Plan Perton Middle School Business Continuity Plan IN AN EMERGENCY 1 IF APPROPRIATE, CALL THE EMERGENCY SERVICES ON 999 (OR 112) 2 CONTACT THE EXECUTIVE HEAD TEACHER ON Mrs M E Tunnicliffe - 01902 434200 or

More information

Houses of Parliament. Health and Safety Policy Supplement (PS1) Accident and Incident Reporting

Houses of Parliament. Health and Safety Policy Supplement (PS1) Accident and Incident Reporting Health and Safety Policy Supplement (PS1) Accident and Incident Reporting This policy supplement has been prepared by the Parliamentary Safety Risk Management team and endorsed by the Director General

More information

Emergency Preparedness Guidelines

Emergency Preparedness Guidelines DM-PH&SD-P7-TG6 رقم النموذج : I. Introduction This Guideline on supports the national platform for disaster risk reduction. It specifies requirements to enable both the public and private sector to develop

More information

Department of Medicine - Departmental Disaster Recovery Plan

Department of Medicine - Departmental Disaster Recovery Plan - Departmental Disaster Recovery Plan 1. In accordance with the College Disaster Recovery Policy (http://www3.imperial.ac.uk/riskanddisasterrecovery/disasterrecoveryhome/disasterre coverypolicy), which

More information

TRUST SECURITY MANAGEMENT POLICY

TRUST SECURITY MANAGEMENT POLICY TRUST SECURITY MANAGEMENT POLICY EXECUTIVE SUMMARY The Board recognises that security management is an integral part of good, effective and efficient risk management practise and to be effective should

More information

School or service safety advisor (SSA) role

School or service safety advisor (SSA) role School or service safety advisor (SSA) role Document control information Published document name: ssa-role-gn Date issued: January 2012 Version: 1.0 School or service safety advisor (SSA) role Previous

More information

Dublin Institute of Technology Critical Incident Management Plan

Dublin Institute of Technology Critical Incident Management Plan Dublin Institute of Technology Critical Incident Management Plan VERSION1 Approved by SLT 2 nd April 2015 TABLE OF CONTENTS Executive summary... 3 1. Objective of the Critical Incident Plan... 4 2. Scope

More information

London Borough of Merton

London Borough of Merton London Borough of Merton STRATEGIC BUSINESS CONTINUITY PLAN April 2014 Distribution List: Name Ged Curran Caroline Holland Yvette Stanley Simon Williams Chris Lee Title Chief Executive Director of Corporate

More information

Sample Emergency and Critical Incident Policy and Procedure

Sample Emergency and Critical Incident Policy and Procedure Sample Emergency and Critical Incident Policy and Procedure 1. Purpose and Scope Emergencies and critical incidents in the workplace can affect people physically and psychologically, and affect program

More information

Business Continuity Planning advice for Businesses with 50-250 employees

Business Continuity Planning advice for Businesses with 50-250 employees Business Continuity Planning advice for Businesses with 50-250 employees Where to begin? A business continuity plan should consist of a business and contingencies analysis. It needs to be developed by

More information

Crisis Response and Disaster Recovery

Crisis Response and Disaster Recovery Crisis Response and Disaster Recovery Health and Safety Services CRISIS RESPONSE AND DISASTER RECOVERY INTRODUCTION This plan is to respond to, and facilitate recovery from, any major adverse event as

More information

AUSTRALIAN COLLEGE OF THEOLOGY

AUSTRALIAN COLLEGE OF THEOLOGY AUSTRALIAN COLLEGE OF THEOLOGY Critical Incident Policy Approval Resolution No: DIR1412-18.3 Date: 8 December 2014 Table of Contents Part A: Policy... 1 1. Purpose and Scope... 1 2. Policy Level... 1 3.

More information

SALVE REGINA UNIVERSITY. Emergency. Office of Safety & Security

SALVE REGINA UNIVERSITY. Emergency. Office of Safety & Security SALVE REGINA UNIVERSITY Emergency Response Plan Office of Safety & Security Original: October 2000 Updated & Revised: February 2006 Updated & Revised: March 2010 Table of Contents Section I: Overview

More information

Corporate Health and Safety Policy

Corporate Health and Safety Policy Corporate Health, Safety & Wellbeing Service Corporate Health and Safety Policy Contents 1. Introduction... 2 2. Policy Statement... 2 3. Scope... 3 4. Definition of Manager... 4 5. Responsibilities...

More information

Health and Safety Policy Part 1 Policy and organisation

Health and Safety Policy Part 1 Policy and organisation Health and Safety Policy Part 1 Policy and organisation ICO H&S Policy Policy and organisation, June 2014 Page 1 of 6 1. Scope 1.1 The Health and Safety policy applies to all employees of the Information

More information

Australia Pacific LNG Project. Narrows Crossing Pipeline Environmental Management Plan Attachment 3 Crisis and Emergency Management Directive

Australia Pacific LNG Project. Narrows Crossing Pipeline Environmental Management Plan Attachment 3 Crisis and Emergency Management Directive Australia Pacific LNG Project Narrows Crossing Pipeline Environmental Management Plan Attachment 3 Crisis and Emergency Management Crisis and Emergency Management This document outlines the requirements

More information

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 0.2 Jul 2013 Initial draft for comment Jon Fahie 0.3 Sep

More information

Major Incident COMMUNICATIONS STRATEGY AND PLAN

Major Incident COMMUNICATIONS STRATEGY AND PLAN Major Incident COMMUNICATIONS STRATEGY AND PLAN ELFT staff must use the version published on the Trust Intranet for managing an incident response or training purposes. Version 2.2 8 th September 2014 Revision

More information

Business Continuity Plan. MakeStuff Ltd

Business Continuity Plan. MakeStuff Ltd Business Continuity Plan of MakeStuff Ltd Unit 1 Factory Way Makerville Anyshire MA1 2FG in relation to The recorded version of this plan is 2008A Table of Contents Introduction and Plan Details Roles

More information

Attendance Management Guidance

Attendance Management Guidance Attendance Management Guidance As at 15 September 2009-1 - Contents Page 1. Policy statement 3 2. Purpose 3 3. Scope 4 4. Confidentiality 4 5. Preventing sickness absence 5 6. Roles 5 7. Occupational health

More information

Business Continuity Plan Guidance and Template to support Small Businesses

Business Continuity Plan Guidance and Template to support Small Businesses Business Continuity Plan Guidance and Template to support Small Businesses Disclaimer This template and guidance is provided as general information about Business Continuity Planning. It is not intended

More information

THE ARTS EDUCATIONAL SCHOOLS, LONDON DAY SCHOOL AND SIXTH FORM FIRE RISK MANAGEMENT POLICY

THE ARTS EDUCATIONAL SCHOOLS, LONDON DAY SCHOOL AND SIXTH FORM FIRE RISK MANAGEMENT POLICY THE ARTS EDUCATIONAL SCHOOLS, LONDON DAY SCHOOL AND SIXTH FORM FIRE RISK MANAGEMENT POLICY STATEMENT OF INTENT The Arts Educational Schools, London, will ensure, so far as is reasonably practicable, that

More information

OURIMBAH FLOOD RESPONSE PLAN

OURIMBAH FLOOD RESPONSE PLAN OURIMBAH FLOOD RESPONSE PLAN February 2014 2 EMERGENCY CONTACT DETAILS Security Services for all Emergencies (24 Hours) Ourimbah 4348 4222 If not able to be reached please call Newcastle on Newcastle 4921

More information

ASBESTOS MANAGEMENT POLICY

ASBESTOS MANAGEMENT POLICY ASBESTOS MANAGEMENT POLICY Published : 4th Revision December 2014 1 Table of Contents INTRODUCTION... 3 DUTY TO MANAGE ASBESTOS... 3 DUTIES OF CAMPUS SERVICES... 3 1.0 POLICY OBJECTIVES... 5 2.0 RESPONSIBILITIES...

More information

BUSINESS CONTINUITY PLAN

BUSINESS CONTINUITY PLAN >Insert Company Logo Here< >Insert Company Name Here< BUSINESS CONTINUITY PLAN Date Version Author Address Telephone (Landline/Mobile) E-mail Plan Approval Approved By (Please print) Signature Date Page

More information

Absence Management Policy

Absence Management Policy Absence Management Policy 1. Policy Statement The University is committed to developing a working environment and working practices which help maintain and improve the health of our employees. As such,

More information

[INSERT NAME OF SCHOOL] BUSINESS CONTINUITY PLAN

[INSERT NAME OF SCHOOL] BUSINESS CONTINUITY PLAN Plan Ref No: [INSERT NAME OF SCHOOL] BUSINESS CONTINUITY PLAN PLAN DETAILS Date Written Plan Owner Plan Writer Version Number Review Schedule 6 monthly Annually Date of Plan Review Date of Plan Exercise

More information

Crisis Management & Business Continuity Plan - Overview

Crisis Management & Business Continuity Plan - Overview Crisis Management & Business Continuity Plan Lead member of SLT: Designated Governor: Alistair Easterfield Nigel Slater Associated documentation Health and Safety Policy Document Exam Contingency Policy

More information

Measuring your capabilities in Workplace Safety Management

Measuring your capabilities in Workplace Safety Management Working with business Measuring your capabilities in Workplace Safety Management ACC Workplace Safety Management Practices Audit Standards Contents Section 1 Audit standards for ACC s Workplace Safety

More information

Balancing and Settlement Code BSC PROCEDURE BSCP537. QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS AND CVA MOAs

Balancing and Settlement Code BSC PROCEDURE BSCP537. QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS AND CVA MOAs Balancing and Settlement Code BSC PROCEDURE BSCP537 QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS AND CVA MOAs APPENDIX 3 GUIDANCE NOTES ON COMPLETING THE SAD Version 2.0 Date: 10 September 2007

More information

NHS Durham Dales, Easington and Sedgefield Clinical Commissioning Group. Business Continuity Plan

NHS Durham Dales, Easington and Sedgefield Clinical Commissioning Group. Business Continuity Plan NHS Durham Dales, Easington and Sedgefield Clinical Commissioning Group Business Continuity Plan Page 1 Review To be done annually Author Chief Operating Officer Reviewer Head of Corporate Services Version

More information