District 3A ITS Scoping Study. MEMORANDUM VI Implementation Plan

Size: px
Start display at page:

Download "District 3A ITS Scoping Study. MEMORANDUM VI Implementation Plan"

From this document you will learn the answers to the following questions:

  • What does the system provide?

  • What does CCTV stand for?

  • How do Mayday Systems Mayday systems help emergency responders respond to emergencies?

Transcription

1 District 3A ITS Scoping Study MEMORANDUM VI Implementation Plan March 2004 Prepared by

2 TABLE OF CONTENTS VI. IMPLEMENTATION PLAN... VI-1 A. Overview...VI-1 B. Conceptual Design Approach...VI-1 1. Deployment Schedule and Phasing...VI-1 2. System Component Descriptions...VI-4 3. Migration Plan...VI Software...VI Systems Integration...VI Cost Estimates...VI-11 C. Integration/Scalable Opportunities...VI-13 D. Funding Alternatives...VI Government-Funded Programs...VI Public-Private Partnerships...VI-15 E. Operations and Management Plan...VI Operations...VI Maintenance...VI Personnel Resources...VI Training...VI-18 LIST OF FIGURES Figure VI-1 Short and Intermediate Term Implementation Plan Field Elements VI-3 LIST OF TABLES Table VI-1 Deployment Schedule Table VI-2 Mn/DOT District 3A ITS Scoping Study Implementation Plan VI-2 VI-12 i

3 VI. IMPLEMENTATION PLAN A. Overview Previous project memoranda have identified and documented the following: outreach, inventory and research activities, existing or baseline transportation related conditions, user problems and needs, and recommended Intelligent Transportation System (ITS) technologies. This document provides an implementation strategy and sequence of deployments at a conceptual level to implement the ITS elements of the District. This document identifies a program of coordinated activities by defining what, where, and when these activities will happen. In addition, this document considers the phasing, staffing, and funding options available for deploying the ITS. B. Conceptual Design Approach The conceptual design of the ITS for District 3A has been developed in a series of steps documented in previous memoranda. The insight and information obtained through these steps from partner agencies was critical in the development of the ITS conceptual design for the District. Based upon the partner agency requirements and expectations, many ITS technologies were identified and assessed. As a result, the most applicable ITS technologies and elements for implementation in the District 3A transportation corridor were identified. 1. Deployment Schedule and Phasing Table VI-1 lists the identified recommended ITS technologies for District 3A. The technologies are grouped by anticipated deployment phase. Short-term projects represent initiatives that are recommended for deployment within the next two years. Intermediate projects should be considered for implementation between three and five years from the date of this memorandum. Deployment of projects that have been identified as long-term should be considered beyond six years from the publication date. However, the phasing of recommended technologies will need to be reevaluated as funding becomes available and as the needs of stakeholders and partner agencies develop over the coming years. VI-1

4 Table VI-1 Deployment Schedule Short Term (0 2 years) Emergency Vehicle Preemption Closed Loop Signal Control Closed Circuit Television (CCTV) Surveillance Road Weather Information Systems (RWIS) Inductive Loop and Non-Invasive Detection Weather Information Dissemination Systems Dynamic Message Signs (DMS) Interagency Signal System Coordination Automatic Anti-Icing System Route Diversion System Paratransit Reservations/Scheduling/Dispatch Software Computer Aided Dispatch (CAD) Control Center Intermediate Term (3 5 years) Inductive Loop and Non-Invasive Detection Automatic Anti-Icing System Seasonal Service Patrols Closed Circuit Television (CCTV) Surveillance Dynamic Message Signs (DMS) Road Weather Information Systems (RWIS) Automatic Vehicle (AVL) Highway-Rail Alert/Crossing Systems Automated Visibility Warning Systems Paratransit Reservations/Scheduling/Dispatch Software Access for County/City Agencies Long Term (6 10 years) Closed Circuit Television (CCTV) Surveillance Dynamic Message Signs (DMS) Seasonal Service Patrols Transit AVL/MDT Systems Public Vehicle Fleet Management Systems Smart Plows/Agency Vehicle Monitoring Integrated Land/Mobile Radio Integrated Weather Monitoring/Prediction Systems Integrated Communications Systems Paratransit Reservations/Scheduling/Dispatch Software Ongoing Public Agency Outreach for Transportation Management Television/Radio Information on the Internet 511/Traffic Information Telephone Number Mayday Systems Geographic Information Systems (GIS) Coordination of Rural Transit Services VI-2

5 \\IL01SNT01\projects\ \Memoranda\IPM\Imp Plan Memo.doc VI-3

6 2. System Component Descriptions Each of the functions of an ITS requires one or more elements or components. A number of these components require hardware that must be physically in place; others are procedures and strategies that are enacted by agency personnel. Generally, these components can be categorized as existing either in the field, as part of a communication linkage, or within a control center. Therefore, the ITS components of District 3A have been broken down into three categories: field elements, integration/control center, and communications. Proposed field element locations for the short and intermediate term vision are shown in Figure VI-1. a. Field Elements (1) Emergency Vehicle Preemption Emergency vehicles occasionally run into heavy queues near signalized intersections. Emergency vehicle preemption is a system that will be installed allowing emergency vehicles to receive a green signal and clear the queue as they approach an intersection. This system consists of a transmitter located inside the emergency vehicle and a receiver and confirmation light mounted on the traffic signal poles or mast arms. Transmitters are typically installed on fire and ambulance vehicles. s District 3A Signals Little Falls Ambulance Services Various Fire Vehicles (2) Closed Loop Traffic Signal Control Closed loop traffic signal control allows for real-time coordination of traffic signals using a centralized software system. A field master communicates directly with the centralized software and in turn, communicates to local traffic signal controllers. Closed loop systems can communicate via fiber optics, wireless, twisted pair, and telephone lines. Closed loop systems maximize the efficiency of corridor traffic signal operations. s Brainerd, Baxter, Little Falls Traffic Signals Central Control Software at and City Engineering (3) Closed Circuit TV (CCTV) Surveillance Pan-tilt-zoom CCTV cameras will be used throughout the district as an effective tool for monitoring traffic conditions and verifying incidents on major routes and at major intersections. Also, several existing camera VI-4

7 sites will require upgraded communications links to enhance the quality of video at the. Camera s Baxter (HWY HWY 371) Brainerd (HWY 8 th Ave. and RTE. 3) Fort Ripley Nisswa Garrison Onamia Remer Long Prairie All existing RWIS Sites Communications Upgrade s Baxter (HWY Business HWY 371) Brainerd International Raceway (HWY 371 north of Baxter) (4) Road Weather Information Systems (RWIS) Road weather information systems provide site specific weather information for key points in the district. RWIS also provides information for weather prediction models and can be used for traveler information purposes. s Fort Ripley Nisswa Garrison Long Prairie Onamia Remer (5) Dynamic Message Signs (DMS) DMS installations will be either permanent or temporary, depending on location. In general, these electronic signs will provide updates to the motoring public on construction staging, travel times, and incidentrelated information. s HWY 371 (North and South of Baxter) HWY 169 (South of Onamia, North of HWY 18, North of Milaca) HWY 6 (North of HWY 18) HWY 10/371 (North of Little Falls) Motley (Northbound and Eastbound) Aitkin (6) Automatic Anti-Icing System VI-5

8 Automatic anti-icing systems are installed at locations prone to icy conditions. Anti-icing systems dispense a chemical solution on the roadway when conditions warrant. Anti-icing systems are typically installed on bridge decks. These systems benefit drivers by increasing highway safety at specific locations. s TH 10 Eastbound Royalton Bridge RTE 3 (North of Brainerd) HWY 10 (North of Little Falls) (7) Route Diversion Systems Route diversion systems provide an effective tool for law enforcement to quickly and easily implement an alternate route during major incidents and construction. Route diversion systems typically include static signing, variable message signs, and increased coordination between agencies. Route diversions allow drivers to continue their travels at a reasonable rate of speed in the event that a major route becomes blocked or closed. HWY 371 (North of Baxter) (8) Inductive Loop and Non-Invasive Detection Depending on the location, both intrusive (in-pavement) and nonintrusive detection systems will be used on the freeway segments in the District. The volume, speed, and occupancy data obtained from these detectors will be used to monitor traffic conditions, detect incidents, and provide traveler information. s Fort Ripley Nisswa Garrison Long Prairie Onamia Remer Verndale Rice (9) Seasonal Service Patrols Service patrols provide an early response to motorists involved in crashes and vehicle breakdowns. Service patrols are assigned to a specific route with high traffic volumes and frequent incidents. In District 3A, service patrols would be used during seasonal peaks to alleviate traffic congestion due to incidents. VI-6

9 HWY 371 (Baxter to Pequot Lakes) (10) Automatic Vehicle (AVL) Automatic vehicle location allows dispatchers to know the exact location and status of their agencies vehicles. AVL maximizes the efficiency of maintenance operations and emergency vehicle response. AVL software is part of a statewide initiative and the migration plan. Districtwide (11) Highway-Rail Alert/Crossing Systems Railroad crossing detection will be used at highway-rail intersections near emergency vehicle response stations and high volume intersections for the coordination of vehicular and train movements. Specifically, railroad crossing detection will provide responders and travelers with information on the blocked crossings. s To be determined (12) Automated Visibility Warning Systems Automated visibility warning systems make use of specialized sensors and variable message signs to alert motorists of low visibility conditions. Automated visibility warning systems are typically used for fog and blizzard conditions. Garrison (South) (13) Transit AVL/MDT Systems Transit AVL/MDT systems provide real time transit locations and communications for transit operators and dispatchers. These systems can be cost effective for small transit operations and increase operational efficiency. s Mille Lacs Crow Wing Wadena b. Integration/Control Center (1) Weather Information Dissemination Systems VI-7

10 Weather information dissemination systems make use of RWIS data to provide motorists with the latest weather conditions on heavily traveled corridors. The RWIS information would be integrated with the existing 511 traveler information system. - Baxter (2) Interagency Signal System Coordination Interagency signal system coordination allows agencies to access adjacent traffic signal system data for coordination purposes. System coordination maximizes the efficiency of corridor signal operations. Baxter - Brainerd (3) Computer-Aided Dispatch (CAD) Computer aided dispatch is part of a larger ongoing statewide initiative to integrate emergency services and maintenance responders via mobile computer systems. CAD allows dispatchers an additional means to communicate with emergency responders and maintenance operators. - Baxter (4) Control Center The statewide program is in the process of upgrading nine control center facilities throughout Minnesota. The control center is the primary means for communicating with and operating field elements recommended for implementation. The control center also provides an entry point for local agencies, such as cities and counties, to access traveler information data from Mn/DOT and the Minnesota State Patrol. - Baxter (5) Paratransit Reservations/Scheduling/Dispatch Software Paratransit operations software allows paratransit agencies to maximize efficiency of services using computer based scheduling and customer data. s Crow Wing Mille Lacs Wadena VI-8

11 (6) Public Vehicle Fleet Management Systems Public vehicle fleet management systems are closely linked with automatic vehicle location technology. Public vehicle fleet management provides a database for storing information acquired from the fleet utilizing the AVL technology. - Baxter (7) Smart Plows/Agency Vehicle Monitoring The intelligent vehicle initiative provides state of the art technology for snow plows including collision avoidance systems, driver heads up display, GPS location, and others. Smart plows can increase the safety and efficiency of winter maintenance operations. - Baxter (8) Integrated Weather Monitoring/Prediction Systems Integrated weather monitoring and prediction systems make use of RWIS sensor data and control center software to develop models to predict weather patterns. The information provided by the monitoring and prediction systems can be used by managers for staffing assignments and to provide traveler information for the motoring public. - Statewide (9) Television/Radio Television and radio provide a large audience for traveler information. Television and radio can provide important travel information to their viewers/listeners by accessing pre-approved data. - Baxter (10) Information on the Internet The Internet provides a large audience for traveler information. Traveler information can be provided to Internet users allowing them to access real-time travel information. The Internet is also an entry point into the latest in-vehicle information displays and will eventually provide travel information to drivers on demand. - Baxter/Statewide VI-9

12 (11) 511/Traffic Information Telephone Number 511 is the dedicated traveler information telephone number. Mn/DOT currently operates an extensive 511 program that can be accessed via phone and the internet. New information will need to be integrated into the 511 system as data becomes available. Baxter/Statewide (12) Mayday Systems Mayday systems provide improved response times for emergency responders by locating and identifying traffic incidents early. The should serve as the answering point and coordinator for any mayday activated responses. Baxter/Statewide (13) Geographic Information Systems (GIS) Geographic Information Systems can be a valuable tool for planning purposes. Data collected from field devices and the should be put into a format that is GIS compatible. The databases would be made available to other agencies such as the regional planning commission, local government, and law enforcement. - Baxter (14) Coordination of Rural Transit Services Rural transit service coordination benefits rural transit agencies, by combining the efforts of scattered transit and paratransit agencies to improve the efficiency and effectiveness of regional transit. Districtwide c. Communications (1) Integrated Communications Systems Integrated communications systems utilizes technologies to coordinate inter-agency operations in real-time. Integrated communications are the first step to exchanging information between agencies. Districtwide VI-10

13 3. Migration Plan (2) Integrated Land/Mobile Radio Emergency responders use land-mobile radio systems to dispatch units to respond to an incident. Assigned frequencies based upon their parent agency and function, the responders are typically unable to use their radios at the incident site. There are on-going efforts to integrate these systems to improve communications at an emergency. Districtwide The Migration Plan outlines the effort by the Minnesota Department of Transportation and Department of Public Safety to integrate services and deploy regional traffic operations communications centers throughout the state. One such deployment is located in District 3A at the State Patrol District 2800 headquarters. The current facility includes two operator computer workstations. During future expansion to the communications facility, space for a third operator workstation is recommended. The plays a major role in the operations of field equipment recommended for implementation by this study. The also provides a gateway for the availability of travel information by providing regional information to the statewide 511 traveler information system. 4. Software ITS software will be required to operate and control the ITS elements in District 3A, as well as integrate local operations. The program currently makes use of the Virtual Traffic Operations Center (VTOC) software provided by ADDCO, Inc. The VTOC software provides numerous operational modules and can be customized specifically for District 3A. 5. Systems Integration The integration of ITS components with existing elements, systems, and control centers is an issue that has routinely been discussed to date amongst partner agencies. Partner agencies have expressed an interest to have all ITS components and subsystems required for the implementation of the ITS system to be integrated to the extent possible in order to be able to communicate with each other and work together. As such, the ITS should be designed to provide flexibility and accommodate system expansion so that components and subsystems will be easily integrated. 6. Cost Estimates Table VI-2 includes cost estimates for the implementation of the recommended ITS technologies. Costs are shown in 2004 values. related programs are assumed to be already funded through the statewide program. The overall program cost is estimated to be about six million dollars, including annual operations and maintenance costs. VI-11

14 Table VI-2 Mn/DOT District 3A - ITS Scoping Study Implementation Plan PRIORITY PROJECT LOCATION(S) NUMBER OF UNITS UNIT COST DEPLOYMENT COST ANNUAL OPERATIONS & MAINTENANCE COST Short Term (0-2 years) Emergency Vehicle Preemption - In Vehicle Actuators High Little Falls, Ambulance Services, Various Fire Vehicles 40 $1,500 $60,000 $3,000 Emergency Vehicle Preemption - Traffic Signal Units High District 3A Signals 13 $8,000 $104,000 $5,200 Closed Loop Signal Control - Communications Medium Brainerd, Baxter, Little Falls Signals 17 $10,000 $170,000 $8,500 Closed Circuit TV (CCTV) Surveillance High Baxter (HWY HWY 371), Brainerd (HWY 8th Ave. & RTE 3), Nisswa**, All 8 Existing RWIS Sites 12 $30,000 $360,000 $18,000 Closed Circuit TV (CCTV) Communications Upgrade High Baxter (HWY Business HWY 371), BIR (371 N of Baxter) 2 $15,000 $30,000 $1,500 Road Weather Information Systems (RWIS) High Nisswa 1 $30,000 $30,000 $1,500 Inductive Loop and Non-Invasive Detection High Nisswa**, Verndale**, Rice** 3 $5,000 $15,000 $750 Weather Information Dissemination Systems* Dynamic Message Signs (DMS) High HWY 371 (North & South of Baxter), HWY 169 (South of Onamia, North of HWY 18, North of Milaca), HWY 6 (North of HWY 18), HWY 10/371 (North of Little Falls) 7 $70,000 $490,000 $24,500 Automatic Anti-Icing System High TH 10 EB Royalton Bridge 1 $20,000 $20,000 $1,000 Route Diversion Systems High HWY 371 (North of Baxter) 1 $75,000 $75,000 $3,750 Paratransit Reservations/Scheduling/Dispatch Software Medium Crow Wing 1 $3,000 $3,000 *** Computer-Aided Dispatch (CAD)* Control Center* Sub-Total $1,357,000 $67,700 Intermediate Term (3-5 years) Inductive Loop and Non-Invasive Detection High Onamia**, Remer**, Fort Ripley**, Garrison**, Long Prairie** 5 $5,000 $25,000 $1,250 Emergency Vehicle Preemption - Traffic Signal Units High District 3A Signals 13 $8,000 $104,000 $5,200 Automatic Anti-Icing System High HWY 10 (North of Little Falls), RTE 3 (North of Brainerd) 2 $200,000 $400,000 $20,000 Closed Circuit TV (CCTV) Surveillance Medium Onamia**, Remer**, Garrison**, Fort Ripley**, Long Prairie** 5 $30,000 $150,000 $7,500 Dynamic Message Signs (DMS) Medium Motley (NB and EB), Aitkin 3 $70,000 $210,000 $10,500 Road Weather Information Systems (RWIS) Medium Onamia, Remer, Garrison, Fort Ripley, Long Prairie 5 $30,000 $150,000 $7,500 Automatic Vehicle (AVL)* Highway-Rail Alert/Crossing Systems Low TBD 10 $16,000 $160,000 $8,000 Automated Visibility Warning Systems Low Lake Mille Lacs 2 $75,000 $150,000 $7,500 Paratransit Reservations/Scheduling/Dispatch Software Low Mille Lacs, Wadena 2 $10,000 $20,000 *** Access for County/City Agencies**** High Brainerd, Baxter, Little Falls, Crow Wing County, Cass County, Morrison County 6 $25,000 $150,000 $7,500 Sub-Total $1,519,000 $74,950 Long Term (6-10 years) Closed Circuit TV (CCTV) Surveillance Medium TBD 2 $30,000 $60,000 $3,000 Dynamic Message Signs (DMS) Medium TBD 2 $70,000 $140,000 $7,000 Seasonal Service Patrols Low HWY 371 (Baxter to Pequot Lakes) 5 $30,000 $150,000 NA Transit AVL/MDT Systems Low Mille Lacs, Crow Wing, Wadena 15 $10,000 $150,000 $7,500 Interagency Signal System Coordination TBD Brainerd/Baxter 1 $20,000 $20,000 $1,000 Closed Loop Signal Control - Control Software TBD Brainerd/Baxter/ 1 $200,000 $200,000 $10,000 Public Vehicle Fleet Management Systems* Smart Plows/Agency Vehicle Monitoring* Integrated Land/Mobile Radio* Integrated Weather Monitoring/Prediction Systems* Integrated Communications Systems* Paratransit Reservations/Scheduling/Dispatch Software Low Cass, Todd Counties (New Systems) 2 $10,000 $20,000 *** Upgrade Paratransit Software Low Crow Wing, Mille Lacs, Wadena, Cass, Todd 5 $10,000 $50,000 *** Sub-Total $790,000 $28,500 Ongoing Public Agency Outreach for Trans. Man. High 10 $2,000 $20,000 NA Districtwide Television/Radio High 10 $5,000 $50,000 NA Information on the Internet* 511/Traffic Information Telephone Number* Mayday Systems* Geographic Information Systems (GIS)* Coordination of Rural Transit Services Medium Districtwide 10 $5,000 $50,000 NA Sub-Total $120,000 Contingency 20% $757,200 $283,820 Total $4,543,200 $1,702,920 Total Yearly Cost Breakdown (per year, including operations and maintenance costs) Year 1 $758,200 Year 2 $758,200 Year 3 $660,983 Year 4 $660,983 Year 5 $660,983 Years 6-10 (per year) $341,150 Total Program Cost $6,246,120 * Funded under existing Mn/DOT Program ** Part of RWIS Installation *** Transit O&M Costs Programmed by Local Agencies **** Possible Future Access for Cities/Counties with Transit NOTE - All Costs Shown in 2004 Dollars Mn/DOT District 3A ITS Scoping Study - VI-12

15 Several ITS efforts that are identified as being priority in this plan are expected to move forward as elements of broader statewide projects or programs such as the Transportation Operations and Communications Center () project. Although these proposed efforts would not be pursued at the District level, they are considered integral to the overall vision of this District plan. C. Integration/Scalable Opportunities Many similarities exist between the rural areas of Minnesota and several technologies from the District 3A Scoping Study have been recommended in other areas of the state. Several initiatives that have been discussed could be implemented on a statewide or regional basis. Implementing the technology on a regional or statewide basis would be beneficial in many ways. Procurement of equipment would be more cost effective and compatibility between devices would be almost guaranteed. The learning curve for operations and maintenance would be drastically reduced by using knowledge from other districts that may have already implemented similar systems. The systems identified throughout the state for possible statewide or regional deployment include the following. (Initiatives recommended for implementation in District 3A in bold.) Emergency Vehicle Operations Rural Transit Travel Information Awareness and Dissemination Speed Reduction/Traffic Calming RWIS Upgrades/Additional Installations Deployment and Integration with other s or centers CVO Traveler Information Anti Icing Automatic Vehicle (AVL) Interagency Communications Agency Agreement Documentation Highway Railroad Intersection Safety and Train/Crossing Detection Portable Dynamic Message Sign (PDMS) Deployment D. Funding Alternatives The principal source of government funding for transportation-related projects in the past decade has been through the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) and the Transportation Equity Act for the 21 st Century (TEA-21) passed in ISTEA provided and authorized federal funding for highway, highway safety, public transit, and other surface transportation programs. TEA-21 has built on and continues the initiatives established by ISTEA and combines them with new initiatives. These initiatives seek to meet the challenges of improving safety as traffic continues to increase at record levels, while protecting and enhancing communities and the natural environment, and advancing economic growth through providing efficient, safe, and flexible transportation. Specifically as it relates to ITS, TEA-21 established the ITS Deployment Program to facilitate the integrated deployment of ITS in the United States. The ITS Deployment Program includes two main components: the ITS Integration component and the Commercial Vehicle ITS Infrastructure Deployment component. In general, the ITS Integration component provides federal ITS funding for the integration and interoperability of ITS in metropolitan and rural areas; and, the Commercial Vehicle ITS Infrastructure Deployment component provides federal ITS funding to deploy Commercial Vehicle Information Systems and Networks (CVISN). VI-13

16 In addition to ITS funding programs under TEA-21, several of the following standard funding categories have also been used to fund ITS related activities: 1. Government-Funded Programs a. Congestion Mitigation and Air Quality Program (CMAQ) This funding category can only be applied to projects that do not expand highway capacity for single occupant vehicles and that have quality benefits in Clean Air Act non-attainment areas for ozone and carbon monoxide. b. National Highway System (NHS) The NHS funding category can be applied to any road defined by the State of Minnesota. Project types eligible for funding on these facilities includes: construction; reconstruction; maintenance and operational improvements; safety; traffic management; parking areas; carpool/vanpool projects; and bicycle/pedestrian projects. Projects on NHS routes must be included in the Transportation Improvement Program (TIP). c. Surface Transportation Program (STP) The STP funding category can be applied to any road classified as an urban or rural arterial, urban collector or rural major collector. Project types eligible for funding on these facilities includes: construction; reconstruction and maintenance of roadways and bridges; transit capital projects; safety projects; traffic monitoring, management and control projects; air quality related transportation control measures; and planning and management activities. Projects on STP routes in urban areas must be included in the Metropolitan TIP. d. STP Set Aside for Safety Improvement Program The overall objective of this funding category is to reduce the number and severity of accidents and decrease accident potential on all public roads other than interstates. This funding mechanism includes planning, implementation, and evaluation of safety programs and projects under processes developed by the state and local governments and FHWA. e. Traffic Impact Mitigation Funding This category can be applied to highway construction projects that can cause traffic to divert to alternate routes. In many cases, diversion tends to occur on local streets near the construction area. Typically, construction projects designate funding to help mitigate or reduce the traffic impacts generated by the project. Re-timing of traffic signal systems, additional law enforcement, enhanced freeway patrols in construction zones, and additional traveler information are examples of traffic mitigation measures that have been utilized in other parts of the country. VI-14

17 f. Other Funding Other potential government funding sources could include emergency government, Department of Natural Resources Hazardous Materials Program (DNR HAZMAT), Minnesota State Police and County Sheriff resource programs, and the state tourism program. These programs could assist with: enhanced freeway patrols; patrol vehicle push bumpers; accident investigation sites; computer-aided dispatch (CAD) and 911 enhancements; incident management legislation; and, traveler information programs. 2. Public-Private Partnerships Public-private partnerships have been used to both leverage and increase funding resources for ITS projects. Some examples of potential private partners that have assisted with service patrols, traveler information, and communications networks located in other areas of the country are: utility and telecommunications companies; commercial radio and TV companies; trucking organizations; and insurance companies. Beyond these ITS funds and alternatives, it is expected that partner agencies will continue to seek supplemental ITS funds from other normal federal funding programs and resource sharing opportunities such as those noted above. This approach is consistent with national trends towards mainstreaming ITS activities into the more traditional transportation project funding requests. It should also be noted that national trends are also moving towards making provisions for federal funding of operations and management related activities. This is particularly relevant to District 3A because of the significant effort that will ultimately be involved in operating and maintaining the ITS. As such, partner agencies should stay abreast of any developments in this area in particular in order to maximize the potential for supplemental and future ITS funds. E. Operations and Management Plan The success of the ITS will depend on the commitment of the partner agencies to provide adequate resources to operate and maintain the system. Typically, the focus is on the costs of constructing and installing the ITS elements and little attention is given to the follow-on operations and maintenance of the system. In addition, this problem has been magnified in recent years by the increasing complexity of the ITS components being implemented. It is recommended that these documents be prepared by an ITS consultant using a process that would include such items as surveys, interviews, and meetings. These meetings would discuss partner expectations; evaluate alternative operational scenarios, strategies and control tactics; evaluate maintenance alternatives; and provide a neutral forum for resolving conflict and reaching a consensus on operational and maintenance-related issues. The ITS Operations Plan would be written to provide guidance for the day-to-day operations of the ITS elements, and to define the jurisdictional roles and responsibilities of each partner agency. An ITS Maintenance Plan would be written to define the maintenance roles and responsibilities for each partner agency s specific ITS components of the project. In addition to addressing VI-15

18 operational and maintenance procedures, these plans would need to address the staffing, training, and support equipment requirements of each agency. 1. Operations operations should be standardized on a statewide basis to maximize the effectiveness of the program and enable information sharing between centers. The program plans to act as a communications hub for the following services: emergency response, enforcement, incident management, transit services (where possible), maintenance operations, traffic management, and traveler information. operations staff will need to be proficient communicators for all of the services to be provided. Comprehensive training and an operations guide will provide resources and basic functional information for the operators. Local agencies involved with the operations should also be trained on the basic applications and limitations for the. The planned hours of operation are 24 hours a day, seven days a week. operators would continue their primary duties of answering 911 calls and communicating with state patrol field officers. The additional information available to the operators would enhance their ability to provide field officers with information. Increased capabilities would also allow dispatchers to communicate pertinent information to the media, traveling public, and other agencies. 2. Maintenance a. Design Modification/Configuration Management Problems with the design or operation of ITS often develop, or only become apparent, after implementation. As a result, a design modification can be required to correct a recurring problem or to update the ITS equipment to current design standards and specifications. Typical design modifications could include the addition or removal of special equipment, new software functions, changes in displays, configurations, or locations, and upgrading ITS equipment or communications system components. However, once a system has been placed in operation, no changes to the system should be made without assessing their impact on existing operations and maintenance. Policies and procedures should be established and followed to approve and document all changes to the equipment and system configurations hardware or software. b. Preventative Maintenance This level of maintenance is the most labor intensive. However, it is also the most efficient and least intrusive on system operations. It typically consists of periodically testing the equipment to validate its performance, predicting and preventing system failures by routinely replacing expendable hardware, and cleaning the equipment and its enclosures. The intent of preventative maintenance is to keep the ITS components and equipment operating at their asinstalled conditions. As a result, interruptions are scheduled to minimize their impact on system operations. VI-16

19 c. Responsive Maintenance 3. Personnel Resources With responsive maintenance, agencies limit maintenance to only those systems experiencing problems and outages. This level of maintenance includes both field procedures used to restore operation as well as shop procedures to repair and rehabilitate the malfunctioning equipment. In general, responsive maintenance has six steps: 1) Notification; 2) Site Security; 3) Fault Isolation; 4) System Restoration; 5) Equipment & System Rehabilitation; and 6) Documentation. Depending on the nature of the problem and its severity, Steps 4 and 5 can be combined. Responsive maintenance will keep the system operating between the as-built and failed-system conditions. Each partner agency should have a plan describing acceptable responses in terms of staff and timeliness for every ITS subsystem and their major component. These three levels of maintenance can be broken down further into functional classifications: local-control, system-control, and physical plant. Examples of local-control items include intersection vehicle-detectors, traffic signal interconnects, traffic signals and other ITS equipment hardware. System-control items include the communications backbone and local distribution, video surveillance subsystem, vehicle detection subsystem, dynamic message signs and their subsystem, local and distributed firmware, computer hardware, and software. The physical-plant includes, for example, furniture, the heating and air conditioning system, and the electrical power distribution, and telephone systems. Over the last decade, the FHWA, in partnership with other transportation organizations (FTA, ITS America, etc.), has comprehensively investigated the staffing levels, personnel skills, and training requirements for ITS applications and traffic control systems. Their research has identified that a majority of ITS applications and traffic control systems are not operating at their full potential. They identified the predominant problems as: A lack of commitment to provide adequate funding and staffing for day-to-day operations and comprehensive maintenance The staff s lack of technical knowledge of how the ITS related hardware and software functions, as well as the general principles of traffic operations and how to use the ITS equipment To ensure that the greatest benefit from the implementation of the ITS plan, adequate operational and maintenance staffing levels and expertise must be provided. Several ITS components will be new and current personnel will not have the time to operate and maintain these new ITS field devices and communications systems. In addition, maintaining the ITS system elements will require different skill-sets from those that are currently used for existing system operations. Accordingly, it is important that the partner agency staff be included in the discussions throughout the ITS design and deployment process. This will help to ensure that the appropriate knowledge will be provided on the operations and maintenance of all ITS components. Though the VI-17

20 Migration Plan identifies future needs for equipment and facilities, the plan fails to address the future staffing needs for the ITS program. 4. Training The new ITS element will require that the staff of the partner agencies be involved in a variety of new functions and responsibilities. Accordingly, these personnel will need to be trained on the ITS hardware, software, and communications systems, along with any algorithms that may be used, in order to perform their jobs in a capable manner. At the very least, staff must have a basic understanding and be knowledgeable and capable of working with those aspects of the ITS that directly interface with their agency s operations. Therefore, it is recommended that operations, maintenance, and software training be conducted periodically throughout the ITS deployment and that it include all impacted employees. To initiate this training, two recommended training sessions include the Incident Management Training Program sponsored by the FHWA and the ITS Peer-to-Peer Program sponsored by the FHWA, Federal Transit Administration, and Federal Motor Carrier Safety Administration. These sessions along with other training sessions will provide public sector transportation stakeholders with a convenient method to tap into the growing knowledge base of ITS experience and receive short-term assistance on operating and maintaining the ITS element. All of these ITS related training sessions should be videotaped for use by future employees. In addition, these videotapes should form the basis of an on going ITS training program for the partner agency staff. VI-18

I-29 Corridor ITS Architecture and Systems Engineering Analysis

I-29 Corridor ITS Architecture and Systems Engineering Analysis 430 IACC Building Fargo, ND 58105 Tel 701-231-8058 Fax 701-231-1945 www.ugpti.org www.atacenter.org I-29 Corridor ITS Architecture and Systems Engineering Analysis Technical Memorandum December 2001 Prepared

More information

8 IMPLEMENTATION PLAN. 8.1 Introduction

8 IMPLEMENTATION PLAN. 8.1 Introduction 8 IMPLEMENTATION PLAN 8.1 Introduction An implementation plan for the Illinois Statewide ITS Strategic Plan is the next step of the project planning process. This plan provides a strategy for implementing

More information

Intelligent Transportation Systems Technical Report Summary

Intelligent Transportation Systems Technical Report Summary Intelligent Transportation Systems Technical Report Summary Background What is an Intelligent Transportation System? An Intelligent Transportation System (ITS) improves transportation safety and mobility

More information

Traffic Incident Management Enhancement (TIME) Blueprint Version 2.0 Executive Summary

Traffic Incident Management Enhancement (TIME) Blueprint Version 2.0 Executive Summary Blueprint Version 2.0 Executive Summary Strategic Background The Southeastern Wisconsin region, which encompasses the following eight counties: Fond du Lac, Kenosha, Milwaukee, Ozaukee, Racine, Walworth,

More information

ITS Investment Strategy 10-Year Program, FY07-16

ITS Investment Strategy 10-Year Program, FY07-16 New Jersey Department of Transportation ITS Investment Strategy 10-Year Program, FY07-16 Statewide Traffic Operations ITS Engineering March, 2007 Intelligent Transportation Systems Investment Strategy

More information

Task 7 Oahu ITS Integration Strategy

Task 7 Oahu ITS Integration Strategy Deliverable for: Oahu Regional ITS Architecture Project Task 7 Oahu ITS Integration Strategy Deliverable VII-1 Final Submitted to: Oahu Metropolitan Planning Organization Submitted by: Parsons Brinckerhoff

More information

EFFORTS ACCOMPLISHED TO DATE

EFFORTS ACCOMPLISHED TO DATE 12. Intelligent Transportation Systems The Dallas-Fort Worth (DFW) Metropolitan Area is currently involved in the planning, programming, and implementation of Intelligent Transportation System (ITS) programs

More information

INTELLIGENT TRANSPORTATION SYSTEMS IN WHATCOM COUNTY A REGIONAL GUIDE TO ITS TECHNOLOGY

INTELLIGENT TRANSPORTATION SYSTEMS IN WHATCOM COUNTY A REGIONAL GUIDE TO ITS TECHNOLOGY INTELLIGENT TRANSPORTATION SYSTEMS IN WHATCOM COUNTY A REGIONAL GUIDE TO ITS TECHNOLOGY AN INTRODUCTION PREPARED BY THE WHATCOM COUNCIL OF GOVERNMENTS JULY, 2004 Whatcom Council of Governments 314 E. Champion

More information

CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS)

CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS) CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS) Intelligent Transportation Systems (ITS) enables people and goods to move more safely and efficiently through a state-of-the-art multi-modal transportation

More information

Rhode Island Department of Transportation ITS State Architecture Update

Rhode Island Department of Transportation ITS State Architecture Update Rhode Island Department of Transportation ITS State Architecture Update By: 2014 1 Table of Contents ITS Architecture Description: 1. Introduction - What is an ITS Architecture?... 3 2. Background ITS

More information

Intelligent Transportation Systems (ITS) Concept of Operations for Arterial Traffic Management

Intelligent Transportation Systems (ITS) Concept of Operations for Arterial Traffic Management Intelligent Transportation Systems (ITS) Concept of Operations for Arterial Traffic Management Prepared for: Minnesota Department of Transportation (Mn/DOT) Prepared by: Athey Creek Consultants and Alliant

More information

EXECUTIVE SUMMARY. Syracuse Metropolitan Area Intelligent Transportation Systems Strategic Plan

EXECUTIVE SUMMARY. Syracuse Metropolitan Area Intelligent Transportation Systems Strategic Plan Syracuse Metropolitan Area Intelligent Transportation Systems Strategic Plan Final Report EXECUTIVE SUMMARY Prepared for New York State Department of Transportation & Syracuse Metropolitan Transportation

More information

How to Use the MAG ITS Architecture and Website

How to Use the MAG ITS Architecture and Website MAG Regional ITS Architecture How to Use the MAG ITS Architecture and Website Prepared by: June, 2013 Copyright 2013, Kimley-Horn and Associates, Inc. 1. HOW TO USE THE MAG ITS ARCHITECTURE AND WEBSITE

More information

7.0 Transportation Management

7.0 Transportation Management 7.0 Transportation Management I. Introduction The Kansas City region has invested considerable effort and resources in the design and implementation of its regional multimodal transportation system. As

More information

Portable Traffic Management System Smart Work Zone Application

Portable Traffic Management System Smart Work Zone Application Portable Traffic Management System Smart Work Zone Application Operational Test Evaluation Report IN N ESOT A PA R T M E N T PO DE R TAT I O N M OF TRANS May 1997 PORTABLE TRAFFIC MANAGEMENT SYSTEM SMART

More information

Eastern RTMC. www.dot.state.pa.us

Eastern RTMC. www.dot.state.pa.us Eastern RTMC Regional Traffic Management Centers Agenda District 6 0 TIMS Program Overview Freeway and Arterial ITS Deployments Ongoing/Upcoming Projects Future Concepts TIMS Program Timeline 1993 TMC

More information

Appendix A - Cost Estimate Spreadsheet

Appendix A - Cost Estimate Spreadsheet CCTV Camera, PTZ Per Each $18,500 $1,250 12 $33,500 Closed circuit television (CCTV) camera with pan, tilt, zoom (PTZ) functionality in a dome enclosure. CCTV Camera, Fixed Per Each $14,000 $1,250 12 $29,000

More information

Olympic Region Traffic Management Center. Olympic Radio

Olympic Region Traffic Management Center. Olympic Radio Olympic Region Traffic Management Center Olympic Radio Six Regions - One DOT We work in close partnership with other TMCs 6 WSDOT Regions 6 Regional Traffic Management Centers Tacoma Seattle Vancouver

More information

Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments

Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments The mission of the Traffic Management Center (TMC) within the Boston Transportation Department is to monitor,

More information

Florida Statewide ITS Strategic Plan. Integration of ITS into the MPO Transportation Planning Process Issue Paper

Florida Statewide ITS Strategic Plan. Integration of ITS into the MPO Transportation Planning Process Issue Paper Florida Statewide ITS Strategic Plan Integration of ITS into the MPO Transportation Planning Process Issue Paper 1. INTRODUTION The Metropolitan Planning Organization (MPO) planning process provides a

More information

Quick-Starting Your. Regional ITS Architecture Update

Quick-Starting Your. Regional ITS Architecture Update Personal Information Access Transit Management Traffic Management Communications Fixed Point-to-Fixed Point Communica Vehicle Roadway Quick-Starting Your Systems Engineering For ITS Regional ITS Architecture

More information

Delaware Department of Transportation Transportation Management Program

Delaware Department of Transportation Transportation Management Program Delaware Department of Transportation Transportation Management Program Delmarva Freight & Goods Movement Task Force Meeting December 4, 2013 Overview ITMS Background Relationship to Freight and Goods

More information

Metropolitan Intelligent Transportation Systems (ITS) Infrastructure 2010 Transportation Management Center

Metropolitan Intelligent Transportation Systems (ITS) Infrastructure 2010 Transportation Management Center Metropolitan Intelligent Transportation Systems (ITS) Infrastructure 2010 Instructions This questionnaire is designed to obtain data measuring the level of Intelligent Transportation System (ITS) implemented

More information

District Wide Traffic Incident Management Strategic Plan

District Wide Traffic Incident Management Strategic Plan Page 1 Executive Summary The District Wide Traffic Incident Management (TIM) Strategic Plan was prepared to provide a roadmap for the Florida Department of Transportation (FDOT) District 4 to advance their

More information

Incident Management. Index. Purpose. Description. Relevance for Large Scale Events. Options. Technologies. Impacts. Integration potential

Incident Management. Index. Purpose. Description. Relevance for Large Scale Events. Options. Technologies. Impacts. Integration potential Incident Management Index Purpose Description Relevance for Large Scale Events Options Technologies Impacts Integration potential Implementation Best Cases and Examples 1 of 13 Purpose An incident is an

More information

CHAPTER 8 Integration of Systems

CHAPTER 8 Integration of Systems Integration of Systems CHAPTER 8 Integration of Systems 8-1 Advanced Transportation Management Technologies 8-2 Integration of Systems Individual metropolitan intelligent transportation infrastructure

More information

The development of this ITS Communications Plan was a joint project of the Metropolitan Topeka Planning Organization (MTPO) and Kansas Department of

The development of this ITS Communications Plan was a joint project of the Metropolitan Topeka Planning Organization (MTPO) and Kansas Department of The development of this ITS Communications Plan was a joint project of the Metropolitan Topeka Planning Organization (MTPO) and Kansas Department of Transportation (KDOT). Development of this ITS Communications

More information

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda MAP 21 themes Strengthens America s highway and public transportation systems Creates jobs and supports economic growth Supports the Department s aggressive safety agenda Simplifies and focuses the Federal

More information

Incident Management Challenges and Solutions

Incident Management Challenges and Solutions Incident Management Challenges and Solutions Welcome and Introductions Kentucky Transportation Cabinet Chuck Knowles Presented by the Kentucky Transportation Cabinet and the Kentucky Transportation Center

More information

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS October 2015 Background The Surface Transportation Program (STP) was originally established as Section 133 of

More information

Some questions. What s next? What is the TMA? Why a TMC? What will the Chicago TMC do? What s done so far? Existing systems Related projects

Some questions. What s next? What is the TMA? Why a TMC? What will the Chicago TMC do? What s done so far? Existing systems Related projects Some questions What is the TMA? Why a TMC? What will the Chicago TMC do? What s done so far? Existing systems Related projects What s next? An Overview Signal systems Traveler information Transit and traffic

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

APPENDIX A Dallas-Fort Worth Region Transportation System Management Strategies and Projects

APPENDIX A Dallas-Fort Worth Region Transportation System Management Strategies and Projects APPENDIX A Transportation System Management Strategies and Projects Transportation System Transportation System Management Projects Management Strategies Traffic Signalization and Control New Signal Installation

More information

TRANSPORTATION Carson Howell, Analyst

TRANSPORTATION Carson Howell, Analyst State of Utah FY 2008 Budget Recommendations Carson Howell, Analyst AGENCY BUDGET OVERVIEW Mission: Build and maintain the State s transportation system, plan and implement new highway projects, improve

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

STATEWIDE ITS ASSETS 1

STATEWIDE ITS ASSETS 1 STATEWIDE ITS ASSETS 1 STATEWIDE IINITIATIVES: Increase safety through better incident management. Improve detection and emergency response. Gather and share real-time traveler information. Manage traffic

More information

Table of Contents. 1.1. Introduction 1. 1.2. System Needs 2. 1.3. Potential Projects 3. 2.1. Background 5. 2.2. Objectives 5

Table of Contents. 1.1. Introduction 1. 1.2. System Needs 2. 1.3. Potential Projects 3. 2.1. Background 5. 2.2. Objectives 5 Table of Contents Page 1. Executive Summary 1.1. Introduction 1 1.2. System Needs 2 1.3. Potential Projects 3 2. Introduction 2.1. Background 5 2.2. Objectives 5 2.3. Plan Development Process 6 2.4. TCC

More information

Transportation Operations & Management Center Implementation Plan

Transportation Operations & Management Center Implementation Plan Kansas Statewide Transportation Operations & Management Center Study KDOT Project No. 106 K-9062-01, Task 10 Transportation Operations & Management Center Implementation Plan September 2005 Prepared by:

More information

DALLAS FORT WORTH REGIONAL INCIDENT MANAGEMENT PROGRAM AND COMMITMENT LEVEL SURVEY

DALLAS FORT WORTH REGIONAL INCIDENT MANAGEMENT PROGRAM AND COMMITMENT LEVEL SURVEY DALLAS FORT WORTH REGIONAL INCIDENT MANAGEMENT PROGRAM AND COMMITMENT LEVEL SURVEY 2014 TexITE SPRING MEETING Jory Dille May 30, 2014 North Central Texas Council of Governments Overview of NCTCOG Incident

More information

September 8th 8:30 AM 10:00 AM PL1: Reinventing Policy to Support the New ITS

September 8th 8:30 AM 10:00 AM PL1: Reinventing Policy to Support the New ITS September 8th 8:30 AM 10:00 AM PL1: Reinventing Policy to Support the New ITS September 8th 10:30 AM 12:00 PM AM01: Sustainable Transportation Performance Measures: Best Practices September 8th 10:30 AM

More information

INDOT 2000-2025 Long Range Plan

INDOT 2000-2025 Long Range Plan Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process

More information

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS Please provide the following information when applying to RPA 14/ATURA for Surface Transportation Program (STP) funding for projects

More information

Central Regional Traffic Management Center

Central Regional Traffic Management Center Central Regional Traffic Management Center The Shift to Operations Rich Deen, RTMC Manager, District 8-0 October 5, 2009 ASHE Meeting Where we came from? Circa 1986 Someone in PENNDOT- We can t build our

More information

Policy for the Design and Operation of Closed-Circuit Television (CCTV) in Advanced Traffic Management Systems September 4, 2001

Policy for the Design and Operation of Closed-Circuit Television (CCTV) in Advanced Traffic Management Systems September 4, 2001 I. Introduction. Traffic Engineering and Highway Safety Division Policy for the Design and Operation of Closed-Circuit Television (CCTV) in Advanced Traffic Management Systems September 4, 2001 The New

More information

I-95 Corridor Coalition. Best Practices for Border Bridge Incident Management Executive Summary

I-95 Corridor Coalition. Best Practices for Border Bridge Incident Management Executive Summary I-95 Corridor Coalition Best Practices for Border Bridge Incident Management January 2007 Best Practices for Border Bridge Incident Management Prepared for: I-95 Corridor Coalition Sponsored by: I-95 Corridor

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

Chapter 5 Financial Plan

Chapter 5 Financial Plan The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to

More information

GENERAL. This manual addresses five local programs that are funded under the current Highway Act:

GENERAL. This manual addresses five local programs that are funded under the current Highway Act: OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal

More information

TRANSPORTATION OPERATIONS CENTER (TOC) STRATEGY

TRANSPORTATION OPERATIONS CENTER (TOC) STRATEGY Chapter 6: TRANSPORTATION OPERATIONS CENTER (TOC) STRATEGY 6.1 INTRODUCTION This chapter discusses the Regional Transportation Operations Center (TOC) vision for the Eugene-Springfield metropolitan area.

More information

Moving Ahead for Progress in the 21st Century. 2014 Performance Report

Moving Ahead for Progress in the 21st Century. 2014 Performance Report MAP 21 Moving Ahead for Progress in the 21st Century 2014 Performance Report A report to Florida s Congressional Delegation March 2014 Overview: Because life is precious, FDOT has set the highway safety

More information

DVRPC/District 6 ROP Projects

DVRPC/District 6 ROP Projects Pennsylvania Department of Transportation ROP Overview and Summary DVRPC/District 6 ROP Projects November 2007 76 APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS Page 1 of 15 ST-01: I-95 ITS DEPLOYMENT (DE

More information

CHAPTER 13. Transportation Systems Management & Operations

CHAPTER 13. Transportation Systems Management & Operations CHAPTER 13 TABLE OF CONTENTS Overview / Summary... 1 Introduction... 2 System Management Strategies used in the ROCOG area... 2 Key Management Strategies / Access Management... 13 Implementation Directions

More information

9. OPERATIONS AND MAINTENANCE PLAN. 9.1 Introduction. 9.2 Purpose of Operations and Maintenance Planning. 9.3 Project Operations Planning

9. OPERATIONS AND MAINTENANCE PLAN. 9.1 Introduction. 9.2 Purpose of Operations and Maintenance Planning. 9.3 Project Operations Planning 9. OPERATIONS AND MAINTENANCE PLAN 9.1 Introduction Operations and maintenance planning is a critical component to any transportation system, especially in the case of ITS where new and complex technologies

More information

Concept Of Operations: Fargo-Moorhead Traffic Operations Center

Concept Of Operations: Fargo-Moorhead Traffic Operations Center Concept Of Operations: Fargo-Moorhead Traffic Operations Center December 2014 FINAL REPORT Prepared for: Fargo-Moorhead Council of Governments (Metro COG) Prepared by: Advanced Traffic Analysis Center

More information

OM-13: Transportation Management and Operations

OM-13: Transportation Management and Operations : Transportation and Operations 1-15 points Goal: Maximize the utility of the existing roadway network through use of technology and management of operations strategies. Sustainability Linkage Transportation

More information

Traffic Management Centers

Traffic Management Centers Traffic Management Centers IN A CONNECTED VEHICLE ENVIRONMENT Task 2. Investigation of Expected Changes in TMCs Final Report Prepared for: CTS Pooled Fund Study, University of Virginia Prepared By: November

More information

Federal Guidelines for STP-U Funding

Federal Guidelines for STP-U Funding MPC 5.f Attachment 1 STP-U Eligibility Guidelines Page 1 of 5 Federal Guidelines for STP-U Funding SURFACE TRANSPORTATION PROGRAM (STP) ELIGIBLE EXPENDITURES PERIOD AVAILABLE: FY + 3 Years FUND: Highway

More information

Nashville Regional Intelligent Transportation Systems Architecture

Nashville Regional Intelligent Transportation Systems Architecture Nashville Regional Intelligent Transportation Systems Architecture April 2003 Please Note: This plan reflects the preferred intelligent transportation systems (ITS) deployment strategy without explicit

More information

SECTION 16 TRAFFIC/SAFETY SECTIONS 16.1, 16.2 AND 16.3 ARE UNDER DEVELOPMENT

SECTION 16 TRAFFIC/SAFETY SECTIONS 16.1, 16.2 AND 16.3 ARE UNDER DEVELOPMENT SECTION 16 TRAFFIC/SAFETY SECTIONS 16.1, 16.2 AND 16.3 ARE UNDER DEVELOPMENT 16.1-1 16.4 Intelligent Transportation Systems Introduction The ITS Engineering Unit is responsible for the design of all ITS

More information

CHAPTER 13. Transportation Systems Management & Operations

CHAPTER 13. Transportation Systems Management & Operations CHAPTER 13 TABLE OF CONTENTS Overview / Summary... 1 Introduction... 2 System Management Strategies used in the ROCOG area... 2 Key Management Strategies / Access Management... 12 Implementation Directions

More information

Intelligent Transportation Systems (ITS)

Intelligent Transportation Systems (ITS) Intelligent Transportation Systems (ITS) Statewide Plan Final Report October 2004 (Updated September 2005) Prepared for: North Dakota Department of Transportation Prepared by: Advanced Traffic Analysis

More information

CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP)

CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP) Local Assistance Program Guidelines Chapter 4 CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP) CONTENTS Section Subject Page Number 4.1 INTRODUCTION... 4-1 4.2 ELIGIBILITY CRITERIA... 4-1 General... 4-1

More information

!"! # " " $$ January 2008

!! #   $$ January 2008 !"! # " $$ January 2008 " MISSISSIPPI INTELLIGENT TRANSPORTATION SYSTEM CONCEPT OF OPERATIONS MDOT-ITS 004-01-001 Version 1.0 FINAL DRAFT Prepared for: Prepared by: URS Corporation Gresham, Smith and Partners,

More information

FREEWAY CORRIDOR TRAFFIC MANAGEMENT

FREEWAY CORRIDOR TRAFFIC MANAGEMENT FREEWAY CORRIDOR TRAFFIC MANAGEMENT Table of Contents 3-1.00 INTRODUCTION...2 3-1.01 Purpose...2 3-1.02 Chapter Organization...2 3-2.00 GLOSSARY...2 3-3.00 REGIONAL TRANSPORTATION MANAGEMENT CENTER (RTMC)...3

More information

Table of Contents 1. INTRODUCTION...2 2. INVENTORY OF EXISTING ITS IN THE TULSA REGION...3

Table of Contents 1. INTRODUCTION...2 2. INVENTORY OF EXISTING ITS IN THE TULSA REGION...3 Table of Contents 1. INTRODUCTION...2 2. INVENTORY OF EXISTING ITS IN THE TULSA REGION...3 3. DEVELOPMENT OF THE TULSA REGIONAL ITS ARCHITECTURE...4 3.1 CONFORMITY WITH THE ITS NATIONAL ARCHITECTURE...4

More information

Chapter VIII: Long-Term Outlook and the Financial Plan

Chapter VIII: Long-Term Outlook and the Financial Plan A. Long-Term Outlook Chapter VIII: Long-Term Outlook and the Financial Plan When examining the long-term outlook for transportation planning and programming over the foreseeable future, there are several

More information

Transportation Management & Operation

Transportation Management & Operation Transportation Management & Operation System Safety and Efficiency TEA-21 challenged FHWA and FTA to move beyond traditional infrastructurebased approaches to improve the movement of people and goods.

More information

Traffic Operations Center Concepts for South Dakota

Traffic Operations Center Concepts for South Dakota SD2005-04-X Connecting South Dakota and the Nation South Dakota Department of Transportation Office of Research FREEWAY & ARTERIAL DETECTION & SURVEILLANCE ARTERIAL TRAFFIC SIGNAL CONTROL COORDINATED INCIDENT

More information

Safety Engineering Policy Memorandum

Safety Engineering Policy Memorandum Safety Engineering Policy Memorandum SAFETY 2-13 Automated Traffic Law Enforcement Systems: Red Light Running (RLR) Camera Enforcement Systems and Automated Railroad Grade Crossing (RGC) Enforcement Systems

More information

Regional Surface Transportation Program Policy and Allocation

Regional Surface Transportation Program Policy and Allocation FY 2014-15 Regional Surface Transportation Program Policy and Allocation August 2015 Humboldt County Association of Governments 611 I Street, Suite B Eureka, CA 95501 Phone: 707.444.8208 www.hcaog.net

More information

CHAPTER 8 INTELLIGENT TRANSPORTATION SYSTEMS

CHAPTER 8 INTELLIGENT TRANSPORTATION SYSTEMS 8.0 INTRODUCTION CHAPTER 8 INTELLIGENT TRANSPORTATION SYSTEMS This Chapter of the Tennessee Department of Transportation Traffic Design Manual will be used to address policies, guidelines, standard procedures,

More information

Transportation System Operations and Intelligent Transportation Systems

Transportation System Operations and Intelligent Transportation Systems Transportation System Operations and Intelligent Transportation Systems Oregon Department of Transportation Oregon Broadband Advisory Council Presented by: Galen McGill, PE; Intelligent Transportation

More information

FINAL Intelligent Transportation Systems (ITS) Deployment Strategy for the FM Metropolitan Area December 2014 Prepared For Originally Prepared By:

FINAL Intelligent Transportation Systems (ITS) Deployment Strategy for the FM Metropolitan Area December 2014 Prepared For Originally Prepared By: FINAL Intelligent Transportation Systems (ITS) Deployment Strategy for the FM Metropolitan Area December 2014 Prepared For Originally Prepared By: ACKNOWLEDGEMENTS ITS Deployment Strategy for the FM Metropolitan

More information

INVESTIGATION OF ASIM 29X, CANOGA, RTMS, SAS-1, SMARTSENSOR, TIRTL & OTHER SENSORS FOR AUTOMATIC VEHICLE CLASSIFICATION

INVESTIGATION OF ASIM 29X, CANOGA, RTMS, SAS-1, SMARTSENSOR, TIRTL & OTHER SENSORS FOR AUTOMATIC VEHICLE CLASSIFICATION INVESTIGATION OF ASIM 29X, CANOGA, RTMS, SAS-1, SMARTSENSOR, TIRTL & OTHER SENSORS FOR AUTOMATIC VEHICLE CLASSIFICATION RESEARCH NEED This research will add to the national and local state-of-the-art on

More information

Table of Contents ESF-3-1 034-00-13

Table of Contents ESF-3-1 034-00-13 Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 3 Purpose... 3 Situations and Assumptions... 4 Direction and

More information

Activity Report for FY 2010 Real-time Traffic Signal Adjustments

Activity Report for FY 2010 Real-time Traffic Signal Adjustments Boston Transportation Management Center Activity Report for FY 2010 Real-time Traffic Signal Adjustments The Boston Transportation Department s Transportation Management Center (TMC) holds the mission

More information

TRAFFIC INCIDENT MANAGEMENT OPERATIONS GUIDELINES Omaha Council Bluffs March 24, 2011

TRAFFIC INCIDENT MANAGEMENT OPERATIONS GUIDELINES Omaha Council Bluffs March 24, 2011 TRAFFIC INCIDENT MANAGEMENT OPERATIONS GUIDELINES Omaha Council Bluffs March 24, 2011 ADMINISTERED AND SPONSORED BY THE: AS PART OF THE WESTERN IOWA ITS PROJECT PREPARED BY: Alfred Benesch & Company IN

More information

A Case for Real-Time Monitoring of Vehicular Operations at Signalized Intersections

A Case for Real-Time Monitoring of Vehicular Operations at Signalized Intersections White Paper A Case for Real-Time Monitoring of Vehicular Operations at Signalized Intersections 10 1 0 1 0 TRAFINFO.COM TrafInfo Communications, Inc. 556 Lowell Street Lexington, MA 02420 www.trafinfo.com

More information

The New Brunswick Intelligent Transportation Systems (ITS) Strategic Plan 2008-2018

The New Brunswick Intelligent Transportation Systems (ITS) Strategic Plan 2008-2018 Being A Leader With ITS The New Brunswick Intelligent Transportation Systems (ITS) Strategic Plan 2008-2018 Table of Contents Executive Summary 1 Introduction 2 Background 3 The Vision 4 ITS Research and

More information

LA/VENTURA REGION ITS STRATEGIC DEPLOYMENT PLAN TABLE OF CONTENTS

LA/VENTURA REGION ITS STRATEGIC DEPLOYMENT PLAN TABLE OF CONTENTS TABLE OF CONTENTS 1.0 Introduction 1.1 Purpose... 1-1 1.2 Background... 1-1 1.3 Methodology... 1-8 1.3.1 Development of the LA/Ventura Region ITS Strategic Deployment Plan... 1-10 1.3.2 Supporting Documents...

More information

Mainstreaming Incident Management in Design-Build: The T-REX Experience

Mainstreaming Incident Management in Design-Build: The T-REX Experience Mainstreaming Incident Management in Design-Build: The T-REX Experience Patricia B. Noyes Abstract The Colorado Department of Transportation (CDOT) initiated a design-build project on I-25 and I-225 in

More information

a. Project Name & Location b. Name of the prime design consulting firm responsible for the overall project design. Name: I-77 Dynamic Message Sign Construction / Installation Location: Virginia Name: N/A

More information

OREGON TRANSPORTATION PLAN UPDATE Technology in Transportation. Table of Contents

OREGON TRANSPORTATION PLAN UPDATE Technology in Transportation. Table of Contents OREGON TRANSPORTATION PLAN UPDATE Technology in Transportation Table of Contents ITS BENEFITS...F-1 Traveler Information (Pre-trip and En-route)...F-2 Traveler Safety...F-3 Traffic and Incident Management...F-3

More information

(This page intentionally left blank.)

(This page intentionally left blank.) (This page intentionally left blank.) BROWARD COUNTY TRANSIT Information Technology (IT) Systems Plan July 26, 2013 TRANSIT INFORMATION TECHNOLOGY SYSTEMS PLAN INTRODUCTION In order to develop an appropriate

More information

Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000

Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000 1 of 8 12/27/2013 8:21 AM U.S. Department of Transportation Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000 MAP-21 - Moving Ahead for Progress in the 21st Century

More information

FINAL Advanced Traffic Management System (ATMS) Concept of Operations

FINAL Advanced Traffic Management System (ATMS) Concept of Operations Prepared for Louisiana Department of Transportation and Development Prepared by Transportation April 2011 FINAL Advanced Traffic Management System (ATMS) Louisiana Department of Transportation and Development

More information

PennDOT Traveler Information and Traffic Management Systems Opportunities for Public Private Partnerships. January 9, 2013

PennDOT Traveler Information and Traffic Management Systems Opportunities for Public Private Partnerships. January 9, 2013 Objective is to establish a public-private partnership with one or more contractors to provide the following critical traffic operations services: 1. Design, develop, implement, test, operate, maintain

More information

Wireless Traffic Management System

Wireless Traffic Management System Wireless Traffic Management System 1 Introduction The County of Los Angeles Department of Public Works (LADPW) manages surface street traffic flow in one of the world s largest metropolitan areas. The

More information

Kansas City Scout Traffic Management Center Monthly Report

Kansas City Scout Traffic Management Center Monthly Report Kansas City Scout Traffic Management Center Monthly Report March 2010 Prepared For: KC Scout Board of Directors Prepared By: KC Scout Operations Team March 2010 Table of Contents List of Figures... iii

More information

Knoxville Regional Transportation Planning Organization. Certification Review Report. April 2012

Knoxville Regional Transportation Planning Organization. Certification Review Report. April 2012 Knoxville Regional Transportation Planning Organization Certification Review Report April 2012 Federal Highway Administration Federal Transit Administration Tennessee Division Office Region 4 404 BNA Drive,

More information

Engineered solutions within reach TRAFFIC CONTROL & INTELLIGENT TRANSPORTATION SYSTEMS

Engineered solutions within reach TRAFFIC CONTROL & INTELLIGENT TRANSPORTATION SYSTEMS Engineered solutions within reach TRAFFIC CONTROL & INTELLIGENT TRANSPORTATION SYSTEMS a Quarter of a Century s Experience in Traffic Engineering Technologies Traffic Tech is a leading provider of engineered

More information

GAO INTELLIGENT TRANSPORTATION SYSTEMS. Improved DOT Collaboration and Communication Could Enhance the Use of Technology to Manage Congestion

GAO INTELLIGENT TRANSPORTATION SYSTEMS. Improved DOT Collaboration and Communication Could Enhance the Use of Technology to Manage Congestion GAO United States Government Accountability Office Report to the Committee on Science, Space, and Technology, House of Representatives March 2012 INTELLIGENT TRANSPORTATION SYSTEMS Improved DOT Collaboration

More information

South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures

South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures Prepared for: Prepared by: June 2013 TABLE OF CONTENTS 1. Introduction... 1 1.1 Baseline Understanding...

More information

Module 2.1. Page 1 of 10. Slide 1

Module 2.1. Page 1 of 10. Slide 1 Slide 1 Module 2: Traffic Incident Management Framework & Resources Lesson 2.1 Regional Transportation Management Centers This course was developed by the Baltimore Regional Operations Coordination Committee

More information

QUALITY TRAFFIC INFORMATION

QUALITY TRAFFIC INFORMATION QUALITY TRAFFIC INFORMATION Manuel Fontan, P.E. Engineer III Broward County Public Works Department Highway Construction and Engineering Division 1 North University Dr. Plantation, Florida 33324 +1-954-577-4654,

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

TIM/PSE Peer-to-Peer Overview

TIM/PSE Peer-to-Peer Overview TIM/PSE Peer-to-Peer Overview INTRODUCTION: The Traffic Incident Management (TIM) & Planned Special Events (PSE) Peer-to-Peer (P2P) Program is a Federal Highway Administration Technical Assistance Program

More information

Los Angeles Regional Transportation Management Center

Los Angeles Regional Transportation Management Center California Department of Transportation Los Angeles Regional Transportation Management Center NASCIO Recognition Awards 2008 Category: Cross-Boundary Collaboration and Partnerships Executive Summary In

More information

Business Intelligence System for Traffic Data Integration: Linking Roadway, Collision and Traffic Flow Data to Improve Traffic Safety

Business Intelligence System for Traffic Data Integration: Linking Roadway, Collision and Traffic Flow Data to Improve Traffic Safety Business Intelligence System for Traffic Data Integration: Linking Roadway, Collision and Traffic Flow Data to Improve Traffic Safety Stevanus A. Tjandra, Ph.D. City of Edmonton Office of Traffic Safety

More information

Intergraph Roadway Information Management Solution. Title Title. Title Title. A White Paper

Intergraph Roadway Information Management Solution. Title Title. Title Title. A White Paper Intergraph Roadway Information Management Solution A White Paper Security, Government & Infrastructure, a division of Intergraph Title Title Title Title Table of Contents 1. Introduction... 1 2. Intergraph

More information