1 ASPEN: A Framework for Automated Planning and Scheduling of Spacecraft Control and Operations Alex S. Fukunaga Gregg Rabideau Steve Chien David Yan Jet Propulsion Laboratory California Institute of Technology 4800 Oak Grove Drive, MS Pasadena, CA , USA Abstract A number of successful applications of automated planning and scheduling applications to spacecraft operations have recently been reported in the literature. However, these applications have been one-of-a-kind applications that required a substantial amount of development effort. In this paper, we describe AS- PEN (Automated Planning/Scheduling Environment), a modular, reconfigurable application framework which is capable of supporting a wide variety of planning and scheduling applications. We describe the architecture of ASPEN, as well as a number of current spacecraft control/operations applications in progress. 1 INTRODUCTION Automated planning/scheduling technologies have great promise in reducing operations cost and increasing the autonomy of aerospace systems. Planning 1 is the selection and sequencing of activities such that they achieve one or more goals and satisfy a set of domain constraints. Scheduling selects among alternative plans and assigns resources and times for each activity so that the assignments obey the temporal restrictions between activities and the capacity limitations of a set of shared resources. In addition, scheduling is an optimization task in which metrics such as tardiness and makespan are minimized. Scheduling is a classical combinatorial problem that has long been studied by researchers in operations research. While traditional operations research approaches (c.f. [7]) have focused on optimal solutions for highly restricted classes of problems, there has been much recent interest in the heuristic, constraint-based approaches that are applicable to practical domains. In Proc. Int. Symposium on AI, Robotics and Automation in Space (i-sairas), Tokyo, Japan, We take these definitions of planning/scheduling from [6]. Traditionally, the problems of planning and scheduling have been studied separately. Recently, approaches that integrate both the planning and scheduling process together under a unifying framework in which plans are generated and scheduled simultaneously by a single system (as opposed to using separate planning and scheduling systems) have been developed. Some recent aerospace applications of hybrid planner/schedulers include [10, 11, 15]. Although the benefits of applying planning/scheduling technology can be significant, developing real-world, planning/scheduling systems is often an extremely time-consuming task. Modeling a complex domain requires an expressive modeling language, as well as data structures that represent the constraints expressed in the domain model. In addition, complex data structures and algorithms that support incremental modifications to candidate plans/schedules need to be designed and implemented. In order to enable the rapid development of automated scheduling systems for NASA applications, we have developed ASPEN (Automated Scheduling and Planning ENvironment), a reusable, configurable, generic planning/scheduling application framework. An application framework [14] is a class library (i.e., a reusable set of software components) that provides the functionality of the components found in prototypical instances of a particular application domain. Frameworks anticipate much of an application s design, which is reused in all applications based on the framework. This implies a significant reduction in the amount of code necessary to implement successive systems. The reusable components provided by ASPEN include: An expressive constraint modeling language to allow the user to naturally define the application domain; A constraint management system for representing and maintaining spacecraft operability and resource constraints, as well as activity requirements; 1
2 In Proc. Int. Symposium on AI, Robotics and Automation in Space (i-sairas), Tokyo, Japan, A temporal reasoning system for expressing and maintaining temporal constraints; and A graphical interface for visualizing plans/schedules (for use in mixed-initiative systems in which the problem solving process is interactive). ASPEN is currently being utilized in the development of an automated planner/scheduler for commanding the New Millennium EO-1 satellite and a naval communications satellite, as well as a scheduler for the ground maintenance for the Reusable Launch Vehicle and a design analysis tool for the Pluto Express spacecraft. The rest of the paper is organized as follows: Section 2 describes the architecture of ASPEN and its components. Section 3 describes some current applications of the ASPEN framework, including ground maintenance scheduling for the Reusable Launch Vehicle, as well as operations planning/scheduling for two autonomous satellites. Finally, Section 4 describes related work. 2 The ASPEN Architecture The development of an application framework for a particular domain implies a standardized approach to implementing systems for that domain, and a commitment by the framework developer to support applications that conform to that standardized approach. It is impractical to develop a framework to support all viable approaches to planning and scheduling. Numerous, widely divergent approaches to planning and scheduling have been developed (cf. [3, 20]. Since planning/scheduling are currently very active areas of research, there is no clear consensus on which approaches are most useful. Thus, we restricted the scope of our framework to approaches that had been found useful for NASA applications in the past. 2 By analyzing our previous experience with building planning/scheduling systems, (cf. [15, 11]), as well as requirements for current and future applications, we abstracted a set of requirements that is flexible enough to support a wide range of applications, and developed the components described below: 2.1 Activity Database The central data structure in ASPEN is an activity. An activity represents an action or step in a plan/schedule. An activity has a start time, end time, and a duration. Activities can use one or more resources. All activities in a plan/schedule are elements of the Activity Database (ADB), which maintains the state of all of the activities in the current plan/schedule, and serves as the integrating component that provides an interface to all of the other classes. 2 See [4] for an overview of planning/scheduling applications recently developed at JPL. One function of the ADB is to represent and maintain hierarchical relationships between activities. Activities can contain other activities as subactivities; this facility can be used to reason about the plan/schedule at various levels of abstractions (e.g., a scheduler can first reason about a set of activities without considering that each of those activities are themselves composed of a set of subactivities this can make various reasoning tasks much more computationally tractable. Temporal and resource-constraints between activities are also represented in the ADB. Although most of the actual computational mechanisms that maintain these constraints are implemented in other the modules described below, the protocol that a search algorithm uses to access constraints in the context of a plan/schedule is implemented in the ADB. For example, although the resource timelines are responsible for detecting overuse of resources by activities, the ADB maintains data structures that indicate the assignment of activities to specific timelines, so that one can efficiently ask queries such as, which resources does this activity use? As another example: although the temporal constraint network (see below) is responsible for maintaining temporal constraints between individual activities, the ADB is responsible for global constraints. (e.g., the ADB contains global constraints such as: all activities occur after the start of the scheduling horizon. When an activity is created, the temporal constraint that the activity occurs after the horizon is created automatically by the ADB). 2.2 Temporal Constraint Network A Temporal Constraint Network (TCN) is a graph data structure that represents temporal constraints between activities. A temporal constraint describes the temporal relationship between an activity and other activities and/or the scheduling horizon, and impose an ordering on the set of activities. The TCN implements a Simple Temporal Problem, as defined in [5], and represents a set of constraints, all of which must be satisfied at any given time, i.e., it represents the conjunct of all active constraints between activities in the ADB. Activities are represented in the TCN as pairs of time points, where each time point corresponds to the beginning or end of an activity, and the edges in the TCN graph represent the constraints on the temporal distance between the time points. The TCN can be queried as to whether the temporal constraints currently imposed between the activities are consistent. 2.3 Resource Timelines Resource timelines are used to reason about the usage of physical resources by activities. Capacity conflicts are detected if the aggregate usage of a resource exceeds its capacity at any given time. Several subclasses of resource timelines are implemented, including depletable resource timelines used to
3 In Proc. Int. Symposium on AI, Robotics and Automation in Space (i-sairas), Tokyo, Japan, model consumable resources (e.g., fuel), and non-depletable resources that are used to model resources which are not actually consumed by usage, but are instead reserved for a period of time (e.g., a piece of equipment). Our current model of resource usage is discrete. That is, if we specify that an activity such as move-forward uses 2 units of fuel, then both of these units are modeled as being immediately consumed at the beginning of the activity. This is a discrete approximation, since the usage of the fuel may be better modeled as a linear function such as 2, where is the time elapsed since the beginning of the activity, and is the duration of the activity. 2.4 State Timelines State timelines represent arbitrary attributes, or states, that can change over time. Each state can have several possible values; at any given time, a state has exactly one of these values. Activities can either change or use states. For example, a dooropen activity would set the state of door to be open, while an enter-building activity would require that the state of door be open. As activities are placed/moved in time, the state timeline updates the values of the state, and detects possible inconsistencies or conflicts that can be introduced as a result. For example, an activity that requires that the door be open is placed at time t, then the state timeline checks to verify that the door is in fact open at time t. Otherwise, a state constraint violation is indicated. Users can define legal sequences of state transitions. The state timeline class will detect illegal transition sequences if they are introduced into the timeline. For example, consider modeling a traffic light with a state timeline, traffic-light. The possible values are! " #, $"%, and! "&. The legal state value transitions are: " " to "$"%, $"% to! "&, " "& to " ". All other transitions are illegal. 2.5 Parameter Dependency Network Each activity has a number of parameters that are either userdefined or computed by the system, such as start time, end time, duration, any resources it uses, any states it changes/uses, etc. In ASPEN, it is possible to create dependencies between pairs of parameters within the same activity, or between pairs of parameters defined in different parameters. A dependency between two parameters ' 1 and ' 2 is defined as a function from one parameter to another, ' 1 )(* ' 2, where (*,+- is an arbitrary function whose input is the same type as p2, and whose output has the type of p1. These dependencies are represented and maintained in a Parameter Dependency Network (PDN). The PDN maintains all dependencies between parameters, so that at any given time, all dependency relations are satisfied. Note that if there exists a dependency such that ' 1.(* ' 2, its inverse dependency, ' 2 /(10 1 ' 1 does not necessary exist, unless the user specifies the inverse relationship and specifies the inverse dependency as well. Note that the TCN can be seen as a special case of a PDN in which the functional relationships between the parameters (activity start/end times and durations) is a distance relationship, and for which very efficient constraint propagation algorithms have been implemented. In general, as commonly used special cases of functional dependencies between parameters (such as temporal distance relationships), it can be useful to develop special dependency networks that implement efficient constraint propagation algorithms that take advantage of the special structure of these dependencies, instead of relying on the general mechanism offered by the PDN. Such special-purpose dependency networks can be implemented as subclasses of the abstract parameter dependency network, or (if the protocol that must be supported is sufficiently unique) abstracted out as a separate basic component of ASPEN, as was done with the TCN. 2.6 Planning/Scheduling Algorithms The search algorithm in a planning/scheduling system searches for a valid, possibly near-optimal plan/schedule. The AS- PEN framework has the flexibility to support a wide range of scheduling algorithms, including the two major classes of AI scheduling algorithms: constructive and repair-based algorithms. Constructive algorithms (e.g., [6]) incrementally construct a valid schedule, ensuring that at every step, the partial schedule constructed so far is valid. When a complete schedule is constructed, it is therefore guaranteed to be valid. Repair-based algorithms(cf. [9, 19]) generate a possibly invalid complete schedule using either random or greedy techniques. Then, at every iteration, the scheduled is analyzed, and repair heuristics that attempt to eliminate conflicts in the schedule are iteratively applied until a valid schedule is found. The search algorithms that have currently been implemented include: forward dispatch, a greedy, constructive algorithm; IRS, a constructive, backtracking algorithm based on [11]; and DCAPS, a iterative repair based algorithm based on [15]. 2.7 Graphical User Interface The ASPEN Graphical User Interface (GUI) component provides tools for graphically displaying and manipulating schedules. Resource and state timelines are displayed. Activities are overlayed on the timelines, and users can directly manipulate activities using standard drag-and-drop procedures.
4 In Proc. Int. Symposium on AI, Robotics and Automation in Space (i-sairas), Tokyo, Japan, Activity prevalve removal duration = 15 slot subsystem after prevalve prep with (subsystem == this.subsystem) before prevalve replace with (subsystem == this.subsystem) Reservation hydraulic lift usage resource = hydraulic lift; usage = 1; duration = 5; requires state prevalve-purged TRUE requires state prevalve-illuminated TRUE Resource hydraulic lift type non-depletable quantity 1 good solutions for a particular domain. 5 Examples of heuristic extensions include new repair heuristics for a repair-based scheduler, or an entirely new search algorithm. 3 APPLICATIONS OF ASPEN In this section, we describe ongoing applications of the AS- PEN scheduling system to: generation of spacecraft command sequences for the New Millennium Earth Observing One satellite and the U.S. Navy UHF Follow On One (UFO-1) satellite; generation of mission operations sequences to assist in design analysis for science and operability; and rapid generation of plans for maintenance and refurbishing for Highly Reusable Space Transportation. Figure 1: Sample of ASPEN modeling language (part of the Reusable Launch Vehicle maintenance model). This describes an activity for removing the prevalve of an engine subsystem. 2.8 Extending ASPEN for Applications There are two means by which ASPEN can be extended and specialized for a particular application. These are: Creation of domain-specific models using the modeling language, and Extension of the application framework code. The modeling language is used to specify domain-specific constraints and activities. Figure 1 shows part of a domain model specified in the ASPEN modeling language. The base ASPEN framework, including the modeling language is sufficiently extensible to support a range of applications without any extensions to the code of the framework itself (e.g., the Reusable Launch Vehicle ground maintenance scheduling application is directly derived from the framework by simply specifying a model file). Extensions to the framework code need to be made when changes in the behavior of ASPEN components are required. This includes two classes of extensions: epistemological and heuristic. 3 Epistemological extensions are necessary when new representational capabilities are in order to model a new domain. For example, if we wanted to implement a new type of resource timeline which had a more sophisticated, continuous model of resource usage 4, then a new subclass of the resource timeline abstract class would need to be implemented. Heuristic extensions customize the behavior of the framework to improve the quality of solutions found or the time to find 3 This classification follows [8]. 4 Recall from Section 3 that we use a simple, discrete resource usage model. 3.1 Spacecraft Commanding The primary application area for the ASPEN scheduling system is generation of spacecraft command sequences from high level goal specifications. In this role, automated scheduling systems will encoding of complex spacecraft operability constraints, flight rules, spacecraft hardware models, science experiment goals and operations procedures to allow for automated generation of low level spacecraft sequences by use of planning and scheduling technology. By automating this process and encapsulating the operation specific knowledge we hope to allow spacecraft commanding by non-operations personnel, hence allowing significant reductions in mission operations workforce with the eventual goal of allowing direct user commanding (e.g., commanding by scientists). Current ASPEN applications to spacecraft commanding focus on two missions: the New Millennium Earth Observing One (NM EO-1) satellite (to be launched in late 1998) and the U.S. Navy UHF Follow On One (UFO-1) satellite (currently in orbit). NM EO-1 [18] is a earth imaging satellite featuring an advanced multi-spectral imaging device. For this mission, operations consists of managing spacecraft operability constraints (power, thermal, pointing, buffers, consumables, engineering downlinks, etc.) and science goals (imaging of specific targets within particular observation parameters). Of particular difficulty is managing the downlinks as the amount of data generated by the imaging device is quite large and ground contacts are a limited resource. The current ASPEN EO-1 scheduler generates an initial schedule using forward sweeping greedy dispatch to generate an initial schedule, then uses the DCAPS iterative repair algorithm to resolve state, resource, and temporal conflicts. 5 This implies that the framework is, in principle capable of eventually finding some solution without a heuristic extensions.
5 In Proc. Int. Symposium on AI, Robotics and Automation in Space (i-sairas), Tokyo, Japan, Another ongoing effort in the area of spacecraft commanding is the development of an advanced commanding system for the U.S. Navy UFO-1 satellite [1]. UFO-1 is an on-orbit testbed managed by the U.S. Naval Academy Space Artificial Intelligence Lab (SAIL) at Annapolis. In this collaboration, SAIL is developing an uplink, downlink, basic data transport, and commanding capability to be interfaced with an advanced planning and scheduling engine (ASPEN). In this application, ASPEN will allow high level commanding of the UFO-1 satellite to perform high level functions such as: auto pitch momentum dumping, preparation for eclipse season, delta-v maneuvers, IRU warmup and turnon, battery cell pressure bias calibration, delta inclination maneuvers, and other engineering housekeeping functions. The ASPEN scheduling engine then performs appropriate expansion and conflict resolution to generate lower level command sequences to achieve the higher level goals. 3.2 Design Evaluation ASPEN is also being applied in the Pluto Express [2] for the dual purposes of science planning and design evaluation for science and operability [2]. In support of science planning, we are developing high level models of proposed PX spacecraft to assist in automated generation of science data acquisition plans (e.g., high level activity sequences) from high level science goals to assist in developing science plans for mission profiling. This same capability to generate science plans is being used to evaluate candidate spacecraft designs from the standpoint of emergent design aspects such as science return and operability. This spin-off application arises from the observation that often it is difficult to determine how well a given spacecraft design will perform without fleshing out approximate operations sequences for critical phases of the mission (e.g., encounter). In order to address this difficulty, we are developing a design analysis tool which accepts as input: a candidate spacecraft design (and operations constraints, models, etc.); a set of engineering and science objectives; and a set of scoring functions to assess how well a sequence achieves the objectives. This tool then applies an ASPEN-based planner/scheduler to generate a candidate sequence; then uses the scoring function to score this sequence in terms of the aspects of science, operability, etc. This enables design teams to rapidly and impartially evaluate large numbers of spacecraft designs with little effort, thus allowing improved analysis of design tradeoffs to enhance science and operations concerns for future missions. 3.3 Maintenance Scheduling As part of the NASA Highly Reusable Space Transportation (HRST) program 6 we have been developing and demonstrating advanced scheduling systems for the rapid generation and 6 Which targets the development of technologies enabling highly reusable, low-cost space transportation systems [12, 13]. revision of plans for maintenance and refurbishment of highly reusable launch vehicles. In this application, real-time telemetry downlinked either during flight or immediately after flight would be analyzed to automatically generate a set of maintenance requests, which would then be transformed into a refurbishment plan by an automated planning and scheduling system which would account for available equipment and resources as well as the intricacies of the refurbishment procedures of the highly complex propulsion systems. The end target is to allow a turnaround of several hours for the HRST spacecraft to support a flight frequency on the order of several flight per day. 7 If the maintenance schedule can be generated using in-flight telemetry then the refurbishment process can be speeded even further by allowing for downlinking of requests for pre-positioning of equipment and resources to minimize schedule delay. Once the actual maintenance plan has been generated, the planning tool continues to be of use in two ways. First, in many cases there can be several mutually exclusive maintenance activities which can be performed next. Via lookahead and critical path analysis automated scheduling software can determine the next activities to enable the minimal makespan (overall schedule execution time). Second, as unexpected events arise (such as equipment failures, resource unavailabilities, and schedule slippage), the automated scheduling software has the ability to revise the schedule so as to minimize schedule disruption (movement of activities and resources from their original assignments) and schedule slippage (delay of the completion of the overall refurbishment). In order to test and validate this technology we have been utilizing test maintenance procedures Specifically, we used the maintenance procedures developed for the LO 2 and LH 2 propulsion systems for the Rockwell International X-33 Reusable Launch Vehicle. 8 The procedures derived for maintaining and refurbishing the test articles provided a rich testbed for Space Propulsion System Maintenance Scheduling. Our testbed model consisted of 576 activity types, 6 resources, and on average 6 state, resource, and precedence constraints per activity. In this application we allowed maintenance requests to request either refurbishment of specific subsystems or major systems. In order to schedule the maintenance requests the ASPEN system used a forward sweeping greedy dispatch algorithm which used strong knowledge of the precedences of activities in the plan. The resulting scheduler has been able to generate schedules for refurbishment problems involving approximately half of the subsystems (8 subsystems, 358 activities) in 8 minutes. 7 In comparison, the space shuttle refurbishment process takes approximately 65 days with a flight frequency of once per 4 months; the current Reusable Launch Vehicle initiative has a targeted flight frequency of once every 1-2 weeks. 8 Developed by Rockwell International during the Phase 1 competition of the Reusable Launch Vehicle Program which ended in July 1996.
6 In Proc. Int. Symposium on AI, Robotics and Automation in Space (i-sairas), Tokyo, Japan, RELATED WORK The idea of an application framework for planning/scheduling was pioneered in the OZONE system of Smith et al. [16, 17], which has been used in production management, transportation scheduling, and logistics applications. Differences between OZONE and ASPEN include the following: OZONE has emphasized applications in manufacturing and transportation planning and scheduling, while AS- PEN is designed for spacecraft operations domains. OZONE emphasizes decision support tools, while AS- PEN (due to the nature of spacecraft operations domains) emphasizes tools that support more autonomous decisionmaking applications. 5 CONCLUSIONS/FUTURE WORK In this paper, we have described ASPEN, a reconfigurable, modular framework for planning/scheduling applications, and described three current applications of ASPEN in spacecraft operations. Although the development of a generic software architecture has required a substantial, initial investment of effort, we expect the total development effort for a set of scheduling applications to be significantly decreased (as compared to individually developing each of the applications). ASPEN is currently a scheduling-oriented system, although some planning capabilities are supported for hybrid planning/scheduling applications such as the EO-1 and UFO-1. We plan to extend ASPEN to support additional planning capabilities. Currently, ASPEN already supports much of the functionality of state of classical planning systems [3]. We plan to extend ASPEN s planning capabilities so that it can be used as a framework for planning applications that also exploit the additional temporal reasoning and resource management capabilities which are available through ASPEN s schedulingoriented facilities. ACKNOWLEDGMENTS This work was performed by the Jet Propulsion Laboratory, California Institute of Technology, under contract to the National Aeronautics and Space Administration. We thank Steve F. Smith for helpful comments on a draft of this paper. Robert Sherwood implemented spacecraft operations models for the ASPEN applications, and Quoc Vu implemented the GUI. References [1] Ultra high frequency follow on communications satellite system fact sheet, sheet.html. [2] Pluto express information page, [3] J. Allen, J. Hendler, and A. Tate. Readings in Planning. Morgan Kaufmann, [4] S. Chien, D. DeCoste, R. Doyle, and P. Stolorz. Making an impact: Artificial intelligence at the jet propulsion laboratory. AI Magazine, 18(1): , [5] R. Dechter, I. Meiri, and J. Pearl. Temporal constraint networks. Artificial Intelligence, 49:61 95, [6] M. Fox. Isis: a retrospective. In M. Zweben and M. Fox, editors, Intelligent Scheduling. Morgan Kaufmann, [7] S. Graves. A review of production scheduling. Operations Research, 29(4): , [8] J. McCarthy and P. Hayes. Some philosophical problems from the standpoint of artificial intelligence. In B. Meltzer and D. Mitchie, editors, Machine Intelligence, volume 4, pages Edinburgh University Press, [9] S. Minton, M. Johnston., A. Philips, and P. Laird. Minimizing conflicts: A heuristic repair method for constraint satisfaction and scheduling problems. Artificial Intelligence, 58: , [10] N. Muscettola. Hsts: Integrating planning and scheduling. In M. Zweben and M. Fox, editors, Intelligent Scheduling. Morgan Kaufmann, [11] N. Muscettola, B. Smith, S. Chien, C. Fry, K. Rajan, S. Mohan, G. Rabideau, and D. Yan. On-board planning for new millennium deep space one autonomy. In Proceedings of IEEE Aerospace Conference, pages , Snowmass, CO, [12] NASA. Proceedings of the Technical Interchange Meeting on Highly Reusable Space Transportation, Huntsville, AL, July [13] NASA. Proceedings of the Technical Interchange Meeting on Highly Reusable Space Transportation, Huntsville, AL, August [14] W. Pree. Design patterns for object-oriented software development. ACM Press, [15] G. Rabideau, S. Chien, T. Mann, J. Willis, S. Siewert, and P. Stone. Interactive, repair-based planning and scheduling for shuttle payload operations. In Proceedings of IEEE Aerospace Conference, pages , Snowmass, CO, [16] S.F. Smith and O. Lassila. Configurable systems for reactive production management. In E. Szelke and R. Kerr, editors, Knowledge-Based Reactive Scheduling, International Federation of Information Processing (IFIP) Transactions B [17] S.F. Smith, O. Lassila, and M. Becker. Configurable mixedinitiative systems for planning and scheduling. In A. Tate, editor, Advanced Planning Technology. AAAI Press, [18] D. Speer, P. Hestness, M. Perry, and B. Stabnow. The new millennium program eo-1 mission and spacecraft design concept. In Proceedings of IEEE Aerospace Conference, volume 4, pages , Snowmass, CO, [19] M. Zweben, B. Daun, E. Davis, and M. Deale. Scheduling and rescheduling with iterative repair. In M. Zweben and M. Fox, editors, Intelligent Scheduling. Morgan Kaufmann, [20] M. Zweben and M. Fox. Intelligent Scheduling. Morgan Kaufmann, 1994.
AUTOMTED PLANNING AND SCHEDULING TECHNOLOGY
Steve Chien, Benjamin Smith, and Gregg Rabideau, Jet Propulsion Laboratory, California Institute of Technology Nicola Muscettola and Kanna Rajan, NASA Ames Research Center UTOMATED PLANNING AND scheduling
Ontologies for Enterprise Integration
Ontologies for Enterprise Integration Mark S. Fox and Michael Gruninger Department of Industrial Engineering,University of Toronto, 4 Taddle Creek Road, Toronto, Ontario M5S 1A4 tel:1-416-978-6823 fax:1-416-971-1373
REDUCING THE COST OF GROUND SYSTEM DEVELOPMENT AND MISSION OPERATIONS USING AUTOMATED XML TECHNOLOGIES. Jesse Wright Jet Propulsion Laboratory,
REDUCING THE COST OF GROUND SYSTEM DEVELOPMENT AND MISSION OPERATIONS USING AUTOMATED XML TECHNOLOGIES Colette Wilklow MS 301-240, Pasadena, CA phone + 1 818 354-4674 fax + 1 818 393-4100 email: [email protected]
Automated Spacecraft Scheduling The ASTER Example
Automated Spacecraft Scheduling The ASTER Example Ron Cohen [email protected] Ground System Architectures Workshop 2002 Jet Propulsion Laboratory The Concept Scheduling by software instead of
Introduction. Real World Planning. Planning with Time. Time 15/11/2012. COMP219: Artificial Intelligence. COMP219: Artificial Intelligence
COMP219: Artificial Intelligence COMP219: Artificial Intelligence Dr. Annabel Latham Room 2.05 Ashton Building Department of Computer Science University of Liverpool Lecture 26: Real World Planning: Scheduling
INDEPENDENT VERIFICATION AND VALIDATION OF EMBEDDED SOFTWARE
PREFERRED RELIABILITY PRACTICES PRACTICE NO. PD-ED-1228 PAGE 1 OF 6 INDEPENDENT VERIFICATION AND VALIDATION OF EMBEDDED SOFTWARE Practice: To produce high quality, reliable software, use Independent Verification
Rotorcraft Health Management System (RHMS)
AIAC-11 Eleventh Australian International Aerospace Congress Rotorcraft Health Management System (RHMS) Robab Safa-Bakhsh 1, Dmitry Cherkassky 2 1 The Boeing Company, Phantom Works Philadelphia Center
Autonomy for SOHO Ground Operations
From: FLAIRS-01 Proceedings. Copyright 2001, AAAI (www.aaai.org). All rights reserved. Autonomy for SOHO Ground Operations Walt Truszkowski, NASA Goddard Space Flight Center (GSFC) [email protected]
Integrating Transportation in a Multi-Site Scheduling Environment
Integrating Transportation in a Multi-Site Scheduling Environment Jürgen Sauer, Hans-Jürgen Appelrath University of Oldenburg Dept. of Computer Science Escherweg 2, D-26121 Oldenburg Germany {sauer appelrath}@informatik.uni-oldenburg.de
Proc. IJCAI 09 Workshop on Artificial Intelligence in Space, Pasadena, California, US 17 18 July 2009 (ESA SP-673, September 2009)
INTELLIGENT AGENTS FOR SCHEDULING SPACE COMMUNICATIONS Pete Bonasso, Debra Schreckenghost TRACLabs, Inc., 1012 Hercules, Houston,. TX 77058 [email protected], [email protected] ABSTRACT The evolving
Autonomous Operations for Small, Low-Cost Missions: SME, EOR (STEDI), DATA, and Pluto Express OUTLINE. Visions for Future, Low-Cost Missions
Autonomous Operations for Small, Low-Cost Missions: SME, EOR (STEDI), DATA, and Pluto Express Introduction Challenges Solutions Technologies Technology Gaps OUTLINE Visions for Future, Low-Cost Missions
Propsim enabled Aerospace, Satellite and Airborne Radio System Testing
www.anite.com Propsim enabled Aerospace, Satellite and Airborne Radio System Testing Anite is now part of Keysight Technologies Realistic and repeatable real-time radio channel emulation solutions for
TIMED Mission System Engineering and System Architecture
TIMED Mission System Engineering and System Architecture David Y. Kusnierkiewicz Aspace mission consists of more than just a spacecraft and scientific instruments. It also includes a ground system to support
0 0-10 5-30 8-39. Rover. ats gotorock getrock gotos. same time compatibility. Rock. withrover 8-39 TIME
Verication of plan models using UPPAAL Lina Khatib 1, Nicola Muscettola, and Klaus Havelund 2 NASA Ames Research Center, MS 269-2 Moett Field, CA 94035 1 QSS Group, Inc. 2 RECOM Technologies flina,mus,[email protected]
FlexPlan: An Operational Mission Planning & Scheduling COTS Used Internationally
FlexPlan: An Operational Mission Planning & Scheduling COTS Used Internationally J.A. Tejo, M. Pereda, Iker Veiga GMV S.A. Calle Isaac Newton, 11 PTM-Tres Cantos 28760 Madrid, SPAIN +34 91 807 2100 [email protected]
VOIP over Space Networks
VOIP over Space Networks C. Okino, W. Kwong, J. Pang, J. Gao, and L. Clare Jet Propulsion Laboratory California Institute of Technology Presented at The Fifth Space Internetworking Workshop 2006 Hanover,
Space Flight Project Work Breakdown Structure
APPENDIX G. (WBS) Space Flight Project Work Breakdown Structure G.1 Introduction G.1.1 The Project Work Breakdown Structure (WBS) is a key element of project management. The purpose of a WBS is to divide
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS Tang-Hung Nguyen 1 ABSTRACT This paper outlines a computer-based framework that can assist construction planners and schedulers in automatically
A STRATEGIC PLANNER FOR ROBOT EXCAVATION' by Humberto Romero-Lois, Research Assistant, Department of Civil Engineering
A STRATEGIC PLANNER FOR ROBOT EXCAVATION' by Humberto Romero-Lois, Research Assistant, Department of Civil Engineering Chris Hendrickson, Professor, Department of Civil Engineering, and Irving Oppenheim,
A Tool for Generating Partition Schedules of Multiprocessor Systems
A Tool for Generating Partition Schedules of Multiprocessor Systems Hans-Joachim Goltz and Norbert Pieth Fraunhofer FIRST, Berlin, Germany {hans-joachim.goltz,nobert.pieth}@first.fraunhofer.de Abstract.
USE OF SCILAB FOR SPACE MISSION ANALYSIS AND FLIGHT DYNAMICS ACTIVITIES
USE OF SCILAB FOR SPACE MISSION ANALYSIS AND FLIGHT DYNAMICS ACTIVITIES Thierry Martin CNES Scilabtec 09 Use of Scilab for space mission analysis Page 1 Use of Scilab in CNES Scilab is now widely used
Vdot A Revolutionary Tool for Space Logistics Campaign Planning and Simulation
AIAA SPACE 2009 Conference & Exposition 14-17 September 2009, Pasadena, California AIAA 2009-6551 Vdot A Revolutionary Tool for Space Logistics Campaign Planning and Simulation Roger Herdy 1 Qualis Corporation,
Semantic Search in Portals using Ontologies
Semantic Search in Portals using Ontologies Wallace Anacleto Pinheiro Ana Maria de C. Moura Military Institute of Engineering - IME/RJ Department of Computer Engineering - Rio de Janeiro - Brazil [awallace,anamoura]@de9.ime.eb.br
JOURNAL OF OBJECT TECHNOLOGY
JOURNAL OF OBJECT TECHNOLOGY Online at http://www.jot.fm. Published by ETH Zurich, Chair of Software Engineering JOT, 2007 Vol. 6, No. 1, January-February 2007 CM Configuration Change Management John D.
Systems Engineering Interfaces: A Model Based Approach
Systems Engineering Interfaces: A Model Based Approach Elyse Fosse, Christopher L. Delp Jet Propulsion Laboratory, California Institute of Technology 4800 Oak Grove Drive Pasadena, CA 91109 [email protected]
the Reactive Model-based Programming Language for Robotic Space Explorers
A Reactive Model-based Programming Language for Robotic Space Explorers Michel Ingham, Robert Ragno, Brian Williams MIT Space Systems Laboratory / Artificial Intelligence Laboratory Cambridge, MA 02139
Aerospace Engineering: Space Stream Overview
Aerospace Engineering: Space Stream Overview Dept. of Aerospace Engineering Ryerson University Winter 2011 Department of Aerospace Engineering 1 The Space-stream at a Glance Builds on strong aerospace
The Space Shuttle: Teacher s Guide
The Space Shuttle: Teacher s Guide Grade Level: 6-8 Curriculum Focus: Astronomy/Space Lesson Duration: Two class periods Program Description This video, divided into four segments, explores scientists'
SCADE Suite in Space Applications
SCADE Suite in Space Applications at EADS David Lesens 09/10/2008 Overview Introduction Historical use of SCADE at EADS Astrium ST Why using SCADE? The Automatic Transfer Vehicle (ATV) M51 and Vega R&T
A View Integration Approach to Dynamic Composition of Web Services
A View Integration Approach to Dynamic Composition of Web Services Snehal Thakkar, Craig A. Knoblock, and José Luis Ambite University of Southern California/ Information Sciences Institute 4676 Admiralty
SOFTWARE ENGINEERING IT 0301 Semester V B.Nithya,G.Lakshmi Priya Asst Professor SRM University, Kattankulathur
SOFTWARE ENGINEERING IT 0301 Semester V B.Nithya,G.Lakshmi Priya Asst Professor SRM University, Kattankulathur School of Computing, Department of IT 1 2 Process What is it? A series of predictable steps
Operability in the SAVOIR Context
SAVOIR Avionics Reference Architecture Operability in the SAVOIR Context Avionics, Data Control & Software Systems Workshop 23/10/2012 Implementing Operability The CCN Standoff & the SOIRD SOIRD & Standarisation
SOFTWARE DEVELOPMENT STANDARD FOR SPACECRAFT
SOFTWARE DEVELOPMENT STANDARD FOR SPACECRAFT Mar 31, 2014 Japan Aerospace Exploration Agency This is an English translation of JERG-2-610. Whenever there is anything ambiguous in this document, the original
Reusable Knowledge-based Components for Building Software. Applications: A Knowledge Modelling Approach
Reusable Knowledge-based Components for Building Software Applications: A Knowledge Modelling Approach Martin Molina, Jose L. Sierra, Jose Cuena Department of Artificial Intelligence, Technical University
FULLY AUTOMATIC AND OPERATOR-LESS ANOMALY DETECTING GROUND SUPPORT SYSTEM FOR MARS PROBE "NOZOMI"
Proceeding of the 6 th International Symposium on Artificial Intelligence and Robotics & Automation in Space: i-sairas 2001, Canadian Space Agency, St-Hubert, Quebec, Canada, June 18-22, 2001. FULLY AUTOMATIC
A Contribution to Expert Decision-based Virtual Product Development
A Contribution to Expert Decision-based Virtual Product Development László Horváth, Imre J. Rudas Institute of Intelligent Engineering Systems, John von Neumann Faculty of Informatics, Óbuda University,
Can Hubble be Moved to the International Space Station? 1
Can Hubble be Moved to the International Space Station? 1 On January 16, NASA Administrator Sean O Keefe informed scientists and engineers at the Goddard Space Flight Center (GSFC) that plans to service
The PACS Software System. (A high level overview) Prepared by : E. Wieprecht, J.Schreiber, U.Klaas November,5 2007 Issue 1.
The PACS Software System (A high level overview) Prepared by : E. Wieprecht, J.Schreiber, U.Klaas November,5 2007 Issue 1.0 PICC-ME-DS-003 1. Introduction The PCSS, the PACS ICC Software System, is the
Demonstration of an Automated Integrated Test Environment for Web-based Applications
Demonstration of an Automated Integrated Test Environment for Web-based Applications Tiziana Margaria 1,2, Oliver Niese 2, and Bernhard Steffen 2 1 METAFrame Technologies GmbH, Dortmund, Germany [email protected]
ABSTRACT. I. Introduction. BI software allows the analyst to create automated tools (or queries) that will:
SpaceOps 2010 ConferenceDelivering on the DreamHosted by NASA Mars 25-30 April 2010, Huntsville, Alabama AIAA 2010-2113 Use of Business Intelligence Tools in the DSN Joseph I.
Masters in Information Technology
Computer - Information Technology MSc & MPhil - 2015/6 - July 2015 Masters in Information Technology Programme Requirements Taught Element, and PG Diploma in Information Technology: 120 credits: IS5101
The Integrated Supply Chain Management System
The Integrated Supply Chain Management System Mark S. Fox, John F. Chionglo, Mihai Barbuceanu Department of Industrial Engineering, University of Toronto 4 Taddle Creek Road, Toronto Ontario M5S 1A4 tel:
INTERNATIONAL JOURNAL OF COMPUTER ENGINEERING & TECHNOLOGY (IJCET)
INTERNATIONAL JOURNAL OF COMPUTER ENGINEERING & TECHNOLOGY (IJCET) International Journal of Computer Engineering and Technology (IJCET), ISSN 0976 6367(Print), ISSN 0976 6367(Print) ISSN 0976 6375(Online)
A class-structured software development platform for on-board computers of small satellites
A class-structured software development platform for on-board computers of small satellites Takaichi Kamijo*, Yuhei Aoki*, Sotaro Kobayashi*, Shinichi Kimura* *Department of Electrical Engineering, Tokyo
Tool Support for Software Variability Management and Product Derivation in Software Product Lines
Tool Support for Software Variability Management and Product Derivation in Software s Hassan Gomaa 1, Michael E. Shin 2 1 Dept. of Information and Software Engineering, George Mason University, Fairfax,
What is a life cycle model?
What is a life cycle model? Framework under which a software product is going to be developed. Defines the phases that the product under development will go through. Identifies activities involved in each
Complexities of Simulating a Hybrid Agent-Landscape Model Using Multi-Formalism
Complexities of Simulating a Hybrid Agent-Landscape Model Using Multi-Formalism Composability Gary R. Mayer [email protected] Hessam S. Sarjoughian [email protected] Arizona Center for Integrative Modeling
CubeSats and the Growth of NanoSpace
CubeSats and the Growth of NanoSpace Scott MacGillivray, President Tyvak Nano-Satellite Systems LLC (714) 392-9095 [email protected] Presentation to the Aerospace & Defense Forum October 21, 2011 2011, Tyvak
Component-based Development Process and Component Lifecycle Ivica Crnkovic 1, Stig Larsson 2, Michel Chaudron 3
Component-based Development Process and Component Lifecycle Ivica Crnkovic 1, Stig Larsson 2, Michel Chaudron 3 1 Mälardalen University, Västerås, Sweden, [email protected] 2 ABB Corporate Research,
Solar System Observations contains two components: Planetary Astronomy and Near Earth Object Observations.
C.6 SOLAR SYSTEM OBSERVATIONS 1. Scope of Program Solar System Observations supports both ground-based astronomical observations and suborbital investigations of our Solar System involving sounding rockets
Master s Program in Information Systems
The University of Jordan King Abdullah II School for Information Technology Department of Information Systems Master s Program in Information Systems 2006/2007 Study Plan Master Degree in Information Systems
A Mathematical Programming Solution to the Mars Express Memory Dumping Problem
A Mathematical Programming Solution to the Mars Express Memory Dumping Problem Giovanni Righini and Emanuele Tresoldi Dipartimento di Tecnologie dell Informazione Università degli Studi di Milano Via Bramante
ARM-UAV Mission Gateway System
ARM-UAV Mission Gateway System S. T. Moore and S. Bottone Mission Research Corporation Santa Barbara, California Introduction The Atmospheric Radiation Measurement-unmanned aerospace vehicle (ARM-UAV)
A Characterization Taxonomy for Integrated Management of Modeling and Simulation Tools
A Characterization Taxonomy for Integrated Management of Modeling and Simulation Tools Bobby Hartway AEgis Technologies Group 631 Discovery Drive Huntsville, AL 35806 256-922-0802 [email protected]
The Intelligent Data Network: Proposal for Engineering the Next Generation of Distributed Data Modeling, Analysis and Prediction
Making Sense of your Data The Intelligent Data Network: Proposal for Engineering the Next Generation of Distributed Data Modeling, Analysis and Prediction David L. Brock The Data Center, Massachusetts
Requirements for Software Deployment Languages and Schema
Requirements for Software Deployment Languages and Schema Richard S. Hall, Dennis Heimbigner, Alexander L. Wolf Software Engineering Research Laboratory Department of Computer Science University of Colorado
DEOS. Deutsche Orbitale Servicing Mission. The In-flight Technology Demonstration of Germany s Robotics Approach to Service Satellites
DEOS Deutsche Orbitale Servicing Mission The In-flight Technology Demonstration of Germany s Robotics Approach to Service Satellites B. Sommer, K. Landzettel, T. Wolf, D. Reintsema, German Aerospace Center
Surveying and evaluating tools for managing processes for software intensive systems
Master Thesis in Software Engineering 30 Credits, Advanced Level Surveying and evaluating tools for managing processes for software intensive systems Anuradha Suryadevara IDT Mälardalen University, ABB
Ryan F. Schkoda, Ph.D. Postdoctoral Fellow Wind Turbine Drivetrain Testing Facility Charleston, SC
Systems Engineering Activities at Clemson University s International Center for Automotive Research (CU-ICAR) and Wind Turbine Drivetrain Testing Facility Ryan F. Schkoda, Ph.D. Postdoctoral Fellow Wind
Mars Express Mission Planning: An example of successful software reuse
Mars Express Mission Planning: An example of successful software reuse Thierry Bru European Space Operation Centre (ESOC) Robert Bosch Strasse 5, D-64293 Darmstadt, Germany Fax +49 (0) 6151 902067, E-mail:
CubeSats for Geospace Science at Montana State University: Tailored approaches to CubeSat Mission Implementation
CubeSats for Geospace Science at Montana State University: Tailored approaches to CubeSat Mission Implementation David Klumpar, for the MSU teams Space Science and Engineering Laboratory Montana State
Enable Location-based Services with a Tracking Framework
Enable Location-based Services with a Tracking Framework Mareike Kritzler University of Muenster, Institute for Geoinformatics, Weseler Str. 253, 48151 Münster, Germany [email protected] Abstract.
Agenda. Interface Agents. Interface Agents
Agenda Marcelo G. Armentano Problem Overview Interface Agents Probabilistic approach Monitoring user actions Model of the application Model of user intentions Example Summary ISISTAN Research Institute
Peter Mileff PhD SOFTWARE ENGINEERING. The Basics of Software Engineering. University of Miskolc Department of Information Technology
Peter Mileff PhD SOFTWARE ENGINEERING The Basics of Software Engineering University of Miskolc Department of Information Technology Introduction Péter Mileff - Department of Information Engineering Room
Optimization of patient transport dispatching in hospitals
Optimization of patient transport dispatching in hospitals Cyrille Lefèvre and Sophie Marquet Supervisors: Yves Deville and Gildas Avoine 1500 minutes Thesis motivation MedSoc NPO asked us to conduct a
AGI Software for Space Situational Awareness
AGI Software for Space Situational Awareness The number of objects in space has significantly proliferated since 1957, with more than 17,000 objects bigger than 10 cm and 1,000+ active payloads currently
Telepresence for Deep Space Missions Project
ABSTRACT Incorporating telepresence technologies into deep space mission operations can give the crew and ground personnel the impression that they are in a location at time that they are not. NASA s space
CS 389 Software Engineering. Lecture 2 Chapter 2 Software Processes. Adapted from: Chap 1. Sommerville 9 th ed. Chap 1. Pressman 6 th ed.
CS 389 Software Engineering Lecture 2 Chapter 2 Software Processes Adapted from: Chap 1. Sommerville 9 th ed. Chap 1. Pressman 6 th ed. Topics covered Software process models Process activities Coping
Christie Price Subcontract Administrator Lockheed Martin Corporation 12257 South Wadsworth Blvd. Littleton, CO 80125
Functional Area 1 - Research and Development Support ISYS provides research and development, thermal design, analysis, research, planning and development support for the Thermal Protection System of the
High-Mix Low-Volume Flow Shop Manufacturing System Scheduling
Proceedings of the 14th IAC Symposium on Information Control Problems in Manufacturing, May 23-25, 2012 High-Mix Low-Volume low Shop Manufacturing System Scheduling Juraj Svancara, Zdenka Kralova Institute
Anomaly Detection Toolkit for Integrated Systems Health Management (ISHM)
AIAA Infotech@Aerospace 2010 20-22 April 2010, Atlanta, Georgia AIAA 2010-3498 Anomaly Detection Toolkit for Integrated Systems Health Management (ISHM) John Schmalzel 1 and Fernando Figueroa 2 NASA, Stennis