Develop the Avrig Hotel School Concept

Size: px
Start display at page:

Download "Develop the Avrig Hotel School Concept"

Transcription

1 Act. 7.2 Development of Project Chains : Develop the Avrig Hotel School Introduction IMC University of Applied Sciences Krems, Austria 1

2 Table of Contents 1 Activity Scope Project Chains Planning the Hotel School Development Development Process Review of Existing Documentation Development of a Project Manual Checklist for the Avrig Hotel School Activity Output and Recommendations

3 1 Activity Scope The development of a hotel school concept is part of the European INTERREG CultTour project and foreseen in work package 7 under the activity 7.2 Development of project chains for pilot sites. 1.1 Project Chains A project chain is defined as a series of consecutive projects and processes that lead to the implementation of strategic/long-term objectives of an investment. Such an investment can be an investment into infrastructure, a product or a service that will be developed, a company that is set up and put operational, or any other (business) idea that is developed. The concept a project chain and its several projects can be illustrated with the figure below. Figure 1: Hotel School Project Chains Source: Author s figure The main aims of the project chain concept are: To support all the planning/development/implementation steps needed in order to realise the idea, To ensure a comprehensive and long-term view on the planning approach adopted, To reduce the risk of management mistakes and failures, To provide a base for decision-making and to develop and visualise the costs and benefits of the entire investment. The project chain does not replace the detailed planning of individual projects. 3

4 1.2 Planning the Hotel School Development One of the project chains for the Municipality of Avrig is the aforementioned development of a hotel school concept. With competencies in the field of tourism and project management, the IMC University of Applied Sciences (PP3) supports the development of this hotel school concept. Its support is reflected in the following aims: Assist the lead partner (LP) in developing a realistic concept for a hotel school in Avrig, Check the completeness and comprehensiveness of already existing documentation, Give input on structured project planning to ensure an optimal implementation of the investment management, Provide draft plans that will be completed and adjusted to the on-site situation by the LP in Avrig. 4

5 2 Development Process The process designed by PP3 to develop the deliverables of W.P.7, Act.7.2 is presented in the section. It focused on three main activities: reviewing documentation that had been communicated so far, producing a project manual and defining an operational checklist for the Avrig Hotel School. 2.1 Review of Existing Documentation In a first step, material provided by the LP was reviewed. This included the following documents: Synthesis S.Brukenthal Tourism School in Avrig, S. Brukenthal Tourism School Structure, Study for Hotel School by Adelia Morosan. 2.2 Development of a Project Manual In a next step, PP3 compiled various projects plans into a project manual. The project manual covers different elements relevant for a detailed and structured project planning and serves as the basis for the planning and development of the hotel school concept. It includes the main elements of scope, schedule, cost but also a project environments/stakeholders and risk analyses. This project manual consists of a selection of plans to provide a basis for the planning. In case that further project plans are needed, the LP is invited to refer to PP3, relevant project management training offers and/or literature. 2.3 Checklist for the Avrig Hotel School Finally, a checklist for the Avrig Hotel School was developed. The model used outlines the most important elements to describe an organization and highlights key areas of consideration. The checklist is seen as an addendum to the hotel school concept project manual. 5

6 3 Activity Output and Recommendations In total, the LP will receive the following documents from PP3: 1. Activity Introduction, 2. Project Manual including draft project plans for further detailed planning of the hotel school concept, 3. Checklist for the Avrig Hotel School. After reviewing the existing documentation, PP3 highly recommends to focus on the following dimensions: Further research and documentation on the different elements pointed out as not considered or in the checklist, Internal decisions on the concept components where additional specifications are still necessary, in line with the results of the research conducted, Comprehensive and detailed planning for the development of the hotel school concept. In order to do so, the IMC advises to review and complete the project manual provided as well as to use the aforementioned checklist to ensure a successful implementation of the concept development phase. 6

7 Act. 7.2 Development of Project Chains : Develop the Avrig Hotel School Project Manual (Draft Plans) IMC University of Applied Sciences Krems, Austria Version 1.0 Project Manager: Maria Sinca Date (last changes): 11/03/2014

8 P a g e 2 Index 1. Introduction 3 2. Project Assignment 4 3. Project Deliverables 6 4. Work Breakdown Structure 7 5. Project Milestone Plan 8 6. Bar Chart 9 7. Project Cost Plan Project Responsibility Matrix Analysis of Pre-Project and Post-Project Phase Project Environment/Stakeholder Analysis Relationships to Relevant Project Environments/Stakeholders Project Organisation Chart Project Risk Analysis 17

9 P a g e 3 INTRODUCTION The following project manual serves as the basis for the planning and development of the hotel school concept for the Municipality of Avrig, Romania. Planning and developing the concept is considered as the first project within a series of project chains as outlined in the figure below. Figure 1: Hotel School Project Chains Source: Author s figure After the end of the project Develop the Hotel School, the project Implement the Hotel School starts. Within this second project all actions are concretely implemented to prepare for the actual hotel school operation. Operation of the hotel school can commence as soon as the development project is finished and the school is therefore ready to function. As indicated in Figure 1, such project chains typically involve one to one year and half for the first project, consisting in the planning of the concept. Another year and half, up two years, are usually considered for the implementation, for a total preparation time varying between two years and half and three years and half before reaching the phase of an operating hotel school. The project manual covers different elements relevant for a detailed and structured project planning. It includes the main elements of scope, schedule, cost but also project environments/stakeholders and risk analyses. All plans presented here are either drafts or a structure proposed to support the project planning: they need to be adjusted and finalized. It is the responsibility of the project manager to review and complete this project manual. Information in order to do so is gathered from the investor, the project stakeholders and the project team. All plans need to be developed according to the project specific objectives. In addition to the project manual, a checklist for the hotel school has been developed. The checklist is an addendum to the project manual and highlights strategic areas of consideration and leading questions.

10 P a g e 4 Avrig Hotel School PROJECT ASSIGNMENT Project start date Project end date Project objectives Design of a concept for a private hotel school nearby the Brukenthal Palace, Avrig Design of three programmes on vocational-, high school- and post high school level including practical training (internship) Consideration of additional service options (personality training, venue rental for external events, catering, etc.) Definition of the infrastructure requirements including functional plan and architectural proposal in cooperation with a lead architect Definition of the investment cost components based on the space requirements and functional plan Definition of the operating cost components Definition of the organisational requirements (human resources, marketing etc.) Project non-objectives Development of a hotel school concept at university level Development of a concept for a public hotel school Long-term objectives and justification (business case) Creating training conditions for the necessary human resources in order to offer high class tourism services and high qualifications for the tourism labour force in Olt Country and Transylvania. Raise the service standard for national and international visitors Develop Avrig as a centre of hospitality and tourism education Enlarge the profile of the City of Avrig by developing tourism and education as further economic components Contribute to the economic and social development of the City of Avrig and Sibiu County and the sustainable success of the Brukenthal Palace Provide employment for the local people Raise the income and the spending capacity of the population Contribute to the multi-functional tourism concept developed for the city of Avrig (tourism master plan) and the Brukenthal Palace in order to ensure and enhance the attractiveness of the area in general and the Brukenthal Palace specifically Enhance the image of Avrig as tourism destination Project phases Project costs Project income Phase 1: Project Management Phase 2: Research Phase 3: Strategic Planning Phase 4: Operational Planning Phase 5: Preparation for Implementation Project owner Arnold Klingeis Project team members Project manager Maria Sinca

11 P a g e 5 Project Team Member Research (Adelia Morosan) Project Team Member Planning & Development (Maria Sinca) Architect (Conny Feyer) Educational Expert ( ) Infrastructure Expert ( ) Financial Expert (Mrs. Klingeis) Relationships to other projects (synergies or potential conflicts) Related to various feasibility studies for the Brukenthal Palace (hotel, garden, hotel school) Other European and community projects within the Municipality Relevant project environments/stakeholders Samuel von Brukenthal Foundation Local Community Target Market Project Organization Competitors Political Institutions Legal Institutions signature signature Project manager Project owner Version 1.0 Date: Author: M.Sinca

12 P a g e 6 Avrig Hotel School PROJECT DELIVERABLES* Deliverable Type Strategy Deliverable Overall strategy for the hotel school List of objectives Number of classes and students Types of educational programmes Programme curricula Services & Products Course objectives Approval for certification of students Additional services (personality training, venue rental for external events, catering, etc.) * Please refer to the Checklist for the Avrig Hotel School for a comprehensive list of deliverables. Version 1.0 Date: Author:

13 P a g e 7 Avrig Hotel School WORK BREAKDOWN STRUCTURE* Version 1.0 Date: Author: * To be completed to meet the project s objectives. [to be modified in separate Word Document attached]

14 P a g e 8 Avrig Hotel School PROJECT MILESTONE PLAN WP-code Milestone Planned date Actual date Project initiated and started Research concluded Strategy developed Applications for hotel school accreditations submitted Detailed project plans for implementation prepared Project approved and closed down Version 1.0 Date: Author:

15 P a g e 9 Avrig Hotel School BAR CHART The timeline for all project activities needs to be established according to the work breakdown structure. For each phase and work package, a specific duration should be defined for an optimal scheduling of all the activities that need to be carried out. Scheduling software can be downloaded from the following link: Version 1.0 Date: Author:

16 P a g e 10 Avrig Hotel School PROJECT COST PLAN* WP Code WP Label Cost type Planned quantity Price Planned costs Phase 1.1 Project management Phase 1.2 Research Phase 1.3 Strategic Planning Phase 1.4 Operational Planning Phase 1.5 Preparation for Implementation Version 1.0 Date: Author: [double click to edit] * It is recommended to develop a rough project budget for the five project phases (as listed above) in order to have a cost estimate. A more accurate cost plan can also be done at the level of the work packages (e.g ). Cost items are, for example: Internal personnel costs Material costs Travel costs External expert costs

17 P a g e 11 Avrig Hotel School PROJECT RESPONSIBILITY MATRIX* Project roles and relevant environments WBScode WB label project owner (team) project manager PTM 1 - Research PTM 2 Planning & Development PTM 3 - PTM 4- PTM 5- External Expert 1 -Finance External Expert 2 - Education External Expert 3 - Infrastructure External Expert 3 - Architect Project start C P C C Project controlling P I I Continuous project coordination P I I Project close down C P C C Research educational offer P Research student and industry markets P C Research finance I P C Research infrastructure needs P C C

18 P a g e Perform an environmental analysis I P I Conclude on research findings and communicate results Decide on financial and legal structure of hotel school ownership Develop objectives & strategy for hotel school P I D I P C I I P Define hotel school organisation I I P Plan educational offer in detail I P C Identify target groups and strategic tourism partners Develop detailed financial investment plan Integrate environmental analysis findings into planning activity Identify infrastructure needs and develop rough plans Ensure approvals for building / infrastructure, operation and environmental issues I P C I P C C P I P C C I P I I Apply for necessary accreditations I P I I Plan personnel recruiting I P I Plan infrastructure development I P C C Plan and implement first marketing activities Prepare detailed project plans for realisation of entire hotel school concept I P C Version 1.0 Date: Author: Legend: P: performance; C: contribution, D: decision; I: information * To be completed to show responsibilities for each work package.

19 P a g e 13 Avrig Hotel School ANALYSIS OF PRE-PROJECT AND POST- PROJECT PHASE Description of the results of the pre-project phase Environment relationships relevant for the project Various feasibility studies within the CultTour project (hotel, garden, school, ) Input from the business plan development for the Brukenthal Palace Decisions/events relevant for the project / Which decisions have been made already? Accomplishment of the feasibility studies Development of business plans Existing documentation relevant for the project Synthesis S.Brukenthal Tourism School in Avrig S.Brukenthal Tourism School Structure Study for Hotel School Expectations regarding the post-project phase Further development of the environment relationships... Measures for the post-project phase Initiation of the second phase of the project chain: Implement the Hotel School.. Version 1.0 Date: Author:

20 P a g e 14 Avrig Hotel School PROJECT ENVIRONMENT/STAKEHOLDER ANALYSIS Project Environment Graph Target Market Local/regional market National market Parents of pupils Brukenthal Foundation Competitors Local/regional tourism schools Local/regional high schools National tourism schools Private tourism schools Hotel chains with in-house education. Hotel School Development Political Institutions Municipality of Avrig Sibiu Country State of Romania Local Community Residents of Avrig Workforce in Avrig Legal Institutions Ministry of Education Bodies for construction law Certification bodies Other accreditation bodies Version 1.0 Date: Author:. [double click to edit]

21 P a g e 15 Avrig Hotel School RELATIONSHIPS TO RELEVANT PROJECT ENVIRONMENTS/STAKEHOLDERS Relevant environment Relationship Measures WBS code for measure Target Market Brukenthal Foundation Neutral/positive relationship increased demand Create and implement an efficient communication strategy as part of the marketing concept Neutral relationship Legal Institutions Neutral relationship Political Institutions Positive relationships on municipal level Competitors Neutral relationship Local Community Neutral/positive relationship Version 1.0 Date: Author:

22 P a g e 16 Avrig Hotel School PROJECT ORGANISATION CHART Project Contributor Architect Project Contributor Education Project Contributor Infrastructure Project Contributor - Finance Project Team Member Research Project Team Member Planning Project Contributor -.. Project Team Project Manager Project Organisation Project Owner [ double click to edit] Project role Person performing role Project owner (team) Arnold Klingeis primar@primaria-avrig.ro Project manager Maria Sinca maria.sinca@primaria-avrig.ro Project Team Member Planning Maria Sinca maria.sinca@primaria-avrig.ro Project Team Member Research Adelia Moroson mbconsilierefinanciara@yahoo.com Project Contributor Architect Project Contributor Education Project Contributor Infrastructure Project Contributor Finance Version 1.0 Date: Author:

23 P a g e 17 Avrig Hotel School PROJECT RISK ANALYSIS WBS-code WP / phase Risk Characteristic/ description Measure Research Inaccurate estimation of demand Overestimation of demand could question the forecasts made in the investment plan Realistic demand calculation based on rigorous field research and data analysis Research Inaccurate cost calculation in the investment plan Under- or overestimation of resources needed for establishing & operating the hotel school Realistic cost calculation based on thorough data analysis and external expertise Operational Planning Timely approval of hotel school operation, use of the building and environmental factor Delays in the administrative approval of the hotel school operation, use of the building and environmental factor Anticipate administrative approvals early in advance and schedule activities accordingly Operational Planning Non accreditation of the hotel school Unsuccessful applications for necessary accreditations Gather all information with relevant institutions and integrate their requirements into the hotel school concept Interpretation of the risk management: Version 1.0 Date: Author:

24 P a g e 18 In case that further project plans are needed, the LP is invited to refer to PP3, relevant project management training offers and/or literature.

25 Act. 7.2 Development of Project Chains : Develop the Avrig Hotel School Checklist for the Avrig Hotel School IMC University of Applied Sciences Krems, Austria 1

26 The following checklist is an addendum to the hotel school concept project manual. It is based on a model which outlines the most important elements to describe an organisation. Reviewing the information on the hotel school concept provided by the partner, PP3 indicates which elements have already been considered in this concept and which ones need further consideration. Explanations and comments are provided in the comment box. Component Elements Status per February 2014 Comments INTERNAL STRUCTURES Strategies, objectives (raison d être) Services & products Overall strategy for the hotel school List of objectives Number of classes & students Types of educational programmes Programme curricula Course objectives Certification of students fully considered A clear and sustainable strategy should be formulated for the hotel school concept, outlining the underlying reason for developing the school. Clearly list the main objectives, but also the non-objectives of the overall concept and its long-term benefits. What is financially feasible? Specification of the content of the individual programmes based on a research on state-of-the art hospitality curricula. Define practical training options as part of the curricula. List the objectives of the individual courses offered within each programme. Which certificate is most recognized among employers and educational institutions? What is the legal consideration for the certification? 2

27 Ancillary services not considered 1. Does the school provide any further services such as: personality training, venue rental for external events, catering, a job platform, an interface for local/regional tourism networks, further hospitality courses for the regional tourism industry stakeholders? 2. Clarification of the relationship between the hotel school and the various services delivered at the Brukenthal Palace (cf. Infrastructure). Do the respective expectations match? Core competencies Organisation, culture and values Central to running the businesses - training and educational activities Legal form and ownership not considered not considered What does the school stand for and does it do best? Some different examples of education focus could be sustainability, international orientation, employability, etc. What will the legal form of the hotel school be? Who will be the owner of the school? Executive management not considered Who will be the director and the other executives of the school? Processes not considered How will the organisational processes look? Departments Administration Marketing services Teaching staff Accounting & Controlling Facility and IT services not considered Which departments are needed and what is the amount of staff needed in the different departments for running the first year of the school? Organisational culture not considered On what will be based the school's identity? (e.g. specific symbols, norms, rules, communication, degree of internationalisation, etc.) Personnel Internal human resources Founders of the school Teachers & professors Students Consider how, how often and on what your staff will be trained. 3

28 External human resources Teachers & professors Partners for Practical training Infrastructure Building fully considered Classrooms Classroom equipment Training kitchen Training Restaurant & Bar Training reception Study infrastructure Offices/staff rooms Student facilities (housing, food services and leisure time) Sanitary facilities Intranet for students Computer and software not considered not considered not considered not considered How will the classroom be equipped? (e.g. beamer, whiteboard, computer...) What will be the interface between the tourists and training facilities within the Brukenthal complex? Consider size and equipment of the kitchen. What will be the interface between the tourists and the training facilities within the Brukenthal complex? What will be the interface between the tourists and training facilities within the Brukenthal complex? What facilities does the study infrastructure include? (e.g. library, reading room, space for group work, etc ) Consider the amount of offices/staff rooms needed depending on the number of departments and staff. Which facilities are necessary for the students? What further facilities could it include? E.g. sport facilities, rooms for visiting friends and relatives. Possibility of using the reception and dining facilities of the dormitory as training reception/restaurant. Establishment of an online platform to facilitate communication between students, lecturers and the administration. How many computers will be provided? Which software is needed? (e.g. for communication activities, for training tools such as reservation systems or online courses) 4

29 Budget Investment plan Marketing CONTEXT Hotel school marketing concept Individual programmes marketing concept not considered not considered History and future Target market (demand) Industry competition market analysis Investment plan for establishing & operating costs (Income e.g. Tuition fees, sponsorship, fundraising, grants; set up costs; operating costs e.g. taxes) --> use the financial analysis of the business plan for the Brukenthal Palace as a starting point for the development of an own business plan for the hotel school. How will the marketing mix, particularly the promotion part, of the hotel school look? How are the individual programmes promoted? Based on the different target groups, what specific and adapted channels will be used for each of them? Considered on a local/regional level. What about the national/international level? What are the motives of future students? Is there enough demand from the region? The demand has to be secured! Considered on a local/regional level. What about the national/international level? Consider national and international benchmarking examples. Political factor What is the political influence on the hotel school? Economic factor What influence does the current economic situation have on the hotel school (e.g. average household income on amount of tuition fees)? What are future economic trends in Romania and Europe that could impact the hotel school? How to secure income in a sustainable way? Social factor What positive/negative social influences could the hotel school face? (e.g. citizens of Avrig, Sibiu) Who could be possible cooperation partners for the hotel school? 5

30 Ecological factor not considered What ecological impacts will the establishment of the school have particularly on the park area? Which measures are taken to ensure a sustainable operational management? (for instance ecological processes) Technological factor What impact do technological advancements have on the school and its program? (e.g. social media, online courses, hospitality/cooking innovations) Legal factor What laws influence the establishment and operation of the school? Which laws need to be considered for the certification of students and the degree awarding? Relationships to relevant external social environments/stakeholders Other national educational providers Further providers are listed, but what is the relationship to these providers if one exists? Industry acceptance How can you ensure and increase the acceptance of your school and its graduates among the education sector and the tourism industry (employability)? National and international accreditation not considered What accreditation schemes could be relevant for the school to increase quality and credibility? What type of accreditation is considered? (public/ private/ publicprivate partnership; national/international; Ministry or other institutions, etc.) What are their requirements? Potential partners for international cooperation not considered Could some competitors or other relevant institutions become cooperation partners? (e.g. exchange programmes, guest lectures, sharing resources, etc.) 6

Managing the Project Start

Managing the Project Start Roland Gareis University of Economics and Business Administration PROJEKTMANAGEMENT GROUP, Franz-Klein-Gasse 1, A-1190 Vienna, Austria Tel: (+43-1) 4277-29401, Fax: (+43-1) 368 75 10, Email: roland.gareis@wu-wien.ac.at

More information

Interreg CENTRAL EUROPE 1 st Call for proposals

Interreg CENTRAL EUROPE 1 st Call for proposals Interreg CENTRAL EUROPE 1 st Call for proposals Lead applicant training step 2, 20.10.2015, Prague Exercise Please note that this exercise presents only an example of how to technically link the project

More information

A Quality Assurance Model for Continuing Technical Education

A Quality Assurance Model for Continuing Technical Education A Quality Assurance Model for Continuing Technical Education P. Venkataram +, Anandi Giridharan* + Professor at Dept. of Electrical Communication Engineering & Chairman of Centre for Continuing Education,

More information

Strategic Planning. Strategic Planning

Strategic Planning. Strategic Planning 4 Strategic Planning Strategic Planning 1 4 TABLE OF CONTENTS Strategic Planning 3... What is Strategic Planning? 3... Why do Strategic Planning? 4... Assessing Your Strategic Planning 5... Developing

More information

TISCH CENTER B.S. IN HOTEL AND TOURISM MANAGEMENT COURSE DESCRIPTIONS 2011

TISCH CENTER B.S. IN HOTEL AND TOURISM MANAGEMENT COURSE DESCRIPTIONS 2011 AS OF THE FALL SEMESTER UPDATED APRIL 15, MAJOR CORE Tourism Impacts and Issues TCHT1-DC 1000 A survey of the dimensions, operations, and issues of the global tourism industry. Topics covered include:

More information

JE PANEL/BENCHMARKING REF NO: 867/4 EVALUATION DATE:

JE PANEL/BENCHMARKING REF NO: 867/4 EVALUATION DATE: 1. JOB TITLE Job Title: Project Manager (Transport Infrastructure) Reports to: Design Programme Manager Service: Highways and Transport Environment & Infrastructure Date: November 2014 2. JOB PURPOSE To

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

PROJECT AUDIT METHODOLOGY

PROJECT AUDIT METHODOLOGY PROJECT AUDIT METHODOLOGY 1 "Your career as a project manager begins here!" Content Introduction... 3 1. Definition of the project audit... 3 2. Objectives of the project audit... 3 3. Benefit of the audit

More information

LECTURE 5: SOFTWARE PROJECT MANAGEMENT. Software Engineering Mike Wooldridge

LECTURE 5: SOFTWARE PROJECT MANAGEMENT. Software Engineering Mike Wooldridge LECTURE 5: SOFTWARE PROJECT MANAGEMENT Mike Wooldridge 1 Introduction The software crisis of the 1960s and 1970s was so called because of a string of high profile software project failures: over budget,

More information

2-Day Workshop Project JumpStart The Workshop Designed to Launch Projects Faster

2-Day Workshop Project JumpStart The Workshop Designed to Launch Projects Faster 2-Day Workshop Project JumpStart The Workshop Designed to Launch Projects Faster Traditional Classroom / Onsite Course No. 665 Duration: 2 days Credits: 14 PDUs / 1.4 CEUs Prerequisites Twelve hours of

More information

Meta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism.

Meta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism. Meta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism. In 2013, the Directorate for Development Cooperation and

More information

How To Manage A Vet

How To Manage A Vet QUALITY MANAGEMENT RECOMMENDATION FOR VOCATIONAL EDUCATION AND TRAINING QUALITY MANAGEMENT RECOMMENDATION FOR VOCATIONAL EDUCATION AND TRAINING Authors and the Finnish National Board of Education ISBN

More information

IMEO International Mass Event Organization based on Recent Experience of Euro 2012

IMEO International Mass Event Organization based on Recent Experience of Euro 2012 IMEO International Mass Event Organization based on Recent Experience of Euro 2012 1. Name of the project: Project Management 2. Leader of the workshop (materials' author): Szymon Włochowicz 1 Objectives

More information

Communication Plan. for the. ATLANTIC AREA 2007-2013 Transnational Cooperation Programme

Communication Plan. for the. ATLANTIC AREA 2007-2013 Transnational Cooperation Programme Communication Plan for the ATLANTIC AREA 2007-2013 Transnational Cooperation Programme Prepared by the Managing Authority 18 January 2008 Index 0. Introduction... 2 1. Communication Strategy... 2 1.1

More information

World Tourism Organization RECOMMENDATIONS TO GOVERNMENTS FOR SUPPORTING AND/OR ESTABLISHING NATIONAL CERTIFICATION SYSTEMS FOR SUSTAINABLE TOURISM

World Tourism Organization RECOMMENDATIONS TO GOVERNMENTS FOR SUPPORTING AND/OR ESTABLISHING NATIONAL CERTIFICATION SYSTEMS FOR SUSTAINABLE TOURISM World Tourism Organization RECOMMENDATIONS TO GOVERNMENTS FOR SUPPORTING AND/OR ESTABLISHING NATIONAL CERTIFICATION SYSTEMS FOR SUSTAINABLE TOURISM Introduction Certification systems for sustainable tourism

More information

General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.

General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided. Introductory Certificate The APM Project Fundamentals Qualification. Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60

More information

Foundation Degree: Events and Hospitality Management

Foundation Degree: Events and Hospitality Management Programme Specification Foundation Degree: Events and Hospitality Management A programme specification is a concise description of the intended outcomes of learning from a higher education programme, and

More information

2011-2013. Academy Profession degree (AP) in Service, Hospitality, and Tourism Management

2011-2013. Academy Profession degree (AP) in Service, Hospitality, and Tourism Management Academy Profession degree (AP) in Service, Hospitality, and Tourism Management 2011-2013 Erhvervsakademiuddannelsen, Serviceøkonom AP Degree in Service, Hospitality and Tourism Management AP Degree in

More information

TERMS OF REFERENCE. Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities

TERMS OF REFERENCE. Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities TERMS OF REFERENCE Reference: Post Title: DMU/NXCWG0927 Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities Project Location: Nassau, The Bahamas

More information

Input, Output and Tools of all Processes

Input, Output and Tools of all Processes 1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /

More information

TERMS OF REFERENCE FOR THE SCOPING AND DEVELOPMENT OF REQUIREMENTS SPECIFICATIONS FOR THE SALGA HUMAN RESOURCE INFORMATION MANAGEMENT SYSTEM (HRIMS)

TERMS OF REFERENCE FOR THE SCOPING AND DEVELOPMENT OF REQUIREMENTS SPECIFICATIONS FOR THE SALGA HUMAN RESOURCE INFORMATION MANAGEMENT SYSTEM (HRIMS) 29 April 2013 TERMS OF REFERENCE FOR THE SCOPING AND DEVELOPMENT OF REQUIREMENTS SPECIFICATIONS FOR THE SALGA HUMAN RESOURCE INFORMATION MANAGEMENT SYSTEM (HRIMS) BID: SALGA/09/2013 CLOSING DATE: 10 June

More information

Preface. Dear reader,

Preface. Dear reader, c h a p t e r h e a d e r I Preface Preface Dear reader, Thank you for reading pm baseline 3.0, the updated version of our successful pm baseline manual. The pm baseline can provide you with valuable support

More information

Bucovina Tourism Academy

Bucovina Tourism Academy Bucovina Tourism Academy Training structure that offer vocational education in tourism and training programs Who are the clients: Young people that intent to work in tourism field Employees in tourism

More information

Process for a Hotel to Become Green-Star Hotel-Certified

Process for a Hotel to Become Green-Star Hotel-Certified Process for a Hotel to Become Green-Star Hotel-Certified Introduction The Green Star Hotel (GSH) Certificate for tourist accommodation businesses is awarded to tourist accommodations in Egypt for their

More information

NEW GRADUATE DEGREE PRELIMINARY REVIEW AND PROPOSAL OUTLINE

NEW GRADUATE DEGREE PRELIMINARY REVIEW AND PROPOSAL OUTLINE Office of the Provost and Executive Vice President for Academic Affairs MSC05 3400 1 University of New Mexico Albuquerque, NM 87131-0001 505.277.2611 NEW GRADUATE DEGREE PRELIMINARY REVIEW AND PROPOSAL

More information

Project management. Project management is about applying these skills to a specific group of activities and goals.

Project management. Project management is about applying these skills to a specific group of activities and goals. A2 Project management In developing or replacing infrastructure, regardless of the size of the project or the type of infrastructure, sound management skills are needed, including: good information-gathering

More information

Interreg CENTRAL EUROPE Programme. Application Manual. Part D: How to apply with us

Interreg CENTRAL EUROPE Programme. Application Manual. Part D: How to apply with us Interreg CENTRAL EUROPE Programme Application Manual Part D: (amended version of 18 February 2015: section IV.2.5, page D32 correction of preparation costs) Content Part A Part B Part C Part D What is

More information

How To Be A Senior Director Of Marketing At Visit Konkville

How To Be A Senior Director Of Marketing At Visit Konkville Job Title: Senior Director of Marketing Department: Marketing Reports To: President FLSA: Professional Exemption Job Summary Responsible for planning, development and implementation of all of the organization

More information

Request for Consulting Services For the Preparation of an International Marketing Strategy EXECUTIVE SUMMARY

Request for Consulting Services For the Preparation of an International Marketing Strategy EXECUTIVE SUMMARY Request for Consulting Services For the Preparation of an International Marketing Strategy EXECUTIVE SUMMARY The City of Abbotsford, Economic Development Department, is seeking a consultant to develop

More information

Business Administration www.fh-krems.ac.at

Business Administration www.fh-krems.ac.at Business Bachelor Business Administration www.fh-krems.ac.at Business and Man Majors: Corporate Communications or International Project Management Aims of our programme We aim to prepare you for your future

More information

Construction Academies in Southeast Europe: Pilot Projects in the Field of Dual Vocational Training

Construction Academies in Southeast Europe: Pilot Projects in the Field of Dual Vocational Training Construction Academies in Southeast Europe: Pilot Projects in the Field of Dual Vocational Training Walter Reiter Background Basic assumption: dual vocational education is a successful method of providing

More information

RECOMMENDATIONS ON BUSINESS PLAN PREPARATION

RECOMMENDATIONS ON BUSINESS PLAN PREPARATION RECOMMENDATIONS ON BUSINESS PLAN PREPARATION 1. General provisions Business plan must contain: name of the investment project, as well description of its essence and feasibility; substantiation of the

More information

10.3.2 Objectives of the Public Relations Services in German Speaking Market (German, Switzerland and Austria).

10.3.2 Objectives of the Public Relations Services in German Speaking Market (German, Switzerland and Austria). THE COMPETITIVENESS AND ENTERPRISE DEVELOPMENT PROJECT (CEDP) TERMS OF REFERENCE FOR A PUBLIC RELATIONS FIRM TO REPRESENT UTB IN GERMAN SPEAKING MARKETS (GERMANY, AUSTRIA AND SWITZERLAND). 10.3.1 Project

More information

Event Management. www.fetac.ie. Module Descriptor

Event Management. www.fetac.ie. Module Descriptor The Further Education and Training Awards Council (FETAC) was set up as a statutory body on 11 June 2001 by the Minister for Education and Science. Under the Qualifications (Education & Training) Act,

More information

PRCA Communications Management Standard (CMS) for In-House Teams

PRCA Communications Management Standard (CMS) for In-House Teams PRCA Communications Management Standard (CMS) for In-House Teams PRCA Communications Management Standard (CMS) for In-House Teams Contents Introduction 4 The Communications Management Standard for In-House

More information

Governments implement PPP programmes in the healthcare sector for one or more of a number of reasons:

Governments implement PPP programmes in the healthcare sector for one or more of a number of reasons: UNECE Healthcare PPP Project Team Project Brief Introduction This is a very active time globally for the healthcare sector as demand for services continues to grow exponentially, driven by rising life

More information

Application form. Interreg Europe Application form 1 / 23. Sharing solutions for better regional policies

Application form. Interreg Europe Application form 1 / 23. Sharing solutions for better regional policies European Union European Regional Development Fund Sharing solutions for better regional policies Application form Disclaimer: This document was endorsed by the programming committee on 10 February 2015.

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a RECOMMENDATION OF THE COUNCIL AND OF THE EUROPEAN PARLIAMENT

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a RECOMMENDATION OF THE COUNCIL AND OF THE EUROPEAN PARLIAMENT COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 12.10.2004 COM(2004) 642 final 2004/0239 (COD) Proposal for a RECOMMENDATION OF THE COUNCIL AND OF THE EUROPEAN PARLIAMENT on further European cooperation

More information

Guidelines for Applicants

Guidelines for Applicants Guidelines for Applicants CORNET 19 th Call for Proposals Opening National and Regional Programmes for transnational Collective Research between SME Associations and Research Organisations. Closing date:

More information

Business Idea Development Product production Services. Development Project. Software project management

Business Idea Development Product production Services. Development Project. Software project management Page 1, 1/20/2003 Ivica Crnkovic Mälardalen University Department of Computer Engineering ivica.crnkovic@mdh.se Development Project Product Lifecycle Business Idea Development Product production Services

More information

Smart Cities Stakeholder Platform. Public Procurement for Smart Cities

Smart Cities Stakeholder Platform. Public Procurement for Smart Cities Smart Cities Stakeholder Platform Public Procurement for Smart Cities SMART CITIES STAKEHOLDER PLATFORM FINANCE WORKING GROUP GUIDANCE DOCUMENT PUBLIC PROCUREMENT FOR SMART CITIES Document information

More information

PROGRAMME MANUAL 3. APPLICATION STAGE

PROGRAMME MANUAL 3. APPLICATION STAGE PROGRAMME MANUAL 3. APPLICATION STAGE 3. APPLICATION STAGE...1 Introduction...3 3.1. Application procedure...6 3.1.1. Application Procedure for modular projects...6 3.1.2. Application Procedure for horizontal

More information

Third Annual CTO Tourism Human Resources Conference June 27-29, 29, 2007, Guadeloupe Leading Change in Tourism within a Dynamic Global Environment

Third Annual CTO Tourism Human Resources Conference June 27-29, 29, 2007, Guadeloupe Leading Change in Tourism within a Dynamic Global Environment June 27-29, 29, 2007, Guadeloupe Leading Change in Tourism within a Dynamic Global Environment Determining the Present and Future Human Resource Needs in the Tourism Sector Presentation by: Frank J. Comito

More information

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter 1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process

More information

NATIONAL CERTIFICATES (VOCATIONAL)

NATIONAL CERTIFICATES (VOCATIONAL) NATIONAL CERTIFICATES (VOCATIONAL) ASSESSMENT GUIDELINES PROJECT MANAGEMENT NQF Level 3 September 2007 PROJECT MANAGEMENT LEVEL 3 CONTENTS SECTION A: PURPOSE OF THE SUBJECT ASSESSMENT GUIDELINES SECTION

More information

Effective project management

Effective project management Effective project management (1) INTRODUCTION: What are Projects? Defined start and end (deadlines) Innovation instead of routine A goal to be achieved based on the division of labour Comprehensive design

More information

Strategy of the Federal and Länder Ministers of Science. for the Internationalisation of the Higher Education Institutions.

Strategy of the Federal and Länder Ministers of Science. for the Internationalisation of the Higher Education Institutions. Strategy of the Federal and Länder Ministers of Science for the Internationalisation of the Higher Education Institutions in Germany (Resolution of the 18th Meeting of the Joint Science Conference in Berlin

More information

Trinidad and Tobago Hospitality and Tourism Institute. Programme Application Guide

Trinidad and Tobago Hospitality and Tourism Institute. Programme Application Guide Trinidad and Tobago Hospitality and Tourism Institute Programme Application Guide Dear Prospective Student, Thank you for considering the Trinidad and Tobago Hospitality and Tourism Institute (TTHTI)

More information

pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development

More information

Tourism Product Development and Marketing Strategies in the COMCEC Region

Tourism Product Development and Marketing Strategies in the COMCEC Region Standing Committee for Economic and Commercial Cooperation of the Organization of Islamic Cooperation (COMCEC) Tourism Product Development and Marketing Strategies in the COMCEC Region COMCEC COORDINATION

More information

South East Europe (SEE) Implementation Manual

South East Europe (SEE) Implementation Manual South East Europe (SEE) Implementation Manual Version 5.0 Date of approval (v1.2): 8 th May 2009 1 st amendment (v2.1): 7th July 2009 2 nd amendment (v3.1): 21 st January 2011 3 rd amendment (v3.2): 27

More information

JOB DESCRIPTION. Contract Management and Business Intelligence

JOB DESCRIPTION. Contract Management and Business Intelligence JOB DESCRIPTION DIRECTORATE: DEPARTMENT: JOB TITLE: Contract Management and Business Intelligence Business Intelligence Business Insight Manager BAND: 7 BASE: REPORTS TO: Various Business Intelligence

More information

CURRICULUM for Diploma of Technology in Project Management

CURRICULUM for Diploma of Technology in Project Management CURRICULUM for Diploma of Technology in Project Management Revised 1 April 2011 Table of contents 1. Introduction 2. The purpose of the programme 3. Programme duration 4. Programme title 5. Admission requirements

More information

PROPOSAL ACRONYM - ETN / EID / EJD (delete as appropriate and include as header on each page) START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS

PROPOSAL ACRONYM - ETN / EID / EJD (delete as appropriate and include as header on each page) START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS Innovative Training Networks (ITN) Call: H2020-MSCA-ITN-2015 PART B PROPOSAL ACRONYM This proposal is to be evaluated as: [ETN] [EID] [EJD] [delete as appropriate]

More information

International framework curriculum for a master degree for TVET teachers and lecturers

International framework curriculum for a master degree for TVET teachers and lecturers International framework curriculum for a master degree for TVET teachers and lecturers Objectives It is the common consensus of opinion that the professionalization of TVET actors within the international

More information

NVAO Initial Accreditation Assessment. International Business Innovation Studies - Inholland University of Applied Sciences (003108)

NVAO Initial Accreditation Assessment. International Business Innovation Studies - Inholland University of Applied Sciences (003108) NVAO Initial Accreditation Assessment International Business Innovation Studies - Inholland University of Applied Sciences (003108) Assessment of conditions 1. Introduction and Procedure This report is

More information

MID-TERM EVALUATION VIE/031. Strengthening of Human Resources in the Hospitality and Tourism in Vietnam

MID-TERM EVALUATION VIE/031. Strengthening of Human Resources in the Hospitality and Tourism in Vietnam MID-TERM EVALUATION VIE/031 Strengthening of Human Resources in the Hospitality and Tourism in Vietnam PROJECT SUMMARY DATA Country Long Project Title Short Project Title LuxDev Code Vietnam Strengthening

More information

Terms of Reference. Database and Website on Political Parties

Terms of Reference. Database and Website on Political Parties Terms of Reference Database and Website on Political Parties Summary International IDEA is through its programme on Dialogue and Research on Political Parties (see Annex D for a programme overview) carrying

More information

Guidelines for Applicants

Guidelines for Applicants Guidelines for Applicants CORNET 21 st Call for Proposals Combining national and regional programmes for international Collective Research for the benefit of SMEs. Closing date: 30 st of March 2016, 12

More information

Drawing up and assessment of proposals for officially recognised postgraduate programmes and degrees. Academic Year 2008-2009

Drawing up and assessment of proposals for officially recognised postgraduate programmes and degrees. Academic Year 2008-2009 Drawing up and assessment of proposals for officially recognised postgraduate programmes and degrees Academic Year 2008-2009 The Quality Assurance Agency for the University System in Castilla y León June

More information

EUR-ACE. Framework Standards for the Accreditation of Engineering Programmes. Foreword... 2. 1. Programme Outcomes for Accreditation...

EUR-ACE. Framework Standards for the Accreditation of Engineering Programmes. Foreword... 2. 1. Programme Outcomes for Accreditation... As approved by the ENAEE Administrative Council on 5 November 2008 EUR-ACE Framework Standards for the Accreditation of Engineering Programmes Table of Contents Foreword... 2 1. Programme Outcomes for

More information

IMCPM04 Project Scheduling and Cost Control. Course Outline

IMCPM04 Project Scheduling and Cost Control. Course Outline IMCPM04 Project Scheduling and Cost Control Course Outline January 2012 Project Scheduling and Cost Control Course Aim Project Scheduling and Cost Control is a five-day (5 day) course which provides participants

More information

Health Informatics Service Accreditation Manual. Assessment Process. May 2013, Version 1

Health Informatics Service Accreditation Manual. Assessment Process. May 2013, Version 1 Health Informatics Service Accreditation Manual Assessment Process May 2013, Version 1 Contents 1. Contacts... 2 2. Introduction... 3 3. Assessment principles... 6 4. Assessment outcome... 7 5. Planning

More information

Case Studies in Design Policy & Programmes

Case Studies in Design Policy & Programmes Case Studies in Design Policy & Programmes This case study was developed as part of the SEE project. SEE is a network of eleven European partners sharing experience and stimulating debate on how to integrate

More information

Work Breakdown Structure & Schedules

Work Breakdown Structure & Schedules A Work Breakdown Structure (WBS) identifies tasks and deliverables associated with a project. Resources are identified for each item within the WBS that facilitates budgeting as well as assignment of responsibilities.

More information

Manual on Training Preparation

Manual on Training Preparation Project on Improvement of Local Administration in Cambodia Three Steps of Training Preparation Step 1: Work Breakdown Structure Step 2: Schedule Step 3: Budget Table of Contents Three Steps of Training

More information

OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT)

OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT) OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT) 3 DAY COURSE INTRODUCTION The principles of project management are generic and therefore can be applied to all projects regardless of business sector.

More information

WORK PROGRAM GUIDELINES

WORK PROGRAM GUIDELINES Project Managed Change Program WORK PROGRAM GUIDELINES JABATAN KERJA RAYA MALAYSIA Cawangan Pengurusan Projek Kompleks (PROKOM) Ibu Pejabat JKR Malaysia 2 Document Ownership Section No Section Amendment

More information

Project management & implementation activities

Project management & implementation activities Project management & implementation activities ZGURA-M Ltd. Aims: A1: To ensure that the project is established on a robust and secure organisational structure with clearly defined management functions.

More information

ASSISTANT / ASSOCIATE PROFESSOR (TENURE TRACK)

ASSISTANT / ASSOCIATE PROFESSOR (TENURE TRACK) Dean s Decision 1 (10) APPOINTMENT SPECIFICATION Three positions of PROFESSOR or ASSISTANT / ASSOCIATE PROFESSOR (TENURE TRACK) in the fields of Software Engineering and Software Security, Software Engineering

More information

************************ REQUEST FOR EXPRESSIONS OF INTEREST FOR AN INDIVIDUAL CONSULTANT AFRICAN DEVELOPMENT BANK

************************ REQUEST FOR EXPRESSIONS OF INTEREST FOR AN INDIVIDUAL CONSULTANT AFRICAN DEVELOPMENT BANK ************************ REQUEST FOR EXPRESSIONS OF INTEREST FOR AN INDIVIDUAL CONSULTANT AFRICAN DEVELOPMENT BANK 01 B.P. 1387 Abidjan 01 - Côte d Ivoire 8 th floor, office 8A/CCIA Building. IDEV Department

More information

Developing a Strategic Plan

Developing a Strategic Plan Te Papa National Services He Rauemi Developing a Strategic Plan Resource Guides INSIDE 2 The benefits of a strategic plan 4 Stage one: preparations 7 Stage two: the planning sessions 15 Stage three: the

More information

APPROVED EDEXCEL BTEC CENTRE

APPROVED EDEXCEL BTEC CENTRE GET A REALLY DEMANDED PROFESSION! The tourism and hospitality industry is a rising star of the world economy. It is estimated that in 2020 it will employ every 11th person on the planet! After studying

More information

QUALITY MANAGEMENT RECOMMENDATIONS FOR VOCATIONAL EDUCATION AND TRAINING

QUALITY MANAGEMENT RECOMMENDATIONS FOR VOCATIONAL EDUCATION AND TRAINING QUALITY MANAGEMENT RECOMMENDATIONS FOR VOCATIONAL EDUCATION AND TRAINING Recommendations Working Group PREFACE Vocational education and training (VET) and those responsible for providing it play more and

More information

Chapter 2: Project Time Management

Chapter 2: Project Time Management Chapter 2: Project Time Management Learning Objectives o o o o Understand the importance of project schedules and good project time management. Define activities as the basis for developing project schedules.

More information

Gender Impact Assessment - A Model For Empowerment

Gender Impact Assessment - A Model For Empowerment Gender Impact Assessment Prototype Introduction Men and women are equal. The Government shall promote the actual enforcement of equality between women and men, and shall take action to eliminate any existing

More information

Syllabus 2nd Edition

Syllabus 2nd Edition Syllabus 2nd Edition 2 Introductory Certificate Syllabus 2nd Edition 2nd Edition Introductory Certificate syllabus All of the syllabus elements should be taken within the context of a project and project.

More information

Higher education in Finland

Higher education in Finland Higher education in Finland Department for Higher Education and Science Policy Counsellor of Education Maarit Palonen Counsellor of Education Tomi Halonen Government Programme 2011-2015 and joint objectives

More information

Hospitality and Tourism 2016 PROGRAMMES

Hospitality and Tourism 2016 PROGRAMMES Hospitality and Tourism 2016 PROGRAMMES Taste life. Right here Passion, service and flavour. These are some of the key ingredients we bring together in our School of Hospitality. Cookery. Patisserie.

More information

Feasibility analysis of the transfer of the Quality System Manager in Health care training in the Romanian vocational and educational system

Feasibility analysis of the transfer of the Quality System Manager in Health care training in the Romanian vocational and educational system Feasibility analysis of the transfer of the Quality System Manager in Health care training in the Romanian vocational and educational system This study was conducted within the project entitled SKILLS

More information

INDIVIDUAL CONSULTANCY

INDIVIDUAL CONSULTANCY INDIVIDUAL CONSULTANCY ARCHITECTURAL CONSULTANT SERVICE TO DEVELOP A CONCEPT DESIGN AND UPDATE THE BUILDING SPECIFICATIONS FOR THE ONE UN HOUSE IN RWANDA TERMS OF REFERENCE 1. Background and Project Description

More information

INTERNATIONAL LABOUR ORGANIZATION THE OFFICE OF THE ILO LIAISON OFFICER. Call for Expression of Interest ILO/YGN/15/10.

INTERNATIONAL LABOUR ORGANIZATION THE OFFICE OF THE ILO LIAISON OFFICER. Call for Expression of Interest ILO/YGN/15/10. INTERNATIONAL LABOUR ORGANIZATION THE OFFICE OF THE ILO LIAISON OFFICER Call for Expression of Interest ILO/YGN/15/10 19 November 2015 Post Title: Organization: Duty Station: National Consultant for the

More information

Hospitality manager apprenticeship standard

Hospitality manager apprenticeship standard Hospitality s work across a huge variety of organisations including bars, restaurants, cafés, conference centres, banqueting venues, hotels and contract caterers. These s generally specialise in a particular

More information

Quick Reference Guide Interactive PDF Project Management Processes for a Project

Quick Reference Guide Interactive PDF Project Management Processes for a Project Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process

More information

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History

More information

Management, budget & finance

Management, budget & finance European Union European Regional Development Fund Sharing solutions for better regional policies Management, budget & finance Interreg Europe secretariat Katja Ecke, Finance Officer Ilaria Piazza, Finance

More information

EAPAA Accreditation Committee Evaluation Report

EAPAA Accreditation Committee Evaluation Report European Association for Public Administration Accreditation EAPAA Accreditation Committee Evaluation Report "Master en Administration Publique" MPA programme, IDHEAP, University of Lausanne. Evaluation

More information

THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT

THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT 1 CONTENTS Introduction 3 Prince2 5 Every as a project tool 6 Major development and building work 7 Further reading and information..9 2 THE COMPLETE GUIDE

More information

URBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS

URBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS URBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS Open 30 March 2015 16 June 2015 1 TABLE OF CONTENT INTRODUCTION... 3 SECTION 1 - ABOUT URBACT

More information

Software Project Planning. CITS1220 Software Engineering

Software Project Planning. CITS1220 Software Engineering Software Project Planning CITS1220 Software Engineering Lecture Overview Problems for SW Project Planning Planning Terms Work Breakdown Dependencies Schedule Tracking 2 Planning SW Projects Your boss:

More information

Section 1: Simple Procurement Resource Module Objectives...3 Part 1: Welcome and Introductions... 3

Section 1: Simple Procurement Resource Module Objectives...3 Part 1: Welcome and Introductions... 3 Simple Resource Module: Project Management Section 1: Simple Resource Module Objectives...3 Part 1: Welcome and Introductions... 3 Section 2: Project Management and...6 Key Competencies for you to Consider...

More information

Consultation Statement

Consultation Statement Consultation Statement Draft Supplementary Planning Document (SPD) on Delivering Skills, Employment, Enterprise and Training from Development through S106 Consultation statement prepared in accordance

More information

Open tender. Reference: 2012-BB-SALES-13. Marketing Birmingham. Lead Generation Chinese Market

Open tender. Reference: 2012-BB-SALES-13. Marketing Birmingham. Lead Generation Chinese Market Page 1 of 20 Open tender Reference: 2012-BB-SALES-13 Marketing Birmingham Lead Generation Chinese Market Project description and tender October 2012 Marketing Birmingham Baskerville House Centenary Square

More information

The second specialisation is in Food, Beverage and Operations Management and will take place on the Les Roches campus in Bluche, Valais Canton.

The second specialisation is in Food, Beverage and Operations Management and will take place on the Les Roches campus in Bluche, Valais Canton. 7 FACTSHEET Press Release Contact person: Address: Contact details: Mrs. Nadège Chiaradia Laureate Hospitality Education Rue du Lac 118 CH-1815 Clarens Switzerland Tel: +41(0)21 989 26 63 - Fax: +41 (0)21

More information

Best Practice: Directory of Accessibility for Disabled People

Best Practice: Directory of Accessibility for Disabled People REPORT UPDATED: JANUARY 17, 2012 CITY: DUBLIN POLICY AREAS: SOCIAL SERVICES; TECHNOLOGY BEST PRACTICE Since 2008, the online Access Guide of Dublin, found at www.accessdublin.ie, has been maintained by

More information

UoD IT Job Description

UoD IT Job Description UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management

More information

Project Integration Management

Project Integration Management Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform

More information

Request for Proposals

Request for Proposals Request for Proposals Connected Responder: Public Safety and Emergency Response Community Connected Vehicle Interest, Context and Business Case Development RFP Schedule RFP Release Date: April 30, 2015

More information

Associate Degree HANDBOOK CARRIBEAN EXAMINATIONS COUNCIL

Associate Degree HANDBOOK CARRIBEAN EXAMINATIONS COUNCIL Associate Degree HANDBOOK CARRIBEAN EXAMINATIONS COUNCIL Published by the Caribbean Examinations Council. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system,

More information

Trinidad and Tobago Hospitality and Tourism Institute. Programme Application Guide

Trinidad and Tobago Hospitality and Tourism Institute. Programme Application Guide Trinidad and Tobago Hospitality and Tourism Institute Programme Application Guide Application Guide 1 Dear Prospective Student, Thank you for considering the Trinidad and Tobago Hospitality and Tourism

More information