The Bonasika Project. Refractory Grade Bauxite Guyana FIRST BAUXITE CORPORATION
|
|
|
- Rudolf Randall
- 10 years ago
- Views:
Transcription
1 The Bonasika Project Refractory Grade Bauxite Guyana Investor Presentation FIRST BAUXITE CORPORATION (FBX: TSX-V FBI: Frankfurt/Berlin) March 2012 Hilbert N Shields MSc. President & CEO
2 Disclaimer This document contains certain forward looking statements which invoke known and unknown risks, delays, and uncertainties not under the corporation s control, which may cause actual results, performance or achievements of the corporation to be materially different from the results, performance or expectation implied by these forward looking statements & presentation slides. Each recipient of this document accepts that no representation or warranty is made concerning the information herein nor is any liability accepted in respect thereof by First Bauxite, or any other shareholder (present or future) in Bonasika. Company Copyright clauses are valid in this case. Content and slides from this presentation are not allowed to be copied or distributed otherwise, without the written consent of the Company. Acknowledgements The Company acknowledges that several companies have provided information and material used in this presentation. These companies include Rothschild, CRU Strategies, Met-Chem, G-Mining, Aluminpro and others. Page 2
3 First Bauxite Corporation A Robust Project built around a Unique Commodity in a Captive Market Page 3 1. PROJECT: Bonasika has 44 Years of Mineable Reserves in mining friendly GUYANA managed by professionals with >100 years of refractory industry & in-country experience 2. COMMODITY: High Quality Refractory Grade Bauxite used in the pyro-metallurgical industry to manufacture steel, cement, glass, aluminum, etc. 3. CAPTIVE MARKET: Inelastic Supply where China & Chinese operators are the World s Only Source of traded refractory grade bauxite
4 Capable and Experienced Management Team Hilbert N Shields President & CEO Ian Fodie CFO Over 30 years experience in the Mineral Exploration and Mining Industry, including 14 years with Golden Star Resources Inc., as Vice President with responsibility for gold exploration in Guyana and Venezuela and diamond exploration worldwide Extensive bauxite industry experience including being part of the management team of Aroaima bauxite mine during its privatization and ultimate sale to UC RUSAL. Managed the exploration of Omai gold deposit in Guyana, from acquisition by Golden Star through to the completion of the Feasibility Study with the involvement of Cambior, and later became a Director of Omai Gold Mines Ltd. Extensive international accounting, finance and capital markets experience Previously CFO of Lithium Americas Corp., President and CEO of Woulfe Mining Corp., and CFO of Resinco Capital Partners Inc. George Bennett COO Over 50 years experience in the exploration, mining, production and sale of industrial minerals with specific focus on refractories Experience extends from start-up refractory operations to managing international licensing and technology sales for Harbison-Walker Refractories, and global refractories marketing responsibilities Acted as an industrial minerals consultant to the Guyana and Peru refractory alumino-silicate industries on technical operating issues, and the establishment of global marketing and distribution organization for refractory and chemical-grade bauxites Jess Hutchinson Vice President Marketing and Product Development Over 25 years experience in the minerals and manufacturing industries, with significant exposure to refractories Project and product management, and application engineering positions; Market and Product Development Manager, and VP of International Operations at Harbison- Walker; Executive VP of worldwide sales and marketing at Global Industrial Technologies; CEO of RHI America Howard Winkelbauer Technical Director Products Over 19 years of experience in the research and technology development field for Harbison-Walker Refractories and senior research roles with RHI America and ANH Refractories. An accomplished writer with a number of technical publications released,and research resulting in 11 U.S. patents, many related to refractory products and processes Page 4
5 The World of Bauxite: Met & Non-Met Global BAUXITE Production 210 Mt FBX: Primary Product Refractory Grade Bauxite Guysin Wash Plant rejected bauxite can be used as feedstock to manufacture: Proppants: Oil & Gas industry Mullites: Lower temp refractory Abrasives: Grinding applications Welding Flux: Welding grade Calcined products Fused Refractory Abrasive Special uses products - Sintered refractory bauxite - Mullites Abrasive Refractory Non-Met Bauxite < 5% Proppant Welding flux Special products Cement products Chemical products Metallurgical Bauxite 95% Alumina production Bayer Process Alumina Trihydrate Calcined Alumina " Guyana & China supply the non-china world s demand for refractory bauxite " Domestic production in India, Russia and Brazil is captive " IM monthly prices vary based on quality: Range from US$460 US$510 FOB Smelter-Grade Alumina Aluminum metal (Al) Page 5
6 The World of Refractory Grade Bauxite Refractory bauxite is derived by the high temperature sintering or calcining of high purity bauxite and is used to make thermally, chemically and physically resistant refractory products such as bricks & castables, which are used to line the steel shells of furnaces. STEEL, CEMENT, ALUMINIUM & GLASS INDUSTRIES ARE HEAVILY RELIANT ON REFRACTORY PRODUCTS FBX Raw Materials Industry & Mining Sintered Bauxite (2.2 mt) BFA (1 mt), alumina (1.8 mt) Magnesia (6.5 mt 7.5 mt) Dolomite (800,000 t 900,000 t) Clay (10 mt) Other (10 mt) Refractories Industry Production of Different Types for Refractories Refractory products Materials Industry Steel, Cement, Glass Petro-Chemicals Non- Ferrous (1) Page 6
7 Refractory Bauxite: Historical Price Actual price has about a US$40 range based on product quality & specifications Refractory bauxite prices have remained stable since June 2009 Source: Industrial Minerals Magazine Chinese quota system is designed to discourage the export of raw materials Page 7
8 INDEPENDENT MARKET STUDY CONCLUSIONS Independent refractory bauxite market study prepared by CRU commodity research unit concluded that a variety of industrial processes will consistently need this industrial material over the long-term, providing real price support at approx. US$500/ tonne. " SUPPLY: Chinese industry to struggle as availability of high grade bauxite declines and becomes more expensive due to pollution controls and modernization; " DEMAND: Global demand is anticipated to grow steadily over the next 10 to 15 years; " PRICES: Refractory grade bauxite prices are expected to rise over the next 10 to 20 years; and " FBX: Strong desire in the market for a new producer CRU International Limited All rights reserved. Page 8
9 Guyana Excellent Mining Jurisdiction " GDP of US$2.2bn (US$2,950 per capita) " Real GDP growth of 3.6% (2010) " Independence from UK in 1966 " Westminster Style parliamentary democracy " Government has followed a free market model for development with a policy of economic liberalization and promotion of direct foreign investment " Long history of Bauxite, Gold & Diamond production: " Bauxite: discovered in 1859 & mined in 1917 by ALCOA and later ALCAN " Two operating Bauxite Mines: RUSAL & BOSAI " Mineral exploration: 25+ Canadian companies " Four (4) Mineral Agreements recently signed " Three (3) Feasibility Studies: Two mines scheduled to start construction in 2012 " REPSOL & CGX Oil drilling offshore in 2012 Nov.2011 FBX signed Mineral Agreement with GoG: Strong stability clause outlining fiscal conditions including royalty, fuel, withholding & corp tax holiday Page 9
10 Sand Hills: A Strategic location on Demerara River Location & Access: " Sand Hills 15 Km from international Airport " Sand Hills 60 Km from Capital city of Georgetown Ocean Access: " Sand Hills Plant located on left bank of navigable Demerara River 65 Km from open ocean Haul Distance: " Bonasika 7 pit 20 Km from Sand Hills. " Existing trail to be upgraded to all weather haul road Bosai s Linden plant è Ship on Demerara River Page 10
11 Geology: Bonasika Resources & Reserves Resource as of November 18, 2011 Tonnage LOI SiO 2 TiO 2 Fe 2 O 3 AI 2 O 3 Mineral resource (incl. reserves) (kt) (%) % (%) (%) (%) Bonasika 1 1, Bonasika Bonasika Bonasika 6 4, Bonasika 7 5, Total measured and indicated 13, Mineable reserves Tonnage (kt) LOI (%) SiO 2 % TiO 2 (%) Fe 2 O 3 (%) AI 2 O 3 (%) Bonasika 1 1, Bonasika Bonasika Bonasika 6 4, Bonasika 7 4, Total ore 11, Mine reserve life (@ 100,000 t/yr) 44.5 Existence of approximately 13.1 million tonnes of Measured and Indicated Mineral Resources Source: First Bauxite November 18, Technical Report Page 11
12 Mining and Processing Overview Mining will commence at the Bonasika 7 Deposit " Large (1700 x 900 m) shallow (average depth 30m) open pit " Direct dig conventional truck and shovel operation for both overburden stripping and ore mining " Mining rate of 208,500 tonnes of dry run of mine ore annually: " Selective mining of 83,480 of high grade (SiO 2 <3%, Al 2 O 3 >61%, Fe 2 O 3,<0.7%) direct feed, DFB ore " And 125,020 of regular grade (SiO 2 <10%, Al 2 O 3 >57%, Fe 2 O 3,<1%), RGB ore " The shallow-pit depth, relatively low production tonnages and soft ground conditions all favor a fleet of backhoe oriented hydraulic excavators and articulated haul trucks, no blasting is required Processing consists of two processing plants: Wash Plant & Sinter Plant The Processing Plants and ancillary installations including a 9.5 MW power plant and a wharf will be located at the Sand Hills Complex some 21 km from the Bonasika 7 Pit, on the west bank of the navigable Demerara River Polysius RCE Sinter Plant Briquettes after sintering & crushing Page 12 Wash Plant: Crushing & silica reduction using water to flush out kaolin " Regular Grade Bauxite ( RGB ) will be crushed and will be processed through the wash plant to expose and reduce silica contained in kaolin " Direct Feed Bauxite ( DFB ) will only be crushed since silica content will be within specifications " RGB and DFB concentrates will be stored separately in a covered shed, to be later blended to achieve on-specification sinter plant feed silica content; on-spec feed will be stored ahead of the sintering plant Sinter Plant: Two Vertical high temperature shaft t/y each to sinter bauxite " Processing ahead of the sintering plant will entail drying and fine grinding the feed " The fine dried bauxite will then be moistened and fed to briquetting rolls, where the ground material will be formed into compacted pillow shaped briquettes " Sintering of the briquettes will be done in two Maerz RCE150 tonnes per day pressurized vertical shaft kilns operating 'at a peak temperature of 1,650 degrees Celsius " Briquettes will be crushed to produce a sized product for distribution to the market
13
14 Guysin : A trademarked High Quality Product 6% 7% 2% 1% RASC Bosai Northern Chinese various Global refractory bauxite production Alpha Star Imerys First Bauxite target for Guysin Brown fused alumina, China AI 2 O % min 87.5% max 89.5% min 88.0% min 95.5% min SiO max max 1.0 max TiO max max 3.0 max Fe 2 O max 0.3 max Na / K 0.15 max max n.a. BSG, g/cc 3.1 min min 3.4 min 3.9 IM indicative price US$460/ tonne US$503/ tonne US$510/ tonne US$510/ tonne US$678/ tonne FBX s trademarked GUYSIN is high quality: High alumina, low alkalis, low iron, and high density Bonasika will be the only non-chinese owned producer of high quality export oriented refractory bauxite, providing consumers with new source of premium product 84% China Brazil India Guyana Russia Refractory bauxite from India, Brazil and Russia cannot ordinarily meet the quality specifications of product from Guyana or China which consumers covet Page 14
15 BFSU Methodology: Study was a collaboration among a team of experts with specific technical, commodity & country expertise BFSU Objective: Bankable study to IFC Performance Standards and Equator Principle compliant BFSU: Industry experts lead by Met- Chem & managed by G Mining " Resource: Aluminpro " Reserves: Met-Chem " Geotechnical: Golder " Sinter Plant: Polysius & Met-Chem " Wash Plant: Bennett & Met-Chem " Infrastructure: G Mining " Financial: G Mining " Market Study: CRU Research Unit " Environment ESIA: SENES BFSU: Completed October 2011 Key Study base Parameters " Production Level: 100,000 MTA " Fuel price: Assumed of US$85.00 per barrel crude & 90% factor on crude price to HFO price. " Sale price: Life of Mine (Bonasika 6 & 7 = 38 Years of Mine Life) at US$475 per tonne FOB, Sand Hills wharf, Guyana. " Royalty Rate: 1.5% of FOB at shipping " Corporate Tax Rate: Five Year tax holiday and then 30% rate " Depreciation: 5 Year 20% straight line Page 15
16 BFSU Key Financial Outcomes A robust and economically viable project with NPV 7.5% before tax of US$157 million & an IRR of 19% " Capex: US$124M " Sale Price: US$475 per tonne " Opex: US$210 per tonne (excl. royalty) " Gross margin: US$ 258 (net of royalty) " NPV 7.5% after tax: US$124M " IRR after tax: 18% " Undiscounted pre-tax Cash Flow: US$732M " Payback Period: 5 Years Page 16 Financial analysis does not include: " Bonasika 1, 2 & 5 deposits " Additional bauxite products made from wash plant rejects " Proppants: Oil & Gas industry " Mullites: Refractories used at lower service temperatures
17 Marketing Guysin Marketing strategy underpinned by the need to secure offtake agreements which give lenders comfort in our ability to service commercial debt; Banks have varying risk tolerance so their offtake needs are different; Arrangements range from LOI to take or pay. " Offtake Bauxite Supply Agreements (BSA) which: " Have a component of take or pay with a floor price " Commit approx. 50% of production for a period of up to 5 years " Escalation clause indexed to the price of oil " Price discount, off IM benchmark, for inaugural customers " Quantum of discount related to strength of contract " Expose some production to market prices " Distribute production among many customers so that they can qualify Guysin " Marketing team lead by former CEO of largest refractory company in NA. " Most customers have received lab scale samples for product testing " First LOI signed in December 2011 Page 17
18 Medium Term Growth Strategy " Expansions to Higher Production Levels Through consecutive low incremental capital expansions to 150,000 (estimated cost of 50% expansion i.e. installing one additional kiln is US$33M) " Expanded Production & Product diversification using wash plant bauxite rejects: Other Refractory products such as lower temperature Mullites Non-Refractory applications: e.g. Proppants for Oil & Gas fracking:(cost are management estimates; NOT NI compliant) " Proppant Plant estimated Capex US$12-15M " Estimated Opex <US$100 " Estimated sale price US$400 per tonne FOB CRU believes Bonasika is well-positioned Refractory Grade Bauxite 100,000 t/y Initial Production Refractory Grade Bauxite 100,000 t/y Incremental Addition of 50,000 t/y to 150,000 t/y First Expansion Production of Proppants, Mullites and Abrasives Refractory Grade Bauxite 100,000 t/y Initial Production Incremental Addition of 50,000 t/y to 200,000 t/y Second Expansion Page 18
19 Page 19
20 HISTORICAL MILESTONES Project started in 2008 when Bonasika was purchased by FBX " Sep 2008 Commenced Sonic drilling " Jun 2009 PacRoad Financing $8M + $20M " Oct 2009 Met-Chem Feasibility Study " Sep 2010 NI Technical Report " Oct 2010 Acquired BCGI & Tarakulli " Jan 2011 RCF Financing $8M + $20M " Apr 2011 Rothschild appointed Financial Advisors " Oct 2011 Bankable Feasibility Study Updated " Nov 2011 Updated NI Technical Report; Completed ESIA; Signed Mineral Agreement with Government of Guyana; Received Environmental Permits. Page 20
21 First Bauxite Corporation Capital Structure Common shares issued & outstanding Fully diluted shares outstanding 53.8MM 81.4MM Management & Directors 17.3% RCF & PacRoad 6.7% Stock price (March 1, 2012) Market capitalization C$0.60 C$32.3MM Page 21 Management and financial partners hold a significant stake in First Bauxite and are invested to succeed
22 A COMPELLING INVESTMENT OPPORTUNITY " Unique resource: High quality refractory grade bauxite with long mine life " Experienced team: Strong management team with both deep refractory and incountry experience " Excellent location: Guyana is mining friendly jurisdiction with almost 100 years history of supplying the world with high quality bauxite " Captive market: wanting alternative to China as monopoly supplier (demand confirmed by CRU Study) " Expansion & Growth: Project amenable to expansion with blue sky in by-products Timeline Q Q Q Q Q Q Q Q NI BFSU Negotiate off-take agreements Finalize Bonasika financing Order long-lead time items Construction Commissioning Commercial production First Bauxite provides a unique & exciting investment opportunity Page 22
23 Page 23 Aerial Photo of Sand Hills and the Demerara River
FIRST BAUXITE CORPORATION Suite 1220 1066 West Hastings St. Vancouver, B.C., V6E 3X1 604-806-0916 Fax: 604-806-0956 www.firstbauxite.
FIRST BAUXITE CORPORATION Suite 1220 1066 West Hastings St. Vancouver, B.C., V6E 3X1 604-806-0916 Fax: 604-806-0956 www.firstbauxite.com October 6, 2011 NEWS RELEASE Symbol: FBX: TSX V FBI: FWB/BER FIRST
LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT
LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT Conference Call December 1, 2015 Lydianinternational.co.uk TSX:LYD Cautionary Statements Forward Looking Statements & Other
TD Securities Mining Conference JANUARY 26-27, 2016. Developing the third-largest copper mine
TD Securities Mining Conference JANUARY 26-27, 2016 Developing the third-largest copper mine Forward-looking statements This presentation includes certain forward-looking information within the meaning
Corporate Presentation October 2015
TSX.V: GBB OTC PK: GBBFF THE GRANADA GOLD PROPERTY IN ROUYN - NORANDA QUEBEC a Corporate Presentation October 2015 GoldBullionDevelopmentCorp.com A Compelling Value Proposition High-grade rolling start
Detour Gold Provides New Life of Mine Plan for Detour Lake
January 25, 2016 NEWS RELEASE Detour Gold Provides New Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce a new life of mine plan
Cannon Big Pit Given the Green Light
ASX Release Tuesday 3 November 2015 Cannon Big Pit Given the Green Light Southern Gold maintains 50% profit share on Cannon Metals X estimate open pit recovered gold +270% to ~50koz Significant cash flow
For personal use only
Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio
AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME
African Gold Group, Inc. TSX-V: AGG Yonge & Richmond Centre 151 Yonge Street, 11th Floor. Toronto Canada M5C 2W7 Tel: +1 647 775 8538 website : www.africangoldgroup.com AFRICAN GOLD GROUP, INC. DEFINITIVE
Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM
PRESS RELEASE Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM SILVERCORP ANNOUNCES POSITIVE PRELIMINARY ASSESSMENT FOR THE SILVERTIP SILVER-LEAD-ZINC PROJECT, BRITISH COLUMBIA, CANADA VANCOUVER, British
Mako Project, Eastern Senegal Completion of Scoping Study
Toro Gold Ltd Trafalgar Court Admiral Park, Guernsey. GY1 3EL. News Release: 18 th April 2013, Guernsey Mako Project, Eastern Senegal Completion of Scoping Study Toro Gold Ltd ( Toro Gold or the Company
(NYSE-MKT:XRA, TSX:XRC,
For Immediate Release: NR 15-08 Corporate Update Vancouver, B.C., December 17 th, 2015 Exeter Resource Corporation (NYSE-MKT:XRA, TSX:XRC, Frankfurt:EXB Exeter or the Company ) is pleased to provide the
Savannah North Scoping Study Looking into the future 3 February 2016
Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement
Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015
Developing the Tanlouka Gold Project AGM Presentation 18th November 2015 1 Executive Summary West African Resources Ltd is an ASX and TSXV listed gold development company focussed on Burkina Faso Largest
ADVISORY CAPABILITY STATEMENT
ADVISORY CAPABILITY STATEMENT Bridging Two Disciplines We are independent Engineering Economists and Advisors. Our principal competency is as supply side and asset specialists. Since 1971 we have bridged
Commerzbank German Investment Seminar. Dr. Jürgen Köhler, CEO New York. January 2016
SGL Group s Strategic Realignment Commerzbank German Investment Seminar Dr. Jürgen Köhler, CEO New York January 2016 Transformation of SGL Group. Guided by clearly defined targets (Sept. 2014) Capital
Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016
Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion
Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016
Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes
Sorby Hills Silver Lead Project
ASX RELEASE Sorby Hills Silver Lead Project Major Milestone Achieved with Environmental Approval As announced on 3 April, the WA Minister for Environment has approved the development of the Sorby Hills
For personal use only
Mawson Iron Project PERTH 21 ST NOVEMBER 2015 Dr Gavin England General Manager DISCLAIMER AND COMPETENT PERSONS STATEMENT Slogan XXXX URBANISATION & INDUSTRIALISATION Chinese urbanisation and industrialisation
Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review
Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining 17 November 2015 Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review Ferrex plc, the AIM quoted
Endeavour Management Presentation
Endeavour Management Presentation June 2014 GOLD PRODUCER WEST AFRICA CASH FLOW Disclaimer & Forward Looking Statements This presentation contains forward-looking statements including but not limited to,
For personal use only
ASX Release 28 January 2016 QUARTERLY ACTIVITIES REPORT For the quarter ended 31 December 2015 Level 1, 672 Murray Street West Perth WA 6005 Locked Bag 8 West Perth WA 6872 t. +61 8 9322 1182 f. +61 8
Feasibility Study shows low cost battery grade lithium hydroxide production possible using ELi Technology
ASX RELEASE 11 July 2016 Feasibility Study shows low cost battery grade lithium hydroxide production possible using ELi Technology Highlights Positive results for Feasibility Study ( FS ) on producing
Nemaska Lithium A near term lithium hydroxide supplier
Nemaska Lithium A near term lithium hydroxide supplier Charging the future by Euro Pacific, Canada May 13, 2014 Guy Bourassa President and CEO Forward-looking Statements During the course of this presentation,
September 2015 Quarterly Activities Report
ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production
Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015
Developing Power Projects in Southern Africa Annual General Meeting Presentation 20 th November 2015 2015 Company Highlights AFR now participating in the development of three large-scale power projects
BAUXITE RESOURCES LIMITED
BAUXITE RESOURCES LIMITED POSITIVE EXPORT DSO BAUXITE SCOPING STUDY RESULTS RECEIVED FOR 100% BRL FORTUNA PROJECT Highlights Existing Mineral Resource and rail logistic chain can support a Direct Shipping
This discussion and analysis contains forward-looking statements. Please refer to the cautionary language on page 19.
This discussion and analysis of financial condition and results of operation of Thompson Creek Metals Company Inc. ( Thompson Creek or the Corporation ) is prepared as at August 7, 2008, and should be
Focusing on Near Term Production and Exploration in Quebec
Focusing on Near Term Production and Exploration in Quebec AGM January 2016 Forward Looking Statement Forward Looking Statement This presentation may contain forward looking statements, being statements
Redefining Canada s Iron Ore Industry. Positioned To Become The First HBI Producer In Canada.
Redefining Canada s Iron Ore Industry Positioned To Become The First HBI Producer In Canada. DISCLAIMER The following presentation may include certain forward-looking statements within the meaning of applicable
WILLAMAX PROJECT. TSX-V: DVN Reach us at 604 818 1706. Developing B.C. mining assets to create profitable gold production.
WILLAMAX PROJECT Developing B.C. mining assets to create profitable gold production May 2014 Reach us at 604 818 1706 Management Team Akash Patel, President and CEO Mr. Patel has received a bachelor in
Positioned for Production: Exploring for Growth
ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors
Pathway to Production
Charging forward with Lithium Pathway to Production 8th Lithium Supply & Markets Conference 24 26 May 2016 Las Vegas Disclaimer This presentation has been prepared by Altura Mining Limited ( Altura or
Fast Tracking to Production
Fast Tracking to Production THE ABU DABBAB TANTALUM-TIN-FELDSPAR PROJECT, EGYPT THE 400K DEVELOPMENT. Gippsland Ltd (February 2015)) 1 Important Notices Competent Persons Compliance Statement The information
Cummins Range Rare Earths Project
Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general
Resources Rising Stars
ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources
FIJI GOLD LION ONE METALS
FIJI GOLD LION ONE METALS Tuvatu Gold Project January 2016 Presentation Disclaimer Forward Looking Statements and Qualified Person DISCLAIMER The information provided in this presentation is not intended
ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015
ANNUAL GENERAL MEETING Investor Presentation 24 November 2015 Corporate Structure ASX Code: OVR Shares on Issue 205.4 million Top 20 133.0 million (64.8%) Market Capitalisation $1.23 million (share price
Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015. Successful Share Issue Raises A$5.6 Million
Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015 Highlights Successful Share Issue Raises A$5.6 Million Successful Share Issue raises A$5.6 Million Non-binding bauxite Off-Take
International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies
International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies Sergei Sabanov, PhD, CEng MIMMM Date:10 December 2013 Location: Almaty, Kazakhstan SRK Consulting
RHI AG. May 12, 2016
RHI AG Results 1Q/16 May 12, 2016 Highlights & Lowlights Highlights Positiv Steel Division operating EBIT margin of 7.8% in 1Q/16 driven by Europe and North America as a result of an improved product mix
Silver Mine Project Investment Opportunity in Scandinavia
Silver Mine Project Investment Opportunity in Scandinavia KPMG Corporate Finance ( KPMG ) has been retained by Sotkamo Silver as exclusive Financial and Strategic adviser in connection with the Project
Baader Investment Conference
Baader Investment Conference Bernhard Kleinermann, Director Corporate Communication and IR Munich, September 23, 20 1 Market Situation 2 Financial Accounts First Half of 20 3 Salzgitter AG 20 / Prospects
Mines and Money Presentation
ASX:BCI 24 Mar 15 Mines and Money Presentation Morgan Ball Managing Director 2 DISCLAIMER This document has been prepared by BC Iron Limited ( BC Iron ) to provide an update regarding the companies to
R. Naghizadeh 1, J. Javadpour 1, M. Naeemi 2, M.T. Hamadani 3 and H. R. Rezaie 1
FEASIBILITY STUDY ON THE USE OF IRANIAN BAUXITES IN THE FABRICATION OF SHAPED REFRACTORY & HIGH ALUMINA CEMENTS. R. Naghizadeh 1, J. Javadpour 1, M. Naeemi 2, M.T. Hamadani 3 and H. R. Rezaie 1 1 Iran
ALCYONE REPORTS JORC SILVER RESOURCES
ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR
C o r p o r a t e P r e s e n t a t i o n A u g u s t 2 0 1 5
C o r p o r a t e P r e s e n t a t i o n A u g u s t 2 0 1 5 Forward Looking Statements This presentation includes certain estimates, projections and forward looking statements within the meaning of Section
KOPY GOLDFIELDS AB. A thorny path of a public Junior Gold Exploration Company in Russia Russian & CIS Metals Summit 2014, Moscow, February, 2014
KOPY GOLDFIELDS AB A thorny path of a public Junior Gold Exploration Company in Russia Russian & CIS Metals Summit 2014, Moscow, February, 2014 Disclaimer - Forward looking statement Forward Looking Information
News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS
No. 7/2015 News release KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS BAAR, SWITZERLAND, August 12, 2015 Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") today announces its financial
Mineral Deposits and their Global Strategic Supply. Group Executive and Chief Executive Non-Ferrous 14 December 2011
Mineral Deposits and their Global Strategic Supply Andrew Mackenzie Andrew Mackenzie Group Executive and Chief Executive Non-Ferrous 14 December 2011 Disclaimer Reliance on Third Party Information The
DRX : Cyclone DFS soon
1 February 2016 DRX : Cyclone DFS soon Tick Hill : 22koz gold in Resources Recommendation BUY, High Risk Price 1.1c Valuation 7.2c In December, DRX announced an increase in its Reserves for Resources for
Great Western Minerals Reports Second Quarter 2014 Results August 13, 2014 Page 2 of 7
NEWS RELEASE 2121 Airport Drive, Unit 201B, Saskatoon, SK S7L 6W5 FOR IMMEDIATE RELEASE Great Western Minerals Reports Second Quarter 2014 Results SASKATOON, SK, Canada, Great Western Minerals Group Ltd.
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation London 3 February 2016 Aerial view of Chepica Gold Mine Taken with Phantom 3 Professional Drone 2 We are xtracting significant
CANADA S INTERMEDIATE GOLD PRODUCER
CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2015 Results Conference 1 Call & Webcast October 29, 2015 Forward Looking Information This presentation contains certain forward-looking information and
Sabina Gold & Silver Corp.
Sabina Gold & Silver Corp. Creating precious metals opportunities in the Canadian North November 2011 Hackett River Camp, looking to west 1 Forward Looking Statements This presentation includes certain
FORM 7 MONTHLY PROGRESS REPORT
FORM 7 MONTHLY PROGRESS REPORT Name of CNSX Issuer: Muskrat Minerals Incorporated (the Issuer ). Trading Symbol: YYR Number of Outstanding Listed Securities: 17,251,015 Date: July 3, 2015 This Monthly
BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE
TSX-V/AIM Symbol: BCN April 15, 2016 NEWS RELEASE BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE BACANORA MINERALS LTD.
INVESTOR PRESENTATION JULY 2013
INVESTOR PRESENTATION JULY 2013 DISCLAIMER This presentation contains only a brief overview of Millennium Minerals Limited. The contents of this presentation, including matters relating to the geology
CNSX: TV www.trevali.com
CNSX: TV www.trevali.com March 2010 DISCLAIMER Certain statements contained in this document, including, without limitation, those concerning the economic outlook for the mining industry, expectations
For personal use only
DECEMBER 2011 Issued 31 January 2012 HIGHLIGHTS INDIAN IRON ORE MINING PROJECT Significant on-site work completed and installation of phase one processing infrastructure underway at Kurnool iron beneficiation
For Discussion Purposes Only. Direct Metals Recycling Financing Opportunity. (Note: All figures contained herein are in US dollars)
For Discussion Purposes Only Direct Metals Recycling Financing Opportunity (Note: All figures contained herein are in US dollars) June 2015 Cautionary Statement This Confidential Information Memorandum
Change of Company Name to Neometals Ltd (ASX: NMT)
Level 1, 672 Murray Street West Perth WA 6005 Locked Bag 8 West Perth WA 6872 t. +61 8 9322 1182 f. +61 8 9321 0556 [email protected] neometals.com.au Neometals Ltd ABN 89 099 116 631 ASX RELEASE 18
El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.
El cinturón de oro del río Narcea: el futuro de la minería de oro en España Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. CORPORATE PRESENTATION JUNE 16, 2009 TARGETED TO BECOME ONE OF WESTERN
THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial
THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES Craig Roberts National Bank Financial ABSTRACT While various methods are available to estimate a mining project
ANNUAL GENERAL MEETING 2015. 30 November 2015
ANNUAL GENERAL MEETING 2015 30 November 2015 Disclaimer Competent Person Statement This presentation may contain some references to forecasts, estimates, assumptions and other forward-looking statements.
2008 Annual General Meeting
2008 Annual General Meeting Presented by Stephen Popadynetz and Roderick Chisholm May 6, 2008 Integrated Solutions for the Oil & Gas Industry Disclaimer This presentation may contain forward-looking statements,
Update on Heap Leach potential of the Murchison gold project
3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and
Q2-14 Financial Results. July 30, 2014
Q2-14 Financial Results July 30, 2014 Forward-looking Statements & Non-GAAP Measures Information contained in these materials or presented orally on the earnings conference call, either in prepared remarks
Interview with Paul Atherley, Managing Director of Berkeley Energia (911733, ASX: BKY, London: BKY)
Interview with Paul Atherley, Managing Director of Berkeley Energia (911733, ASX: BKY, London: BKY) Dear Paul, thank you very much for the opportunity to interview you today as I know you are very busy
Introduction to Zinc and Lead Smelting Business
Introduction to Zinc and Lead Smelting Business 25 November 2009 Important Notice This presentation has been prepared by the management of Nyrstar NV (the "Company"). It does not constitute or form part
LABRADOR IRON MINES REPORTS QUARTERLY RESULTS
LABRADOR IRON MINES REPORTS QUARTERLY RESULTS Toronto, Ontario, August 28, 2015. Labrador Iron Mines Holdings Limited ( LIM or the Company ) today reports its operating and financial results for its first
FIRST QUARTER CONFERENCE CALL MAY 4, 2010
FIRST QUARTER CONFERENCE CALL MAY 4, 2010 1 Cautionary Statement CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS: This presentation contains or incorporates by reference forwardlooking statements
COALWORKS Limited. Investor Series:Coal August 2008
Investor Series:Coal August 2008 1 DISCLAIMER The information in this presentation does not purport to contain all the information that may be required to evaluate the prospects of Coalworks and in particular
NIKO REPORTS RESULTS FOR THE QUARTER ENDED DECEMBER 31, 2015
NIKO REPORTS RESULTS FOR THE QUARTER ENDED DECEMBER 31, 2015 Niko Resources Ltd. ( Niko or the Company ) is pleased to report its operating and financial results for the quarter ended December 31, 2015.
3Q 2015 OPERATIONS REVIEW
OPERATIONS REVIEW MDL s primary asset is a 50% interest in the TiZir joint venture ( TiZir ), which owns the Grande Côte mineral sands operation ( GCO ) in Senegal, West Africa and the TiZir Titanium &
NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW
NEWS RELEASE February 11, 2008 Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW INTERNATIONAL MINERALS ANNOUNCES 6.2 MILLION OUNCES OF MEASURED AND INDICATED GOLD RESOURCES AND RESULTS
AGNICO-EAGLE MINES LIMITED
AGNICO-EAGLE MINES LIMITED Corporate Update January 2008 Agnico-Eagle Mines Limited 1 Forward Looking Statements The information in this document has been prepared as at January 15, 2007. Certain statements
Galahad Gold plc (Galahad)
23 January 2007 Galahad Gold plc (Galahad) 2006 Drilling Expands Northern Dynasty's Pebble East Deposit Pebble East Deposit Now Over 7000 Ft By 4000 Ft With Grades Exceeding 1% Cueq Galahad sets out below
THE ROLE OF METALLURGY IN ENHANCING BENEFICIATION IN THE SOUTH AFRICAN MINING INDUSTRY
THE ROLE OF METALLURGY IN ENHANCING BENEFICIATION IN THE SOUTH AFRICAN MINING INDUSTRY Marek Dworzanowski, Presidential Address, SAIMM AGM, 22 August 2013 CONTENTS Introduction Definitions Phases of metallurgical
NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS
NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce
Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project
Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Toronto, Ontario, November 17, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the
PACIFIC ENERGY LIMITED POWER GENERATION
PACIFIC ENERGY LIMITED POWER GENERATION 2015 RESULTS PRESENTATION August 2015 ASX: PEA Important Notice and Disclaimer This presentation has been prepared by (PEL) for information purposes only. This presentation
Location of significant gold and base metals drill results announced 2013
Exploration, development and mining mining codes and their role in attracting long term investment ensuring a balanced participation in benefits IPAD 214 Location of significant gold and base metals drill
Barkerville Gold Mines Investor presentation q1 2016. The last great Canadian gold mining camp controlled by a junior mining company.
Barkerville Gold Mines Investor presentation q1 2016 The last great Canadian gold mining camp controlled by a junior mining company. 1 Forward Looking statement This presentation and the material contained
First Quarter Fiscal Year 2016 Earnings Release and Conference Call. August 4, 2015
Fiscal Year 2016 Earnings Release and Conference Call August 4, 2015 Forward-Looking Statements Forward-Looking Statements. This presentation contains forward-looking statements within the meaning of Section