Information Systems Analysis and Design CSC340. XXIV. Other Phases
|
|
|
- Kimberly Harris
- 10 years ago
- Views:
Transcription
1 XXIV. Other Phases Implementation Phase Testing and Installation Phase Post-Installation Tasks Course Summary 2004 John Mylopoulos Other Phases -- 1 The Software Lifecycle Revisited Survey project scope & feasibility feasibility study Study current problem statement Define end user reqs. project request initial requirements Select feasible solution Customers delivered Maintain & improve Design design spec detailed requirements configuration Select & Acquire S&H/W Deliver S/W Construct Vendors 2004 John Mylopoulos Other Phases -- 2
2 Software Development Lifecycle Revisited Implementation Phase -- equipment and software purchases, project management controls, programming, testing and installation Operation Phase -- training, operations control, security controls, file maintenance and database administration 2004 John Mylopoulos Other Phases -- 3 Implementation Phase Survey Phase.. Study Phase.. Global Design Phase. Selection Phase.. Acquisition Phase... Detailed Design Phase.. Implementation Phase Installation of H/W and S/W site preparation.. install & test Programming plan preparation... Building test data, test files and DBs... Writing and testing programs... Installing purchased software.. Extending/adopting purchased software John Mylopoulos Other Phases -- 4
3 Hardware and Software Purchase Select software -- DBMS, 4GL, compilers and loaders, project management tools,... Select hardware needed -- disks, processors, workstations, monitors, networks, communications lines, network drivers, communications devices, modems, etc. How to Purchase -- establish request for bids, or negotiate contract with desired vendor Sources of information to aid in the evaluation -- Datapro, A.D. Little, Seybold reports, user groups, e.g., SHARE, DECUS, s publications, e.g., Computing Canada, Computerworld, John Mylopoulos Other Phases -- 5 Installation of System Hardware and Software Site preparation -- air-conditioning installation, cable trays, cable conduits, cable laying, installation of satellite relay station, power increase, installation of clean power, ergonomic furniture installation, negotiation for space, building false floors; all this applies for multi-user equipment, not for personal machines and/or workstations. Machine setup -- loading and testing, testing software for performance, arrangement of furniture, training of programming personnel 2004 John Mylopoulos Other Phases -- 6
4 Programming Plan Preparation Review the design specifications Organization of the programmer team -- chief programmer, librarian, specialists, programmers Team Manager -- is the person who is in charge of the team and directs the whole implementation. Development of detailed construction plan -- order in which modules will be built and tested; specification of naming conventions and parameter passing conventions; specification of version numbers of and development accomplishments; specification of control procedures 2004 John Mylopoulos Other Phases -- 7 A Note: Chief Programmers In the seventies, software teams were defined around chief programmers. Chief programmer -- is the person who conceives and directs the whole implementation. Chief programmer team concept has never been validated: Some tasks best dealt with by assigning them to one very qualified programmer; Other complex tasks done by a team of equal programmers each contributing their specialty; Mundane tasks fit best the chief programmer team model John Mylopoulos Other Phases -- 8
5 Building Test Data, Test Files and Databases Have users generate test data, if possible Generate full range of data, even non-key values Generate enough data to test size decisions of programs, e.g., have reports printed on more than one page Generate data that test the full range of potential values, e.g., generate the maximum and minimum input values allowed by a program Note: This stage may include the conversion of an existing database 2004 John Mylopoulos Other Phases -- 9 Programming and Testing Here is a top-down programming strategy: Review program structure Design user interface modules - prototyping Test user interface Design top modules Code and test top modules (stub testing) Design lower modules Code and test lower modules (stub testing) Stub testing -- test individual modules by simulating the interfaces to other modules Unit or program testing -- test all modules that have been coded System testing -- test the whole 2004 John Mylopoulos Other Phases -- 10
6 Delivery Phase Implementation Phase. Delivery Phase Install files and databases. Train end users. Convert to the. Post-implementation review Immediate... Delayed John Mylopoulos Other Phases System Acceptance Testing Alpha Testing - testing on friendly users, often in-house Beta Testing - testing on less friendly users, usually an outside group who wants to use the early End-user testing (or verification testing) - test the in a simulated environment to see whether it meets user specifications and usability requirements; often done during alpha testing Validation testing -- run the in a live environment, testing performance, peak workload performance, human engineering test, methods and procedures test, backup and recovery test, audit testing, i.e., is free of errors 2004 John Mylopoulos Other Phases -- 12
7 Post-Implementation Review Involves two subtasks: Evaluate operational information -- Does it fulfill the objectives set out? Does it adequately support transaction processing, management reporting...? Are the projected benefits being realized? How do endusers feel about the? Should there be any enhancements? When should they be implemented? Are the internal controls working adequately? Evaluate development processes -- Did costs match budgeted amounts? Was completed on time? What was the performance of each individual on the project? What problems did we encounter? What would we do differently? 2004 John Mylopoulos Other Phases Course Summary Building information s involves three phases: Feasibility Study -- understand the problem, come up with an information solution. Requirements Analysis -- specify functional and non-functional requirements of selected alternative. Design -- define the overall architecture, databases, interface and program structures. All three phases can be supported by modeling languages such as UML John Mylopoulos Other Phases -- 14
8 Team work, understanding human, organizational, and social situations, capturing this understanding through models are important prerequisites to successful information development 2004 John Mylopoulos Other Phases Lifecycle Phases For large software s (>10KLOC), cost breakdown: Requirements Analysis 5% Design 10% Programming-in-the-small 15% Integration 10% Maintenance and Evolution 60% For small software s (<5KLOC): Specification 10% Decomposition 20% Coding 20% Optimization 15% Testing 25% Validation 10% Analysis and design more important than coding! 2004 John Mylopoulos Other Phases -- 16
9 What Comes Next? CSC407: Software Architectures -- software design, object-oriented design and design patterns. CSC 408: Software Engineering -- all software development phases, project management CSC 434: Data Management -- DBMSs, implementation techniques CSC454: The Business of Software -- how to build a software company CSC 465: Programming Methodology -- program design and specification using logic. CSC2106: Requirements Analysis -- practice and research. CSC2507: Conceptual Modeling -- modeling languages such as UML John Mylopoulos Other Phases -- 17
Information Systems Analysis and Design CSC340. I. Introduction
I. Introduction Types of Software Information Systems in Organizations Requirements Analysis and Design Roles of a Systems Analyst Notations, Methods and Tools Information System Lifecycle Phases 2003
IV. Software Lifecycles
IV. Software Lifecycles Software processes and lifecycles Relative costs of lifecycle phases Examples of lifecycles and processes Process maturity scale Information system development lifecycle Lifecycle
REQUIREMENTS SPECIFICATION AND MANAGEMENT. Requirements Analysis and Specification
REQUIREMENTS SPECIFICATION AND MANAGEMENT In this note we give the requirements process in a software organization, a template for the requirements document, and the process to manage changes to the requirements.
Information Technology Specialist - Band A. Class Specifications Demonstration Project
Information Technology Specialist Class Specifications Demonstration Project (910Axx, 910Bxx, 910Cxx, 910Dxx) 9104A, 9104B, 9104C, 9104D I. Definition The Information Technology Specialist series is characterized
Page 1 of 5. IS 335: Information Technology in Business Lecture Outline Computer Technology: Your Need to Know
Lecture Outline Computer Technology: Your Need to Know Objectives In this discussion, you will learn to: Describe the activities of information systems professionals Describe the technical knowledge of
Chapter 11: Integration- and System Testing
Chapter 11: Integration- and System Testing Chapter 14: Testing (2/2) Object-Oriented Software Construction Armin B. Cremers, Sascha Alda & Tobias Rho (based on Bruegge & Dutoit) Software Lifecycle Activities...and
Assistant Information Technology Specialist. X X X software related to database development and administration Computer platforms and
FUNCTIONAL AREA 5 Database Administration (DBA) Incumbents in this functional area plan, design, develop, test, implement, secure, and administer database systems. Database Administration applies to all
Chapter 11: Integrationand System Testing
Object-Oriented Software Engineering Using UML, Patterns, and Java Chapter 11: Integrationand System Testing Integration Testing Strategy The entire system is viewed as a collection of subsystems (sets
Domain 1 The Process of Auditing Information Systems
Certified Information Systems Auditor (CISA ) Certification Course Description Our 5-day ISACA Certified Information Systems Auditor (CISA) training course equips information professionals with the knowledge
Karunya University Dept. of Information Technology
PART A Questions 1. Mention any two software process models. 2. Define risk management. 3. What is a module? 4. What do you mean by requirement process? 5. Define integration testing. 6. State the main
Chapter 3. Database Environment - Objectives. Multi-user DBMS Architectures. Teleprocessing. File-Server
Chapter 3 Database Architectures and the Web Transparencies Database Environment - Objectives The meaning of the client server architecture and the advantages of this type of architecture for a DBMS. The
Request for Proposal for Application Development and Maintenance Services for XML Store platforms
Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...
i. Definition ii. Primary Activities iii. Support Activities iv. Information Systems role in value chain analysis
ACS 1803 Final Exam Topic Outline I. Enterprise Information Systems a. Enterprise systems vs. inter-organisational systems b. Value Chain Analysis ii. Primary Activities iii. Support Activities iv. Information
The Role of the Software Architect
IBM Software Group The Role of the Software Architect Peter Eeles [email protected] 2004 IBM Corporation Agenda Architecture Architect Architecting Requirements Analysis and design Implementation
How to Write a Software Process Procedures and Policy Manual for YOUR COMPANY
How to Write a Software Process for YOUR COMPANY 1. Introduction MicroTools is proposing to assist YOUR COMPANY in improving the existing software process. The purpose of this project is to both improve
Software Engineering Question Bank
Software Engineering Question Bank 1) What is Software Development Life Cycle? (SDLC) System Development Life Cycle (SDLC) is the overall process of developing information systems through a multi-step
Updating the International Standard Classification of Occupations (ISCO) Draft ISCO-08 Group Definitions: Occupations in ICT
InternationalLabourOrganization OrganisationinternationaleduTravail OrganizaciónInternacionaldelTrabajo Updating the International Standard Classification of Occupations (ISCO) Draft ISCO-08 Group Definitions:
Fundamentals of Information Systems, Fifth Edition. Chapter 8 Systems Development
Fundamentals of Information Systems, Fifth Edition Chapter 8 Systems Development Principles and Learning Objectives Effective systems development requires a team effort of stakeholders, users, managers,
Design Document Version 0.0
Software Development Templates Design Document Version 0.0 Description of Project DOCUMENT NO: VERSION: CONTACT: EMAIL: Ivan Walsh DATE: 4/13/2004 Distribution is subject to copyright. Design Document
Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.
INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing
Project Management Planning
Develop Project Tasks One of the most important parts of a project planning process is the definition of activities that will be undertaken as part of the project. Activity sequencing involves dividing
Introduction. Chapter 1. Introducing the Database. Data vs. Information
Chapter 1 Objectives: to learn The difference between data and information What a database is, the various types of databases, and why they are valuable assets for decision making The importance of database
TITLE: Control of Software
Page 1 of 8 TITLE: Control of Software WARNING This document is the property of United Technologies Corporation (UTC). You may not possess, use, copy or disclose this document or any information in it,
Chapter 10. Practical Database Design Methodology. The Role of Information Systems in Organizations. Practical Database Design Methodology
Chapter 10 Practical Database Design Methodology Practical Database Design Methodology Design methodology Target database managed by some type of database management system Various design methodologies
In this Lecture you will Learn: Implementation. Software Implementation Tools. Software Implementation Tools
In this Lecture you will Learn: Implementation Chapter 19 About tools used in software implementation How to draw component diagrams How to draw deployment diagrams The tasks involved in testing a system
White Paper A Model Driven Approach to Data Migration
White Paper A Model Driven Approach to Data Migration This paper describes the approach used by Snowflake Software to migrate data from legacy databases to a new database infrastructure. This process has
Software testing. Objectives
Software testing cmsc435-1 Objectives To discuss the distinctions between validation testing and defect testing To describe the principles of system and component testing To describe strategies for generating
How To Write An Slcm Project Plan
SLCM 2003.1 Artifacts in a Nutshell ( as of 01/21/2005) Project Development Phases Pension Benefit Guaranty Corporation s (PBGC) System Life Cycle Methodology (SLCM) is comprised of five project development
COURSE NAME: Database Management. TOPIC: Database Design LECTURE 3. The Database System Life Cycle (DBLC) The database life cycle contains six phases;
COURSE NAME: Database Management TOPIC: Database Design LECTURE 3 The Database System Life Cycle (DBLC) The database life cycle contains six phases; 1 Database initial study. Analyze the company situation.
Chapter 10 Practical Database Design Methodology and Use of UML Diagrams
Chapter 10 Practical Database Design Methodology and Use of UML Diagrams Copyright 2011 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 10 Outline The Role of Information Systems in
Chapter 11, Testing, Part 2: Integration and System Testing
Object-Oriented Software Engineering Using UML, Patterns, and Java Chapter 11, Testing, Part 2: Integration and System Testing Overview Integration testing Big bang Bottom up Top down Sandwich System testing
PLCs and SCADA Systems
Hands-On Programmable Logic Controllers and Supervisory Control / Data Acquisition Course Description This extensive course covers the essentials of SCADA and PLC systems, which are often used in close
Database System Architecture & System Catalog Instructor: Mourad Benchikh Text Books: Elmasri & Navathe Chap. 17 Silberschatz & Korth Chap.
Database System Architecture & System Catalog Instructor: Mourad Benchikh Text Books: Elmasri & Navathe Chap. 17 Silberschatz & Korth Chap. 1 Oracle9i Documentation First-Semester 1427-1428 Definitions
Information Systems Development Process (Software Development Life Cycle)
Information Systems Development Process (Software Development Life Cycle) Phase 1 Feasibility Study Concerned with analyzing the benefits and solutions for the identified problem area Includes development
How To Integrate Software And Systems
September 25, 2014 EFFECTIVE METHODS FOR SOFTWARE AND SYSTEMS INTEGRATION P R E S E N T E D B Y: D R. B O Y D L. S U M M E R S 1 Software Engineer (Quality) Defense and Space The Boeing Company - Seattle,
Establishing Great Software Development Process(es) for Your Organization. By Dale Mayes [email protected]
Establishing Great Software Development Process(es) for Your Organization By Dale Mayes [email protected] Class: ETP-410 Embedded Systems Conference San Francisco 2005 Abstract: There are
Database Administrator [DBA]
Definition Database Administrator [DBA] Centralized control of the database is exerted by a person or group of persons under the supervision of a highlevel administrator. This person or group is referred
INTRODUCTION. National Competency Standard for Application Developers Commission on Information and Communications Technology
COMMISSION ON INFORMATION AND COMMUNICATIONS TECHNOLOGY NATIONAL ICT COMPETENCY STANDARD FOR APPLICATION DEVELOPERS (NICS APPDEV) INTRODUCTION The National ICT Competency Standard for Application Developers
COMPONENTS in a database environment
COMPONENTS in a database environment DATA data is integrated and shared by many users. a database is a representation of a collection of related data. underlying principles: hierarchical, network, relational
How To Write A Contract For Software Quality Assurance
U.S. Department of Energy Washington, D.C. NOTICE DOE N 203.1 Approved: Expires: 06-02-01 SUBJECT: SOFTWARE QUALITY ASSURANCE 1. OBJECTIVES. To define requirements and responsibilities for software quality
F15. Towards a More Mature Test Process. Anne Mette-Hass. P r e s e n t a t i o n
Towards a More Mature Test Process Anne Mette-Hass International Conference On Software Testing, Analysis & Review November 19-23 Stockholm, Sweden P r e s e n t a t i o n F15 Friday 23rd November, 2001
COMPUTER INTEGRATED MANUFACTURING
COMPUTER INTEGRATED MANUFACTURING 1. INTRODUCTION: Computer Integrated Manufacturing () encompasses the entire range of product development and manufacturing activities with all the functions being carried
https://sjobs.brassring.com/tgwebhost/jobdetailpreview.aspx?partnerid=25082&siteid=5045&pid=^...
Page 1 of 5 Close Bulletin Number Type of Recruitment Position Title Rebulletin Exam Number Filing Type 19125BR Open Competitive Job Opportunity Human Resources Countywide Exams INFORMATION SYSTEMS ANALYST
Information Systems and Tech (IST)
California State University, San Bernardino 1 Information Systems and Tech (IST) Courses IST 101. Introduction to Information Technology. 4 Introduction to information technology concepts and skills. Survey
Development, Acquisition, Implementation, and Maintenance of Application Systems
Development, Acquisition, Implementation, and Maintenance of Application Systems Part of a series of notes to help Centers review their own Center internal management processes from the point of view of
Sample Career Ladder/Lattice for Information Technology
Click on a job title to see examples of descriptive information about the job. Click on a link between job titles to see the critical development experiences needed to move to that job on the pathway.
Exhibit F. VA-130620-CAI - Staff Aug Job Titles and Descriptions Effective 2015
Applications... 3 1. Programmer Analyst... 3 2. Programmer... 5 3. Software Test Analyst... 6 4. Technical Writer... 9 5. Business Analyst... 10 6. System Analyst... 12 7. Software Solutions Architect...
Software Test Plan (STP) Template
(STP) Template Items that are intended to stay in as part of your document are in bold; explanatory comments are in italic text. Plain text is used where you might insert wording about your project. This
Answers to Review Questions
Tutorial 2 The Database Design Life Cycle Reference: MONASH UNIVERSITY AUSTRALIA Faculty of Information Technology FIT1004 Database Rob, P. & Coronel, C. Database Systems: Design, Implementation & Management,
How To Build A New System For A College
Application Development Methodology The main objective of Enterprise Applications is to design, develop, and maintain quality software. This document out lines the requirements for requesting new systems,
Table of Contents. Auditor's Guide to Information Systems Auditing Richard E. Cascarino Copyright 2007, John Wiley & Sons, Inc.
Table of Contents PART I. IS Audit Process. CHAPTER 1. Technology and Audit. Technology and Audit. Batch and On-Line Systems. CHAPTER 2. IS Audit Function Knowledge. Information Systems Auditing. What
Chapter 10 Practical Database Design Methodology and Use of UML Diagrams
Chapter 10 Practical Database Design Methodology and Use of UML Diagrams Copyright 2011 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 10 Outline The Role of Information Systems in
Decomposition into Parts. Software Engineering, Lecture 4. Data and Function Cohesion. Allocation of Functions and Data. Component Interfaces
Software Engineering, Lecture 4 Decomposition into suitable parts Cross cutting concerns Design patterns I will also give an example scenario that you are supposed to analyse and make synthesis from The
Qualification details
Qualification details Title New Zealand Diploma in Information Systems (Level 5) Version 1 Qualification type Diploma Level 5 Credits 120 NZSCED 020399 Information Technology > Information Systems > Information
3 SYSTEM DEVELOPMENT METHODOLOGIES
3 SYSTEM DEVELOPMENT METHODOLOGIES 3.1 INTRODUCTION Different types of system development methodologies are used in designing information system. Depending upon the actual requirement of the system, different
Please Note: Temporary Graduate 485 skills assessments applicants should only apply for ANZSCO codes listed in the Skilled Occupation List above.
ANZSCO Descriptions This ANZSCO description document has been created to assist applicants in nominating an occupation for an ICT skill assessment application. The document lists all the ANZSCO codes that
Virtualization s Evolution
Virtualization s Evolution Expect more from your IT solutions. Virtualization s Evolution In 2009, most Quebec businesses no longer question the relevancy of virtualizing their infrastructure. Rather,
Information Technology Project Management (ITPM)
FUNCTIONAL AREA 10 Project Management (ITPM) Incumbents in this functional area direct information technology system solution and/or improvement projects for cost, time, scope, risk, and quality. They
Course Description Bachelor in Management Information Systems
Course Description Bachelor in Management Information Systems 1605215 Principles of Management Information Systems (3 credit hours) Introducing the essentials of Management Information Systems (MIS), providing
Application Functional Safety IEC 61511
Application Functional Safety IEC 61511 Introduction Functional safety must be an integral part of the project execution if we shall succeed to make safe application program We can t test and audit safety
B.Com(Computers) II Year DATABASE MANAGEMENT SYSTEM UNIT- V
B.Com(Computers) II Year DATABASE MANAGEMENT SYSTEM UNIT- V 1 1) What is Distributed Database? A) A database that is distributed among a network of geographically separated locations. A distributed database
Chapter 2 Database System Concepts and Architecture
Chapter 2 Database System Concepts and Architecture Copyright 2011 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 2 Outline Data Models, Schemas, and Instances Three-Schema Architecture
Implementation of ANSI/AAMI/IEC 62304 Medical Device Software Lifecycle Processes.
Implementation of ANSI/AAMI/IEC 62304 Medical Device Software Lifecycle Processes.. www.pharmout.net Page 1 of 15 Version-02 1. Scope 1.1. Purpose This paper reviews the implementation of the ANSI/AAMI/IEC
Introduction to Virtualization. Paul A. Strassmann George Mason University October 29, 2008, 7:20 to 10:00 PM
Introduction to Virtualization Paul A. Strassmann George Mason University October 29, 2008, 7:20 to 10:00 PM 1 Data Center Transformation 2 Scope of Virtualization Services 3 Virtualization Evolution 4
Acknowledgement. Software Engineering. CS 3141: Team Software Project Introduction
CS 3141: Team Software Project Introduction Ali Ebnenasir Department of Computer Science Michigan Technological University Acknowledgement Betty H.C. Cheng Software Engineering Systematic approach for
University at Buffalo Learning Management and Performance Management System Request for Information # 14CBW0036
University at Buffalo Learning Management and Performance Management System Request for Information # 14CBW0036 Background The University at Buffalo (UB), The State University of New York is a major public
NATIONAL CERTIFICATE (VOCATIONAL)
NATIONAL CERTIFICATE (VOCATIONAL) SUBJECT GUIDELINES DATA COMMUNICATION AND NETWORKING NQF Level 4 September 2007 DATA COMMUNICATION AND NETWORKING LEVEL 4 CONTENTS INTRODUCTION 1 DURATION AND TUITION
Systems Software. Introduction to Information System Components. Chapter 1 Part 2 of 4 CA M S Mehta, FCA
Systems Software Introduction to Information System Components Chapter 1 Part 2 of 4 CA M S Mehta, FCA 1 Systems Software Learning Objects Task Statements 1.1 Identify deployment of different components
Foundations for Systems Development
Foundations for Systems Development ASSIGNMENT 1 Read this assignment introduction. Then, read Chapter 1, The Systems Development Environment, on pages 2 25 in your textbook. What Is Systems Analysis and
PART 10 COMPUTER SYSTEMS
PART 10 COMPUTER SYSTEMS 10-1 PART 10 COMPUTER SYSTEMS The following is a general outline of steps to follow when contemplating the purchase of data processing hardware and/or software. The State Board
performs a variety of complicated tasks, may lead and direct the work of others, may report directly to a project
State of Iowa-IT Services-Position Descriptions Levels of Experience The following levels of experience apply to all job categories unless a job category details other requirements (example Data Entry).
Sistemi ICT per il Business Networking
Corso di Laurea Specialistica Ingegneria Gestionale Sistemi ICT per il Business Networking Software Development Processes Docente: Vito Morreale ([email protected]) 17 October 2006 1 The essence of
Certified Information Systems Auditor (CISA)
Certified Information Systems Auditor (CISA) Course Introduction Course Introduction Module 01 - The Process of Auditing Information Systems Lesson 1: Management of the Audit Function Organization of the
Information Technology Engineers Examination. Information Security Specialist Examination. (Level 4) Syllabus
Information Technology Engineers Examination Information Security Specialist Examination (Level 4) Syllabus Details of Knowledge and Skills Required for the Information Technology Engineers Examination
Chapter 1. Database Systems. Database Systems: Design, Implementation, and Management, Sixth Edition, Rob and Coronel
Chapter 1 Database Systems Database Systems: Design, Implementation, and Management, Sixth Edition, Rob and Coronel 1 In this chapter, you will learn: The difference between data and information What a
Software Testing Lifecycle
STLC-Software Testing Life Cycle SDLC Software Testing Lifecycle Software Testing Life Cycle (STLC) defines the steps/ stages/ phases in testing of software. However, there is no fixed standard STLC in
Chapter 13 Configuration Management
Object-Oriented Software Engineering Using UML, Patterns, and Java Chapter 13 Configuration Management Outline of the Lecture Purpose of Software Configuration Management (SCM)! Motivation: Why software
INFORMATION SYSTEMS SPECIALIST 8 1488
INFORMATION SYSTEMS SPECIALIST 8 1488 SERIES DESCRIPTION The INFORMATION SYSTEMS SPECIALIST (ISS) classification series has eight levels that describe technical and professional non-supervisory positions
Software Process Training
Dr. Ernest Wallmüller Wolfgang Höh Rule 8 Configuration Management Qualität & Informatik www.itq.ch Copyright Qualität & Informatik 2005 Software Configuration Management (S) The process of identifying,
Administering Microsoft SQL Server Databases
Course Code: M20462 Vendor: Microsoft Course Overview Duration: 5 RRP: 2,025 Administering Microsoft SQL Server Databases Overview This five-day instructor-led course provides delegates with the knowledge
B.Sc (Computer Science) Database Management Systems UNIT-V
1 B.Sc (Computer Science) Database Management Systems UNIT-V Business Intelligence? Business intelligence is a term used to describe a comprehensive cohesive and integrated set of tools and process used
CDC UNIFIED PROCESS JOB AID
CDC UNIFIED PROCESS JOB AID Independent Verification & Validation Activities Document Purpose This Job Aid is a brief document listing the items to be noted, checked, remembered, and delivered when completing
System Design Approaches. System Design. Model-Driven Approaches Modern Structured Design. Model-Driven Approaches
System Design Systems design the specification of a detailed computer-based solution. Also called physical design. systems analysis emphasizes the business problem systems design emphasizes the technical
MCQ on Management Information System. Answer Key
MCQ on Management Information System. Answer Key 1.Management information systems (MIS) 1. create and share documents that support day-today office activities 2. process business transactions (e.g., time
IT - General Controls Questionnaire
IT - General Controls Questionnaire Internal Control Questionnaire Question Yes No N/A Remarks G1. ACCESS CONTROLS Access controls are comprised of those policies and procedures that are designed to allow