SONY PICTURES ENTERTAINMENT INC.
|
|
- Alexina McKenzie
- 8 years ago
- Views:
Transcription
1 SONY PICTURES ENTERTAINMENT INC. EXHIBIT A WORK ORDER UST Global Reference: SONY WORK ORDER, Exhibit to the Consultant Services Agreement (the "Agreement") by and between Sony Pictures Entertainment Inc. (the "Company") and VST Global Inc ("Vendor") dated March 2, SERVICES: The Vendor will provide application design and development services for the Company. Prototype Deliverables and Acceptance Criteria: Functional Requirements Review Review of all functional requirements Document completed by the Application Architect & Functional Specs with Project Manager sign-off on understanding Gap analysis of any required byvst/spe clarification on Functional Requirements for application design or effort estimation Conduct clarification meeting with SPE BRM (business analyst) and potentially the user where required Application Architecture The Application Architect will design Application Architecture Diagram and document the system architecture Diagram, presented, for the application across the full reviewed and approved by stack from VI through Middleware and Database. Including specifications for non-functional requirements including performance, scalability, & security. The architecture will take into account the existing elements of the SPE C2 framework on JBOSS and Oracle DB. Mobile architecture will also be completed with delivery on the ipad but architecture design that is as device agnostic as possible. Including handsets and tablets. SPE ADMlSDM. Development of Release 1 & 2 Create simulation and/or prototype of Working functionality for Release 1- View Project List and the requirement for validation with Release 1 & Release 2 View Project Detail the BA and/or user. available in the SPE Create Technical Design for the Production Environment Release 2 - Crew Deal History, releases. Launch Attachments, and Add- Provide the Technical & SONY Sony Pictures Motion Picture Production Database Project Page 11
2 Edit Project Final MPPDB completed project estimate and Project Plan Simulation to the offshore development team Promote to PY for QA and VAT Complete any fixes from VAT Promote to Production Create a fixed-bid estimate for Releases 3-8 based on the finalized functional requirements, application design, and development throughput data from releases 1 & 2. Create a development Project Plan through Development, System Testing, Go-Live and KT for Maintenance. Layered PhotoShop files PDF document with newly designed screens 1.1. Applicable Service Level Requirements (SLRs) of milestones by scheduled completion date Functional % of Test 100% of Test % Bi-weekly Upon and Non Cases Cases duringuat Completion Functional phase ofqaprior Requirements touat Met before and UAT start date measured in Quality Center Defect free %ofuat to all 93.3%* At completion On deliverables Cases deliverables of each Completion leach milestone I of each milestone Project milestone Performance = [(Cumulative number of deliveries shipped on or before project completion)] * 100/Cumuiative number of deliveries Performance = Number of UAT cases met/total Number ofuatcases (number of by project completion where bugs = x * 100 I (number of deliverables for the entire 40% 35% *The 93.3 defect rate is the standard acceptance rate by the Six Sigma definition, it assumes zero Severity 1 or Severity 2 defects. Defects are measured against approved and documented test scenarios in the Functional Design Document. Reported defects found in processes not defined in the documented test scenario will not be considered in defect density calculation nor guaranteed for a fix before the scheduled Go Live date Service Level Requirements (SLRs) and Fee Reduction The SLRs set forth in section 1.1 have been designed to encourage Vendor's consistent performance in the form of timely delivery of service, quality of service, high customer satisfaction and overall value to the Company. Each SLR set forth in section 1.1 identifies key performance measures that will be used to evaluate the Vendor's delivery of the in scope Services on a recurring basis. The overriding goal in developing SLRs is to support Company's desire to manage the Vendor by monitoring and measuring performance on the Company's most-important business and technical requirements Fee Reduction SONY Sony Pictures Motion Picture Production Database Project Page 12
3 Fee Reductions are calculated dollar amounts payable to Company as a result of Vendor's failure to meet the SLRs set forth herein. Fee Reductions are not intended to compensate Company for damages, but rather to provide Company an interim financial remedy that approximates the diminished value of the Services contracted for but not performed as a result of a SLR failure. Fee Reductions shall not be construed as an exclusive remedy and Company shall be entitled to other remedies as are available under the Agreement Failure For the purposes ofthis Exhibit, "Failure", shall with respect to SLRs means the failure to meet such SLR performance as set forth in section 1.1 and assumes that the Company has provided the Vendor with all necessary documentation, system access, availability of subject matter experts, and decision-makers at the critical milestones for the Vendor to meet the project milestones Weighting Factor Each SLR in this Exhibit has been assigned a weight representing relative criticality as compared with other SLRs, which is expressed as a percentage (hereinafter the "Weighting Factor"). Weighting Factors shall be used to calculate Fee Reductions for a failure to meet SLRs (in accordance with Section 1.6 herein). The sum of all Weighting Factor percentages shall not exceed one hundred percent (100%) with a maximum weighting factor of 65% for any single SLR Fee Reduction Methodology Upon any failure with respect to a SLR, a Fee Reduction shall be assessed, which shall be equal to the product of: At Risk Amount (as defined in Section 1.7) multiplied by the Weighting Factor for the SLR that was missed. The Fee Reduction will be immediately credited to Company and shall be identified and itemized in the next invoice. Company may also set off amounts owed as Fee Reductions against future invoices that are payable to Vendor Project At Risk Amount The portion of Fees against which Fee Reductions can be assessed for SLR failures shall be known as the ("At Risk Amount"). The At Risk Amount for Vendor's failure to meet SLRs is eight percent (8%) ofthe SOW Fees Development Approach and Methodology The Vendor will execute the development in two phases. Activities performed under each of the phases are detailed below: 1. Application Design Phase: Functional Requirements Analysis: Analyze and understand the user requirements based on functional requirements, non-functional requirements and design objectives. Application Architecture Design: modernize the existing system for improved web-enablement and to implement design improvements, developed as new module on the Concept-to-Camera (C2) framework, addressing Architecture alignment to SPE's compliance, consistency and re-usability Multi-channel access to Business Services: the application will be designed for multibrowser access (IE, Firefox, Navigator, & Safari) and mobile access to important information with focus on reusable business services Re-design the data model to ensure easy data maintenance and reuse: as the application is modernized, changing the data model for re-use and performance may be required Improved flexibility around analytics and reporting 2. Iterative Build Phase for Release 1 & Release 2: Prototype and/or simulate the requirement Develop Technical Specifications Code and Test the solution Perform QA and promote to the Test Environment for UAT preparation SONY Sony Pictures Motion Picture Production Database Project Page 13
4 Perform any required fixes from QA or UAT phases Promote to the Production Environment 1.9. Assumptions All hardware and software required for the development, prototype and production environments will be provided by SPE, workstations for offshore development staff will be provided by UST. Development, Test & Production environments will be prepared with access provided prior to the start of the development process Project Level Reporting Vendor Communication Plan Methodology / Tool Frequency Content Project Status Reports Weekly Status of deliverables and progress of activities Risk and Issue Log Weekly Identified risks and mitigation plans of production support issues.- exlcullvl.- exlcullvl TERM: SPE Activities UST --y Leodo"hlp r eom Sponsor Sponsor Pro"om MonlCO r Projlct MonOClmlnl Offlte Partner Mlnl,.r ~ Discuss overall healt h of re lationship Vision alignment Obtain feedback Strategic Direction of t he Organizatior:- Review quarterly performance UST Leadership Executive Sponsor Global Relationship Manaee:r Account/Project Manacar Obtain felt dback Executlv. Sponsor "' Discuss innovation Set quarterly objectives Discuss strategic initiativu Globol RoloUon,hip M.anac.r Account/Projoct Mlnl/lor exlcutlvl Spon.or Review mont hly perfo rmance Glob.1 Rel.tlon.hlp Procr1m Mln.,er Obtain feedback Mana,.r Projlct MonOClmlnl Offlte Address Change, Risks, and Issues Account/Project Mana,or Portnlr Monocor Review 90 day demand forecast Offshore Acc.ount Manac.r Pro,,"m Monocer Partn.r Mana,.,.._ _ Project Status Reviews Review incident/cq analysis Address Chan;:e, Risks, and Issues Project Mana,er Systems Analyst.L. rethnlcal Lead ~ ~ The project is scheduled to start on July 18, 2011 with an estimated duration of 11 business weeks from project kickoff concluding September 30, COMPENSATION: a. Vendor will be compensated on a fixed fee per the following payment schedule: $14,676 to be invoiced at the conclusion of July $40, I 62 to be invoiced at the conclusion of August $40,162 to be invoiced at the conclusion of September based on deliverable completion and signoff by Company b. Expenses: Prior written approval by the Company is required. c. Overtime compensation: included in the fixed price SONY Sony Pictures Motion Picture Production Database Project Page 14
5 d. Other Compensation/Credits: N/A e. Total Costs: The total fee for the duration of this exhibit is $95, MANAGER: Paul Gaffner, Director SPE Motion Pictures 5. PERSONNEL: Depending on the scope of the engagement personnel can fall under the following roles described as follows : Project Manager: The Project Manager serves as the primary focal point for ensuring that the SDLC process is followed and that deliverables meet required timelines & quality standards. Java Architect/Technical Lead: Creates the application architecture and ensures compliance against that architecture throughout the development phase. Performs final QA before delivery to SPE for UAT. Developer: Responsible for technical design of solutions and coding VI Designer/Tester: Responsible for UI design of the screens and unit testing 5.1. Personnel Approval Process Prior to assigning the Vendor onsite lead and other key service delivery staff to Company, Vendor will provide Company with proposed staff resumes and other information about the members, and Company will have the right to approve them. If Company objects in good faith to the proposed assignment, Vendor shall propose other individuals to meet Company staffing requirements. During the contract period, if Company determines in good faith that the continued assignment of one or more of the Vendor engineering personnel is not in the best interests of Company (due to poor staff performance) and as such requests replacement of such person(s), Vendor will replace that person(s) with another person(s) of suitable ability and qualifications per the staff approval process described above Project Team and Organization Vendor will employ a hybrid global delivery model focused at providing more touch points to the Company in terms of senior resources such as Account Manager, Coordinator, Architects, etc. located at the client site to work closely with the MPG while leveraging our offshore delivery. A high level Project Team Organization is explained below: SPE. Engagement Relationship MPPDB Application Development Team SPE SPE PMO Jay Kuderka Relationship Mgr. SPE Project Manager Christine Faraci Accou nt Mgr. Java Developers ITSME JavaCoE Mandira Shah 1 Practice Leadej AVStudio Andrew Doak Practice Di=:J II Sunil P 1 Practice Archite.:J SONY Sony Pictures Motion Picture Production Database Project Page 15
6 Vendor team organization structure comprise of the following roles: 3. Executive Sponsor: Senior member of Vendor's leadership team who will be accountable for all strategic business and relationship matters involving Company 4. Relationship Manager: Accountable for planning and commitment of vendor in support of Companies initiatives and maintaining the day-to-day relationship 5. Account Manager: Single point of contact to the Company and responsible for execution of project activities and day-today management of staff and deliverables. The Account manager will facilitate status meetings and issue resolution 6. Project Manager: Responsible for project team management, coordination of project deliverables. The Project Manager will report to the Account Manager. The Project Manager will own the task level activities and will be responsible for accomplishing the project deliverables 7. Development team: Java/J2EE Technical Architect and Java/J2EE Engineers are assigned to develop the proposed solution in accordance with service level requirements 8. Domain Experts: This is a group of technical architects who would support the delivery team in creating high-level design of an end-to-end solution. The team will work closely with the end users to confirm that the application meets their needs. AGREED AND ACCEPTED this the 18th day of July, 2011: UST GLOBAL INC SONY PICTURES ENTERTAINMENT INC By: Charlie Bunten Director, Contract Services By: Date: July 22, 2011 SONY Sony Pictures Motion Picture Production Database Project Page 16
Custom Software Development Approach
Custom Software Development Approach Our approach to custom software development combines benefits from several standard development process models. We tend to have a well-defined, predictable and highly
More informationIf you have any concerns, feedback, suggestions regarding the document then Email at sales@agicent.com;
NOTE: This is a Sample Software Development Agreement, assuming the case, where an existing iphone App project is being outsourced for its next phase of development on fixed price basis. Disclaimer: This
More informationThe Customer. Manual and Automation Testing for a leading Enterprise Information Management (EIM) Solution provider. Business Challenges
CASE STUDY a t t e n t i o n. a l w a y s. The Customer Manual and Automation for a leading Enterprise Information Management (EIM) Solution provider Our Customer is one of the global leaders in Enterprise
More informationApplication Management Services (AMS)
Contents 1. AMS : An Overview 2. AMS : Models 3. Delivery Organization 4. Processes & Tools 5. Transition Methodology 6. Pricing Application Management Services (AMS) Enterprise Application Services Capability
More informationájoƒ ùdg á«hô dg áµلªÿg Yesser Overall SDLC Process Definition
ájoƒ ùdg á«hô dg áµلªÿg Yesser Overall SDLC Process Definition Version 0.6 - Page 3 / 43 Table of Contents 1. Process Introduction... 5 1.1. Process Scope... 5 1.2. Process Objectives and Benefits... 5
More informationProject Management Plan Outline ITSC
Project Management Plan Outline ITSC Date: 02/28/2012 Introduction At start of each project vendors must create a project management plan for ITSC approval, including, at a minimum, the sections described
More information101-301 Guide to Mobile Testing
101-301 Guide to Mobile Testing Perfecto Mobile & Toronto Association of System and Software Eran Kinsbruner & Joe Larizza 2014 What To Do? Great News Your first Mobile Project has arrived! You have been
More informationGartner, Inc. DIR-SDD-2042
Texas Department of Information Resources STATEMENT OF WORK (SOW) FOR DELIVERABLES-BASED INFORMATION TECHNOLOGY SERVICES Identity & Access Management Analysis IT Assessment & Planning Gartner, Inc. DIR-SDD-2042
More informationProject Lifecycle Management (PLM)
Project Lifecycle Management (PLM) Process or Tool? Why PLM? Project Definition Project Management NEW REQUEST/ INITIATIVES SUPPORT (Quick fixes) PROJECT (Start Finish) ONGOING WORK (Continuous) ENHANCEMENTS
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
More informationRFP# 917-051-020115-05 CONSULTING SERVICES FOR ORACLE E-BUSINESS SUITE R12 UPGRADE QUESTION AND ANSWER RFP Reference Question GSFA Response
RFP# 917-051-020115-05 CONSULTING SERVICES FOR ORACLE E-BUSINESS SUITE R12 UPGRADE QUESTION AND ANSWER RFP Reference Question GSFA Response 1 Section 1.1.2, Pg. 1 Does GSFA plan to have a dedicated DBA
More informationLEXEVS OPERATIONS AND MAINTENCE SUPPORT PROJECT MANAGEMENT PLAN
LEXEVS OPERATIONS AND MAINTENCE SUPPORT PROJECT MANAGEMENT PLAN Version Number: 1.0 Version Date: October 1, 2014 VERSION HISTORY Version Number Implemented By Revision Date Approved By Approval Date 1.0
More informationOracle Taleo Professional/Consulting Services Descriptions December 10, 2015
Oracle Taleo Professional/Consulting Services Descriptions December 10, 2015 Product Oracle Taleo Enterprise- Remote Systems Administration & Oracle HCM Cloud - Remote Systems Administration Oracle Taleo
More informationSLCM Framework (Version 2003.1) Roles and Responsibilities As of January 21, 2005
SLCM Framework (Version 2003.1) Roles and Responsibilities As of January 21, 2005 ROLE RESPONSIBILITY REVIEW SIGN- OFF CTO Manage IT assets to meet corporate goals Establish and chair the Information Technology
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationA Business Analysis Perspective on Business Process Management
A Business Analysis Perspective on Business Process Management October 2013 Discussion Points! Why have Roles?! What is Business Analysis?! Who is the Business Analyst?! Business Analysis & Business Process
More informationTest Plan (a Real Sample) SoftwareTestingHelp.com Live Project Training - OrangeHRM
www.softwaretestinghelp.com Test Plan (a Real Sample) SoftwareTestingHelp.com Live Project Training - OrangeHRM 2/1/2014 SoftwareTestingHelp.com Name of the tester Note: This is a sample test plan created
More informationThe George Washington University
PMLC Project Management Life Cycle The George Washington University eexpense System Implementation Project Test Plan & Procedures Prepared By: Jeff Pearson Version: 1 Date: August 13, 2012 Project Owners:
More informationHow To Write An Slcm Project Plan
SLCM 2003.1 Artifacts in a Nutshell ( as of 01/21/2005) Project Development Phases Pension Benefit Guaranty Corporation s (PBGC) System Life Cycle Methodology (SLCM) is comprised of five project development
More informationResponses to Inquiries RFP 14-15 Software Quality Assurance Managed Services
Responses to Inquiries RFP 14-15 Software Quality Assurance Managed Services 1. Questions with specific reference to documentation in the RFP Question/ Clarification What else does the application environment
More informationRFP Attachment C Classifications
RFP 1. Applications IT Architect Analyzes and designs the architecture for software applications and enhancements, including the appropriate application of frameworks and design patterns and the interrelationships
More informationCOST/FUNDING SOURCE: $549,050/FY2014 and FY2015 Uniform Rate
AGENDA ITEM C3 DATE: April 7, 2014 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles H. Carden, Chief Operating Officer Computerized Maintenance Management System Implementation Services Award Contract
More informationProject Implementation Process (PIP)
Vanderbilt University Medical Center Project Implementation Process (PIP).......... Project Implementation Process OVERVIEW...4 PROJECT PLANNING PHASE...5 PHASE PURPOSE... 5 TASK: TRANSITION FROM PEP TO
More informationMICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET UCC and CPC MDOS Letters to FileNet PROJECT MANAGER STATEMENT OF WORK (SOW)
MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET UCC and CPC MDOS Letters to FileNet PROJECT MANAGER STATEMENT OF WORK (SOW) A Pre-Qualification Program was developed to provide a mechanism for
More informationProject Type Platform Number of Phases Development Java, Win NT, DB2 Four Phases.
Given below is a Project Management Plan for a real life project executed by a commercial company. This example is from my book Software Project Management in Practice (2002, Addison Wesley).The project
More informationTemplate K Implementation Requirements Instructions for RFP Response RFP #
Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship
More informationQUICK FACTS. Enhancing the Marketing Campaign Management Portal for an SaaS Provider. TEKsystems Global Services Customer Success Stories
[ Information Technology, Application Development ] TEKsystems Global Services Customer Success Stories Client Profile Industry: Internet and software services Revenue: Over $200 million Employees: Nearly
More informationThe Evolution of Business Architecture in Wells Fargo
The Evolution of Business Architecture in Wells Fargo Atul Bhatt Wells Fargo, Enterprise Architecture & IT Strategy Business Architecture Innovation Summit OMG BASIG & BA Guild 25-26 March 2014 Outline
More informationManaging Multiple Vendors: Getting the Most from a Complex Team. November 16, 2012
Managing Multiple Vendors: Getting the Most from a Complex Team November 16, 2012 1 Contents About the presenters Context: working with multiple SIs is the norm Benefits and challenges of working with
More informationCrosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
More informationLDAP Authentication Configuration Appendix
1 Overview LDAP Authentication Configuration Appendix Blackboard s authentication technology is considered a focal point in the company s ability to provide true enterprise software. Natively, the Blackboard
More informationTerrace Consulting Services
Terrace Consulting Services Overview: Every project will require some degree of Planning before Implementation can begin. Analysis and Planning are essential in order to confirm requirements, define the
More informationProject Management Methodology
Project Management Methodology 1/6/2015 PAGE 1 OF 28 Version 2.0 Contents INTRODUCTION... 4 1. Overview... 4 PHASE 1 PROJECT INITIATION... 5 1. Governance Model... 6 2. Project Prioritization Process...
More informationEnterprise Data Governance
DATA GOVERNANCE Enterprise Data Governance Strategies and Approaches for Implementing a Multi-Domain Data Governance Model Mark Allen Sr. Consultant, Enterprise Data Governance WellPoint, Inc. 1 Introduction:
More informationPUERTO RICO JOB REQUISITION DETAILS INFOSYS
PUERTO RICO JOB REQUISITION DETAILS INFOSYS If you are interested to apply for any of the following positions listed in the table, you can quickly search on Infosys site with the REQ No s mentioned below,
More informationHow To Model Software Development Life Cycle Models
Various Software Development Life Cycle Models Sahil Jindal, Puneet Gulati, Praveen Rohilla Dronacharya College of Engineering, India Abstract:An SDLC model is a conceptual framework describing different
More informationTDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.
Previews of TDWI course books offer an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews cannot be printed. TDWI strives to provide
More informationProject Scorecard Template
Project Scorecard Template 1. Identify criteria for success: Review the objectives and deliverables in the Project Definition, as well as any other existing information that is relevant to the project.
More informationHow To Build A Social Network For A Business
iapps Consulting Fixed Scope Offering For ORACLE SALES Cloud Agenda Business Objectives Solution Proposal Scope (Business Process) Scope (Application) Implementation Approach \ Methodology Project Plan
More informationF. No. E 12020/03/2015-E&A Food Safety and Standards Authority of India
F. No. E 12020/03/2015-E&A Food Safety and Standards Authority of India (A Statutory Authority established under the Food Safety & Standards Act, 2006) Establishment Division FDA Bhawan, Kotla Road, Near
More informationRFP-00118 ADDENDUM NO. 1
INTERNAL SERVICES DEPARTMENT PROCUREMENT MANAGEMENT SERVICES 111 NW 1 ST Street Suite 1300 Miami, Florida 33128-1974 Telephone: 305-375-4725 Fax: (305) 375-5688 RFP-00118 ADDENDUM NO. 1 DATE: March 26,
More informationExecutive Summary... 2. OpenEdge Streamlines Development and Support... 2. Factors Affecting Benefits And Costs... 3. Disclosures...
TABLE OF CONTENTS Executive Summary... 2 OpenEdge Streamlines Development and Support... 2 Factors Affecting Benefits And Costs... 3 Disclosures... 3 TEI Framework And Methodology... 5 Analysis... 7 Interview
More informationVMware Performance and Capacity Management Accelerator Service
AT A GLANCE The VMware Performance and Capacity Management Accelerator Service rapidly deploys a performance management, capacity optimization, and log management solution focused on a limited predefined
More informationG-Cloud Service Definition. Atos SI Oracle CRM and CX Services
G-Cloud Service Definition Atos SI Oracle CRM and CX Services Atos SI Oracle CRM and CX Services SCS Atos provides a range of expert Customer Relationship Management (CRM) and Customer Experience (CX)
More informationThe Accenture Foundation Platform for Oracle. Enter
The for Oracle Enter for Oracle Accenture s pre-built, pre-tested Oracle Fusion Middleware 11g-based architecture is a strategic decision guide and implementation accelerator that improves application
More informationInformation Technology Services ServiceNow: Change Management Phase I Project Charter
ServiceNow: Change Management Phase I Project Charter VERSION: 1.3 REVISION DATE: 9/28/2011 Approval of the Project Charter indicates an understanding of the purpose and content described in this deliverable.
More informationRequest for Proposal for Application Development and Maintenance Services for XML Store platforms
Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...
More informationLeveraging the power of social media & mobile applications
Leveraging the power of social media & mobile applications Xoriant delivers an innovative solution blending mobile applications and web based social networking media for our client focusing on local marketing.
More informationQUICK FACTS. Providing Application Development and Data Migration Support for a Leading Healthcare Company
[ Healthcare Services, Application Development ] TEKsystems Global Services Customer Success Stories Client Profile Industry: Healthcare Revenue: Private Employees: Over 400 Geographic Presence: Locations
More informationOE PROJECT CHARTER TEMPLATE
PROJECT : BearBuy Implementation PREPARED BY: Vanessa Wong and Jon Conhaim DATE (MM/DD/YYYY): 07/23/2011 PROJECT CHARTER VERSION HISTORY VERSION DATE COMMENTS (DRAFT, SIGNED, REVISED CURRENT STATUS) (MM/DD/YYYY)
More informationCONSULTANTS TO THE INSURANCE INDUSTRY IT DEVELOPMENT QA TESTING CEDERIGHT REINSURANCE STAFF AUGMENTATION
CONSULTANTS TO THE INSURANCE INDUSTRY IT DEVELOPMENT QA TESTING CEDERIGHT REINSURANCE STAFF AUGMENTATION S I M P L I F Y I N G W H AT M AT T E R S 2 OUR EXPERTISE 01 02 03 04 IT Development QA Testing
More informationA discussion of information integration solutions November 2005. Deploying a Center of Excellence for data integration.
A discussion of information integration solutions November 2005 Deploying a Center of Excellence for data integration. Page 1 Contents Summary This paper describes: 1 Summary 1 Introduction 2 Mastering
More informationKMS Implementation Roadmap
KMS Implementation Roadmap Sample Excerpt Prepared by: The Knowledge Compass, Inc. TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 5 1.1 Overview 5 1.2 Project Goals & Objectives 5 1.3 Implementation Approach 5
More informationRequest for Offers (RFO) Addendum
Request for Offers (RFO) Addendum RFO Number: RFO0095 Addendum Number: 1 Date of Addendum: _10/21/2015 Original Due Date, Time: 10/26/2015, 2:00pm Revised Date, Time: _10/26/2015, 2:00pm Title: _MNLARS
More informationMicrosoft Dynamics Sure Step 2012 Supplementary Training Material Version 5.0
Microsoft Dynamics Sure Step 2012 Supplementary Training Material Version 5.0 www.firebrandtraining.com Course content Module 0 Course Content and Plan... 7 Objectives... 7 Course Plan... 7 Course Modules...
More informationManage projects effectively
Business white paper Manage projects effectively HP Project and Portfolio Management Center and HP Agile Manager Table of contents 3 Executive summary 3 The HP Solution Invest in what matters most then
More informationQuality Assurance for SAP Implementations
Quality Assurance for SAP Implementations Combining the power of SAP Quality Assurance Services with the depth and breadth of experience and knowledge of the SAP corporate ecosystem to drive your end-to-end
More informationSCHEDULE OO CE NETWORK TRANSITION
SCHEDULE OO CE NETWORK TRANSITION 1. INTERPRETATION 1.1 Purpose of this Schedule This Schedules outlines the terms and conditions with respect to the CE Transition, including the procedures, terms and
More informationNUCSOFT. Asset Liability Management
NUCSOFT Asset Liability Management ALM Overview Forecasting, Budgeting & Planning Tool for Advanced Liquidity Management & ALM Analysis & Monitoring of Liquidity Buffers, Key Regulatory Ratios such as
More informationDraft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing
STATE OF MICHIGAN SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing Executive Summary The State of Michigan has dedicated integrated team of resources for the
More informationPhases, Activities, and Work Products. Object-Oriented Software Development. Project Management. Requirements Gathering
Object-Oriented Software Development What is Object-Oriented Development Object-Oriented vs. Traditional Development An Object-Oriented Development Framework Phases, Activities, and Work Products Phases,
More informationOften Clients tend to use in-house functional resources for their testing and validation processes ending up with issues such as
TESTING IN ERP ENVIRONMENT Organizations implement ERP applications to respond to major business challenges of reducing costs and improving revenue. ERP applications make use of a single, centralized data
More informationG. Michael Hendon, Director McDonald s Worldwide Training Learning and Development
Integrating e-learning into McDonald s Worldwide On-the-Job Restaurant Learning System (original draft provided to Pearson Prentice Hall for publication in Workplace Training and Learning, Cases from Cross-Cultural
More informationApplication Management Services
Application Management Services Application Development Key Initiative Overview Structured Approach Strategize and Plan Develop Governance Drive Change Management Execute Measure and Improve Data source:
More informationCDC UNIFIED PROCESS JOB AID
CDC UNIFIED PROCESS JOB AID Independent Verification & Validation Activities Document Purpose This Job Aid is a brief document listing the items to be noted, checked, remembered, and delivered when completing
More informationDCSS Time and Attendance Project
2014 DCSS Time and Attendance Project Dougherty County School System 3/28/2014 Contents Definition of Terms.. 2 Introduction.. 3 Background.. 3 Specifications/Scope of Work.. 3 Current Application Overview..
More informationSystem Build 2 Test Plan
System Build 2 Test Plan Version 1.0 System Build 2 Test Plan Author s Signature Your signature indicates that this document has been prepared with input from content experts and is in compliance with
More informationBUSINESS ANALYSIS ANISAN TECHNOLOGIES (I) PRIVATE LIMITED
TECHNOLOGY PEOPLE BUSINESS ANALYSIS ANISAN TECHNOLOGIES (I) PRIVATE LIMITED INTRODUCTION : ANISAN Technologies is a global consulting organization located in Jersey City, USA & Mumbai, India. We envision
More information0714 MDM Key Learnings, Cost Drivers and Accelerator Templates. Ward Witkowski, The Coca-Cola Company
0714 MDM Key Learnings, Cost Drivers and Accelerator Templates Ward Witkowski, The Coca-Cola Company 500 BRANDS 200+ COUNTRIES 3,500 PRODUCTS 1.8 BILLION SERVINGS PER DAY 20 48 MILLION OUTLETS World's
More informationClient Overview. Engagement Situation
Client Overview Client, a global leader in Video Management and Licensing solutions offers storage, access, and licensing for enterprise-scale video libraries. Its technology platform and services enable
More informationSHAREPOINT SOLUTIONS
SHAREPOINT SHAREPOINT SOLUTIONS Connected Systems is one of Australia s premier SharePoint Services practice and has extensive SharePoint expertise in the following areas: Strategic Consulting (Information
More informationDepartment of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
More informationEssentials of the Quality Assurance Practice Principles of Testing Test Documentation Techniques. Target Audience: Prerequisites:
Curriculum Certified Software Tester (CST) Common Body of Knowledge Control Procedures Problem Resolution Reports Requirements Test Builds Test Cases Test Execution Test Plans Test Planning Testing Concepts
More informationFixed Scope Offering for. Oracle Taleo EE Saas Implementation
Fixed Scope Offering for Oracle Taleo EE Saas Implementation Agenda Company Profile Business Challenges Business Objectives Solution Proposal Scope Modules and Functionalities Implementation Approach Project
More informationPROJECT PLAN FOR. Project Name Here
PROJECT PLAN FOR Project Name Here Version # DatE Reviewed and Approved for submittal to Executive Sponsor , Project Manager Project Plan Approved for submittal to Executive Sponsor: , Project
More informationEducation Data Portal ( EDP ) Data Dashboard Solutions
NYSED DATA DASHBOARD SOLUTIONS RFP Attachment 6.8 Statement of Work Template THIS IS STATEMENT OF WORK dated [Date] (the SOW ) to the Contract dated [Date] (the Agreement ) between NEW YORK STATE EDUCATION
More informationTRU Website Redesign Project Charter. 1/21/2011 Thompson Rivers University Web Project Team
TRU Website Redesign Project Charter 1/21/2011 Thompson Rivers University Web Project Team INTRODUCTION... 4 BACKGROUND... 4 PROJECT GOALS AND OBJECTIVES... 5 Project Goal... 5 Project Objectives... 5
More informationSTAFF AUGMENTATION REQUEST FOR QUOTE - REPOST
STAFF AUGMENTATION RFQ - REPOST STAFF AUGMENTATION REQUEST FOR QUOTE - REPOST STAFF AUGMENTATION RFQ COVER SHEET Doc ID: Project Name: Other Information: Open To: EDUR2011015R MS SharePoint 2010 Application
More informationFixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions
Fixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions Today s Business Challenges Adopt leading CRM practices and stream line processes Take advantage
More informationmiletone as suggested below:
Response to Queries by Bidders for Tender "RFP for Design, Development, Hosting and Maintenance of Website/Portal for MMRC for 2 years." Sr. No. Clause Ref. No. Original Clause Query Proposal by Bidder
More informationIdentifying Application Performance Risk
Identifying Application Performance Risk Performance Engineering COLLABORATIVE WHITEPAPER SERIES COLLABORATIVE WHITE PAPER SERIES: Identifying Application Performance Risk Under what conditions will an
More informationHow To Implement Fusion Hcm
Fixed Scope Offering Fusion HCM Implementation Mindtree limited 2015 Agenda Business Objectives Product Overview Key Implementation Features Implementation Packages & Timelines High Level Scope Implementation
More informationAGILE SOFTWARE TESTING
AGILE SOFTWARE TESTING Business environments continue to rapidly evolve, leaving many IT organizations struggling to keep up. This need for speed has led to an increased interest in the Agile software
More informationAppendix 2-A. Application and System Development Requirements
Appendix 2-A. Application and System Development Requirements Introduction AHRQ has set up a Distributed Systems Engineering Lab (DSEL) to support all internal development efforts and provide a facility
More informationTEST METRICS AND KPI S
WHITE PAPER TEST METRICS AND KPI S Abstract This document serves as a guideline for understanding metrics and the Key performance indicators for a testing project. Metrics are parameters or measures of
More informationThe Quality Assurance Centre of Excellence
The Quality Assurance Centre of Excellence A X I S T E C H N I C A L G R O U P A N A H E I M H E A D Q U A R T E R S, 300 S. H A R B O R, B L V D. S U I T E 904, A N A H E I M, CA 92805 PHONE :( 714) 491-2636
More information2. Please describe the project s alignment with the Common System Principles (Appendix 1).
Project Name Project Summary Please provide the project charter with this request. Please note any changes to the scope or schedule, or budget in this section and any other information you feel necessary.
More informationFIXED SCOPE OFFERING FOR ORACLE FUSION TALEO CLOUD
Vijay Karthick Kumbeswaran Head - Enterprise Human Capital, Finance & Supply Chain Management Practice Email : marketing-communication-in@altimetrik.com Altimetrik is a Business Transformation and Technology
More informationFive best practices for deploying a successful service-oriented architecture
IBM Global Services April 2008 Five best practices for deploying a successful service-oriented architecture Leveraging lessons learned from the IBM Academy of Technology Executive Summary Today s innovative
More informationINTRODUCTION. Page 1 of 16
INTRODUCTION CALIFORNIA STATE TEACHERS RETIREMENT SYSTEM REQUEST FOR QUOTE JAMA LICENSING AND SERVICES RFQ NUMBER 201204 Offer Due Date: July 23, 2013, 2:00 p.m. Pacific Time (PT) The California State
More informationRapid Application Development Process
Rapid Application Development Process Rohit Saini Information Technology, Dronacharya College of Engineering, Gurgaon-122001 Abstract o Deliver the customer s requirements with accuracy using Prototyping
More informationElectronic Medical Record (EMR) Request for Proposal (RFP)
Electronic Medical Record (EMR) Request for Proposal (RFP) SAMPLE Proposal Due: [INSERT DESIRED DUE DATE] Table of Contents SECTION 1 RFP INFORMATION... 2 I. Introduction... 2 A. Purpose and Background...
More informationCOMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF HEALTH AND HUMAN SERVICES
COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF HEALTH AND HUMAN SERVICES The Office of Information Technology Project Methodology and Lifecycle Guide Version 4.4 Last Updated: November 15, 2011 CE M
More informationMinnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) Project Status Report Week Ending: 09-19-2012 Page - 1 Executive Summary The Executive Summary provides an executive level review of general project activities,
More informationQuality Assurance. Ministry of Community Development and Ministry of Tourism, Culture and the Arts
Ministry of Community Development and Ministry of Date: August 2006 Prepared By: Fredo Vanlierop Project: CAWS Standards Documentation Harvest Package Name: Harvest Version: Contract: N/A 1 Document Revision
More informationSDLC- Key Areas to Audit in IT Projects ISACA Geek Week 2013 8/21/2013. PwC
SDLC- Key Areas to Audit in IT Projects ISACA Geek Week 2013 8/21/2013 1 Introductions and Projects Overview Presenters Charlie Miller and Andrew Gerndt The Coca-Cola Company Principal IT Auditors Atlanta,
More informationPASTA Abstract. Process for Attack S imulation & Threat Assessment Abstract. VerSprite, LLC Copyright 2013
2013 PASTA Abstract Process for Attack S imulation & Threat Assessment Abstract VerSprite, LLC Copyright 2013 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
More informationWeb & Mobile Apps Development Services
Meaningful Mobile Solutions Corporate Overview Web & Mobile Apps Development Services Company Snapshot 8+ YEARS Founded in 2006 as a high technology mobile, web & social media company 170+ ENGINEERS 785+
More informationSample Statement of Work
Sample Statement of Work Customer name Brad Miller brad@solidborder.com Fishnet Security Sample Statement of Work: Customer Name Scope of Work Engagement Objectives Customer, TX ( Customer or Client )
More information