1 General Ex-Ante Conditionalities Anna-Lena ZADEMACH-SCHWIERZ DG REGIO, E1, Competence Centre Administrative Capacity Building Brussels, Summer 2014

2 Contents 1. Overview and purpose of general ex-ante conditionalities (ExACs) 2. Assessment and evidence of fulfilment 3. Action plans 4. Delivery of Actions Concrete focus on Public Procurement 2

3 Questions How to assess fulfilment? How to prepare an Action Plan? What resources are available for support? What recurrent issues do we see linked to assessment of ExACs? How to address "changes in Directives"? What happens if we don't fulfil Actions by deadlines? 3

4 General Ex-Ante Conditionalities (ExAC) B.1 Anti-discrimination B.2 Gender equality B.3 Disability B.4 Public procurement B.5 State aid B.6 Environmental legislation B.7 Statistical systems and result indicators We will focus on Public Procurement 4

5 Public Procurement (PP) Basics Key principles Transparency Equal treatment & nondiscrimination Proportionality in purchase of works, supplies and services by public entities or entities with a public service mission in special sectors (water, energy, transport and postal services) Legal enactment Directive 2004/18/EC (Classic Directive) Directive 2004/17/EC (Special sectors) Directive 2007/66/EC (Remedies Directive) MARKT Interpretative Communications & Explanatory Notes ECJ Case Law A complex area with New Directives 2014 transposition by April

6 Public Procurement using ESI Funds RISKS Compliance: Fraud/Corruption Lack of knowledge/ experience, inadequate regulatory arrangements => inefficient public spending Errors => Financial Corrections OPPORTUNITIES Use of public funds: Value-for-money Support to policy 6

7 DG REGIO audit work Public Procurement irregularities 40% of irregularities detected by DG REGIO since 2005 are due to non-compliance with Public Procurement rules European Court of Auditors: DAS 2011 found 44% of all quantifiable errors were in Public Procurement. From , 32% of contracts audited were affected by errors National audits: report more and more irregularities on Public Procurement 7

8 DG REGIO audit work Public Procurement irregularities Most common errors detected by audit: Inappropriate tendering procedures Artificial splitting of contracts Inadequate assessment of bids Irregular additional works (25% of irregularities on PP) In general, lack of proper preparation of the tendering and inadequate level of publicity 8

9 DG REGIO audit work Public Procurement irregularities More risky areas: services contracts, followed by supply contracts are more risky than works ones (evaluation, monitoring of actual expenditure) smaller beneficiaries are more at risk (municipal level): weaker administrative capacity/experience and local considerations for choosing the companies concessions and long term services contracts: financial challenges and direct negotiations addenda/additional works: can change the balance of the initial competition 9

10 General Ex-ante Conditionality: Public Procurement "The existence of arrangements for the effective application of EU public procurement law in the field of the ESI Funds" Criteria for fulfilment: 1.Arrangements for the effective application of EU PP rules through appropriate mechanisms 2.Arrangements which ensure transparent contract award procedures 3.Arrangements for training & dissemination of information for staff involved in the implementation of the funds 4.Arrangements to ensure administrative capacity for implementation and application of EU PP rules 10

11 Assessment grid (1) Criteria for fulfilment Arrangements for the effective application of Union public procurement rules through appropriate mechanisms: EU Directives on public procurement (2004/17, 2004/18, 2009/81/EC 92/13/EEC and 89/665/EEC) have been correctly transposed by the Member State; The legal, institutional and procedural arrangements in place ensure legal certainty and coherent and uniform interpretation of EU public procurement legislation; Legal, institutional and procedural arrangements in place allow to address in an effective way the most serious and recurrent types of failures in the application of public procurement rules (i.e. to prevent, quickly detect and effectively remedy such failures and, if relevant, to apply appropriate sanctions). Existence of an effective system of judicial protection for tenderers. The arrangements in place should not create unjustified and disproportionate obstacles or disproportionate burden either to the tenderers claiming harm or to the contracting authority conducting the procedure. Criteria fulfilled? Elements of YES/NO non-fulfilment 11

12 Assessment grid (2) Arrangements which ensure transparent contract award procedures: The legal, institutional and procedural arrangements in place ensure the effective respect of the TFEU principles (e.g. equal treatment, transparency, non-discrimination) throughout the entire public procurement process for all contracts having a cross-border interest; Appropriate legislation/guidance on the award of concessions and public contracts including for those out of the scope of the Directives and which have a cross-border interest has been prepared by the Member State and made available to the potential beneficiaries (i.a. contracting authorities and entities and economic operators where appropriate) and the staff concerned in the managing authorities and intermediate bodies. Availability of appropriate IT tools and systems which ensure access to information on contract award procedures. YES/NO Elements of nonfulfilment 12

13 Assessment grid (3) Arrangements for training and dissemination of information for staff involved in the implementation of ESI funds: Appropriate training for staff involved in the application of EU public procurement rules at all relevant levels has been provided or has been planned; There is an effective training strategy developed (training sessions, only training, etc), with quantitative indicators, where possible. A system of dissemination and exchange of information is in place for all staff applying EU public procurement rules (managing authorities, intermediate bodies, certifying authorities, audit authorities and beneficiaries) ensuring consistent implementation of public procurement rules (e.g. setting-up a network of all staff involved in public procurement to exchange, via websites, direct mail, etc.) YES/NO Elements of nonfulfilment 13

14 Assessment grid (4) Arrangements to ensure administrative capacity for implementation and application of Union public procurement rules: Existence of a central body (or a coordinated network of bodies) having the administrative capacity (sufficient number and qualified staff) to give substantive practical and legal advice on application of EU public procurement rules to all entities subject to these rules in the field of ESI Funds YES/NO Elements of non-fulfilment Appropriate technical assistance (e.g. guidance documents, external experts) is provided to all the bodies involved in the application of public procurement rules in the field of ESI funds (launching, monitoring and control of public procurement rules). 14

15 Self-assessment of general ExAC Overall ExAC assessment for MS in PA, but The self-assessment (and specific actions in case of nonfulfilment) to be presented in the Operational Programmes concerned The summary of the self-assessment to be presented in the PA for those ExAC where the responsibility for fulfilment lies at national level and as an overview of National fulfilment (logically if ExAC is not fulfilled for any OP then PA should indicate "not fulfilled") It is recommended to include a full assessment of fulfilment of general ExAC in the PA when several OPs are concerned 15

16 General ExAC assessment by Commission The assessment of fulfilment by the Commission shall be limited to the criteria ( ) and shall respect national and regional competences to decide on the specific and adequate policy measures including the content of strategies (Art. 19(3) CPR) In case of non-fulfilled criteria by the date of the submission of the PA linked directly to legislative requirements, the reference point is the legislation in force by the date of the submission of the PA (Guidance on ExAC, section 2.2) e.g. issue of e-procurement raised by DG MARKT Current REGIO assessment: 11 MS will require Action Plans for Public Procurement in some MS, capacity problem is at regional level 16

17 Evidence of non-fulfilment available to Commission Findings of relevant audit reports conducted in Member States by OP Audit Authority, National Audit Authorities, ESI Fund Auditors, ECA leading to letters, payment interruptions etc. Number of OLAF or National Fraud investigations related to PP Conclusions of relevant studies and evaluation reports on public procurement On-going infringement cases launched by the Commission against Member States linked to effective application of EU public procurement law Under the European Semester process, a Country Specific Recommendation related to public procurement, e.g. "Increase transparency of public procurement and improve the implementation of public tenders by providing appropriate guidance and supervision." 17

18 Frequency of Country Specific Recommendations (2014 latest) Currently 9 MS have CSRs related to PP 18

19 Key messages for drafting of APs 1. Clear link to the main assessment criteria 2. First step: diagnosis of problem! 3. Define realistic and verifiable milestones and indicators (by 2016) 4. Fulfillment assessed against existing legislation, however action plan to anticipate new elements obligatory in near future 5. Use of TA for OPs to pro-actively support the fulfilment of ExAC 19

20 Action Plans 1. Diagnosis of problem(s)/weakness(es) 2. Objective(s) to be achieved e.g. Reduce irregularities 3. Actions to achieve objective(s) e.g. Guidance, targeted training, system changes 4. Responsibility for Action e.g. National MA for OP TA 5. Resources needed for delivery e.g. Specialist consultants + peer-to-peer support 6. Deadline for completion (Dec 2016 latest) e.g. June Verifiable measure(s) of successful achievement e.g. Production of Guidance; Declining error rate 20

21 Example of an inadequate AP Actions: Identification of measures to address the major errors identified by the EC on public procurement Preparation of regional guidelines on public procurement under the thresholds Preparation of dissemination of information to beneficiaries and other stakeholders in ESIF Deadline: 31/12/2016 Bodies responsible: Central government/regional/ma 21

22 Examples of elements for AP PP 1. Effective application of EU PP rules through appropriate mechanisms strengthening institutional cooperation definition of Coordination mechanisms reinforce MCS, e.g. repartition of ex-ante and expost quality controls appeal procedures (reduce delays and frequency of appeals) 2. Transparent contract award procedures availablility of appropriate IT tools 22

23 Examples of elements for AP PP 3. Arrangements for training and dissemination adequate training obligations for all staff, including routes to professional qualifications in PP communication channels between MA and beneficiaries 4. Arrangements to ensure administrative capacity for implementation and application stability and professionalisation of bodies (e.g. PP Agency), reinforcing of staff - HR Strategy assistance to Contracting Authorities (Guidance + TA) MA prior assessment and accreditation of capacity of grant recipients 23

24 Example of e-procurement - General comment of DG MARKT in ISC concerning e- procurement relating to new PP directives goes beyond EAC fulfilment requirement (bad practice) - Agreement REGIO MARKT: take comment into consideration only for those countries that need AP - DG MARKT to assist in definition of mile stones and indicators relating to e-procurement for AP omandatory electronic notification of call for tenders and electronic access to tender documents from April

25 Action plans linked to non-fulfilment of ExAC Follow-up Monitoring of fulfilment of actions (meetings of Monitoring Committee, annual meetings, etc) Reporting on actions to fulfil ex-ante conditionalities by Member States Deadline to fulfil ex-ante conditionalities: 31 December 2016 Member States shall provide information on the fulfilment of exante conditionalities (at the latest) in 2017 (within their annual implementation report (OP) - Art. 50(4) or their progress report (PA) - Art. 52(2) of the CPR). 25

26 Action plans linked to non-fulfilment of ExAC Failure to complete actions by MS The Commission may suspend payments in case of failure to complete the actions set out in the OP (Article 142(1)e CPR) The Commission shall lift the suspension of payments as soon: - as the MS has demonstrated that it has completed the actions - in case of the OP amendment (ExAC not applicable any more) 26

27 Implications of New PP Directives Rules will change midway through programming period New rules = Uncertainty = RISK (audit) New rules = Strategic opportunity to improve systems & tools (e.g. e-procurement, GPP, PPI) Need for funding new e-procurement IT systems (Thematic Objective 2 or 11) Need for support in transposition and training in application! 27

28 Help! To deliver Action Plans External consultants paid from TA budgets JASPERS Peer-to-Peer support from other MS who have overcome similar challenges DG MARKT (already working on strategic Action Plans with several MS) ESI Fund Geographic Desks & Competence Centre IFIs, OECD etc. 28

29 Practical Guidance on "How to avoid common PP errors" Target Audience is Procurement Officer managing day-to-day procurement activities Guidance structured around the main stages of a public procurement process, highlighting issue to look out for and potential mistakes to avoid, with links through to a more detailed Toolkit of resources addressing specific topics in greater depth and giving concrete examples on what to do and what not to do during the procurement and contract management stages of the project cycle. under preparation by Commission Inter-service Working Group 29

30 Discussion - exchange of experience Which General ExAC issues are most relevant in your country? What is your experience with Action Plans? Do you face any particular challenges related to Public Procurement? 30

Annual Assurance and Irregularities

Annual Assurance and Irregularities Annual Assurance and Irregularities Trainer : Dermot Byrne Head of Authority ERDF Audit Authority, Ireland Brussels September 2014 This training has been organised by EIPA-Ecorys-PwC under the Framework

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /..

COMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /.. EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XX/XX/2007 COM(2006) XXX COMMISSION REGULATION (EC) No /.. of [ ] implementing Council Regulation (EC) No 1085/2006 establishing an instrument

More information

Audit authority Audits of Systems, Operations and Accounts

Audit authority Audits of Systems, Operations and Accounts Audit authority Audits of Systems, Operations and Accounts Trainer:Dermot Byrne Head of Authority ERDF Audit Authority, Ireland Brussels September 2014 This training has been organised by EIPA-Ecorys-PwC

More information

Performance Measurement

Performance Measurement Brief 21 August 2011 Public Procurement Performance Measurement C O N T E N T S What is the rationale for measuring performance in public procurement? What are the benefits of effective performance management?

More information

Official Journal of the European Union

Official Journal of the European Union L 132/32 COMMISSION IMPLEMTING REGULATION (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an

More information

Fostering Quality of Public Administration with ESF support 2014-2020. Stefan DE KEERSMAEKER, DG EMPL E.1 28 October 2013

Fostering Quality of Public Administration with ESF support 2014-2020. Stefan DE KEERSMAEKER, DG EMPL E.1 28 October 2013 Fostering Quality of Public Administration with ESF support 2014-2020 Stefan DE KEERSMAEKER, DG EMPL E.1 28 October 2013 PRESENTATION OVERVIEW 1. Public sector = IMPORTANT! 2. Public Administration Reforms

More information

2012 IAS CONFERENCE. Case Study N 2: Monitoring EU LAW Implementation. Pascal Hallez René Scholzen 12 October 2012

2012 IAS CONFERENCE. Case Study N 2: Monitoring EU LAW Implementation. Pascal Hallez René Scholzen 12 October 2012 2012 IAS CONFERENCE Case Study N 2: Monitoring EU LAW Implementation Internal Audit Service: Improving the Commission s Performance Pascal Hallez René Scholzen 12 October 2012 1. Setting the scene 2. Carrying

More information

Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013

Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 EUROPEAN COMMISSION European Social Fund Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 Version of June 2015 Please consult http://ec.europa.eu/esf/sco

More information

PUBLIC PROCUREMENT CONTRACTS

PUBLIC PROCUREMENT CONTRACTS PUBLIC PROCUREMENT CONTRACTS Public authorities conclude contracts to ensure the supply of works and delivery of services. These contracts, concluded in exchange for remuneration with one or more operators,

More information

The primary responsibility for the data processing lies within the Administration Department, which the FINCOP Unit is part of.

The primary responsibility for the data processing lies within the Administration Department, which the FINCOP Unit is part of. Opinion on a Notification for Prior Checking received from the Data Protection Officer of the European Training Foundation Regarding the Processing Operations to Manage Calls for Tenders Brussels, 22 April

More information

PRIORITIES TURKEY MAY 2013

PRIORITIES TURKEY MAY 2013 www.sigmaweb.org PRIORITIES TURKEY MAY 2013 This document has been produced with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official

More information

Errors in Cohesion Policy. Where are they? What is being done about them? What will the 2014-2020 legal framework improve?

Errors in Cohesion Policy. Where are they? What is being done about them? What will the 2014-2020 legal framework improve? EN Errors in Cohesion Policy Where are they? What is being done about them? What will the 2014-2020 legal framework improve? Who is responsible for the money? Cohesion policy accounts for approximately

More information

Policy Brief. Public e-procurement at the local level in Albania. Challenges in the fight against corruption. Mona Xhexhaj

Policy Brief. Public e-procurement at the local level in Albania. Challenges in the fight against corruption. Mona Xhexhaj Policy Brief Public e-procurement at the local level in Albania Challenges in the fight against corruption Mona Xhexhaj This policy brief has been prepared in the frame of the TRAIN Programme 2014 (Think

More information

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on electronic invoicing in public procurement. (Text with EEA relevance)

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on electronic invoicing in public procurement. (Text with EEA relevance) EUROPEAN COMMISSION Brussels, 26.6.2013 COM(2013) 449 final 2013/0213 (COD) Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on electronic invoicing in public procurement (Text with

More information

Financial instruments - opportunities offered by the 2014-2020 framework. Key novelties and Commission guidance Bratislava, 2 October 2015

Financial instruments - opportunities offered by the 2014-2020 framework. Key novelties and Commission guidance Bratislava, 2 October 2015 Financial instruments - opportunities offered by the 2014-2020 framework Key novelties and Commission guidance Bratislava, 2 October 2015 2014-2020 framework Ø Performance oriented legal framework to promote

More information

BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS

BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Labour Law BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Proposal for an Interinstitutional Agreement on Better Regulation

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Proposal for an Interinstitutional Agreement on Better Regulation EUROPEAN COMMISSION Strasbourg, 19.5.2015 COM(2015) 216 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL Proposal for an Interinstitutional Agreement on Better Regulation

More information

How To Improve The Economic And Social Prospects Of The Euro Zone

How To Improve The Economic And Social Prospects Of The Euro Zone Twelve levers for the development of the Single Market Developments on public procurement Ms Kristin SCHREIBER Deputy Head of cabinet of Commissioner Barnier NB: The information contained in this presentation

More information

programme and its use on Pre-Commercial Procurement of Innovation

programme and its use on Pre-Commercial Procurement of Innovation New structural funds programme and its use on Pre-Commercial Procurement and Public Procurement of Innovation PUBLIC DEMAND OF INNOVATION FOR: Efficient Public Services and Competitive European Industries

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014 the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014

Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 adopted by the Norwegian Ministry of Foreign Affairs pursuant to Article 8.8 of the Agreement between the Kingdom of Norway

More information

Call for proposals concerning projects of common interest in the field of trans-european energy networks

Call for proposals concerning projects of common interest in the field of trans-european energy networks EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT DIRECTORATE C - Security of supply and energy markets Energy policy and & security of supply Call for proposals concerning projects of common

More information

How To Close A Project

How To Close A Project Final version of 23/04/2008 COMMISSION OF THE EUROPEAN COMMUNITIES COCOF 08/0022/02-EN Brussels, SEC(2007) COMMUNICATION TO THE COMMISSION FROM MS HÜBNER Guidelines on the Closure of Cohesion Fund and

More information

EU Cohesion Policy 2014-2020 and the European Semester

EU Cohesion Policy 2014-2020 and the European Semester EU Cohesion Policy 2014-2020 and the European Semester Law and the Environment Conference Cork, 3 April2014 Silvija Aile Enforcement, Cohesion Policy and European Semester Unit (3) DG Environment European

More information

Guide for Applicants. Call for Proposal:

Guide for Applicants. Call for Proposal: Guide for Applicants Call for Proposal: COSME Work Programme 2014 TABLE OF CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1. Relevant documents... 3 II.2. Participants... 4 II.2.1.

More information

Electronic public procurement in the EU

Electronic public procurement in the EU Electronic public procurement in the EU Recent developments EIPA International Public eprocurement seminar Donostia-San Sebastian, 23-24 April 2008 Julia FERGER European Commission Directorate-General

More information

ROADMAP. A. Context and problem definition

ROADMAP. A. Context and problem definition ROADMAP TITLE OF THE INITIATIVE PARTIAL REVISION OF REGULATIONS (EC) NOS 883/2004 and 987/2009 LEAD DG RESPONSIBLE UNIT EMPL/B4 DATE OF ROADMAP 12/03/2013 This indicative roadmap is provided for information

More information

Guidance for Member States on Audit of Accounts

Guidance for Member States on Audit of Accounts EGESIF_15_0016-02 final 05/02/2016 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Audit of Accounts DISCLAIMER: This is a document prepared by the Commission

More information

Annual Activity Report. Annexes. Employment, Social Affairs and Inclusion

Annual Activity Report. Annexes. Employment, Social Affairs and Inclusion 2013 Annual Activity Report Annexes Employment, Social Affairs and Inclusion 80 81 ANNEX 1: Statement of the Resources Director I declare that in accordance with the Commission s communication on clarification

More information

Financial Instruments supported by the European Structural and Investment (ESI) Funds in 2014-2020. MADRID, 7 November 2013

Financial Instruments supported by the European Structural and Investment (ESI) Funds in 2014-2020. MADRID, 7 November 2013 Financial Instruments supported by the European Structural and Investment (ESI) Funds in 2014-2020 MADRID, 7 November 2013 Financial instruments and IFI Relations Directorate-General for and Urban 1 Contents

More information

Annotated Agenda of the Sherpa meeting. Main features of Contractual Arrangements and Associated Solidarity Mechanisms

Annotated Agenda of the Sherpa meeting. Main features of Contractual Arrangements and Associated Solidarity Mechanisms Annotated Agenda of the Sherpa meeting 21-11-2013 Main features of Contractual Arrangements and Associated Solidarity Mechanisms At their meeting on 26 November the Sherpas are invited to discuss: General

More information

PRINCIPLES OF EU ENVIRONMENTAL LAW

PRINCIPLES OF EU ENVIRONMENTAL LAW COOPERATION WITH NATIONAL JUDGES AND PROSECUTORS IN THE FIELD OF EU ENVIRONMENTAL LAW WORKSHOP ON EU LEGISLATION PRINCIPLES OF EU ENVIRONMENTAL LAW European Commission, European Environment Agency EU environmental

More information

EUROPEAN COMMISSION. CALL - EAC/A05/2014 Erasmus+ Vocational Education and Training Mobility Charter 2015-2020

EUROPEAN COMMISSION. CALL - EAC/A05/2014 Erasmus+ Vocational Education and Training Mobility Charter 2015-2020 EUROPEAN COMMISSION CALL - EAC/A05/2014 Erasmus+ Vocational Education and Training Mobility Charter 2015-2020 1. Introduction This specific Call is based on Regulation (EU) No 1288/2013 of the European

More information

Brief Summary on the Philippine B bilateral Air Services Agreement

Brief Summary on the Philippine B bilateral Air Services Agreement EUROPEAN COMMISSION Brussels, 27.5.2016 COM(2016) 303 final 2016/0156 (NLE) Proposal for a COUNCIL DECISION on the conclusion of the Agreement between the European Union and the Government of the Republic

More information

SEPTEMBER 2011. INTERACT ENPI is a project funded by the European Union

SEPTEMBER 2011. INTERACT ENPI is a project funded by the European Union Guide on secondary procurement in ENPI CBC programmes SEPTEMBER 2011 INTERACT ENPI is a project funded by the European Union ACKNOWLEDGEMENTS This Guide has been developed by the INTERACT ENPI project

More information

EUROPEAN COMMISSION. Brussels, 24.6.2011 COM(2011) 376 final

EUROPEAN COMMISSION. Brussels, 24.6.2011 COM(2011) 376 final EUROPEAN COMMISSION Brussels, 24.6.2011 COM(2011) 376 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE, AND THE COMMITTEE OF THE

More information

Guidance on Joint Action Plans

Guidance on Joint Action Plans EGESIF_14-0038-01 Guidance on Joint Action Plans Structural and Cohesion Funds 2014-20 Social Europe EGESIF_14-0038-01 Guidance on Joint Action Plans Structural and Cohesion Funds 2014-20 European Commission

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 25.9.2014 COM(2014) 592 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation in the period from 4 December 2011 until 31 December

More information

BUDGET HEADING 04 03 01 05 CALL FOR PROPOSALS VP/2015/002

BUDGET HEADING 04 03 01 05 CALL FOR PROPOSALS VP/2015/002 EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04 03 01 05 Information and training

More information

BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Support for social dialogue VP/2015/001

BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Support for social dialogue VP/2015/001 EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04.03.01.08 Industrial relations

More information

Report to the. Contact Committee. of the heads of the Supreme Audit Institutions. of the Member States of the European Union

Report to the. Contact Committee. of the heads of the Supreme Audit Institutions. of the Member States of the European Union Report to the Contact Committee of the heads of the Supreme Audit Institutions of the Member States of the European Union and the European Court of Auditors on the parallel audit of Analysis of (types)

More information

together with the Office s reply

together with the Office s reply Report on the annual accounts of the Office of the Body of European Regulators for Electronic Communications for the financial year 2014 together with the Office s reply 12, rue Alcide De Gasperi - L -

More information

DRAFT. Guidance for Member States and Programme Authorities Designation Procedure

DRAFT. Guidance for Member States and Programme Authorities Designation Procedure 23/05/2014 EUROPEAN COMMISSION EGESIF_14-0013 DRAFT European Structural and Investment Funds Guidance for Member States and Programme Authorities Designation Procedure (under Articles 123 and 124 of Regulation

More information

Practical Guide to contract procedures for European Union external actions

Practical Guide to contract procedures for European Union external actions Practical Guide to contract procedures for European Union external actions Applicable from 14/03/2013 2013.1.rev Table of Contents 1. INTRODUCTION... 6 2. BASIC RULES... 7 2.1. Overview 7 2.2. Management

More information

Disclaimer. The present document is an internal document that outlines the procedure as currently envisaged by the Commission.

Disclaimer. The present document is an internal document that outlines the procedure as currently envisaged by the Commission. Disclaimer The present document is an internal document that outlines the procedure as currently envisaged by the Commission. It is made available only for advance information and will be integrated into

More information

TENDER INSTRUCTIONS Consulting services and auction software in connection with the 1800 MHz auction. 23 March 2015 Case no.

TENDER INSTRUCTIONS Consulting services and auction software in connection with the 1800 MHz auction. 23 March 2015 Case no. TENDER INSTRUCTIONS Consulting services and auction software in connection with the 1800 MHz auction 23 March 2015 Case no. 2015-2800 Table of contents List of annexes... 3 1. The overall framework for

More information

Screening report Croatia

Screening report Croatia 8 March 2007 Screening report Croatia Chapter 22 Regional policy and coordination of structural instruments Date of screening meetings: Explanatory meeting: 11 12 September 2006 Bilateral meeting: 5 6

More information

Initial appraisal of a European Commission Impact Assessment

Initial appraisal of a European Commission Impact Assessment Initial appraisal of a European Commission Impact Assessment European Commission proposal for a Directive on the harmonisation of laws of the Member States to the making available on the market of radio

More information

REGULATORY IMPACT ANALYSIS (RIA)

REGULATORY IMPACT ANALYSIS (RIA) REGULATORY IMPACT ANALYSIS (RIA) European Union (Lifts and Safety Components for Lifts) Regulations, 2016 (S.I. No. of 2016) Page 1 Contents 1.Foreword...2 2.Policy context...2 3.Objectives...3 4.Options...3

More information

BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Improving expertise in the field of industrial relations VP/2015/004

BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Improving expertise in the field of industrial relations VP/2015/004 EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04.03.01.08 Industrial relations

More information

BUDGET HEADING 04.03.02.01. Posting of workers: enhancing administrative cooperation and access to information

BUDGET HEADING 04.03.02.01. Posting of workers: enhancing administrative cooperation and access to information EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Labour Law BUDGET HEADING 04.03.02.01 Posting of workers: enhancing administrative cooperation

More information

BUDGET HEADING 04.03.01.06 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS

BUDGET HEADING 04.03.01.06 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Labour Law BUDGET HEADING 04.03.01.06 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES

More information

The new procurement Directive(s)

The new procurement Directive(s) The new procurement Directive(s) Behind the scenes the passage of the new EU procurement directives Upphandlingsdagarne 2015 - Stockholm 28 January 2015 Claudio Romanini DG for Internal Market, Industry,

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE CALL FOR PROPOSALS Action grants to support projects on non-discrimination and Roma integration RIGHTS, EQUALITY AND CITIZENSHIP PROGRAMME (2014-2020) TABLE

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 21.3.2012 COM(2012) 124 final 2012/0060 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the access of third-country goods and services to

More information

Action grants to support national and transnational projects projects aiming to promote Union citizenship

Action grants to support national and transnational projects projects aiming to promote Union citizenship EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE CALL FOR PROPOSALS Action grants to support national and transnational projects projects aiming to promote Union citizenship RIGHTS, EQUALITY AND CITIZENSHIP

More information

Erasmus+ General Information. Application Form Call: 2015. KA2 Cooperation and Innovation for Good Practices

Erasmus+ General Information. Application Form Call: 2015. KA2 Cooperation and Innovation for Good Practices General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating

More information

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM 2009-2014. between THE KINGDOM OF NORWAY,

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM 2009-2014. between THE KINGDOM OF NORWAY, MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM 2009-2014 between THE KINGDOM OF NORWAY, hereinafter referred to as Norway and THE REPUBLIC OF POLAND hereinafter

More information

Questions & Answers. on e-cohesion Policy in European Territorial Cooperation Programmes. (Updated version, May 2013)

Questions & Answers. on e-cohesion Policy in European Territorial Cooperation Programmes. (Updated version, May 2013) Questions & Answers on e-cohesion Policy in European Territorial Cooperation Programmes (Updated version, May 2013) This fact sheet was drafted jointly by INTERACT and European Commission (DG Regional

More information

MEMORANDUM OF UNDERSTANDING. between the European Community and the Republic of Turkey

MEMORANDUM OF UNDERSTANDING. between the European Community and the Republic of Turkey MEMORANDUM OF UNDERSTANDING between the European Community and the Republic of Turkey on the participation of the Republic of Turkey in the Community programmes Leonardo da Vinci II, Socrates II and Youth

More information

Context: Smart Regulation

Context: Smart Regulation The European Commission Impact Assessment Board Presentation by Riccardo Maggi Deputy Head IAB Secretariat - European Commission OECD-Czech Workshop on Regulatory Impact Assessment Prague, Czech Republic

More information

JASPERS Networking Platform Annual Meeting 2014

JASPERS Networking Platform Annual Meeting 2014 JASPERS Networking Platform Annual Meeting 2014 Concept, achievements and 2014 programme Eckart Tronnier, Head of Division - Water and Waste Massimo Marra, Networking Platform Officer Brussels, 20 May

More information

Align Technology. Data Protection Binding Corporate Rules Processor Policy. 2014 Align Technology, Inc. All rights reserved.

Align Technology. Data Protection Binding Corporate Rules Processor Policy. 2014 Align Technology, Inc. All rights reserved. Align Technology Data Protection Binding Corporate Rules Processor Policy Confidential Contents INTRODUCTION TO THIS POLICY 3 PART I: BACKGROUND AND ACTIONS 4 PART II: PROCESSOR OBLIGATIONS 6 PART III:

More information

E U R O P E A N E C O N O M I C A R E A

E U R O P E A N E C O N O M I C A R E A E U R O P E A N E C O N O M I C A R E A S T A N D I N G C O M M I T T E E O F T H E E F T A S T A T E S Distribution: EEA EFTA 20 March 2012 SUBCOMMITTEE I ON THE FREE MOVEMENT OF GOODS EEA EFTA Comment

More information

Report on the annual accounts of the Education, Audiovisual and Culture Executive Agency for the financial year 2014. together with the Agency s reply

Report on the annual accounts of the Education, Audiovisual and Culture Executive Agency for the financial year 2014. together with the Agency s reply Report on the annual accounts of the Education, Audiovisual and Culture Executive Agency for the financial year 2014 together with the Agency s reply 12, rue Alcide De Gasperi - L - 1615 Luxembourg T (+352)

More information

EUROPEAN COMMISSION RESEARCH EXECUTIVE AGENCY (REA) H2020 1 MODEL GRANT AGREEMENT FOR MARIE SKŁODOWSKA-CURIE INDIVIDUAL FELLOWSHIPS 2 (MSC-IF MONO)

EUROPEAN COMMISSION RESEARCH EXECUTIVE AGENCY (REA) H2020 1 MODEL GRANT AGREEMENT FOR MARIE SKŁODOWSKA-CURIE INDIVIDUAL FELLOWSHIPS 2 (MSC-IF MONO) EUROPEAN COMMISSION RESEARCH EXECUTIVE AGENCY (REA) Director H2020 1 MODEL GRANT AGREEMENT FOR MARIE SKŁODOWSKA-CURIE INDIVIDUAL FELLOWSHIPS 2 (MSC-IF MONO) Introductory remark MSC-IF Mono deviates from

More information

GUIDANCE NOTE ON THE CONCEPT OF RELIANCE

GUIDANCE NOTE ON THE CONCEPT OF RELIANCE Final version of 23/02/2009 COCOF 09/0002/01-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY GUIDANCE NOTE ON THE CONCEPT OF RELIANCE ON THE WORK OF OTHER AUDITORS DISCLAIMER This is a Working

More information

ROADMAP. A. Context and problem definition

ROADMAP. A. Context and problem definition ROADMAP TITLE OF THE INITIATIVE Recommendation on best practices in the prevention and combatting of betting related match fixing LEAD DG RESPONSIBLE UNIT MARKT DATE OF ROADMAP 12/2012 This indicative

More information

Guidance for Member States on Article 37(4) CPR Support to enterprises/working capital

Guidance for Member States on Article 37(4) CPR Support to enterprises/working capital EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Article 37(4) CPR Support to enterprises/working capital DISCLAIMER This is a working document prepared by the

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 3.10.2014 COM(2014) 615 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL Annual report to the Discharge Authority on internal audits carried out

More information

BUDGET HEADING 04 03 01 05 CALL FOR PROPOSALS VP/2014/002

BUDGET HEADING 04 03 01 05 CALL FOR PROPOSALS VP/2014/002 EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04 03 01 05 Information and training

More information

Audit of the control body through the monitoring of compliance with control plan. Measures for the irregularities

Audit of the control body through the monitoring of compliance with control plan. Measures for the irregularities Workshop on verification of compliance with product specification for PDO, PGI and TSG Audit of the control body through the monitoring of compliance with control plan Measures for the irregularities Viktorija

More information

BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Support for social dialogue VP/2014/001

BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Support for social dialogue VP/2014/001 EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04.03.01.08 Industrial relations

More information

Lead Provider Framework Draft Scope. NHS England / 13/12/13 Gateway Ref: 00897

Lead Provider Framework Draft Scope. NHS England / 13/12/13 Gateway Ref: 00897 Lead Provider Framework Draft Scope NHS England / 13/12/13 Gateway Ref: 00897 1 Introduction The commissioning support lead provider framework is being developed in response to requests from CCGs for a

More information

Roadmap on the follow-up to the Common Approach on EU decentralised agencies

Roadmap on the follow-up to the Common Approach on EU decentralised agencies Roadmap on the follow-up to the Common Approach on EU decentralised agencies The Common Approach endorsed by the European Parliament, the Council and the Commission in July 2012 represents the first political

More information

Under European law teleradiology is both a health service and an information society service.

Under European law teleradiology is both a health service and an information society service. ESR statement on the European Commission Staff Working Document on the applicability of the existing EU legal framework to telemedicine services (SWD 2012/413). The European Society of Radiology (ESR)

More information

Taxing Multinationals: Recent developments in the EU

Taxing Multinationals: Recent developments in the EU Taxing Multinationals: Recent developments in the EU Oxford, March 18, 2013 Philip Kermode - EU Commission DG Taxation and Customs Union Common Consolidated Corporate Tax Base - to remove tax obstacles

More information

DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES

DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES Ref. Ares(2014)571140-04/03/2014 DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES EXECUTIVE SUMMARY January 2014 TABLE OF CONTENTS Introduction 1. RATIONALE FOR BUDGET SUPPORT 1.1 What is Budget Support?

More information

Programming period 2014-2020. Monitoring and Evaluation of European Cohesion Policy. European Social Fund. Guidance document

Programming period 2014-2020. Monitoring and Evaluation of European Cohesion Policy. European Social Fund. Guidance document Programming period 2014-2020 Monitoring and Evaluation of European Cohesion Policy European Social Fund Guidance document June 2015 "DISCLAIMER: This is a document prepared by the Commission services.

More information

COMMUNICATION TO THE COMMISSION FROM MR POTOČNIK IN AGREEMENT WITH VICE-PRESIDENT KALLAS

COMMUNICATION TO THE COMMISSION FROM MR POTOČNIK IN AGREEMENT WITH VICE-PRESIDENT KALLAS EUROPEAN COMMISSION Brussels, 15 December 2009 SEC(2009) 1720 final COMMUNICATION TO THE COMMISSION FROM MR POTOČNIK IN AGREEMENT WITH VICE-PRESIDENT KALLAS Simplification of the recovery process in the

More information

Communication Plan. for the. ATLANTIC AREA 2007-2013 Transnational Cooperation Programme

Communication Plan. for the. ATLANTIC AREA 2007-2013 Transnational Cooperation Programme Communication Plan for the ATLANTIC AREA 2007-2013 Transnational Cooperation Programme Prepared by the Managing Authority 18 January 2008 Index 0. Introduction... 2 1. Communication Strategy... 2 1.1

More information

EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG. Employment and Social Legislation, Social Dialogue Labour Law

EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG. Employment and Social Legislation, Social Dialogue Labour Law EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Labour Law BUDGET HEADING 04.03.01.06 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES

More information

EUROPEAN COMMISSION Employment, Social Affairs and Equal Opportunities DG COMMUNITY PROGRAMME FOR EMPLOYMENT AND SOCIAL SOLIDARITY (PROGRESS)

EUROPEAN COMMISSION Employment, Social Affairs and Equal Opportunities DG COMMUNITY PROGRAMME FOR EMPLOYMENT AND SOCIAL SOLIDARITY (PROGRESS) EUROPEAN COMMISSION Employment, Social Affairs and Equal Opportunities DG Directorate-General General Coordination, Interinstitutional Relations Brussels, 21 December 2006 01/FB D(2006) PROGRESS/003/2006

More information

THE INSURANCE MEDIATION DIRECTIVE 2002/92/EC OF 9 DECEMBER 2002

THE INSURANCE MEDIATION DIRECTIVE 2002/92/EC OF 9 DECEMBER 2002 THE INSURANCE MEDIATION DIRECTIVE 2002/92/EC OF 9 DECEMBER 2002 Manuel ALTEMIR Insurance and Pensions Funds Unit Screening process Screening meeting with Croatia and Turkey 29 March 2006 Slide 1 Why a

More information

COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document

COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document EUROPEAN COMMISSION Brussels, 27.3.2014 SWD(2014) 102 final COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT Accompanying the document Proposal for a Directive of the European

More information

H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi)

H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi) H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi) Version 1.0 9 June 2015 HISTORY OF CHANGES Version Publication date Changes 1.0 09.06.2015 Initial version 1 EUROPEAN COMMISSION

More information

Programming Period 2014-2020 Monitoring and Evaluation of European Cohesion Policy European Social Fund

Programming Period 2014-2020 Monitoring and Evaluation of European Cohesion Policy European Social Fund Programming Period 2014-2020 Monitoring and Evaluation of European Cohesion Policy European Social Fund Guidance document Annex D - Practical guidance on data collection and validation May 2016 (Based

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 6.12.2013 COM(2013) 861 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL Report on the application of Directive 2006/54/EC of the European Parliament

More information

COMMITTEE ON STANDARDS AND TECHNICAL REGULATIONS (98/34 COMMITTEE)

COMMITTEE ON STANDARDS AND TECHNICAL REGULATIONS (98/34 COMMITTEE) EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Regulatory Policy Standardisation Brussels, 9 th November 2005 Doc.: 34/2005 Rev. 1 EN COMMITTEE ON STANDARDS AND TECHNICAL REGULATIONS (98/34

More information

(Article 131(2) of the Financial Rules of the Innovative Medicines Initiative Joint Undertaking)

(Article 131(2) of the Financial Rules of the Innovative Medicines Initiative Joint Undertaking) Annual report of the Executive Director to the Discharge on measures taken in the light of the Discharge s recommendations of 2012 in respect of the implementation of the budget of 2010 (Article 131(2)

More information

DRAFT GUIDANCE DOCUMENT ON THE LOW VOLTAGE DIRECTIVE TRANSITION

DRAFT GUIDANCE DOCUMENT ON THE LOW VOLTAGE DIRECTIVE TRANSITION EUROPEAN COMMISSION Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs Industrial Transformation and Advanced Value Chains Advanced Engineering and Manufacturing Systems DRAFT

More information

Call for proposals Nº: MARKT/2013/133/H

Call for proposals Nº: MARKT/2013/133/H EUROPEAN COMMISSION Directorate General Internal Market and Services RESOURCES AND COMMUNICATION Financial Resources and Internal Control Call for proposals Nº: MARKT/2013/133/H Preparatory action Capacity

More information

INTERACT III 2014-2020 Operational Programme version 2.4 (pre-final draft), June 2014

INTERACT III 2014-2020 Operational Programme version 2.4 (pre-final draft), June 2014 INTERACT III 2014-2020 Operational Programme version 2.4 (pre-final draft), June 2014 CCI Title INTERACT III 2014-2020 Version First year Last year Eligible from Eligible until EC decision number EC decision

More information

PUBLIC PROCUREMENT GUIDANCE FOR PRACTITIONERS

PUBLIC PROCUREMENT GUIDANCE FOR PRACTITIONERS PUBLIC PROCUREMENT GUIDANCE FOR PRACTITIONERS on the avoidance of the most common errors in projects funded by the European Structural and Investment Funds Europe Direct is a service to help you find answers

More information

Norwegian Financial Mechanism Memorandum of Understanding Hungary MEMORANDUM OF UNDERSTANDING

Norwegian Financial Mechanism Memorandum of Understanding Hungary MEMORANDUM OF UNDERSTANDING MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM 2009 2014 between THE REPUBLIC OF HUNGARY hereinafter referred to as the Beneficiary State and THE KINGDOM OF NORWAY,

More information

HERCULE III PROGRAMME 2014-2020 CALL FOR PROPOSALS - 2015 LEGAL TRAINING AND STUDIES E PROGRA MME 2014-0. Deadline Tuesday, 22 September 2015

HERCULE III PROGRAMME 2014-2020 CALL FOR PROPOSALS - 2015 LEGAL TRAINING AND STUDIES E PROGRA MME 2014-0. Deadline Tuesday, 22 September 2015 HERCULE III PROGRAMME 2014-2020 UL CALL FOR PROPOSALS - 2015 LEGAL TRAINING AND STUDIES E PROGRA MME 2014-0 Deadline Tuesday, 22 September 2015 The English version of the Call is the original The English

More information

EU Directive on Statutory Audits of Annual and Consolidated Accounts and EU Regulation on Statutory Audit of Public Interest Entities

EU Directive on Statutory Audits of Annual and Consolidated Accounts and EU Regulation on Statutory Audit of Public Interest Entities April 2014 EU Directive on Statutory Audits of Annual and Consolidated Accounts and EU Regulation on Statutory Audit of Public Interest Entities Background The European Union (EU) audit market reform began

More information

MEMO/09/143. General What are interchange fees? Brussels, 1 st April 2009

MEMO/09/143. General What are interchange fees? Brussels, 1 st April 2009 MEMO/09/143 Brussels, 1 st April 2009 Antitrust: Commissioner Kroes notes MasterCard's decision to cut cross-border Multilateral Interchange Fees (MIFs) and to repeal recent scheme fee increases frequently

More information

COMMISSION STAFF WORKING DOCUMENT. Better Regulation Guidelines. {COM(2015) 215 final} {SWD(2015) 110 final}

COMMISSION STAFF WORKING DOCUMENT. Better Regulation Guidelines. {COM(2015) 215 final} {SWD(2015) 110 final} EUROPEAN COMMISSION Strasbourg, 19.5.2015 SWD(2015) 111 final COMMISSION STAFF WORKING DOCUMENT Better Regulation Guidelines {COM(2015) 215 final} {SWD(2015) 110 final} EN EN Table of Contents TABLE OF

More information

coordination structure

coordination structure The national anti-fraud coordination structure By General Giovambattista Urso Florence, 9-10 May 2013 Community principles Article 325, Treaty on the Functioning of the European Union principle of assimilation,

More information