1 1 Facility Information Summary AER Reporting Year Licence Register Number 2013 P Name of site ESB Poolbeg Generating Station Site Location Pigeon House Road, Ringsend, Dublin 4 NACE Code 3511 Class The operation of combustion installations with a rated Class/Classes of Activity thermal input to or greater than 50MW National Grid Reference (6E, 6 N) E, N A description of the activities/processes at the site for the reporting year. This should include information such as production increases or decreases on site, any infrastructural changes, environmental performance which was measured during the reporting year and an overview of compliance with your licence listing all exceedances of licence limits (where applicable) and what they relate to e.g. air, water, noise. Poolbeg Generating Station currently has a total electricity generating capacity of 470MW from a combined cycle gas turbine (CCGT) generating unit. The CCGT plant is made up of two gas turbines of 155 MWe each and a steam turbine of 170 MWe. The station is fired on natural gas from the national gas network and gas oil is stored as a secondary fuel which is normally only used for testing purposes and in times of grid system emergency. On 31st March 2010, 510 MW of Thermal Generating Units ceased to operate. The CCGT will continue to operate into the future on the Poolbeg site. Summary of Environmental Performance: Poolbeg maintains a certified Environmental Management System which is audited biannually, two successful audits took place in There were no complaints or non compliances with the licence in There was one incident in July due to a faulty CEMs system component whihc led to unreliable NOx readings. Poolbeg also reports on CO2 emissions produced annually as per GHG requirements - CO2 emissions for 2013 were 1,026,642 tonnes vs 1,024,130 in Run hours for 2013 were vs total run hours in Declaration: All the data and information presented in this report has been checked and certified as being accurate. The quality of the information is assured to meet licence requirements. Suzanne Moran 31/03/2014 Signature Group/Facility manager (or nominated, suitably qualified and experienced deputy) Date
2 2 AIR-summary template Lic No: P Year 2013 Answer all questions and complete all tables where relevant Additional information 1 Does your site have licensed air emissions? If yes please complete table A1 and A2 below for the current reporting year and answer further questions. If you do not have licenced emissions and do not complete a solvent management plan (table A4 and A5) you do not need to complete the tables Yes Periodic/Non-Continuous Monitoring 2 Are there any results in breach of licence requirements? If yes please provide brief details in the comment section of TableA1 below No 3 Was all monitoring carried out in accordance with EPA guidance note Basic air monitoring AG2 and using the basic air monitoring checklist? checklist AGN2 Yes Table A1: Licensed Mass Emissions/Ambient data-periodic monitoring (non-continuous) Emission reference no: Parameter/ Substance Frequency of Monitoring ELV in licence or any revision therof Licence Compliance criteria Measured value Unit of measurement Compliant with licence limit Method of analysis Annual mass load (kg) Comments - reason for change in % mass load from previous year if applicable Note 1: Volumetric flow shall be included as a reportable parameter
3 3 AIR-summary template Lic No: P Year 2013 Continuous Monitoring 4 Does your site carry out continuous air emissions monitoring? Yes If yes please review your continuous monitoring data and report the required fields below in Table A2 and compare it to its relevant Emission Limit Value (ELV) 5 Did continuous monitoring equipment experience downtime? If yes please record downtime in table A2 below Yes 6 Do you have a proactive service agreement for each piece of continuous monitoring equipment? Yes Maintenance carried out in-house. 7 Did your site experience any abatement system bypasses? If yes please detail them in table A3 below Table A2: Summary of average emissions -continuous monitoring No Emission reference no: Parameter/ Substance A1-5 and A1-7 Nitrogen oxides (NOx/NO2) A1-6 and A1-7 Nitrogen oxides (NOx/NO2) Averaging Period Compliance Criteria Units of measurement Annual Emission Annual maximum Monitoring Equipment downtime (hours) Number of ELV Comments exceedences in current ELV in licence or reporting year any revision therof 80/500(Gas/oil) Monthly average Monthly average < ELV mg/nm tonnes 1635 tonnes % increase in mass emissions 80/500(Gas/oil) Monthly average Monthly average < ELV mg/nm tonnes 1635 tonnes GT15 producing unreliable data between June 28th and July 4th due to a faulty cooler component in the Nox system. See incident No INCI in Alder. 0 22% increase in mass emissions - run hours were higher in 2013 than in A1-5 and A1-7 80/500(Gas/oil) 48 hourly averages as per Condition 4 of IPPCL. A1-6 and A1-7 80/500(Gas/oil) 48 hourly averages as per Condition 4 of IPPCL. note 1: Volumetric flow shall be included as a reportable parameter. 95 % of all 48 hour averages < 110 % of ELV 95 % of all 48 hour averages < 110 % of ELV mg/nm3 As above 0 mg/nm3 As above 0 Table A3: Abatement system bypass reporting table Bypass protocol Date* Duration** (hours) Location Reason for bypass Impact magnitude Corrective action * this should include all dates that an abatement system bypass occurred ** an accurate record of time bypass beginning and end should be logged on site and maintained for future Agency inspections please refer to bypass protocol link
4 4 AIR-summary template Lic No: P Year 2013 Solvent use and management on site 8 Do you have a total Emission Limit Value of direct and fugitive emissions on site? if yes please fill out tables A4 and A5 Table A4: Solvent Management Plan Summary Total VOC Emission limit value Solvent regulations Please refer to linked solvent regulations to complete table 5 and 6 No Reporting year Total solvent input on site (kg) Table A5: Solvent Mass Balance summary Total VOC Total VOC emissions as emissions to Air %of solvent input from entire site (direct and fugitive) Total Emission Limit Value (ELV) in licence or any revision therof Compliance (I) Inputs (kg) (O) Outputs (kg) Solvent (I) Inputs (kg) Organic solvent emission in waste gases(kg) Solvents lost in water (kg) Collected waste solvent (kg) Fugitive Organic Solvent (kg) Solvent released in other ways e.g. by-passes (kg) Solvents destroyed onsite through physical reaction Total emission of Solvent to air (kg) Total
5 5 AER Monitoring returns summary template-water/wastewater(sewer) Lic No: P Year 2013 Additional information Does your site have licensed emissions direct to surface water or direct to sewer? If yes please Yes complete table W2 and W3 below for the current reporting year and answer further questions. If 1 you do not have licenced emissions you only need to complete table W1 and or W2 for storm water analysis and visual inspections 2 Was it a requirement of your licence to carry out visual inspections on any surface water discharges or watercourses on or near your site? If yes please complete table W2 below summarising only any evidence of contamination noted during visual inspections Table W1 Storm water monitoring Location reference Location relative to site PRTR Parameter Licenced Parameter activities Monitoring date Yes ELV or trigger level in licence or any revision thereof* Licence Compliance criteria Measured value Unit of measurement Compliant with licence Comments SW9 onsite ph 25-Jan ph units yes See correspondance ref P /ap05PK in relation to SW9 and SW12 analysis. SW9 onsite ph 22-May ph units yes SW9 onsite ph 20-Aug ph units yes SW9 onsite ph 20-Nov ph units yes SW9 onsite COD 25-Jan mg/l yes SW9 onsite COD 22-May-13 <7 mg/l yes SW9 onsite COD 20-Aug mg/l yes SW9 onsite COD 20-Nov mg/l yes SW12 onsite ph 25-Jan ph units yes SW12 onsite ph 22-May ph units yes SW12 onsite ph 20-Aug ph units yes SW12 onsite ph 20-Nov ph units yes SW12 onsite Temperature 25-Jan degrees C yes SW12 onsite Temperature 22-May degrees C yes SW12 onsite Temperature 20-Aug degrees C yes SW12 onsite Temperature 20-Nov degrees C yes SW12 onsite COD 25-Jan mg/l yes SW12 onsite COD 22-May mg/l yes SW12 onsite COD 20-Aug mg/l yes SW12 onsite COD 20-Nov mg/l yes SW12 onsite Suspended Solids 25-Jan mg/l yes SW12 onsite Suspended Solids 22-May mg/l yes SW12 onsite Suspended Solids 20-Aug-13 5 mg/l yes SW12 onsite Suspended Solids 20-Nov mg/l yes SW12 onsite Ammonia (as N) 25-Jan mg/l yes SW12 onsite Ammonia (as N) 22-May mg/l yes SW12 onsite Ammonia (as N) 20-Aug mg/l yes SW12 onsite Ammonia (as N) 20-Nov mg/l yes SW12 onsite Mineral oils 25-Jan-13 < 10 µg/l yes SW12 onsite Mineral oils 22-May µg/l yes SW12 onsite Mineral oils 20-Aug-13 < 10 µg/l yes SW12 onsite Mineral oils 20-Nov-13 < 10 µg/l yes SW12 onsite Fats, Oils and Greases 25-Jan mg/l yes SW12 onsite Fats, Oils and Greases 22-May-13 <1 mg/l yes SW12 onsite Fats, Oils and Greases 20-Aug-13 <1 mg/l yes
6 6 AER Monitoring returns summary template-water/wastewater(sewer) Lic No: P Year 2013 Additional information SW12 onsite Fats, Oils and Greases 20-Nov-13 <1 mg/l yes *trigger values may be agreed by the Agency outside of licence conditions Table W2 Visual inspections-please only enter details where contamination was observed. Location Reference Date of inspection Description of contamination Source of contamination Corrective action Comments Licensed Emissions to water and /or wastewater(sewer)-periodic monitoring (non-continuous) 3 Was there any result in breach of licence requirements? If yes please provide brief details in the comment No section of Table W3 below Was all monitoring carried out in accordance with Assessment of results checklist Yes EPA guidance and checklists for Quality of Aqueous Monitoring Data Reported to the EPA? If no please detail what areas require improvement in additional External /Internal Lab 4 information box Quality checklist Table W3: Licensed Emissions to water and /or wastewater (sewer)-periodic monitoring (non-continuous) Additional information Emission reference no: Emission released to Parameter/ SubstanceNote 1 Type of sample Frequency of monitoring Averaging period ELV or trigger values in licence or any revision therof Note 2 Licence Compliance criteria Measured value Unit of Compliant with licence Method of analysis Procedural measurement reference source Procedural reference standard number Annual mass load (kg) Comments SW1 Water Chlorine Discrete Weekly grab sample 0.1 All values < ELV 0.06 mg/l yes Colorimetric analysis Poolbeg EMS Procedure ESB historical 18 measurement SW3 Water Ammonia Discrete Quarterly grab sample 10 All values < ELV 0.42 mg/l yes Kone Analyser ( By External Lab) B.S. (British Standard) BS 2690 Part 7:1968/ BS 6068:Part 2.11: SW3 Water Suspended Solids Discrete Quarterly grab sample No ELV No ELV mg/l yes Gravimetric analysis (By external lab) B.S. (British Standard) BS 2690:Part 120: SW7 Water Ammonia Discrete Quarterly grab sample < 1 All values < ELV All samples measured < LOD mg/l yes Kone Analyser ( By External Lab) B.S. (British Standard) BS 2690 Part 7:1968/ BS 6068:Part 2.11: Annual mass based on using LOD value SW7 Water ph Discrete Quarterly grab sample No ph value shall deviate from the specified range. SW8 Water Ammonia Discrete Quarterly grab sample < 1 All values < ELV 7.55 ph units yes All samples measured < LOD mg/l yes ph Meter (Electrode) Kone Analyser( By External Lab) B.S. (British Standard) B.S. (British Standard) BS 1377:Part 3:1990 N/a BS 2690 Part 7:1968/ BS 6068:Part 2.11: Annual mass based on using LOD value SW8 Water ph Discrete Quarterly grab sample SW7 Water Oils Discrete Monthly Grab Sample No ph value shall deviate from the specified range ph units yes No ELV - visual inspection for oil. N/a N/a yes ph Meter (Electrode) Visual Inspection B.S. (British Standard) BS 1377:Part 3:1990 N/a N/a N/a N/a SW8 Water Oils Discrete Monthly Grab Sample No ELV - visual inspection for oil. N/a N/a yes Visual Inspection N/a N/a N/a SW11 Water Chlorine Discrete Quarterly grab sample 0.2 All values < ELV 0.12 mg/l yes Colorimetric analysis Poolbeg EMS Procedure Note 1: Volumetric flow shall be included as a reportable parameter Note 2: Where Emission Limit Values (ELV) do not apply to your licence please compare results against EQS for Surface water or relevant receptor quality standards
7 7 AER Monitoring returns summary template-water/wastewater(sewer) Lic No: P Year 2013 Additional information Continuous monitoring Additional Information 5 Does your site carry out continuous emissions to water/sewer monitoring? Yes If yes please summarise your continuous monitoring data below in Table W4 and compare it to its relevant Emission Limit Value (ELV) Did continuous monitoring equipment experience downtime? If yes please record downtime in table W4 6 below 7 Do you have a proactive service contract for each piece of continuous monitoring equipment on site? 8 Did abatement system bypass occur during the reporting year? If yes please complete table W5 below Table W4: Summary of average emissions -continuous monitoring No No No Maintenance carried out in-house. Emission reference no: Emission released to Parameter/ Substance ELV or trigger values in licence or any revision thereof Averaging Period Compliance Criteria Units of measurement Annual Emission for current reporting year (kg) % change +/- from previous reporting year Monitoring Equipment downtime (hours) Number of ELV exceedences in reporting year Comments SW1 Water volumetric flow 1,036,800 1 hour No flow value shall exceed the.specific limit m3/day % 0 0 Change in flow from 2013 is due to less steam turbine run hours than in SW1 Water Temperature 14.0oC(Maximum) and 10oC (98%ile of hourly values) 1 hour No temperature value shall exceed the limit.value degrees C Average over year is C N/a 0 4 hourly averages > than 10oC but less than 14.0oC we remain within licence compliance as 99.95% of hourly average less than 10oC. SW3 Water volumetric flow 200 Infrequent discharging from WTP. No flow value shall exceed the specific limit. m3/day % 0 0 Less WTP regenerations in 2013 SW4 Water ph 6-9 Measures prior to and during discharges from WTP. No ph value shall deviate from the specified range. ph units N/a 0 0 note 1: Volumetric flow shall be included as a reportable parameter. Table W5: Abatement system bypass reporting table Date Duration (hours) Location Resultant emissions Reason for bypass Corrective action* Was a report submitted to the EPA? When was this report submitted? *Measures taken or proposed to reduce or limit bypass frequency
8 8 Bund/Pipeline testing template Lic No: P Year 2013 Bund testing dropdown menu click to see options Additional information Are you required by your licence to undertake integrity testing on bunds and containment structures? if yes please fill out table B1 below listing all new bunds and containment structures on site, in addition to all bunds which failed the integrity test-all bunding structures which failed including mobile bunds must be listed in the table below, please include all bunds outside the licenced testing period (mobile bunds and chemstore included) 1 Yes 2 Please provide integrity testing frequency period 3 years 3 Does the site maintain a register of bunds, underground pipelines (including stormwater and foul), Tanks, sumps and containers? (containers refers to "Chemstore" type units and mobile bunds) Yes 4 How many bunds are on site? 63 1 bund awaiting equipment to enable test to be carried 5 How many of these bunds have been tested within the required test schedule? out. 6 How many mobile bunds are on site? 29 7 Are the mobile bunds included in the bund test schedule? Yes 8 How many of these mobile bunds have been tested within the required test schedule? 29 9 How many sumps on site are included in the integrity test schedule? 1 10 How many of these sumps are integrity tested within the test schedule? 1 Please list any sump integrity failures in table B1 11 Do all sumps and chambers have high level liquid alarms? Yes 12 If yes to Q11 are these failsafe systems included in a maintenance and testing programme? Yes 13 Is the Fire Water Retention Pond included in your integrity test programme? N/A Table B1: Summary details of bund /containment structure integrity test Integrity test failure explanation <50 words Bund/Containment structure ID Type Specify Other type Product containment Actual capacity Capacity required* Type of integrity test Other test type Test date Integrity reports maintained on site? Results of test Corrective action taken Bund No. 19 TF4 transformer bund (Networks general purpose Transformer oil Hydraulic test Visual Inspection 24/04/2012 Yes Fail Failed retention drop test - No visible To be repaired/relined by Asset) concrete/masonry defects noted. This is an ESB Networks ESB Networks in 2014 asset and they are awaiting an outage on the transformer to repair the bund - this is due to take place in Results of retest(if in current Scheduled date for retest reporting year) 2014 Bunds No.13,14,15 and 16 are transformer general purpose bunds in the Thermal station which were being concrete/masonry kept as strategic spares for other ESB sites -a decision has now been made to remove oil from these bunds - oil to be removed in April Transformer oil Hydraulic test Visual Inspection Yes Bund No. 34 Section B - Fyrequel storage container Prefabricated Chemstore Oil barrels/chemicals drums 0.54 N/a Hydraulic test Visual Inspection 02/09/2013 Yes Fail Section B of twin bund failed - steel etc showing signd of localised corrosion and pitting. Other (please describe) Chemstore taken out of service. * Capacity required should comply with 25% or 110% containment rule as detailed in your licence Commentary Has integrity testing been carried out in accordance with licence requirements and are all structures tested in line with BS8007/EPA Guidance? 15 bunding and storage guidelines Yes 16 Are channels/transfer systems to remote containment systems tested? Yes 17 Are channels/transfer systems compliant in both integrity and available volume? Yes Pipeline/underground structure testing Are you required by your licence to undertake integrity testing* on underground structures e.g. pipelines or sumps etc? if yes please fill out table 2 below listing all underground structures and 1 pipelines on site which failed the integrity test and all which have not been tested withing the integrity test period as specified Yes 2 Please provide integrity testing frequency period 3 years *please note integrity testing means water tightness testing for process and foul pipelines (as required under your licence) Table B2: Summary details of pipeline/underground structures integrity test Results of retest(if in current reporting year) Type of secondary containment Does this structure have Integrity reports Integrity test failure Scheduled date Structure ID Type system Material of construction: Secondary containment? Type integrity testing maintained on site? Results of test explanation <50 words Corrective action taken for retest Pipe in channel Diesel pipeline Process Stainless teel Yes NDT Yes To be tested in 2014 Surface water drainage system Storm Vitrified clay No CCTV Yes Fracture in pipework Fracture repaired. Overall site survey to take place, included in 2014 budget plans for work to be carried out in Surface water drainage system Storm/Foul/Process Mix (please specify) No CCTV Yes Please use commentary for additional details not answered by tables/ questions above
9 9 Groundwater/Soil monitoring template Lic No: P Year Are you required to carry out soil monitoring as part of your licence requirements? 3 Do you extract groundwater for use on site? If yes please specify use in comment section 4 Are you required to carry out groundwater monitoring as part of your licence requirements? Do monitoring results show that groundwater generic assessment criteria such as GTVs or IGVs are exceeded or is there an upward trend in results for a substance? If yes, please complete the Groundwater Monitoring Guideline Template Report (link in cell G8) and submit separately through ALDER as a licensee return AND answer questions 5-12 below. Groundwater monitoring template no no no 5 Is the contamination related to operations at the facility (either current and/or historic) 6 Have actions been taken to address contamination issues?if yes please summarise remediation strategies proposed/undertaken for the site 7 Please specify the proposed time frame for the remediation strategy 8 Is there a licence condition to carry out/update ELRA for the site? 9 Has any type of risk assesment been carried out for the site? 10 Has a Conceptual Site Model been developed for the site? 11 Have potential receptors been identified on and off site? 12 Is there evidence that contamination is migrating offsite? Comments We carry out biannual borehole montioring but this is not a licence requirement. Please provide an interpretation of groundwater monitoring data in the interpretation box below or if you require additional space please include a groundwater/contaminated land monitoring results interpretaion as an additional section in this AER Please also refer to report submitted to EPA on 25th Jan Elevated levels of BOD/COD, coliforms and PAHs are reported sporadically in groundwater samples collected across site during biannually monitoring. TPHs were detected at MW3 in the second sample taken and at MW4 during the first sample taken in Table 1: Upgradient Groundwater monitoring results Date of sampling Sample location reference Parameter/ Substance Methodology Monitoring frequency Maximum Concentration++ Average Concentration+.+ where average indicates arithmetic mean.++ maximum concentration indicates the maximum measured concentration from all monitoring results produced during the reporting year Table 2: Downgradient Groundwater monitoring results unit GTV's* ** Upward trend in pollutant concentration over last 5 years of monitoring data Date of sampling Sample location reference Result 1 March 2013 Result 2 October 2013 unit GTV's* IGV Upward trend in yearly average pollutant concentration over last 5 years of monitoring data
10 10 Groundwater/Soil monitoring template Lic No: P Year 2013 March and October 2013 BH1 Parameter/ Substance Methodology Monitoring frequency TPH >C5-C6 ALI GC-FID Biannually < LOD < LOD ug/l nv(no value) no TPH >C6-C8 ALI GC-FID < LOD < LOD ug/l nv no TPH >C8-C10 ALI GC-FID < LOD < LOD ug/l nv no TPH >C10-C12 ALI GC-FID < LOD < LOD ug/l nv no TPH >C12-C16 ALI GC-FID < LOD < LOD ug/l nv no TPH >C16-C21 AL GC-FID < LOD < LOD ug/l nv no TPH >C21-C35 ALI GC-FID < LOD < LOD ug/l nv no TPH >C5-C35 ALI GC-FID < LOD < LOD ug/l nv no TPH >C5-C7 AROM GC-FID < LOD < LOD ug/l nv no TPH >C7-C8 AROM GC-FID < LOD < LOD ug/l nv no TPH >C8-C10 AROM GC-FID < LOD < LOD ug/l nv no TPH >C10-C12 AROM GC-FID < LOD < LOD ug/l nv no TPH >C12-C16 AROM GC-FID < LOD < LOD ug/l nv no TPH >C16-C21 AROM GC-FID < LOD < LOD ug/l nv no TPH >C21-C35 AROM GC-FID < LOD < LOD ug/l nv no TPH >C5-C35 AROM GC-FID < LOD < LOD ug/l nv no TPH C5-C35 ALI + AROM GC-FID < LOD < LOD ug/l 10 no Benzene GC-MS < LOD < LOD ug/l 0.75 no Toluene GC-MS < LOD < LOD ug/l 10 no Ethylene GC-MS < LOD < LOD ug/l 10 no Xylenes GC-MS < LOD < LOD ug/l 10 no MTBE GC-MS < LOD < LOD ug/l 30 no Acenaphthene GC-MS < LOD < LOD ug/l nv no Acenaphthylene GC-MS < LOD < LOD ug/l nv no Anthracene GC-MS < LOD < LOD ug/l no Benzo(a)anthracene GC-MS < LOD < LOD ug/l nv no Benzo(ghi)perylene* GC-MS < LOD < LOD ug/l 0.05 no Benzo(a)pyrene GC-MS < LOD < LOD ug/l no Benzo(b)+Benzo(k) fluoranthene* GC-MS < LOD < LOD ug/l 0.05 no Chrysene GC-MS < LOD < LOD ug/l nv no Dibenzo(ah)anthracene GC-MS < LOD < LOD ug/l nv no Fluoranthene GC-MS < LOD < LOD ug/l 1 no Fluorene GC-MS < LOD < LOD ug/l nv no ndeno(123cd)pyrene* GC-MS < LOD < LOD ug/l 0.05 no Naphthalene GC-MS < LOD 0.5 ug/l 1 no Phenanthrene GC-MS < LOD < LOD ug/l nv no Pyrene GC-MS < LOD < LOD ug/l nv no Total 4 PAHs GC-MS 0 0 ug/l 0.1 no Total 16 PAHs GC-MS ug/l BOD 4 0 mg/l nv no COD 7 13 mg/l nv no Faecal Coliforms 0 0 MPN/100 ml 0 no Total Coliforms MPN/100 ml 0 no
11 11 Groundwater/Soil monitoring template Lic No: P Year 2013 March and October 2013 MW2 TPH >C5-C6 ALI GC-FID Biannually TPH >C6-C8 ALI GC-FID < LOD < LOD ug/l nv(no value) no TPH >C8-C10 ALI GC-FID < LOD < LOD ug/l nv no TPH >C10-C12 ALI GC-FID < LOD < LOD ug/l nv no TPH >C12-C16 ALI GC-FID < LOD < LOD ug/l nv no TPH >C16-C21 AL GC-FID < LOD < LOD ug/l nv no TPH >C21-C35 ALI GC-FID < LOD < LOD ug/l nv no TPH >C5-C35 ALI GC-FID < LOD < LOD ug/l nv no TPH >C5-C7 AROM GC-FID < LOD < LOD ug/l nv no TPH >C7-C8 AROM GC-FID < LOD < LOD ug/l nv no TPH >C8-C10 AROM GC-FID < LOD < LOD ug/l nv no TPH >C10-C12 AROM GC-FID < LOD < LOD ug/l nv no TPH >C12-C16 AROM GC-FID < LOD < LOD ug/l nv no TPH >C16-C21 AROM GC-FID < LOD < LOD ug/l nv no TPH >C21-C35 AROM GC-FID < LOD < LOD ug/l nv no TPH >C5-C35 AROM GC-FID < LOD < LOD ug/l nv no TPH C5-C35 ALI + AROM GC-FID < LOD < LOD ug/l 10 no Benzene GC-MS < LOD < LOD ug/l 0.75 no Toluene GC-MS < LOD < LOD ug/l 10 no Ethylene GC-MS < LOD < LOD ug/l 10 no Xylenes GC-MS < LOD < LOD ug/l 10 no MTBE GC-MS 30 no Acenaphthene GC-MS < LOD < LOD ug/l nv no Acenaphthylene GC-MS < LOD < LOD ug/l nv no Anthracene GC-MS < LOD 0.02 ug/l no Benzo(a)anthracene GC-MS < LOD < LOD ug/l nv no Benzo(ghi)perylene* GC-MS < LOD < LOD ug/l 0.05 no Benzo(a)pyrene GC-MS < LOD < LOD ug/l no Benzo(b)+Benzo(k) fluoranthene* GC-MS < LOD < LOD ug/l 0.05 no Chrysene GC-MS < LOD < LOD ug/l nv no Dibenzo(ah)anthracene GC-MS < LOD < LOD ug/l nv no Fluoranthene GC-MS < LOD < LOD ug/l 1 no Fluorene GC-MS < LOD < LOD ug/l nv no ndeno(123cd)pyrene* GC-MS < LOD < LOD ug/l 0.05 no Naphthalene GC-MS < LOD 0.71 ug/l 1 no Phenanthrene GC-MS < LOD 0.02 ug/l nv no Pyrene GC-MS < LOD < LOD ug/l nv no Total 4 PAHs GC-MS 0 0 ug/l 0.1 no Total 16 PAHs GC-MS ug/l BOD 0 0 mg/l nv no COD 0 27 mg/l nv no Faecal Coliforms 0 0 MPN/100 ml 0 no Total Coliforms MPN/100 ml 0 no
12 12 Groundwater/Soil monitoring template Lic No: P Year 2013 March and October 2013 MW3 TPH >C5-C6 ALI GC-FID Biannually TPH >C6-C8 ALI GC-FID < LOD < LOD ug/l nv(no value) no TPH >C8-C10 ALI GC-FID < LOD < LOD ug/l nv no TPH >C10-C12 ALI GC-FID < LOD 666 ug/l nv no TPH >C12-C16 ALI GC-FID < LOD 5300 ug/l nv no TPH >C16-C21 AL GC-FID < LOD 5460 ug/l nv no TPH >C21-C35 ALI GC-FID < LOD 1430 ug/l nv no TPH >C5-C35 ALI GC-FID < LOD ug/l nv no TPH >C5-C7 AROM GC-FID < LOD < LOD ug/l nv no TPH >C7-C8 AROM GC-FID < LOD < LOD ug/l nv no TPH >C8-C10 AROM GC-FID < LOD < LOD ug/l nv no TPH >C10-C12 AROM GC-FID < LOD 166 ug/l nv no TPH >C12-C16 AROM GC-FID < LOD 2020 ug/l nv no TPH >C16-C21 AROM GC-FID < LOD 2800 ug/l nv no TPH >C21-C35 AROM GC-FID < LOD 660 ug/l nv no TPH >C5-C35 AROM GC-FID < LOD 5646 ug/l nv no TPH C5-C35 ALI + AROM GC-FID < LOD ug/l 10 no Benzene GC-MS < LOD < LOD ug/l 0.75 no Toluene GC-MS < LOD < LOD ug/l 10 no Ethylene GC-MS < LOD < LOD ug/l 10 no Xylenes GC-MS < LOD < LOD ug/l 10 no MTBE GC-MS < LOD < LOD ug/l 30 no Acenaphthene GC-MS < LOD 0.02 ug/l nv no Acenaphthylene GC-MS < LOD 0.03 ug/l nv no Anthracene GC-MS < LOD < LOD ug/l no Benzo(a)anthracene GC-MS < LOD < LOD ug/l nv no Benzo(ghi)perylene* GC-MS < LOD < LOD ug/l 0.05 no Benzo(a)pyrene GC-MS < LOD < LOD ug/l no Benzo(b)+Benzo(k) fluoranthene* GC-MS < LOD < LOD ug/l 0.05 no Chrysene GC-MS < LOD < LOD ug/l nv no Dibenzo(ah)anthracene GC-MS < LOD < LOD ug/l nv no Fluoranthene GC-MS < LOD < LOD ug/l 1 no Fluorene GC-MS < LOD < LOD ug/l nv no ndeno(123cd)pyrene* GC-MS < LOD < LOD ug/l 0.05 no Naphthalene GC-MS < LOD 1.82 ug/l 1 no Phenanthrene GC-MS < LOD 0.02 ug/l nv no Pyrene GC-MS < LOD 0 ug/l nv no Total 4 PAHs GC-MS 0 0 ug/l 0.1 no Total 16 PAHs GC-MS ug/l no BOD 5 0 mg/l nv no COD 0 76 mg/l nv no Faecal Coliforms 0 0 MPN/100 ml 0 no Total Coliforms 0 2 MPN/100 ml 0 no
13 13 Groundwater/Soil monitoring template Lic No: P Year 2013 March and October 2013 MW4 TPH >C5-C6 ALI GC-FID Biannually TPH >C6-C8 ALI GC-FID < LOD < LOD ug/l nv(no value) no TPH >C8-C10 ALI GC-FID < LOD < LOD ug/l nv no TPH >C10-C12 ALI GC-FID < LOD < LOD ug/l nv no TPH >C12-C16 ALI GC-FID < LOD < LOD ug/l nv no TPH >C16-C21 AL GC-FID < LOD < LOD ug/l nv no TPH >C21-C35 ALI GC-FID < LOD < LOD ug/l nv no TPH >C5-C35 ALI GC-FID < LOD < LOD ug/l nv no TPH >C5-C7 AROM GC-FID < LOD < LOD ug/l nv no TPH >C7-C8 AROM GC-FID < LOD < LOD ug/l nv no TPH >C8-C10 AROM GC-FID < LOD < LOD ug/l nv no TPH >C10-C12 AROM GC-FID < LOD < LOD ug/l nv no TPH >C12-C16 AROM GC-FID < LOD 630 ug/l nv no TPH >C16-C21 AROM GC-FID < LOD 100 ug/l nv no TPH >C21-C35 AROM GC-FID < LOD < LOD ug/l nv no TPH >C5-C35 AROM GC-FID < LOD < LOD ug/l nv no TPH C5-C35 ALI + AROM GC-FID < LOD 730 ug/l 10 no Benzene GC-MS < LOD < LOD ug/l 0.75 no Toluene GC-MS < LOD < LOD ug/l 10 no Ethylene GC-MS < LOD < LOD ug/l 10 no Xylenes GC-MS < LOD < LOD ug/l 10 no MTBE GC-MS < LOD < LOD ug/l 30 no Acenaphthene GC-MS < LOD ug/l nv no Acenaphthylene GC-MS < LOD ug/l nv no Anthracene GC-MS < LOD < LOD ug/l no Benzo(a)anthracene GC-MS < LOD < LOD ug/l nv no Benzo(ghi)perylene* GC-MS < LOD < LOD ug/l 0.05 no Benzo(a)pyrene GC-MS < LOD < LOD ug/l no Benzo(b)+Benzo(k) fluoranthene* GC-MS < LOD < LOD ug/l 0.05 no Chrysene GC-MS < LOD < LOD ug/l nv no Dibenzo(ah)anthracene GC-MS < LOD < LOD ug/l nv no Fluoranthene GC-MS < LOD < LOD ug/l 1 no Fluorene GC-MS < LOD < LOD ug/l nv no ndeno(123cd)pyrene* GC-MS < LOD < LOD ug/l 0.05 no Naphthalene GC-MS < LOD 0.1 ug/l 1 no Phenanthrene GC-MS < LOD 0.02 ug/l nv no Pyrene GC-MS < LOD < LOD ug/l nv no Total 4 PAHs GC-MS 0 0 ug/l 0.1 no Total 16 PAHs GC-MS ug/l no BOD 5 0 mg/l nv no COD 0 27 mg/l nv no Faecal Coliforms 0 0 MPN/100 ml 0 no Total Coliforms MPN/100 ml 0 no
14 14 Groundwater/Soil monitoring template Lic No: P Year 2013 *please note exceedance of generic assessment criteria (GAC) such as a Groundwater Threshold Value (GTV) or an Interim Guideline Value (IGV) or an upward trend in results for a substance indicates that further interpretation of monitoring results is required. In addition to completing the above table, please complete the Groundwater Monitoring Guideline Template Report at the link provided and submit separately through ALDER as a licensee return or as otherwise instructed by the EPA. Groundwater monitoring template More information on the use of soil and groundwater standards/ generic assessment criteria (GAC) and risk assessment tools is available in the EPA published guidance (see the link in G31) Guidance on the Management of Contaminated Land and Groundwater at EPA Licensed Sites (EPA 2013). **Depending on location of the site and proximity to other sensitive receptors alternative Receptor based Water Quality standards should be used in addition to the GTV e.g. if the site is close to surface water compare to Surface Water Environmental Quality Standards (SWEQS), If the site is close to a drinking water supply compare results to the Drinking Water Standards (DWS) Surface Groundwater Drinking water (private supply) water EQS regulations GTV's standards
15 15 Groundwater/Soil monitoring template Lic No: P Year 2013 Table 3: Soil results Date of sampling Sample location reference Parameter/ Substance Methodology Monitoring frequency Maximum Concentration Average Concentration unit Where additional detail is required please enter it here in 200 words or less
16 16 Environmental Liabilities template Lic No: P Year 2013 Click here to access EPA guidance on Environmental Liabilities and Financial provision 1 ELRA initial agreement status Required but not submitted Commentary An ELRA for Poolbeg was submitted to the EPA in April the main changes to the report were to take account for the Thermal station closing. A further ELRA is being completed in 2014 to comply with the revised licence and guidelines. Review required and not completed; 2 3 ELRA review status Amount of Financial Provision cover required as determined by the latest ELRA Specify 79,062 4 Financial Provision for ELRA status Submitted and not agreed by EPA; Per 2012 submission 5 Financial Provision for ELRA - amount of cover Specify 6 Financial Provision for ELRA - type 7 Financial provision for ELRA expiry date Enter expiry date No expiry date An RMP was submitted to the EPA in 2012, however based on the revised licence and guidelines a DMP will be submitted in Following the closure of Poolbeg Thermal station in 2010 the RMP as originally submitted to the Agency was carried out to remove hazardous materials and reduce the environmental risk on site. 8 Closure plan initial agreement status Required but not submitted 9 Closure plan review status Review required and not completed 10 Financial Provision for Closure status Required but not submitted ESB has significant working capital and any decommissioning or closure of Poolbeg would be a well resourced activity. The company has adequate resources of finance to implement the RMP through to completion. More significantly, ESB makes specific financial provision for closure of its power stations. 11 Financial Provision for Closure - amount of cover Specify 12 Financial Provision for Closure - type 13 Financial provision for Closure expiry date Enter expiry date
17 17 Environmental Management Programme/Continuous Improvement Programme template Lic No: P Year 2013 Highlighted cells contain dropdown menu click to view Additional Information 1 Do you maintain an Environmental Management System (EMS) for the site. If yes, please detail in EMS system certified to ISO14001 maintained on site and audited additional information Yes biannually. 2 Does the EMS reference the most significant environmental aspects and associated impacts on-site Yes Does the EMS maintain an Environmental Management Programme (EMP) as required in accordance 3 with the licence requirements Yes Do you maintain an environmental documentation/communication system to inform the public on 4 environmental performance of the facility, as required by the licence Yes Environmental Management Programme (EMP) report Objective Category Target Status (% completed) How target was progressed Responsibility Intermediate outcomes Energy Efficiency/Utility conservation Install Energy Meter in new Completed admin building Maintenance Manager Installed by energy meter supplier with assistance of Poolbeg staff. Improved Environmental Management Practices and energy tracking of administration area now possible. Energy Efficiency/Utility conservation Energy Efficiency/Utility conservation Continue to review start ups to ensure they are as efficient as possible. BGE gas data signals to be incorporated into DCS which will allow tracking of gas flow, CV and other gas composition parameters to enable more accurate efficiency calculations. Ongoing - very few starts to There will be more starts in 2014 and further scope for improving start up operation.. Starts reviewed as they occur. In progress Work with BGE ongoing integration into DCS to be designed by Siemens. Carried over to Operations Manager Asset Manager Reduced emissions Reduced emissions Energy Efficiency/Utility conservation Priority drain valves as to be replaced during outages. Completed Treated water consumption now at approx 25 m3/day which is the lowest it has ever been on site to date. Maintenance Manager and Shift Team Leaders. Reduced water consumption. Energy Efficiency/Utility conservation Materials Handling/Storage/Bunding Materials Handling/Storage/Bunding Reduce the potential for discharge to surface and ground water Carry out offline compressor washes and handwash IGVs during outages. Bund testing and repairs if required, ongoing as per schedule ESB Networks to complete bunding of cable oil tanks. Ongoing - very few starts to There will be more starts in 2014 and further scope for improving start ups. Ongoing Biannual testing of boreholes Completed One cable tank remaining to bund. Completed during outages if weather conditions allow. Maintenance Manager Completed by Shift Team Shift Team Leader and Civil Leader and Civil Engineer as Engineer per bund testing schedule. Tank to be bunded in 2014 when cable line outages allow. Completed by groundwater consultant biannually. Operations Manager Environmental Coordinator Maintain efficiency of plant. Reduce the potential for discharge to surface and ground water and comply with licence conditions. Reduce the potential for discharge to surface and ground water and comply with licence conditions. Reduce the potential for discharge to surface and ground water.
18 18 Environmental Management Programme/Continuous Improvement Programme template Lic No: P Year 2013 Reduce the potential for Highlighted discharge to cells surface contain Complete dropdown painting menu of click to view Ongoing ESBI have amalgamated Operations Manager and Civil Monitor groundwater trends and and ground water manholes, drains, sumps, interceptors etc New drainage drawings to be prepared. Drain survey to be carried out. (2013) Site drainage survey (Storm/Process and foul lines) to be completed, included in 2014 budget plans for completion in existing drainage drawings into one drawing. Contractor completed drainage survey(2013) in areas we considered to be at risk repairs completed following the survey. Painting of manholes to be completed when numbers have been assigned to them as per updated drawings. Engineer reduce the potential for discharge to surface and ground water and comply with licence conditions. Reduce the potential for discharge to surface and ground water Waste reduction/raw material usage efficiency Tidy and identify the spill material hut contents. 50% non-hazardous waste Target achieved in to be recycled -(this target 54% waste recycled refers to day to day waste and not that associated with projects) Completed Current stocks for plant to Maintenance Manager and be stored here and obsolete Environmental Coordinator spill materials to be disposed. Monthly tracking of waste, ensuring all materials are recycled if possible. Waste is a KPI in site business plan. Target 55% for Environmental Coordinators and all site personnel Improved Environmental Management Practices and Emergency Preparedness Improved Environmental Management Practices and diverting waste from landfill. Reduction in Water use Ongoing water monitoring and investigations to be carried out to ensure leaks and use are minimised : Target : rolling daily average < 180 m3 Water Use 71,283 m3 in 2013 vs 72,501 m3 in Due to plant operational problems and treated water reduction in 2013, water usage should be reduced in Water is a KPI in site business plan and tracked and reported weekly and monthly. Target for 2014 rolling daily average < 150 m3 Operations Manager/Shift Team Leader Improved Environmental Management Practices and reduction in water use. Reduction in Water use - To optimise treated water and chemical usage in the station Treated water use in CCGT to be monitored by regular drop tests. Water treatment plant resins to be replaced. Sampling station water reuse project to be carried out Valve survey to be carried out on boiler valves. In progress WTP resins changed out with the exception of one small vessel which will be completed in Water reuse project cancelled as treated water use significantly reduced and project would not be beneficial financially. Valves identified as requiring replacement were replaced during outages in Maintenance Manager/Operational Manager/Environmental Coordinator Improved Environmental Management Practices and reduction in water use. Reduction of emissions to Water Chlorine meter to be integrated into the control room system. In progress On site separation electrical list for completion in Software and some hard wiring required. Asset Manager Increased compliance with licence conditions Materials Handling/Storage/Bunding Materials Handling/Storage/Bunding Emergency Prepardness NDT testing of the Diesel Line to gas turbines to be carried out. Diesel farm interceptor to be modified. Further consider remote operation of the final sump pump. In progress Project to be scoped. Large work scope involved, including C&I modifications. Some investigation work was completed in 2013 but further project scope required, modifications could be carried out during site seperation electrical work if project feasible. To be completed in April 2014 Asset Manager Operations Manager/Maintenance Manager/Civil eng/env. Coordinator Asset Manager Increased compliance with licence conditions Improved Environmental Management Practices Improved Environmental Management Practices and Emergency Preparedness
19 19 Noise monitoring summary report Lic No: P Year Was noise monitoring a licence requirement for the AER period? No See correspondance ref P /AP03MG If yes please fill in table N1 noise summary below 2 Was noise monitoring carried out using the EPA Guidance note, including completion of the Noise Guidance N/A "Checklist for noise measurement report" included in the guidance note as table 6? note NG4 3 Does your site have a noise reduction plan N/A Noise not an issue on site. 4 When was the noise reduction plan last updated? Enter date Noise included in EMP if issues arisse - boundary measurements to take palce every three years. 5 Have there been changes relevant to site noise emissions (e.g. plant or operational changes) since the last noise survey? No Table N1: Noise monitoring summary Date of monitoring Time period Noise location (on site) Noise sensitive location -NSL (if applicable) LA eq LA 90 LA 10 LA max Tonal or Impulsive noise* (Y/N) If tonal /impulsive noise was identified was 5dB penalty applied? Comments (ex. main noise sources on site, & extraneous noise ex. road traffic) Is site compliant with noise limits (day/evening/night)? *Please ensure that a tonal analysis has been carried out as per guidance note NG4. These records must be maintained onsite for future inspection If noise limits exceeded as a result of noise attributed to site activities, please choose the corrective action from the following options? ** please explain the reason for not taking action/resolution of noise issues? Any additional comments? (less than 200 words)
20 20 Resource Usage/Energy efficiency summary Lic No: P Year When did the site carry out the most recent energy efficiency audit? Please list the recommendations in table 3 below Is the site a member of any accredited programmes for reducing energy usage/water conservation such as the SEAI programme linked to the right? If yes please list them in additional information SEAI - Large Industry Energy Network (LIEN) No Additional information 2011 Efficiency calculations of combined cycle plant carried out in 2011 before and after major overhauls of Gas Turbine and Steam Turbine units. Where Fuel Oil is used in boilers on site is the sulphur content compliant with licence conditions? Please state percentage 3 in additional information No Tank 1 oil %S and Tank % S. The service tank in use is Tank 1 with compliant sulphur content. Tank 2 is undergoing dilution on a gradual basis. Table R1 Energy usage on site Production +/- % Energy Energy Use Previous year Current year compared to previous reporting year** Consumption +/- % vs overall site production* Total Energy Used (MWHrs) % Total Energy Generated (MWHrs) % Total Renewable Energy Generated (MWHrs) 0 0 Electricity Consumption (MWHrs) Fossil Fuels Consumption: Heavy Fuel Oil (m3) N/a N/a Light Fuel Oil (m3) 220 tonnes 0 Natural gas (m3) Coal/Solid fuel (metric tonnes) N/a N/a Peat (metric tonnes) N/a N/a Renewable Biomass N/a N/a Renewable energy generated on site N/a N/a * where consumption of energy can be compared to overall site production please enter this information as percentage increase or decrease compared to the previous reporting year. ** where site production information is available please enter percentage increase or decrease compared to previous year Table R2 Water usage on site Water Emissions Water Consumption Production +/- % compared to previous reporting year** Energy Consumption +/- % vs overall site production* Volume Discharged back to Volume used i.e not discharged to environment e.g. released as steam m3/yr Unaccounted for Water: Water use Water extracted Previous year m3/yr. Water extracted Current year m3/yr. environment(m 3 yr): Groundwater 0 0 Surface water 0 0 Public supply Recycled water 0 0 Total * where consumption of water can be compared to overall site production please enter this information as percentage increase or decrease compared to the previous reporting year. ** where site production information is available please enter percentage increase or decrease compared to previous year
21 21 Resource Usage/Energy efficiency summary Lic No: P Year 2013 Table R3 Waste Stream Summary Total Landfill Incineration Recycled Other Hazardous (Tonnes) Non-Hazardous (Tonnes)
22 22 Resource Usage/Energy efficiency summary Lic No: P Year 2013 Table R4: Energy Audit finding recommendations Date of audit Recommendations Description of Predicted energy Measures proposed Origin of measures savings % Implementation date Responsibility Completion date Status and comments Table R5: Power Generation: Where power is generated onsite (e.g. power generation facilities/food and drink industry)please complete the following information Gas Turbine 14 Gas Turbine 15 Steam Turbine 16 Unit ID Station Total Technology Primary Fuel Natural Gas Natural Gas Uses hot gases from gas turbines to generate. Thermal Efficiency Unit Date of Commission Total Starts for year Total Running Time Total Electricity Generated (GWH) House Load (GWH) KWH per Litre of Process Water 189 KWH per Litre of Total Water used on 33 Site
23 23 Complaints and Incidents summary template Lic No: P Year 2013 Complaints Additional information Have you received any environmental complaints in the current reporting year? If yes please complete summary details of complaints received on site in table 1 below No Table 1 Complaints summary Date Category Other type (please specify) Total complaints open at start of reporting year 0 Total new complaints received during reporting year 0 Total complaints closed during reporting year 0 Balance of complaints end of reporting year 0 Brief description of complaint (Free txt <20 words) Corrective action< 20 words Resolution status Resolution date Further information Incidents Have any incidents occurred on site in the current reporting year? Please list all incidents for current reporting year in Table 2 below Yes Additional information *For information on how to report and what constitutes an incident What is an incident Table 2 Incidents summary Date of occurrence Incident nature 28/06/2013 Monitoring equipment offline - Nox readings on GT15 unreliable due to a faulty cooler component. Location of occurrence Licenced discharge point (A1-6) Other Incident category*please refer to guidance Receptor cause(please Cause of incident specify) 1. Minor Air Plant or equipment issues Activity in progress at time of incident Communication Occurrence Corrective action<20 words Normal activities EPA New The Nox system cooler component was discovered to be faulty, a portable temporary cooler was installed until a replacement cooler was delivered to site for installation. Preventative action Resolution <20 words status Spare cooler purchased for immediate installation if reoccurrence was to occur. Resolution date Complete 4th July - system reading reliably again. Likelihood of reoccurrence Medium Total number of incidents current year 1 Total number of incidents previous year 0 % reduction/ increase
24 24 WASTE SUMMARY Lic No: P Year 2013 SECTION A-PRTR ON SITE WASTE TREATMENT AND WASTE TRANSFERS TAB- TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIES PRTR facility logon dropdown list click to see options SECTION B- WASTE ACCEPTED ONTO SITE-TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIES Additional Information Were any wastes accepted onto your site for recovery or disposal or treatment prior to recovery or disposal within the boundaries of your facility?;(waste generated within your boundaries 1 is to be captured through PRTR reporting) No If yes please enter details in table 1 below 2 Did your site have any rejected consignments of waste in the current reporting year? If yes please give a brief explanation in the additional information No 3 Was waste accepted onto your site that was generated outside the Republic of Ireland? If yes please state the quantity in tonnes in additional information No Table 1 Details of waste accepted onto your site for recovery, disposal or treatment (do not include wastes generated at your site, as these will have been reported in your PRTR workbook) Licenced annual tonnage limit for your site (total tonnes/annum) EWC code European Waste Catalogue EWC codes Source of waste accepted Description of waste Quantity of waste accepted accepted in current Please enter an reporting year (tonnes) accurate and detailed description - which applies to relevant EWC code European Waste Catalogue EWC codes Quantity of waste accepted in previous reporting year (tonnes) Reduction/ Increase over previous year +/ - % Reason for reduction/ increase from previous reporting year Packaging Content (%)- only applies if the waste has a packaging component Disposal/Recovery or treatment operation carried out at your site and the description of this operation Quantity of waste remaining on site at the end of reporting year (tonnes) Comments - SECTION C-TO BE COMPLETED BY ALL WASTE FACILITIES (waste transfer stations, Composters, Material recovery facilities etc) EXCEPT LANDFILL SITES 4 Is all waste processing infrastructure as required by your licence and approved by the Agency in place? If no please list waste processing infrastructure required onsite 5 Is all waste storage infrastructure as required by your licence and approved by the Agency in place? If no please list waste storage infrastructure required on site 6 Does your facility have relevant nuisance controls in place? 7 Do you have an odour management system in place for your facility? If no why? 8 Do you maintain a sludge register on site? SECTION D-TO BE COMPLETED BY LANDFILL SITES ONLY Table 2 Waste type and tonnage-landfill only Waste types permitted for disposal Authorised/licenced annual intake for disposal (tpa) Actual intake for disposal in reporting year (tpa) Remaining licensed capacity at end of reporting year (m3) Comments Table 3 General information-landfill only Area ID Date landfilling commenced Date landfilling ceased Currently landfilling Private or Public Operated Inert or non-hazardous Predicted date to cease landfilling Licence permits asbestos Is there a separate cell for asbestos? Accepted asbestos in reporting year Total disposal Lined disposal area occupied by area occupied by waste waste Unlined area UNIT UNIT UNIT Cell 8
25 25 WASTE SUMMARY Lic No: P Year 2013 SECTION Table 4 Environmental A-PRTR ON SITE monitoring-landfill WASTE TREATMENT onlyand Landfill WASTE Manual-Monitoring TRANSFERS TAB- Standards TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIES Was meterological monitoring in compliance with Landfill Directive (LD) standard in reporting Was leachate monitored in compliance Was SW monitored in Was Landfill Gas monitored in compliance with LD compliance with LD standard in standard in reporting Was topography of the site Have GW trigger levels Were emission limit values agreed with surveyed in Has the statement under S53(A)(5) of WMA been submitted in year + with LD standard in reporting year reporting year year been established the Agency (ELVs) reporting year reporting year Comments.+ please refer to Landfill Manual linked above for relevant Landfill Directive monitoring standards Table 5 Capping-Landfill only Area uncapped* UNIT Area with temporary cap UNIT Area with final cap to LD Standard m2 ha, a Area capped other Area with waste that should be permanently capped to date under licence What materials are used in the cap Comments *please note this includes daily cover area Table 6 Leachate-Landfill only 9 Is leachate from your site treated in a Waste Water Treatment Plant? 10 Is leachate released to surface water? If yes please complete leachate mass load information below Volume of leachate in reporting year(m3) Leachate (BOD) mass load (kg/annum) Leachate (COD) mass load (kg/annum) Leachate (NH4) mass load (kg/annum) Leachate (Chloride) mass load kg/annum Leachate treatment on-site Specify type of leachate treatment Comments Please ensure that all information reported in the landfill gas section is consistent with the Landfill Gas Survey submitted in conjunction with PRTR returns Table 7 Landfill Gas-Landfill only Gas Captured&Treated by LFG System m3 Power generated (MW / KWh) Used on-site or to national grid Was surface emissions monitoring performed during the reporting year? Comments
26 PRTR# : P0577 Facility Name : Electricity Supply Board Filename : P ESB Poolbeg.xls Return Year : /03/ :52 REFERENCE YEAR 2013 Guidance to completing the PRTR workbook 1. FACILITY IDENTIFICATION Parent Company Name Electricity Supply Board Facility Name Electricity Supply Board PRTR Identification Number P0577 Licence Number P AER Returns Workbook Version Waste or IPPC Classes of Activity No. class_name The operation of combustion installations with a rated thermal input 2.1 equal to or greater than 50MW Address 1 ESB Poolbeg Generating Station Address 2 Pigeon House Road Address 3 Ringsend Address 4 Dublin 4 Dublin Country Ireland Coordinates of Location River Basin District IEEA NACE Code 3511 Main Economic Activity Production of electricity AER Returns Contact Name Suzanne Moran AER Returns Contact Address [email protected] AER Returns Contact Position Environmental Coordinator AER Returns Contact Telephone Number AER Returns Contact Mobile Phone Number AER Returns Contact Fax Number Production Volume Production Volume Units GWhrs Number of Installations 1 Number of Operating Hours in Year 8760 Number of Employees 34 User Feedback/Comments Increase in quantity of hazardous waste disposed of outside Ireland is stack ash from the thermal station chimneys. Web Address 2. PRTR CLASS ACTIVITIES Activity Number 1(c) Activity Name Thermal power stations and other combustion installations 3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002) Is it applicable? No Have you been granted an exemption? No If applicable which activity class applies (as per Schedule 2 of the regulations)? Is the reduction scheme compliance route being used? 4. WASTE IMPORTED/ACCEPTED ONTO SITE Guidance on waste imported/accepted onto site Do you import/accept waste onto your site for onsite treatment (either recovery or disposal activities)? No This question is only applicable if you are an IPPC or Quarry site
27 4.1 RELEASES TO AIR Link to previous years emissions data PRTR# : P0577 Facility Name : Electricity Supply Board Filename : P ESB Poolbeg.xls Return Year : /03/ : SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS RELEASES TO AIR Please enter all quantities in this section in KGs POLLUTANT METHOD QUANTITY Method Used A1-5 - A1-8 No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year 08 Nitrogen oxides (NOx/NO2) M ISO 10849:1996 CEMs Carbon dioxide (CO2) C ETS As per GHG permit and monitoring and reporting protocol Methane (CH4) C OTH As per VGB expert group and ESB calculations Carbon monoxide (CO) C OTH As per VGB expert group and ESB calculations Nitrous oxide (N2O) C OTH As per VGB expert group and ESB calculations Non-methane volatile organic compounds (NMVOC) C OTH As per VGB expert group and ESB calculations Benzene C OTH As per VGB expert group and ESB calculations Mercury and compounds (as Hg) C OTH As per VGB expert group and ESB calculations * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button SECTION B : REMAINING PRTR POLLUTANTS RELEASES TO AIR Please enter all quantities in this section in KGs POLLUTANT METHOD QUANTITY Method Used No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence) RELEASES TO AIR Please enter all quantities in this section in KGs POLLUTANT METHOD QUANTITY Method Used Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year Additional Data Requested from Landfill operators * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button For the purposes of the National Inventory on Greenhouse Gases, landfill operators are requested to provide summary data on landfill gas (Methane) flared or utilised on their facilities to accompany the figures for total methane generated. Operators should only report their Net methane (CH4) emission to the environment under T(total) KG/yr for Section A: Sector specific PRTR pollutants above. Please complete the table below: Landfill: Electricity Supply Board Please enter summary data on the quantities of methane flared and / or utilised Method Used Designation or Description Facility Total Capacity m3 per hour additional_pollutant_no T (Total) kg/year M/C/E Method Code Total estimated methane generation (as per site model) 0.0 N/A Methane flared (Total Flaring Capacity) Methane utilised in engine/s (Total Utilising Capacity) Net methane emission (as reported in Section A above) 0.0 N/A
28 4.2 RELEASES TO WATERS Link to previous years emissions data PRTR# : P0577 Facility Name : Electricity Supply Board Filename : P0577_2013.xls Return Year : /03/ : SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS Data on ambient monitoring of storm/surface water or groundwater, conducted as part of your licence requirements, should NOT be submitted under AER / PRTR Reporting as this only concerns Releases from your facility RELEASES TO WATERS Please enter all quantities in this section in KGs POLLUTANT QUANTITY Method Used No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button SECTION B : REMAINING PRTR POLLUTANTS RELEASES TO WATERS Please enter all quantities in this section in KGs POLLUTANT QUANTITY Method Used No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button SECTION C : REMAINING POLLUTANT EMISSIONS (as required in your Licence) RELEASES TO WATERS Please enter all quantities in this section in KGs POLLUTANT QUANTITY Method Used SW3 SW7 SW8 A (Accidenta F Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 T (Total) KG/Year l) KG/Year (Fugitive) KG/Year External Lab analysis based on - BS 2690: Part 7:1968 / BS 6068: 238 Ammonia (as N) M ALT Part2.11: Suspended Solids M ALT External lab analysis based - Method 2540D, AWWA/APHA, 20th Ed., 1999 / BS 2690: Part ;BS EN * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
29 4.3 RELEASES TO WASTEWATER OR SEWER Link to previous years emissions data PRTR# : P0577 Facility Name : Electricity Supply Board Filename : P0577_2013.xls Return Year : /03/ : SECTION A : PRTR POLLUTANTS OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER Please enter all quantities in this section in KGs POLLUTANT METHOD QUANTITY Method Used No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence) OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER Please enter all quantities in this section in KGs POLLUTANT METHOD QUANTITY Method Used Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
30 4.4 RELEASES TO LAND Link to previous years emissions data PRTR# : P0577 Facility Name : Electricity Supply Board Filename : P0577_2013.xls Return Year : /03/ : SECTION A : PRTR POLLUTANTS RELEASES TO LAND Please enter all quantities in this section in KGs POLLUTANT METHOD QUANTITY Method Used No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence) RELEASES TO LAND Please enter all quantities in this section in KGs POLLUTANT METHOD QUANTITY Method Used Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
31 T/Year Description and Licence / Permit No. of Recoverer / Disposer / Broker Address of Recoverer / Disposer / Broker Name and Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Licence / Permit No. of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Sheet : Treatment Transfers of Waste AER Returns Workbook 31/3/ :24 5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE PRTR# : P0577 Facility Name : Electricity Supply Board Filename : P0577_2013.xls Return Year : /03/ : Please enter all quantities on this sheet in Tonnes 25 Transfer Destination European Waste Code Hazardous Quantity Quantity (Tonnes per Year) of Waste Method Used Waste Treatment Operation M/C/E Method Used Location of Treatment Name Within the Country No 4.37 mixed municipal waste R5 M Weighed Offsite in Ireland packaging containing residues of or Within the Country Yes 0.31 contaminated by dangerous substances R4 M Weighed Offsite in Ireland Haz Waste : Name and Licence/Permit No of Next Destination Facility Non Haz Waste: Name and Licence/Permit No of Recover/Disposer Midlands Waste Disposal,W Enva Environmental,W Clonminam Ind. Estate Portlaoise Co. Laois. Ireland Haz Waste : Address of Next Destination Facility Non Haz Waste: Address of Recover/Disposer Proudstown,.,Navan,Co. Meath,Ireland Clonminam Ind. Estate,Portlaoise,Co. Laois,.,Ireland Name and License / Permit No. and Address of Final Recoverer / Disposer (HAZARDOUS WASTE ONLY) Midland Scrap Metal,WMP02/2008,Midland Scrap Metal,.,Birr,Co Offaly,Ireland Actual Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Midland Scrap Metal,.,Birr,Co Offaly,Ireland To Other Countries Yes absorbents, filter materials (including oil filters not otherwise specified), wiping cloths, protective clothing contaminated by 0.53 dangerous substances R1 M Weighed Abroad Enva Environmental,W Within the Country Yes discarded equipment containing 0.05 chlorofluorocarbons, HCFC, HFC R4 M Weighed Offsite in Ireland KMK Metals (WEEE recycle),w Midlands Waste Within the Country No 0.68 wood R3 M Weighed Offsite in Ireland Disposal,W Within the Country No 3.86 iron and steel R4 M Weighed Offsite in Ireland Clearcircle Metals,WP (Limerick Co. Co.) Clonminam Ind. Estate,Portlaoise,Co. Laois,.,Ireland Cappincur Ind. Estate,Co. Offaly,.,.,Ireland Proudstown,.,Navan,Co. Meath,Ireland Ballysimon Road,Limerick,.,.,Ireland Clonminam Ind. fluorescent tubes and other mercurycontaining Enva Environmental,W0184- Estate,Portlaoise,Co. Within the Country Yes waste 0.04 R4 M Weighed Offsite in Ireland 01 Laois,.,Ireland Midlands Waste Proudstown,.,Navan,Co. Within the Country No 9.74 mixed municipal waste D5 M Weighed Offsite in Ireland Disposal,W Meath,Ireland Midlands Waste Proudstown,.,Navan,Co. Within the Country No 3.16 bulky waste R1 M Weighed Offsite in Ireland Disposal,W Meath,Ireland Lindenschmidt KG, ,Lindenschmidt KG Lindenschmidt KG,Umweitservice Krombacher,Umweitservice Krombacher Strasse 42-46,57223 Strasse 42-46,57223 Kreuztal,.,Germany Kreuztal,.,Germany KMK Metals (WEEE recycle),w ,cappincur Ind. Estate,Co. Offaly,.,.,Ireland Irish Lamp Recycling Ltd.,WFP - KE ,Irish Lamp Recycling,Woodstock Ind. Estate,Athy,Co. Kildare,Ireland Cappincur Ind. Estate,Co. Offaly,.,.,Ireland Irish Lamp Recycling,Woodstock Ind. Estate,Athy,Co. Kildare,Ireland Within the Country No 6.92 saturated or spent ion exchange resins D5 M Weighed Offsite in Ireland Midlands Waste Disposal,W Proudstown,.,Navan,Co. Meath,Ireland Within the Country Yes 1.0 other engine, gear and lubricating oils R1 M Weighed Offsite in Ireland waste blasting material containing To Other Countries Yes 1.04 dangerous substances R1 M Weighed Abroad aqueous liquid wastes other than those Within the Country No 5.66 mentioned in R1 M Weighed Offsite in Ireland Within the Country No 5.82 wastes from cooling-water treatment R1 M Weighed Offsite in Ireland Clonminam Ind. Enva Environmental,W0184- Estate,Portlaoise,Co. 01 Laois,.,Ireland Clonminam Ind. Enva Environmental,W0184- Estate,Portlaoise,Co. 01 Laois,.,Ireland Clonminam Ind. Enva Environmental,W Enva Environmental,W Estate,Portlaoise,Co. Laois,.,Ireland Clonminam Ind. Estate,Portlaoise,Co. Laois,.,Ireland Enva Environmental,W ,Clonminam Ind. Clonminam Ind. Estate,Portlaoise,Co. Estate,Portlaoise,Co. Laois,.,Ireland Laois,.,Ireland Lindenschmidt KG, ,Lindenschmidt KG,Umweitservice Krombacher Strasse 42-46,57223 Kreuztal,.,Germany Lindenschmidt KG,Umweitservice Krombacher Strasse 42-46,57223 Kreuztal,.,Germany bottom ash, slag and boiler dust from coincineration containing dangerous To Other Countries Yes substances R12 M Weighed Abroad Clonminam Ind. Enva Environmental,W0184- Estate,Portlaoise,Co. 01 Laois,.,Ireland Lindenschmidt KG, ,Lindenschmidt KG,Umweitservice Krombacher Strasse 42-46,57223 Kreuztal,.,Germany Lindenschmidt KG,Umweitservice Krombacher Strasse 42-46,57223 Kreuztal,.,Germany PRTR# : P0577 Facility Name : Electricity Supply Board Filename : Poolbeg AER 2013.xls Return Year : 2013 Page 1 of 2
32 T/Year Description and Licence / Permit No. of Recoverer / Disposer / Broker Address of Recoverer / Disposer / Broker Name and Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Licence / Permit No. of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Sheet : Treatment Transfers of Waste AER Returns Workbook 31/3/ :24 Transfer Destination European Waste Code Hazardous Quantity Quantity (Tonnes per Year) of Waste Method Used Waste Treatment Operation M/C/E Method Used waste paint and varnish containing organic To Other Countries Yes 0.09 solvents or other dangerous substances R3 M Weighed Abroad antifreeze fluids containing dangerous To Other Countries Yes 0.05 substances R3 M Weighed Abroad Location of Treatment Name Haz Waste : Name and Licence/Permit No of Next Destination Facility Non Haz Waste: Name and Licence/Permit No of Recover/Disposer Enva Environmental,W Enva Environmental,W Haz Waste : Address of Next Destination Facility Non Haz Waste: Address of Recover/Disposer Clonminam Ind. Estate,Portlaoise,Co. Laois,.,Ireland Clonminam Ind. Estate,Portlaoise,Co. Laois,.,Ireland Clonminam Ind. packaging containing residues of or Enva Environmental,W0184- Estate,Portlaoise,Co. To Other Countries Yes contaminated by dangerous substances R3 M Weighed Abroad 01 Laois,.,Ireland waste paint and varnish other than those Midlands Waste Proudstown,.,Navan,Co. Within the Country No 6.0 mentioned in D5 M Weighed Offsite in Ireland Disposal,W Meath,Ireland Pigeon House Hammond Lane Metal Road,Ringsend,Dublin Within the Country No 1.16 mixed metals R4 M Weighed Offsite in Ireland Co.Ltd,WFP-DC ,4,Ireland Clearcircle Metals,WP Ballysimon Within the Country No 1.44 aluminium R4 M Weighed Offsite in Ireland (Limerick Co. Co.) Road,Limerick,.,.,Ireland Clearcircle Metals,WP Ballysimon Within the Country No 1.1 copper, bronze, brass R4 M Weighed Offsite in Ireland (Limerick Co. Co.) Road,Limerick,.,.,Ireland discarded equipment other than those KMK Metals (WEEE Cappincur Ind. Estate,Co. Within the Country No 0.27 mentioned in to R4 M Weighed Offsite in Ireland recycle),w Offaly,.,.,Ireland Midlands Waste Proudstown,.,Navan,Co. Within the Country No 0.24 glass packaging R5 M Weighed Offsite in Ireland Disposal,W Meath,Ireland Name and License / Permit No. and Address of Final Recoverer / Disposer (HAZARDOUS WASTE ONLY) Nehlsen GmbH & Co.kg,D ,A HH Louis-Krages- Strabe,,Bremen. D-28237,,Germany Actual Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Louis-Krages-Strabe,,Bremen. D-28237,,Germany KS Recycling,E ,Raiffei senstraße 38,D Raiffeisenstraße 38,D - Sonsbec,,,Germany Sonsbec,,,Germany Nehlsen GmbH & Co.kg,D ,A HH Louis-Krages- Strabe,,Bremen. D-28237,,Germany Louis-Krages-Strabe,,Bremen. D-28237,,Germany * Select a row by double-clicking the Description of Waste then click the delete button Link to previous years waste data Link to previous years waste summary data & percentage change Link to Waste Guidance PRTR# : P0577 Facility Name : Electricity Supply Board Filename : Poolbeg AER 2013.xls Return Year : 2013 Page 2 of 2