1 13. Performance Management 13.1 Introduction This chapter sets out how the Council will ensure that it delivers the outcomes of its second Local Transport Plan. Appropriate indicators and targets are identified that will demonstrate progress towards meeting the overall LTP2 objectives and delivering our investment priorities. This chapter describes the processes that have been put in place to monitor progress and performance. It goes on to describe the indicators that have been identified to monitor performance and concludes with a detailed description of the derivation of each target, and the actions required by the Council and its partners to achieve the target and to manage risk Corporate Performance Management Our corporate planning processes are the method by which we plan effectively for the future and ensure that we use our resources to maximum effect for local people. In order to do this we need to be clear about what we can achieve, know when we achieve it and take any action needed if things are not on track. Our corporate planning, performance and financial processes provides a framework to make sure that we: Work with our partners to deliver the City s shared vision Set clear priorities for achieving this vision Set ourselves clear and challenging targets to help us achieve the vision Identify resources to achieve the Council s priorities and goals Learn from our customers, partners and staff in our drive for continuous improvement Integrate all elements of the Council s planning processes to ensure links between service and financial planning Take account of national and local influences for change Identify risk and introduce management measures to reduce or eliminate the risk Our planning is informed through consultation with the community and our partners and the outcomes of consultation are considered during the annual planning cycle The Corporate Performance Management Framework provides a common thread that draws together implementation of the Medium Term Financial Plan (MTFP) and the People Strategy. It ensures that the City Strategy goals for Plymouth are linked via the City Council s Corporate Plan priorities to Service Plans, such as the Local Transport Plan and the performance of service managers. Moreover it clarifies the contribution that each council officer can make to achieve the city vision The Council has put in place a performance management system that allows every level of the Performance Framework to be monitored against targets that have been set by members, officers and other stakeholders. Information is available on-line and is constantly updated by officers responsible for individual targets and activities. The system has been in place for 3 years and is progressively being updated to provide reporting across all services. It provides information on Best Value Performance Indicators (BVPI s), Comprehensive Performance Assessment (CPA) indicators and local indicators established within each service area. It provides a traffic light system of green, amber and red to highlight those indicators that are on track and those where performance is either better or worse than the target / trajectory. The following screen shots give examples of the Council s on-line reporting system. The first shows a dashboard or scorecard for a single indicator, whilst the second shows an overview of indicators for use by senior management in performance monitoring across a service area

2 Figure 13.1: Performance Management Dashboard Screenshot Figure 13.2: Performance Management Screenshot The Council s management team and Cabinet receive quarterly progress reports of the Corporate Plan, Improvement and Best Value targets, indicating when key milestones have been achieved. The Resources and Performance Overview and Scrutiny Panel receives performance information on a similar basis and analyses trends, receives updates on slippage and makes recommendations to the Cabinet if Members believe that action should be taken The Performance Management Framework will provide an essential tool for ongoing monitoring of the LTP2 indicators. This means that rather than monitoring performance as an annual activity, monitoring will take place, where appropriate at least quarterly so that prior warning is provided when an indicator is likely to be off track. The framework crucially provides the means of making the links across service areas to show how performance in other service 206

3 areas can assist in performance against the Local Transport Plan indicators and also where transport interventions can contribute to the Councils corporate performance. This alignment of the LTP with the City Strategy and thematic strategies extends beyond the City Council through the alignment of other delivery agencies via the Local Strategic Partnership Comprehensive Performance Assessment (CPA) The Audit Commission has proposed that an authority's approach to transport, informed by LTP assessment, will feature significantly in the corporate part of the CPA from Since the City Council s CPA in 2002, significant progress has been made in addressing a range of key areas for improvement. The table below illustrates the progress made between the Council s CPA in 2002 and its assessment in December Table 13.1: Audit Commission Comparison Audit Commission Findings in 2002 Audit Commission Findings in 2004 Political and managerial leadership is Political and managerial leadership is strong: lacking capacity at the highest level significant improvements have been made in the management of the Council over the last year The Council lacks strategic vision The Council has clear vision and ambition Overall focus of the Council is weak The Leader and Chief Executive have dramatically increased focus Ambitions are set too low There are realistic long term ambitions that people recognise The Council is unclear about its priorities The Council is clear about its priorities Under the CPA arrangements the Council is required to report on a number of key performance indicators, known as mandatory indicators. Furthermore, the Audit Commission has established rule-bound indicators for which the Council is required to achieve a set performance level. For transport the only such indicator is: Non-intervention by the Secretary of State under the Traffic Management Act Performance in the Transport Service LTP1 Performance Summary We have improved our LTP performance from weak (42%) in 2002/03 to fair (67%) in 2004/05 as shown in the table below. Table 13.2: APR Rating Comparison Year Rating Score APR3: 2002/03 Weak 42% APR4: 2003/04 Average 66% APR5: 2004/05 Fair 67% Following the weak 2002/03 APR, during 2004 the Council, in addition to 7 other local authorities, participated in the Department for Transport Working With Weaker Local Authorities (WWLA) programme to identify the nature and extent of problems affecting transport performance, develop possible solutions, and agree expected improvements. 207

4 WWLA identified eight areas where action was required in the technical transport planning process, and seven areas where management actions, will be necessary to underpin performance improvements. The response of the Council to the WWLA Report has been managed through a Monitoring Board of Chief Officers and Members and is summarised below. Table 13.3: Technical Challenges Challenge T1: Over reliance on bottomup processes for programme assembly Response The LTP2 process has established a clear transportation strategy that supports the City Strategy and is itself supported by detailed thematic strategies identifying clear objectives and investment priorities. T2: Difficulties in obtaining/managing data and distilling from this a coherent explanation of progress T3: Difficulties in setting realistic yet challenging targets T4: Difficulties with distinguishing between performance indicators that reflect desired outcomes (objectives) and other indicators that describe inputs and outputs T5: Cumbersome consultation processes that delay rather than assist delivery T6: Lack of experience and expertise in progress reporting T7: A failure to explain divergence from programme and planned progress T8: Not fully capturing the benefits of joint working and learning from others The authority has made great strides in establishing good quality baseline and historic data although it is acknowledged that it will take time to reap the benefits from this effort. Setting realistic yet challenging targets is dependant to a large degree upon the quality of information available to the authority. Improvements in the baseline data will contribute to setting targets. Furthermore the Council has undertaken benchmarking across a range of indicators with other local authorities having similar transport characteristics. The process of producing the second Local Transport Plan has provided the opportunity to review performance indicators and ensure that the indicators selected will focus performance management upon the desired LTP outcomes. The Council is committed to undertaking timely consultation with residents, businesses, stakeholders and partners and a thorough consultation process has underpinned the production of the second LTP and informed the setting of objectives, investment priorities and detailed strategies. The Council is working to improve its capacity in performance reporting. Difficulties in recruiting and retaining suitable staff has reduced the level of progress in these areas but the recent appointment of a Transport Strategy and Programme Management Team Manager will help to drive improvements in this area. The Council is seeking to work with neighbouring and other local authorities to develop improved working relationships and understanding across a range of transportation issues. 208

5 Table 13.4: Management Challenges Challenge MI: Insufficient priority afforded to the APR itself and the monitoring of progress Response The Council has established a corporate monitoring process that will be used as a framework to guide the preparation of the APR. In addition the Council is committed to ensure that sufficient resources are made available to improve the quality of the APR itself as evidenced by the success of the recent APR4 and APR5. M2: Insufficient linkage between local authority transport agendas (plans and delivery) and corporate objectives M3: Corporate improvement plans stimulating large scale reorganisation diluting the focus on delivery on the ground During the process of producing the second LTP considerable effort has been made to show how it links to the overarching corporate strategy. The Council has now established a structure that draws together the former Engineering Consultancy and the transportation client into a single organisation that has enabled scheme development from concept to completion to take place under a single management structure. M4: Weak project, programme and performance management M5: Lack of cost management and prioritisation of budgets to ensure effective programme delivery M6: Insufficient recognition of the importance of communication M7: Recruiting and retaining the required skills The successful delivery of the A386, George Junction major scheme and the opportunity to increase the number of parking spaces provided within budget is evidence of the focus of the Council upon cost management issues and value for money. The LTP has established a prioritisation process that will be reviewed on an annual cycle to ensure that the programme continues to deliver value for money. The principles of value engineering will underpin scheme development. The Council very much values the developing relationship with regional government officers. The Council has also increasingly established sound working relations with other agencies for example via the joint working on the Eastern Corridor Study. The Council recognises the importance of recruiting and retaining appropriate skills in order to deliver the LTP. This has proved to be an ongoing challenge but one that the Council is determined to rise to. The recent appointment of a Transport Strategy & Programme Management Team Manager will help to drive improvements in this area Performance Indicators The LTP2 performance management programme has been developed based on advice provided in the DfT Technical Guidance on Monitoring the LTP2 Mandatory Indicators (2004) and subsequent advisory letters. 209

6 In line with the DfT technical guidance on monitoring local transport plans, this plan sets out a number of mandatory national indicators which assist the measurement of progress on the transport shared priorities, including on improving accessibility and public transport, whilst reducing problems of traffic congestion, air pollution and road safety and asset maintenance. The following 17 mandatory indicators are relevant to Plymouth: Total Killed and Seriously Injured Casualties (BVPI 99(a) Child Killed and Seriously Injured Casualties (BVPI 99(b) Total Slight Casualties (BVPI 99 (c) Footway Condition (BVPI 187) Principal Road Condition (BVPI 223) Non-Principal Classified Road Condition (BVPI 224a) Unclassified Road Condition (BVPI 224b) Public Transport Patronage (BVPI 102) Satisfaction with Local Bus Services (BVPI 104) Accessibility (Health) Public Transport Access to Derriford Hospital (LTP1) Change in Area Wide Road Traffic Mileage (LTP2) Cycling Trips (Annualised Index) (LTP3) Mode Share of Journeys to School (LTP4) Bus Punctuality (LTP5) Changes in Peak Period Traffic Flow into Urban Centres (LTP6) Air Quality: Exeter Street (LTP8) Air Quality: Mutley Plain (LTP8) The following regional indicators have been developed: SW Regional Traveline: o Completeness and Accuracy to timing points o Completeness and Accuracy to all stops o Verified Traveline data In addition the City Council has developed the following 9 local indicators to monitor the impact of LTP2 on Plymouth: Accessibility (Employment) Public Transport Access to Derriford Hospital and Science Park Satisfaction with Local Transport Information (BVPI 103) Missed Doctors Appointments due to Transport Reasons Patronage on Community Transport (Ring and Ride) Patronage on the Tamar Valley Community Railway Line Mode Share of Non-car Modes on the Torpoint Ferry Mode Share of Journeys to Work Pedestrian Trips into the City Centre Ease of Use of Rights of Way (BVPI 178) The above indicators will be used to track progress on delivery of the LTP2 strategy objectives and investment priorities. Targets have been set for each indicator that are challenging yet realistic and demonstrate achievement of the LTP2 strategy outcomes by 2010/2011. The targets are intended to be achievable without the benefits that may arise from planned major schemes, and reflect: The objectives set out in Chapter 3 The impact of the detailed strategies set out in Chapters 6 to 9 Programme prioritisation set out in Chapter 12 Past performance based on LTP1, Best Value Performance Plans, and internal monitoring of transport Evidence from historic trends and benchmarking from other authorities 210

7 A robust process for setting targets and monitoring performance against trajectories has utilised evidence from past performance during the previous LTP including evidence on trends in outcomes and investments and benchmarking with other local authorities The prioritisation process described in Chapter 12 has identified the contribution of each intervention towards achieving the LTP2 objectives through assessing the impact on each indicator. This has only considered the transportation element to each scheme and has effectively capped the level of costs in relation to benefits delivered by each intervention. This means that target setting has used realistic estimates of the benefits that can be derived from the overall programme of interventions and reduced the risks to the achievement of the targets The process has been iterative so that once initial capital and revenue programmes have been prepared it has been possible to assess the contribution that interventions will make in achieving individual objectives and targets. This has enabled robust setting of targets in the light of actual intervention programmes that are within the planning guidelines The evidence base linking past performance and level of investment will continue to be developed throughout the Plan period to improve the accuracy of the targets and the value for money achieved from set levels of investment. The prioritisation exercise will be repeated on an annual basis as part of a Stage Gate review of the benefit and costs that are provided through each intervention and ensure value for money is maximised. This will again reduce the risk associated with delivery of LTP2 outcomes Table 13.5 shows how each indicator will be used to monitor progress in the delivery of the LTP2 objectives. 211

8 Table 13.5 Cross-Referencing of LTP2 Indicators Against Objectives Improve accessibility and social inclusion Improve air quality & the environment Improve road safety Reduce the rate of growth of traffic congestion Support Plymouth s urban renaissance & sustainable growth Make maintenance more efficient and effective Improve quality of life Asset Maintenance BVPI223 - Principal Road Condition BVPI224a Non Principal Road Condition BVPI224b - Unclassified Road Condition BVPI187 - Footway Condition Road Safety BVPI99(a) - KSI Casualties BVPI99(b) - Child KSI Casualties BVPI99(c) - Slight Casualties Accessibility LTP1(a) - Accessibility (Health) Public Transport Access to Derriford Hospital LTP1(b) - Accessibility (Employment) Public Transport Access to Derriford Hospital and Science Park Missed Outpatient Appointments due to Transport Problems BVPI102 - Public Transport Patronage Public Transport BVPI104 - Bus Satisfaction LTP5 - Bus Punctuality BVPI103 - Satisfaction with Local Transport Information Patronage on Community Transport (Ring and Ride) Patronage on the Tamar Valley Community Railway Line Mode Share of Non-Car Modes on Torpoint Ferry SW Regional Traveline Targets Demand Management LTP2 - Change in Area Wide Road Traffic LTP6 - Change in Peak Period Traffic Flows to Urban Centres 212

9 Improve Accessibility and Social inclusion Improve Air Quality & the Environment Improve road safety Reduce the rate of growth of traffic congestion Support Plymouth s urban renaissance & sustainable growth Make maintenance more efficient and effective Improve quality of life Walking and Cycling LTP3 - Cycling Trips Mode Share of Journeys to Work LTP4 - Mode Share of Journeys to School BVPI178 - Ease of Use of Rights of Way Pedestrian Trips into the City Centre Air Quality LTP8 - Air Quality: Exeter Street LTP8 - Air Quality: Mutley Plain Asset Maintenance Principal Road Condition BVPI 223 Target: To maintain the percentage of the principal road network where structural maintenance should be considered at less than 8.3% throughout the LTP2 period Definition: The percentage of the local authority principal road network where structural maintenance should be considered (based on SCANNER surveys) Monitoring of LTP2 objectives: Make maintenance more efficient and effective Past Performance This indicator has been reported before in both LTP1 and recent BVPPs. BVPP monitoring of principal road condition changed from Deflectograph to TTS (TRACS Type Survey) in 2004/05, and then again to SCANNER (Surface Condition Assessment for the National Network of Roads) in 2005/06. For 2004/05 and 2005/06, the Council decided to carry out Deflectograph, TTS and SCANNER surveys in parallel, so that an ongoing comparison could be made and reported for this indicator until the end of LTP1. However, it should be noted that there has been no extensive investigation of the correlation between BV (96) TTS and either BV (96) Deflectograph or BV (96) Coarse Visual Inspection (CVI). The original intention for the principal road condition target, which was set at the beginning of LTP1, was to achieve 10% of roads requiring structural maintenance by 2005/06. However, this target was set with the caveat that it was only meaningful as long as consistent forms of measurement were applied. Subsequent changes to the methodology and updated Rules and Parameters led to a new baseline and trajectory having to be set in 2003/04 and it would now appear that the original LTP1 target was misinterpreted to be 0%, subsequently the trajectory was miscalculated for the years 2003/04 and 2004/05. In 2005/06 we will be reliant upon the SCANNER methodology under BV (223), which is not wholly compatible with previous methodologies. Thus a more meaningful target needs to be set. A 2004/05 SCANNER figure was extrapolated from the TTS data to serve as a comparison. However, this should be viewed with caution due to the differences in the measurements, additional parameters, and different weighting of results. SCANNER Surveys for Local Roads (UK Roads Board, July 2005) outlines the differences between TTS and SCANNER results in more detail, while also indicating a lack of known correlation between TTS and SCANNER. 213

10 Figure 13.3: Principal Road Condition Deflectograph and SCANNER SCANNER Deflectograph SCANNER TTS / / / / /06 Year Evidence Behind Target Expenditure on road maintenance has declined during the LTP1 period and Deflectograph data suggests that the condition of principal roads is deteriorating. 0 The Council will be seeking to target funding on highway maintenance in ways that will give the most effective return on available resources. For example we are exploring Prudential Borrowing for street lighting replacement, which will in turn, make available funding for highway maintenance. For these reasons a standstill target to maintain principal road condition at below 8.3% is both challenging and realistic. The target is also challenging because the Council only has one year s worth of principal road condition data collected using the SCANNER specification (2005/06) and one year s worth of SCANNER output derived from TTS surveys (2004/05), of which the UK Roads Board has expressed some reservations over the degree of correlation. Methodology For Monitoring Baseline: 2004/05=8.3% (SCANNER data derived from TTS survey) Calendar or Financial Year: Financial Year Reporting Frequency: Annual in LTP APR and BVPP This indicator is to be monitored in line with BVPP guidance. TTS surveys were undertaken on the principal road network in both directions in 2004/05. The 2004/05 BVPI 96 figure (39.284%) was based on TTS which, when used to determine a SCANNER output, yields an output figure of 8.3%. Actions of Plymouth City Council Finalisation of the Transport Asset Management Plan (TAMP) Delivery of capital and revenue maintenance programme, in line with the TAMP Work in partnership with Road Safety to ensure that road safety schemes, for example antiskid surfacing is undertaken at the same time as routine maintenance wherever possible 214

11 Actions of Partners and Operators Contractors to undertake monitoring of this BVPI for the Council in line with DfT, ODPM, and Audit Commission requirements for the monitoring year The Council will consider the suitability of alternative funding sources such as the recently announced PFI process for highway maintenance Potential Risks and Preventative Measures/ Solutions Risk Bad or unusual weather can severely affect the condition of roads Poor weather causing a backlog of schemes Solutions Try to undertake surveys on days with similar weather conditions in order to draw meaningful comparisons. Efficient annual programming of work Non-Principal Road Condition BVPI 224a Target: Not required in Final LTP Definition: Percentage of the non-principal classified road network where maintenance should be considered Monitoring of LTP2 objectives: Make maintenance more efficient and effective Figure 13.4: Non-Principal Road Condition 20 % of Non-Principal Roads Where Stuctural Maintenance Should Be Considered Figure based from splitting BVPI97 into BVPI 97a and 97b - data not comparable with 2002/03 figure Change in methodology from visually assessed rut depths to 'machine measured' rut depths and updated UKPMS Rules and Parameters / / / / /06 Past Performance This indicator has been reported before in both LTP1 and recent BVPPs. Prior to 2002/03, non-principal and unclassified roads were monitored as part of the same BVPI (BVPI 97). In 2002/03 BVPI 97 was split into two parts (97a & b) and data held before 2002/03 cannot be accurately compared with data after 2002/03. Also, within the period 2004/05, a change in survey methodology for non-principal roads took place, with a move away from visually assessed rut depths to machine measured rut depths, in addition to updated UKPMS Rules and Parameters at the request of DfT. It was not practical to undertake a CVI in parallel with this new survey method in 2004/05 and hence 2004/05 data bears no correlation with previous data. LTP2 targets are not required for BVPI 224a due to the lack of historical non-principal classified road SCANNER data. The Council will continue to collect CVI data for non-principal roads to aid the target setting process when required by DfT and to continue prioritising the maintenance of non-principal roads. 215

12 Evidence Behind Target A target for non-principal road condition is not required in Final LTPs due to a changeover to SCANNER surveys. There have been changes in the monitoring methodology in the past which will make setting a target challenging. When required, a target will be set taking a view of the state of the non-principal road network and available capital and revenue funding. Provisional LTP benchmarking showed that 69% of unitary authorities had not set a target (due to the change in methodology for 2005/06); 26% set a target for overall improvement. Methodology For Monitoring Baseline: NA Calendar or Financial Year: Financial Year Reporting Frequency: Annual in LTP APR and BVPP This indicator is to be monitored in line with BVPP guidance. The figure for BVPI 224a in 2005/06 onwards was derived from SCANNER surveys. Actions of Plymouth City Council Finalisation of the Transport Asset Management Plan (TAMP) Delivery of capital and revenue maintenance programme, in line with the TAMP Work in partnership with Road Safety to ensure that road safety schemes, for example antiskid surfacing is undertaken at the same time as routine maintenance wherever possible Actions of Partners and Operators Contractors to undertake monitoring of this BVPI for the Council in line with DfT, ODPM, and Audit Commission requirements for the monitoring year Potential Risks and Preventative Measures/ Solutions Risk Bad or unusual weather can severely affect the condition of roads Poor weather causing a backlog of schemes Solutions Try to undertake surveys on days with similar weather conditions in order to draw meaningful comparisons. Efficient annual programming of work 216

13 Unclassified Road Condition - BVPI 224b Target: To reduce the percentage of unclassified road where structural maintenance should be considered to 8% by 2010/11, from a baseline of 13.4% in 2003/04 Definition: Percentage of the unclassified road network where structural maintenance should be considered Monitoring of LTP2 objectives: Make maintenance more efficient and effective Past Performance This indicator has been reported before in both LTP1 and recent BVPPs. The percentage of unclassified roads where structural maintenance should be considered improved between 2003/04 and 2004/05. Since 2002/03 there have been large fluctuations in the reported figures for unclassified roads. This indicator only measures a percentage of the highway network annually, and this variability is compounded by the subjective nature of CVI surveys. Therefore the target is being based on the higher 2003/04 figure of 13.40%, rather than the lower 2004/05 figure of 7.42%. Figure 13.5: Unclassified Road Condition 16 % of Unclassified Roads Where Structual Maintenance Should Be Considered / / / / /06 Evidence Behind Target The Council will be seeking to target funding on highway maintenance in ways that will give the most effective return on available resources. Historical data shows large fluctuations in the results for BVPI 224b, which is partially due to the variable results of CVI. Therefore the trajectory is being set based upon the 2003/04 figure of 13.4% to ensure that a realistic target is produced. The 2010/11 target is for overall improvement, to reduce the figure to below 8%. Provisional LTP benchmarking showed that 51% of unitary authorities had not set a target for unclassified road condition, and 33% set a target for overall improvement. 217

14 Figure 13.6: Unclassified Road Condition Target BVPI 224b BVPI 224b Target / / / / / / / / / /11 Methodology For Monitoring Baseline: 2003/04 = 13.4% Calendar or Financial Year: Financial Year Reporting Frequency: Annual in LTP APR and BVPP Monitoring of BVPI 224b in Plymouth is based on a visual survey of a proportion of the unclassified road network using the UKPMS CVI survey method. Actions of Plymouth City Council Finalisation of the Transport Asset Management Plan (TAMP). Delivery of capital and revenue maintenance programme, in line with TAMP. Work in partnership with Road Safety to ensure that road safety schemes e.g. anti-skid surfacing is undertaken at the same time as routine maintenance wherever possible. Actions of Partners and Operators Contractors to undertake monitoring of this BVPI for the Council in line with DfT, ODPM, and Audit Commission requirements for the monitoring year. Potential Risks and Preventative Measures/ Solutions Risk Bad or unusual weather can severely affect the condition of roads Poor weather causing a backlog of schemes Variability of CVI survey and the effect on being on track from year to year Solutions Try to undertake surveys on days with similar weather conditions in order to draw meaningful comparisons. Efficient annual programming of work Target set based 2003/04 performance. Analysis of results to more effectively target unclassified road maintenance 218

15 Footway Condition BVPI 187 Target: To reduce the percentage of the category 1, 1a and 2 footway network where structural maintenance should be considered to below 21% by 2010/11, from a baseline of 23.75% in 2003/04 Definition: Percentage of the category 1, 1a and 2-footway network where structural maintenance should be considered. Footway categories are defined in the Code of Practice for Maintenance Management (Institution of Highways and Transportation, 2001) Monitoring of LTP2 objectives: Make maintenance more efficient and effective; Improve accessibility and social inclusion; Improve air quality and the environment; Improve road safety; Reduce the rate of growth of traffic congestion; Support Plymouth s urban renaissance and sustainable growth Past Performance This indicator has been reported before in both LTP1 and recent BVPPs. This indicator is based on the collection and analysis of Detailed Visual Inspection (DVI) measurements using the Rules and Parameters for UKPMS. The threshold is indicative of the need for an investigation to determine whether maintenance is needed to preserve the footway serviceability. The percentage of footways where structural maintenance should be considered has increased overall from 31.68% in 2002/03 to 43.9% in 2004/05; although in the 2003/04 baseline year, the figure was 23.75%. This indicator was originally based on all sections of footway where the Overall Condition Index was >20. From 2004/05 onwards this was changed to all sections where the Overall Condition Index was => 20. Therefore sections of footway where the Overall Condition Index =20 are now included, and footway that previously would not have required investigation for maintenance, now qualifies, and as such has produced a larger result than the original trajectory had suggested. Figure 13.7 shows that before the method for calculation changed, there was progress from 31.68% down to 23.75% between 2002/03 and 2003/04. It is not possible to correlate the result from 2004/05 (43.9%) to previous years and thus, given the uncertainty, setting a baseline on 2003/04, with a target of 21% by 2010/11 is believed to be challenging. Figure 13.7: Footway Condition % of footways exceeding threshold / / / / /06 Year 219

16 Figure 13.8 shows that past expenditure on footways maintenance decreased between 2004/05 and 2005/06. Figure 13.8: Past Expenditure on Footways Maintenance Past Expenditure on Footways Maintenance Thousands of Pounds / / / / /06 Year Evidence Behind Target The Council will be seeking to target funding on highway maintenance in ways that will give the most effective return on available resources. The 2010/11 target is a continuation of the 2007/08 target in the 2005/06 BVPP and aims for overall improvement during LTP2. It assumes that the 2004/05 is a one-off fluctuation % of footways below threshold BVPI 187 Target BVPI / / / / / / / / / /11 Year Figure 13.9: Footway Condition Target The road condition data held in the UKPMS database has been used to identify a range of footway maintenance schemes. DVI was used to identify footway resurfacing schemes. In 2004/05, 360 footway schemes were identified at a cost of 303,300. Provisional LTP benchmarking showed that 50% of unitary authorities had not set a target for footway condition, and 50% set a target for overall improvement. Methodology For Monitoring Baseline: 2003/04 = 23.75% Calendar or Financial Year: Financial Year 220

17 Reporting Frequency: Annual in LTP APR and BVPP This indicator is to be monitored in line with BVPP guidance. It is based on the collection and analysis of Detailed Visual Inspection (DVI) measurements. It is designed to provide the percentage length of the footway network with a Footway Condition Index greater than a defined threshold value. Actions of Plymouth City Council Finalisation of the Transport Asset Management Plan (TAMP) Delivery of capital and revenue maintenance programme, in line with the TAMP Actions of Partners and Operators Contractors to undertake monitoring of this BVPI for the Council in line with DfT, ODPM, and Audit Commission requirements for the monitoring year Potential Risks and Preventative Measures/ Solutions Risk Poor weather causing a backlog of schemes Solutions Efficient annual programming of work 221

18 Road Safety Total Killed and Seriously Injured Casualties BVPI 99(a) Target: To achieve a 60% reduction in the average by 2010 (56 by the year 2010) Definition: Number of people killed or seriously injured (KSI) in road traffic collisions Monitoring of LTP2 objectives: Improve road safety Past Performance This indicator has been reported before in both LTP1 and recent BVPPs. The City Council has already achieved the DfT s national road safety target to reduce total KSIs by 40% by 2010, based on the average of the KSI casualties from (Figure 13.10). The implementation of Road Safety Education, Training and Publicity, Engineering and Enforcement measures have made a significant impact in reducing casualties against a background of increasing road user mileage. Figure 13.10: Killed or Seriously Injured (KSI) Casualties New KSI Target Old KSI Target KSI Actual baseline avg The trend for pedestrian and pedal cycle KSIs is downward compared to the baseline. Motorcycle KSIs are on average showing a downward trend from the 1994/98 average although there is concern that progress may be stalling. Car user KSIs in 2004 are below the five-year average of 26, and continue to be below the 1994/98 average. Evidence Behind Target The City Council is pleased with the success of achieving the National Road Safety targets but also recognises the need to further improve safety by stretching the 2010 targets. The City Council s new targets have been considered and set as a result of careful analysis of casualty data and due regard for plans concerning modal shift, growth and development in the City. The new target for KSI casualties is 56 by the year 2010, corresponding to a 60% reduction based on the 1994/98 average. Comparative analysis of Unitary authority Provisional LTPs shows that the City Council s new target is the second most stretching, only exceeded by Blackburn & Darwen s 65% reduction in total KSI target (Figure 13.11). The City Council s target is also the most stretching Provisional LTP Total KSI target for the South West. 222

19 80% 70% 60% 50% 40% 30% 20% 10% 0% 65% 60% 60% 55% 52% 45% 45% 45% 44% 42% 42% 40% 40% 40% 40% 40% 40% Blackburn & Darwen 40% Windsor & Maidenhead 40% Greater Nottingham (Joint) 40% Central Leicestershire (Joint) 40% Slough 40% West Berkshire 40% Derby (Joint) 40% Hartlepool Target KSIs % Reduction to % 40% 40% 40% 39% Milton Keynes South East Dorset, Bournemouth, Poole (Joint) Stockton-on-Tees Telford & Wrekin Torbay Wokingham Luton & Dunstable (Joint) Figure 13.11: Comparison KSI Targets for Unitary Authorities Key interventions to support the target are the Motorcyclist Safety Engineering Programme, Local Safety Schemes Programme, Safety Barrier Programme, school travel plans and safer crossings in deprived wards. In total 3.0 million of capital funding has been prioritised for road safety schemes from the 17.2 million Planning Guidance. The spend of an additional million through revised funding from the Safety Camera Partnership from 2007/08 onwards will be based on a separate business plan which will identify the split between capital schemes and revenue funding of road safety initiatives. The capital prioritisation process has also shown that other transport scheme types also contribute towards the road safety objective. For example there are schemes within the Demand Management and Walking/ Cycling category that help address the Road Safety shared priority in addition to road safety schemes. Revenue funding over LTP2 will remain the same in real terms to support road safety initiatives. Figure 13.12: Road Safety: Past and Future Capital Spend 1,600,000 1,400,000 Expenditure 1,200,000 1,000, , , ,000 LTP1: Average Capital Spend Per Year on Road Safety LTP2: Average Capital Spend Per Year on Road Safety LTP1: Road Safety Capital (Local Safety Schemes and Road Crossings) Spend Per Year LTP2: Road Safety Capital Spend Per Year 200, / / / / / / / / / /11 Year 223

20 The target is challenging because the 2010 target has been stretched beyond the national road safety targets but with similar levels of funding to LTP1. Figure shows that the average capital spend per year during LTP1 was 941,600. For the LTP2 period, in total million has been prioritised for road safety schemes (including funding from the Safety Camera Partnership), equating to an average figure of 951,800 per year. The target is realistic taking into account the excellent progress made to date in reducing KSIs, the contribution that other scheme types can make towards improving road safety, and the analysis which has been undertaken to produce this target. Methodology For Monitoring Baseline: = 139 Calendar or Financial Year: Calendar Year Reporting Frequency: Annual in LTP APR and Best Value Performance Plan Total KSI statistics are obtained from STATS19, which is the system for collecting information on injury accidents. A range of measures and mechanisms are in place or under development to improve the quantity and quality of data captured to show progress and help to target resources and programmes. The City Council will be responsive to developing situations but see a positive and proactive programme as the best way to deliver objectives. Actions of Plymouth City Council Delivery of Motorcyclist Safety Engineering Programme and Local Safety Schemes Continued evaluation of scheme successes and casualty statistics in programme development Continued undertaking of Road Safety Audits Ensure all new cycle route facilities are introduced only after being subject to all stages of safety audit Ensure roads are properly maintained to reduce accident risk Ensure the provision of sufficient resources for training, education and publicity Continued enforcement of on-street parking, particularly parking prohibitions and restrictions Greater understanding of the root cause of pedestrian, cycling and powered two wheeler accidents Continue to work in partnership with Devon and Cornwall Safety Camera Partnership Actions of Partners and Operators For Devon & Cornwall Constabulary to continue to work in close partnership with PCC and help to deliver the City s Road Safety Strategy and reduce casualties Potential Risks and Preventative Measures/ Solutions Risk Continued reduction in accidents will become more difficult as they become more dispersed as cluster sites are treated Continued growth in motorcycle use Solutions Continue to implement safety and education measures To implement the program of work drawn up for safety including education, training and publicity regarding motorcycle use and safety 224

21 Child Killed and Seriously Injured Casualties BVPI 99(b) Target: To achieve an 80% reduction in the average by 2010 (7 by the year 2010) Definition: Number of children (aged under 16 years) killed or seriously injured (KSI) in road traffic collisions Monitoring of LTP2 objectives: Improve road safety; Improve accessibility and social inclusion Past Performance This indicator has been reported before in both LTP1 and recent BVPPs. The City Council has already achieved the DfT s national road safety target to reduce child KSI S by 50% by 2010, based on the average of the child KSI casualties from (Figure 13.13). Figure 13.13: Child KSI Casualties New KSI Target Old KSI Target KSI Actual Baseline Evidence Behind Target The City Council is pleased with the success of achieving the National Road Safety targets but also recognises the need to further improve safety by stretching the 2010 targets. The City Council s new targets have been considered and set as a result of careful analysis of casualty data and due regard for plans concerning modal shift, growth and development in the City. The new target for Child KSI is 7 by the year 2010, corresponding to an 80% reduction based on the 1994/98 average. Comparative analysis of Unitary authority Provisional LTPs shows that the City Council s 80% reduction in the average by 2010 target is the joint most stretching child KSI target (Figure 13.14). It is also the most stretching for the South West, where most other authorities have adopted the national 50% reduction in the average by 2010 target. Key interventions to support the target include Local Safety Schemes, the Child Road Safety Engineering Programme, and School Travel Plan schemes. In total 3.0 million of capital funding has been prioritised for road safety schemes from the 17.2 million Planning Guidance. The spend of an additional million through revised funding from the Safety Camera Partnership from 2007/08 onwards will be based on a separate business plan which will identify the split between capital schemes and revenue funding of road safety initiatives. The capital prioritisation process has also shown that other transport schemes also contribute towards the road safety objective. For example there are schemes within the Demand Management and Walking/ Cycling category, which help address the Road Safety, shared priority in addition to road safety schemes. Revenue funding over LTP2 will remain the same in real terms to support road safety initiatives. 225

22 Figure 13.14: Comparison Child KSI Targets for Unitary Authorities 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 80% 80% 60% 60% 54% 51% 50% 50% 50% 50% 50% 50% 50% 50% Blackburn & Darwen 50% Brighton & Hove 50% Windsor & Maidenhead 50% Blackpool 50% East Riding 50% Greater Nottingham (Joint) 50% Milton Keynes 50% South East Dorset, Bournemouth, Poole (Joint) 50% Southend-on-sea Target KSIs % Reduction to % 50% 48% 42% 40% Swindon Thurrock Wokingham Luton & Dunstable (Joint) Torbay Figure 13.15: Road Safety: Past and Future Capital Spend 1,600,000 1,400,000 Expenditure 1,200,000 1,000, , , ,000 LTP1: Average Capital Spend Per Year on Road Safety LTP2: Average Capital Spend Per Year on Road Safety LTP1: Road Safety Capital (Local Safety Schemes and Road Crossings) Spend Per Year LTP2: Road Safety Capital Spend Per Year 200, / / / / / / / / / /11 Year The target is challenging because the 2010 target has been stretched beyond that of the national road safety targets but with similar levels of funding to LTP1. Figure shows that the average capital spend per year during LTP1 was 941,600. For the LTP2 period, in total million has been prioritised for road safety schemes (including funding from the Safety Camera Partnership), equating to an average figure of 951,800 per year. The target is realistic taking into account the excellent progress made to date in reducing child KSIs, the contribution that other scheme types make towards improving road safety, and the analysis which has been undertaken to produce this target. 226

23 Methodology For Monitoring Baseline: = 33 Calendar or Financial Year: Calendar Year Reporting Frequency: Annual in LTP APR and Best Value Performance Plan Child KSI statistics are obtained from STATS19, which is the system for collecting information on injury accidents. A range of measures and mechanisms are in place or development to improve the quantity and quality of data captured to show progress and help to target resources and programmes. The City Council will be responsive to developing situations but see a positive and proactive programme as the best way to deliver objectives. Actions of Plymouth City Council Delivery of Local Safety Schemes, the Child Road Safety Engineering Programme, and School Travel Plan Schemes Continued evaluation of scheme successes and casualty statistics in programme development Continued undertaking of Road Safety Audits Ensure all new cycle route facilities are introduced only after being subject to all stages of safety audit Ensure roads are properly maintained to reduce accident risk Ensure the provision of sufficient resources for training, education and publicity Greater understanding of the root cause of pedestrian, cycling and powered two wheeler accidents Implementation of Child Casualty Reduction Scheme programme Continue to work in partnership with Devon and Cornwall Safety Camera Partnership Maintaining/enhance existing scholars bus fare concessions Development and implementation of school travel plans and Safer Routes to Schools schemes Actions of Partners and Operators For Devon & Cornwall Constabulary to continue to work in close partnership with PCC and help to deliver the City s Road Safety Strategy and reduce casualties Potential Risks and Preventative Measures/ Solutions Risk Continued progress will become more difficult as accidents become more dispersed, and more accident cluster sites are treated Solutions Continue to implement safety measures and education of the public 227

24 Total Slight Casualties BVPI 99(c) Target: To achieve a 20% reduction in the average by 2010 (890 by the year 2010) Definition: Number of people slightly injured in road traffic collisions Monitoring of LTP2 objectives: Improve road safety Past Performance This indicator has been reported before in both LTP1 and recent BVPPs. The City Council has already achieved the DfT s national road safety target to reduce total slight casualties 10% by 2010, based on the average of the casualties from Figure shows slight casualties by road user type. Figure 13.16: Historical Slight Casualties Data by Road User Type Slight Casualties Number /98 Average Year Pedestrians Pedal Cyclists Motorcycles Car Users Other Evidence Behind Target The Authority is pleased with these successes to date but also recognises the need to further improve safety by stretching the 2010 targets. The new target for Total Slight Casualties is 890 by 2010 corresponding to a 20% reduction based on the average (Figure 13.17). Figure 13.17: Slight Casualties Slight casualties 1994/98 baseline Target New Target Comparative analysis of Provisional LTPs shows that Plymouth City Council s 20% reduction in the average by 2010 is the joint third most stretching Slight Casualty Provisional LTP 228

25 target and exceeds the national target. Against an increasing trend in area wide vehicle kilometres, this target will be challenging to achieve. Furthermore, Plymouth City Council s target is the most stretching in the South West where most authorities have chosen to adopt targets of 10% reduction average to Figure 13.18: Comparison Slight Casualties Targets for Unitary Authorities Target Slight Casualties % Reduction to % 45% 40% 35% 30% 25% 20% 15% 10% 5% 0% 41% Luton & Dunstable (Joint) 35% Blackburn & Darwen 20% Plymouth 20% Windsor & Maidenhead 11% Blackpool 11% North Lincolnshire 10% Darlington 10% East Riding 10% Medway 10% Milton Keynes 10% South East Dorset, Bournemouth, Poole (Joint) 10% Stockton-on-Tees 10% Thurrock 10% Torbay 10% Warrington 10% Wokingham 10% City of York 6% Central Leicestershire (Joint) Key interventions to support the target include the Motorcyclist Safety Engineering Programme and Local Safety Schemes. In total 3.0 million of capital funding has been prioritised for road safety schemes from the 17.2 million Planning Guidance. The spend of an additional million through revised funding from the Safety Camera Partnership from 2007/08 onwards will be based on a separate business plan which will identify the split between capital schemes and revenue funding of road safety initiatives. The capital prioritisation process has shown that other transport schemes also contribute towards the road safety objective. For example there are schemes within the Demand Management and Walking/ Cycling category, which help address the Road Safety Shared Priority in addition to Road Safety schemes. Revenue funding over LTP2 will remain the same in real terms to support road safety initiatives. 1,600,000 1,400,000 Expenditure 1,200,000 1,000, , , ,000 LTP1: Average Capital Spend Per Year on Road Safety LTP2: Average Capital Spend Per Year on Road Safety LTP1: Road Safety Capital (Local Safety Schemes and Road Crossings) Spend Per Year LTP2: Road Safety Capital Spend Per Year 200, / / / / / / / / / /11 Year Figure 13.19: Road Safety: Past and Future Capital Spend 229

11. Managing our Transport Assets

11. Managing our Transport Assets 11. Managing our Transport Assets 11.1 The Need for an Asset Management Plan 11.1.1 A key challenge is to make transport assets work for the city in a way which fully contributes to the delivery of corporate

More information

11. Monitoring. 11.1 Performance monitoring in LTP2

11. Monitoring. 11.1 Performance monitoring in LTP2 178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the

More information

RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11

RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11 S RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11 22 nd OCTOBER 2004 KEY ISSUES The Transportation Select Committee has asked all local transportation

More information

Bedford s Network Management Strategy (2011 2021) November 2010

Bedford s Network Management Strategy (2011 2021) November 2010 Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national

More information

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document)

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document) SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW (reproduced review document) Highway Network Management Best Value Review Report of the Member Panel Summary of Key Findings Leicestershire County Council

More information

Reported Road Casualties Great Britain: 2013 Annual Report

Reported Road Casualties Great Britain: 2013 Annual Report Reported Road Casualties Great Britain: 2013 Annual Report Focus on pedal cyclists Key findings The key findings from this article include: Pedal cyclist deaths have seen a long-term fall, but have fluctuated

More information

Performance Monitoring

Performance Monitoring 7 Chapter 17 Performance Monitoring Performance Monitoring Contents: 17.1 Introduction 17.2 A Wider Perspective 17.3 Requirements for a Good Performance Indicator 17.4 Types of Performance Monitoring 17.5

More information

1. The consultation seeks views on the vision, targets and measures for improving road safety in Great Britain for the period beyond 2010.

1. The consultation seeks views on the vision, targets and measures for improving road safety in Great Britain for the period beyond 2010. Executive Summary 1. The consultation seeks views on the vision, targets and measures for improving road safety in Great Britain for the period beyond 2010. 2. We have made good progress in reducing road

More information

Child Road Safety Audit for South Gloucestershire 2009-2011

Child Road Safety Audit for South Gloucestershire 2009-2011 Child Road Safety Audit for South Gloucestershire 9 - August 9 Contents Page Foreword Executive Summary. Introduction. Review of the Action Plan. Summary of Casualty Statistics 9. Child Casualty Trends.

More information

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08 Performance Detailed Report May 2008 Review of Performance Management Audit 2007/08 External audit is an essential element in the process of accountability for public money and makes an important contribution

More information

Slough Borough Council. Highway Asset Management Strategy

Slough Borough Council. Highway Asset Management Strategy Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand

More information

Cycle Strategy 2006 2011

Cycle Strategy 2006 2011 Cycle Strategy 2006 2011 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 POLICY BACKGROUND... 2 3 BACKGROUND... 6 4 MAIN OBJECTIVES... 8 5 TARGETS... 9 6 THE CYCLE NETWORK... 10 7 CONCLUSION... 13 Appendix A:

More information

Cycling Demonstration Towns Development of Benefit-Cost Ratios

Cycling Demonstration Towns Development of Benefit-Cost Ratios Cycling Demonstration Towns Development of Benefit-Cost Ratios Executive summary 1. In 2005, Cycling England launched a Cycling Demonstration Town programme to invest in measures to stimulate increased

More information

Highway Infrastructure Asset Management Strategy

Highway Infrastructure Asset Management Strategy Highway Infrastructure Asset Management Strategy City Development Highways and Transportation Highways Asset Management Page i Asset Management Strategic Documents Contents Page Foreword 4. 1 Introduction)...)))))))))))))))))))))))...

More information

Section Description Page

Section Description Page Foreword This Transport Asset Management Plans (TAMP) sets out the County Council's proposed 15 year strategy to maintain and improve the transport asset network in Lancashire between now and 2029. Lancashire

More information

Road Safety Plan 2010

Road Safety Plan 2010 Road Safety Plan 2 Road Safety Plan C. A. Hudson, CBE Chief Executive St.Helens Council Town Hall Victoria Square St.Helens Merseyside WA HP December 2 St.Helens Council This document has been produced

More information

Highway Network Management Plan 2008 to 2017

Highway Network Management Plan 2008 to 2017 Herefordshire Council Environment Directorate Highway Network Management Plan 2008 to 2017 Michael Hainge Director of Environment Brockington, Hafod Road, Hereford March 2008 1 Table of Contents 1 Executive

More information

Healthwatch Factsheet

Healthwatch Factsheet Healthwatch Factsheet Independent Complaints Advocacy Service What is the funding available to local authorities for the provision of NHS complaints advocacy? Clause 185 of the Health & Social Care Bill

More information

Review of 20 mph zones in London Boroughs. by D C Webster and R E Layfield. Published Project Report PPR243

Review of 20 mph zones in London Boroughs. by D C Webster and R E Layfield. Published Project Report PPR243 Review of 20 mph zones in London Boroughs by D C Webster and R E Layfield Published Project Report PPR243 Review of 20 mph zones in London Boroughs by D C Webster and R E Layfield PUBLISHED PROJECT REPORT

More information

Oxfordshire Local Transport Plan 2011-2030 Revised April 2012. Objective 3 Reduce casualties and the dangers associated with travel

Oxfordshire Local Transport Plan 2011-2030 Revised April 2012. Objective 3 Reduce casualties and the dangers associated with travel 6. Road Safety Objective 3 Reduce casualties and the dangers associated with travel Road safety continues to be a core priority both nationally and locally reflecting the very high human and other costs

More information

2014/15 Performance Measures and Targets

2014/15 Performance Measures and Targets Surface Transport Panel Date: 9 April 2014 Item 6: formance Measures and Targets This report will be considered in public 1 Summary 1.1 The purpose of this paper is to provide the Panel with an overview

More information

APPENDIX K: HIGHWAY MAINTENANCE STRATEGY

APPENDIX K: HIGHWAY MAINTENANCE STRATEGY APPENDIX K: HIGHWAY MAINTENANCE STRATEGY K1 1. INTRODUCTION 2. VISION HIGHWAY MAINTENANCE STRATEGY 2004-2011 3. EXECUTIVE SUMMARY 4. OBJECTIVES 5. HIGHWAY AUTHORITY OBLIGATIONS 5.1 Legislation 5.2 Transport

More information

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK July 2013 1 P age Contents Page 1.0 Definition 3 2.0 Context 3 3.0 Purpose and aim of the policy 4 4.0 Policy Statement 4 5.0 Framework for Performance Management

More information

TRANSPORT ASSET MANAGEMENT PLAN STRATEGIC VERSION. Residents & Visitor Services

TRANSPORT ASSET MANAGEMENT PLAN STRATEGIC VERSION. Residents & Visitor Services TRANSPORT ASSET MANAGEMENT PLAN STRATEGIC VERSION Foreword I am very pleased to be able to introduce Torbay Council s first published Strategic dealing with the Highway Asset which records our strategies

More information

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

Benchmarking Services Report

Benchmarking Services Report Benchmarking Services Report Prepared by: Nancy Weir and Richard Beevers Date: March 2011 Contents 1. Executive Summary 3 2. Introduction, Objectives and Method 4 2.1 Introduction 4 2.2 Objectives 5 2.3

More information

Welsh Fire and Rescue Services Road Safety Strategy 2015-2020

Welsh Fire and Rescue Services Road Safety Strategy 2015-2020 All Wales Call Challenge Welsh Fire and Rescue Services Road Safety Strategy 2015-2020 GWASANAETH TÂN AC ACHUB Canolbarth a Gorllewin Cymru Mid and West Wales FIRE AND RESCUE SERVICE 2 Contents Executive

More information

Performance Management Framework

Performance Management Framework Purpose of the framework: To explain how we manage in Poole. It applies to all directly managed services of the Council. Introduction: Effective management at the council will: Ensure our goals are prioritised

More information

CORPORATE TRAVEL PLAN. Key Messages

CORPORATE TRAVEL PLAN. Key Messages CORPORATE TRAVEL PLAN Key Messages Version 1.0 December 2010 Not protectively marked The aims and benefits of the corporate travel plan Our travel plan is a strategic management tool aimed at better managing

More information

How To Develop A Balanced Transport System In Devon

How To Develop A Balanced Transport System In Devon Devon Structure Plan First Review - 1995 to 2011 7 Transportation (T Policies) Explanatory Memorandum (September 1999) (Policies and Proposals adopted February 1999) 7. TRANSPORTATION 7.1 Transportation

More information

Charnwood Borough Council. Corporate Performance Management Framework

Charnwood Borough Council. Corporate Performance Management Framework Charnwood Borough Council Corporate Performance Management Framework Contents 1 Introduction... 1 2 Background... 1 3 Role of the Performance Team... 2 4 Charnwood Framework... 2 4.1 Corporate Plan...2

More information

STAFFORDSHIRE COUNTY COUNCIL ROAD CASUALTY REVIEW

STAFFORDSHIRE COUNTY COUNCIL ROAD CASUALTY REVIEW 223/9/213 STAFFORDSHIRE COUNTY COUNCIL ROAD CASUALTY REVIEW 212 STAFFORDSHIRE COUNTY COUNCIL ROAD CASUALTY REVIEW 212 Contents 1. Accident and Casualty Statistics 2. Introduction 3. Long Term Progress/Casualty

More information

DEVELOPING KPIS THAT DRIVE PROCESS SAFETY IMPROVEMENT

DEVELOPING KPIS THAT DRIVE PROCESS SAFETY IMPROVEMENT DEVELOPING KPIS THAT DRIVE PROCESS SAFETY IMPROVEMENT Megan Brown Lloyds Register EMEA, Aberdeen, UK A case study is provided describing Lloyd s Register s development of a set of Key Performance Indicators

More information

Better Bus Area Monitoring and Evaluation Framework

Better Bus Area Monitoring and Evaluation Framework Do Better Bus Area Monitoring and Evaluation Framework March 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text

More information

Reported Road Casualties Great Britain: 2013. Annual Report. File: 69282_Junctions_6_Sheet Client: TFL. Size: 450x300 Date: 15/10/13

Reported Road Casualties Great Britain: 2013. Annual Report. File: 69282_Junctions_6_Sheet Client: TFL. Size: 450x300 Date: 15/10/13 Reported Road Casualties Great Britain: 2013 Annual Report File: 69282_Junctions_6_Sheet Client: TFL Op: Steve AMV Job No: Publication: 6 Sheet Size: 450x300 Date: 15/10/13 Page:1 DEPARTMENT FOR TRANSPORT

More information

Cllr Kath Hartley, Putting Passengers First

Cllr Kath Hartley, Putting Passengers First Agenda Item No. 7 Meeting: Putting Passengers First Committee Date: 20 October 2014 From: Subject: Lead Member: Director of Operations Service Delivery Dashboard Cllr Kath Hartley, Putting Passengers First

More information

Road Casualties in Kent. Annual review 2014. Published August 2015

Road Casualties in Kent. Annual review 2014. Published August 2015 Road Casualties in Kent Annual review 2014 Published August 2015 Introduction Foreword; 'A comparison of the five year baseline average (2004-08) with the latest 3 year average (2012-14) has been carried

More information

HIGHWAY ASSET MANAGEMENT STRATEGY 2015

HIGHWAY ASSET MANAGEMENT STRATEGY 2015 HIGHWAY ASSET MANAGEMENT STRATEGY 2015 0 Contents Foreword... 2 Executive Summary... 3 1.0 Highway Asset Management... 4 2.0 What is a Highway Asset... 7 3.0 Why and How we Manage Highway Assets... 8 4.0

More information

Vision for Salisbury Quality Bus Partnership. 25 July 2012

Vision for Salisbury Quality Bus Partnership. 25 July 2012 Vision for Salisbury Quality Bus Partnership 25 July 2012 Vision for Salisbury Quality Bus Partnership Signed on 25 July 2012 Sir Christopher Benson J.P., D.L. Chairman... Salisbury Vision Partnership

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Transport and Highways June 2013 Asset Management Strategy (June 2013) Page 1 of 10 CONTENTS INTRODUCTION 3 SECTION 1: WHY ASSET MANAGEMENT 4 1.1 Background 4 1.2 Strategic Framework

More information

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Committee and Date Cabinet 14 th October 2015 Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Responsible Officer

More information

Monitoring and evaluation of walking and cycling (draft)

Monitoring and evaluation of walking and cycling (draft) Sustrans Design Manual Chapter 16 Monitoring and evaluation of walking and cycling (draft) November 2014 September 2014 1 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

A9 Data Monitoring Report

A9 Data Monitoring Report A9 Data Monitoring Report Content 1. Overview 2. Purpose 3. Baseline Statistics from Vehicle Speed and Speed Enforcement Summary Report 2012 4. Casualty Analysis 5. Vehicle Speed Data 6. Incident Frequency

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX C - 59 Speed Limit Policy Isle of Wight Council June 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1

More information

Performance Management: Targets and Indicators

Performance Management: Targets and Indicators TARGETS AND INDICATORS CHAPTER 15 CHAPTER 15 Performance Management: s and Indicators 15.1 Introduction A crucial element of the LTP is performance management. To fulfi l this role, it is necessary to

More information

Environment Committee 11 January 2016

Environment Committee 11 January 2016 Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment

More information

An analysis of collisions & casualties: 18 months pre and post launch Dorset County Council

An analysis of collisions & casualties: 18 months pre and post launch Dorset County Council An analysis of collisions & casualties: 18 months pre and post launch Dorset County Council Completed by Michael Potter October 2011 m.potter@dorsetcc.gov.uk 1 Figures detailed in this report have been

More information

Plymouth Council & Asset Management

Plymouth Council & Asset Management Plymouth Council & Asset Management Plymouth City Council is committed to improving the condition of its carriageways and has demonstrated this graphically by pledging to spend 20m over and above any DfT/central

More information

Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy

Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy Section 8 Output monitoring Inputs Customer requirements Safety standards Outputs and funding SRA and Government Policy Network stewardship strategy Asset and operational policies Maintenance & renewal

More information

2016-2021 Highway Asset Management Strategy

2016-2021 Highway Asset Management Strategy 2016-2021 Highway Asset Management Strategy Barnsley MBC 2016-2021 v0.1 0 BARNSLEY COUNCIL ASSET MANAGEMENT IMPLEMENTATION STRATEGY Contents 1.0 Introduction 2 Page 2.0 Legislative Requirements 2 3.0 Planning

More information

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective

More information

Review of Transport Asset Management Plans For the Department for Transport

Review of Transport Asset Management Plans For the Department for Transport Review of Transport Asset Management Plans For the Department for Transport January 2008 Executive Summary Local Transport Plan guidance encourages local authorities to develop Transport Asset Management

More information

PERFORMANCE REPORT Quarter 2 2014/15

PERFORMANCE REPORT Quarter 2 2014/15 PERFORMANCE REPORT Quarter 2 2014/15 CONTENTS 1. RELIABILITY... 3 2. NETWORK DISRUPTION... 9 3. TRAFFIC VOLUMES... 15 4. TRAFFIC SPEEDS... 17 5. ROAD SAFETY... 18 6. ASSET AVAILABILITY... 19 7. STATE OF

More information

Highway Asset Management Strategy

Highway Asset Management Strategy September 2015 SECTION DESCRIPTION 1 Foreword by Councillor Simon Jones, Portfolio Holder for Highways and Transport. PAGE 3 2 ASSET MANAGEMENT POLICY 3 3 ALIGNMENT TO SHROPSHIRE CORPORATE OBJECTIVES 5

More information

council s Budget and Financial Planning Framework

council s Budget and Financial Planning Framework Basildon District Council Financial Planning Framework 1. Introduction The Financial Planning Framework underpins the Council s Medium Term Financial Strategy and sets out the financial planning processes

More information

Transport Mobility Management: Small Changes - Big Impacts

Transport Mobility Management: Small Changes - Big Impacts Transport Mobility Management: Small Changes - Big Impacts Understanding TMM in the Urban Context Damian PRICE and Amy LEATHER Abstract Although Transport Mobility Management (TMM) is still considered

More information

Highway Asset Management Strategy

Highway Asset Management Strategy w Highway Asset Management Strategy May 2014 - Version 2 Page 5 Surrey County Council Asset Management Strategy 1 Priorities, Vision and Objectives 1.1 Surrey County Council (SCC) recognises the importance

More information

3. OPERATING COMPANY'S ANNUAL ROAD SAFETY REVIEW 1

3. OPERATING COMPANY'S ANNUAL ROAD SAFETY REVIEW 1 SCOTTISH MINISTERS' REQUIREMENTS 1. SCHEDULE 8 PART 3 ROAD SAFETY AND ACCIDENT INVESTIGATION AND PREVENTION CONTENTS Page No. 1. GENERAL 1 1.1 Introduction 1 2. ROUTE SAFETY FILES 1 3. OPERATING COMPANY'S

More information

Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013

Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013 1 Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013 1. Introduction 1.1 The Service s key responsibilities are: o The achievement of proper and effective

More information

Network Management & Congestion Strategy

Network Management & Congestion Strategy Network Management & Congestion Strategy ENVIRONMENT & REGENERATION Luton Borough Council Department of Environment and Regeneration Network Management and Congestion Strategy for Luton 2008 to 2012 Mehmood

More information

Transport Asset Management Plan. Worcestershire Local Transport Plan 3. Worcestershire Local Transport Plan 3

Transport Asset Management Plan. Worcestershire Local Transport Plan 3. Worcestershire Local Transport Plan 3 Worcestershire Local Transport Plan 3 Worcestershire Local Transport Plan 3 Transport Asset Management Plan Find out more online: www.worcestershire.gov.uk/ltp3 Definition of Transport Asset Management...

More information

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION 2013-14 5 JULY 2013. Department for Culture, Media & Sport. The rural broadband programme

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION 2013-14 5 JULY 2013. Department for Culture, Media & Sport. The rural broadband programme REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION 2013-14 5 JULY 2013 Department for Culture, Media & Sport The rural broadband programme 4 Key facts The rural broadband programme Key facts

More information

Appendix 1: Performance Management Guidance

Appendix 1: Performance Management Guidance Appendix 1: Performance Management Guidance The approach to Performance Management as outlined in the Strategy is to be rolled out principally by Heads of Service as part of mainstream service management.

More information

7 Guiding delivery - next steps: efficient transport network management

7 Guiding delivery - next steps: efficient transport network management 7 Guiding delivery - next steps: efficient transport network management Council Plan priorities 2011-2014: making places easier to reach; a resilient economy Making the best use of existing roads for the

More information

Transport Asset Management Plan. 2nd Edition

Transport Asset Management Plan. 2nd Edition Transport Asset Management Plan 2nd Edition Contents 1 Chapter 1 Introduction 6 1.1 Background 6 1.2 Goals And Objectives 7 1.3 What Is Asset Management 8 1.4 Why Do We Need A TAMP 9 1.5 Where We Are Now

More information

Kingston Upon Hull City Council. Network Management Plan. April 2009. 22 Trinity Lane, Beverley. East Riding of Yorkshire.

Kingston Upon Hull City Council. Network Management Plan. April 2009. 22 Trinity Lane, Beverley. East Riding of Yorkshire. Kingston Upon Hull City Council April 2009 22 Trinity Lane, Beverley. East Riding of Yorkshire. HU17 0DY Tel. 01482 679911 www.local-transport-projects.co.uk Registered No. 5295328 NETWORK MANAGEMENT PLAN

More information

Policy and Scrutiny Open Report on behalf of Richard Wills, Executive Director for Environment and Economy. Highways and Transport Scrutiny Committee

Policy and Scrutiny Open Report on behalf of Richard Wills, Executive Director for Environment and Economy. Highways and Transport Scrutiny Committee Agenda Item 9 Policy and Scrutiny Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Date: 01 June 2015 Subject: Decision Key decision? Reference: Summary:

More information

NORTH EAST Regional Road Safety Resource

NORTH EAST Regional Road Safety Resource NORTH EAST Regional Road Safety Resource Project Report: 1. Regional Overview of Pedal Cycle Accidents 2005 2007. Produced May 2008. Natalie Goodman Project is supported by the Department of Transport.

More information

136 deaths in 2007 (Latest figures available) UK (129 in England) 2,458 serious injuries in 2007 in the UK source- National Office of Statistics

136 deaths in 2007 (Latest figures available) UK (129 in England) 2,458 serious injuries in 2007 in the UK source- National Office of Statistics Cycle facts to arm and protect DEATHS AND INJURIES Time: 136 deaths in 2007 (Latest figures available) UK (129 in England) 2,458 serious injuries in 2007 in the UK source- National Office of Statistics

More information

Leicestershire County Council Transport Trends in Leicestershire 2014. Transport Data and Intelligence (TDI)

Leicestershire County Council Transport Trends in Leicestershire 2014. Transport Data and Intelligence (TDI) Leicestershire County Council Transport Trends in Leicestershire 2014 Transport Data and Intelligence (TDI) Table of Contents Contents List of Tables... 3 List of Figures... 3 Overview... 5 Traffic Growth...

More information

Construction Logistics Plan Guidance

Construction Logistics Plan Guidance Construction Logistics Plan Guidance For planners MAYOR OF LONDON Transport for London Section 1 Introduction Contents Section 1 Introduction 3 Section 2 Policy background 6 Section 3 Typical contents

More information

Note the Chief Internal Auditor s findings to date and gain assurance from Officers that key issues raised are being addressed.

Note the Chief Internal Auditor s findings to date and gain assurance from Officers that key issues raised are being addressed. Agenda Item No: 9 To: Joint Audit Committee Date: 24 September 2014 By: Chief Internal Auditor Title: Internal Audit Update Report 2014-15 Purpose of Report: The purpose of this report is to give an opinion

More information

Hertsmere Borough Council. Data Quality Strategy. December 2009 1

Hertsmere Borough Council. Data Quality Strategy. December 2009 1 Hertsmere Borough Council Data Quality Strategy December 2009 1 INTRODUCTION Public services need reliable, accurate and timely information with which to manage services, inform users and account for performance.

More information

The Region s Transport Authority

The Region s Transport Authority Agenda Item No. 12 The Region s Transport Authority Meeting: Integrated Transport Authority Date: Monday 28 April 2014 From: Subject: Lead Member: Head of Sustainability Cycle Charter Fair, Accessible

More information

Deaths/injuries in motor vehicle crashes per million hours spent travelling, July 2008 June 2012 (All ages) Mode of travel

Deaths/injuries in motor vehicle crashes per million hours spent travelling, July 2008 June 2012 (All ages) Mode of travel Cyclists CRASH STATISTICS FOR THE YEAR ENDED 31 DECEMBER 212 Prepared by the Ministry of Transport CRASH FACTSHEET November 213 Cyclists have a number of risk factors that do not affect car drivers. The

More information

PERFORMANCE DATA QUALITY POLICY

PERFORMANCE DATA QUALITY POLICY PERFORMANCE DATA QUALITY POLICY 2007 / 08 Improvement Service May 10 th 2007 Data Quality Policy V7 10.05.07 1 INTRODUCTION / BACKGROUND Good quality performance data is accurate, valid, reliable, timely,

More information

Delivering progress towards meeting HMG targets on the SME growth agenda

Delivering progress towards meeting HMG targets on the SME growth agenda Delivering progress towards meeting HMG targets on the SME growth agenda Action Plan Version 1.1 dated 16 th August 2013 Author: Robert Astall, Head of Commercial Profession and Capability Background The

More information

Network Management Duty. Managing the Road network to support policy objectives AB C

Network Management Duty. Managing the Road network to support policy objectives AB C Managing the Road network to support policy objectives AB C Essex s Local Area Agreement Between Essex Partnership,, Health Authorities, Fire & Police Services, Learning & Skills Council, 12 local Strategic

More information

Asset Lifecycle Plans. December 2010

Asset Lifecycle Plans. December 2010 Asset Lifecycle Plans December 2010 Lifecycle Plan Summary December 2010 P a g e 2 A s s e t L i f e cy c l e P l a n Contents: 1 Introduction to Lifecycle Planning...4 1.1 Primary Purpose of Lifecycle

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd

More information

LTP3 Issue log and decision matrix - online responses

LTP3 Issue log and decision matrix - online responses LTP3 Issue log and decision matrix - online responses ID Comment summary / identified issue Discussion Points What has been changed? Q1. Do you think the vision sets our what transport in Plymouth should

More information

Reported Road Casualties Great Britain: 2012. Annual Report

Reported Road Casualties Great Britain: 2012. Annual Report Reported Road Casualties Great Britain: 2012 Annual Report DEPARTMENT FOR TRANSPORT SCOTTISH GOVERNMENT WELSH ASSEMBLY GOVERNMENT REPORTED ROAD CASUALTIES GREAT BRITAIN 2012 Published : September 2013

More information

Derbyshire County Council Performance and Improvement Framework. January 2012

Derbyshire County Council Performance and Improvement Framework. January 2012 Derbyshire County Council Performance and Improvement Framework January 2012 Contents 1. Introduction 3 2. About the framework 4 3. Planning 7 5. Monitoring Performance 8 6. Challenge and Review 11 7.

More information

Telford College of Arts and Technology

Telford College of Arts and Technology FURTHER EDUCATION COMMISSIONER ASSESSMENT SUMMARY Telford College of Arts and Technology JANUARY 2016 Assessment Background Telford College of Arts and Technology (TCAT) is a medium sized general FE College

More information

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1 City and County of Swansea Human Resources & Workforce Strategy 2013-2017 Ambition is Critical 1 Delivering quality services for a safer, greener, smarter, fairer, healthier, richer Swansea Executive Summary

More information

Financial Planning Assessment Vale of Glamorgan County Borough Council. Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014

Financial Planning Assessment Vale of Glamorgan County Borough Council. Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014 Financial Planning Assessment Vale of Glamorgan County Borough Council Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014 Status of report This document has been prepared for the internal

More information

Sustainable Development Strategy

Sustainable Development Strategy Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for

More information

Developing Asset Management

Developing Asset Management Developing Asset Management Contents: 2.1 Implementation Process 2.2 Towards an Asset Management Culture 2.3 Current State Analysis 2.4 Desired State Analysis 2.5 Gap Analysis 2.6 Implementation Plan 2.7

More information

The Risk Management strategy sets out the framework that the Council has established.

The Risk Management strategy sets out the framework that the Council has established. Derbyshire County Council Management Policy Statement The Authority adopts a proactive approach to Management to achieve Best Value and continuous improvement and is committed to the effective management

More information

Reported Road Accident Statistics

Reported Road Accident Statistics Reported Road Accident Statistics Standard Note: SN/SG/2198 Last updated: 24 October 2013 Author: Matthew Keep & Tom Rutherford Social and General Statistics Section This Note provides a range of data

More information

Community Learning and Skills Service. Contract Management 2015/16. Guidance for providers. Slough and RBWM

Community Learning and Skills Service. Contract Management 2015/16. Guidance for providers. Slough and RBWM Community Learning and Skills Service Contract Management 2015/16 Guidance for providers Slough and RBWM CONTENTS 1. Purpose... 3 2. About East Berkshire Community Learning and Skills Service... 4 3.

More information

The Accidents Sub-Objective

The Accidents Sub-Objective TAG Unit 3.4.1 April 2011 Department for Transport Transport Analysis Guidance (TAG) This Unit is part of a family which can be accessed at www.dft.gov.uk/webtag Contents 1 1 1.1 Introduction 1 1.2 Overview

More information

Referrals to Local Authority Adoption Agencies from First4Adoption by region. Q4 January-March 2015

Referrals to Local Authority Adoption Agencies from First4Adoption by region. Q4 January-March 2015 Referrals to Local Authority Adoption Agencies from FirstAdoption by region Q January-March 0 Yorkshire & The Humber LA Adoption Agencies North East LA Adoption Agencies Leeds City Council Barnsley Adoption

More information

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations Guidelines for the Application of Asset Management in Railway Infrastructure Organisations INTERNATIONAL UNION OF RAILWAYS (UIC) 16 rue Jean Rey - F-75015 PARIS Tel: +33 (0)1 44 49 20 20 Fax: +33 (0)1

More information

Comprehensive Spending Review 2007 covering the period 2008-2011

Comprehensive Spending Review 2007 covering the period 2008-2011 MEASURING UP HOW GOOD ARE THE GOVERNMENT S DATA SYSTEMS FOR MONITORING PERFORMANCE AGAINST PUBLIC SERVICE AGREEMENTS? JUNE 2010 Comprehensive Spending Review 2007 covering the period 2008-2011 Review of

More information

school transport: survey of good practice

school transport: survey of good practice school transport: survey of good practice IMPROVING SERVICES SAFE WORKING TOGETHER SUSTAINABLE SCHOOL TRANSPORT: SURVEY OF GOOD PRACTICE 1 MVA Consultancy was commissioned to undertake a survey of good

More information

PAPER B. Purpose. 4. Specifically the report makes proposals for :-

PAPER B. Purpose. 4. Specifically the report makes proposals for :- PAPER B Committee CABINET Date 10 TH FEBRUARY 2009 Title MEDIUM TERM REVENUE AND CAPITAL BUDGET STRATEGY 2009/10-2011/12 AND COUNCIL TAX 2009/10 Report Author Purpose Dave Burbage, Director of Resources

More information

CGAM022.1/12/10. Asset Management Improvement Strategy 2010

CGAM022.1/12/10. Asset Management Improvement Strategy 2010 Asset Management Improvement Strategy 2010 Version Control Version No. Date Details Author/s 1.0 July 2009 Adopted Strategy 2.0 October 2010 Update TABLE OF CONTENTS OF CONTENTS 4 OF THE ASSET MANAGEMENT

More information

Midlands Connect. Economic Impacts Study

Midlands Connect. Economic Impacts Study Midlands Connect Economic Impacts Study May 2015 In 2036, if journey times were cut by 20% across all of the intensive growth corridors Introduction The location of the Midlands, at the heart of the UK

More information

DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1

DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1 DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1 Guideline: DRAFT Planning the opening of a road project guideline Version: 1.1 Issue: September 2009 Approved By: Phil Margison General Manager,