1 1 Southern Peru Copper Corporation - SPCC (E-12134) Ilo (Peru) Supply of Dry Flue Gas Desulfurization system for the copper refining unit: - Circulating fluid bed scrubber with accessories - Dust recycling - Baghouse - Hydrated lime storage, dosing and injection system ENESA Eléctrica Nueva Energía S.A. (E-12120) Coronel (Chile) ESP for biomass revolving grate boiler. Gas Flow: Am³/h Filtering area: m² HPB / International Papel (E-10194) Mogi Guaçu ESP for biomass revolving grate boiler. Gas Flow: 557,000 m³/h Filtering area: 5,794 m² Usiminas Usinas Siderúrgicas de Minas Gerais (E-10070) Ipatinga Dedusting System for Blast Furnace #3 Casthouse and upgrade for existing exhaust system (turn-key job) Gas Flow: 660,000 m³/h Filtering Area: 7,946 m ThyssenKrupp CSA (E-10007) Santa Cruz Revamping of Absorber of FGD CDS (Circulating Dry Scrubber) for Heat Recovery Boiler of Coke Oven Plant. Manufacturing of the Absorber. Implementation of automation system for entire FGD. Supervision of Commissioning and Operation for Battery C. Main condition: Q= Nm o. C SOX inlet = 2526 mg/nm 3 SOX outlet = 200 mg/nm 3 Reagent= hydrated lime (Ca(OH) 2) Vale Rio Doce Manganês (E-10025) Ouro Preto Electric Arc Furnace Dedusting system in a turn-key job, including mechanical, electric, instrumentation/automation of gas caption, combustion chamber (flare), cyclones battery, heat exchanger, boosters, fabric filter, IDF s, interconnection ducts and Stack, collected dust handling and storage system. Gas Flow: 220,000 m³/h Filtering area: 3,860 m² ArcelorMittal (E-10050) João Monlevade Inspection and mechanical evaluation of the primary ESP for the sinter plant ArcelorMittal Tubarão (E-10005) Design of new ducts for ESP s #1, #2 and #3 for the sinter plant aiming at low pressure drop and even gas distribution HPB Caldeiras Berneck S. A. Painéis e dos (E-10004) Curitibanos (SC) ESP for biomass (Wood chips and saw dust) fluidized bed boiler. Gas Flow: 636,810 m³/h Filtering area: 8,161 m² Cia. Vale do Rio Doce (E-09064) CFD modeling of two Eletrostatic Precipitators 2009
2 11 ThyssenKrupp CSA (E-09288) Santa Cruz Revamping of Absorber of FGD CDS (Circulating Dry Scrubber) for Heat Recovery Boiler of Coke Oven Plant. Manufacturing of the Absorber. Implementation of automation system for entire FGD. Supervision of Commissioning and Operation for Battery B. Main condition: Q= Nm o. C SOX inlet = 2526 mg/nm 3 SOX outlet = 200 mg/nm 3 Reagent= hydrated lime (Ca(OH) 2) ThyssenKrupp CSA (E-09204) Santa Cruz Review of basic, detailed engineering of FGD CDS (Circulating Dry Scrubber) for Heat Recovery Boiler of Coke Oven Plant. Revamping of the Absorber. Manufacturing and erection works of Absorber. Implementation of automation system for entire FGD. Supervision of Commissioning and Operation for Battery A. Main conditions: Q= Nm o. C SOX inlet = 2526 mg/nm 3 SOX outlet = 200 mg/nm 3 Reagent= hydrated lime (Ca(OH) 2) UHDE (E-09041) Ulaanbaatar (Mongólia) Feasibility study of a flue gas cleaning system (SO2 removal and dust) for a heat recovery coking plant CSN - Cia. Siderúrgica (E-08130) 01 Wet Electrostatic Precipitator for a Coke Plant Gas Flow: 30,000 Nm³/h Filter Area: 554 m² MPX Geração de Energia S.A. Mabe Construção e Administração de Projetos Ltda. (E-08147) Fortaleza (CE) Flue Gas Desulphurization System FGD Semi-dry 1 X 365 MW PORTO DE PECEM Spray dryer absorber using rotary atomizers for lime slurry atomization for a pulverized coal fired boiler. Gas flow: 1,260,000 Nm 3 /h Temperature: 125 C. Sulfur content in coal: up to 1,5% SOx removal efficiency: 88,60% Particulate removal efficiency: 99,45% Engineering, material and manufacturing of: 2 Spray Dryer Absorbers (13m dia. x 18m height); 1 Bag Filter (total filtering area of 26,072 m 2 ); 1 pneumatic conveying system for 35 ton/h of solids; 1 plant for lime slurry preparation (capacity of 10,8 t/h of quicklime); 1 plant for dust recycling from bagfilters; 2 dust storage silos (8m dia. x 17.2 m height); 1 compressed air system (2 x 1,512 m 3 /h); Instrumentation, electric cables, secondary grounding and lightning Gerdau / Siderperu (E-08270) Chimbote (Peru) Primary and Secondary Dedusting Systems for a steel complex (LD converters, Electric Arc Furnace, desulfurization and torpedo car): 2008 LD converters Supply: charging hood, bagfilter, ID fan, water spray system, spark arrestor Design: ducts, combustion chamber, water cooled ducts for primary system, quenching tower, spark arrestor Gas Flow: 600,000 m³/h Filtering area: 7,997 m² Electric Arc Furnace Supply: bagfilter, ID fan, spark arrestor Design: ducts, canopy hood Gas Flow: 600,000 m³/h Filtering Area: 7,054 m²
3 17 Diferencial Energia e Empreendimentos e Participações São Luis (MA) Flue Gas Desulphurization System FGD Semi-dry 360 MW PORTO DE ITAQUI 2008 Mabe Construção e Administração de Projetos Ltda. (E-07231) Spray dryer absorber using rotary atomizers for lime slurry atomization for a pulverized coal fired boiler. Gas flow: 1,210,000 Nm 3 /h Temperature: 118 C. Sulfur content in coal: up to 1,5% SOx removal efficiency: 88,78% Particulate removal efficiency: 99,45% Engineering, material and manufacturing of: 2 Spray Dryer Absorbers (13m dia. x 18m height) 1 Bag Filter (total filtering area of 26,072 m 2 ) 1 pneumatic conveying system for 35 ton/h of solids 1 plant for lime slurry preparation (capacity of 10,8 t/h of quicklime) 1 plant for dust recycling from bagfilters 2 dust storage silos (8m dia. x 17.2 m height) 1 compressed air system (2 x 1,512 m 3 /h) Instrumentation, electric cables, secondary grounding and lightning. 18 MPX Geração de Energia S.A. Mabe Construção e Administração de Projetos Ltda. (E-07230) Fortaleza (CE) Flue Gas Desulphurization System FGD Semi-dry 2 X 360 MW PORTO DE PECEM Spray dryer absorber using rotary atomizers for lime slurry atomization for a pulverized coal fired boiler. Gas flow: 1,210,000 Nm 3 /h Temperature: 118 C. Sulfur content in coal: up to 1,5% SOx removal efficiency: 88,78% Particulate removal efficiency: 99,45% 2008 Engineering, material and manufacturing of: 2 Spray Dryer Absorbers (13m dia. x 18m height) 1 Bag Filter (total filtering area of 26,072 m 2 ) 1 pneumatic conveying system for 35 ton/h of solids 1 plant for lime slurry preparation (capacity of 10,8 t/h of quicklime) 1 plant for dust recycling from bagfilters 2 dust storage silos (8m dia. x 17.2 m height) 1 compressed air system (2 x 1,512 m 3 /h) Instrumentation, electric cables, secondary grounding and lightning. 19 Ternium / Siderar (E-07057) San Nicolas (Argentina) Dedusting system forthe cast house of blast furnace #1. Gas Flow: 510,000 m³/h Filter area: 5,687 m² 20 Petrobras / Regap (E-07143) 21 Petrobras / Revap (E-07142) Betim São José dos Campos Supply of PSA system for Hydrogen Purification. Supply of PSA system for Hydrogen Purification.
4 22 Petrobras / Reduc (E-07141) Duque de Caxias Supply of PSA system for Hydrogen Purification. 23 Votorantim Metais Siderúrgica Barra Mansa S.A. (E-07107) Barra Mansa Design, supply and erection of a new bagfilter for the Electric Arc Furnace of Votoraço Plant. Gas Flow: 940,000 m³/h Filtering area: 10,350 m² 24 Areva / Masisa (E-07101) Cabrero (Chile) Electrostatic Precipitator for Biomass Boiler. Gas Flow: 251,746 m³/h Collection area: 1,800 m² 25 Andritz (E-07099) Três Lagoas (MS) Electrostatic Precipitator for a lime sludge kiln Flow: 361,392 m³/h Collection area: 5,474 m² 26 Holcim Brasil S/A (E-07043) Barroso Supply of 2 Bag Filters for Gas generated in contaminated earth treatment Gas Flow: 3,000 m³/h and 12,500 m³/h 27 Holcim Brasil S/A (E-07042) Cantagalo Supply of 2 Bag Filters for generated in contaminated earth treatment Gas Flow: 5,000 m³/h and 18,000 m³/h 28 CSN Cia. Siderúrgica (E-06163) Dedusting system for the cast house of blast furnace #3. Gas Flow: 660,000 m³/h Filtering area: 7,908 m² 29 Vicentin S.A.I.C (E-06054) San Lorenzo (Argentina) Electrostatic Precipitator for Biomass Boiler. Gas Flow: 314,000 m³/h Collection area: 4,751 m² 30 Molinos Rio de la Plata (E-05139) Rosário (Argentina) Electrostatic Precipitator for Biomass Boiler Technical Supervision for internal elements replacement 31 Molinos Rio de la Plata (E-05014) Rosário (Argentina) Electrostatic Precipitator Supply of collecting plates, discharge electrodes and electrical spare parts. 32 Insea S/A (E-06001) Vinika (Chile) Engineering and supply of components for a Wet Electrostatic Precipitator in Vinika Chilean Wine Producer. 33 Gerdau / Açominas (E-05123) Ouro Branco One Electrostatic Precipitator for a Rotary Lime Kiln, in a turn-key job. Gas Flow: 150,000 m³/h Collection Area: 2,546 m² Inlet Dust Conc.: 5,500 mg/nm³ Outlet Dust Conc.: 50 mg/nm3
5 34 Cia. Vale do Rio Doce Mina-Fábrica 1 (E-06104) Congonhas One Electrostatic Precipitator for the Environmental Dedusting System of the Pelletizing plant 1, in a turn-key job. Gas Flow: 970,000 m³/h Collection Area: 12,787 m² Inlet Dust Conc.: 20,000 mg/nm³ Outlet Dust Conc.: 50 mg/nm³ 35 ArcelorMittal Tubarão (E-06009) Dedusting System for a coke/anthracite plant. Gas Flow: 320,000 m³/h. Filter area: 4,730 m² (bagfilter) 36 ArcelorMittal Tubarão (E-05001) Up grade of bagfilter for raw material handling of blast furnace #1 Sinter Line. Gas Flow: 480,900 m³/h Filtering Area: 10,564 m² 37 ArcelorMittal Tubarão (E-05001) Bagfilter for raw material handling of blast furnace #1 Coke Line. Gas Flow: 214,000 m³/h Filtering Area: 3,782 m² 38 ArcelorMittal Tubarão (E-05002) Bagfilter for the Cast House of blast furnace #2. Gas Flow: 450,000 m³/h Filtering Area: 6,195 m² 39 ArcelorMittal (E-05077) João Monlevade Electrostatic Precipitator for the Secondary Dedusting System of a Sinter Plant (turn-key job). Gas Flow : 700,000 m³/h Collection Area: 8,566 m² Inlet Dust Conc.: 20,000 mg/nm³ Outlet Dust Conc.: 50 mg/nm³ 40 ArcelorMittal (E-06041) Timóteo Dedusting System for the Cast House and Blast Furnace #1. Gas Flow: 280,000 m³/h Filtering Area: 2,740 m² 41 Gerdau / Cosigua (E-04110) Sta. Cruz Dedusting System for an Electric Arc Furnace Supply: Bag Filter (reverse air flow) Design: basic/detailed engineering of ducts and hoods Gas Flow: 850,000 m³/h Filtering Área: 16,174 m² Gerdau / Açominas (E-04155) Ouro Branco Dedusting System for a Ladle Furnace and Ferroalloy Silos Supply: hoods, ducts, Bagfilter and ID fan. Gas Flow: 320,000 m³/h Filter Area: 4,298 m² Gerdau / Açominas (E-04094) Ouro Branco Revamp of a Dedusting System for LD Converters, Weighing, Skimmers and KR s of the Steel Mill Plant (turn key job) Supply: hoods, ducts, bagfilter and ID fan Gas Flow: 720,000 m³/h Filter Area: 8,595 m² 2005
6 44 CSN Cia. Siderúrgica (E-04130) 01 Wet Electrostatic Precipitator for the Coke Plant (turn-key job). Gas Flow: 30,000 Nm³/h Filter Area: 554 m² Outlet dust concentration: < 10 mg/nm³ Usiminas Usinas Siderúrgicas de Minas Gerais (E-02076) Ipatinga Bagfilter for dedusting air for the blast furnace blowers. Gas flow: 468,000 m³/h Filtering area: 4,020 m² 46 Ical Indústria de Calcinação Ltda. (E-02045) Pains Electrostatic precipitator for a rotary lime kiln plant (turn-key job) Gas flow: 331,850 m³/h Collection area: 6,128 m² 47 Gerdau (E-03054) Divinópolis Dedusting system for blast furnace #1, 2 and 3. Gas flow: 312,560 m³/h Collecting area: 9,895 m² 48 Cia. Vale do Rio Doce Mina Fábrica 1 (E-04065) Congonhas 01 Electrostatic Precipitator for the Secondary Dedusting System of the Pelletizing plant #1 (turn-key job) Gas Flow: 853,000 m³/h Collecting Area: 7,789 m² 49 Cia. Vale do Rio Doce Mina Fábrica 1 (E-04065) Congonhas 01 Electrostatic Precipitator for the Primary Dedusting System of the Pelletizing Plant #1 (turn-key job) Gas Flow: 1,350,000 m³/h Collection Area: 12,481 m² 50 ArcelorMittal Tubarão (E-04032) Dedusting System for the raw material stock yard of blast furnace #3 System1 Gas Flow 382,300 m³/h Filtering Area: 5,157 m² System 2 Gas Flow: 222,900 m³/h Filtering Area: 3,054 m² System 3 Gas Flow: 10,000 m³/h Filtering Area: 136 m² System 4 Gas Flow: 97,290 m³/h Filtering Area: 2,172 m² 51 ArcelorMittal Tubarão (E-03111) Revamp of dedusting system for the LD steel mill Supply: hoods, ducts and pulse-jet bagfilters. Converters area: Gas flow: 2,300,000 m²/h. Weighing, skimmers and KR areas: Gas flow: 1,550,000 m³/h Filtering area: 18,910 m²
7 52 ArcelorMittal Tubarão (E-03056) Pulse jet bagfilter for the dedusting system of the stock house (coke) of blast furnace #3. Gas flow: 188,000 m³/h Filtering area: 3,050 m² 53 ArcelorMittal Tubarão (E-03056) Pulse jet bagfilter for the dedusting system of the stock house (sinter) of blast furnace #3. Gas flow: 237,000 m³/h Filtering area: 3,050 m² 54 ArcelorMittal Tubarão (E-03056) Pulse jet bagfilter for the dedusting system of the cast house of blast furnace #3 (System 2). Gas flow: 800,000 m³/h Filtering area: 9,895 m² 55 ArcelorMittal Tubarão (E-03056) Pulse jet bagfilter for the dedusting system of the cast house of blast furnace #3 (System 1). Gas flow: 800,000 m³/h Filtering area: 9,895 m² 56 ArcelorMittal (E-02051) João Monlevade Electrostatic precipitator for the primary dust collection of the sinter plant (turn-key job). Gas flow: 720,000 m³/h Collection area: 7,433 m² 57 Cia. Vale do Rio Doce Nibrasco Plant 6 (E-01130) Exhaust caption and dedusting system by electrostatic precipitator with 75 caption points. Gas flow: 915,000 m³/h Collecting area: 11,892 m² Cia. Vale do Rio Doce Nibrasco Plant 5 (E-01130) Exhaust caption and dedusting system by electrostatic precipitator with 75 caption points. Gas flow: 915,000 m³/h Collecting area: 11,892 m² CSN Cia. Siderúrgica (E-20009) Dedusting system for the ladle cleaning and maintenance station at LD steel mill plant, comprised of mobile hoods and ductwork, using the existing filter. Gas flow: 95,000 m³/h Cosipa Cia. Siderúrgica (E-02005) Upgrade of high-voltage control system of the primary electrostatic precipitator of sinter plant, with the supply of three controllers for the TRs ArcelorMittal (E-00042) Timóteo Dedusting system for blast furnace 2 cast house, comprised of with usinor purging holes, all iron runners and discharge spouts and a pulse-jet bag filter. Gas flow: 282,000 m³/h Filtering area: 2,579 m² 2002
8 62 SMS Usiminas Usinas Siderúrgicas de Minas Gerais (E-01136) Ipatinga Dedusting system for ladle furnace and CAS OB 1 and 2 through a pulse-jet bag filter. Gas flow: 300,000 m³/h Filtering area: 3,398 m² 63 ArcelorMittal Tubarão (E-00049) Secondary dedusting system for the steel mill plant comprised of mobile hoods, ductwork and a pulse-jet bag filter. Gas flow: 680,000 m³/h Filtering area: 7,220 m² 64 CSN Cia. Siderúrgica (E-00010) Dedusting system for torpedo car cleaning station, comprised of mobile hoods, ductwork and a pulse jet bag filter. Gas flow: 150,000 m³/h Filtering area: 1,805 m² 65 CSN Cia. Siderúrgica (E-9006) Three completely automatic sealed charging cars for coke batteries IV A/B and V, weighting approximately 130 tons each. 66 CSN Cia. Siderúrgica (E-9005) Pushing emission control system of coke batteries IV A, IV B, V, through mobile hoods, pipes and two pulse-jet bag-filter filtering plants. Gas flow: 328,600 m³/h Filtering area: 4,083 m² 67 CSN Cia. Siderúrgica (E-9005) Pushing emission control system of coke battery I, through mobile hoods, pipes and two pulse-jet bag-filter filtering plants. Gas flow: 256,820 m³/h Filtering area: 3,438 m² 68 CSN Cia. Siderúrgica (E-9004) Dedusting system for the cast house of blast furnace 2, comprised of purging holes, all iron runners and discharge spouts and a pulse-jet bag filter. Gas flow: 645,000 m³/h Filtering area: 6,512 m² CELPAV Cia. De Celulose e Papel Votorantim (PRE A) Jacareí Up grade of one Electrostatic Precipitator for Recovery Boiler n.º 3. Gas flow: 443,800 m³/h Cia. Vale do Rio Doce Nibrasco (E-7003) Electrostatic precipitator for the pelletizing plant V. Gas flow: 900,000 m³/h Collecting area: 6,210 m² Cia. Vale do Rio Doce Nibrasco (E-7003) Electrostatic precipitator for the pelletizing plant VI. Gas flow: 900,000 m³/h Collecting area: 6,210 m² 1997
9 72 Cia. Vale do Rio Doce Itabrasco (E-7005) Electrostatic precipitator for the pelletizing plant. Gas flow: 710,000 m³/h Collecting area: 5,175 m² Cia. Vale do Rio Doce Hispanobrás (E-7004) Electrostatic precipitator for the pelletizing plant. Gas flow: 710,000 m³/h Collecting area: 5,175 m² Cosipa Cia. Siderúrgica (E-7001) Primary dedusting system for sinter plant 3, through a double chamber electrostatic precipitator. Gas flow: 1,650,000 m³/h Collecting area: 15,400 m² Cosipa Cia. Siderúrgica Diagnosis of primary electrostatic precipitator of sinter plant Cosipa Cia. Siderúrgica (E-6001) Pushing emission control system of coke batteries IV, V, through mobile hoods, pipes and two pulse-jet bag-filter filtering plants. Gas flow: 302,720 m³/h Filtering area: 4,223 m² Cosipa Cia. Siderúrgica (E-6001) Pushing emission control system of coke batteries I, II, III, through mobile hoods, ducts and two pulse-jet bag-filters. Gas flow: 240,800 m³/h Filtering area: 3,378 m² Cosipa Cia. Siderúrgica (E-5001) Dedusting system forcast house of blast furnace #2 cast. Pulse-jet bag filter. Gas flow: 390,000 m³/h Filtering area: 4,406 m² Cosipa Cia. Siderúrgica (E-5001) Dedusting system for the stock house of blast furnace #2, with 110 suction points, ductwork and reverse-air bag filter. Gas flow: 518,400 m³/h Filtering area: 12,916 m² Usiminas Usinas Siderúrgicas de Minas Gerais (F-4169) Ipatinga Electrostatic precipitator for sinter plant #2. Secondary Gas flow: 666,000 m³/h Collection Area: 7,768 m² 81 Usiminas Usinas Siderúrgicas de Minas Gerais (F-4169) Ipatinga Electrostatic precipitator for sinter plant #3. Secondary Gas flow: 618,000 m³/h Collection area: 9,768 m² 82 Salgema Indústrias Químicas S.A. (F-3509) Maceió (AL) Fog eliminating system for chlorine-soda plant. 83 Molinos Rio de La Plata (F-4149) Buenos Aires (Argentina) Two electrostatic precipitators for biomass boiler. Gas flow: 336,000 m³/h Collection area: 4,835 m² 84 Industria de Papel Simão S/A (F-3723) Jacareí Electrostatic precipitator for recovery boiler. Gas flow: 509,500 m³/h Collection Area: 14,293 m²
10 85 Ical Indústria de Calcinação Ltda. (F-3922) Vespasiano Electrostatic precipitator for lime kiln. Gas flow: 190,000 m³/h Collection area: 6,042 m² 86 Cia. Vale do Doce Nibrasco (F-3900) Electrostatic precipitator pelletizing plant VI. Gas flow: 1,304,400 m³/h Collection area: 8,919 m² 87 Cia. Vale do Doce Nibrasco (F-3900) Electrostatic precipitator for the pelletizing plant V. Gas flow: 1,304,400 m³/h Collection area: 8,919 m² 88 Cia. Vale do Doce (F-4159) Electrostatic precipitator for the pelletizing plant. Gas flow: 1,272,600 m³/h Collection area: 8,919 m² 89 Cosigua Cia. Siderúrgica de Guanabara (F-3590) Nova Iguaçu Dedusting system with bag-house. Gas flow: 195,000 m³/h 90 Cenibra Celulose Nipo- Brasileira S.A. (F-4189) Belo Oriente Electrostatic precipitator for sludge lime kiln (Ahlstrom). Gas flow: 97,000 m³/h Collection area: 2,512 m² 91 Cenibra Celulose Nipo- Brasileira S.A. (F-4189) Belo Oriente Electrostatic precipitator for lime kiln (FLS). Gas flow: 97,000 m³/h Collection area: 2,512 m² 92 Celpav Cia. Celulose e Papel Votorantim (F-3603) Luiz Antonio Deodorization system.
AIR POLLUTION CONTROL
AIR POLLUTION CONTROL Nº Customer (Order) City (State) Supply Description Year 1 HPB / International Papel (E-10194) Mogi Guaçu ESP for biomass revolving grate boiler. Gas Flow: 557,000 m³/h Filtering
More informationMulti-pollutant control solutions for coal based power plants
Multi-pollutant control solutions for coal based power plants By Luca Mancuso and Hans Janssen Content SOx control Wet Scrubbers Open towers Dual Flow Tray Technology Semi-Dry SDA CFB Scrubbers Dust control
More informationvoestalpine Stahl, Linz, Austria Maximized Emission Reduction Of Sintering SIMETAL CIS MEROS plant Metals Technologies
voestalpine Stahl, Linz, Austria Maximized Emission Reduction Of Sintering SIMETAL CIS MEROS plant Metals Technologies 1 Meeting future environmental demands now! The challenge: Requirements placed on
More informationPhoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance
Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance The Boiler MACT, 40 CFR 63, Subpart DDDDD, was vacated in 2007 by the U.S Court of Appeals and the 2004 rule
More informationIron and Steel Manufacturing
Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Iron and Steel Manufacturing Industry Description and Practices Steel is manufactured by the chemical reduction of iron
More informationAssessing the Changes Required by the Industrial Boiler MACT Regulations
Technical Paper MS-17 Assessing the Changes Required by the Industrial Boiler MACT Regulations Authors: A.L. LeClair L.M. McDermitt Babcock & Wilcox Power Generation Group, Inc. Barberton, Ohio, U.S.A
More informationWell Positioned for the Future
Dominion Generation Virginia City Hybrid Energy Center Well Positioned for the Future The Coal Institute July 13, 2015 Rick Boyd Manager of Fuel Origination & Operations 1 Dominion Profile Operating Segments
More informationMercury emissions control in two hazardous waste incineration plants with dry and semi-dry gas cleaning
Mercury emissions control in two hazardous waste incineration plants with dry and semi-dry gas cleaning X. Chaucherie Prof. Dr. B. W. Vosteen P. Berg April 15th, 2015 VDI Wissensforum 15 th Conference
More informationComparison of selected plasma technologies
Comparison of selected plasma technologies PREPARED BY PLASTEP PARTNER #11 INSTITUTE OF NUCLEAR CHEMISTRY AND TECHNOLOGY Working group Dr. Andrzej Pawelec Mrs. Sylwia Witman-Zając Mrs. Agnieszka Molenda
More informationBill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01)
TO: Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01) FROM: Jeffrey Cole, RTI International DATE: December 2003 SUBJECT: Methodology for Estimating Cost and Emissions Impact for Coal-
More informationrbital Fields of application Variants
Fields of application Based on more than 30 years experience of engineering and fabrication of Air and Flue Gas dampers, NOVAL makes available to its customers this welded design, in particular in the
More informationTBU Stubenvoll GmbH. Experience and Competence in Environmental Technologies. TBU Stubenvoll GmbH
Experience and Competence in Environmental Technologies TBU Services Engineering, consulting, supervision and start-up for waste and biomass incineration plants Basic engineering, detail engineering, delivery
More informationRoadmap Performance Target Best technology Capability
Sulfur Dioxide Control Technologies In Electric Power Plants CCTR Basic Facts File #5 Brian H. Bowen, Marty W. Irwin The Energy Center at Discovery Park Purdue University CCTR, Potter Center, 500 Central
More informationVarious Environmental Projects at Vanderbijlpark Works. December 2014
Various Environmental Projects at Vanderbijlpark Works December 2014 1 1 Several Air Quality Projects 2 Emission reduction projects FMB DUST CONTROL INSTALLED SYSTEM The dust control system at the FMB
More informationFURNACEPHOSPHORUS AND PHOSPHORICACID PROCESS ECONOMICS PROGRAM. Report No. 52. July 1969. A private report by. the
Report No. 52 FURNACEPHOSPHORUS AND PHOSPHORICACID by GEORGE E. HADDELAND July 1969 A private report by. the PROCESS ECONOMICS PROGRAM STANFORD RESEARCH INSTITUTE MENLO PARK, CALIFORNIA CONTENTS 1 INTRODUCTION........................
More informationAPPLICATION FOR EXEMPTION Assessing Authority
TO: Combined Request for Pollution Control and Recycling Property Tax Exemption and Iowa Code Section 427.1 (19) APPLICATION FOR EXEMPTION Assessing Authority IMPORTANT: The application should be filed
More informationComparison of Economic and Technical Features of Fluid Bed and Spray Dryer FGD Systems
Comparison of Economic and Technical Features of Fluid Bed and Spray Dryer FGD Systems Douglas J. Roll, P.E. Plant Manager AES Greenidge, LLC Dresden, NY Dr. Harald Reissner Manager, Gas Cleaning Austrian
More informationUniversity of Iowa Power Plant
University of Iowa Power Plant Contents Purpose... 2 History... 3 Cogeneration... 6 Boilers... 7 Environmental Impact... 10 Steam Turbine Generators... 12 Modernization... 14 Biomass Fuel Initiative...
More informationDrying of Woody Biomass. Process Engineering / GEA Barr-Rosin
Drying of Woody Biomass BioPro Expo & Marketplace / Atlanta, GA / March 14-16, 2011 Drying of Woody Biomass Conventional Direct Fired Dryer Technology Proprietary work of the Copyright Owner Issues with
More informationHow To Make Calcium Carbide
11.4 Calcium Carbide Manufacturing 11.4.1 General Calcium carbide (CaC 2 ) is manufactured by heating a lime and carbon mixture to 2000 to 2100 C (3632 to 3812 F) in an electric arc furnace. At those temperatures,
More informationNAWTEC18-3507 COMPARISON OF ACID GAS CONTROL TECHNOLOGIES IN EFW FACILITIES
Proceedings of the 18 th Annual North American Waste-to-Energy Conference NAWTEC18 May 11-13, 2010, Orlando, Florida, USA NAWTEC18-3507 COMPARISON OF ACID GAS CONTROL TECHNOLOGIES IN EFW FACILITIES Craig
More informationS300 Series Dust Monitors
S301 DustGuard S303 Trend Monitor S304 Emission Monitor S305 Stack Monitor Intrinsically Safe (ATEX) Dust Monitors Split Architecture (Remote)Models Data Logging Software S300 Series Dust Monitors Dust
More informationCoke Manufacturing. Industry Description and Practices. Waste Characteristics
Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Coke Manufacturing Industry Description and Practices Coke and coke by-products, including coke oven gas, are produced by
More informationCoalGen 2010 Pre-Air Heater Control of SO3 and Related Condensables
CoalGen 2010 Pre-Air Heater Control of SO3 and Related Condensables Charles A. Lockert, Breen Energy Solutions, 104 Broadway Street, Carnegie, PA 15106 Greg Filippelli, P.E. and Marty Dillon, ADA Environmental
More informationSewage sludge treatment with oxygen enrichement and oxyfuel combustion in CFBC - new pilot plant results
Sewage sludge treatment with oxygen enrichement and oxyfuel combustion in CFBC - new pilot plant results 64 TH IEA FLUIDIZED BED CONVERSION MEETING Naples 3 rd of June, 2012 Authors: David Wöß, Gregor
More informationHYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3
HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- BY MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3 SYNOPSIS JP Steel Plantech Co. has developed Hybrid system for EAF off-gas heat recovery, with EAF
More informationINTRODUCTION. Fact Sheet: Air Pollution Emission Control Devices for Stationary Sources
Fact Sheet: Air Pollution Emission Control Devices for Stationary Sources INTRODUCTION Stationary sources of air pollution emissions, such as power plants, steel mills, smelters, cement plants, refineries,
More informationI BAU HAMBURG Dry Product Handling
IBAU HAMBURG Your efficient partner for modern and effective bulk material handling I BAU HAMBURG PLANT DESIGN - ENGINEERING - EPC-CONTRACTING CEMENT - THERMAL POWER - MINERALS Central Cone Silos Single
More informationIMPROVING ENERGY EFFICIENCY IN CEMENT PLANTS
IMPROVING ENERGY EFFICIENCY IN CEMENT PLANTS USING COMPUTATIONAL FLUID DYNAMICS (CFD) For Bureau of Energy Efficiency Best Practices in Energy Efficiency in Cement Sector" Date : 23 rd June 2015 Jodhpur,
More informationQuanzhou city Licheng Huangshi Machinery Co., Ltd VANCOUVER ENVIRONMENTAL MACHINERY INVESTMENT LTD TEL:0086-595-22493855 0086-595-22413855
Quanzhou City Licheng Huangshi Machinery Co., Ltd - Garbage incineration Quanzhou city Licheng Huangshi Machinery Co., Ltd VANCOUVER ENVIRONMENTAL MACHINERY INVESTMENT LTD TEL:0086-595-22493855 0086-595-22413855
More informationBEST AVAILABLE RETROFIT TECHNOLOGY AT EGU FACILITIES. July 1, 2011
BEST AVAILABLE RETROFIT TECHNOLOGY AT EGU FACILITIES July 1, 2011 WISCONSIN DEPARTMENT OF NATURAL RESOURCES 101 South Webster Street Box 7921 Madison, Wisconsin 53707-7921 1 Statement of Purpose This document
More informationREPRESENTATIVE PROJECT EXPERIENCE
Roosevelt R. Huggins Roosevelt R. Huggins is the Regional General Manager within Black & Veatch's energy business for Energy Business Development in Texas, Louisiana, Arkansas, and Oklahoma. He is responsible
More informationBIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author
BIOPOWER 5 CEX 1 Wärtsilä 10 January 2012 Presentation name / Author GENERAL INFORMATION ELECTRICAL OUTPUT 4.3 5.5 MWe HEAT OUTPUT Up to 10 MWth (16 t/h steam 1,3 bara) FUEL TYPE Wood chips, bark, saw
More informationMidwest Regional Planning Organization (RPO) Boiler Best Available Retrofit Technology (BART) Engineering Analysis
Midwest Regional Planning Organization (RPO) Boiler Best Available Retrofit Technology (BART) Engineering Analysis Prepared for: The Lake Michigan Air Directors Consortium (LADCO) Prepared by: MACTEC Federal
More informationEnvironment Impact Assessment of Thermal Power Plant for Sustainable Development
International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment
More informationGuidelines on AIR POLLUTION CONTROL for. Joss Paper Burning at Chinese Temples, Crematoria and Similar Places
Guidelines on AIR POLLUTION CONTROL for Joss Paper Burning at Chinese Temples, Crematoria and Similar Places CONTENTS 1 Introduction 2 Major Considerations 3 Best Available Technology for Control of Air
More informationEfficiency on a large scale CFB Steam Boilers
Efficiency on a large scale CFB Steam Boilers Circulating Fluidized Bed Steam Boiler The Circulating Fluidized Bed Steam Boiler is an offering from Bosch Thermotechnology a member of the worldwide Bosch
More informationSuccess Case of Co-firing of Biomass and Coal
Success Case of Co-firing of Biomass and Coal Luca Rigoni Thermal Services Boiler 29/05/2012 Index of Contents Introduction Biomass Fuels Categories Options for Biomass Firing Alstom success case: Fiddlers
More informationSNOX flue gas treatment for boilers burning high-sulphur fuels
SNOX flue gas treatment for boilers burning high-sulphur fuels SNOX flue gas treatment for boilers burning high-sulphur fuels 1 / 18 Summary The processing of more and more high-sulphur crude oil makes
More informationStora Enso Fors Ltd Sweden
THE ANALYSIS REPORT OF PLANT NO. 3 Cofiring of biomass - evaluation of fuel procurement and handling in selected existing plants and exchange of information (COFIRING) - Part 2 Stora Enso Fors Ltd Sweden
More informationJeffery J. Williams Emerson Process Management Power & Water Solutions 200 Beta Drive Pittsburgh, PA. 15238
Author: Jeffery J. Williams Power & Water Solutions 200 Beta Drive Pittsburgh, PA. 15238 Keywords: Abstract: Efficiency, Enterprise Automation, Expert Systems, Modeling, Neural Networks, Optimization,
More informationBasics of Kraft Pulping & Recovery Process. Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology
Basics of Kraft Pulping & Recovery Process Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology Outline History Goals Process Overview Kraft Pulping Process Kraft
More information1.3 Properties of Coal
1.3 Properties of Classification is classified into three major types namely anthracite, bituminous, and lignite. However there is no clear demarcation between them and coal is also further classified
More informationSAIL BOKARO STEEL PLANT ENVIRONMENT CONTROL DEPARTMENT
SAIL BOKARO STEEL PLANT ENVIRONMENT CONTROL DEPARTMENT Compliance to the conditions laid down by MoEF for issuing Modified Environmental Clearance for the proposed Modernization / Expansion of Bokaro Steel
More informationWATER AND WASTEWATER TREATMENT
WATER AND WASTEWATER TREATMENT Nº Customer (Order) City (State) Supply Description Year 1 OSX Brasil (E-11002) São João da Barra Utilities Center supplied in B.O.T. model, with 15 years operation time,
More informationINSTRUCTIONS FOR HOW TO PROPERLY SELECT A FAN OR BLOWER
INSTRUCTIONS FOR HOW TO PROPERLY SELECT A FAN OR BLOWER The instructions that follow are to assist you in completing the information required when making a fan or blower selection. If you need additional
More informationSINTERING AND PELLETISATION OF INDIAN IRON ORES
SINTERING AND PELLETISATION OF INDIAN IRON ORES By SURESH KUMAR* & T.M. SRINIVASAN** 1 * Vice President, Mineral Enterprises Limited, Bangalore ** Managing Director, FerroGreen Technologies Pvt. Ltd. Bangalore
More informationLime Kiln Principles And Operations. Outline
Lime Kiln Principles And Operations Terry N. Adams Technical Consultant Seattle WA Outline Slide 2 Lime kiln equipment flames, chains, refractories product coolers, external mud dryers Lime kiln energy
More informationTutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi
Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi Matti Rautanen Manager, External Networks, Power-wide R&D Tutkimuksella tulevaisuuteen- seminaari Kaukolämpöpäivät, Kuopio 29.8.2013
More informationOROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW
ISRAEL ELECTRIC OROT RABIN POWER STATION UNITS 1-4 4 x 350 MW COAL BOILER CONVERSION TO LOW NO X NATURAL GAS AND COAL FIRING BY PRIMARY AND SECONDARY MEASURES INSTALLATION Replacing the Burner Management
More informationBiomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY
Biomass Boiler House Best Practices Irene Coyle & Fernando Preto CanmetENERGY Growing the Margins London, Ontario March 2010 The Biomass & Renewables Group of Industrial Innovation Group (IIG) of CanmetENERGY
More informationNFPA Combustible Dust Compliance and the Industrial Ventilation System
NFPA Combustible Dust Compliance and the Industrial Ventilation System Presented By: Tom Kroeger PE tkroeger@kirkblum.com Kirk & Blum, a CECO Environmental Company Marty Schloss PE marty.schloss@schlossengineering.com
More informationBy K.K.Parthiban / Boiler specialist / Venus Energy Audit System
FINE TUNING EXPERIENCE OF A CFBC BOILER By K.K.Parthiban / Boiler specialist / Venus Energy Audit System Introduction The Industrial boilers have been seeing a growth in capacity in the recent years. Current
More informationAbstract Process Economics Program Report 136A PLANT UTILITIES COSTS (January 1995)
Abstract Process Economics Program Report 136A PLANT UTILITIES COSTS (January 1995) This report updates the utilities costs previously developed in PEP Report 136, also titled Plant Utilities Costs (September
More informationCommitted to make a better world
Committed to make a better world 1. Higher Availability & Reliability 2. Highest Plant efficiency 3. Lower Heat Rate 4. Minimum Auxiliary Power Consumption 5. Minimum Emission of Pollutants Committed to
More informationSULFURIC ACID MIST PERFORMANCE TEST PROTOCOL. Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida
SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida August 2013 CONTENTS SECTION 1.0 INTRODUCTION...3 SECTION
More informationPurpose. Scope. Preparing for a Test
www.idem.in.gov www.idem.in.gov Purpose The purpose of this guidance is to provide information about the activities a source can perform prior to conducting a formal stack test. Sources may elect to verify
More informationSTATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR MANAGEMENT
Page 1 of 7 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statutes
More informationSödra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden
Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden Vimmerby Energi AB, a energy company owned by the municipality of Vimmerby. The company Vimmerby Energi AB is serving the municipality
More informationA guide to volume measurement solutions for the. Mining Industry. Changing the market from level to volume
A guide to volume measurement solutions for the Mining Industry 1 Changing the market from level to volume Potash Production 2 Changing the market from level to volume Potash Production Potash Production
More informationReinhold Environmental APC Round Table and Expo. GE Energy
Reinhold Environmental APC Round Table and Expo GE Energy Typical SDA System Schematic Reheat Section Steam Generator Economizer Stack Silo Baghouse SDA/Slurry Tower Ash/Reagen t Silo Baghouse or Precipitator
More informationLong-Term Demonstration of CO2 Recovery from the Flue Gas of a Coal-Fired Power Station
Long-Term Demonstration of CO2 Recovery from the Flue Gas of a Coal-Fired Power Station MASAKI IIJIMA* 1 SHOJIRO IWASAKI* 1 SHINYA KISHIMOTO* 1 TORU TAKASHINA* 2 SUSUMU OKINO* 2 There is now a growing
More informationBOILER OPERATORS HANDBOOK
BOILER OPERATORS HANDBOOK prepared by National Industrial Fuel Efficiency Service Ltd. Graham & Trotman First published in 1959 as the New Stoker's Manual and in 1969 as The Boiler Operators Handbook This
More informationI. STEAM GENERATION, BOILER TYPES
I. STEAM GENERATION, BOILER TYPES and BOILER PLANT SYSTEMS 1 Steam Generation Water s Unique Properties: High Thermal Capacity (Specific Heat) High Critical Temperature Ideal Medium for Heat Delivery High
More informationIt s time for H.E.R.O. Energy Saving Strategy for. Tunnel & Shuttle Kilns
Energy Saving Strategy for Tunnel & Shuttle Kilns SANITARY WARE 1 Introduction The application of the Kyoto protocol and the effects of the recent energy crisis, have highlighted just how important it
More informationDescription of Thermal Oxidizers
Description of Thermal Oxidizers NESTEC, Inc. is a full service equipment supplier specializing in solutions for plant emission problems. The benefit in working with NESTEC, Inc. is we bring 25+ years
More informationPatented in 1899 in France,
Feature Article Earliest Leak Detection (ELD): A New Concept of Security in Water Leak Detection in Electric Arc Furnaces Water leakage from water-cooled panels in an EAF is considered to be of high operational
More informationBiomass Energy Demonstration Grant BES-10-10 Lansing Board of Water & Light
Biomass Energy Demonstration Grant BES-10-10 Lansing Board of Water & Light Introduction The Lansing Board of Water & Light (BWL) is a publicly owned utility owned by the citizens of Lansing. It is the
More informationBLASTING SYSTEMS. Turbine blasting systems. Air blasting systems. Automatic Painting plants
BLASTING SYSTEMS Turbine blasting systems Air blasting systems Automatic Painting plants 1, Dust Collector 2, Cyclone Separator 3, Sand (shot) Storage Hopper 4, Bucket elevator 5, Primary separator 6,
More informationThe Fate of Ammonia and Mercury in the Carbon Burn-Out (CBO ) Process
The Fate of Ammonia and Mercury in the Carbon Burn-Out (CBO ) Process Vincent M Giampa Progress Materials, Inc., One Progress Plaza, St. Petersburg, Florida 33701 KEYWORDS: mercury, ammonia, carbon burn-out,
More informationIT3 01 Conference, Philadelphia, PA, May 14-18, 2001
IT3 01 Conference, Philadelphia, PA, May 14-18, 2001 BAGHOUSE OPTIMIZATION AT A MEDICAL WASTE INCINERATOR R. D. Montgomery Phoenix Services, Inc. John Kumm EA Engineering, Science, and Technology C. P.
More informationSteam and hot water boiler systems for industrial and municipal power generation Dr.-Ing. Wolfgang Sobbe VKK Standardkessel Köthen GmbH
Steam and hot water boiler systems for industrial and municipal power generation Dr.-Ing. Wolfgang Sobbe VKK Standardkessel Köthen GmbH German-Vietnamese Bio Energy Day Ho Chi Minh City, 16. September
More informationPellet Process - Uses and Exposures
Pellet Process - Uses and Exposures 1 PROCESS - MANUFACTURING & USES 1 1.1 Manufacturing of pellets 2 Pellets are formed from the raw materials fine ores and additives of < 0.05 mm - into 9-16 mm spheres
More informationTATA Scunthorpe Queen Anne- taphole suction hood optimisation by CFD simulation and physical modelling
1 TATA Scunthorpe Queen Anne- taphole suction hood optimisation by CFD simulation and physical modelling Author(s) Name(s) and Affiliations(s) Bob PETERS, Paul Wurth S.A. Luxembourg, Jean-Paul SIMOES,
More informationLa caldaia a letto fluido circolante per la riduzione delle emissioni di CO2
La caldaia a letto fluido circolante per la riduzione delle emissioni di CO2 Paolo Cotone Principal Process Engineer Silvio Arienti Process Director Power Division Foster Wheeler Italiana Tecnologie e
More informationNitrogenous Fertilizer Plants
Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Nitrogenous Fertilizer Plants Industry Description and Practices This document addresses the production of ammonia, urea,
More informationWASTES INCINERATION PLANTS
WASTES INCINERATION PLANTS CRITERIA OF WASTE CLASSIFICATION FROM ENERGY UTILISATION STANDPOINT MAJOR TYPES OF WASTES 1. Municipal 2. Medical 3. Industrial 4. Sewage sladge 5. Agriculture wastes 6. Building
More informationSulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard
Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain
More informationFLEXICOKING technology for upgrading heavy oil and utilization of by-products
FLEXICOKING technology for upgrading heavy oil and utilization of by-products 2007 Japan-China-Korea Petroleum Technology Seminar Tokyo Dec 3-5, 2007 Toa Oil Co.Ltd Kenya Takahashi Background Driver -
More informationWaste Incineration Plants
Waste Incineration Plants Modern Technology for a better Environmental Welcome at Hafner! We Manufacture Systems for Energy Recovery from Wastes and Biomass as well as for Treatment of Hazardous Wastes.
More informationMILLIKEN CLEAN COAL TECHNOLOGY DEMONSTRATION PROJECT UNIT 2 ELECTROSTATIC PRECIPITATOR PERFORMANCE TEST RESULTS BEFORE AND AFTER MODIFICATION
MILLIKEN CLEAN COAL TECHNOLOGY DEMONSTRATION PROJECT UNIT 2 ELECTROSTATIC PRECIPITATOR PERFORMANCE TEST RESULTS BEFORE AND AFTER MODIFICATION Prepared by: CONSOL Inc. Research & Development 4000 Brownsville
More informationPRE-QUALIFICATION ANNOUNCEMENT
Warsaw March 9, 2011 PRE-QUALIFICATION ANNOUNCEMENT The contracting authority 00-526 Warsaw, ul. Krucza 24/26, Poland Website: www.elektrowniapolnoc.pl Contact person: Mr. Marek Obuchowicz E-mail: info@elektrowniapolnoc.pl
More informationTECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO. 07500003 008
TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO. 07500003 008 This technical support document (TSD) is intended for all parties interested in the draft/proposed permit and to meet
More informationCOMPARISON OF PROCESS FLOWS: FLUID BED COMBUSTOR AND GLASSPACK
COMPARISON OF PROCESS FLOWS: FLUID BED COMBUSTOR AND GLASSPACK PURPOSE The purpose of this document is to present the assumptions and calculations used to prepare Minergy Drawing 100-0204-PP00 (attached).
More informationParticulate Matter Emissions-Control Options for Wood Boiler Systems
Particulate Matter Emissions-Control Options for Wood Boiler Systems PARTICULATE MATTER EMISSIONS-CONTROL OPTIONS for Wood Boiler Systems Contents Particulate Emissions from Wood Combustion Best Practices
More informationM.Sc. Matti Kivelä Power Plant Manager R&D Lahti Energia Oy P.O. Box 93 FIN-15141 Lahti Finland Tel. 358 3 823 3240 matti.kivela@lahtienergia.
LAHTI ENERGIA OY M.Sc. Matti Kivelä Power Plant Manager R&D Lahti Energia Oy P.O. Box 93 FIN-15141 Lahti Finland Tel. 358 3 823 3240 matti.kivela@lahtienergia.fi Contact LAHTI ENERGIA OY Founded. 1907
More informationNitrogenous Fertilizer Plants
Multilateral Investment Guarantee Agency Environmental Guidelines for Nitrogenous Fertilizer Plants Industry Description and Practices This document addresses the production of ammonia, urea, ammonium
More informationThe Nail Factory is expanded with the construction of a new plant in Passo Fundo (state of Rio Grande do Sul, Brazil), active until 1964.
34 TIMELINE Learn about the important events that mark Gerdau s history The business started by João Gerdau is divided into two independent companies: Hugo runs the nail factory and his brother Walter
More informationPractical Examples of Heat Regenerative System at Steelmaking Works
2nd India-Japan Energy Forum Practical Examples of Heat Regenerative System at Steelmaking Works On Monday 4 February 2008 in Delhi Nisshin Steel Co., Ltd. Yukio Tomita 1 Structure of the Regenerative
More informationTRIAL CHEMICAL CLEANING OF FOULED APH BASKETS
TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS Dr. Abhay Kumar Sahay, AGM(CC OS) Bijay Manjul, AGM( Operation) Kahalgaon Boiler has three inputs Steam generator 1. WATER 2. COAL 3. AIR Burner Air preheater
More informationB0401 Abstract 029 Oral Presentation Session B04 Innovative Applications and Designs - Tuesday, July 1, 2008 16:00 h
Reference System for a Power Plant Based on Biomass Gasification and SOFC Richard Toonssen, Nico Woudstra, Adrian H.M. Verkooijen Delft University of Technology Energy Technology, Process & Energy department
More informationBasic requirements 999GG01834
Basic requirements / DIVISIONE INGEGNERIA E INNOVAZIONE AREA DI BUSINESS SVILUPPO E REALIZZAZIONE IMPIANTI 1 Ince Sicurezza Security Index TITOLO Title Basic requirements for the Suppliers qualification
More informationPutting a chill on global warming
Carbon capture and storage Putting a chill on global warming SABINE SULZER SULZER PUMPS MARKUS DUSS SULZER CHEMTECH Whenever fuel is burned, carbon dioxide (CO ) is emitted into the atmosphere. The subsequent
More informationWaste a source of energy. Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow. Incineration. Incineration
Waste a source of energy Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow Garbage School 301: Waste to Energy All organic materials contains energy Plant or animal based Plastics
More informationA Case Study on Coal to Natural Gas Fuel Switch
A Case Study on Coal to Natural Gas Fuel Switch by Brian Reinhart, P.E. Presenter Alap Shah Mark Dittus Ken Nowling Bob Slettehaugh Black & Veatch December 12, 2012 INTRODUCTION In the United States, natural
More informationSO 3 -Monitoring in Flue Gas of a Power Plant Application & Results
of a Power Plant Application & Results : Introduction - SO 3 / H 2 SO4 - The SO 3 Challenge : Spectral evaluation - Components to be monitored - Calibration : Analyzer Setup : Field Test Results : Benefits
More informationLocking In the Benefits to Fuel Switching
Locking In the Benefits to Fuel Switching Patrick Bean CERF III - April 19, 2012 Outline Project purpose The Power Shift Fuel market update Changing power plant dispatch Coal unit environmental Regulations
More information