1 Los Angeles Community College District PROGRAM MANAGEMENT SERVICES Connect LACCD Feasibility Study Update March 2015
2 ConnectLACCD LACCD identified a need to increase the bandwidth in the network connecting its colleges, headquarters and satellite facilities. The PMO conducted a preliminary review and presented it to FMP&OC. The FMP&OC and the BOT affirmed the recommendation for additional study. Today s presentation describes the results of that additional study. 2
3 Previous Presentation to FMP&OC PMO presented network traffic growth projections based on a snapshot of traffic. PMO performed a cost estimate for the fiber ring which indicated a significantly larger funding requirement than was planned. PMO Looked at four solutions: Minimal upgrade: eliminate single points of failure and upgrade ESC to Valley network connection to 10Gps Piggyback on other master agreements Lease bandwidth from another provider Build a privately owned fiber network 3
4 Additional Feasibility Activities Continued to monitor network traffic through CENIC Cricket Tool MT1 Presented preliminary study to the District Technology Council and then requested data on network capacity, traffic, and growth drivers using a questionnaire. Presented preliminary study to the Technology Planning & Policy Committee and requested feedback. Looked for further drivers of bandwidth growth. Business continuity/disaster response SIS New Buildings Requested two additional construction cost estimates from independent firms. 4
5 Slide 4 MT1 there were several comments on the previously presented snap shot in time, you may want to mention any significant changes to what the traffic looks like over the last few months Mestas, Terri, 3/2/2015
6 Bandwidth Utilization Summary Bandwidth utilization at the colleges is currently between 10% and 40% Normal growth will likely cause the bandwidth need to exceed capacity at some colleges in the near future 5
7 Fiber Ring Capital Cost District budget based on a conceptual parametric estimate is $27.5 million. The PMO requested three independent detailed estimates: Vantage Technology Consulting Group: $111,043,990 AECOM NY MTA Project Office: $130,226,395 Lenax Construction Services, Inc: $183,317,000 7
8 Fiber Ring Maintenance Costs (Operational Funds) $1.1 million /year equipment cost over the life of the network based on a 7 year technology refresh cycle. $100,000/year for network operations based on 1 FTE. $150,000 material and emergency response cost.* $38,000 Bandwidth service cost ROI = *Source: TelePacific 8
9 Solutions Two Options Construct a private fiber optic network Draft MOU with MTA LACCD to install fiber cables in MTA pathways Cost of easements unknown LACCD responsible for maintenance Capital Cost: >$100 million Operational Cost : $1.388 million/year Time to implement: 3-5 years Lease network services National and regional Telecommunications carriers have these services available Carriers have flexibility in their leasing options Multiple redundant paths Capital Cost: $0 Operational Cost: $0.5 million/year Time to implement: 180 days 9
10 Findings No immediate change to LACCD Network is required. Some colleges will need more bandwidth in 2017 and A District-owned fiber network has significant issues such as capital cost, maintenance cost, operational staffing cost, training and risk. Leased services are available at a fraction of the cost of building the fiber network and are bond eligible. Annual estimate Districtwide: $500k representing $8.88 million savings in operations cost over 10 years. A service provider s network, such as AT&T, could be turned up in less than 25% of the time required for a private fiber network. There is presently insufficient documented study of projected network growth based on planned applications. 10.
11 Recommended Next Steps Use the RFP process to get best pricing on 1 GB and 10 GB service links. Establish a master service agreement with one or more service providers such as AT&T, TelePacific, Verizon, etc. Each college should decide, in coordination with the District, when more bandwidth is required and procure it from the master service agreement using Bond funds. Estimate of Bond funds required: $500k/Yr.* *At some point in the future, LACCD will need to cover these costs with operational funds 11
12 Los Angeles Community College District PROGRAM MANAGEMENT SERVICES Connect LACCD Feasibility Study Report March
Virtual Leased Line (VLL) for Enterprise to Branch Office Communications
Virtual Leased Line (VLL) for Enterprise to Branch Office Communications Reliable high throughput data connections with low-cost & diverse transport technologies Executive Summary: The Truffle Broadband
Broadband Update. Council Study Session November 12, 2015
Broadband Update Council Study Session November 12, 2015 Purpose and desired outcomes Overview of broadband activities todate Introduce CTC Technology and Energy Conduct council broadband planning workshop
Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. Terri Mestas Program Director
Los Angeles Community College District PROGRAM MANAGEMENT SERVICES Terri Mestas Program Director CMAA Southern California Chapter February 13, 2015 1 LACCD Overview Established in 1969 Governed by seven-member
White Paper: Virtual Leased Line
Executive Summary: Virtual Leased Line (VLL) for high throughput and high reliability Enterprise Branch Office Communications The Truffle Broadband Bonding Network Appliance enables enterprise branch offices
Fiber Options. 2015 Service Provider Training. June 2, 2015 Phoenix June 16, 2015 Tampa
2015 Service Provider Training Fiber Options June 2, 2015 Phoenix June 16, 2015 Tampa Agenda Today we ll talk about: Review of the FCC s Second E-Rate Modernization Order Expanding Access to Broadband
Ministry of Information and Communication Technology EXPRESSION OF INTEREST
EXPRESSION OF INTEREST Consultancy Services for SubmarineFibre Optic Connectivity in Rodrigues (Authorised under Section 24(2) of the Public Procurement Act 2006) Reference No. : MICT/Q3/2012/EOI 1.0 Introduction
City of Sacramento Community Wireless Broadband Network
Request for Information (RFI) (I15071011001) City of Sacramento Community Wireless Broadband Network RFI Submittals Due: August 22, 2014 by 3:00 p.m. (PST) (Submit electronically, in PDF format) via the
Columbia County Connectivity Plan 12/01/2015. 12/2/2015 Prepared by ECC Technologies, Inc. 1
Columbia County Connectivity Plan 12/01/2015 12/2/2015 Prepared by ECC Technologies, Inc. 1 ECC Technologies Telecommunications and Broadband consultants providing Analysis, planning, and development for
Truffle Broadband Bonding Network Appliance
Truffle Broadband Bonding Network Appliance Reliable high throughput data connections with low-cost & diverse transport technologies PART I Truffle in standalone installation for a single office. Executive
1.264 Lecture 34. Telecom: Connecting wired LAN, WAN. Next class: Green chapter 17. Exercise due before class
1.264 Lecture 34 Telecom: Connecting wired LAN, WAN Next class: Green chapter 17. Exercise due before class 1 Exercise Your transportation brokerage company also handles billing for freight shipments,
Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. 90-Day Progress Report
Los Angeles Community College District PROGRAM MANAGEMENT SERVICES 90-Day Progress Report July 24, 2013 Board of Trustees Meeting Scope of the Presentation Establishment of uniform policies and procedures
2013-2016. Three Year District Technology Plan. Pasco School District #1 July 1, 2013 to June 30, 2016
2013-2016 Three Year District Technology Plan Pasco School District #1 July 1, 2013 to June 30, 2016 Development History August 2012 November 2012 December 2012 December 2012 February 2013 March 2013 April
Community Anchor Institution Service Level Agreement
Community Anchor Institution Service Level Agreement Date: 3/13/2014 Version: 2.0 Prepared by: DC-Net Table of Contents 1 Service Level Agreement... 3 2 Definitions... 3 3 Service Delivery... 5 3.1 Network
DOMINO Broadband Bonding Network
2 DOMINO AGGREGATION DE VOIES ETHERNET N 1 Bridging to the Future par [Hypercable] DOMINO DOMINO Broadband BondingTM Network Appliance With cellular data card failover/aggregation capability DANS CE NUMERO
Dark fiber vs. lit fiber. The benefits of choosing dark fiber over a traditional lit carrier
Dark fiber is fiber optic infrastructure that s not yet in use by a service carrier or a provider. It is an installation of cables currently lying dormant, ready to be connected at some time in the future.
Michigan Higher Education Dark Fiber Acquisition Project
Appendix II Michigan Higher Education Dark Fiber Acquisition Project The University of Michigan, on behalf of its partners Michigan State University and Wayne State University issued a Request for Information
The primary goals of the technology plan are to support the goals of the district strategic plan:
STOUGHTON PUBLIC SCHOOLS TECHNOLOGY PLAN 2012-2015 I. MISSION The mission of Stoughton Public School's Technology Program is to provide technology systems and support that meet the needs of students, teachers,
Broadband Bonding Network Appliance TRUFFLE BBNA6401
Broadband Bonding Network Appliance TRUFFLE BBNA6401 White Paper In this brief White Paper we describe how the TRUFFLE BBNA6401 can provide an SMB with faster and more reliable Internet access at an affordable
The Wisconsin State Network: BadgerNet
The Wisconsin State Network: BadgerNet June 2009 What follows is a case study of a successful library broadband network in this case, Wisconsin collaborates with regional library cooperatives to provide
High Availability Private Network (HAPN ) Network Upgrade Case Study
Copyright 2013 NetDiverse, LLC ABC, Inc. 1 (ABC) is an insurance adjusting firm with 10 locations in the Southeast including their headquarters office in Nashville, Tennessee. ABC utilizes their network
APPLICATION NOTE. Building corporate networks with variable speed leased lines up to 16 Mbps via Fractional STM1 service delivery
APPLICATION NOTE Building corporate networks with variable speed leased lines up to 16 Mbps via Fractional STM1 service delivery Single service delivery from 2 to 16Mbps instead of multiple E1 leased lines.
PSCOC Status Update October 5, 2015
PSCOC Status Update October 5, 2015 PSFA Presenters: Kendra Karp, Chief Information Officer Ovidiu Viorica, Broadband Program Manager 1 Partnering with New Mexico's communities to provide quality, sustainable
Frontier North Inc. f/k/a Verizon North Inc. GENERAL EXCHANGE TARIFF UNBUNDLED NETWORK ELEMENTS IN ALL EXCHANGES
Original Title Sheet No. 1 Cancelling Ill. C.C. No. 13 In Its Entirety of Frontier North Inc. f/k/a Verizon North Inc. Frontier North Inc. f/k/a Verizon North Inc. GENERAL EXCHANGE TARIFF IN ALL EXCHANGES
Alaska Broadband Audit Report May 2015 Page 62
RECOMMENDAT Alaska Broadband Audit Report May 2015 Page 62 E-RATE AND ALASKA EDUCATION As the Alaska School Broadband Audit and Needs Assessment Survey have shown, connecting schools to broadband in Alaska
9. OPERATIONS AND MAINTENANCE PLAN. 9.1 Introduction. 9.2 Purpose of Operations and Maintenance Planning. 9.3 Project Operations Planning
9. OPERATIONS AND MAINTENANCE PLAN 9.1 Introduction Operations and maintenance planning is a critical component to any transportation system, especially in the case of ITS where new and complex technologies
White Paper: Broadband Bonding with Truffle PART I - Single Office Setups
PART I - Single Office Setups Truffle boosting WAN banwidth and reliability for a single office The Truffle Broadband Bonding Network Appliance enables an SMB (Small and Medium Sized Business) or an enterprise
Chabot-Las Positas Community College District Bond Measure Technology Improvements Supplement to Capital Improvement Program
Chabot-Las Positas Community College District Bond Measure Technology Improvements Supplement to Capital Improvement Program Guidelines for Technology Estimates: The Capital Improvement Program for both
Component 4: Introduction to Information and Computer Science
Component 4: Introduction to Information and Computer Science Unit 7: Networks & Networking Lecture 1 This material was developed by Oregon Health & Science University, funded by the Department of Health
Broadband Bonding Network Appliance TRUFFLE BBNA6401
Broadband Bonding Network Appliance TRUFFLE BBNA6401 White Paper In this brief White Paper we describe how the TRUFFLE BBNA6401 can provide an SMB with faster and more reliable Internet access at an affordable
M E M O R A N D U M. Issue Statement. Background
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: Commissioners Simpson, Brown, Helgeson, Manning and Mital FROM: Debra Smith, Assistant General Manager and Dean Ahlsten, Compliance Officer DATE: March
FINAL AUDIT REPORT WITH RECOMMENDATIONS Internal Operations No. 08-005
FINAL AUDIT REPORT WITH RECOMMENDATIONS Internal Operations No. 08-005 SUBJECT: Review of Trapeze, the Bus Rail DATE: March 25, 2008 Scheduling and Dispatch System FROM: TO: IG/OIG Helen Lew /s/ GMGR John
Storage Area Networks (SANs) and iscsi Protocol An Introduction to New Storage Technologies
Page 1 Storage Area Networks (SANs) and iscsi Protocol An Introduction to New Storage Technologies Introduction This paper explains the concepts of Storage Area Network or SAN, iscsi technology and how
SAMPLE. Please answer the following questions about connectivity between THIS CAMPUS AND THE INTERNET:
Survey Questions The first nine (9) questions are asked for each campus in the district or charter school. The last three (3) questions are each asked once for the district or charter school as a whole.
[ Fiber Optics ] [ Voice & Data Networks ] [ Underground Construction ] [ Engineering ] [ Emergency Fiber Optic Restoration ]
[ Fiber Optics ] [ Voice & Data Networks ] [ Underground Construction ] [ Engineering ] [ Emergency Fiber Optic Restoration ] 224 N. 27th Street, Unit B, San Jose, CA 95116 tel: (408) 946-9011 fax: (408)
EXECUTIVE MANAGEMENT COMMITTEE FEBRUARY 21, 2013 BOARDROOM AUDIO-VIDEO SYSTEM UPGRADE AWARD CONTRACT ACTION: RECOMMENDATION
53 One Gateway Plaza Los Angeles, CA 90012-2952 213-922.2000 metro. net EXECUTIVE MANAGEMENT COMMITTEE FEBRUARY 21, 2013 SUBJECT: ACTION: BOARDROOM AUDIO-VIDEO SYSTEM UPGRADE AWARD CONTRACT RECOMMENDATION
Introduction to Optical Networks
Yatindra Nath Singh Assistant Professor Electrical Engineering Department Indian Institute of Technology, Kanpur Email: [email protected] http://home.iitk.ac.in/~ynsingh 1 What are optical network? Telecomm
Presented By: David J. Musto, Principal Thermo Systems L.L.C. East Windsor, NJ USA
Designing Secure, Redundant Fiber Optic Networks for District Energy Systems: A case study of the Lulu Island network design in Manama, Kingdom of Bahrain. Presented By: David J. Musto, Principal Thermo
1. BACKGROUND. Terms of Reference. Background
GOVERNMENT OF SAINT VINCENT AND THE GRENADINES Caribbean Regional Communications Infrastructure Project TERMS OF REFERENCE FOR CONSULTING SERVICES For the Design of a National Broadband Network SVG CARCIP
Quarterly Network Forum. May 17, 2016
Quarterly Network Forum May 17, 2016 1 Opening and Introduction Barbara Garrett Deputy Director, Statewide Telecommunications and Network Division (STND) 2 Agenda 9:00-9:05 AM Opening and Introductions
Intelligent Load Balancing: Overflow Balance
More Bandwidth. More Reliability. More Survivability Intelligent Load Balancing: Overflow Balance Application Note Understanding Outbound Balance Routing The BODi delivers a simple, cost effective way
AboveNet Virtual Data Center
AboveNet Virtual Data Center Changing the way companies access their data centers June 26 th, 2008 In this webinar we will address: Best strategies to effectively expand your operations in cities with
COUNTY OF LOS ANGELES InternalServicesDepartment
LOS ANGELES COUNTY. --- - -. - _. -..- - :;...Iii...E -. - - Dave Lambertson Director COUNTY OF LOS ANGELES InternalServicesDepartment 1100 North Eastern Avenue Los Angeles, California 90063 To enrich
Fleet Operations - Telematics FAQs
What is telematics? Fleet Operations - Telematics FAQs The word telematics is a combination of informatics and telecommunication. For vehicles, it is a system involving a communication device that transmits
TECHMART 5201 Great America Parkway Santa Clara, California
TECHMART 5201 Great America Parkway Santa Clara, California PROPERTY DETAILS Techmart is a five-story, Class A, approximately 285,000 square foot office building with approximately 1,080 surface and structured
Dimensioning, configuration and deployment of Radio Access Networks. Lecture 2.1: Voice in GSM
Dimensioning, configuration and deployment of Radio Access Networks. Lecture.: Voice in GSM GSM Specified by ETSI Frequency Division Duplex TDMA system Originally at 900MHz, but today also at 800, 800,
Subject: County of Los Angeles Data Center Space Requirement
Subject: County of Los Angeles Data Center Space Requirement The County of Los Angeles, Chief Executive Office, Real Estate Division (CEO-RED) is issuing this Property Search for the purchase of a vacant,
Pacnet Global EIPL Point-to-Multipoint Service
Products and Services PRIVATE NETWORKS Pacnet Global EIPL Point-to-Multipoint Service NO-COMPROMISE POWER COST EFFICIENCY The biggest challenge of multi-site enterprises is how to get all its branches
Town of Wilton Telephone System Addendum 1 to RFP. NOTE: Deadline for submitting proposals has been postponed to March 13, 2015
Town of Wilton Telephone System Addendum 1 to RFP Based on Questions asked at the Telephone System Vendor Conference February 20, 2015, Room B, 10 a.m. The following additional information is being provided
Reliable high throughput data connections with low-cost & diverse transport technologies
Virtual Leased Line (VLL) for Communications between Offices Reliable high throughput data connections with low-cost & diverse transport technologies Executive Summary: The Truffle Broadband Bonding Network
www.22itrig.org Technology Readiness in Michigan
www.22itrig.org Technology Readiness in Michigan Slide 1 FY2012 13: $50,000,000.00 for technology infrastructure grants to districts or to intermediate districts on behalf of their constituent districts.
SAN DIEGO CITY SCHOOLS Office of the Superintendent. District Wide Applications November 12, 2002
SAN DIEGO CITY SCHOOLS Office of the Superintendent District Wide Applications November 12, 2002 Introductory Statement After extensive analysis, staff has negotiated with vendors the software, hardware,
Dark Fiber Eligibility
Dark Fiber Eligibility Since FY 2011, the lease of unlit (dark) fiber is eligible for E-rate funding subject to the caveats described below. There are some significant limitations on dark fiber eligibility
Data Center Build vs. Buy
2014 Data Center Build vs. Buy More information available on our website: /page/whitepapers Data Center Build vs. Buy 2014 When considering colocating your data center, first you must understand your technical
Infrastructure solution Options for
RFP 16-01 EXHIBIT L Infrastructure solution Options for Corporations and Charities System Contributors: Sanjeev Batta Contents Introduction... 1 Conceptual Infrastructure Design... 2 Corporations and Charities
better broadband Redundancy White Paper
Redundancy White Paper May 2009 Table of Contents Executive Overview 3 Towerstream Overview 4 Towerstream Difference 4 Page 5 of 9 Cost of Downtime To Businesses 5 Causes of Unplanned Downtime 6 Cost of
Chapter 4. IP Communications Network (FLET S Service)
Chapter 4 IP Communications Network (FLET S Service) Conditions for Interconnection to IP Communications Network (FLET S Service) Interconnection to the (FLET S service) is a menu for ISPs that provide
City of Seattle. Paul Schell, Mayor. Department of Information Technology Marty Chakoian, Director and Chief Technology Officer
City of Seattle Paul Schell, Mayor Department of Information Technology Marty Chakoian, Director and Chief Technology Officer Office of Cable Communications Report on WIN Franchise Application December
TECHMART. 5201 GREAT AMERICA PARKWAY SANTA CLARA, CALIFORNIA www.cbre.com/techmart
TECHMART 5201 GREAT AMERICA PARKWAY SANTA CLARA, CALIFORNIA www.cbre.com/techmart Property Details Techmart is a five-story, Class-A, approximately 284,000-square-foot office building with approximately
Building the Business Case for Government Fiber Networks: there is life after I-Nets and stimulus
Building the Business Case for Government Fiber Networks: There Is Life After I-Nets and Stimulus Joanne Hovis President, CTC Technology and Energy With the lucky few recipients of the federal broadband
Ami Layman Accounts Receivable [email protected]
Ami Layman Accounts Receivable [email protected] Increased demand for higher bandwidths are statewide. OneNet partners with local providers for the last mile on internet circuits. Staff pursues all available
Multi-protocol Label Switching
An INS White Paper Multi-protocol Label Switching An economic way to deliver integrated voice, video and data traffic March 2013 Run your business on one network Multi-protocol Label Switching (MPLS) is
Arctic Fibre - Overview
PTC Breakfast 2014 Network Map 2 Arctic Fibre - Overview Subsea cable project that provides both transoceanic and domestic connectivity International: $620 million backbone network connects Tokyo to London
University of North Carolina at Greensboro
University of North Carolina at Greensboro 2008-2009 Information Technology Services Annual Report Executive Summary In the 2008 2009 fiscal year, ITS focused on technology enhancements that broadened
MOUNTAIN EMPIRE UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSAL
MOUNTAIN EMPIRE UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSAL VOIP Communication System E-Rate Funding Year 2016 RFP No. 1004 Submittals due on or before: 3PM on January 15th, 2016 ATTN: Rob Foraker Information
addition to upgrading connectivity between the PoPs to 100Gbps, GPN is pursuing additional collocation space in Kansas City and is in the pilot stage
Cyberinfrastructure Plan GPN GPN connects research and education networks in 6 states to the Internet2 backbone and to ESnet. GPN provides redundant connectivity for several other affiliated campuses and