ENVIRONMENTAL SUSTAINABILITY STRATEGY Annual Statement 2014/15

Size: px
Start display at page:

Download "ENVIRONMENTAL SUSTAINABILITY STRATEGY Annual Statement 2014/15"

Transcription

1 ENVIRONMENTAL SUSTAINABILITY STRATEGY Annual Statement 2014/15

2 1 Introduction The environment is fragile and we need to conserve resources to protect our future. We recognise this and understand that as both a consumer of services and provider of homes, there is a lot we can do to reduce the impact of our activities on the environment. This statement sets out our approach to environmental sustainability and our progress to date. The strategy The focus of our activity will be on the following areas: To reduce the carbon footprint of our operations: We will ensure that our activities reduce waste, reduce energy consumption and minimise CO2 emissions. This activity will extend to our contractors, office premises and supply chain. To reduce Residents energy consumption: We will support residents to reduce consumption of fuel whilst enabling them to remain safe and warm. This will include provision of specialist equipment, improvement works and providing various forms of learning and information. To use low life cycle products where possible: We will take an incremental approach to addressing the life cycle of components in our homes in order to reduce the need for replacement, and deliver energy efficient solutions during their lifetime. To reduce waste: We will encourage and participate in recycling activities for both ourselves and our residents in order to recycle as much as possible. We will also ensure that goods are re-used as far as possible by supporting and participating in schemes which promote this. To make the best use of green space: We will encourage a range of planting from growing food to increasing biodiversity across our sites. We will engage our residents in the use of their open spaces and where the quality of open spaces is poor, we will work with residents to undertake improvement works. To manage water efficiently: We will work to reduce our water consumption and encourage residents to do the same. We will use our procurement process, install specialist equipment and carry out improvement works to deliver this. Good Rubbish Day at the TVH office

3 2 How we will deliver these aims We will assess our performance on an annual basis against each of the six criteria and identify actions we need to take to improve. Where possible, we will measure our progress in terms of carbon emissions and deliverable outcomes. Our overall position, progress to date and aims for the next 12 months will be set out in our annual Environmental Sustainability Statement for 2015/16 which will be published on our website. This is the statement for 2014/15. I recycle because... photoshoot

4 3 Reducing the carbon footprint of TVH operations How well we re doing We take a proactive approach to managing the impact of our operations on the environment and are always seeking new opportunities to improve our performance. In our activities we continue to benefit from our office premises as a low carbon workplace with its BREAM Excellent and SKA Gold ratings. The works undertaken in 2012/13 led to a reduction in energy use of 39%. We also ensure that we minimise the impact of our actions by doing things like purchasing green energy, using follow me printing, re-cycling batteries and using wax printers to reduce chemicals. In 2013/14 we decreased staff commuting by car from 48% to 32% as a result of our green travel plan. We are also careful to work with contractors to ensure their activities meet our requirements. For example our gas contractor has three accreditations in relation to environmental sustainability. BENCHMARKING Our office has considerably lower carbon emissions when compared to ECON19 s air conditioned office benchmarks. TVH GOOD Benchark TYPICAL Benchark Carbon emissions (kgco2e/m2/year) TVH GOOD benchmark TYPICAL benchmark HEATING EMISSIONS For example, the CO2 emissions to heat our office (including water heating) are more than 4 times less than the typical emittions from offices built like ours. Carbon emissions (kgco2e/m2/year)

5 4 Recent Achievements: This year we renewed the membership and arrangements for our internal sustainability groups to get fresh ideas. This was kicked off with a piece of research into staff awareness and behaviours in this area. This gave us the information we needed to trial new approaches. As a result we raised awareness of environmental sustainability with our staff through a number of initiatives, from posters advertising our green credentials to creating a dedicated area on our intranet. Staff have engaged positively with these initiatives and there is a core of people keen to promote energy aware behaviour. There was also a targeted campaign around re-cycling which is covered in the section on reducing waste. On the back of a successful re-launch of our Green Travel Plan last year we have built on this success with more free cycling lessons, bike checks, bike markings and a talk on safe cycling for staff. We also provided folding bike lockers to further encourage cycling to work. Staff enthusiastically blogged about these sessions on our intranet. We also encouraged car sharing via our intranet as well as changing working practices to reduce mileage by working away from the office. Our cleaning contractor Cleanscapes also contributed to the reduction in travel by replacing 30 vans with newer, more fuel efficient models and having speed restrictors across their fleet reducing fuel use by over 20%. Travel has also been reduced by using Kwik Fit for localised servicing, repairs and MOTS and they have trialled their first electric vehicle. We have also taken steps to reduce our energy consumption by using cloud hosting more efficiently so we don t have to increase our server when we upgrade IT systems. We also encouraged staff to reduce their energy consumption by running Green Doctor sessions for them. Green Doctors are certified professionals who can help you use less energy, keep warm, and save money by identifying the problem areas in your home and giving you tools to manage your energy efficiently. Aspirations for the future: The focus for the year ahead will be printing, travel and technology. We will look at a range of ideas we can use to encourage behaviours which reduce the impact on the environment. We will be working with the Low Carbon Workplace to make sure our approach has the biggest impact. We will also look at re-running our travel survey to measure progress. Posters encouraging sustainability at the TVH office

6 5 Reducing Resident Energy Consumption How well we re doing We have been investing in the energy efficiency of the homes we manage for many years through our planned repairs programme. Our stock condition survey is used to identify the energy performance of individual homes and we have targeted resources at the worst performing. Alongside this we have also carried out improvement works across large numbers of properties, such as installing and upgrading loft insulation. Work includes the insulation of solid wall properties, the use of Baxi A rated condensing boilers which exceed the latest European standards in safety and energy efficiency, installation of passive infrared (PIR) sensors on communal lighting, installation of ground source heat pumps and the installation of solar panels. These measures have been instrumental in reducing the energy consumption and costs for our residents. Our new homes are all either Code for Sustainable Homes Level three or four. This exceeds current building regulations and we use a fabric first approach to ensure the best thermal performance of the building prior to adding additional energy saving devices. Items often fitted include photo voltaic panels, solar water heating and district heating systems all of which reduce energy consumption. Our stock currently has an average Standard Assessment Procedure (SAP) rating of 71%. This compares favourably with a UK social housing average of 62.4% and UK housing average of 51%. We also regularly update and inform residents through various forms of communication and surveys around energy consumption. Feedback from residents is used to change the way we work. Following a resident survey on sustainability, the works we carry out on a property before it is let now include the installation of a shower and low energy light bulbs. REDUCING RESIDENT CONSUMPTION TVH properties have a higher average Standard Assessment Procedure (SAP) than the UK housing and UK social housing sectors. 51% UK housing 62.4% UK social housing 71% Recent Achievements This year we provided information for our residents to reduce energy consumption on our website with an emphasis on saving money and also asked residents to contact us if they had a green project they would like to run on their estate. This year we also launched our first energy saving competition for residents who receive advice and monthly equipment such as draft excluders, shower timers, timer switches etc., over a 12 month period. Each family is given support, with all ages encouraged to join in. There is a prize for the household making the biggest energy saving at the end of the year and the results will be announced in January TVH

7 6 Our residents have received over 70 free devices to help them measure their energy consumption and reduce waste. We continued to provide external cladding to homes in Rushmoor continuing on from no. 23 up to no. 44. Twelve owners also took advantage of our offer to do their houses whilst we were on site. The increased insulation is reducing energy consumption and bills for residents. We will have information after 12 months on the actual energy savings made. We installed LED lighting at Maple House in Kew replacing fittings which were 10 years old and on 24 hours a day. The installation included lighting controls to switch off areas where there is natural daylight and a time clock arrangement. In addition, the lighting controls were set at 40% brightness in some areas. Overall, this provides an estimated energy saving of approximately 50% on the communal lighting energy use. Following the installation of gas central heating to a site in Guildford, we provided all residents with the opportunity to attend a Green Doctor event which gave them information on how to use their new systems efficiently as well as other energy saving tips. This was also followed up with an article in our residents magazine and a new leaflet which will be available for all new residents and handed out with the annual gas safety check. Oxford Brooks University carried out research into a section of our new build homes to assess their energy performance. The report found that airtightness was not as robust in reality as the design had assumed and U-values were lower than anticipated. Systems such as MVHR were not as efficient as had been estimated due to a combination of incorrect commissioning and a misunderstanding of how to use the product by residents. As a result we have produced a leaflet on passive ventilation systems which explains the correct way to use them. We will also be monitoring the quality of new builds around air-tightness. Aspirations for the future We would like to look at opportunities to train tenants to become Green Doctors so they can run sessions in the areas where they live. We will also be reviewing the outcomes of our resident competition to reduce energy consumption and advertising the results. We will also be trialling a YouTube video showing residents how to use the equipment in their home.

8 7 Low Life Cycle Components How well we re doing We set high standards for the components we fit to our homes as this reduces future maintenance costs, reduces component replacement and increases resident satisfaction. This leads to reduced waste and reduced energy consumption as the components need replaced less often. An example of this is the cyclical programme of works where we fit highly efficient A rated Baxi gas boilers. The easyto-use heating controls have also been well received by customers and help manage energy consumption. All new schemes we build are scrutinised by a technical appraisal group to ensure that durable products are used and can be maintained easily and at low cost. Each new scheme s lifecycle costs are financially modelled to ensure the total costs over a 60 year period are kept below a threshold of 80% of the build cost. Recent Achievements This year we have completed reviews of kitchen ranges, extractor fans, windows and communal lighting to create a list of standard components which are energy efficient with long life cycles. We have reviewed manufacturers green credentials as part of this and ensured that as far as possible we are only using parts which minimise the impact on the environment in terms of production and use of materials. Our kitchen ranges for example are 100% recyclable and one of the best products on the market in terms of sustainability. In addition to using these products in our planned replacement works, we are also installing them where we can on our new build homes. This year we also instigated a new process for updating our development design brief which will mean contracts will be procured using up to date information on component performance from our Asset Management department. Changes include the boiler manufacturer, lift specification, communal lighting and reference to Heat Network (Metering and Billing) Regulations Aspirations for the future Next year we will work with our main repairs contractor to review the components used and their approach to sustainability to see what improvements can be delivered.

9 8 Reducing Waste How well we re doing We recycle100% of the waste produced by our head office, and we always use components with long life cycles in our homes where we can. We actively encourage re-cycling across our offices including green waste and battery re-cycling points. We only use re-cycled paper in our offices. As well as directly managing our own waste, we also seek to reduce waste through the contractors we employ by insisting they have a waste management policy in place. The majority of our key contractors also have an ISO accreditation. Our responsive repairs contractor, gas repairs and servicing contractor and our door entry-phone contractor all have systems in place to ensure the sorting and re-cycling of waste materials which have been approved by us. We currently also have a paint can recycling initiative in place as part of our cyclical redecorations programme. Recent Achievements Our contractors have achieved some good outcomes across our areas of operation. In particular, 90% of any belongings left behind by residents are re-cycled when they move out and our grounds and cleaning contractors recycle 100% of all cardboard, wood and green waste collected from our sites. 100% of all dumped electric and white goods have been recycled at amenity tips, and 50 items from sites across our schemes have been re-used rather than being sent to land fill. Also our repairs partner, Axis Europe, have an environmental management system and site waste management plan which means that they recycle 100% of timber, copper, UPVC and hazardous waste. We also looked at the amount of re-cycling we do in the office this year. The staff intranet has been key in driving this, along with briefing sessions and posters. Kitchen re-cycling has been a particular target with events such as clearing out a land fill bin to see how much recyclable material it contained (and advertising the results on the intranet), quizzes, questionnaires, and Did you know blog posts. To track this we have started counting the bags going into landfill. We have also begun to focus on paper consumption by producing an activity report to track it, introducing double sided printing as a default and having orphaned paper boxes in the print rooms to demonstrate how much paper is wasted. Our cleaning contractor Cleanscapes also introduced paperless sign off sheets reducing paper consumption by around 120,000 A4 sheets per annum. We also included the opportunity for residents to recycle as part of our TVH On Tour initiative and good rubbish day at an estate in Sutton to provide re-cycling opportunities as well as a specific clothes re-cycling initiative in Slough. Aspirations for the future Next year we will work with the Low Carbon Workplace to devise a range of initiatives which will increase the activity in this area through wider staff engagement. We recycle 90%of all the furniture our residents leave behind.

10 9 Optimise the use of Green Space How well we re doing As a provider of over 14,000 homes across the South East we are responsible for the management of a large number of open spaces. We take a responsible approach to the environmental aspects of these areas and instigate many activities with residents to enhance their appearance and maximise their use. Over the years we have helped residents install vegetable areas, enhance the planting and complete make-overs of garden areas which residents then maintain. Through our cleaning and gardening contractors we work in partnership to deliver local projects, with access to materials and labour. This has complemented our own programme of improvement works and enabled us to have a much bigger impact. We actively manage our trees to ensure long life as well as planting new ones. On our new build sites, we have a comprehensive design guide which covers green spaces and ensures that we provide areas which enhance the natural environment and engage with residents to make the best use of them. The guide provides specific expert landscape guidance including planting and the selection and location of trees. Recent Achievements Our Community Investment Strategy continues to deliver a wide range of environmental projects and in 2014/15, 20 projects were funded and delivered as part of this strategy. These projects are covered in full as part of our annual Go Green report. This year saw the delivery of a project in Slough where we partnered with the Woodland Trust. Volunteers planted 1000 trees in two days, next to one of our housing schemes. Being next to the M4 and the Heathrow flight path, the impact will be to reduce noise, improve air quality and encourage wild life. As part of a resident focussed Green Week we also completed five projects over five days with different communities. These events ranged from clearing up open spaces to making your own bird box and beetle nest. As part of this we funded a project to clear up a copse in Reading using community volunteers and removing rubbish and fly tipping from a woodland area. We funded a day of wildlife sessions in Westfield Primary School in Woking for 240 children in partnership with Surrey Wildlife Trust. We also published an article in our resident s magazine giving advice on re-planting a vegetable patch to encourage local food production and we supported residents to set up a vegetable patch on their estate. Our grounds contractors Just Ask also converted 200 tonnes of green waste from our sites into compost. School children building bird boxes with help from Surrey Wildlife Trust

11 10 In addition we helped fund three environmental projects through our small grants scheme, Community Chest. These included an educational art walk with the Bucks Wildlife Trust and an allotment project with Hounslow Food Box. This year we have also completed 14 estate improvement projects with increased resident involvement in the final design. We also improved our approach to final design on new schemes with early involvement of the estates team. This helps ensure open spaces are better suited to those who live there and encourage biodiversity. We complete site visits to sign off designs and check sites throughout the defects period to make sure that standards are maintained and planting is well looked after. Aspirations for the future We will continue to roll out various community based initiatives with our residents to raise awareness, improve the quality of the environment and ensure sustainability. Planting 1000 trees in Slough

12 11 Manage Water Efficiently How well we re doing We ensure that we minimise our own water consumption as an organisation in the types of products we use in our offices, such as zip taps and waterless urinals. Across our stock we advise residents, encourage the reduction of wasted water and have supplied free water butts to residents across various sites to enable rainwater to be used on gardens. Our grounds maintenance contractors have invested in a de-ionisation system to take impurities out of waste water to turn it into pure water for re-use. There is an increased cost, however this approach (unlike cheaper standard filtration systems) produces no waste water. All our new homes have dual flush WC s, small baths, low flow showers and water butts in the gardens of houses. Any white goods supplied in our new homes are A+ rated as a minimum and we ensure sustainable urban drainage across our new schemes. Recent Achievements In partnership with our contractor Cleanscapes, we fitted 11 water butts to our residents properties this year. These contractors also use rain water collected at their office to wash their vehicles. Aspirations for the future We will continue to promote the benefits of saving water to our staff and residents. Whenever we can, we will make practical interventions to reduce water consumption. We use zip taps in the office to reduce water consumption

13 12 Infographics REDUCING OUR CARBON FOOTPRINT Our office has considerably lower carbon emissions when compared to ECON19 s air conditioned office benchmarks. TVH GOOD Benchark TYPICAL Benchark Carbon emissions (kgco2e/m2/year) TVH GOOD benchmark TYPICAL benchmark HEATING THE OFFICE The CO2 emissions to heat our office (including water heating) are more than 4 times less than the typical emittions. Carbon emissions (kgco2e/m2/year) 51% 62.4% 71% RESIDENT CONSUMPTION TVH properties have a higher average Standard Assessment Procedure (SAP) than the UK housing and UK social housing sectors. UK housing UK social housing TVH

Capita Symonds Real Estate Sustainability Report 2012 Royal London Asset Management Portfolio

Capita Symonds Real Estate Sustainability Report 2012 Royal London Asset Management Portfolio Capita Symonds Real Estate Sustainability Report 2012 Royal London Asset Management Portfolio Highlights Over 10,000 tonnes CO2 equivalent saved from entering the atmosphere Carbon Saver Gold Standard

More information

Environmental Policy March 2012

Environmental Policy March 2012 Environmental Policy March 2012 1 Contents 1. MISSION STATEMENT... 3 2. IMPLEMENTATION... 3 3. SCOPE OF POLICY... 3 4. KEY ENVIRONMENTAL IMPACTS... 4 4.1 OFFICES... 4 4.2 BUSINESS TRAVEL... 4 4.3 AUDIENCE

More information

glyndwr.ac.uk/sustainability environmental sustainability strategy

glyndwr.ac.uk/sustainability environmental sustainability strategy glyndwr.ac.uk/sustainability environmental sustainability strategy 2012-2014 overview of the environmental sustainability strategy 2012-2014 Glyndŵr University s Environmental Sustainability Strategy 2012-2014

More information

Archant London Environmental Awards

Archant London Environmental Awards Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has

More information

Public Sector Sustainability Report 2013-14

Public Sector Sustainability Report 2013-14 Public Sector Sustainability Report 2013-14 Date: August 2014 Version number: 3 Owner: Approval route: Approval status: Michael Browne, Estates Operations Manager Audit Committee and Senior Management

More information

CitySwitch Green Office Sustainability Action Plan Small Business

CitySwitch Green Office Sustainability Action Plan Small Business CitySwitch Green Office Sustainability Action Plan Small Business Organisation details Organisation name: Address: Energy Manager: Contact details: Number of employees in office: NABERS rating commitment:

More information

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust BREEAM Refurbishment and Fit-out 2014 Briefings Part of the BRE Trust BREEAM for Refurbishment and Fit-out Follows 2 years of development Draft scheme published and consultation from 19 th July 2014 Launched

More information

Bloomsbury Colleges Environmental Policy Statement

Bloomsbury Colleges Environmental Policy Statement 15 December 2011 P a g e 1 Bloomsbury Colleges Environmental Policy Statement The Bloomsbury Colleges are committed to the responsible use of energy, water and other resources with the aim of minimising

More information

Carbon Management Plan

Carbon Management Plan E-2015-02-02 Addendum Carbon Management Plan Date: 14 May 2014 Owners: Approval: K.W.Bullimore & M.Sackett A.Burrell Executive Summary This document sets out the Carbon Management Plan (CMP) for The Open

More information

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings Duchy Homes Site: Cantley Lane Doncaster Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings 22 nd February 2013 Leanne Brooksbank Accredited Energy & Code

More information

LHT S ASSET MANAGEMENT STRATEGY 2015-20. It s My Home

LHT S ASSET MANAGEMENT STRATEGY 2015-20. It s My Home LHT S ASSET MANAGEMENT STRATEGY 2015-20 It s My Home 0 ASSET MANAGEMENT STRATEGY 2015-20 It s My Home Contents Page No 1. WHAT DOES OUR ASSET MANAGEMENT STRATEGY AIM TO DO? 2 2. WHY IS ASSET MANAGEMENT

More information

Organizational Change Management for Sustainability Pearson Inc www.pearson.com

Organizational Change Management for Sustainability Pearson Inc www.pearson.com Organizational Change Management for Sustainability Pearson Inc www.pearson.com Kate McCarthy Kate.McCarthy@pearson.com Project Lead Green Teams Pearson North America Sustainability Specialist 1 About

More information

Domestic energy consumption in Barnet has reduced but remains higher than the British average:

Domestic energy consumption in Barnet has reduced but remains higher than the British average: HOME ENERGY EFFICIENCY ACT (HECA) RETURN LB BARNET 31ST MARCH 2013 The following report sets out the energy conservation actions being or proposed to be taken by London Borough of Barnet that it considers

More information

Sustainability and Environmental Review. Introduction

Sustainability and Environmental Review. Introduction Sustainability and Environmental Review Introduction Edmundson Electrical Ltd is a long established privately owned company with an unrivalled reputation in the marketplace and with a unique culture that

More information

APPENDIX B - PL1 Homes that meet people s needs and aspirations

APPENDIX B - PL1 Homes that meet people s needs and aspirations APPENDIX B - PL1 Homes that meet people s needs and aspirations Decent and accessible homes are vital to all. Our focus on providing affordable homes is being progressed primarily through the Affordable

More information

Rainwater Harvesting

Rainwater Harvesting Rainwater Harvesting With climate change now a reality rather than a speculated possibility, the demand on water resources has gone up, whilst the amount of water available for supply has gone down. Forth

More information

CLEAN GREEN & SUSTAINABLE NS1439215

CLEAN GREEN & SUSTAINABLE NS1439215 CLEAN GREEN & SUSTAINABLE NS1439215 1 Contents 2 Introduction Strategic Alignment 1 - Energy Efficiency 2 - Water Management 3 - Fleet and Plant Management 4 - Carbon Offsets 5 - Waste Management Everything

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Flat 3 Dwelling type: Mid-floor flat 30, Brunswick Square Date of assessment: 23 September 2008 HOVE Date of certificate: 23 September 2008 BN3 1ED Reference number: 8398-6021-5510-4127-8022

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Flat 2 Bagshot House Redhill Street LONDON NW1 4BY Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Ground-floor flat 09 April

More information

PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014

PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 Carbon emissions (kgco2) Page 1 PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014 1. INTRODUCTION

More information

energy in education promoting energy efficiency in schools

energy in education promoting energy efficiency in schools The DART Energy Research Programme Recognising that the programme should be as much about people and changing cultures while delivering service the approach was developed initially through the four different

More information

HILLCREST HOUSING ASSOCIATION LIMITED MAINTENANCE POLICY

HILLCREST HOUSING ASSOCIATION LIMITED MAINTENANCE POLICY HILLCREST HOUSING ASSOCIATION LIMITED POLICY NO. AM14 MAINTENANCE POLICY 1.0 INTRODUCTION 1.1 This policy describes our arrangements for ensuring that our properties are well maintained and kept in good

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Flat 307 Windsor House Cumberland Market LONDON NW1 4DE Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Mid-floor flat 8361-6824-6900-7049-8026

More information

Transportation assistance parents are encouraged to car pool when driving to schools

Transportation assistance parents are encouraged to car pool when driving to schools s Towards Carbon Neutrality The actions listed below contribute to a reduction in greenhouse gas emissions from sources for which public sector organizations are responsible under the carbon neutral government

More information

ENVIRONMENTAL POLICY STATEMENT

ENVIRONMENTAL POLICY STATEMENT ENVIRONMENTAL POLICY STATEMENT COMPANY NAME ADDRESS COMPANY ACTIVITIES TRACKYOU LTD BLACKWOOD BUSINESS PARK, ASH ROAD SOUTH, WREXHAM, LL13 9UG Telematics Provider of Vehicle Tracking Units to Local Authorities

More information

Energy Management Strategy

Energy Management Strategy Energy Management Strategy Gloucester s Energy Management Strategy sets out the way for the organisation to measure and manage all the energy and water resources it uses. The main areas it looks at are

More information

Green House, Hungary

Green House, Hungary Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support noel.morrin@skanska.se Green House, Hungary Case Study 109 Aspects of Sustainability This project

More information

Water Efficiency Self-Assessment Guide from

Water Efficiency Self-Assessment Guide from Water Efficiency Self-Assessment Guide from 1 Water Efficiency Self-Assessment Guide from Anglian Water Introduction More than 97% of the water in the world is too salty to drink, 2% is locked in glaciers

More information

ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY

ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY Paul Stokes Kevin Munford Asset & Facilities Manager Energy Officer 01/03/2006 THE COUNCIL S ENERGY POLICY FOR PUBLIC BUILDINGS AND TRANSPORT

More information

CASH SAVING BEATS ECO CONCERNS AS MAIN REASON TO GREEN YOUR HOME

CASH SAVING BEATS ECO CONCERNS AS MAIN REASON TO GREEN YOUR HOME Press Release CASH SAVING BEATS ECO CONCERNS AS MAIN REASON TO GREEN YOUR HOME Saving money is now our main motivation for carrying out green home improvements ahead of concerns for the environment. One

More information

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Features High-performance HVAC High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Landscaping Recycled and Regional Materials Storm-water Management District

More information

Ethical and environmental policy. Union of Brunel Students

Ethical and environmental policy. Union of Brunel Students Ethical and environmental policy Senior Management and Student Officers Version 2.0 November 2012 1 Contents Ethical and environmental policy 1. Introduction 3 2. Objectives 4 3. Environmental working

More information

EU Life+ Project: Combining Water and Energy Efficiency. A report by the Energy Saving Trust and Waterwise UK.

EU Life+ Project: Combining Water and Energy Efficiency. A report by the Energy Saving Trust and Waterwise UK. : Combining Water and Energy Efficiency A report by the Energy Saving Trust and Waterwise UK. Combining Water and Energy Effi ciency Water in the home External to household Overview The EU Life+ RENEW

More information

Home Energy and Water Efficiency in Alvaston, Chaddesden and Spondon

Home Energy and Water Efficiency in Alvaston, Chaddesden and Spondon Home Energy and Water Efficiency in Alvaston, Chaddesden and Spondon A guide on how to be more efficient with energy and water Energy and Efficiency booklet.indd 1 05/09/2013 15:45 Contents Alvaston, Chaddesden

More information

PRUPIM. Interim Sustainability Report 2007

PRUPIM. Interim Sustainability Report 2007 Executive summary PRUPIM Interim Sustainability Report 2007 Welcome to the Executive Summary of our 2007 Interim Sustainability Report, which provides an overview of PRUPIM s sustainability performance

More information

How To Be A Responsible Corporate Social Responsibility (Csr) Organisation

How To Be A Responsible Corporate Social Responsibility (Csr) Organisation CORPORATE SOCIAL RESPONSIBILITY STRATEGY 2013-2018 1 Contents Introduction...3 Our CSR Vision...5 Our CSR Objectives...7 Challenges and barriers...10 Implementation Framework...11 Communication Framework...13

More information

University of Glasgow Strategic Travel Plan 2010 2015

University of Glasgow Strategic Travel Plan 2010 2015 University of Glasgow Strategic Travel Plan 2010 2015 Jess Bailey Travel Plan Specialist Viola Retzlaff University of Glasgow Document Control Date Reviewed: March 2010 Version Number: 1 Author/Revised

More information

http://www.bca.gov.sg/greenmark/others/gm_nreb_v2.1.pdf

http://www.bca.gov.sg/greenmark/others/gm_nreb_v2.1.pdf Green Mark Criteria for Non-residential Existing Building (Version 2.1) GM for Non-residential Existing Buildings Criteria (Ver. 2.1) can be downloaded from : http://www.bca.gov.sg/greenmark/others/gm_nreb_v2.1.pdf

More information

Trust. Integrity. Shared Responsibility

Trust. Integrity. Shared Responsibility Allianz UK review 2011 04 Managing the business risks and opportunities of climate change 05 Reducing the environmental of our operations 06 Community Having a positive on the communities in which we operate

More information

Chelsea s energy saving campaign

Chelsea s energy saving campaign What s this all about? We take our responsibility for our environmental impact seriously and are committed to reducing waste and costs. We have already made huge progress in monitoring and reporting on

More information

Commercial Heating and Ventilation

Commercial Heating and Ventilation Commercial Heating and Ventilation Providing a comprehensive range of heating and ventilation solutions to local authorities, registered social landlords and commercial properties for over 35 years, Oakray

More information

RESOURCE USE & THE SUPPLY CHAIN

RESOURCE USE & THE SUPPLY CHAIN RESOURCE USE & THE SUPPLY CHAIN as part of the Energy Efficiency Information Grants Program Energy efficiency is one aspect of broader resource efficiency, which is the efficient use and re-use of all

More information

BCA Green Mark for Restaurants

BCA Green Mark for Restaurants BCA Green Mark for Restaurants Updated: 10/5/2011 1 Point Allocations - BCA Green Mark for Restaurants (I) Energy Related Requirements Part 1 : Energy Efficiency Category Point Allocations Minimum 20 points

More information

Case Study: Low carbon refurbishment of Westborough Primary School

Case Study: Low carbon refurbishment of Westborough Primary School Case Study: Low carbon refurbishment of Westborough Primary School Summary The buildings at Westborough Primary had evolved through a fragmented and piecemeal series of building additions and adaptations

More information

GREEN FACTS. Marina Bay Sands

GREEN FACTS. Marina Bay Sands Marina Bay Sands GREEN FACTS Marina Bay Sands is committed to integrating sustainability into the core business strategy. We drive sustainability through our Sands ECO360 Sustainability programme, a global

More information

Menzies Distribution Carbon Reduction. Overview Utilities Transport Waste Management

Menzies Distribution Carbon Reduction. Overview Utilities Transport Waste Management Menzies Distribution Carbon Reduction Overview Utilities Transport Waste Management 44.00 42.00 40.00 38.00 36.00 34.00 KG/CO2 per tonne delivered 2001 PPA Supply chain work commenced 2006 David Morton

More information

Operating Sustainable Facilities

Operating Sustainable Facilities Operating Sustainable Facilities Introduction... 1 Chapter 1: Energy Topic 1: Energy and Sustainable Facilities... 8 Topic 2: Energy Metrics... 11 Topic 3: Sustainable Facility Energy Initiatives... 20

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan This environmental management plan outlines Red Bus Services objectives and strategies for protecting the environment. This plan sets out how Red Bus Services intends to comply

More information

Think global THEY SAY and act local HERE S HOW

Think global THEY SAY and act local HERE S HOW think global act local Think global THEY SAY and act local HERE S HOW Some companies decide to go green to save money. Some do it to reassure clients, or because clients are expanding their corporate responsibility

More information

Sustainability: 5 Simple Ways Businesses Can Save at Work Tips from the Logistics Experts at UPS

Sustainability: 5 Simple Ways Businesses Can Save at Work Tips from the Logistics Experts at UPS Sustainability: 5 Simple Ways Businesses Can Save at Work Tips from the Logistics Experts at UPS "Employees who say they have the opportunity to make a direct social and environmental impact through their

More information

www.adaptcbe.co.uk Business Support

www.adaptcbe.co.uk Business Support www.adaptcbe.co.uk Business Support Events and Seminars The UEA Exemplar Low Carbon Building Project was awarded 6.2m from the European Regional Development Fund in October 2011. As a condition of this

More information

Eco-schools is a fantastic programme for schools and the awards are a brilliant achievement for both the pupils and the school as a whole.

Eco-schools is a fantastic programme for schools and the awards are a brilliant achievement for both the pupils and the school as a whole. Eco-schools is a fantastic programme for schools and the awards are a brilliant achievement for both the pupils and the school as a whole. At the moment 46 schools in Bexley are registered for eco-school,

More information

MAKING YOUR HOME WARMER

MAKING YOUR HOME WARMER MAKING YOUR HOME WARMER INTRODUCTION This guide has been written to help householders take the first steps to improving the homes they rent or own, making them warmer and cosier to live in, and less expensive

More information

North London Muslim Housing Association

North London Muslim Housing Association North London Muslim Housing Association Value for Money Self-Assessment 2013-2014 Value for Money The Association remains committed to providing services that represent Value for Money for our residents

More information

Has offset 279.07 tonnes of carbon dioxide through greenhouse gas reduction projects in order to reduce the rate of global climate change.

Has offset 279.07 tonnes of carbon dioxide through greenhouse gas reduction projects in order to reduce the rate of global climate change. This certifies that LaserTryk.dk A/S Has offset 279.07 tonnes of carbon dioxide through greenhouse gas reduction projects in order to reduce the rate of global climate change. ClimateCare 02 September

More information

Business energy management and. investment. Case studies

Business energy management and. investment. Case studies Business energy management and Case studies Ashley Primary School Ashley Shopping Centre Birtley House Nursing Home Canon Coulsdon Audi Guildford Borough Council Harlequin Theatre and car park High Ashurst

More information

G REEN G UIDE FOR B USINESS

G REEN G UIDE FOR B USINESS G REEN G UIDE FOR B USINESS 50 WAYS TO G O G REEN Want to go green? Not sure how? Or simply not convinced that it will make a difference? This guide has been compiled specifically to provide small to medium-sized

More information

Cabinet Sub Group - Performance Board

Cabinet Sub Group - Performance Board Cabinet Sub Group - Performance Board Part 1 1 November 2012 Item No 4 Subject Purpose Author Ward Summary Fuel Poverty To provide Performance Board with an outline of what constitutes Fuel Poverty and

More information

SUSTAINABILITY CHARTER. May 2012. 1 R&CA Sustainability Charter V1

SUSTAINABILITY CHARTER. May 2012. 1 R&CA Sustainability Charter V1 SUSTAINABILITY CHARTER May 2012 1 R&CA Sustainability Charter V1 Introduction By their very nature, restaurant and catering businesses are significant users of energy, water and raw materials. Cooking

More information

Asset Management Strategy

Asset Management Strategy Greater Manchester Fire and Rescue Service Asset Management Strategy 2013-2015 Appendix 1 Document Version Control Document Version Date Written by 0.1 June 2012 Andrea Heffernan 0.2 December 2012 Andrea

More information

2008 City of Chicago Green Pavilion

2008 City of Chicago Green Pavilion 2008 City of Chicago Green Pavilion [Station 1 Copy] Be Green. Save Green. Who doesn t like to save money? Put more green in your pocket as much as $700 annually and help conserve energy and offset climate

More information

Introduction to the London Energy Efficiency Fund (LEEF)

Introduction to the London Energy Efficiency Fund (LEEF) Executive Summary Introduction to the London Energy Efficiency Fund (LEEF) 1. The London Green Fund (LGF) is a 100m Fund comprising of 50m from the London 2007-13 European Regional Development Fund (ERDF)

More information

Travelife Sustainability System Criteria

Travelife Sustainability System Criteria Travelife Sustainability System Criteria Please note that the criteria are under a two-stage consultation review and may be subject to change when this concludes in July 2012. Introduction to the Travelife

More information

London Underground Environment Strategy

London Underground Environment Strategy London Underground Environment Strategy 2008 2013 mayor of london Transport for London Contents Introduction 3 London Underground Environment strategy 4 Managing environmental impacts 5 Embedding environment

More information

Islington Solar Panel Programme

Islington Solar Panel Programme Islington Solar Panel Programme Frequently Ask Questions When will it take place? It will take place during the November and December 2011 and the first stage will be completed during December 2011. Why

More information

BREEAM Europe. This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe.

BREEAM Europe. This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe. BREEAM Europe BREEAM Europe This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe. Key objectives Provide consistency and comparability

More information

A Strategic Approach to Housing Asset Management

A Strategic Approach to Housing Asset Management Housing A Strategic Approach to Housing Asset Management www.milton-keynes.gov.uk/housing-mkc 0 A Strategic Approach to Housing Asset Management Contents Page 1. Introduction 1 2. Developing a New Set

More information

Report Date: 04/03/2014. Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: 106178106 MPRN: 10301589669

Report Date: 04/03/2014. Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: 106178106 MPRN: 10301589669 Report Date: 04/03/2014 Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: 106178106 MPRN: 10301589669 About this Advisory Report Energy use in our homes is responsible for almost

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

Sustainable Supply Chain Policy

Sustainable Supply Chain Policy Sustainable Supply Chain Policy 1. Contents Page 2. Introduction & Purpose 1 3. Definitions 1 4. Benefits of a Sustainable approach to the Supply Chain 2 5. Operational Context 2 6. Elements & Principles

More information

HHHHH Outstanding 85%

HHHHH Outstanding 85% Provinciehuis_Assessment_2040204_74,32%Final Score and Rating BREEAM Scheme: Europe 2009: Offices H Pass 30% Building Name: Provinciehuis Antwerpen HH Good 45% BREEAM Registration No.: BREEAM-0048-4626

More information

Architecture Design Engineering Urbanism Sustainability Lighting Acoustics. Strategic Consultancy by BDP

Architecture Design Engineering Urbanism Sustainability Lighting Acoustics. Strategic Consultancy by BDP Architecture Design Engineering Urbanism Sustainability Lighting Acoustics Strategic Consultancy by BDP About BDP BDP is a major international, interdisciplinary practice of architects, designers, engineers

More information

ASEAN GREEN HOTEL. Audit Checklist

ASEAN GREEN HOTEL. Audit Checklist _ --- / ASEAN GREEN HOTEL Audit Checklist Nominee for Green Hotel Scope AuditTeam 1. 2. 3. Date of audit Requirement ndicators Criteria of audit Audit Guidance Rating Score Audit Findings Major Criteria

More information

Facilities Management Contract

Facilities Management Contract Facilities Management Contract Local Authority Contract value Length London Borough of Croydon 22-24 million per annum 7 years with optional extension of 3 years Contract requirements Croydon reviewed

More information

Code for Sustainable Homes. A step-change in sustainable home building practice

Code for Sustainable Homes. A step-change in sustainable home building practice A step-change in sustainable home building practice www.communities.gov.uk community, opportunity, prosperity December 2006 On 5th May 2006 the responsibilities of the Office of the Deputy Prime Minister

More information

Palmaris Services Ltd. Corporate Social Responsibility Statement

Palmaris Services Ltd. Corporate Social Responsibility Statement Palmaris Services Ltd Corporate Social Responsibility Statement Introduction We recognise that we must integrate our business values and operations to meet the expectations of our stakeholders. They include

More information

Elaine Harvie & Jeremy Cruickshank Jan 10

Elaine Harvie & Jeremy Cruickshank Jan 10 Elaine Harvie & Jeremy Cruickshank Jan 10 3 Assembly Square, Cardiff - EXCELLENT BREEAM International Introduction Elaine Harvie Mechanical Engineer BREEAM Assessor Offices School/Education Industrial

More information

Towards a One Planet Olympics

Towards a One Planet Olympics Towards a One Planet Olympics Achieving the first sustainable Olympic Games and Paralympic Games a joint initiative: What is a One Planet Olympics? The One Planet Living Challenge Studies into mankind

More information

ANNUAL ENVIRONMENTAL REPORT 2009

ANNUAL ENVIRONMENTAL REPORT 2009 ANNUAL ENVIRONMENTAL REPORT 2009 Index Executive summary 3 Our approach 5 Energy 7 Travel 8 Waste 9 Water 11 Governance 12 Appendix 13 2 Executive summary St. James s Place has reduced its normalised carbon

More information

KIRKLEES. Visions and Strategies related to Energy and Climate Issues

KIRKLEES. Visions and Strategies related to Energy and Climate Issues KIRKLEES Visions and Strategies related to Energy and Climate Issues In recognition of the urgency of climate, the UK Government has committed to take action now and has introduced the Climate Change Act

More information

SECTIO 9 SOCIALLY RESPO SIBLE WORKI G PRACTICES

SECTIO 9 SOCIALLY RESPO SIBLE WORKI G PRACTICES SECTIO 9 SOCIALLY RESPO SIBLE WORKI G PRACTICES RECOMME DED STA DARDS WITH EXAMPLES FOR CO SIDERATIO The examples given at Annex 1 show practices which have been introduced by various businesses and institutions.

More information

Brian Salisbury. Director, Strategic Planning Community Living British Columbia

Brian Salisbury. Director, Strategic Planning Community Living British Columbia Community Living British Columbia (CLBC) actively promoted green ideas to staff through its Go Green Committee and network of Go Green office leads located throughout the province. CLBC also maintains

More information

THE POWER TO BUILD YOUR BUSINESS

THE POWER TO BUILD YOUR BUSINESS THE POWER TO BUILD YOUR BUSINESS FIND out how our products and services can power your business to success the power behind your business who we are NICEIC and ELECSA are leading voluntary regulatory bodies

More information

Identifying Social Attitudes and Barriers to Water Conservation A Community Water Survey

Identifying Social Attitudes and Barriers to Water Conservation A Community Water Survey Identifying Social Attitudes and Barriers to Water Conservation A Community Water Survey H Lane 1, C Krogh 2, L O Farrell 3 1 Eurobodalla Shire Council, harvey.lane@eurocoast.nsw.gov.au 2 Eurobodalla Shire

More information

Proposal for a Demonstration Exemplar at British Sugar, York

Proposal for a Demonstration Exemplar at British Sugar, York Executive 21 July 2009 Report of the Director of City Strategy URBAN ECO SETTLEMENT Proposal for a Demonstration Exemplar at British Sugar, York Summary 1. This paper outlines a proposal for funding a

More information

Carbon Footprint of CMC Hospital for 2013

Carbon Footprint of CMC Hospital for 2013 Carbon Footprint of CMC Hospital for 2013 Carbon footprint of CMC Hospital campus was estimated for the year 2011 and 2012 and the total CO2e emission was estimated at 15271.74 CO2e tons and 15456.61 CO2e

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 0 Raleigh Drive CULLOMPTON EX15 1FZ Dwelling type: Date of assessment: Date of certificate: Reference number: Type of assessment: Total floor area: Semi detached house 09

More information

Environmental Performance Report April 2011 March 2012

Environmental Performance Report April 2011 March 2012 Essex County Fire & Rescue Service Our Values: Respect, Accountability, Openness and Involvement Environmental Performance Report April 2011 March 2012 Contents Executive summary...3 Introduction...4 Environmental

More information

Household waste & recycling storage requirements

Household waste & recycling storage requirements South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well

More information

Chair Tom Galloway and Members of the Administration and Finance Committee UPDATE - CORPORATE ENVIRONMENTAL SUSTAINABILITY STRATEGY

Chair Tom Galloway and Members of the Administration and Finance Committee UPDATE - CORPORATE ENVIRONMENTAL SUSTAINABILITY STRATEGY REGION OF WATERLOO CORPORATE RESOURCES Facilities Management & Fleet Services TO: Chair Tom Galloway and Members of the Administration and Finance Committee DATE: May 13, 2008 FILE CODE: A26-50(A) SUBJECT:

More information

Energy Saving Fact Sheet Energy Management

Energy Saving Fact Sheet Energy Management Energy Saving Fact Sheet Energy Management Energy it s much more manageable than you think Energy is not an unmanageable overhead it is one of the largest controllable costs in most organisations. Cutting

More information

FCB NEW ZEALAND. Environmental Policy 2015

FCB NEW ZEALAND. Environmental Policy 2015 FCB New Zealand Environmental Policy FCB NEW ZEALAND Environmental Policy 2015 Auckland/Wellington Environmental Policy July 2015 Page 1 TABLE OF CONTENTS ENVIRONMENTAL POLICY 3 DEFINITIONS 6 IDENTIFYING

More information

Get Ready For The One Tonne Action Challenge!

Get Ready For The One Tonne Action Challenge! Get Ready For The One Tonne Action Challenge! Read through the four elements of the one-tonne challenge - making a difference is easier than you think!! Watt's It All About? As our demand for electricity

More information

Code for Sustainable Homes Guidelines

Code for Sustainable Homes Guidelines Canoldir Penrhos Anglesey LL65 2TS Phone: 01407 860666 Email: saps@easonline.co.uk www.easonline.co.uk Code for Sustainable Homes Guidelines A CSH rating is the responsibility of the Developer/ Architect

More information

Introduction to Waste Treatment Technologies. Contents. Household waste

Introduction to Waste Treatment Technologies. Contents. Household waste Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting

More information

A guide to our company and our services. www.phjones.co.uk

A guide to our company and our services. www.phjones.co.uk A guide to our company and our services www.phjones.co.uk NATIONWIDE COVERAGE local expertise Introduction Since it s formation in 1963, PH Jones has continued to grow through the provision of excellent

More information

Waste Management Action Plan 2011-2015

Waste Management Action Plan 2011-2015 Waste Management Action Plan 2011-2015 Approved on: 7 June 2011 Owner: Program Manager, 8203 7723 Trim Reference: ACC2011/77875 Next Review Date: June 2014 Executive Summary This Waste Management Action

More information

How To Manage Property In Tower Hamlets

How To Manage Property In Tower Hamlets 2015 2020 Page 1 of 15 Contents 1 Introduction 2 What is Asset Management 3 Limitations 4 THCH Asset Profile 5 How the Asset Management Strategy Supports THCH s Strategic Priorities 6 How The Asset Management

More information

Energy and Water Efficiency Management Practice Guide

Energy and Water Efficiency Management Practice Guide Carbonproof Energy and Water Efficiency Management Practice Guide The material provided in this guide has been produced in conjunction with our partner Energetics Pty Ltd. 2011 Energetics Pty Ltd and AgriFood

More information

C21 Ecologically Sustainable Development

C21 Ecologically Sustainable Development C21 Ecologically Sustainable Development Sustainable Schools Initiative The Australian Sustainable Schools Initiative (AuSSI) is a partnership between the Australian Government and States and Territories

More information