1 Cook County Government Bureau of Finance Enterprise Resource Planning Center of Excellence ERP Briefing August 19, 2014 DISCLAIMER: This presentation is thought to be accurate on the date it is posted, it is provided for informational purposes only. Vendors are responsible for reviewing the information included in the RFP, including any addendums issued to develop ERP Proposal responses.
2 Table of Contents Introductory Remarks Office of the Chief Procurement Officer Enterprise Resource Planning CoE ERP System Integration Services Projected Timeline Scope of Work Projected Benefits Approach Other ERP Initiatives Currently Underway Denovo JDEdwards E1 Human Resources/Payroll Migration WorkForce EmpCenter Time & Attendance Implementation Office of Contract Compliance Question & Answer DISCLAIMER: This presentation is thought to be accurate on the date it is posted, it is provided for informational purposes only. Vendors are responsible for reviewing the information included in the RFP, including any addendums issued to develop ERP Proposal responses. 2
3 Office of the Chief Procurement Officer The Office of the Chief Procurement Officer ( OCPO ) as mandated by the Cook County Procurement Code, set forth in the Cook County Code of Ordinances, procures all goods, services, equipment and supplies for Cook County (the County ). Ensures an open and transparent procurement process which helps to promote maximum vendor participation while leveraging overall County volume to achieve lower costs Provides or facilitates information sharing between user departments and vendor communities through outreach events and workshops Manages and monitors the procurement process: 1. Review and publicly advertise procurement opportunities 2. Establishes RFP schedule 3. Compiles Questions and publishes addendums 4. Ensure thorough and fair evaluations 5. Ensure all RFPs/Bids and contracts adhere to the Procurement Process 6. Documents and monitors RFP and contract related concerns or issues, including issuing notices of violation to enforce the provisions of this Code, as applicable 7. Resolves disputes DISCLAIMER: This presentation is thought to be accurate on the date it is posted, it is provided for informational purposes only. Vendors are responsible for reviewing the information included in the RFP, including any addendums issued to develop ERP Proposal responses. 3
4 System Integration Services: Projected Timeline Target Q Q Q Q Q Q Q Task Complete System Integrator RFP Review Release System Integrator RFP Train Evaluation Committee Receive System Integrator Proposals Complete Software Contract Negotiations Accept System Integrator Evaluation Committee Recommendation Present Contracts as New Items to the County Board for Consideration Note: Currently reviewing options for project IV&V services DISCLAIMER: This presentation is thought to be accurate on the date it is posted, it is provided for informational purposes only. Vendors are responsible for reviewing the information included in the RFP, including any addendums issued to develop ERP Proposal responses. 4
5 System Integration Services: Scope of Work Implementation Services Complete To-Be Process Design Install and Configure Primary ERP Software Conduct Training for ERP End-Users Provide Post-Implementation Warranty Services Managed Services Implement Software Patches & Version Upgrades Manage Application & Database Provide Level 2/3 Support Follow Service Level Agreements (SLAs) Transition Implementation to Managed Services Third-Party Software Propose solutions to any gaps in required functionality Install and Configure Third-Party Software Maintenance Services Maintain Hardware Provide Level 2/3 Support Follow Service Level Agreements (SLAs) DISCLAIMER: This presentation is thought to be accurate on the date it is posted, it is provided for informational purposes only. Vendors are responsible for reviewing the information included in the RFP, including any addendums issued to develop ERP Proposal responses. 5
6 System Integration Services: Projected Benefits Forest Preserves Acct. Rules Security Common ERP Platform Cook County Elected Corporate Hospital Accounting Rules Security Security Security Project Objectives: Common Platform Business Process Improvement Accurate, Consolidated Data Measurable Savings Business Rules Business Rules Business Rules Business Rules PO/SCM Procurement/Supply Chain Management Patient Bill Patient Management Inventory Inventory Purchasing HR/PL/Benefits HR/Payroll/Benefits Financials GL Rpt/Analytics Time Entry CAFR Column Time Entry Vendors Financials GL (Cash/Modified/Full) Reporting/Analytics Time Entry Time Entry DISCLAIMER: This presentation is thought to be accurate on the date it is posted, it is provided for informational purposes only. Vendors are responsible for reviewing the information included in the RFP, including any addendums issued to develop ERP Proposal responses. 6
7 System Integration Services: Approach Deployment Model On-premise Managed services Application Support Staffing Model Utilizing ERP Functional Organizational Model with both County and vendor staff assigned to specific roles Project office is staffed with ERP-experienced, full-time dedicated employees Matrix structure with Bureau of Technology (BOT) staff Project Management Standards Collaborated with BOT & County Auditor to standardize minimum phase deliverables to reduce project risk Independent Validation & Verification (IV&V) firm to manage the quality review process Vendors encouraged to follow their unique methodology within the deliverables framework ERP As-Is State Business Process Blueprinting Financial, Procurement, Inventory Management, HR, Payroll and Benefits processes 40+ key business processes & sub-processes documented Identified common and unique functional requirements Shadow System & Interface Inventory 110+ shadow systems documented at field-level Identified systems to retire & data conversion strategy DISCLAIMER: This presentation is thought to be accurate on the date it is posted, it is provided for informational purposes only. Vendors are responsible for reviewing the information included in the RFP, including any addendums issued to develop ERP Proposal responses. 7
8 Denovo JDE E1 HR/Payroll Migration Timeline Target June 20, 2014 June 27, 2014 June 27, 2014 June 27, 2014 July 14, 2014 July 23, 2014 July 23, 2014 August 7, 2014 August 15, 2014 September 26, 2014 Task Disaster Recovery Connectivity Testing Stress Testing User Acceptance Testing Train the Trainer Disaster Recovery Business Continuity Testing End-User Training Cut-Over Activities Go-Live First E1 Payroll Post Go-Live Support DISCLAIMER: This presentation is thought to be accurate on the date it is posted, it is provided for informational purposes only. Vendors are responsible for reviewing the information included in the RFP, including any addendums issued to develop ERP Proposal responses. 8
9 WorkForce Time & Attendance Timeline Activity Target Task Project Management Jul-14 Project Initiation & Discovery Software Aug-14 Common Foundational Requirements Project Management Sep-14 Change Management Plan Software Oct-14 Non-Union Requirements Analysis Software Nov-14 Collective Bargaining Agreements (CBAs) Analysis Clocks Dec-14 Functional Site Surveys Clocks Feb-15 Technical Site Surveys Software May-15 Enterprise Requirements Project Management Jun-15 Enterprise Design & Configuration Project Management Nov-15 Testing Clocks Dec-15 Biometric Clock Installation Project Management Jan-16 Enterprise Phase I Go-Live DISCLAIMER: This presentation is thought to be accurate on the date it is posted, it is provided for informational purposes only. Vendors are responsible for reviewing the information included in the RFP, including any addendums issued to develop ERP Proposal responses. 9
10 Office of Contract Compliance Minority and Woman Business Enterprise (M/WBE) Participation It is the County s goal of achieving 35% M/WBE participation on professional services contracts Goals may be set by subcategories versus overall contract Be Responsive Identify potential certified M/WBEs Cook County s online M/WBE directory at M/WBEs must be currently certified by: Cook County or; City of Chicago along with Reciprocal Certification Affidavit Must meet Cook County s definition of small business size standards and personal net worth Start working on your M/WBE Utilization Plan If goals can not be met, a waiver or partial waiver must be requested and good faith efforts shall be demonstrated as set forth in Section under Chapter 34 of Cook County s Procurement Code This is a networking event for M/WBEs and Prime vendors to meet and create opportunities for potential partnerships DISCLAIMER: This presentation is thought to be accurate on the date it is posted, it is provided for informational purposes only. Vendors are responsible for reviewing the information included in the RFP, including any addendums issued to develop ERP Proposal responses. 10
COOK COUNTY TECHNOLOGY OUTLOOK. October 28, 2014
COOK COUNTY TECHNOLOGY OUTLOOK October 28, 2014 COOK COUNTY TECHNOLOGY OUTLOOK Shannon E. Andrews Chief Procurement Officer of Cook County OFFICE OF THE CHIEF PROCUREMENT OFFICER 1/2 The Office of the
More informationProcess Validation Workshops. Overview Session
Process Validation Workshops Overview Session 2 Session Objectives: Prepare staff for participating in a Process Validation Workshop Clarify the Purpose of Process Validation Workshops Clarify Expected
More informationAT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
More informationCommittee of the Whole. January 22, 2014
Committee of the Whole January 22, 2014 Drivers for 2003 IT Outsourcing Cost savings - privatization model ($2- $3MM/year) Cost avoidance Data center lease with County expiring ($3.5MM) Disaster recovery
More informationHow To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
More informationEnterprise Projects Fiscal Year 2011/2012 Third Quarter Report
Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report The Enterprise Program Investment Council (EPIC) is responsible for governance
More informationEnterprise Projects Fiscal Year 2009/2010 First Quarter Report
Enterprise Projects Fiscal Year 2009/2010 First Quarter Report Enterprise Projects Fiscal Year 2009/2010 - First Quarter Report The Enterprise Program Investment Council (EPIC) is responsible for governance
More information07/18/2011. sodexousa.com
07/18/2011 sodexousa.com Overview Sodexo Who We Are Talent Management of Olde Competency Model Going Online Performance Cycle Online Process 2004-2011 Benefits Realized Succession Planning Data 2009 Decision
More informationBUSINESS SYSTEM SOFTWARE IMPLEMENTATION: Expensive, late, and incomplete
BUSINESS SYSTEM SOFTWARE IMPLEMENTATION: Expensive, late, and incomplete November 2010 LaVonne Griffin-Valade City Auditor Drummond Kahn Director of Audit Services Janice Richards Senior Management Auditor
More informationEnterprise Projects Fiscal Year 2009/2010 Third Quarter Report
Enterprise Projects Fiscal Year 2009/2010 Third Quarter Report Enterprise Projects Fiscal Year 2009/2010 - Third Quarter Report The Enterprise Program Investment Council (EPIC) is responsible for governance
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationEnterprise Resource Planning (ERP) Program: Overview and Status Update
Enterprise Resource Planning (ERP) Program: Overview and Status Update Human Resources (HR), Finance & Property Services (FPS), and Information Technology (IT) Departments For the Council Committee of
More information1. Regarding section 1.6 (Page 7), what level of support (onsite or remote) is required?
Responses to questions in reference to the Governor s Office of Storm Recovery Managed Information Technology Network and Application Development Support Services Request for Proposal dated June 17, 2014
More informationMichigan Department of Human Services MiSACWIS Overview and Update
Michigan Department of Human Services MiSACWIS Overview and Update Steve Yager C h i l d r e n s S e r v i c e s D i r e c t o r 1 Definition of MiSACWIS Michigan Statewide Automated Child Welfare Information
More informationMemorandum. Date: 11.27.13 RE: Citizens Advisory Committee December 4, 2013
Memorandum Date: 11.27.13 RE: Citizens Advisory Committee December 4, 2013 To: From: Subject: Summary Citizens Advisory Committee Cynthia Fong Deputy Director for Finance and Administration ACTION Adopt
More informationConsulting Services for Enterprise Resource Planning Project Planning and RFP Development Government Finance Officers Association
Volusia County Schools Consulting Services for Enterprise Resource Planning Project Planning and RFP Development Government Finance Officers Association May 12, 2016 Agenda o Introductions o Approach &
More informationAgriLife Information Technology IT General Session January 2010
AgriLife Information Technology IT General Session January 2010 Agenda Topics Year in Review Enterprise IT Services Update FirstCall Overview and Next Steps Sophos Antivirus Initiative Update Information/
More informationNew Jersey Transportation Authority (NJTA) Request For Proposal And Optional PeopleSoft Financial System
January 14, 2010 TO ALL PROPOSERS: RE: Request for Proposal New Jersey Turnpike Authority The Upgrade and Enhancement of the PeopleSoft Financial System And Optional PeopleSoft Financial System for South
More informationDomain 1 The Process of Auditing Information Systems
Certified Information Systems Auditor (CISA ) Certification Course Description Our 5-day ISACA Certified Information Systems Auditor (CISA) training course equips information professionals with the knowledge
More informationBenefits of Latest Innovations in Campus Planning
Exempt Employee Association 01/29/13 Agenda icat Objectives CedarCrestone Overview Project Scope and Timeline Project Methodology What is Changing and Your Involvement Change Management Overview Closing
More informationCase 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
More informationACTIVE MICROSOFT CERTIFICATIONS:
Last Activity Recorded : May 30, 2014 Microsoft Certification ID : 375009 SUSANNE SCHNEIDER KAISERSTRASSE 53 REUTLINGEN, 72764 DE SUSANNE.SCHNEIDER@KIT-KOM.DE *Charter- Certification that was achieved
More informationBoard Update. Performance Management Activities
Board Update Performance Management Activities May 2007 Purpose of Today s Meeting Update Board Members Share Scope, Plans & Results» Benchmarking & Performance Improvement» Compliance Activities 1 Chugach
More informationCouncil, 6 February 2014. IT Report. Executive summary and recommendations. Introduction
Council, 6 February 2014 IT Report Executive summary and recommendations Introduction The report sets out the main activities of the IT Department since the last meeting of Council. It includes statistical
More informationLong Term Data Center Facilities Program
Long Term Data Center Facilities Program ISAC Briefing August 22, 2012 Overview: The Long Term Data Center Facilities Program is an initiative of the approved data center strategic plan to consolidate
More informationUniversity of Wisconsin System Strategic Initiatives
University of Wisconsin System Strategic Initiatives April 27,2015 Sasi K. Pillay UWSA CIO 1 Principles Mission Enablement Reduction of Risk Cost-effective Operations 2 The Four Tenets A. Elevate the Professionalism
More informationExecutive Branch IT Reorganization Project Plan
Office of Information Resource Management Executive Branch Project Plan Work Program Funded by for IT Appropriations Reorganization 2007, 2009 and Five Small Projects Date: August 2009 Version: 1.3 Revision
More informationLeveraging Technology For ICD-10 Program Management Using MS SharePoint 2010. Poster Presentation by Maithili Vadula
Leveraging Technology For ICD-10 Program Management Using MS SharePoint 2010 Poster Presentation by Maithili Vadula ICD-10 Project using SharePoint: Project Background: New structure for coding diagnosis
More informationPurchased Services Areas of Opportunity:
Purchased Services Areas of Opportunity: How Texas Children's Hospital Achieved Significant Cost Savings For Its Contract Staffing Purchased Services Presented by Edward M. Lewis, C.P.M., CMRP Supply Chain
More informationManaging Open Source Code Best Practices
Managing Open Source Code Best Practices September 24, 2008 Agenda Welcome and Introduction Eran Strod Open Source Best Practices Hal Hearst Questions & Answers Next Steps About Black Duck Software Accelerate
More informationEnhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
More informationPerformance Audit Concurrent Review: ERP Pre-Solicitation
Performance Audit Concurrent Review: ERP Pre-Solicitation April 2002 City Auditor s Office City of Kansas City, Missouri 24-2001 April 10, 2002 Honorable Mayor and Members of the City Council: We conducted
More informationCity & County of San Francisco Permit & Project Tracking System
City & County of San Francisco Permit & Project Tracking System PPTS Sneak Preview March 20, 2013 Welcome & Opening Statements AGENDA 1. Opening Statements Department Directors 2. Project Background 3.
More informationRequest for Proposal for Application Development and Maintenance Services for XML Store platforms
Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...
More informationCentral Hosting. Case Study
Central Hosting Case Study October, 2014 Central Hosting Case Study Background An Chéim was originally set up to procure, distribute and implement key MIS systems (hardware and software) for the Institutes
More information2009 NASCIO Recognition Awards Page 2 of 7
State of Oklahoma 2009 NASCIO Recognition Awards Nomination Statewide ERP Implementation Office of State Finance Nominating Category: Enterprise IT Management Initiatives Lead, Support, Serve B. Executive
More informationAdvisory User Group Meeting. October 18, 2011
Advisory User Group Meeting October 18, 2011 1 Agenda 11:30 Welcome Christine Lavoie 11:35 Session Objectives Christine Lavoie 11:40 USC s Research Administration System Christine Lavoie 11:50 Project
More informationThe Business Case For Private Cloud Services
Velocity Technology Solutions / May 015 This Private Cloud Services guide will: Define a common vocabulary around Private Cloud Service Providers Describe how Private Cloud Services can reduce the total
More informationFrom: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer Date: September
More informationCompany A Project Plan
Company A Project Plan Project Name: Close Optimization Project Example Prepared By: David Done - Project Manager Title: John Doe -Project Manager Date: March 17, 2011 Project Plan Approval Signatures
More informationRequest for Information (RFI) for Cook County Enterprise Resource Planning System
(RFI) for Enterprise Resource Planning System Issued: February 3, 2011 Response deadline: March 4, 2011 Request for Information: #11-50-05I Request for Information #11-50-05I 1 of 14 This RFI is for planning
More informationSCOPE OF WORK. The scope of work of Implementation Partner (IP) shall include the following:
SCOPE OF WORK 1. Brief Scope of work The scope of work of Implementation Partner (IP) shall include the following: Supply and installation of ERP licenses including ATS ERP system implementation, Project
More informationIntegrated Enterprise Resource Planning (ERP) System Page 1 of 1 Appendix 10 Narrative Responses
Integrated Enterprise Resource Planning (ERP) System Page 1 of 1 Table of Contents 1.1. TECHNICAL ARCHITECTURE... 2 1.1.1. Application Overview... 2 1.1.2. Technology Overview... 2 1.1.2.1. Hardware Environment...
More informationExtending the Life of Your Enterprise Resource Planning. (ERP) Solution Presenters:
Extending the Life of Your Enterprise Resource Planning QR Code (ERP) Solution Presenters: Moderator: David Keller, Asst. City Manager & CFO Speakers: Simon Threlfall, Senior Director, Customer Modernization
More informationCompleted and Current Projects
Completed and Current Projects This project list is updated regularly with the current status of each project and the milestones that have been achieved. You can see the latest information on each project
More informationAnalysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
More informationStrategic Evaluation of ERP. Presented on 25th June, 2013 by: Yousef Awwad, CPA Chief Financial Officer
Strategic Evaluation of ERP Presented on 25th June, 2013 by: Yousef Awwad, CPA Chief Financial Officer Agenda Our Purpose TUSD Enterprise Resource Planning (ERP) Timeline History Lesson s Learned Project
More informationThe Business Case For Private Cloud Services
Velocity Technology Solutions / April 2015 This Private Cloud Services guide will: Define a common vocabulary around Private Cloud Service Providers Describe how Private Cloud Services can reduce the total
More informationRFP Q & A for BUDGET DEVELOPMENT SOFTWARE 1. Cover page (page 1): Would SCBE considers a 3 week extension to the July 1st deadline?
1. Cover page (page 1): Would SCBE considers a 3 week extension to the July 1st deadline? A. Yes, Monday, July 22, 2015. Please see Addendum I. 2. Cover page (page 1): What is TIME REQUIRED FOR DELIVERY
More informationSage ERP MAS 90, 200, 200 SQL, and Sage ERP MAS 500. Supported Versions
Sage ERP MAS 90, 200, 200 SQL, and Sage ERP MAS 500 Supported Versions Current Document: 2012... Page 1 Earlier Documents: 2011... Page 2 2010... Page 3 2009... Page 4 2008... Page 5 Sage ERP MAS 90, 200,
More informationThe Plan Category. Middle East Academy For Training & Consulting. Training Plan 2016. Public Relations. Leadership and Management. Sales and Marketing
Middle East Academy For Training & Consulting ل د للتدريب واإلستشارات Training Plan 2016 The plan contains about Eighteen specialty specialty contain all the programs listed. Each program contains three
More informationOakland County Department of Information Technology Project Scope and Approach
Oakland County Department of Information Technology Project Scope and Approach Project Name: Service Center Knowledge Base Project ID: DH6181KB Leadership Group: Internal Services Department: Information
More informationCounty of Orange ~ Information Technology Quarterly IT Project Status Detail Report Fiscal Year 2014-15, 1st Quarter
County of Orange ~ Information Technology Quarterly IT Project Detail Report Fiscal Year 2014-15, 1st Quarter Executive Summary The Quarterly IT Project Detail report provides an inventory of all County
More informationGTA Board of Directors December 4, 2014
GTA Board of Directors December 4, 2014 Our Strategic Vision Our Mission A transparent, integrated enterprise where technology decisions are made with the citizen in mind To provide technology leadership
More informationIndependent Accountants Report on Applying Agreed-Upon Procedures
Independent Accountants Report on Applying Agreed-Upon Procedures Board of Trustees We have performed the procedures, as discussed below, with respect to the employer contributions remitted by to the in
More informationApproaches to Successfully Implementing Statewide ERP
Approaches to Successfully Implementing Statewide ERP August 24, 2015 NASACT Clark Partridge, State of Arizona Michael J. Smarik, State of Arizona Daniel Keene, CGI James Colbert, CGI Agenda Statewide
More informationDCSS Time and Attendance Project
2014 DCSS Time and Attendance Project Dougherty County School System 3/28/2014 Contents Definition of Terms.. 2 Introduction.. 3 Background.. 3 Specifications/Scope of Work.. 3 Current Application Overview..
More informationBad Honnef 14.-15. September 2010. Reiner Schmitt. schmitt consulting. your license. our business
Bad Honnef 14.-15. September 2010 Reiner Schmitt schmitt consulting your license. our business Agenda 1. Responsibilities @ SAP AG 2. Motivation / Challenges for Software License & Asset 3. Transparency
More informationASSAM POWER GENERATION CORPORATION LIMITED
ASSAM POWER GENERATION CORPORATION LIMITED Notice Inviting Expression of Interest for Consultancy in connection of Assam Power Sector Investment Program financed by ADB NIT No. NIT/PMU/05 of 2014-15 Director
More informationLaunching an Enterprise-Wide Solution My Government of Canada Human Resources (My GCHR)
Tammy Labelle Public Works and Government Services Government of Canada Launching an Enterprise-Wide Solution My Government of Canada Human Resources (My GCHR) Copyright Notice The contents of this presentation
More informationMaryland Health Benefit Exchange: Independent Verification and Validation (IV&V) Services Public Summary
Maryland Health Benefit Exchange: Independent Verification and Validation (IV&V) Services Public Summary Angarai International Monthly IV&V Report Report Month: August 2014 Delivery Date: September 15,
More informationRFP-00118 ADDENDUM NO. 1
INTERNAL SERVICES DEPARTMENT PROCUREMENT MANAGEMENT SERVICES 111 NW 1 ST Street Suite 1300 Miami, Florida 33128-1974 Telephone: 305-375-4725 Fax: (305) 375-5688 RFP-00118 ADDENDUM NO. 1 DATE: March 26,
More informationHow To Get A Certificate From Ms.Net For A Server Server
Last Activity Recorded : December 19, 2014 Microsoft Certification ID : 2665612 MARC GROTE Wittorfer Strasse 4 Bardowick, Lower Saxony 21357 DE grotem@it-training-grote.de ACTIVE MICROSOFT CERTIFICATIONS:
More informationHosting JDE EnterpriseOne in the Cloud Hear how one company went to the cloud
Hosting JDE EnterpriseOne in the Cloud Hear how one company went to the cloud October 2015 2015 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T Agenda Organizational
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 26-AUG-2013 End: 20-OCT-2013 Start: 21-OCT-2013 End: 15-DEC-2013
2013-2014 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2013 TERM Key: P/T = Part of Term P/T Description
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 25-AUG-2014 End: 19-OCT-2014 Start: 20-OCT-2014 End: 14-DEC-2014
2014-2015 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2014 TERM Key: P/T = Part of Term P/T Description
More informationCity of Minneapolis RCA Provision of IT Services. Committee of the Whole February 11, 2015
City of Minneapolis RCA Provision of IT Services Committee of the Whole February 11, 2015 Background IT Services contract with Unisys signed 12/2002 Unisys contract renegotiated in 2007 Reduced cost, added
More informationLong Term Data Center Facilities Program
Long Term Data Center Facilities Program ISAC Briefing December 2012 Overview: The Long Term Data Center Facilities Program is an initiative of the approved data center strategic plan to consolidate Citizens
More informationAssumptions. It is assumed that:
It is assumed that: Assumptions 1. The State will establish a MICAM project steering committee to oversee the progress of the project. This steering committee will have representation from Contractor.
More informationTeam A SaaS Strategy
Team A SaaS Strategy What is a strategy? Strategy is the direction and scope of an organization over the long-term term: : which achieves advantages for the organization through its configuration of resources
More informationBlackboard Collaborate Web Conferencing Hosted Environment Technical Infrastructure and Security
Overview Blackboard Collaborate Web Conferencing Hosted Environment Technical Infrastructure and Security Blackboard Collaborate web conferencing is available in a hosted environment and this document
More informationConsumer ID Theft Total Costs
Billions Consumer and Business Identity Theft Statistics Business identity (ID) theft is a growing crime and is a growing concern for state filing offices. Similar to consumer ID theft, after initially
More informationOrganizational Development Plan
Commonwealth of Massachusetts Consolidation Planning Project Plan Version 11.0 05/03/2009 Revision History The table below serves to track the key revisions made to this document for change control purposes.
More informationERP Selection Process - A Case Study From Newport,RI
Celebrating Success in ERP Systems QR Code Presenters: Perry James III, CFO, City of Raleigh, NC Speakers: Nancy Lalli, Controller, City of Newport, RI Stan Van Ostran, VP & CFO, Metropolitan Nashville
More informationACTIVE MICROSOFT CERTIFICATIONS:
Last Activity Recorded : August 04, 2011 Microsoft Certification ID : 483228 KENT NORDSTROM Asbergsvagen 27 Soderhamn, 82637 SW kent@xpservices.se ACTIVE MICROSOFT CERTIFICATIONS: Microsoft Certified Solutions
More informationNASA Shared Services Center (NSSC) Overview
(NSSC) Overview October 2015 www.nasa.gov NASA Centers 2 The National Aeronautics and Space Administration (NASA) NASA Vision We reach for new heights and reveal the unknown for the benefit of humankind
More informationUCPath Project: Phase 1 Implementation Plan UC Santa Cruz
UCPath Project: Phase 1 Implementation Plan UC Santa Cruz 06/12/2012 Version: Final Author: Laurie Eppler, David Turner Table of Contents 1 EXECUTIVE SUMMARY... 1 1.1 Introduction... 1 1.2 Context for
More informationAdministrative Systems Modernization Program ASMP 2.0. Town Hall April 1, 2014
Administrative Systems Modernization Program ASMP 2.0 Town Hall April 1, 2014 It all started 2006 Core Application Strategy for the Enterprise (CASE) 2009 Strategic IT Accountability Board (SITAB) Report
More informationBb Upgrade Timeline. Oct Nov Dec Jan 2011 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2012. PDFmyURL.com
Bb Upgrade Timeline Oct Nov Dec Jan 2011 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2012 Technology Create a training plan for Bb early adopters and mentors Conduct Transitioning to Bb 9.1 training
More informationHow to Manage a Successful R12 Upgrade and Overcome the Challenges: Methodology and Tips that Work
O2 Works Putting Oracle to Work Oracle E-Business Specialists How to Manage a Successful R12 Upgrade and Overcome the Challenges: Methodology and Tips that Work August 20, 2010 Overview / Agenda Introductions
More informationintegrate 2: Business Process Redesign
Nevada System of Higher Education integrate 2: Business Process Redesign Executive Summary TABLE OF CONTENTS I. BACKGROUND AND OBJECTIVES 2 II. METHODOLOGY AND APPROACH 3 III. PROJECT OUTCOMES 5 IV. MAJOR
More informationPROPOSAL XXX INFRASTRUCTURE MIGRATION PROJECT (RFP 20XX.XX.XX)
PROPOSAL XXX INFRASTRUCTURE MIGRATION PROJECT (RFP 20XX.XX.XX) PREPARED FOR: CLIENT Address City, Province / State, Index Contact: Name, Title PREPARED BY: VIMEX TECHNOLOGIES 604-126 West 3 rd Street North
More informationOrange County Convention Center Orlando, Florida June 3-5, 2014. Architecturing the cloud for your SAP landscape Florian Stilkerich
Orange County Convention Center Orlando, Florida June 3-5, 2014 Architecturing the cloud for your SAP landscape Florian Stilkerich LEARNING POINTS What are the different types of Cloud Enterprise Architecture
More informationFunctions of the Clerk s s Office
Agenda Welcome and Introductions What is Being Procured? ITN Scope and Anticipated Timeline Vendor Qualifications ITN Structure Reply Response & Evaluation Vendor Oral Presentations Questions Vendor Conference
More informationGTA Board of Directors September 4, 2014
GTA Board of Directors September 4, 2014 Our Strategic Vision Our Mission A transparent, integrated enterprise where technology decisions are made with the citizen in mind To provide technology leadership
More informationAryzta Commercial Excellence (ACE) ACE Project Overview
Aryzta Commercial Excellence (ACE) ACE Project Overview ( Cloud for Customer, mobile BI, Product Catalogue ) Agenda Introduction to ARYZTA Overview of the Project: Background, Objectives and Key Business
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 24-AUG-2015 End: 18-OCT-2015 Start: 19-OCT-2015 End: 13-DEC-2015
2015-2016 SPECIAL TERM ACADEMIC CALENDAR For Scranton Education Online (SEOL), Masters of Business Administration Online, Masters of Accountancy Online, Health Administration Online, Health Informatics
More informationMISSION SUMMARY OF SERVICES/FACILITIES
DEPARTMENT SUMMARY MISSION To provide County departments and small businesses with excellent customer service, professional assistance, and technical responsiveness to promote the economic growth, expansion
More informationIntroduction. Our Services
Introduction RCMT IT Solutions is a global provider of Custom Software, Infrastructure Technology and Managed Solutions. Offering extensive consulting expertise and professional mastery of the latest technologies,
More informationConsolidating Multiple Product Development Systems at TreeHouse Foods into SAP Product Lifecycle Management
Consolidating Multiple Product Development Systems at TreeHouse Foods into SAP Product Lifecycle Management Kathy Kugelman, TreeHouse Foods Robin Patrawala, Linx-AS SESSION CODE: PL1288 AGENDA About TreeHouse
More informationRFP # FAR226005 - Addendum #4 Enterprise Resource Planning (ERP) Software and Services
Purpose of this Addendum: Vendor Inquiries and responses are provided. Where appropriate, the impacted section(s) of the RFP have been inserted to reflect the amended language. Clarification has also been
More informationStrategies for a Successful E2E Systems Integration Test. Fiona Charles Let s Test May 9, 2012
Strategies for a Successful E2E Systems Integration Test Fiona Charles Let s Test May 9, 2012 This session Describes key project management strategies I have used to manage large- scale Systems Integration
More informationHuman Capital Management Mapping a Blueprint to the Cloud. June 25 th, 2 3pm EST
Human Capital Management Mapping a Blueprint to the Cloud June 25 th, 2 3pm EST Today s Presenters Stacey Harris VP Research & Analytics @StaceyHarrisHR www.linkedin.com/in/staceyharris/ Richard George
More informationDesigning Cloud Computing Solutions for Integration with SAP
Orange County Convention Center Orlando, Florida May 15-18, 2011 Designing Cloud Computing Solutions for Integration with SAP Bhavik Gupta ] Learning Points Understanding cloud solutions and considerations
More information2/9/2012. 2012 HIPAA Privacy and Security Audit Readiness. Table of contents
2012 HIPAA Privacy and Security Audit Readiness Mark M. Johnson National HIPAA Services Director Table of contents Page Background 2 Regulatory Background and HITECH Impacts 3 Office of Civil Rights (OCR)
More informationBusiness Idea Development Product production Services. Development Project. Software project management
Page 1, 1/20/2003 Ivica Crnkovic Mälardalen University Department of Computer Engineering ivica.crnkovic@mdh.se Development Project Product Lifecycle Business Idea Development Product production Services
More informationOracle Cloud Been there, Done that!
Oracle Cloud Been there, Done that! What we have heard today Can we upgrade from 11i or R12 to Fusion? (sure lets call it Cloud) Oracle Cloud has many flavors Fusion (ERP, HCM etc), licensing (SaaS model),
More informationStephen Doune HRIS Project Manager Plan International
Stephen Doune HRIS Project Manager Plan International Content 1. About Plan International 2. The Challenge 3. The Vision 4. About Assima 5. The Projects 6. The Timeline 7. Partner Selection 8. Key 1st
More informationTERMS OF REFERENCE FOR THE HUMAN RESOURCES AND COMPENSATION COMMITTEE
I. PURPOSE The purpose of the Human Resources and Compensation Committee (the Committee ) is to assist the Board in fulfilling its obligations relating to human resource and compensation policy and related
More information