1 ITEM NO. 11(a) 2015/1 201/20 REVENUE FINANCIAL PLAN Report by the Chief Financial Officer SCOTTISH BORDERS COUNCIL 18 December PURPOSE AND SUMMARY 1.1 This report seeks approval to consult on the draft 2015/1 201/20 Revenue Financial Plan. 1.2 Members and senior officers have engaged over the last 2 years in a medium term revenue budget process based on a 5 year cycle in which a more strategic approach to the financial planning process has been adopted to meet the financial challenges facing the Council. The Revenue Financial Plan has been used as the starting point to roll forward the plan or a third time. 1.3 The Corporate Management Team and the Administration Budget working Group have reviewed and updated the assumptions used to set the budget around pay and price inflation, other manpower costs including, pension changes, auto enrolment, increments and future changes anticipated to the national insurance system as well as demographic and other departmental pressures. These pressures have been offset by the full year effects of savings which commenced in 2014/15, savings proposed to start in 2015/1 and proposals which will be delivered in future years as well as additional funding drawn down from reserves. 1.4 The scale of the financial challenge facing the Council next year and beyond means that the robust, proactive approach to the delivery of efficiency savings evidenced in previous years will continue to be required to balance the budget and protect services in key priority areas. Members will be asked to approve a firm budget for 2015/1 and an indicative budget for the remaining 4 years of the plan. 2 RECOMMENDATIONS 2.1 It is recommended that Council a) Notes the five year plan and the amount of resources available in appendix 1 and proceeds to consider the Administration s draft revenue proposals for consultation. Council 18 December

2 3 BACKGROUND 3.1 The public sector continues to face significant funding constraints as the Scottish Government, in partnership with Local Authorities, continues to freeze Council tax for an eighth year. Overall the resources available to the council via the Local Government Finance Settlement are anticipated to reduce by around 1% over the next 5 years in cash terms. 3.2 The continuing challenges facing the UK public sector over the next 5-10 years are very considerable and can be summarised as: - the need to reduce the cost of public services to the UK taxpayer - rising expectations over the level and quality of public services, - further moves a move towards online services as a primary access channel for many people accessing public services and a presumption of "digital by design", - demographic pressures particularly associated with, but not restricted to, older peoples services - delivery of structural reforms in local authority and NHS services following the publication of the Public Bodies Joint working Act 2014? - the ongoing impact welfare reform - the reform of public sector pensions in 2015 to respond to the Hutton review and address long term concerns over affordability - the ongoing challenge of inflation on hard pressed budgets - publication of the Smith Commission 3.3 At a local level these factors are already impacting significantly upon Scottish Borders Council. The unprecedented pace of change require the Council to continue to :- - Modernise its operational structure and service delivery model, - improve flexibility and responsiveness to change, - focus its efforts on corporate transformation to deliver significant efficiencies and improve service quality, - align service and financial planning more effectively and - adopt a strategic, longer term approach to the budget. 4 FINANCIAL PLANNING PROCESS 4.1 The Council continues to adopt a corporate approach to address the financial and service challenges facing the organisation. 2015/1 will be the third year of the current 5 year plan and the External Auditors report on the 2013/14 accounts indicated that the council was developing a reputation for delivery service efficiencies. The space afforded by the adoption of a medium term planning timeframe via the 5 year plan recognises the time required to deliver major corporate change programmes effectively so that they improve services and wherever possible save money. 4.2 In order to ensure the continued adoption of a strategic approach members have previously agreed to focus on the delivery of a major programme of transformational change required to balance the Financial Plan. Council 18 December

3 4.3 Following a review of the plan agreed for additional pressures have arisen from increasing Out of Area placement costs in the Children & Young People service, inflationary increases as well as the continuing pressures from the reintroduction of incremental pay progression from November 2013 and assumptions over future pay awards. 4.4 In order to support the longer term financial plan CMT adopted the following process: - A reviewed of the assumptions made within the Financial Plan for both pressures and savings - Departments continued to monitor the benefits being realised by their programme of transformation and identified new project savings to meet the budget gap - Further savings have been identified that can support the Financial Plan which can be implemented in the shorter term - External fees & charges were reviewed as part of the financial planning process to maximise income whilst ensuring all charges are fair, equitable and consistent with approved policy. - CMT have worked with members of Admin budget working group to formulate the Administration proposals for the roll forward of the revenue budget to 2015/1 which are included elsewhere on the council agenda YEAR FINANCIAL PLAN Year Financial Model 2015/1 201/20 The Council approved a five year Financial Plan on the February 2014 which quantified the financial challenges facing the organisation and approved 24.m of savings to meet the resultant annual gap between income and expenditure. This is the starting position for the construction of the new five year plan covering the period 2015/1 201/20. A review of pressures, available funding and savings has been carried out and is highlighted in the report. 5.2 PRESSURES Pay Award Provision The model makes provision for pay awards for all staff including teachers of 1% in 2015/1 and thereafter assumes a 1.5% increase for the remaining 4 years. 5.3 Non staffing inflation The Financial Plan makes significant provision of 4.m for a range of inflationary pressures including those derived from existing strategic contracts or from inflationary pressures in key commodity items for example energy costs, vehicles fuel and key services purchased from the private and third sectors. 5.4 Departmental / Demographic Pressures The Council has reviewed the assumptions made for departmental and demographic pressures impacting upon Council services over the next 5 years. Further pressure is forecast above that set out in last year s Financial Plan with revised assumptions of increasing numbers of vulnerable children many of whom have complex social, emotional, behavioural and medical needs. Provision has been made for departmental pressures of 8.m over the next 5 years. Council 18 December

4 5.5 Local Government Finance Settlement The Financial Plan has been prepared in advance of the Local Government Finance Settlement. At present firm figures are only available for 2015/1. Any changes arising from the confirmed settlement letter expected on the 11 December i.e. after council papers will be published. Any additional information will be provided verbally at Council on the 18 December will be reflected in the final report to Council on 12 February Council Tax The Council Tax has now been frozen since 2007/08. The Financial Plan assumes this freeze will continue which means Council Tax has now been frozen for eight consecutive years. Increases in the council tax product are assumed to deliver additional income over the 5 year plan; however, this additional income is projected to be derived solely from new housing and the band D equivalent rate is assumed to remain frozen at the 2007/08 level of 1,084. Council tax levels assumed in the financial model in the next two years are shown in table 1 below. Table 1 Council Tax 2015/ / Council Tax 51,47 51, Total Funding Available In order to support the delivery of the Council s programme of transformation funding has been identified in addition to General Revenue Support Grant (RSG), Non-domestic rates and Council Tax as follows: Resources provided for implementation of the Children s Bill of in 2015/1 rising to 1.3 per annum thereafter, A contribution from Reserves of 0.73 over 2015/1 to 2017/18, Use of earmarked balances of 0.50m over 2015/1 and 201/17 to support the implementation of an Outreach team in the Children & Young People s service to deliver longer term reductions in the costs of out of area placements, A review of pay award provision has resulted in a planned adjustment to resources between 2015/1 and 201/17. Table 2 Total Funding 2015/ 201/1 2017/ 2018/ 201/ Total Revenue Support Grant 15, 73 15,7 3 14,8 8 14,0 3 14, ,34 0 Children s Bill 1,153 1,3 1,3 1,3 1,3,17 funding Non Domestic Rates 34,84 34,84 34,84 34,84 34,84 174,24 5 Reserves Ring-fenced reserves Pay award (1,277 1, adjustment ) Council Tax 51,47 51,87 52,37 52,87 53,37 21,8 0 Total 252, ,02 253, , , 54 1,28, 828 Council 18 December

5 5.8 Savings Proposals A review of all the savings proposals included in the Financial Plan approved on the February 2014 has been carried out and updated to reflect more robust information as the Corporate Transformation programme develops. To meet the new pressures in the Financial Plan and support the delivery of the transformation programme new savings have been identified. 5. Communications The Council will again engage in an extensive process of budget consultation as part of the 2015/1 budget process. A detailed communication plan has been prepared with the corporate communications team and agreed by CMT and the Council Administration. As in previous years consultation will be undertaken using an on-line budget simulator tool accessed via the Council s website and through a series of face to face meetings with staff, unions, community planning partners, community councils and the wider Borders population. The feedback gathered will be considered as the budget process develops and will be reported to members with the budget papers in February IMPLICATIONS.1 Financial There are no costs attached to any of the recommendations contained in this report its content being concerned with the construction of the council s financial plans..2 Risk and Mitigations (a) The main risks facing the council in setting its Financial Plan are: The non delivery of savings required by the Financial Plan Continually increasing inflation Unforeseen pressures e.g. pension costs. A final Local Government financial settlement which varies from the indicative settlement previously provided Overestimates of funding to be provided as a result of new statutory burdens Increasing demand for services Demographic pressures not included in the Financial Plan Delays in the delivery of the transformation savings or a decision to cancel parts of the programme without identifying alternative savings The budget is being developed against the backdrop of ongoing negotiations re the current freeze in teacher numbers between COSLA and the Scottish Government and the outcome of these discussions could have an impact on the overall shape of the final 2015/1 budget. These risks will be managed through the monitoring of the corporate transformation programme on a quarterly basis and the monthly budget monitoring in 2015/1 to ensure that where possible, departments take corrective action and any significant permanent impacts are factored into ongoing financial planning discussions and iterative resource allocations. Council 18 December

6 .3 Equalities An Equalities Impact Assessment will be carried out on all budget proposals with assessment for corporate transformation proposals being brought forward as part of Council reports as they are developed for consideration by elected members..4 Acting Sustainably There are no economic, social or environmental effects from the proposal in this report. The budget process itself will seek to ensure sustainability sits at the core of Council s decision making with regard to the budget. The development of a 5 year rather than an annual plan should assist considerably in this regard..5 Carbon Management There is no impact on the Council s carbon emissions. 7 CONSULTATION 7.1 Corporate Management Team has been involved in and agreed the compilation of the revenue financial plan. 2.2 The Monitoring Officer, the Chief Legal Officer, the Service Director Strategy and Policy, the Chief Officer Audit & Risk, the Chief Officer HR, and the Clerk to the Council are being consulted and any comments received will be reflected in the report. Approved by David Robertson Chief Financial Officer Signature.. Author(s) Name Debbie Collins Suzy Douglas Designation and Contact Number Financial Services Manager Finance Business Partner Background Papers: Previous Minute Reference: Note You can get this document on tape, in Braille, large print and various computer formats by contacting the address below. Finance can also give information on other language translations as well as providing additional copies. Contact us at Debbie Collins, Council HQ, Debbie.collins@scotborders.gov.uk, Council 18 December 2014

a) raises the funds required by the Council to meet approved service levels in the most effective manner;

a) raises the funds required by the Council to meet approved service levels in the most effective manner; ITEM FINANCIAL STRATEGY 2016/17 2020/21 Report By Chief Financial Officer SCOTTISH BORDERS COUNCIL 11 February 2016 1 PURPOSE AND SUMMARY 1.1 This report seeks approval for the financial strategy for the

More information

council s Budget and Financial Planning Framework

council s Budget and Financial Planning Framework Basildon District Council Financial Planning Framework 1. Introduction The Financial Planning Framework underpins the Council s Medium Term Financial Strategy and sets out the financial planning processes

More information

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective

More information

CHESHIRE FIRE AUTHORITY SUBJECT : 2014-15 DRAFT BUDGET, COUNCIL TAX AND MEDIUM TERM FINANCIAL PLAN

CHESHIRE FIRE AUTHORITY SUBJECT : 2014-15 DRAFT BUDGET, COUNCIL TAX AND MEDIUM TERM FINANCIAL PLAN CHESHIRE FIRE AUTHORITY Item 2 ITEM: 2 MEETING OF : FIRE AUTHORITY DATE : 12 FEBRUARY 2014 REPORT OF : CHIEF FIRE OFFICER AUTHOR : HEAD OF FINANCE SUBJECT : 2014-15 DRAFT BUDGET, COUNCIL TAX AND MEDIUM

More information

SCOTTISH LOCAL AUTHORITY BUSINESS LOAN FUND

SCOTTISH LOCAL AUTHORITY BUSINESS LOAN FUND ITEM NO 8 SCOTTISH LOCAL AUTHORITY BUSINESS LOAN FUND Report by Service Director Strategy & Policy EXECUTIVE 3 February 2015 1 PURPOSE AND SUMMARY 1.1 This report provides an overview of the proposed Scottish

More information

Finance and Budget Committee Policy. Overview of Long-Term Financial Plan and Revenue Budget 2014/15 update

Finance and Budget Committee Policy. Overview of Long-Term Financial Plan and Revenue Budget 2014/15 update Finance and Budget Committee Policy Development and Review Sub-Committee 2pm, Wednesday 24 April 2013 Overview of Long-Term Financial Plan and Revenue Budget 2014/15 update Item number Report number Wards

More information

PAPER B. Purpose. 4. Specifically the report makes proposals for :-

PAPER B. Purpose. 4. Specifically the report makes proposals for :- PAPER B Committee CABINET Date 10 TH FEBRUARY 2009 Title MEDIUM TERM REVENUE AND CAPITAL BUDGET STRATEGY 2009/10-2011/12 AND COUNCIL TAX 2009/10 Report Author Purpose Dave Burbage, Director of Resources

More information

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability CLACKMANNANSHIRE COUNCIL THIS PAPER RELATES TO ITEM 05 ON THE AGENDA Report to: Resources and Audit Committee Date of Meeting: 24 September 2015 Subject: External Audit BV Performance Report: Delivering

More information

Scottish Borders Council Draft Revenue Financial Plan 2014/15-2018/19. Council 12th December 2013

Scottish Borders Council Draft Revenue Financial Plan 2014/15-2018/19. Council 12th December 2013 Draft Revenue Financial Plan - Council 12th December 2013 Revenue Financial Plan - Page No. Content 3 Introduction 4 Revenue Resources summary 5 Department summary 6 Budget movement summary 7 Manpower,

More information

Kenny Dick, Head of Finance and Corporate Governance. To present draft budget proposals for 2014/15 to the Board for approval.

Kenny Dick, Head of Finance and Corporate Governance. To present draft budget proposals for 2014/15 to the Board for approval. 2014-15 Draft Budget Report to: Board Date: 28 March 2014 Report by: Report No. Kenny Dick, Head of Finance and Corporate Governance Agenda Item: 9 PURPOSE OF REPORT To present draft budget proposals for

More information

FINANCIAL PLAN 2014/15 2018/19

FINANCIAL PLAN 2014/15 2018/19 Appendix 11a Financial Plan 2014/15 2018/19 NHS LOTHIAN Board Meeting 2 April 2014 Director of Finance FINANCIAL PLAN 2014/15 2018/19 1 Purpose of the Report 1.1 The purpose of this report is to seek approval

More information

Foreword from the Deputy Chief Executive

Foreword from the Deputy Chief Executive Foreword from the Deputy Chief Executive Wigan Council is one of the largest local authorities in the country with a population in excess of 300,000, more than 140,000 residential properties and a yearly

More information

ARGYLL AND BUTE COUNCIL SUPPORT SERVICES REVIEW 15 DECEMBER 2011 SUMMARY REPORT

ARGYLL AND BUTE COUNCIL SUPPORT SERVICES REVIEW 15 DECEMBER 2011 SUMMARY REPORT ARGYLL AND BUTE COUNCIL EXECUTIVE SUPPORT SERVICES REVIEW 15 DECEMBER 2011 SUMMARY REPORT 1.0 SUMMARY 1.1 The service reviews for Customer and Support Services, Improvement and HR and Strategic Finance

More information

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1 City and County of Swansea Human Resources & Workforce Strategy 2013-2017 Ambition is Critical 1 Delivering quality services for a safer, greener, smarter, fairer, healthier, richer Swansea Executive Summary

More information

Bath and North East Somerset Council People and Communities Directorate Plan

Bath and North East Somerset Council People and Communities Directorate Plan Bath and North East Somerset Council People and Communities Directorate Plan Introduction There are three Directorate Plans covering the Councils three directorates. This is the People and Communities

More information

council Of Brazil - Tax Year 2014

council Of Brazil - Tax Year 2014 Meeting: Overview and Scrutiny Board Date: 9 July 2014 Full Council 17 July 2014 Wards Affected: All Wards Report Title: Provisional Outturn 2013/14 Subject to Audit Executive Lead Contact Details: Mayor

More information

Dumfries & Galloway Council

Dumfries & Galloway Council Dumfries & Galloway Council Audit of housing and council tax benefit Risk assessment report Prepared for Dumfries & Galloway Council May 2013 Audit Scotland is a statutory body set up in April 2000 under

More information

Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013

Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013 1 Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013 1. Introduction 1.1 The Service s key responsibilities are: o The achievement of proper and effective

More information

2.0 RECOMMENDATIONS Members of the Committee are asked to note the information contained within this report.

2.0 RECOMMENDATIONS Members of the Committee are asked to note the information contained within this report. REPORT TO: SCRUTINY COMMITTEE 25 JUNE 2013 REPORT ON: REPORT BY: INTERNAL AUDIT REPORTS CHIEF INTERNAL AUDITOR REPORT NO: 280-2013 1.0 PURPOSE OF REPORT To submit to Members of the Scrutiny Committee a

More information

CORPORATE PLAN 2012-13 2013-14 2014-15

CORPORATE PLAN 2012-13 2013-14 2014-15 CORPORATE PLAN 2012-13 2013-14 2014-15 V0.3 170412 1 1. Introduction This Corporate Plan identifies the main strategic challenges facing the Agency over the next three years, and sets out its key performance

More information

Corporate Governance Service Business Plan 2011-2016. Modernising Services

Corporate Governance Service Business Plan 2011-2016. Modernising Services Corporate Governance Service Business Plan 2011-2016 Modernising Services Index 1. Executive Summary 3 2. Vision and Strategy 4 3. Service Overview 3.1 What Services do we and Will we Deliver? 5 3.2 How

More information

Patient Choice at the Point of GP Referral

Patient Choice at the Point of GP Referral DEPARTMENT OF HEALTH Patient Choice at the Point of GP Referral LONDON: The Stationery Office 9.25 Ordered by the House of Commons to be printed on 17 January 2005 REPORT BY THE COMPTROLLER AND AUDITOR

More information

WEST MERCIA BUDGET 2013/14 MEDIUM TERM FINANCIAL PLAN 2013/14 TO 2017/18. Report of the Treasurer, Director of Finance, Chief Executive and

WEST MERCIA BUDGET 2013/14 MEDIUM TERM FINANCIAL PLAN 2013/14 TO 2017/18. Report of the Treasurer, Director of Finance, Chief Executive and WEST MERCIA BUDGET 2013/14 MEDIUM TERM FINANCIAL PLAN 2013/14 TO 2017/18 Report of the Treasurer, Director of Finance, Chief Executive and Chief Constable 1. Recommendation The Commissioner is recommended

More information

Annual Audit Letter. Basildon and Thurrock University Hospitals NHS Foundation Trust Audit 2009/10 August 2010

Annual Audit Letter. Basildon and Thurrock University Hospitals NHS Foundation Trust Audit 2009/10 August 2010 Annual Audit Letter Basildon and Thurrock University Hospitals NHS Foundation Trust Audit 2009/10 August 2010 Contents Key messages 3 Financial statements and statement on internal control 5 Securing economy,

More information

ITEM NO: 5. Date: 21 September 2015. Reporting Officer:

ITEM NO: 5. Date: 21 September 2015. Reporting Officer: ITEM NO: 5 Report To: OVERVIEW (AUDIT) PANEL Date: 21 September 2015 Reporting Officer: Cllr J M Fitzpatrick - First Deputy (Performance and Finance) Ben Jay - Assistant Executive Director, (Finance) Subject:

More information

Bath and North East Somerset Council - Resources Directorate Plan 2016/17 to 2019/20

Bath and North East Somerset Council - Resources Directorate Plan 2016/17 to 2019/20 Bath and North East Somerset Council - Resources Directorate Plan 2016/17 to 2019/20 Introduction This plan sets out the future direction of the Resources Directorate over the next 3 years. Legal & Democratic

More information

Report on the 2009/10 Audit to Accountant in Bankruptcy and the Auditor General for Scotland October 2010

Report on the 2009/10 Audit to Accountant in Bankruptcy and the Auditor General for Scotland October 2010 Accountant in Bankruptcy Report on the 2009/10 Audit to Accountant in Bankruptcy and the Auditor General for Scotland October 2010 Accountant in Bankruptcy Report on the 2009/10 Audit to Accountant in

More information

Agenda Item No: 2 Page Numbers: 1-6 EAST RIDING OF YORKSHIRE COUNCIL THE CABINET 1 FEBRUARY 2011

Agenda Item No: 2 Page Numbers: 1-6 EAST RIDING OF YORKSHIRE COUNCIL THE CABINET 1 FEBRUARY 2011 Report to: The Ca binet To appr ove as a correct record the Minutes of t he meeting of The Cabinet held on 1 Febr uary 2011 Contact Officer: 01 March 2011 Iain Edmiston Senior Committee Manager Telephone

More information

Scotland s public sector workforce. Good practice guide

Scotland s public sector workforce. Good practice guide Scotland s public sector workforce Good practice guide Prepared by Audit Scotland March 2014 Contents Introduction... 4 Purpose of the guide... 4 What s in the guide?... 4 Part 1. Good practice in workforce

More information

Information Commissioner's Office

Information Commissioner's Office Phil Keown Engagement Lead T: 020 7728 2394 E: philip.r.keown@uk.gt.com Will Simpson Associate Director T: 0161 953 6486 E: will.g.simpson@uk.gt.com Information Commissioner's Office Internal Audit 2015-16:

More information

Page 7. London Borough of Sutton

Page 7. London Borough of Sutton Page 7 Agenda Item 3 London Borough of Sutton The Executive - 5 July 2011 Joint Report of the Strategic Director Resources and Executive Head of Policy and Customer Services BUSINESS AND FINANCIAL PLANNING

More information

MARCH 2012. Strategic Risk Policy Update March 2012 v1.10.doc

MARCH 2012. Strategic Risk Policy Update March 2012 v1.10.doc MARCH 2012 Version 1.10 Strategic Risk Policy Update March 2012 v1.10.doc Document History Current Version Document Name Risk Management Policy Statement and Strategic Framework Last Updated By Alan Till

More information

Leicestershire Partnership Trust. Leadership Development Framework

Leicestershire Partnership Trust. Leadership Development Framework Leicestershire Partnership Trust Leadership Development Framework 1 Leadership Development Framework Introduction The NHS in England is facing a period of substantial change in light of the recent Government

More information

[to be completed by Democratic Services] Council 27 February 2015

[to be completed by Democratic Services] Council 27 February 2015 Council Title of Report: Report No: Decisions plan reference: Report to and date/s: Portfolio holder: Lead officer: Purpose of report: Budget and Council Tax Setting: 2015/16 and Medium Term Financial

More information

People Strategy 2013/17

People Strategy 2013/17 D a t a L a b e l : P U B L I C West Lothian Council People Strategy 2013/17 Contents 1 Overview 2 2 Council Priorities 8 3 Strategy Outcomes 10 1 Engaging and motivating our employees 13 2 Recognised

More information

Funding local authorities to support former Independent Living Fund recipients: the former ILF Recipient Grant

Funding local authorities to support former Independent Living Fund recipients: the former ILF Recipient Grant Funding local authorities to support former Independent Living Fund recipients: the former ILF Recipient Grant Technical consultation response: LGA and ADASS February 2016 About the LGA and ADASS 1. The

More information

South Northamptonshire Council. Cabinet. 12 January 2015. Provisional Local Government Finance Settlement 2015-2016

South Northamptonshire Council. Cabinet. 12 January 2015. Provisional Local Government Finance Settlement 2015-2016 South Northamptonshire Council Cabinet 12 January 2015 Provisional Local Government Finance Settlement 2015-2016 Report of Head of Finance & Procurement This report is public Purpose of report The report

More information

LEICESTERSHIRE COUNTY COUNCIL RISK MANAGEMENT POLICY STATEMENT 2011-2012

LEICESTERSHIRE COUNTY COUNCIL RISK MANAGEMENT POLICY STATEMENT 2011-2012 106 LEICESTERSHIRE COUNTY COUNCIL RISK MANAGEMENT POLICY STATEMENT 2011-2012 Leicestershire County Council believes that managing current and future risk, both opportunity and threat, is increasingly vital

More information

Commissioning and Financial Plan Guidance 2013/14

Commissioning and Financial Plan Guidance 2013/14 Page 127 Agenda Item 6 Appendix C Commissioning and Financial Plan Guidance 2013/14 Agenda Item 6 Page 128 INTRODUCTION 1. This document sets out the formal guidance to the London Borough of Sutton for

More information

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK July 2013 1 P age Contents Page 1.0 Definition 3 2.0 Context 3 3.0 Purpose and aim of the policy 4 4.0 Policy Statement 4 5.0 Framework for Performance Management

More information

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL CABINET THE COUNCIL S 2016/2017 REVENUE BUDGET REPORT OF THE GROUP DIRECTOR CORPORATE & FRONTLINE SERVICES

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL CABINET THE COUNCIL S 2016/2017 REVENUE BUDGET REPORT OF THE GROUP DIRECTOR CORPORATE & FRONTLINE SERVICES AGENDA ITEM 2 RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL CABINET 11 TH FEBRUARY 2016 THE COUNCIL S 2016/2017 REVENUE BUDGET REPORT OF THE GROUP DIRECTOR CORPORATE & FRONTLINE SERVICES AUTHOR: Chris Lee (01443

More information

AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007

AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 PAGE: 1 REPORT TO: SUBJECT: BY: AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 ASSET MANAGEMENT CHIEF FINANCIAL OFFICER 1. REASON FOR REPORT 1.1 To provide the Audit and Performance Review

More information

Opinion on the robustness of the budget and the adequacy of the reserves. Helen Martin Ext. 7483

Opinion on the robustness of the budget and the adequacy of the reserves. Helen Martin Ext. 7483 BUDGET AND COUNCIL TAX SETTING 2015/16 Council 17 February 2015 Report of Status: Key Decision: Chief Finance Officer For Decision No Executive Summary: This report sets out the factors that need to be

More information

Civil Service Conciliation and Arbitration Scheme General Council Report 1368

Civil Service Conciliation and Arbitration Scheme General Council Report 1368 Civil Service Conciliation and Arbitration Scheme General Council Report 1368 (Meeting/s of 4 May 2000) Agreement on the introduction of the Performance Management and Development System in the Irish Civil

More information

Page 329. Integrated Impact Assessment Community Wellbeing Programme

Page 329. Integrated Impact Assessment Community Wellbeing Programme Page 329 Agenda Item 10 Integrated Impact Assessment Community Wellbeing Programme Appendix 1 This template sets out questions for the full IIA. The sections you must complete are sections 1, 2, 3 and

More information

Unrestricted. REVENUE EXPENDITURE OUTTURN 2011/12 Borough Treasurer

Unrestricted. REVENUE EXPENDITURE OUTTURN 2011/12 Borough Treasurer TO: EXECUTIVE 3 JULY 2012 1 PURPOSE OF REPORT REVENUE EXPENDITURE OUTTURN 2011/12 Borough Treasurer 1.1 The Council, at its meeting on 2 March 2011, approved a revenue budget for 2011/12 of 76.255m. This

More information

NHS LANARKSHIRE FINANCIAL PLAN 2009/10 2013/14

NHS LANARKSHIRE FINANCIAL PLAN 2009/10 2013/14 NHS LANARKSHIRE FINANCIAL PLAN 2009/10 2013/14 1. Purpose of Report 1.1. This paper seeks Board approval for the NHS Lanarkshire Financial Plan for the five year period 2009/10 to 2013/14. 2. Overview

More information

Submitted to: NHS West Norfolk CCG Governing Body, 29 January 2015

Submitted to: NHS West Norfolk CCG Governing Body, 29 January 2015 Agenda Item: 11.2 Subject: Draft Financial Plan 2015/16 Presented by: John Ingham, Chief Financial Officer Submitted to: NHS West Norfolk CCG Governing Body, 29 January 2015 Purpose of Paper: For information

More information

CAIRNGORMS NATIONAL PARK AUTHORITY FINANCE AND DELIVERY COMMITTEE

CAIRNGORMS NATIONAL PARK AUTHORITY FINANCE AND DELIVERY COMMITTEE Finance Committee Paper 5 12/12/14 FINANCE AND DELIVERY COMMITTEE FOR DISCUSSION Title: Prepared by: 2015/16 FORWARD BUDGET CONSIDERATIONS David Cameron, Corporate Services Director Daniel Ralph, Finance

More information

Business Continuity Management Framework 2014 2017

Business Continuity Management Framework 2014 2017 Business Continuity Management Framework 2014 2017 Blackpool Council Business Continuity Framework V3.0 Page 1 of 13 CONTENTS 1.0 Forward 03 2.0 Administration 04 3.0 Policy 05 4.0 Business Continuity

More information

The Risk Management strategy sets out the framework that the Council has established.

The Risk Management strategy sets out the framework that the Council has established. Derbyshire County Council Management Policy Statement The Authority adopts a proactive approach to Management to achieve Best Value and continuous improvement and is committed to the effective management

More information

Appendix 5 Oadby and Wigston Borough Council: HRA self-financing business plan model

Appendix 5 Oadby and Wigston Borough Council: HRA self-financing business plan model Appendix 5 Oadby and Wigston Borough Council: HRA self-financing business plan model As we enter the final quarter of 2013/14, the HRA business plan model has been updated to reflect activity in 2013/14

More information

The Audit of Best Value and Community Planning The City of Edinburgh Council. Best Value audit 2016

The Audit of Best Value and Community Planning The City of Edinburgh Council. Best Value audit 2016 The Audit of Best Value and Community Planning The City of Edinburgh Council Best Value audit 2016 Report from the Controller of Audit February 2016 The Accounts Commission The Accounts Commission is the

More information

Charnwood Borough Council. Corporate Performance Management Framework

Charnwood Borough Council. Corporate Performance Management Framework Charnwood Borough Council Corporate Performance Management Framework Contents 1 Introduction... 1 2 Background... 1 3 Role of the Performance Team... 2 4 Charnwood Framework... 2 4.1 Corporate Plan...2

More information

Review of Financial Planning and Monitoring. City of York Council Audit 2008/09 Date

Review of Financial Planning and Monitoring. City of York Council Audit 2008/09 Date Review of Financial Planning and Monitoring City of York Council Audit 2008/09 Date Contents Introduction and Background 3 Audit approach 4 Main conclusions 5 Financial Planning Findings 6 Financial Monitoring

More information

Quarterly Corporate Performance Report (Quarter 1, 2015/16) Executive Committee. 18 August 2015. Report by Chief Executive

Quarterly Corporate Performance Report (Quarter 1, 2015/16) Executive Committee. 18 August 2015. Report by Chief Executive Quarterly Corporate Performance Report (Quarter 1, 2015/16) Report by Chief Executive Executive Committee 18 August 2015 1 PURPOSE AND SUMMARY 1.1 This report presents a quarterly performance update for

More information

Framework Agreement between the Department of Health and the NHS Trust Development Authority. Annex C: Finance and Accounting

Framework Agreement between the Department of Health and the NHS Trust Development Authority. Annex C: Finance and Accounting Framework Agreement between the Department of Health and the NHS Trust Development Authority Annex C: Finance and Accounting 2014 1. The Framework Agreement sets out the governance and accountability arrangements

More information

Financial Planning Assessment Conwy County Borough Council. Audit year: 2014-15 Issued: October 2014 Document reference: 544A2014

Financial Planning Assessment Conwy County Borough Council. Audit year: 2014-15 Issued: October 2014 Document reference: 544A2014 Financial Planning Assessment Conwy County Borough Council Audit year: 2014-15 Issued: October 2014 Document reference: 544A2014 Status of report This document has been prepared for the internal use of

More information

Appendix C Accountant in Bankruptcy. Annual report on the 2013/14 audit

Appendix C Accountant in Bankruptcy. Annual report on the 2013/14 audit Appendix C Accountant in Bankruptcy Annual report on the 2013/14 audit Prepared for Accountant in Bankruptcy and the Auditor General for Scotland 6 August 2014 Audit Scotland is a statutory body set up

More information

Human Resources & Facilities Services. Service Delivery Plan 2014/15. Overview of the Human Resources Service

Human Resources & Facilities Services. Service Delivery Plan 2014/15. Overview of the Human Resources Service Human Resources & Facilities Services Service Delivery Plan 2014/15 Overview of the Human Resources Service The role of the HR Service is to support the Council in achieving its corporate objectives, priorities

More information

HIGH PEAK BOROUGH COUNCIL. Report to the Corporate Select Committee. 19th January 2016

HIGH PEAK BOROUGH COUNCIL. Report to the Corporate Select Committee. 19th January 2016 AGENDA ITEM 5 HIGH PEAK BOROUGH COUNCIL Report to the Corporate Select Committee 19th January 2016 TITLE: EXECUTIVE COUNCILLOR: CONTACT OFFICER: WARDS INVOLVED: Housing Revenue Account (HRA) Business Plan

More information

JOB DESCRIPTION. Tatchbury Mount base and other Southern Health Sites as required

JOB DESCRIPTION. Tatchbury Mount base and other Southern Health Sites as required JOB DESCRIPTION Job Title: Band: Hours: Location: Accountable to: Lead Manager for Workforce Planning & Resourcing 8a 37.5 per week Tatchbury Mount base and other Southern Health Sites as required Deputy

More information

Heading: Council Service and Management Structures Education and Children and Criminal Justice Social Work Services

Heading: Council Service and Management Structures Education and Children and Criminal Justice Social Work Services Item 9 To: Council On: 26 June 2014 Report by: Chief Executive Heading: Council Service and Management Structures Education and Children and Criminal Justice Social Work Services 1. Summary 1.1. The purpose

More information

Stratford on Avon District Council. The Human Resources Strategy

Stratford on Avon District Council. The Human Resources Strategy Stratford on Avon District Council The Human Resources Strategy Page 1 1 Purpose of The Human Resources (HR) Strategy The purpose of this document is to review the role and effectiveness of human resource

More information

Scottish Borders Council. Local Scrutiny Plan 2015/16

Scottish Borders Council. Local Scrutiny Plan 2015/16 Scottish Borders Council Local Scrutiny Plan 2015/16 March 2015 Scottish Borders Council Local Scrutiny Plan 2015/16 Introduction 1. This local scrutiny plan sets out the planned scrutiny activity in Scottish

More information

Risk Management Policy

Risk Management Policy Principles Through a process of Risk Management, the University seeks to reduce the frequency and impact of Adverse Events that may affect the achievement of its objectives. In particular, Risk Management

More information

INVESTING IN REFORM INVESTING IN STOCKPORT DRAFT BUSINESS CASE

INVESTING IN REFORM INVESTING IN STOCKPORT DRAFT BUSINESS CASE INVESTING IN STOCKPORT DRAFT BUSINESS CASE INVESTING IN REFORM IIS Programme/Project Name: Project Name: Portfolio: IIS Outcome: IIS Board SRO: IIS Project Lead: Public Realm and Solutions SK Communities

More information

Medium Term Financial Strategy and Efficiency Plan 2016/17 to 2018/19

Medium Term Financial Strategy and Efficiency Plan 2016/17 to 2018/19 Medium Term Financial Strategy and Efficiency Plan 2016/17 to 2018/19 1. EXECUTIVE SUMMARY 1.1.1 This strategy supports the Council's medium term policy and financial planning process. Fundamentally the

More information

If you have any queries on this paper, please contact Marc Stoner on 020 7580 5861

If you have any queries on this paper, please contact Marc Stoner on 020 7580 5861 Board meeting Agenda item 8 Subject 2014 Financial Outturn Status Purpose For Note From Marc Stoner, Financial Controller History Parent Committee First submitted Revision Number N/A 1 If you have any

More information

Vale of Glamorgan. Overview Report: Review of HR and Workforce Planning. November 2011

Vale of Glamorgan. Overview Report: Review of HR and Workforce Planning. November 2011 Vale of Glamorgan Overview Report: Review of HR and Workforce Planning November 2011 Content 1 Introduction 1 2. Review Findings 3 3. The Way Forward 17 2012 Grant Thornton UK LLP. All rights reserved.

More information

Role Context & Purpose

Role Context & Purpose Group Manager Children s Social Care Services Role Profile: Grade: Accountable to: Accountable for: Senior Manager Hay B Service Leader 3-6 direct line reports, plus circa 48 staff that these direct reports

More information

I N BVRG H + HR Service Centre/Payrol I Services Integration. Item no Report no. Finance and Resources Committee.

I N BVRG H + HR Service Centre/Payrol I Services Integration. Item no Report no. Finance and Resources Committee. + ED I N BVRG H + THE CITY OF EDINBURGH COUNCIL Item no Report no c1 HR Service Centre/Payrol I Services Integration Finance and Resources Committee 24 August 2010 1 1.I 2 2.1 2.2 2.3 Purpose of report

More information

CABINET. 24 March 2015

CABINET. 24 March 2015 CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group

More information

House of Commons Corporate Governance Framework

House of Commons Corporate Governance Framework House of Commons Corporate Governance Framework What is Corporate Governance? 1. Good corporate governance is fundamental to any effective organisation and is the hallmark of any well-managed corporate

More information

Introduction 3. Scope of the Consultation 3. Background 3. Proposals for the Teachers Pension Scheme from April 2013 to March 2014 4

Introduction 3. Scope of the Consultation 3. Background 3. Proposals for the Teachers Pension Scheme from April 2013 to March 2014 4 Consultation on proposed increases in contributions for members of the Teachers Pension Scheme (TPS) in 2013-14; and the removal of provisions governing scheme valuations and cap and share arrangements

More information

Corporate Director and Chief Financial Officer

Corporate Director and Chief Financial Officer Report to Cabinet Subject: Provisional Local Government Finance Settlement 2014/15 Date: Wednesday 15 January 2014 Author: Corporate Director and Chief Financial Officer Wards Affected Borough-wide Purpose

More information

Follow-up on the Charity Commission

Follow-up on the Charity Commission Report by the Comptroller and Auditor General Charity Commission Follow-up on the Charity Commission HC 908 SESSION 2014-15 22 JANUARY 2015 4 Key facts Follow-up on the Charity Commission Key facts 21.1m

More information

Financial Resilience Assessment Bridgend County Borough Council. Audit year: 2015-16 Issued: March 2016 Document reference: 210A2016

Financial Resilience Assessment Bridgend County Borough Council. Audit year: 2015-16 Issued: March 2016 Document reference: 210A2016 Financial Resilience Assessment Bridgend County Borough Council Audit year: 2015-16 Issued: March 2016 Document reference: 210A2016 Status of report This document has been prepared as part of work performed

More information

WARWICKSHIRE POLICE AUTHORITY 22 February 2012

WARWICKSHIRE POLICE AUTHORITY 22 February 2012 Agenda No 11 WARWICKSHIRE POLICE AUTHORITY 22 February 2012 Medium Term Financial Planning Strategy including 2012/13 Revenue Budget, 2012/13 2015/16 Capital Programme and Reserve Strategy Joint Report

More information

Assistant Director for Human Resources

Assistant Director for Human Resources Assistant Director for Human Resources Indicative Salary Range: 90,000 to 105,000 p/a Reports to Chief Operating Officer Job Purpose The purpose of the role is to lead, manage and be accountable for the

More information

PROGRESS THROUGH PARTNERSHIP MAKING A DIFFERENCE GUIDANCE PERFORMANCE MANAGEMENT FRAMEWORK AND CONTINUOUS IMPROVEMENT

PROGRESS THROUGH PARTNERSHIP MAKING A DIFFERENCE GUIDANCE PERFORMANCE MANAGEMENT FRAMEWORK AND CONTINUOUS IMPROVEMENT PROGRESS THROUGH PARTNERSHIP MAKING A DIFFERENCE GUIDANCE PERFORMANCE MANAGEMENT FRAMEWORK AND CONTINUOUS IMPROVEMENT July 2014 Contents Page Introduction 3 What is continuous improvement? 4 Why do we

More information

APPENDIX B - PL1 Homes that meet people s needs and aspirations

APPENDIX B - PL1 Homes that meet people s needs and aspirations APPENDIX B - PL1 Homes that meet people s needs and aspirations Decent and accessible homes are vital to all. Our focus on providing affordable homes is being progressed primarily through the Affordable

More information

London Borough of Bromley

London Borough of Bromley London Borough of Bromley Report No.DHR15007 PART I PUBLIC Agenda Item No.: Decision Maker: General Purposes & Licensing Committee Date: 17 th September 2015 Decision Type: Non-Urgent Non-Executive Non-Key

More information

Buckinghamshire & Milton Keynes Fire Authority

Buckinghamshire & Milton Keynes Fire Authority ITEM 6 Buckinghamshire & Milton Keynes Fire Authority MEETING Executive Committee DATE OF MEETING 18 March 2015 OFFICER LEAD MEMBER SUBJECT OF THE REPORT David Sutherland, Acting Director of Finance and

More information

Business Planning & Budgetary Control 2012/13

Business Planning & Budgetary Control 2012/13 Cymdeithas Tai Cantref Cyf Final Internal Audit Report Business Planning & Budgetary Control 2012/13 Date of fieldwork: October November 2012 Date of draft report: November 2012 Date of final report: November

More information

NORTHUMBERLAND, TYNE AND WEAR NHS FOUNDATION TRUST BOARD OF DIRECTORS MEETING

NORTHUMBERLAND, TYNE AND WEAR NHS FOUNDATION TRUST BOARD OF DIRECTORS MEETING NORTHUMBERLAND, TYNE AND WEAR NHS FOUNDATION TRUST Meeting Date: 25 March 2015 BOARD OF DIRECTORS MEETING Title and Author of Paper: 2015/16 Budget & Financial Plans 15/16 & 16/17 James Duncan, Deputy

More information

Divisions And Responsibilities OfSenior Staff In The Financial Department

Divisions And Responsibilities OfSenior Staff In The Financial Department UNIVERSITY HOSPITAL OF NORTH STAFFORDSHIRE (NHS) TRUST FINANCE DIRECTORATE JOB DESCRIPTION 1. POST: Divisional Business Advisors 2. GRADE: 8b 3. LOCATION: Division-based expected to work in finance department

More information

Shetland Islands Council Medium Term Financial Plan 2014-2019

Shetland Islands Council Medium Term Financial Plan 2014-2019 Appendix 1 Shetland Islands Council Medium Term Financial Plan 2014-2019 Securing the Best for Shetland Medium Term Financial Plan Page 1 Contents 1. Purpose......3 2. Principles...4 3. Context...8 4.

More information

Job No. (Office Use) Directorate Corporate Services Department Programme Management Office Reports to (Job Title) If No state reason

Job No. (Office Use) Directorate Corporate Services Department Programme Management Office Reports to (Job Title) If No state reason ROLE PROFILE Transformation Programmes Manager Role Profile Job Title Transformation Programme Manager Job No. (Office Use) C6074 Grade (Office Use) Directorate Corporate Services Department Programme

More information

Business Continuity Policy and Business Continuity Management System

Business Continuity Policy and Business Continuity Management System Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain

More information

Subject: Resource & Governance Business Plan 2014/15

Subject: Resource & Governance Business Plan 2014/15 CLACKMANNANSHIRE COUNCIL Report to Resource & Audit Committee THIS PAPER RELATES TO ITEM 10 ON THE AGENDA Date of Meeting: 19 June 2014 Subject: Resource & Governance Business Plan 2014/15 Report by: Senior

More information

Corporate Director Environment & Community Services

Corporate Director Environment & Community Services CABINET Meeting date: 23 July 2015 From: Corporate Director Environment & Community Services DIGITAL STRATEGY 1.0 EXECUTIVE SUMMARY 1.1 This paper presents Cabinet with a draft Digital Strategy for approval.

More information

Aberdeen City Welfare Reform Risks

Aberdeen City Welfare Reform Risks Appendix 1 Aberdeen City CORPORATE RISK REGISTER An extract from the Corporate Risk Register taken 20th February 2013. Title Potential Impact Current Risk Residual Risk Assigned To Risk that planned welfare

More information

Recognition of Prior Learning (RPL) BSB40515 Certificate IV in Business Administration

Recognition of Prior Learning (RPL) BSB40515 Certificate IV in Business Administration Recognition of Prior Learning (RPL) BSB40515 Certificate IV in Business Administration What is RPL? RPL recognises that you may already have the skills and knowledge needed to meet national competency

More information

SKILLED, ENGAGED & MOTIVATED STAFF

SKILLED, ENGAGED & MOTIVATED STAFF Leadership and Management Capability Flexibility of Staff SKILLED, ENGAGED & MOTIVATED STAFF Skills Assurance Reward and Recognition Scottish Court Service People Strategy 2012 2015 1 Why have a People

More information

Get in on the Act. The Care Act 2014. Corporate

Get in on the Act. The Care Act 2014. Corporate Get in on the Act The Care Act 2014 Corporate Get in on the Act The Care Act 2014 Background The Care Act was first published as a Bill in the House of Lords on 9 May 2013, following prelegislative scrutiny.

More information

Glasgow Kelvin College. Financial Control Committee. UK Government Spending Review. Report by Vice Principal Finance & Corporate Services

Glasgow Kelvin College. Financial Control Committee. UK Government Spending Review. Report by Vice Principal Finance & Corporate Services Glasgow Kelvin College Item 15 For Information Financial Control Committee UK Government Spending Review Report by Vice Principal Finance & Corporate Services 1. Introduction The purpose of this report

More information

INTEGRATED PLANNING AND REPORTING

INTEGRATED PLANNING AND REPORTING Government of Western Australia Department of Local Government INTEGRATED PLANNING AND REPORTING Framework and Guidelines Integrated Planning and Reporting Framework and Guidelines p1. Contents Foreword

More information

Status of Report: Public Agenda Item: 10. The Chief Fire and Rescue Officer and the Treasurer

Status of Report: Public Agenda Item: 10. The Chief Fire and Rescue Officer and the Treasurer Status of Report: Public Agenda Item: 10 Meeting: Policy Committee Date: 14 th January 2015 Subject: Report by: Author: For: Local Government Finance Settlement The Chief Fire and Rescue Officer and the

More information

THE FUTURE ARRANGEMENTS FOR THE DELIVERY OF CRIMINAL JUSTICE SOCIAL WORK SERVICES.

THE FUTURE ARRANGEMENTS FOR THE DELIVERY OF CRIMINAL JUSTICE SOCIAL WORK SERVICES. STIRLING COUNCIL THIS REPORT RELATES TO ITEM ON THE AGENDA CARE COMMITTEE COMMUNITY SERVICES 26 th October 2000 NOT EXEMPT THE FUTURE ARRANGEMENTS FOR THE DELIVERY OF CRIMINAL JUSTICE SOCIAL WORK SERVICES.

More information