1 Abstract Number: Title: Application of Drum-Buffer-Rope Methodology in Scheduling of Healthcare System Author's information: Arefeh Mohammadi and Emmanuel S. Eneyo Southern Illinois University Edwardsville, Engineering Building, Box 185, Edwardsville, Illinois POMS 23rd Annual Conference Chicago, Illinois, U.S.A. April 2 to April 23, 212 Abstract Theory of constraints (TOC) is a management philosophy that seeks to increase throughput (efficiency or performance) of the system by identifying those processes that are constraining the system bottlenecks. There have been very few profound studies of TOC in health care systems. In order to fill this gap, this study was conducted to determine how healthcare systems are utilizing components of TOC to schedule operations and what results are being obtained. This is done by using a patient flow model for a radiotherapy section of a hospital. The drum-buffer-rope (DBR) was used as the methodology for scheduling this flow. Successful outcomes obtained by proposed model improved the efficiency and quality of radiotherapy treatment. Key words: Theory of Constraints, Drum-Buffer-Rope scheduling, healthcare system, radiotherapy planning 1
2 1. Introduction Theory of constraints (TOC) emphasizes the importance of improving system performance by exploiting the bottleneck. The underlying concept of the TOC is that any system has at least one constraint which limits its performance. Since a system can best perform only as well as its constraints, TOC focuses on the system's constraints, their exploitation according to the goal of the organization, and implications of exploiting these constraints on the rest of the system. TOC increase that improving constraints performance, which directly results in total system performance (Schragenheim & Ronen, 199) and (Stahl, 1999). The scheduling system TOC uses is often referred to as drum-buffer-rope (DBR). DBR methodology operates by developing a schedule for the system's primary constraint (Mahapatra & Sahu, 26). It is now being implemented in a growing number of organizations enabling better scheduling and decision-making that helps the manager to concentrate on the most critical issues. According to Goldratt, a perfectly balanced operation with no excess capacity is undesirable, and some amount of both imbalance and excess capacity is necessary to ensure optimal performance. Based on this logic, DBR systems work by identifying the system's primary resource constraint and then develops a schedule for it that ensures a high utilization rate while simultaneously leaving some amount of excess capacity at all other resources (i.e. non constraints) (Atwater & Chakravorty, 1995) (Goldratt & Fox, 1986) (Chakravorty & Atwater, 25). Three TOC paradigms that have evolved over the last twenty five years are logistics, global performance measures, and thinking processes. Originally, the logistics paradigm had managers looking for, and elevating, system constraints in order to increase throughput. This included using drum buffer rope scheduling techniques and the five focusing steps of TOC. In the second paradigm, global performance measures were effectively utilized. These measures, based on throughput, operating expense, and inventory, allow managers to easily 2
3 assess the impact of any given decision and help the manager to focus on the system goal (Moos, 27). Patient scheduling in health care systems has been researched extensively over the last 5 years. One special area of concern is medical treatments involving radiation applications to cancer patients, where improper scheduling procedures could have a severe impact on the success of treatments and, above all, could potentially affect the survival rate of the same patients. Indeed, many cancer patients receive combined radiation therapy in accordance with a schedule. Failure to arrange for an appointment for one of the procedures may compromise the treatment (Conforti, 27). Health care systems always have mixed-manufacturing characteristics within their operation in which the TOC logistics and or scheduling paradigms may be customized and utilized (Moos, 27). Consequently, TOC seems to be a natural fit for healthcare systems; in fact, some of its means and concepts have been applied to this situation. However, there are still no reported applications of TOC s DBR tool and inadequate customizations regarding scheduling health care systems. Therefore a better understanding of them by using DBR method is needed. This study aims to investigate the efforts which have previously been done for applying TOC for scheduling and will result in possible models that can be a starting point for using DBR for scheduling health care systems. We begin with a description of TOC and DBR scheduling logic and a brief review of the literature that has led up to this study. We then proceed to define our model of radiotherapy patient scheduling of an oncology section of a hospital. Following the modeling section, we provide model analysis. In the final section, we discuss the conclusions drawn from this study and identify directions for future research. To the best of our knowledge, this is the first study which uses DBR optimizing the radiotherapy planning. 3
4 2. Review of Related Research 2.1 Theory of Constraints Theory of Constraints (TOC) came into view as a tool for optimization of the manufacturing and service systems. Goldratt in his first book "the goal" gave the introduction of TOC and its application in factory scenario. The theory was developed as a management philosophy when the Optimized Production Technology (OPT) scheduling software was introduced in 1979 (Goldratt & Fox, 1986). Goldratt presented his ideas of production management in the form of a book and highlighted the difficulties faced by most of the production managers in their day-to-day work. He presented the drawbacks of conventional measurement systems and suggested three measurement yardsticks to gauge the performance of the system defined as below: a. Throughput: Defined as the rate at which the system generates money by the sale of the goods and services which it produces. b. Inventory: Money that a system is invested in purchasing the things that it intends to sell. c. Operational expenses: Money which a system spends, to convert inventory into throughput. Therefore all the parameters can be defined in terms of money. He highlighted the reasons for buildup of inventory in the manufacturing organizations. He defined a constraint resource, the role of constraints in determining the output of organization, and methods to identify and exploit constraints (Bhardwaj & Gupta, 21). While a lot of researchers have contributed to the development of TOC, in this paper Watson's (27) approach in summarizing the development of the theory is followed. To clearly focus on the development of principles of TOC concepts, they segmented the evolution of TOC into five Eras as follow: 4
5 1. The Optimized Production Technology Era, the secret algorithm 2. The Goal Era- articulating Drum-Buffer-Rope scheduling 3. The Haystack Syndrome Era- articulating the TOC measures 4. It's not luck Era- thinking process applied to various topics 5. The critical chain Era- TOC project management To constructively exploit this segmentation for this paper, the discussion of The Goal Era is cited in order to investigate the utilization of DBR methodology for the health care systems. 2.2 Era 2: The Goal Goldratt and Cox in "The Goal", 1984, explained the situation of Alex Rogo, who saves his plant with the help of some pointed questions by his mentor, Jonah. The goal was written largely to educate workers at facilities employing OPT in an effort to have them follow OPT schedules. The Goal describes a number of heuristics and techniques that have become the foundation for TOC practice. The Goal outlines the Five Focusing Steps (5FS), the process by which TOC concepts are implemented. The 5FS have evolved into what is now called the process of ongoing Improvement, a combination of the Five Focusing Steps and the two prerequisites for implementation. The first prerequisite for implementation is to describe the system under investigation and identify its purpose. The second one is to define measurements that align the system to that purpose. (Watson, 27). The 5FS are as follow: 1. Identify the system constraint(s). A constraint is any element or factor that prevents a system from achieving a higher level of performance relative to its goal (Blackstone & Cox, 24). Having defined the purpose of the system, Identification of the constraint follows from the principal opinion of TOC, "constraints determine the performance of a system." Since there are few constraints in any system, management of these few key points allows for effective control of the entire system. 5
6 2. Decide how to exploit the system constraints. This means making sure that the utmost is done to ensure that processes leading up to the constraint resource always run as smoothly as possible. In other words once the constraint has been identified, the next step is to determine the most effective means to exploit it. Exploitation of the constraint seeks to achieve the highest rate of throughput possible within the confines of the system s current resources. The output of the system is limited by the rate of throughput at the constraint. 3. The third step is to subordinate the system to the constraint. This eliminates waste and insures maximum responsiveness since the system only works on that which it can reasonably expect to turn into cash through sales in the near term. 4. Elevate (improve the performance of) the system constraint. It means elevating the throughput by adding capacity to the system at the constraint location. This may result in the acquisition of additional capacity, new machines or new technology to lift or break the constraint. Improving the performance of the constraint leads to improvement in the performance of the entire system (Moos, 27). 5. If, in the previous steps, a constraint has been removed, go back to step one, but do not allow inertia to cause another constraint. The fifth step renews the improvement cycle (Hutchin & Jeary, 26) and (Watson, 27). It is very likely that once a constraint has been identified and addressed, another constraint will become evident. This should be addressed through the same 5 step process. A process of ongoing or continuous improvement has begun (Moos, 27). An organization needs to repeat these steps in order to achieve the continuous improvement. From the early works, practicing managers started thinking that application of TOC is confined only to production area. To break this misconception, "Goal II" was written, and it highlights the method to apply TOC in marketing (Bhardwaj & Gupta, 21). Due to 6
7 simple methodology the application of TOC techniques, have been discussed in the academic literature, retailing, supply chain, process improvement, and in a variety of production environments. TOC techniques will result in increased output while decreasing both inventory and cycle time. Other studies show that TOC techniques exceeds the performance of those using manufacturing resource Planning (MRP-II), lean manufacturing, agile manufacturing, and just-in-time (Cook, 1994); (Watson, 27). 2.3 Drum-Buffer-Rope Flowing directly from the 5FS, The Goal develops the scheduling methodology employed under TOC: drum-buffer-rope (DBR). The constraint, or drum, determines the pace of production. The rope is the material release mechanism, releasing material to the first operation at a pace determined by the constraint. Material release is offset from the constraint schedule by a fixed amount of time, the buffer. Buffers are strategically placed to protect shipping dates and to prevent constraint processes from starvation due to a lack of materials. Consistent with the step one of the 5FS, identification of the drum, or constraint, is required for implementation of a DBR system. The second step of the 5FS, exploit the constraint, necessitates strategic buffering at the constraint and at other system control points to protect the ability of the system to produce the schedule. The term buffer is often synonymous with work-in-process or finished goods inventory. Finally, consistent with step three of the 5FS, the rope subordinates non-constraint machines to the constraint, releasing inventory to the system based on the rate of consumption at the constraint. The ''length'' of the rope, hence the amount of inventory in the system, is determined by the protection to the constraint provided by the buffer. Since workin-process inventory downstream of the constraint is negligible, the rope acts to keep minimal and constant inventory levels in the system. Therefore, TOC systems exhibit reduced and consistent lead times when compared to traditional management techniques. 7
8 As previously stated, testing of DBR points out that TOC systems produce greater numbers of product while reducing inventory, manufacturing lead time, and the standard deviation of cycle time (Watson, 27). 2.4 Scheduling in DBR DBR are the three components of the OPT scheduling and control system. OPT makes a distinction between two types of constraints: bottlenecks and Capacity Constrained Resources (CCRs). A bottleneck is a resource whose capacity is less than or equal to the market demand. A CCR is a resource which, if not scheduled properly, can damage due date performance or throughput. Buffers are also allocated before assembly stations where products arriving from bottleneck resources are assembled. Their main purpose is to prevent the system from stopping because of statistical fluctuations. Another place where buffers are located is in front of the orders. This enables the user to control the due dates and supply. The rope is the third component in the OPT scheduling concept. Since scheduling is done according to the drum, the rope is the offset of time between the scheduling of the drum and the release of raw materials. The OPT concept suggests that the drum can be either at the end of the process or at any other place. The drum is identified according to the circumstances; it is the bottleneck of the system (Ronen & Starr, 199). It is wrong to believe that the application of theory of constraints is confide to production functions only. It can be applied to any type of organization with same degree of success (Bhardwaj & Gupta, 21). During the past 15 years, there has been a move to expand TOC non manufacturing applications. The drum buffer rope (DBR) scheduling technique can be used in services as well as in manufacturing. While manufacturing uses DBR to schedule machinery, services may use DBR to schedule people within the organization, to set appointments for customers, or to predict lead times for customers (Moos, 27). 8
9 3. Model of Healthcare System From an operation management view, hospital care processes are considered to be rather complex as compared to processes in industry or most other types of service organizations. This may explain the difficulties that often are encountered during efforts to apply operations management (OM) principles and technologies in hospital care surroundings. However, complex operational processes also exist in industry, and operations management principles have been successfully applied to many of them. Because TOC is a management philosophy, it has broad applicability. Services can improve their processes and procedures just as can manufacturers (Moos, 27) Similarities and Differences between Industrial OM and Health OM "In manufacturing industry, competition between companies was one of driving forces for an evolution in OM. Competition creates a high pressure on performance in terms of quality, efficiency, and flexibility. Production control or logistics can be defined as the coordination of supply, production and distribution processes in manufacturing systems to achieve specific delivery flexibility and delivery reliability at minimum costs. Related objectives are to decrease the lead-times delivery times and costs and to increase throughput, revenues and profit of the organization. Logistics-oriented manufacturing has contributed in many circumstances to improvements in customer performance (delivery times, delivery reliability) as well as efficiency by the better balancing of delivery performances and efficiency. Health care is confronted with similar challenges: Increased complexity of processes by shorter lengths of stay patients, a shift from inpatient treatment towards ambulatory treatment and day care, use of new technology and increased specialization; Need for efficient utilization of resources and reduction of costs; Increased pressure to improve the quality of services by, among other things, decreasing waiting listed and in-process waiting times; Need to control the workload of nursing staff and other personnel in order to avoid adverse impacts on their 9
10 working conditions. Similarities and Differences between Manufacturing Systems and Healthcare Systems are shown in table 4-1. Taking these similarities into account, we can define production control in health care organizations, analogous to the definition of production control in industrial setting- as: The design, planning, implementation and control of coordination mechanisms between patient flows and diagnostic and therapeutic activities in health service organizations to maximize output/throughput with available resources, taking into account different requirements for delivery flexibility (elective/appointment, semi-urgent) and acceptable standards for delivery reliability (waiting list, waiting times) and acceptable medical outcomes" (Vissers & Beech, 1994). Table 4-1: Similarities and Differences between Manufacturing Systems and Healthcare Systems Characteristics Manufacturing Health care Object Material flow Patient flow Specification of end product Up-front specified Subjective and fuzzy requirement Means of production Equipment and staff Equipment and staff Buffers Stock or lead-times Waiting times and leadtimes Financial goal Profit Cost control Market environment Market competition Limited market competition 3.2 Applicability of OM Principals to Healthcare, Considerations for Defining a Healthcare Model The essential assumption underlying OPT mechanism is that there exists a stable bottleneck resource in the production system. By definition, this is also the case for production processes in hospitals. Applying this principle is very useful in tracing the bottleneck. Given the great variation in patient flows, there is often more than one potential bottleneck for the hospital as a whole. An analysis of patient flow gives insight into the 11
11 bottleneck for each of these flows. The relevance of tracing the bottleneck is obvious: to optimize the use of this resource, to enlarge this resource, to reduce the throughput time. At the conceptual level, much can be learned from industrial production control. However, methods and techniques are mostly not directly applicable due to the very specific characteristics of certain hospital health care processes. These include the high variability and high uncertainty in the processing steps required the use of a specialist resource in many processing steps, and the different levels of urgency providing health care (Vissers & Beech, 1994). The scheduling researches related to health care management and logistics were done in the following areas: Patient scheduling: patient-staff scheduling, patient flow, appointment scheduling Resource scheduling: nurse scheduling, Operating room and physician scheduling, Logistics 3.3 Radiotherapy Patient Scheduling Model In this part we are going to discuss the radiotherapy patient scheduling problem. The model is defined and developed within the oncology section of a hospital which is customized to deal with the theory of constraints features. The process by which patients are scheduled for treatment is crucial for the efficiency of the patient flow and, thus, it strongly influences the overall performance of health care systems (Conforti, 27). By developing a patient process flow map, the aim is to identify where the flow is slowed within the overall process of care. In the whole patient journey until discharge after treatment, it is very likely that there will be at least one constraint. A constraint in this model can be any part of the system where patient flow is obstructed causing waits and delays. It interrupts natural flow and hinders movement along the care pathway, determining the pace at which the whole process works. For improving the process the constraint should be tackled. Any service 11
12 improvement is unlikely to succeed because the patient will be accelerated into the queue, only to be halted further along the pathway by the constraint (NHS, 28). There are different approaches to mapping patient journey, procedures, and administrative processes in healthcare services. Mapping patient journeys is an essential tool to reduce delays and highlight improvements for patients and staff. It is worthwhile to observe that radiotherapy patient scheduling differs from the classical scheduling problem because the radiation schedule is tailored to particular circumstances based on the size, number, and location of tumors, overall healthy conditions and body size (Conforti, 27). In what follows, we describe the proposed model. The objective of the optimization model is to maximize the number of patients to be scheduled. For developing and mapping the radiotherapy patient model, we need to make the following assumptions. We start the description of the proposed basic model by observing that, in practice, the first treatment requires more time than the subsequent ones. This is mainly due to the fact that the operator has to introduce the treatment parameters into the linear accelerator (i.e., electron or X-ray mode, intensity, duration), has to memorize the coordinates of the center of the tumor, etc. In addition, part of the first visit to the radiation oncology will be spent determining precise details of how best to treat the patient: it is necessary to determine the correct position of the patient on the treatment bed, to mark his skin with small dots, using temporary or permanent ink, and to create shields for sensitive organs; all these actions are called "simulation" (Turner & Qian, 22). Before beginning the treatment plan it is necessary to validate first time the radiotherapy parameters and also the constructed shields; this action takes an estimated time of 15min. The treatment of each patient takes 15 minutes for each session. Only one linear accelerator is available. 12
13 The patients are served based on the FIFO rule (First In First Out). The Arena Software is used for describing the model, afterward the 5FS are discussed for applying the DBR methodology based on the mentioned model. As figure 4-1 shows the patients first enter the radiotherapy section and check in at the reception. Based on the above assumption in the next step, the set-up, and simulation actions are taken and radiotherapy is completed using linear accelerator that is the equipment of the treatment. If the patient needs more radiation from different angles the process of adjusting the angle based on the tumor location takes time. After treatment the patient then finish up the process and check out. Figure 4-2 shows a sample run of the model when the patients are waiting to be treated. Angle Change Arriving Patients Checkin at set up and M o re Ra d ia tio n Tr ue Assign Finish up Dispose 2 Radiation Angle ion ion Recept radiat Ne e d e d? Fals e Figure 4-1: The radiotherapy patient flow scheduling model Figure 4-2: A sample run of the model 3.4 Five Focusing Steps for Scheduling Radiotherapy Patient Flow Model: Identifying the Constraint. The model identified stages in the patient journey where patients have to queue or are put on a waiting list then mapped to the level of what one person does, in one place, with one piece of equipment, at one time. Look carefully for the true constraint. This is often a lack of availability of a specific skill or piece of equipment. The constraint must always be managed, as it determines the rate at which patients go 13
14 through the system. It is therefore important to ensure that there is no idle or wasted time at this point in the process (NHS, 28). By looking at the following flow (figure 4-2) it is known that the constraint of the model is the linear accelerator which is the equipment of the treatment. It makes a bottleneck in the treatment process which must be exploited. Detailed process templates will help to identify opportunities and help the operational management of constraints. This information will help to develop careful schedules around the constraint. This is important, as every minute that is not used at the constraint is a minute lost to the whole process Define How to Exploit the Constraint, Discovering the Real Reason for the Delay. In order to do this the following should be checked: Ensure that the bottleneck has no idle time, for example, have a list of stand by patients who can be called at short notice in the event of idle capacity Put inspection or checking tasks in front of the bottleneck Distribute the work amongst the clinical team so that everyone works to their highest level of skill and expertise. Separate responsibilities for clinical care and paper flow To increase the capacity of the bottleneck, give some of the work to non bottleneck areas, even if it is less efficient for these areas Improving the Whole Process. Modeling the process in this way will results in identifying unnecessary delays, steps, handovers, duplication of effort and waste, things that don't make sense and not logical, likely hotspots, and bottlenecks or constraints. It is here that the organization needs to ensure that its own policies, resources, behaviors, measurements etc support the constraint to ensure that it is always working. Theory of Constraints recommends putting a 'buffer' (a small queue) in front of the constraint to ensure it is always fed and there is no 'down time'. At the same time, see if processes can be 14
15 improved. Having improved the situation at one bottleneck, others may emerge as rate limiting steps in the patient journey. Bottleneck management is, therefore, a process of continual improvement. Other alternative that may help to ensure maximum utilization are multi-skilling staff, as well as assisting with set up and paperwork activities to enable trained staff to concentrate on the use of the machinery itself. Where the constraint is equipment, it is important to ensure that it is always in use. Routine servicing of radiotherapy machines during the working week, will impact on throughput. Once the most out of a constraint is gotten, the bottleneck may move to another step in the process (NHS, 28) Elevate the System's Constraint. The basic approach of DBR is of exploiting the system constraints and subordinating the rest of the system to the exploitation of the constraints. If the constraint still exists after exploiting and subordinating everything else to it, then during this step the constraint is elevated and broken' by investing resources in it. This step is only necessary if the constraint is a true bottleneck. If the bottleneck breaks, the constraint will move. Knowing the constraint may be sufficient to help improve the process and to help its operational management (Schragenheim & Ronen, 199) How good is the DBR Solution? Based on the above steps we now define the DBR component for the radiotherapy planning model. The "Drum" is the linear accelerator which creates a bottleneck in the system based on the shown simulation of the system. In order to subordinate the system to constraint we put a buffer in front of the constraint. While a patient is in the set-up process, the constraint is idle. If we improve the constraint by reducing the idle time, the whole process will be improved because the throughput of the system (the number of patient who served / time) will be increased. The "Buffer" here means a room where the set-up and simulation can be done by the radiotherapy staff so the idle time of the linear accelerator will be reduced. The "Rope" is the pace that patients are entered into the 15
16 system (the treatment room), and it is controlled by the performance of constraint (linear accelerator). The modified and optimized model of the radiotherapy is shown in figure 4-3. Figure 4-4 shows a sample run of the modified model. The patients are in another queue before they get to the constraint of the system. This queue is the projected buffer which improves the constraint of the system. In other words the set-up process is done in another area before the bottleneck of the system, as a result the constraints will be exploited in a more efficient and quality mode. When the model was run, it is determined that the patients spend less time in the system because in the optimized model the constraint of the system is performing better. Angle Change Arriving Patients Checkin at Setup and More Radiat ion Tr ue Assign Radiat ion Radiat ion LA Finish up Angle Recept ion Sim ulat ion Needed? Dispose 2 F a ls e Figure 4-3: The optimized radiotherapy patient flow scheduling model Figure 4-4: A sample run of the model 4. Conclusion and Future Work As a management philosophy, TOC has wide-ranging applicability, and this study has investigated its application to health care systems. This is done by exploring the TOC principles into health care and confirming an instrument for that exploration. The instrument is the Drum-Buffer-Rope which is used for scheduling the radiotherapy within the oncology department of a hospital. The five focusing steps are explored for this case in order to apply the scheduling for the model. The successful outcomes obtained by the proposed model 16
17 improve the efficiency and quality of radiotherapy treatment. This outcome leads to a reduction of waiting time and waiting lists for radiotherapy treatments and it improves the real schedule. In this way the excessive waiting time, often the major reason for patients dissatisfaction, is minimized as much as possible in outpatient services. Clearly there is more research to be done with respect to the use of TOC within health care systems. Future research should consider various sections of health care systems in order to identify the constraint of the systems and improve the whole system by exploiting the constraint. Future work may also concentrate on improving such sections by removing the constraint and exploring the next in order to put the model in the improvement cycle. By extending the model to a more tailored and detailed one, the problem would be more comparable to the real situations. Some examples include involving more equipment and personnel, considering different treatment plans, and diversifying programs for radiations which will lead to a more precise study about application of DBR for healthcare systems. References: Atwater, & Chakravorty. (1995). Using the Theory of Constraints to guide the impelementation of quality improvment Projects in manufacturing environments. International Journal of Production Research, Volume 25, Issue 2, March 27, Pages Bhardwaj, & Gupta. (21). Drum-Buffer-Rope: The Technique to Plan and Control the Production Using Theory of Constraints. World Academy of Science, Engineering and Technology, Article 19, page 13. Blackstone, & Cox. (24). APICS Dictionary. VA: Alexandria, Volume 25, Issue 2, March 27, Pages Chakravorty, & Atwater. (25). The impact of free goods on the performance of the drumbuffer-rope scheduling systems. International Journal of Production Economics, volume 95, issue 3,, Pages Conforti. (27). Optimization Models for radiotherapy patient scheduling. A Quarterly Journal Of Operations Research, Volume 6, Number 3,
18 Cook. (1994). A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks. Production and Inventory Management Journal, Vol. 18 Iss: 4, pp Goldratt, & Fox. (1986). The Race. The Race. [Croton-on-Hudson, NY]: North River Press. pp ISBN Hutchin, & Jeary. What is Drum-Buffer-Rope (DBR)? TOC Lean Operations Management. Leicestershire: TOC-Lean Institute. Mahapatra, & Sahu. (26). APPLICATION OF THEORY OF CONSTRAINTS ON SCHEDULING OF DRUM-BUFFER-ROPE SYSTEM. International Conference on Global Manufacturing and Innovation. Moos. (27). Improving Service Quality with the Theory of Constraints. Journal of Academy of Business and Economics, 4(3) NHS. (28). Retrieved Dec 8, 211, from _improvement_tools/bottlenecks.html Ronen, & Starr. (199). Synchronized manufacturing as in OPT:From practice to theory. Computer and Industrial Engineering, Vol. 18 No. 4, pp. Schragenheim, & Ronen. (199). Drum-Buffer-Rope shop floor control. Production and Inventory Management Journal, third quarter. Stahl, M. J. (1999). Encyclopedia of health care management Turner, & Qian. (22). Protocol techniques for testing radiotherapy accelerators. Springer- Verlag, Berlin, November 22 Vissers, J., & Beech., R. (1994). Health operations management: patient flow logistic in health care Watson. (27). The evolution of a managemnt philosophy: The Theory of Constraints. Journal of Operation Managemnt, 25 (27)
APPLICATION OF THEORY OF CONSTRAINTS ON SCHEDULING OF DRUM-BUFFER-ROPE SYSTEM
Proceedings of the International Conference on Global Manufacturing and Innovation July 27-29, 26-1 - APPLICATION O THEORY O CONSTRAINTS ON SCHEDULING O DRUM-BUER-ROPE SYSTEM S.S.Mahapatra 1 Amit Sahu
Simplified Drum-Buffer-Rope A Whole System Approach to High Velocity Manufacturing by Eli Schragenheim and H. William Dettmer
Simplified Drum-Buffer-Rope A Whole System Approach to High Velocity Manufacturing by Eli Schragenheim and H. William Dettmer Introduction Drum-Buffer-Rope (DBR) is the Theory of Constraints (TOC) production
HISTORY AND INTRODUCTION
HISTORY AND INTRODUCTION I 1 Introduction The APICS dictionary defines the term supply chain as either the processes from the initial raw materials to the ultimate consumption of the finished product linking
The Distinction between Manufacturing and Multi-Project And the Possible Mix of the Two. By Eli Schragenheim and Daniel P. Walsh
vector strategies The Distinction between Manufacturing and Multi-Project And the Possible Mix of the Two By Eli Schragenheim and Daniel P. Walsh The floor looks similar to any other manufacturing floor.
Automated Scheduling Methods. Advanced Planning and Scheduling Techniques
Advanced Planning and Scheduling Techniques Table of Contents Introduction 3 The Basic Theories 3 Constrained and Unconstrained Planning 4 Forward, Backward, and other methods 5 Rules for Sequencing Tasks
How Constraint Management fits the Operations Management Philosophy
Constraint Management Chapter 7 How Constraint Management fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process Strategy Process Analysis
THEORY OF CONSTRAINTS AS AN EFFECTIVE TOOL FOR SUPPLY CHAIN MANAGEMENT JOANNA NOWAKOWSKA-GRUNT 1 EWA MOROZ 2
Advanced Logistic Systems, Vol. 7, No. 1 (2013), pp. 71 78. THEORY OF CONSTRAINTS AS AN EFFECTIVE TOOL FOR SUPPLY CHAIN MANAGEMENT JOANNA NOWAKOWSKA-GRUNT 1 EWA MOROZ 2 Abstract: Supply chain management
CCPM: TOC Based Project Management Technique
CCPM: TOC Based Project Management Technique Prof. P.M. Chawan, Ganesh P. Gaikwad, Prashant S. Gosavi M. Tech, Computer Engineering, VJTI, Mumbai. Abstract In this paper, we are presenting the drawbacks
How To Compare Six Sigma, Lean and the Theory of Constraints
P R O C E S S M P R O V E M E N T How To Compare Six Sigma, Lean and the Theory of Constraints A framework for choosing what s best for your organization WTHN THE AMERCAN business community a multitude
VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the
VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS by Ganesh S Thummala A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree In Management Technology
NEW MODELS FOR PRODUCTION SIMULATION AND VALIDATION USING ARENA SOFTWARE
NEW MODELS FOR PRODUCTION SIMULATION AND VALIDATION USING ARENA SOFTWARE Marinela INŢĂ 1 and Achim MUNTEAN 1 ABSTRACT: Currently, Lean Manufacturing is a recognized topic in many research fields, which
Improve the Agility of Demand-Driven Supply Networks
GE Intelligent Platforms Improve the Agility of Demand-Driven Supply Networks Leverage real-time production data to optimize the supply chain for a sustainable competitive advantage Improve the Agility
Customer Success Stories
Customer Success Stories Read how the following organizations have built up simulation skills, using SIMUL8 simulations to maximize business performance. General Motors, Manufacturing/Automotive GM increase
Lean Manufacturing in a Make-To-Order Environment
Lean Manufacturing in a Make-To-Order Environment Table of Contents Executive Overview..................................... 2 What is Lean?........................................... 3 Implementing Lean......................................
Chapter 11. MRP and JIT
Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) 11.1. MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the
HEALTHCARE SIMULATION
HEALTHCARE SIMULATION SIMULATION IS USED BY HEALTH CARE AND HUMAN SERVICE ORGANIZATIONS ACROSS THE WORLD TO IMPROVE THEIR SYSTEMS OF CARE AND REDUCE COSTS. SIMULATION OFFERS EVIDENCE BASED, RISK FREE DECISION
50% task time estimate A task time estimate that has a 50% probability of being achieved.
1 2 nd edition CC terms 50% task time estimate A task time estimate that has a 50% probability of being achieved. Perspective: The distribution of task times is generally viewed as an asymmetrical positive
INVENTORY CONTROL BY TOYOTA PRODUCTION SYSTEM KANBAN METHODOLOGY A CASE STUDY
Int. J. Mech. Eng. & Rob. Res. 2013 V M Nistane and Srinivas Viswanath V, 2013 Research Paper ISSN 2278 0149 www.ijmerr.com Vol. 2, No. 1, January 2013 2013 IJMERR. All Rights Reserved INVENTORY CONTROL
Discrete-Event Simulation
Discrete-Event Simulation Prateek Sharma Abstract: Simulation can be regarded as the emulation of the behavior of a real-world system over an interval of time. The process of simulation relies upon the
SUPPLY CHAIN MODELING USING SIMULATION
SUPPLY CHAIN MODELING USING SIMULATION 1 YOON CHANG AND 2 HARRIS MAKATSORIS 1 Institute for Manufacturing, University of Cambridge, Cambridge, CB2 1RX, UK 1 To whom correspondence should be addressed.
Gaining Competitive Advantage through Reducing Project Lead Times Duncan Patrick, CMS Montera Inc. Jack Warchalowski, CMS Montera Inc.
Gaining Competitive Advantage through Reducing Project Lead Times Duncan Patrick, CMS Montera Inc. Jack Warchalowski, CMS Montera Inc. Introduction We all know that any successfully completed project has
Statements on Management Accounting
Statements on Management Accounting STRATEGIC COST MANAGEMENT TITLE Theory of Constraints (TOC) Management System Fundamentals CREDITS This statement was approved for issuance as a Statement on Management
Process Cutting Heating Assembly Hrs per unit 2 3 4 Total hours available 100,000 120,000 220,000
RELEVANT TO ACCA QUALIFICATION PAPER F5 AND PERFORMANCE OBJECTIVES 12, 13 AND 14 Throughput accounting and the theory of constraints In the previous article, I told you all about The Goal, the book in
OPTIMIZING PRODUCTION
REAL WORLD SCENARIOS Volume 2 Cases 7-12 OPTIMIZING PRODUCTION SQUEEZE MORE OUT OF PRODUCTION OPTIMIZING SCHEDULING PRODUCTION FLOW IMPROVEMENTS INTEGRATED MAINTENANCE PLANNING INTEGRATED PROJECT MANAGEMENT
Lean Six Sigma: Redesigning the Cancer Care Delivery Process. 2014 Community Oncology Conference
Lean Six Sigma: Redesigning the Cancer Care Delivery Process 2014 Community Oncology Conference Disclosure Medical Directorship, The US Oncology Network, compensated A Typical Oncology Clinic (Does this
INTRODUCTION. What is Enterprise Resource Planning?
1 INTRODUCTION MGT2405, University of Toronto, Denny Hong-Mo Yeh What is Enterprise Resource Planning? According to the definition given in the APICS Dictionary (American Production and Inventory Control
Integrate Optimise Sustain
Prepared by James Horton - james.horton@ - +61 8 9324 8400 August 2012 Overview The intent of this paper is to describe how rail automation can be integrated with logistics scheduling. It provides general
Measurable Results: Establish service excellence. Reduce errors by 50% The choice for progressive medical centers.
The choice for progressive medical centers Delivering tailored solutions to modern healthcare organization complexities by integrating a unique blend of strategies with wide-ranging industry experience.
Working Smarter. Putting Best Practices to Work: Transforming Logistics Capability into Readiness at the Marine Corps Maintenance Centers
Working Smarter Putting Best Practices to Work: Transforming Logistics Capability into Readiness at the Marine Corps Maintenance Centers Maj Don Humpert, USMC [email protected] The Problem Example:
Problems, Methods and Tools of Advanced Constrained Scheduling
Problems, Methods and Tools of Advanced Constrained Scheduling Victoria Shavyrina, Spider Project Team Shane Archibald, Archibald Associates Vladimir Liberzon, Spider Project Team 1. Introduction In this
Manufacturing Flow Management
Manufacturing Flow Management Distribution D Distribution Authorized to Department of Defense and U.S. DoD Contractors Only Aim High Fly - Fight - Win Supply Chain Management Processes Information Flow
Five Tips to Achieve a Lean Manufacturing Business
Five Tips to Achieve a Lean Manufacturing Business Executive Overview Introduction The more successful manufacturers today are those with the ability to meet customer delivery schedules while maintaining
A Diagnostic Approach to Scheduling
Harish C Bahl * Neelam Bahl California State University, Chico, CA, U.S.A. Several algorithms and methodologies have been proposed for a variety of environments. In this paper, we suggest a diagnostic
Business Challenges. Customer retention and new customer acquisition (customer relationship management)
Align and Optimize Workflows with Lean Dan Marino Marino Associates, LLC Strategic and tactical planning Information systems integration Customer retention and new customer acquisition (customer relationship
COMPUTER INTEGRATED MANUFACTURING
COMPUTER INTEGRATED MANUFACTURING 1. INTRODUCTION: Computer Integrated Manufacturing () encompasses the entire range of product development and manufacturing activities with all the functions being carried
Lean and Green Manufacturing: Concept and its Implementation in Operations Management
International Journal of Advanced Mechanical Engineering. ISSN 2250-3234 Volume 4, Number 5 (2014), pp. 509-514 Research India Publications http://www.ripublication.com/ijame.htm Lean and Green Manufacturing:
Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning
Aggregate, Material Requirement, and Capacity Topic: Aggregate, Material Requirement, and Capacity Slide 1 Welcome to Workshop Eight presentation: Aggregate planning, material requirement planning, and
SIMULATION STUDY OF THE OPTIMAL APPOINTMENT NUMBER FOR OUTPATIENT CLINICS
ISSN 1726-4529 Int j simul model 8 (29) 3, 156-165 Professional paper SIMULATION STUDY OF THE OPTIMAL APPOINTMENT NUMBER FOR OUTPATIENT CLINICS Zhu, Z. C.; Heng, B. H. & Teow, K. L. Department of Health
Bottlenecks in Agile Software Development Identified Using Theory of Constraints (TOC) Principles
Master thesis in Applied Information Technology REPORT NO. 2008:014 ISSN: 1651-4769 Department of Applied Information Technology or Department of Computer Science Bottlenecks in Agile Software Development
Lean enterprise Boeing 737 manufacturing Lean Production System
Student Self-administered case study Lean enterprise Boeing 737 manufacturing Lean Production System Case duration (Min): 45-60 Operations Management (OPs) Lean enterprise Worldwide Case summary: Assembling
The problem with waiting time
The problem with waiting time Why the only way to real optimization of any process requires discrete event simulation Bill Nordgren, MS CIM, FlexSim Software Products Over the years there have been many
Production Planning Process in a Flexible Manufacturing Cell
ISBN 978-1-84626-xxx-x Proceedings of 2011 International Conference on Optimization of the Robots and Manipulators (OPTIROB 2011) Sinaia, Romania, 26-28 Mai, 2011, pp. xxx-xxx Production Planning Process
Glossary of Inventory Management Terms
Glossary of Inventory Management Terms ABC analysis also called Pareto analysis or the rule of 80/20, is a way of categorizing inventory items into different types depending on value and use Aggregate
Labor Optimization. 1. Demand volatility 2. Increasing consumer expectations 3. Cost pressures on logistics and transportation
SOLUTION PERSPECTIVES: Aligning Labor to Maximize Efficiency Labor Optimization in the New Everywhere Commerce Retail World The Internet has revolutionized the way consumers shop and in the process has
Operational Business Intelligence in Manufacturing
Operational Business Intelligence in Manufacturing Copyright 2007 KeyTone Technologies Inc. Page 1 SmartWIP - Intelligent Manufacturing with RFID Manufacturers are under competitive pressure to fulfill
Determining Inventory Levels in a CONWIP Controlled Job Shop
Determining Inventory Levels in a CONWIP Controlled Job Shop Sarah M. Ryan* Senior Member, IIE Department of Industrial and Management Systems Engineering University of Nebraska-Lincoln Lincoln, NE 68588-0518
Production and Operations Management
Production and Operations Management Norman Gaither Greg Frazier 1996 Wadsworth Publishing Company Chapter 1 Production and Operations Management (POM): An Introduction Overview Introduction Factors Affecting
Lean manufacturing and ERP: How to leverage ERP to get lean
E-Book Lean manufacturing and ERP: How to leverage ERP to get lean A manufacturing firm adopting the principles of lean manufacturing can effectively leverage the company s ERP system during its transition
Spreadsheet simulation for industrial application: a case study
Spreadsheet simulation for industrial application: a case study Wan Hasrulnizzam Wan Mahmood a,b,1 a Faculty of Manufacturing Engineering, Universiti Teknikal Malaysia Melaka, Locked Bag 1752, Durian Tunggal
J-Curve effect, 38, 274 276 JIT. See Just-in-Time Inventory Just Enough Design Initially (JEDI), 6, 283
A Accounting for change, 180, 224, 245 Accounting for rework, 224, 245 246 Activity Based Costing (ABC), 26 Adaptive behavior, emergence of, 109 Agile management theory and roles, 109, 185 Agile Manifesto
A Study of Theory of Constraints Supply Chain Replenishment System
Vol. 3, No.3, July 2013, pp. 78 88 ISSN: 2225-8329 2013 HRMARS www.hrmars.com A Study of Theory of Constraints Supply Chain Replenishment System Horng-Huei Wu 1 Mao-Yuan Liao 2 Chih-Hung Tsai 3 Shih-Chieh
Chapter 11. Lean synchronization
Chapter 11 Lean synchronization Slack et al s model of operations management Direct Design Operations Management Deliver Develop Supply network management Capacity management Inventory management Planning
Module 1: Basic concepts of management accounting
Module 1: Basic concepts of management accounting Required reading Chapter 1, pages 4-23 ERH, Section C3: "Code of ethical principles and rules of conduct" Reading 1-1: "Moral responsibility within the
OPERATIONAL EXCELLENCE A KEY TO WORLD- CLASS BUSINESS PERFORMANCE
OPERATIONAL EXCELLENCE A KEY TO WORLD- CLASS BUSINESS PERFORMANCE NĂFTĂNĂILĂ Ion Academy of Economic Studies, Bucharest, Romania RADU Cătălina Academy of Economic Studies, Bucharest, Romania CIOANĂ Georgiana
APICS Certified in Production and Inventory Management [CPIM] Exam Content Manual. Preview
APICS Certified in Production and Inventory Management [CPIM] Exam Content Manual Preview 2013 APICS CPIM Overview of Exam Content Manual Basics of Supply Chain Management January 1, 2013 through December
white paper Inventory Control: Control it before it controls you
white paper Inventory Control: Control it before it controls you Introduction The purpose of this paper is to offer up ideas and discussion points on the importance of inventory control for businesses.
CONSTRUCTION PROJECT BUFFER MANAGEMENT IN SCHEDULING PLANNING AND CONTROL
CONSTRUCTION PROJECT BUFFER MANAGEMENT IN SCHEDULING PLANNING AND CONTROL Jan, Shu-Hui Ph.D. Student Construction Engineering & Management Program Department of Civil Engineering National Taiwan University
The Network Approach to Inventory Management
The Network Approach to Inventory Management Getting Accurate Inventory Information Across the Entire Supply Chain Stream Creates Healthy Companies A GT Nexus White Paper The Inventory Challenge The problem
Lean Silver Certification Blueprint
The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types
Supply Chain Management
Supply Chain Management Contents A. Definition and Terminologies B. Evolution of SCM C. Supply Chain Management D. Integrated Logistics E. Fulfillment Process F. Specialized Supply Chains G. Supply Chain
The Journey Starts Now
The Journey Starts Now Inspiring Business Excellence Thought Leaders - Educators - Coaches - Mentors Lean On Us Practical experience Willing to get their hands dirty This is how clients describe Oliver
Lean Six Sigma Lean 201 Introduction. TECH 50800 QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY
TECH 50800 QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY Before we begin: Turn on the sound on your computer. There is audio to accompany this presentation. Audio will accompany most of the online
Office Efficiency Improving Office Processes and Task Analysis
Office Efficiency Improving Office Processes and Task Analysis Contents Office Efficiency... 3 Office Efficiency Aim... 3 Sample Office Efficiency Aims... 3 Key Efficiency Measures... 4 Balance Supply
Management of Uncertainty In Supply Chain
Management of Uncertainty In Supply Chain Prof.D.P.Patil 1, Prof.A.P.Shrotri 2, Prof.A.R.Dandekar 3 1,2,3 Associate Professor, PVPIT (BUDHGAON), Dist. Sangli(M.S.) [email protected] [email protected]
Interactive Dynamic Modeling for the Passenger Flow Bottleneck and Security Checkpoint Management at an Airport
Interactive Dynamic Modeling for the Passenger Flow Bottleneck and Security Checkpoint Management at an Airport Yaman BARLAS M. Serdar ÇAKACIASLAN Tolga SAĞLIK Pınar SEKE Mustafa UĞUR Boğaziçi University
CRITICAL CHAIN AND CRITICAL PATH, CAN THEY COEXIST?
EXECUTIVE SUMMARY PURPOSE: This paper is a comparison and contrast of two project management planning and execution methodologies: critical path methodology (CPM) and the critical chain project management
Evolving To The Enterprise Production System (EPS)
Collaborative Manufacturing Whitepaper Series Evolving To The Enterprise Production System (EPS) Michael McClellan President Vancouver, WA 360.833.8400 Collaboration Synergies Inc. Manufacturing Execution
Integrating Your ERP and MES to Improve Operations
GE Intelligent Platforms Integrating Your ERP and MES to Improve Operations Advanced enterprise integration applications enable companies to leverage real-time information exchange between the business
A Kanban System for Sustaining Engineering on Software Systems
A Kanban System for Sustaining Engineering on Software Systems David J Anderson Senior Director Software Engineering Rick Garber Manager Process Engineering Corbis is a Creative Services Company whose
Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations
Why use simulation? Accurate Depiction of Reality Anyone can perform a simple analysis manually. However, as the complexity of the analysis increases, so does the need to employ computer-based tools. While
How Constraints Management Enhances Lean and Six Sigma
Lean and Six Sigma are two of the most effective business improvement techniques available today. However, many companies still struggle to harness one or both disciplines to achieve the desired results.
Lean Manufacturing and Six Sigma
Lean Manufacturing and Six Sigma Research Questions What have we done in the past? What must we do in the future? How do we know these are the correct actions? 1 Lean Definitions Key concepts of lean:
C LOUD E RP: HELPING MANUFACTURERS KEEP UP WITH THE TIMES
June 2013 C LOUD E RP: HELPING MANUFACTURERS KEEP UP WITH THE TIMES MORE I NNOVATION, L ESS C OST W ITH S AAS E RP Data Source In late 2012 and early 2013 Mint Jutras collected more than 475 qualified
I. INTRODUCTION A. There are two aspects to an effective operating system: 1. Design 2. Control.
Operations Control Chapter 8 CHAPTER OUTLINE I. INTRODUCTION A. There are two aspects to an effective operating system: 1. Design 2. Control. B. Effective operations control is attained by applying the
consulting group Increase Competitiveness Reduce Costs
Strengthen the Textile Supply Chain Through IT Increase Competitiveness Increase Efficiencies Reduce Costs The real Textile World The Garment Industry Retail The Chemical Fibre Industry The Chemical Industry
Hessel Visser NCOI Les 6 A P 373. Operations Management, 7E: Chapter 14 en15
1 Lecture Planning and Control 14 Enterprise Resource Planning (ERP) 15 Lean synchronization 16 Project Management (zie andere sheets) 17 Quality Management (zie andere sheets) Hessel Visser NCOI Les 6
Section D: Logistics. 2008 APICS All rights reserved. 2-141 Version 1.4 Draft 2
This section is designed to Define logistics and explain its relationship to supply chain strategy Describe the interrelationship of the various logistics functions Define warehousing and sketch a brief
Value Creation Through Supply Chain Network Optimization To Address Dynamic Supply Chain
Value Creation Through Supply Chain Network Optimization To Address Dynamic Supply Chain A Thought Paper on Supply Chain Network Design & Optimization Services from the Business Consulting Group Introduction
Chapter 12. Just-in-Time/Lean/The Theory of Constraints/Six Sigma
Chapter 12 Just-in-Time/Lean/The Theory of Constraints/Six Sigma Just-in-Time, Lean, the Theory of Constraints, and Six Sigma are all related methodologies. All four of these methodologies are continuous
Chapter 16 Inventory Management and Control
Chapter 16 Inventory Management and Control We shall be interested primarily in the control of material in manufacturing. Actually, we are concerned with the control of the flow of material from a raw
The Power of Two: Combining Lean Six Sigma and BPM
: Combining Lean Six Sigma and BPM Lance Gibbs and Tom Shea Lean Six Sigma (LSS) and Business Process Management (BPM) have much to contribute to each other. Unfortunately, most companies have not integrated
UTILIZAÇÃO DA LEAN METODOLOGIA. Desmistificando Aplicações Reais Para CME. Apresentado por John Kimsey
UTILIZAÇÃO DA METODOLOGIA LEAN Desmistificando Aplicações Reais Para CME Apresentado por John Kimsey STERIS LEAN CME SIMULATION SAO PAULO, RIO, PORTO ALEGRE 2 STERIS LEAN CME SIMULATION SAO PAULO, RIO,
The Theory of Constraints & Lean Manufacturing
The Theory of Constraints & Lean Manufacturing Don Guild Synchronous Management, Milford, CT P: 3-877-1287 E: [email protected] Reproduction or use of these materials, in whole or in part, is prohibited
Standing on Eli Goldratt s Shoulders
Standing on Eli Goldratt s Shoulders Management attention to build the ever-flourishing state Presented By: Constantin von Campe - VP Logistics at Grupo Berlin Andres Hurtado GC Julio Fiallos - GC Date:
Cutting-Edge Concepts in Inventory Management
Cutting-Edge Concepts in Inventory Management Just-In-Time (JIT) and Accurate Response have quickly become popular approaches due to the dramatic improvements on profitability. Due to the reduction in
International Association of Scientific Innovation and Research (IASIR) (An Association Unifying the Sciences, Engineering, and Applied Research)
International Association of Scientific Innovation and Research (IASIR) (An Association Unifying the Sciences, Engineering, and Applied Research) ISSN (Print): 2279-0020 ISSN (Online): 2279-0039 International
BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -
BSCM Sample TEST. 1. Which of the following demand fulfillment approaches typically provides the longest delivery time? A) Engineer-to-order. B) Make-to-order. C) Assemble-to-order. D) Make-to-stock. 2.
Simulation software for rapid, accurate simulation modeling
Simulation software for rapid, accurate simulation modeling Celebrating 20 years of Successful Simulation Powerful. Flexible. Fast. A UNIQUELY POWERFUL APPROACH TO PROCESS IMPROVEMENT AND DECISION MAKING
The Internet of Things and the future of manufacturing
JUNE 2013 Josh Cochran b u s i n e s s t e c h n o l o g y o f f i c e The Internet of Things and the future of manufacturing Executives at Robert Bosch and McKinsey experts discuss the technology-driven
Basics of Supply Chain Management (BSCM) Curriculum
Basics of Supply Chain Management (BSCM) Curriculum Version 4.0 Session 1 to Supply Chain Management to Manufacturing Role of Manufacturing Global Citizenship Manufacturing Business Model Business Environment
Achieving Basic Stability By Art Smalley
Achieving Basic Stability By Art Smalley Introduction Lean production has dramatically lifted the competitiveness of many manufacturing companies and the value they deliver to customers. What s more, encouraging
Improving Supply Chain Activity using Simulation
IJIRST International Journal for Innovative Research in Science & Technology Volume 1 Issue 4 September 2014 ISSN(online) : 2349-6010 Improving Supply Chain Activity using Simulation Rabikanta Sharma Manoharmayum
INFORMATION TECHNOLOGIES AND MATERIAL REQUIREMENT PLANNING (MRP) IN SUPPLY CHAIN MANAGEMENT (SCM) AS A BASIS FOR A NEW MODEL
Bulgarian Journal of Science and Education Policy (BJSEP), Volume 4, Number 2, 2010 INFORMATION TECHNOLOGIES AND MATERIAL REQUIREMENT PLANNING (MRP) IN SUPPLY CHAIN MANAGEMENT (SCM) AS A BASIS FOR A NEW
Antti Salonen KPP227 KPP227 1
1 What is capacity? The maximum rate of output for a facility OR The rate at which output can be produced by an operating unit (machine, process, workstation, facility or an entire company). 2 Factors