Complex Systems Engineering What s s the Difference?
|
|
|
- Egbert Brooks
- 10 years ago
- Views:
Transcription
1 AEROSPACE CONCEPTS Complex Systems Engineering What s s the Difference? Shaun Wilson Aerospace Concepts Pty Ltd 1
2 Rationale (Why am I here?) Symposium theme is Understanding Adaptivity to Deal with Complexity One aim is to Place particular emphasis on the conceptual tools needed 2
3 Scope (What will I cover?) Challenges in engineering CAS Why Traditional Systems Engineering (TSE) might struggle Beyond TSE to Complex SE (CSE) TSE and CSE An alternative to CSE Conclusions 3
4 AEROSPACE CONCEPTS Challenges in CAS Engineering What makes CAS more difficult to engineer than (merely) complex systems? 4
5 Key Issue Systems not just getting bigger and more complex in a linear sense but ICT is allowing and encouraging systems to be integrated and made interoperable resulting in systems which resemble living ecosystems in some ways CAS and Systems-of-Systems (SoS) 5
6 AEROSPACE CONCEPTS Why TSE Might Struggle with CAS / SoS What makes CAS / SoS difficult for TSE to deal with? 6
7 What is TSE? Interdisciplinary approach and means to enable realization of successful systems. Focuses on defining customer needs and required functionality Integrates all the disciplines and specialty groups into a team Considers both the business and the technical needs (International Council on Systems Engineering (INCOSE) 2006 abridged) 7
8 Why Does TSE Exist? Response to rapid increase in the complexity of military and aerospace projects in the decades after WW II Proven history of identifying end-user needs and translating into solutions 8
9 TSE Assumptions A priori knowledge of desired outcomes Single common manager Central introduction and management of change Resources can be applied and reallocated as needed (Norman & Kuras 2004, p. 9) 9
10 Challenges for Net-Centric Force Development Destination is unclear or, at least, only defined at an outline level of detail What must the force be able to do (better)? This is a different question from what is must (will) be (ORBAT etc)! ADF is a system-of-systems Not just a scaled-up mega system Differences related to purpose & control 10
11 Defence Organisations as SoS Do not share a common conceptual basis Not built for the same purpose or for use exclusively within the parent SoS Share an acquisition environment which encourages them to be standalone Have little or no effective common control or management No shared funding which can be directed to fixing integration problems as required Many customers of which the SoS capability is but one Evolve rapidly (particularly ICT) and at different rates subject to different, generally uncoordinated, pressures and needs (Norman & Kuras 2004, p. 4) 11
12 Incomplete needs Lack of control Traditional Systems Engineering (Adapted Aerospace Concepts from Technology Pty Ltd 2006 Australasia Pty Ltd 1998) Pan-TTCP CAS Symposium CSE... What's the Difference? 12
13 Example of Lack of Control: Defence Capability Development Defence capability development (in Australia at least) is highly project-centric Defence Capability Program (DCP) is, in essence, a collection of projects Resourcing at project level Management at project level (c tees, etc) Result is that the ADF SoS is built by numerous partially-autonomous agents 13
14 Example of Incomplete Needs: HNA (Army devt) ) Desired Outcomes Make best use of DCP Negative political outcome if not achieved Enhanced survivability Improved SA Blue force ID reduced fratricide risk Enhanced targeting & lethality Improved sustainability Networked logistics information systems Just-in-time supply Anticipatory push supply Network-enabled (this is an enabler itself!) Effectiveness (defined how?) Survivability Adaptability Better interoperability Joint via JCSS? Coalition via what? Increased capability & versatility Rapid task transition (agility) (3-block war on same block) (CA Directive 14/05 Hardened and Networked Army as cited in Australian Army 2006,, p. 1) 14
15 AEROSPACE CONCEPTS Beyond TSE to CSE Evolving engineering practice to suit CAS / SoS 15
16 Different Approach Needed... here is the solution designed from the requirements, now go implement it to here are the selective pressures acting on the elements present, now resolve or reduce them (Norman & Kuras 2004, p. 17) 16
17 History and Basis Defined by Norman & Kuras of MITRE Corp. From work on USAF Air & Space Ops Centres Applies at the enterprise (SoS) level deliberate & accelerated mimicry of the processes that drive emergence and natural evolution. address[es] overall coherence without a direct and immediate attention to detail. Opposite to current Aust Defence process of (too much) detail (too) early in project development (Norman & Kuras 2004, p. 17) 17
18 Role of Autonomous Agents acknowledges the presence and action of autonomous agents as important elements of a SoS. Individual acquisition projects Other parts of Defence community creates and manages an environment in which multiple autonomous agents each address a fraction of the relationships that might be involved in an overall complex system. (Norman & Kuras 2004, pp. 17 & 19) 18
19 CSE Regimen Elements (Adapted from Norman & Kuras 2004, pp ) 19
20 CSE Elements Examples Element Developmental environment Outcomes spaces Rewards Developmental precepts Judging Defence example(s) Reqts & acquisition environments, military experimentation but recognised and managed as a developmental environment Statements of intent in Hardened & Networked Army directive Access to financial resources for a project or passage through a development gate Rules Australian two-pass-to-government approval process Still looking Could be applied in spiral development? Continuous characterisation NCW assessment work done in Army Safety regulations Duality Maintaining operational capability during change Stopping unsuitable capabilities being fielded Relationships between operational and developmental environments through personnel exchange, feedback of experimental results, etc (Wilson et al 2006, Section 9) 20
21 CSE Elements Allocated (Adapted from Norman & Kuras 2004, pp ) 21
22 Running the CSE Regimen Continuous formulation of desirable outcome spaces (not specific outcome points) Creation of rewards available to autonomous agents expressed in terms visible to the agents even if the outcomes spaces themselves are not Judging and rewarding of achievement of desirable outcomes Binding developmental precepts that serve to influence (but not to specify) the decision-making of the autonomous agents Continuous characterisation emphasising those aspects that are associated with the state) of the system as it enters targeted outcomes spaces (Adapted from Norman & Kuras 2004, p. 29) 22
23 AEROSPACE CONCEPTS TSE and CSE What s s the relationship? 23
24 TSE versus CSE TSE Reproducible products Pre-conceived specifications Well-defined boundaries Unwanted possibilities removed Externally-driven integration Defined development endpoint Development ends when unwanted possibilities & friction removed CSE No two enterprises alike Continual evolution Ambiguous boundaries New possibilities assessed during enterprise evolution Self-integrating & re-integrating Never-ending development Enterprises depend on internal cooperation and competition to stimulate evolution (Norman & Kuras 2004, p. 18) 24
25 TSE within CSE CSE is not an abandonment of TSE TSE and CSE should be applied concurrently in the realisation and evolution of a complex system. TSE is appropriate for managing the decision-making processes of individual autonomous agents in a complex system. CSE must be added when multiple autonomous agents must be part of any solution (Norman & Kuras 2004, p. 18) 25
26 AEROSPACE CONCEPTS An alternative to CSE Checkland s s Soft Systems Methodology (SSM) 26
27 History and Basis Developed in 1960s/70s to deal with large-scale problematic situations Socio-technical systems British National Health Service (NHS) Focuses on situation modelling Describe system elements as-is Describe in terms of functions to be performed or contribute to Seeks actions to improve the situation 27
28 Hard versus Soft Observer 1 ( hard ) System System System System I spy systems which I can engineer Observer 2 ( soft ) The observer s perceived real world The World: Systemic The observer s perceived real world I spy complexity and confusion; but I can organise exploration of it as a learning system The Process of Enquiry: Systemic (Checkland 1999, p. A11) 28
29 1 The problem situation unstructured 7 Action to improve problem situation 6 Feasible, desirable changes 2 The problem situation expressed 5 Comparison of 4 with 2 Real World Systems Thinking 3 4 Root definitions of relevant systems (Checkland 1999, p. 163) Formal system concept 4a Conceptual models Other systems thinking 4b
30 SSM and CSE Recognition of impracticality of prespecification Role is influence on autonomous agents, not central control The developmental environment is as important as the outcome environment We are currently working to synthesise an approach based on the relevant aspects of SSM and CSE (and others) 30
31 AEROSPACE CONCEPTS Conclusions What does CSE mean to us in Defence? 31
32 What does it all mean? TSE is, arguably, deficient for CAS / SoS engineering challenges (the debate is only just beginning) Defence presents lots of such challenges CSE offers a promising way forward based on (apparently) mimicking natural processes But not the only approach we (the SE community) have lots of work to do to create a mature approach to engineering of CAS / SoS 32
33 References Australian Army 2006, Land NCW Campaign Plan, Army Headquarters, Canberra, draft at 19 May. Checkland, P 1999, Systems Thinking, Systems Practice Includes a 30 Year Retrospective, Wiley, Chichester, UK. INCOSE 2006, What is Systems Engineering?, viewed on 13 July 2006, Norman, DO & Kuras, ML 2004, Engineering Complex Systems, Case # , The MITRE Corporation, viewed on 14 April 2006, orman_engineering.pdf. Technology Australasia Pty Ltd 1998, The Systems Engineering Process poster, Technology Australasia Pty Ltd, Melbourne, Australia. Wilson, SA et al 2006, Network-Centric Warfare Prioritisation & Integration Army s 2009 Networked Battlegroup Foundation Analysis, ACPL-REPORT J63, Aerospace Concepts Pty Ltd, Canberra. 33
34 AEROSPACE CONCEPTS Fin Questions, please 34
35 AEROSPACE CONCEPTS 17 Yallourn Street PO Box 371 Fyshwick ACT 2609 Tel: Fax: [email protected] 35
So, asks the Chief Engineer What do I go do? [1]*
This is an annotated briefing. See the Notes Pages for paper. So, asks the Chief Engineer What do I go do? [1]* Douglas O. Norman Brian E. White (781) 271-8218 [email protected] 8 April 2008 Session 2D1
A Soft Approach to Solving Hard Problems in Construction Project Management
Second International Conference on Construction in the 21 st Century (CITC-II) Sustainability and Innovation in Management and Technology 10-12 December, 2003, Hong Kong A Soft Approach to Solving Hard
BUILDING CONSTRUCTION PRIMARY TASK MODELS
Construction Informatics Digital Library http://itc.scix.net/ paper w78-1996-319.content BUILDING CONSTRUCTION PRIMARY TASK MODELS Kangari R. and Sadri S. ABSTRACT: This paper provides a foundation for
Towards Software Engineering Process for C4I Systems
Towards Software Engineering Process for C4I Systems Tazar Hussain, Khalid Naseer Al-Mutib, Abdullah Sharaf Alghamdi Department of Software Engineering College of Computer and Information Sciences, King
From Stored Knowledge to Smart Knowledge
From Stored Knowledge to Smart Knowledge The British Library s Content Strategy 2013 2015 From Stored Knowledge to Smart Knowledge: The British Library s Content Strategy 2013 2015 Introduction The British
Department of Defense NetOps Strategic Vision
Department of Defense NetOps Strategic Vision December 2008 Department of Defense Chief Information Officer The Pentagon Washington, D.C. Table of Contents 1 Purpose...1 2 Introduction...1 2.1 NetOps
Programme Specification
Programme Specification Title: Master of Business Final Award: Master of Business Administration (MBA) With Exit Awards at: Postgraduate Certificate in Management (CMS) Postgraduate Diploma (PG Dip) Master
The profile of your work on an Agile project will be very different. Agile projects have several things in common:
The Agile Business Analyst IT s all about being Agile? You re working as a Business Analyst in a traditional project environment, specifying the requirements for IT Developers to build. Suddenly everyone
Scientist-practitioner?
Paper 14-1 PAPER 14 Scientist-practitioner? Bob Dick (1996) Is it time to revise the scientistpractitioner model?. An unpublished discussion paper. Revised in 1996 from an earlier draft. For some years
Software Development Process
Software Development Process A software development process, also known as software development lifecycle, is a structure imposed on the development of a software product. Similar terms include software
SME Innovation & Differentiation as a Business Strategic Priority Leveraging the SME IT-Capability Maturity Framework
Page 1 White Paper, May 2014 Dr Marian Carcary SME Innovation & Differentiation as a Business Strategic Priority Leveraging the SME IT-Capability Maturity Framework Abstract In a globalized business landscape
International Centre for Complex Project Management
International Centre for Complex Project Management The Management of Projects in Complex Environments Deborah Hein Managing Director and CEO ICCPM Presentation Outline ICCPM and why we exist The Complex
Balancing the Outsourcing Equation
Whitepaper Balancing the Outsourcing Equation A Blueprint on how to obtain the benefits of outsourcing without the risks. 2013 Blueprint Software Systems Inc. All rights reserved Executive Summary This
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value
ED462672 2001-12-00 Mental Health Counseling: Identity and Distinctiveness. ERIC/CASS Digest.
ED462672 2001-12-00 Mental Health Counseling: Identity and Distinctiveness. ERIC Development Team www.eric.ed.gov Table of Contents If you're viewing this document online, you can click any of the topics
DRAFT NATIONAL PROFESSIONAL STANDARDS FOR TEACHERS. Teachers Registration Board of South Australia. Submission
DRAFT NATIONAL PROFESSIONAL STANDARDS FOR TEACHERS Teachers Registration Board of South Australia Submission 21 May 2010 Table of Contents 1. EXECUTIVE SUMMARY 1 2. TEACHERS REGISTRATION BOARD OF SOUTH
British School of Commerce
British School of Commerce Programme Specification for the Cardiff Metropolitan University Master of Business Administration (MBA) Major Project Stage 1 Contents Page 1 Programme Aims and Objectives 3
Technology management in warship acquisition
management in warship acquisition A J Shanks B.Eng(Hons) MIET BMT Defence Services Limited SYNOPSIS Today s warship designers and engineers look to technology to provide warships and systems better, cheaper
Executive Summary of the Task Force Report INTERNATIONAL COMPLEX PROJECT MANAGEMENT TASK FORCE
INTERNATIONAL COMPLEX PROJECT MANAGEMENT TASK FORCE COMPLEX PROJECT MANAGEMENT GLOBAL PERSPECTIVES AND THE STRATEGIC AGENDA TO 2025 Executive Summary of the Task Force Report 2011, International Centre
Executive Summary. The functional groupings of LSD s operations are:
Executive Summary Land Systems Division (LSD) is a Division within the (DMO) that is responsible for acquisition and sustainment of designated land systems for the Australian Defence Force (ADF). LSD provides
Customer Service Charter
Customer Service Charter Single entry point to government 13 23 24 www.service.sa.gov.au Service SA - the State Government's single entry point to government services and information What we do We provide
U.S. Dept. of Defense Systems Engineering & Implications for SE Implementation in Other Domains
U.S. Dept. of Defense Systems Engineering & Implications for SE Implementation in Other Domains Mary J. Simpson System Concepts 6400 32 nd Northwest, #9 Seattle, WA 98107 USA Joseph J. Simpson System Concepts
Dodo Power & Gas Complaint Management Policy
DODO POWER & GAS PTY LTD Dodo Power & Gas Complaint Management Policy Jurisdiction: All 2013 Policy Reference ref DPG 100-004 Version: 1.2 Author: Status Andrew Mair Draft Publication Date 7/06/2013 Location:
place-based asset management
place-based asset management Managing public sector property to support aligned local public services TOWN HALL CIPFA, the Chartered Institute of Public Finance and Accountancy, is the professional body
Graduate Certificate in Applied Management (Policing and Emergency Services)
Graduate Certificate in Applied Management (Policing and Emergency Services) Designed for managers with significant experience and the capacity for higher office, this is a nationally accredited qualification
Quick Guide: Meeting ISO 55001 Requirements for Asset Management
Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International Infrastructure Management Manual (IIMM) ISO 55001: What is required IIMM: How to get
Key Factors in Successful Research Degree Performance
COLLABORATIVE SUPERVISION AND RESEARCH SKILLS TRAINING IN RESEARCH DEGREE PROGRAMS Jan Whittle Centre for University Teaching and Learning University of South Australia This paper discusses a research
The Early Years Learning Framework: Getting started
The Early Years Learning Framework: Getting started Joy Goodfellow This publication is provided as part of the Early Years Learning Framework Professional Learning Program Research in Practice Series About
Integrating PRINCE2 and Scrum for successful new product development
1 Goal Professional Services Pty Ltd 2 Renewtek Pty Ltd Integrating PRINCE2 and Scrum for successful new product development Rankins G J 1 and Kearns M 2 This paper was presented at the Australian Institute
Designing Law Enforcement: Adaptive Strategies for the Complex Environment
Designing Law Enforcement: Adaptive Strategies for the Complex Environment John A. Bertetto, Police Officer, Chicago Police Department Crime Control Strategies As law enforcement professionals, we often
How To Create A Knowledge Enabled Organization
Losing Your Minds: Capturing, Retaining and Leveraging Organizational Knowledge bill Kaplan Published by In association with Losing Your Minds: Capturing, Retaining and Leveraging Organizational Knowledge
Integrate Optimise Sustain
Prepared by James Horton - james.horton@ - +61 8 9324 8400 August 2012 Overview The intent of this paper is to describe how rail automation can be integrated with logistics scheduling. It provides general
How To Write A Curriculum Paper On Arts Education In Nsw
NSW Response to the Draft Shape of the Australian Curriculum: The Arts Background The Office of the Board of Studies has conducted consultation on the draft Arts Shape paper in order to provide feedback
PROGRAMMME SPECIFICATION FOR MA in LEADERSHIP AND MANAGEMENT (HEALTH AND SOCIAL CARE SERVICES)
PROGRAMMME SPECIFICATION FOR MA in LEADERSHIP AND MANAGEMENT (HEALTH AND SOCIAL CARE SERVICES) MA in LEADERSHIP AND MANAGEMENT (HEALTH AND SOCIAL CARE SERVICES) 1. Award 2. Route Management (Health and
Doctor of Clinical Psychology
Doctor of Clinical Psychology Programme of study for the degree of Doctor of Clinical Psychology 1. The following may be accepted as a candidate for the degree of Doctor of Clinical Psychology: Graduates
An Overview of the Systems Engineering Knowledge Domain
An Overview of the Assignment for ESD.83: Research Seminar in Engineering Systems Prepared by Annalisa L. Weigel 24 October 2000 Society is always taken by surprise at any new example of common sense.
A SYSTEMS MODEL OF PROJECT MANAGEMENT
A SYSTEMS MODEL OF PROJECT MANAGEMENT Richard Brian Barber Research Student School of Civil Engineering Australian Defence Force Academy Canberra ACT Australia 2600 [email protected] INTRODUCTION
Application Development Services
Hannan I.T. Application Development Services Refer to: Amos Attar Business Development Manager Hannan IT Pty Ltd 61-63 Oxford Street Collingwood Vic 3066 PO Box 1943 Collingwood Vic 3066 Telephone: 03
Modelling the Management of Systems Engineering Projects
AEROSPACE CONCEPTS Modelling the Management of Systems Engineering Projects Daniel Spencer Shaun Wilson Aerospace Concepts Pty Ltd www.concepts.aero 28 November 2012 Model-Based Systems Engineering Symposium
Model-Based Conceptual Design through to system implementation Lessons from a structured yet agile approach
Model-Based Conceptual Design through to system implementation Lessons from a structured yet agile approach Matthew Wylie Shoal Engineering Pty Ltd [email protected] Dr David Harvey Shoal Engineering
Does a Model Based Systems Engineering Approach Provide Real Program Savings? Lessons Learnt
Does a Model Based Systems Engineering Approach Provide Real Program Savings? Lessons Learnt Presenter: Steve Saunders FIEAust CPEng AWD Combat System Chief Engineer Date: 25 Oct 2011 Customer Success
Programme Specification
Programme Specification Title: Finance Final Award: Master of Business Administration (MBA) With Exit Awards at: Master of Business Administration (MBA) Postgraduate Diploma (PG Dip) Postgraduate Certificate
BIMM Course Specification
Full title of the course & final award Mode of attendance BA (Hons) in Event Management Full-time Length of course This course is taught as a traditional three-year course at levels four, five and six,
Project Management in Marketing Senior Examiner Assessment Report March 2013
Professional Diploma in Marketing Project Management in Marketing Senior Examiner Assessment Report March 2013 The Chartered Institute of Marketing 2013 Contents This report contains the following information:
STAGE 1 COMPETENCY STANDARD FOR PROFESSIONAL ENGINEER
STAGE 1 STANDARD FOR PROFESSIONAL ENGINEER ROLE DESCRIPTION - THE MATURE, PROFESSIONAL ENGINEER The following characterises the senior practice role that the mature, Professional Engineer may be expected
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire
An SSM-Based Approach to Implement a Dynamic Performance Management System
An SSM-Based Approach to Implement a Dynamic Management System Roberto da Piedade Francisco and Américo Azevedo INESC Porto & Faculdade de Engenharia da Universidade do Porto, Rua Doutor Roberto Frias
A SOFT SYSTEMS CASE STUDY INVESTIGATING THE INFORMATION SYSTEM OF A SMALL BUSINESS AND DEMONSTRATING THE USEFULNESS OF RICH PICTURES ABSTRACT Mark Campbell Williams, Faculty of Business and Public Management,
About Allocate Software
About Allocate Software Our Company: The Workforce Optimisation Specialists Allocate Software is the leading workforce optimisation software applications provider for global organisations with large, multi-skilled
EFRAG Short Discussion Series THE EQUITY METHOD: A MEASUREMENT BASIS OR ONE-LINE CONSOLIDATION?
THE EQUITY METHOD: A MEASUREMENT BASIS OR ONE-LINE CONSOLIDATION? JAN 2014 The addresses topical and problematic issues with the aim of helping the IASB to address cross-cutting dilemmas in financial reporting
Seven Principles of Change:
Managing Change, LLC Identifying Intangible Assets to Produce Tangible Results Toll Free: 877-880-0217 Seven Principles of Change: Excerpt from the new book, Change Management: the people side of change
the Defence Leadership framework
the Defence Leadership framework Growing Leaders at all Levels Professionalism Loyalty Integrity Courage Innovation Teamwork Foreword One of the founding elements of Building Force 2030, as outlined in
PARENT EDUCATION AND EARLY CHILDHOOD PROGRAMMES
The Consultative Group on Early Childhood Care and Development PARENT EDUCATION AND EARLY CHILDHOOD PROGRAMMES Coordinators' Notebook No. 12, December 1992 by Cassie Landers Consultative Group for Early
Models of Dissertation Research in Design
Models of Dissertation Research in Design S. Poggenpohl Illinois Institute of Technology, USA K. Sato Illinois Institute of Technology, USA Abstract This paper is a meta-level reflection of actual experience
Infrastructure Asset Management Report
Infrastructure Asset Management Report From Inspiration to Practical Application Achieving Holistic Asset Management 16th- 18th March 2015, London Supported by Table of contents Introduction Executive
RAMS, Systems Engineering and Systems Thinking
RAMS, Systems Engineering and Systems Thinking Presentation for The Joint Electrical Institutions Lecture Programme Ravindra K Bagia About Me Ravindra Bagia UTS Faculty of Engineering and IT Teaching:
Position Classification Flysheet for Logistics Management Series, GS-0346
Position Classification Flysheet for Logistics Management Series, GS-0346 Table of Contents SERIES DEFINITION... 2 SERIES COVERAGE... 2 EXCLUSIONS... 4 DISTINGUISHING BETWEEN LOGISTICS MANAGEMENT AND OTHER
The use of generic process models for process transformation
The use of generic process models for process transformation S J Childe, P A Smart, A M Weaver University of Plymouth Plymouth, PL4 8AA, U.K., Tel. +44 1752 232618, Fax +44 1752 232540, Email [email protected]
ehealth Architecture Principles
ehealth Architecture Principles Version 3.0 June 2009 Document Control Details Title: ehealth Architecture Principles Owner: Head of Architecture and Design, Scottish Government ehealth Directorate Version:
LOUGHBOROUGH UNIVERSITY. Programme Specification. International Financial and Political Relations
LOUGHBOROUGH UNIVERSITY Programme Specification MSc in International Financial and Political Relations Please note: This specification provides a concise summary of the main features of the programme and
The National Commission of Audit
CA Technologies submission to The National Commission of Audit November, 2013 Kristen Bresch CA Technologies Executive Summary CA Technologies is pleased to present the National Commission of Audit the
Rapid software development. Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 17 Slide 1
Rapid software development Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 17 Slide 1 Objectives To explain how an iterative, incremental development process leads to faster delivery of
Reasons for need for Computer Engineering program From Computer Engineering Program proposal
Reasons for need for Computer Engineering program From Computer Engineering Program proposal Department of Computer Science School of Electrical Engineering & Computer Science circa 1988 Dedicated to David
Statements of Learning for Information and Communication Technologies (ICT)
Statements of Learning for Information and Communication Technologies (ICT) ISBN-13: 978-1-86366-633-6 ISBN-10: 1 86366 633 8 SCIS order number: 1291673 Full bibliographic details are available from Curriculum
CS 389 Software Engineering. Lecture 2 Chapter 2 Software Processes. Adapted from: Chap 1. Sommerville 9 th ed. Chap 1. Pressman 6 th ed.
CS 389 Software Engineering Lecture 2 Chapter 2 Software Processes Adapted from: Chap 1. Sommerville 9 th ed. Chap 1. Pressman 6 th ed. Topics covered Software process models Process activities Coping
Competencies and Maturity models. Towards the Integration of Event Management Best Practice by the Project Management Process - continued
Competencies and Maturity models Towards the Integration of Event Management Best Practice by the Project Management Process - continued Draft - Version 1 29/06/2002 William J. O'Toole University of Technology,
University Reviews: Exploring a New and Coordinated Approach
University Reviews: Exploring a New and Coordinated Approach Abstract Sue Leahy University of Technology Sydney The University of Technology, Sydney (UTS) has endorsed the implementation of a new model
DSDM DSDM. CONSORTiUM. CONSORTiUM. AgileBA. The Handbook for Business Analysts. Extract The Requirements Lifecycle In An Agile Project. www.dsdm.
DSDM CONSORTiUM DSDM CONSORTiUM AgileBA The Handbook for Business Analysts Extract The Lifecycle In An Agile Project www.dsdm.org This Extract from AgileBA, The Lifecycle in an Agile Project, is based
Project Management Excellence Enabling Quality In Project Execution
WHITE PAPER DRAFT Project Management Excellence Enabling Quality In Project Execution Grzegorz Szalajko, Grzegorz Dzwonnik, Louis Klein, Steve Raue 20/02/2014 Version 1 Systemic Excellence Group Independent
Project Portfolio Optimisation: Do you gamble or take informed risks?
PROJECT ADVISORY Project Portfolio Optimisation: Do you gamble or take informed risks? Leadership Series 8 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of
Career proposition for software developers and web operations engineers
Career proposition for software developers and web operations engineers Introduction The Government Digital Service is at the centre of the digital transformation of government, making information and
Strengthening the Performance Framework:
Strengthening the Performance Framework: Towards a High Performing Australian Public Service Diagnostic Implementation July 2014 2155 This paper was prepared by: Professor Deborah Blackman, University
Quality management/change management: two sides of the same coin?
University of Wollongong Research Online Deputy Vice-Chancellor (Education) - Papers Deputy Vice-Chancellor (Education) 2004 Quality management/change management: two sides of the same coin? Felicity McGregor
Key Trends in Enterprise Mobility. Shaun Collins CEO @shauncollins [email protected]
Key Trends in Enterprise Mobility Shaun Collins CEO @shauncollins [email protected] Evolving from a PC/Notebook World to Smartphone/Tablet/Hybrid World 2 2 Mobility Is Now Much More Than Just
