1 BETTER RECORDS MANAGEMENT THROUGH PROJECT MANAGEMENT Maura L. Dunn, CRM President April 8, 2015

2 What is the difference between program management and project management? Why does it matter? Programs Are ongoing Support strategic business goals Have broad financial impacts budget, revenue, quarterly results and require ongoing reporting Include multiple, related projects and the management of multiple sets of resources Records management programs Are ongoing Support business operations Provide a disciplined set of methods, tools, policies to ensure the appropriate creation, management, protection and disposition of official business records Require multiple, related projects Projects Are temporary Have a defined beginning and end with specific, defined milestones May involve staff who do not typically work together Financial impact tied directly to project budget Records management programs can benefit from project management disciplines

3 What makes a project a project? Clearly define objectives Declare a beginning, middle and end Manage don t just let it happen Identify resources People Tools Standards Procedures Identify specific milestones Project goals Interim milestones Identify measurements Budget Schedule Milestones

4 Combine RM and PM disciplines to ensure success Records Management Align records management program to organizational goals Actively manage organization s records Support organization in meeting regulatory and legal requirements Project Management Clearly define goals Outline charter and scope Develop project plan, schedule and budget Execute according to project plan Measure progress and success

5 Project Management Steps

6 Case Study: Field Records Cleanup Large organization 12 lines of business staff Geographically dispersed 400+ local offices Unknown but very large quantity of legacy paper records stored in remote locations Multiple business functions carried out in over 400 field locations Very long-lived records related to physical assets Changes made in the field; updates made to official (electronic) systems of record in headquarters offices Historical delay in providing updates to field resulting in tendency to keep unofficial records

7 Initiate Draft Project Charter Identify project manager, project champion and stakeholders Identify purpose, objectives and deliverables State the goals and the expected outcomes of the project Clearly define entrance/exit criteria for each phase Identify resources Team members Equipment Documentation Plan for the project definition meeting with key stakeholders

8 Plan: Develop a work breakdown structure

9 Plan: Develop a project schedule, noting duration and dependencies

10 Resource: Develop team structure Match your team structure to your project plan Project Manager Advance Team Lead Processing Lead Analysts Indexers Change Management Specialists

11 Resource: Acquire necessary equipment Laptops Printers Labels Boxes

12 Resource: Acquire or develop necessary documentation Management plans Communication Reporting Resource management Logistics Standard operating procedures Advance team Initial review Indexing Follow-up Boxing Transmittal forms Shipping Closeout

13 Resource: Acquire or develop necessary documentation

14 Execute Kickoff Introduce team Outline goals, high level project plan Discuss communication, reporting mechanisms Execute Measure progress daily, weekly, monthly Report progress weekly Mark completion of milestones Track progress to identify any issues early

15 Execute: Monitor

16 Monitor Status Reports Earned Value Management (EVM) Risk Management Identify potential risks Quantify impact and probability of risk occurring Develop mitigation and contingency plans

17 Close Complete final milestone(s) Discuss lessons learned Compile project documentation

18 Benefits Project completed on budget, on schedule Progress measured and easily reported, communicated to leadership, stakeholders, broad organization Specific milestones achieved as planned Program well-positioned for future projects Credibility Experience Business case

19 Contact Maura Dunn, CRM President, TrailBlazer Consulting, LLC

Project Management Guidelines

Project Management Guidelines Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of

More information

LMI Aerospace PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012

LMI Aerospace PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012 PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012 TABLE OF CONTENTS INTRODUCTION... 2 PROJECT MANAGEMENT APPROACH... 2 PROJECT SCOPE... 2 MILESTONE LIST... 2 SCHEDULE BASELINE

More information

Project Management Change Management Procedure

Project Management Change Management Procedure Change Management Procedure Procedure # Description: Overview Outlines the steps for a Project Manager to manage change in an organization Objective To ensure that organizational change is managed in a

More information

OFFICE OF THE CIO. PROCEDURE Informational VERSION: 1.0

OFFICE OF THE CIO. PROCEDURE Informational VERSION: 1.0 OFFICE OF THE CIO PROCEDURE Informational VERSION: 1.0 Purpose Project Management of Major or Large NDUS Information Technology Projects Project Managers Guide/Checklist This procedural process will ensure

More information

Subject Area 1 Project Initiation and Management

Subject Area 1 Project Initiation and Management DRII/BCI Professional Practice Narrative: Establish the need for a Business Continuity Plan (BCP), including obtaining management support and organizing and managing the BCP project to completion. (This

More information

Practical Project Management For Administrative Professionals

Practical Project Management For Administrative Professionals Practical Project Management For Administrative Professionals Presented By: Rhonda Scharf, CSP Certified Speaking Professional ON THE RIGHT TRACK 1 PROJECT MANAGEMENT FOR ADMINISTRATIVE PROFESSIONALS What

More information

Information Technology Project Oversight Framework

Information Technology Project Oversight Framework i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11

More information

Agenda. You are not in the business to manage records

Agenda. You are not in the business to manage records Global Records and Information Management Risk: Proactive and Practical Approaches to Effective Records Management September 16, 2014 Maura Dunn, MLS, CRM Lee Karas, MBA Agenda Drivers for your Records

More information

The ITS Project Management Framework

The ITS Project Management Framework The ITS Project Management Framework Information Technology Services Project Management Framework v1.0 1 Table of Contents Introduction 3 Why Create a Project Management Framework? 4 Projects versus Operational

More information

MIS 424 COURSE OUTLINE

MIS 424 COURSE OUTLINE UNIVERSITY OF ALBERTA School of Business DEPARTMENT OF ACCOUNTING & MIS MIS 424 COURSE OUTLINE Course website: http://courses.bus.ualberta.ca/mis424-mullaly/ Instructor: Mark Mullaly Term II, 2004/2005

More information

1.040 Project Management

1.040 Project Management MIT OpenCourseWare http://ocw.mit.edu 1.040 Project Management Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. Fred Moavenzadeh Spring 2009

More information

AWWA/WEF Information Management & Technology Conference, March 4-7, 2007, Austin, TX

AWWA/WEF Information Management & Technology Conference, March 4-7, 2007, Austin, TX Management and Control Technology for Water/Waste Water Utility Programs Burcin Becerik 1, Gustavo Soto-Rosa 2 Abstract This paper discusses the implementation and use of management and control solutions

More information

Project Management Professional (PMP) Examination Content Outline

Project Management Professional (PMP) Examination Content Outline Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP ) Examination Content Outline Revised August 2011 Published by: Project

More information

Appeals Case Management System Project. Scope Management Plan. November 20, 2014

Appeals Case Management System Project. Scope Management Plan. November 20, 2014 Appeals Case Management System Project Version 1.0 Health and Human Services Agency, Office of Systems Integration Template Revision History REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF

More information

Crosswalk Between Current and New PMP Task Classifications

Crosswalk Between Current and New PMP Task Classifications Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the

More information

Guidelines: Project Schedule Project Management Office (PMO)

Guidelines: Project Schedule Project Management Office (PMO) Guidelines: Project Schedule Project Management Office (PMO) Process The project Schedule outlines the tasks and activities of the project; the duration; start and end dates for each individual task and

More information

Program Management Professional (PgMP) Examination Content Outline

Program Management Professional (PgMP) Examination Content Outline Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management

More information

PMP Examination Tasks Puzzle game

PMP Examination Tasks Puzzle game PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in

More information

Executive Director for Operations AUDIT OF NRC S CYBER SECURITY INSPECTION PROGRAM FOR NUCLEAR POWER PLANTS (OIG-14-A-15)

Executive Director for Operations AUDIT OF NRC S CYBER SECURITY INSPECTION PROGRAM FOR NUCLEAR POWER PLANTS (OIG-14-A-15) UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OFFICE OF THE INSPECTOR GENERAL May 7, 2014 MEMORANDUM TO: Mark A. Satorius Executive Director for Operations FROM: Stephen D. Dingbaum

More information

1.0 Purpose. 2.0 Roles and Responsibilities. Management System Description: Project Management. Management System Owner: Lorie Howard

1.0 Purpose. 2.0 Roles and Responsibilities. Management System Description: Project Management. Management System Owner: Lorie Howard Management System Description: Project Management Management System Owner: Lorie Howard Point of Contact: Lorie Howard EMCBC Home Page Issue Date: Revision: 1 1.0 Purpose The purpose of the Office of Environmental

More information

Central Agency for Information Technology

Central Agency for Information Technology Central Agency for Information Technology Development of a National IT Governance Framework Project Management Agenda 1 What is project management? Why it is important? 2 Leading practices 3 Project management

More information

POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections

POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections Policy Subject: Policy Number: Project Management 1.1.5 Date of Issue: Authority: Effective Date: May 29, 2009 Signature on File

More information

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing

More information

Organization. Project Name. Project Overview Plan Version # Date

Organization. Project Name. Project Overview Plan Version # Date Project Overview Plan Template Organization Project Name Project Overview Plan Version # Date REVISION HISTORY VERSION # REVISION DATE COMMENT 1 APPROVALS: Authorized Signature DATE 2 Table of Contents

More information

THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT

THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business

More information

PROJECT MANAGEMENT FOR NON-PROJECT MANAGERS

PROJECT MANAGEMENT FOR NON-PROJECT MANAGERS PROJECT MANAGEMENT FOR NON-PROJECT MANAGERS NADC PTAC 2929 3 rd Ave., N., Suite 300 Billings, MT 59101 P. (406) 259-3804 F. (406) 259-4569 ww.nadc-nabn.org HIGHLINER CONSULTING GROUP, LLC. 255 E. Fireweed

More information

The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004)

The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004) The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004) is the processes required to ensure that the various elements of the project are properly coordinated. the processes required to ensure

More information

Project Delivery Process Overview

Project Delivery Process Overview New Jersey Department of Transportation Project Delivery Process Overview Presented by the Program Management Office January, 2012 Project Delivery Process Overview The New Jersey Department of Transportation

More information

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition. Project Management Institute Construction Extension to A Guide to the Project Management Body of Knowledge PMBOK Guide 2000 Edition Provisional Construction Extension to A Guide to the Project Management

More information

Companion Notes for LTC Process Flowcharts. Notes for Initiation Stage

Companion Notes for LTC Process Flowcharts. Notes for Initiation Stage Companion Notes for LTC Process Flowcharts Contents Notes for Initiation, Planning, Execution/Production and Close Stages Glossary and Acronyms Page 1 4 5 6 Notes for Initiation Stage Purpose The purpose

More information

INTEGRATED PROJECT MANAGEMENT (IPM) DOCUMENT SECTION 1

INTEGRATED PROJECT MANAGEMENT (IPM) DOCUMENT SECTION 1 PMO QA/Approval: September 11, 2015 Project Title/Subject: INTEGRATED PROJECT MANAGEMENT (IPM) DOCUMENT SECTION 1 Back Office Collaboration and Integration Project GENERAL INFORMATION [this section completed

More information

Project Management. Sally Buck, MS. Chief Executive Officer July 2014

Project Management. Sally Buck, MS. Chief Executive Officer July 2014 600 East Superior Street, Suite 404 I Duluth, MN 55802 I Ph. 800.997.6685 or 218.727.9390 I www.ruralcenter.org Project Management Sally Buck, MS Chief Executive Officer July 2014 Purpose The National

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

Best Practice Approaches to Improving Clinical Supply Chain Management. Matthew Do Client Development Lead Almac Pharmaceutical Services

Best Practice Approaches to Improving Clinical Supply Chain Management. Matthew Do Client Development Lead Almac Pharmaceutical Services Best Practice Approaches to Improving Clinical Supply Chain Management Matthew Do Client Development Lead Almac Pharmaceutical Services A variety of challenges complicate trial supply management Multiple

More information

Head, Office of Project Management Oversight

Head, Office of Project Management Oversight SUBJECT: FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Management Oversight REVISION: 43 APPROVED BY: TITLE Head, Office of Project Management

More information

Mission Oriented Business Integrated Services (MOBIS) Schedule 874

Mission Oriented Business Integrated Services (MOBIS) Schedule 874 General Services Administration (GSA) Contract Number: GS-10F-0048Y Mission Oriented Business Integrated Services (MOBIS) Schedule 874 www.realtimeprocesssolutions.com 2011-MOBIS Table of Contents A. Contact

More information

EMERSON S ROSEMOUNT PROJECT MANAGEMENT OFFICE. Delivering project success for your instrumentation

EMERSON S ROSEMOUNT PROJECT MANAGEMENT OFFICE. Delivering project success for your instrumentation EMERSON S ROSEMOUNT PROJECT MANAGEMENT OFFICE Delivering project success for your instrumentation One Less Project YOUR INSTRUMENTATION IS ON TRACK. Capital projects always come down to the details. The

More information

The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management.

The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management. Knowledge Areas The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management. These are: Project Integration Management Project Scope

More information

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History

More information

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date: 07-31-2012

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date: 07-31-2012 Minnesota Health Insurance Exchange Project (MNHI) Deliverable Definition Document (DDD) For Project Plan Date: 07-31-2012 11/9/2012 1:18 PM Page 1 of 8 1. High Level Deliverable Description The Project

More information

Statement of Work For Sunt Community Physicians

Statement of Work For Sunt Community Physicians Statement of Work For Sunt Community Physicians Between: and: Sunt Community Physicians Wildcat Software Solutions, LLC Prepared by: Kazi Russell Effective Date: March 18, 2015 Under Contract #: SCP-Lab1-2015

More information

Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report

Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report The Enterprise Program Investment Council (EPIC) is responsible for governance

More information

Draft Documents RFP 3.2.4

Draft Documents RFP 3.2.4 Draft Documents RFP 3.2.4 In accordance with RFP 3.2.4, CNSI includes the required draft documents in the following order: Work Plan: Team CNSI provides a comprehensive draft Work Plan for the Iowa EHR

More information

The Secret Mix of Successful GIS Project Management

The Secret Mix of Successful GIS Project Management 2014 WAURISA Conference The Secret Mix of Successful GIS Project Management Presented By: Geoff Almvig, Skagit County GIS Don Burdick, Salish Coast Sciences, LLC What Is A Project? Definition: A project

More information

USFWC Project Management Workshop May 31 st, 2014

USFWC Project Management Workshop May 31 st, 2014 USFWC Project Management May 31 st, 2014 Project Management Basics Project Management Basics Project Definition Why do projects fail? Pain Curve Triple Constraint Principle Progressive Elaboration vs.

More information

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: Support@Nutek-us.com

More information

Project Management Concepts and Strategies

Project Management Concepts and Strategies Project Management Concepts and Strategies Contact Hours: 24 Course Description This series provides a detailed examination of project management concepts and strategies. It discusses the seven components

More information

Construction Management Standards of Practice

Construction Management Standards of Practice Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388

More information

<name of project> Software Project Management Plan

<name of project> Software Project Management Plan The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor

More information

Certification Exam Objectives: PK0-003

Certification Exam Objectives: PK0-003 Certification Exam Objectives: PK0-003 INTRODUCTION The CompTIA Project + examination is designed for business professionals involved with projects. This exam will certify that the successful candidate

More information

Project Management Professional (PMP) Examination Content Outline

Project Management Professional (PMP) Examination Content Outline Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published by: Project Management

More information

Delivery Management Guidelines Delivery Process 2 - Project Management

Delivery Management Guidelines Delivery Process 2 - Project Management Delivery Management Guidelines Delivery Process 2 - Project Management Version control Version 9-1 Date 2010-10-18 Status Approved The IDMS Prov Infr Strat DP1: Portfolio Management DP1-1 Infrastructure

More information

PROJECT PLAN FOR. Project Name Here

PROJECT PLAN FOR. Project Name Here PROJECT PLAN FOR Project Name Here Version # DatE Reviewed and Approved for submittal to Executive Sponsor , Project Manager Project Plan Approved for submittal to Executive Sponsor: , Project

More information

Systems Analysis and Design in a Changing World, Fifth Edition

Systems Analysis and Design in a Changing World, Fifth Edition Systems Analysis and Design in a Changing World, Fifth Edition Learning Objectives Explain the elements of project management and the responsibilities of a project manager Explain project initiation and

More information

ITS Project Management

ITS Project Management ITS Project Management Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS

More information

Draft Requirements Management Plan

Draft Requirements Management Plan BAO111: Core Competencies for the Business Analyst Draft Requirements Management Plan 1.0 INTRODUCTION 1.1 Purpose This document outlines requirements roles and responsibilities, presents a stakeholder

More information

ABC COMPANY Extended Accounting System (EAS) Project Charter Sample

ABC COMPANY Extended Accounting System (EAS) Project Charter Sample ABC COMPANY Extended Accounting System (EAS) Project Charter Sample Prepared by: Document Details ABC Company IT Canada Inc. Business Services Department Information Technology Project: Extended Accounting

More information

Program Management Review

Program Management Review 2020 Census Program Management Review High-level 2020 Census Life Cycle Schedule March 28, 2014 Kim Higginbotham Program Manager for Project Management, 2020 Census Research and Planning Office U.S. Census

More information

Project Zeus. Risk Management Plan

Project Zeus. Risk Management Plan Project Zeus Risk Management Plan 1 Baselined: 5/7/1998 Last Modified: N/A Owner: David Jones/Zeus Project Manager Page Section 1. Introduction 3 1.1 Assumptions, Constraints, and Policies 3 1.2 Related

More information

Process Assessment and Improvement Approach

Process Assessment and Improvement Approach Process Assessment and Improvement Approach June 2008 The information contained in this document represents the current view of Virtify on the issues discussed as of the date of publication. Virtify cannot

More information

The purpose of this course is to provide practical assistance for defining and managing project scope.

The purpose of this course is to provide practical assistance for defining and managing project scope. Scope Definition and Scope Management Purpose - To provide practical assistance for defining and managing project scope. This course will focus on tips for creating a scope statement rather than a step-by-step

More information

NOTICE: This publication is available at: http://www.nws.noaa.gov/directives/.

NOTICE: This publication is available at: http://www.nws.noaa.gov/directives/. Department of Commerce $ National Oceanic & Atmospheric Administration $ National Weather Service NATIONAL WEATHER SERVICE INSTRUCTION 1-806 June 29, 2007 Administration and Management Records Management,

More information

INTERNATIONAL CONSTRUCTION CONSULTING, LLC PROJECT MANAGEMENT TRAINING PLAN

INTERNATIONAL CONSTRUCTION CONSULTING, LLC PROJECT MANAGEMENT TRAINING PLAN INTERNATIONAL CONSTRUCTION CONSULTING, LLC PROJECT MANAGEMENT TRAINING PLAN A 10/23/05 Draft FGL Client Executive REVISION NO. ISSUE DATE ISSUE DESCRIPTION PREPARED BY CLIENT APPROVAL TABLE OF CONTENTS

More information

NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Support Services REVISION: 4 APPROVED BY: TITLE SUBJECT: Head, Office of Project Support Services

NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Support Services REVISION: 4 APPROVED BY: TITLE SUBJECT: Head, Office of Project Support Services SUBJECT: FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Support Services REVISION: 4 APPROVED BY: TITLE Head, Office of Project Support Services

More information

Frequently Asked Questions in Project Management

Frequently Asked Questions in Project Management Frequently Asked Questions in Project Management 1. Question: What is Project Management? Answer: Project Management is the collection and application of skills, knowledge, processes, and activities to

More information

Strategies to successfully manage your major project

Strategies to successfully manage your major project PROJECT ADVISORY Strategies to successfully manage your major project Whitepaper 1 Thought Leadership Series 10 kpmg.com/nz About this whitepaper KPMG s Project Advisory thought leadership series is aimed

More information

Understanding Software Project Management PMI fundamentals, Project Selection, Initial documents Emanuele Della Valle http://emanueledellavalle.

Understanding Software Project Management PMI fundamentals, Project Selection, Initial documents Emanuele Della Valle http://emanueledellavalle. Planning and Managing Software Projects 2011-12 Class 3 Understanding Software Project Management PMI fundamentals, Project Selection, Initial documents Emanuele Della Valle http://emanueledellavalle.org

More information

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement

More information

Welcome to the Data Analytic Toolkit PowerPoint presentation an introduction to project management. In this presentation, we will take a brief look

Welcome to the Data Analytic Toolkit PowerPoint presentation an introduction to project management. In this presentation, we will take a brief look Welcome to the Data Analytic Toolkit PowerPoint presentation an introduction to project management. In this presentation, we will take a brief look at project management to understand the process and some

More information

Project Scorecard Template

Project Scorecard Template Project Scorecard Template 1. Identify criteria for success: Review the objectives and deliverables in the Project Definition, as well as any other existing information that is relevant to the project.

More information

Baseline Change Control Procedure

Baseline Change Control Procedure Earned Value Management System (EVMS) Implementing Procedures Baseline Change Control Procedure EVMS-P-7 Revision 0 - October, 2006 Change Log Earned Value Management System Procedure Change Log Revision

More information

How to successfully manage your mega-project

How to successfully manage your mega-project BUILDING, CONSTRUCTION & REAL ESTATE How to successfully manage your mega-project Part II Stakeholder communication and project controls integration kpmg.com 2 Building, Construction & Real Estate How

More information

Never confuse effort for results. If you're measuring effort as progress, you're not measuring the right thing

Never confuse effort for results. If you're measuring effort as progress, you're not measuring the right thing Module VI: Establishing Goals & Managing Employee Performance INTRODUCTION Never confuse effort for results. If you're measuring effort as progress, you're not measuring the right thing Anonymous What

More information

2-Day Workshop Project JumpStart The Workshop Designed to Launch Projects Faster

2-Day Workshop Project JumpStart The Workshop Designed to Launch Projects Faster 2-Day Workshop Project JumpStart The Workshop Designed to Launch Projects Faster Traditional Classroom / Onsite Course No. 665 Duration: 2 days Credits: 14 PDUs / 1.4 CEUs Prerequisites Twelve hours of

More information

Enterprise Performance Life Cycle Management. Guideline

Enterprise Performance Life Cycle Management. Guideline Enterprise Performance Life Cycle Management Guideline Version 2.1 PREPARED BY THE ENTERPRISE PROGRAM MANAGEMENT OFFICE MAY 2011 Table of Contents Document Control...i 1. Introduction... 2 1.1 Purpose...

More information

Project Charter Supporting Documents

Project Charter Supporting Documents 2011 CVR/IT Consulting LLC All Rights Reserved 1 www.cvr-it.com info@cvr-it.com Overview Project Charter Supporting Documents CVR/IT Consulting LLC 2011 CVR/IT Consulting LLC All Rights Reserved 2 Introduction

More information

AGILE. Project OPM3 Portugal. 2014 PM4S. All Rights Reserved. Lisbon, Portugal

AGILE. Project OPM3 Portugal. 2014 PM4S. All Rights Reserved. Lisbon, Portugal AGILE Project OPM3 Portugal 2014 PM4S. All Rights Reserved. Lisbon, Portugal OPM3 Maturity Model OPM3 Knowledge Assessment Improvement Projects Programs Portfolios Organizational Enablers Measures processes

More information

Program Lifecycle Methodology Version 1.7

Program Lifecycle Methodology Version 1.7 Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated

More information

FEMA Faces Challenges in Managing Information Technology

FEMA Faces Challenges in Managing Information Technology FEMA Faces Challenges in Managing Information Technology November 20, 2015 OIG-16-10 DHS OIG HIGHLIGHTS FEMA Faces Challenges in Managing Information Technology November 20, 2015 Why We Did This Audit

More information

PROJECT MANAGEMENT PLAN <PROJECT NAME>

PROJECT MANAGEMENT PLAN <PROJECT NAME> PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome

More information

Information Management CoE A Pragmatic Approach

Information Management CoE A Pragmatic Approach Information Management CoE A Pragmatic Approach Peter LePine- Practice Director Tom Lovell - Data Governance Specialist Information Management & Business Intelligence Practice Information Management &

More information

Safety Management Program

Safety Management Program Corrective Action Plan (CAP) Safety Management Program Submitted by TransCanada PipeLines Limited and its National Energy Board Regulated Subsidiaries to address non-compliant findings in the National

More information

INTRODUCTION. Page 1 of 16

INTRODUCTION. Page 1 of 16 INTRODUCTION CALIFORNIA STATE TEACHERS RETIREMENT SYSTEM REQUEST FOR QUOTE JAMA LICENSING AND SERVICES RFQ NUMBER 201204 Offer Due Date: July 23, 2013, 2:00 p.m. Pacific Time (PT) The California State

More information

Project Charter Client: IPS

Project Charter Client: IPS Project Summary Project* IPS Integration with Global Financials Client* Mercer IPS Primary Contact Chi Swain Engagement Manager* Project Manager* Tracking/Billing Code* Description* Irene Spyke Joy Wallace

More information

Scheduling Process Maturity Level Self Assessment Questionnaire

Scheduling Process Maturity Level Self Assessment Questionnaire Scheduling Process Maturity Level Self Assessment Questionnaire Process improvement usually begins with an analysis of the current state. The purpose of this document is to provide a means to undertake

More information

This article provides an overview of Organization Change Management (OCM)

This article provides an overview of Organization Change Management (OCM) This article provides an overview of Organization Change Management (OCM) Purpose The aim of this article is to provide a framework for managing and coordinating change, and engendering engagement with

More information

Project Management Certificate (IT Professionals)

Project Management Certificate (IT Professionals) Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.

More information

Biometrics Enterprise Architecture Project Management Plan (BMEA PMP)

Biometrics Enterprise Architecture Project Management Plan (BMEA PMP) Biometrics Enterprise Architecture Project Management Plan (BMEA PMP) Version 1.0 Prepared by: Date: November 24, 2008 Revision History Purpose Revision Date Level 11/17/2009 First Draft 1.0 Responsible

More information

Minnesota Health Insurance Exchange (MNHIX)

Minnesota Health Insurance Exchange (MNHIX) Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration

More information

Project Human Resource Management. Overview of PMBOK Basics

Project Human Resource Management. Overview of PMBOK Basics Human Resource Management Overview of PMBOK Basics Michael R. Williams Ph.D. Professor - College of Business Administration Director Professional Sales Institute Illinois State University Campus Box 5590

More information

ESKISP6056.01 Direct security testing

ESKISP6056.01 Direct security testing Direct security testing Overview This standard covers the competencies concerning with directing security testing activities. It includes setting the strategy and policies for security testing, and being

More information

Project Execution Guidelines for SESAR 2020 Exploratory Research

Project Execution Guidelines for SESAR 2020 Exploratory Research Project Execution Guidelines for SESAR 2020 Exploratory Research 04 June 2015 Edition 01.01.00 This document aims at providing guidance to consortia members on the way they are expected to fulfil the project

More information

Enterprise Projects Fiscal Year 2009/2010 Third Quarter Report

Enterprise Projects Fiscal Year 2009/2010 Third Quarter Report Enterprise Projects Fiscal Year 2009/2010 Third Quarter Report Enterprise Projects Fiscal Year 2009/2010 - Third Quarter Report The Enterprise Program Investment Council (EPIC) is responsible for governance

More information

Gartner, Inc. DIR-SDD-2042

Gartner, Inc. DIR-SDD-2042 Texas Department of Information Resources STATEMENT OF WORK (SOW) FOR DELIVERABLES-BASED INFORMATION TECHNOLOGY SERVICES Identity & Access Management Analysis IT Assessment & Planning Gartner, Inc. DIR-SDD-2042

More information

Commercial Software Licensing

Commercial Software Licensing Commercial Software Licensing CHAPTER 11: Software Prepared by DoD ESI January 2013 Chapter Overview The government uses three primary agreement types for services: Fixed Price (FP). T&M (Time and Materials).

More information

MGMT 4135 Project Management. Chapter-4. Defining the Project

MGMT 4135 Project Management. Chapter-4. Defining the Project MGMT 4135 Project Management Chapter-4 Where We Are Now Chapter-4 Steps for Chapter-4 Step-1 Scope Step-2 Establishing Project Priorities Step-3 Creating the Work Breakdown Structure Step-4 Integrating

More information

Project Management for econnectivity

Project Management for econnectivity Project Management for econnectivity Marilyn Hunter - PMP November 10, 2015 2 Purpose of this session Provide information and understanding of how to lead connectivity projects within AgGateway or within

More information

Test Fragen + Antworten. October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003

Test Fragen + Antworten. October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003 Test Fragen + Antworten October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003 Question 1 All the following Statements about a WBS are true except that it a. Provides a framework for

More information