1 STRATEGIC IT ACCOUNTABILITY BOARD AGENDA Wednesday, December 19, :00 3:00 p.m. STARK LIBRARY I. IT Strategic Priorities & ITS Capital Budget (FY 12 13) Update & Approval II. Voice over IP Deployment Update III. UT System Security Funding Update IV. UT System IT Roadmap Update a.) Third Regional Data Center b.) Network Enhancements V. Mainframe Computer Disaster Recovery Plan Approval 1 Strategic IT Accountability Board Meeting Agenda and Handouts, December 19, 2012
2 IT Strategic Priorities & ITS Capital Budget (FY 12-13) Update & Approval IT Strategic Priorities FY Upgrade Core Campus Network and Develop Network Speed Plan Create Educational Technology Roadmap Create Big Data Policies Enhance Research Computing Environment Begin to Develop Learning Analytics Create Administrative Systems Replacement Roadmaps Design and Build the New Administrative System Technical Environment Define Universal Institutional Data Access Drive Savings via Cooperative Software Purchasing Upgrade Web Infrastructure Complete Mobile Strategy ITS Capital Budget in Support of Governance Priorities (FY 12-13) Project Estimated Budget Core Campus Network Infrastructure Upgrades $1,800,000 $2,000,000 Upgrade Web Infrastructure $500,000 - $750,000 Design and Build the New Administrative Systems Technical Environment Implement Additional Disaster Recovery for Critical Services $300,000 - $500,000 $500,000 - $600,000 Total $3,100,000 - $3,580,000 In addition to the large capital budget items above, ITS will dedicate $750,000 in operating funds in FY to accelerate the Voice over Internet Protocol (VoIP) implementation on campus. 2 Strategic IT Accountability Board Meeting Agenda and Handouts, December 19, 2012
3 Voice over IP Deployment Update Overview The university is moving its legacy phone system to Voice over Internet Protocol (VoIP). Installation of the core system is nearing completion and deployment is expected to begin in the spring. Strategic IT Accountability Board (SITAB) Action VoIP Approach was endorsed on March 6, 2012 Status 1) Acquisition: carrier class VoIP system from Genband -- $2M. 2) Installation: core system will be running by December. Buildings deployments will begin in the Spring. 3) Accelerated Deployment: Operational IT Committee approved accelerating building deployments from four to two years by using a contractor. ITS expects to fund $750K for the contractor in FY ) Unit Involvement: engaging unit heads to designate the appropriate individual to make decisions on their behalf. General communications to campus will begin this soon. 5) Buildings Security System: ITS will form task force this spring to recommend funding options. 3 Strategic IT Accountability Board Meeting Agenda and Handouts, December 19, 2012
4 UT System Security Funding Update As a result of an external security audit last year and targeted Information Security Office funding requests, UT System has agreed to provide approximately $3 million in one-time funding to help address several high-risk security areas. In the table below, the impacts of this funding are presented: UTBackup for Faculty Pre-Funding None specified Post-Funding 50 gigabytes of space per device Virtual Computing $300 per virtual machine unit per year $100 per virtual machine unit per year University Data Center $1.70 per kilowatt hour (around $700 per year for an average system) Reduction in rate of 40-50%. Rate reductions will be in effect for a minimum of three fiscal years and will make key services more affordable to campus units, which will reduce related security risks on campus. The goal is to move 1,000 new physical or virtual servers into the University Data Center within the next two fiscal years. 4 Strategic IT Accountability Board Meeting Agenda and Handouts, December 19, 2012
5 UT System IT Roadmap: Third Regional Data Center Phase I High Performance & Research Computing Tier 1 or 2 5,000 square feet of core support 10 Mega Watts of Power Administrative Computing Tier 3 3 Mega Watts of Power Austin Arlington Arlington Austin Houston Houston Phase II build as needed High Performance & Research Computing Tier 1 or 2 10 Mega Watts of Power Administrative Computing Tier 3 5 Mega Watts of Power Phase I Construction $60 - $80M Network & Connection $10.0M Operating Expense $14.5M / year Phase II Construction $50 - $60M Network $5.0M Operating Expense $13.0M / year Network Enhancements UT Austin Campus Network - $18.3 Million New Primary Network Operating Center - $5.8 Million (UT System Share 35%) 5 Strategic IT Accountability Board Meeting Agenda and Handouts, December 19, 2012
6 Mainframe Computer Disaster Recovery Plan Approval Overview The University of Texas at Austin currently has a Disaster Recovery process for the mainframe computer through an outside vendor. The recovery time for the mainframe to be restored is hours. The following proposal outlines a Business Services Committee (BSC) recommendation to reduce this restoration time to hours, and seeks Operational IT Committee and Strategic IT Accountability Board approvals to fund this new approach. Current and Proposed Solution Analysis Current Mainframe Disaster Recovery Plan Recovery Time Cost Risks Benefits hours $125,000/year University Data Center-B availability to generate data tapes ( base contract includes an annual test; weekly usage cost during disaster will be additional) Tape loss or delay during transport to vendor Business operations stop at BSC decision point to begin mainframe Disaster Recovery process Disaster Recovery procedure has been tested three years successfully Known costs Proposed: Current Mainframe Disaster Recovery Plan, plus hosted, mirrored storage hours $335,000/year (includes $125,000/year base contract, $150,000/year for networking, and $60,000/year hosting services) Long distance private network increases technical issues, and business complexity The selected back-up data center may also have operational challenges Reduces time to restore business operations dependent on the mainframe computer Eliminates the need to create and transport data tapes Recommendation The Operational IT Committee, the Business Services Committee, along with Information Technology Services (ITS) recommends the approval of the new approach which will reduce the time for the current Mainframe Disaster Recovery process. The increased cost for this recommendation is $210,000 which will come from the ITS budget. 6 Strategic IT Accountability Board Meeting Agenda and Handouts, December 19, 2012
STRATEGIC IT ACCOUNTABILITY BOARD (SITAB) AGENDA WEDNESDAY, JUNE 15, 2011 2:30 3:30 p.m. STARK LIBRARY
STRATEGIC IT ACCOUNTABILITY BOARD (SITAB) AGENDA WEDNESDAY, JUNE 15, 2011 2:30 3:30 p.m. STARK LIBRARY Attendees: William Powers Alex Albright, Jay Boisseau, Pat Clubb, Brad Englert, Rod Hart, Kevin Hegarty,
OPERATIONAL IT COMMITTEE MEETING AGENDA Wednesday, September 26, 2012 3:00 p.m., FAC 228D
OPERATIONAL IT COMMITTEE MEETING AGENDA Wednesday, September 26, 2012 3:00 p.m., FAC 228D I. Welcome and Introductions II. 2012-2013 OIT Chair II. Governance Overview III. OIT Priority Topics for 2012-2013
Department of Technology Services UNIX SERVICE OFFERING
Department of Technology Services UNIX SERVICE OFFERING BACKGROUND The Department of Technology Services (DTS) operates dozens of UNIX-based systems to meet the business needs of its customers. The services
EaseUS Todo Backup PXE Server
EaseUS Todo Backup PXE Server ----New added in EaseUS Todo Backup 4.6 EaseUS Todo Backup 4.6 adds PXE Server in Todo Backup Server, Todo Backup Advanced Server and Todo Backup Technician. EaseUS Todo Backup
INFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES June 2012
INFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES June 2012 Program Description Network Services is a service unit in Information Technology Services responsible for designing, acquiring, deploying, operating,
Technology Services Strategic Plan Status ITAC February 2011
Technology Services Strategic Plan Status ITAC February 2011 T S ECHNOLOGY ERVICES Washoe County Agenda I. Results of 1 st Half FY 10/11 Planning Infrastructure Efficiency Employees Security II. Preview
BACKUP AND RECOVERY PLAN MS SQL SERVER
BUREAU OF INFORMATION & TELECOMMUNICATIONS BACKUP AND RECOVERY PLAN MS SQL SERVER Page 1 of 5 Revisions & Addendums Log: Instructions: Changes and Addendum can be sent to: James R. Douglas, Technical Analyst
Backup Policy (ITP004) Information Technology Services Department
Introduction This policy defines the backup guidelines for systems within the Central Dauphin School District. These systems are typically servers, Storage Area Network devices (SAN), or Network-Attached
Tk20 Backup Procedure
Tk20 Backup Procedure 1 TK20 BACKUP PROCEDURE OVERVIEW 3 FEATURES AND ADVANTAGES: 3 TK20 BACKUP PROCEDURE 4 DAILY BACKUP CREATION 4 TRANSFER OF BACKUPS 5 AUDITING PROCESS 5 BACKUP REPOSITORY 5 WRITE TO
RECORDS MANAGEMENT POLICY
RECORDS MANAGEMENT POLICY PURPOSE The purpose of this policy is to: Assist departments in effective utilization of space and efficient information retrieval; Establish guidelines for disposal of records;
Integrated Technology Plan (FY10 FY12)
(FY10 FY12) Anne Arundel Community College embraces and promotes a seamless integration of appropriate technologies in support of the learning community within the framework of the college s mission and
TECHNOLOGY AND INNOVATION DEPARTMENT BACKUP AND RECOVERY REVIEW AUDIT 14-08 SEPTEMBER 23, 2014
TECHNOLOGY AND INNOVATION DEPARTMENT BACKUP AND RECOVERY REVIEW AUDIT 14-08 SEPTEMBER 23, 2014 CITY OF TAMPA Bob Buckhorn, Mayor Internal Audit Department Christine Glover, Internal Audit Director September
A2: If the above list did not provide enough detail, please describe, in your own words, your enterprise s primary industry.
MeasureIT Survey Questions (Complete Budget and Staffing) NOTE: Budget questions only - sections A, B, C, G Staffing questions only - sections A, D, E, F, G, H Section A: Primary Demographic Information
HyperQ DR Replication White Paper. The Easy Way to Protect Your Data
HyperQ DR Replication White Paper The Easy Way to Protect Your Data Parsec Labs, LLC 7101 Northland Circle North, Suite 105 Brooklyn Park, MN 55428 USA 1-763-219-8811 www.parseclabs.com [email protected]
Request For Information. Telecom System Management and Billing Software
Request For Information Telecom System Management and Billing Software RFI #15-558683-cs Date Issued: 4/1/15 Due Date: 4/15/15 Submitted by the University of California Davis Health System This RFI is
The Impact Of The WAN On Disaster Recovery Capabilities A commissioned study conducted by Forrester Consulting on behalf of F5 Networks
February 2007 The Impact Of The WAN On Disaster Recovery Capabilities A commissioned study conducted by Forrester Consulting on behalf of F5 Networks TABLE OF CONTENTS Introduction: Upgrading Disaster
Information Technology Department Programs and Services
Brevard County Citizens Board of County Commissioners County Management Information Technology Department Programs and Services Information Systems Administration Telecommunications Software Development
MANAGEMENT AUDIT REPORT DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION
MANAGEMENT AUDIT REPORT OF DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION REPORT NO. 13-101 City of Albuquerque Office of Internal Audit
1. Backup and Recovery Policy
POLICY TITLE: POLICY #: IT - 2 DATE DRAFTED: 09/23/05 APPROVED DATE: 09/23/05 REVISION DATE: BRIEF DESCRIPTION: Backup and Recovery Policy Minimum requirements for the creation and retention of computer
Speeding Recovery Through the Cloud Presentation to Mid TN ISC2 Matthew Stevens, Senior Solutions Engineer Windstream Hosted Solutions
Speeding Recovery Through the Cloud Presentation to Mid TN ISC2 Matthew Stevens, Senior Solutions Engineer Windstream Hosted Solutions November 7, 2014 1 Agenda My Background Current Trends in the Datacenter
TSM Backup Service. Standard Service Level Agreement
TSM Backup Service Standard Service Level Agreement University Of Michigan Information Technology and Services 7/1/2008 1.0 Overview Service Level Agreements (SLAs) are between Information Technology and
2.2 INFORMATION SERVICES Documentation of computer services, computer system management, and computer network management.
3 Audit Trail Files Data generated during the creation of a master file or database, used to validate a master file or database during a processing cycle. GS 14020 Retain for 3 backup cycles Computer Run
Many government agencies are requiring disclosure of security breaches. 32 states have security breach similar legislation
Is it safe? The business impact of data protection. Bruce Master IBM LTO Program Linear Tape-Open, LTO, LTO Logo, Ultrium and Ultrium Logo are trademarks of HP, IBM and Quantum in the US and other countries.
7 Real Benefits of a Virtual Infrastructure
7 Real Benefits of a Virtual Infrastructure Dell September 2007 Even the best run IT shops face challenges. Many IT organizations find themselves with under-utilized servers and storage, yet they need
INFORMATION TECHNOLOGY ENGINEER V
1464 INFORMATION TECHNOLOGY ENGINEER V NATURE AND VARIETY OF WORK This is senior level lead administrative, professional and technical engineering work creating, implementing, and maintaining the County
Agenda Report. April 8, 2013. Honorable Mayor and City Council TO: THROUGH: Finance Committee (April 8, 2013) FROM: Water and Power Department
Agenda Report April 8, 2013 TO: Honorable Mayor and City Council THROUGH: Finance Committee (April 8, 2013) FROM: SUBJECT: Water and Power Department AUTHORIZATION TO ENTER INTO CONTRACTS WITH DESIGNATED
M.Sc. IT Semester III VIRTUALIZATION QUESTION BANK 2014 2015 Unit 1 1. What is virtualization? Explain the five stage virtualization process. 2.
M.Sc. IT Semester III VIRTUALIZATION QUESTION BANK 2014 2015 Unit 1 1. What is virtualization? Explain the five stage virtualization process. 2. What are the different types of virtualization? Explain
The Fastest Path to the Cloud Building Your SaaS Company on Force.com
The Fastest Path to the Cloud Building Your SaaS Company on Force.com Kai Mäkelä salesforce.com [email protected] Safe Harbor Safe harbor statement under the Private Securities Litigation Reform Act
Total year-over-year spending change in networking, 2009-2012. (Percent of respondents) 37% 36% 35% 37% 29% 26% 16% 13% 0% 20% 40% 60% 80%
Research Brief 2012 Networking Spending Trends Date: March 2012 Author: Jon Oltsik, Senior Principal Analyst; Bob Laliberte, Senior Analyst; and Bill Lundell, Senior Research Analyst Abstract: According
The Data Center Migration (DCM) Evaluation Tool
The Data Center Migration (DCM) Evaluation Tool The DCM Evaluation Tool is a series of targeted questions intended to establish a baseline for your migration s scope, schedule and cost. The questions are
The HP IT Transformation Story
The HP IT Transformation Story Continued consolidation and infrastructure transformation impacts to the physical data center Dave Rotheroe, October, 2015 Why do data centers exist? Business Problem Application
INFORMATION GOVERNANCE POLICY: DATA BACKUP, RESTORE & FILE STORAGE HANDLING
INFORMATION GOVERNANCE POLICY: DATA BACKUP, RESTORE & FILE STORAGE HANDLING Original Approved by: Policy and Procedure Ratification Sub-group on 23 October 2007 Version 2.2 Approved by : Information Governance
The ROI of Tape Consolidation
The ROI of Tape Consolidation NOTICE This white paper may contain proprietary information protected by copyright. Information in this white paper is subject to change without notice and does not represent
TABLE OF CONTENTS FOR AUDIT, COMPLIANCE, AND MANAGEMENT REVIEW COMMITTEE
TABLE OF CONTENTS FOR AUDIT, COMPLIANCE, AND MANAGEMENT REVIEW COMMITTEE Brenda Pejovich, Chairman Wallace L. Hall, Jr. R. Steven Hicks Jeffery D. Hildebrand Robert L. Stillwell Committee Meeting: /4/203
Statement of Work for ShoreTel Implementation
Statement of Work for ShoreTel Implementation Project Management ScanSource Services Group shall assign a dedicated Project Manager to interface directly with the Reseller with the following responsibilities:
Iowa State University Proposal for HR-01 ISU HR Operating Model
Iowa State University Proposal for HR-01 ISU HR Operating Model Overview: Iowa State University proposes undertaking the HR-01 ISU HR Operating Model business case to transform the quality, manner and
Introduction to Virtualization. Paul A. Strassmann George Mason University October 29, 2008, 7:20 to 10:00 PM
Introduction to Virtualization Paul A. Strassmann George Mason University October 29, 2008, 7:20 to 10:00 PM 1 Data Center Transformation 2 Scope of Virtualization Services 3 Virtualization Evolution 4
Enabling Multi-Tenancy with NetApp MultiStore
Enabling Multi-Tenancy with NetApp MultiStore Agenda What is Multi-Tenancy? Secure Multi-Tenancy as Cloud Infrastructure Introducing MultiStore MultiStore Use Cases Customer Examples 2009 NetApp. All rights
Office of Information Technology Addendum to Managed Workstation Service Level Agreement
Office of Information Technology Addendum to Managed Workstation Service Level Agreement This Addendum further defines and explains the Basic Support, Extended Support and Premium Support Level Services
MCSE SYLLABUS. Exam 70-290 : Managing and Maintaining a Microsoft Windows Server 2003:
MCSE SYLLABUS Course Contents : Exam 70-290 : Managing and Maintaining a Microsoft Windows Server 2003: Managing Users, Computers and Groups. Configure access to shared folders. Managing and Maintaining
ITMF Disaster Recovery and Business Continuity Committee Report for the UGA IT Master Plan
ITMF Disaster Recovery and Business Continuity Committee Report for the UGA IT Master Plan I. Executive Summary Planning for continued operation during unforeseen catastrophic events, and for returning
Open Source Server Product Description
Open Source Server Product Description Disclaimer: The information in this document shall not be disclosed outside System Associates Limited and shall not be duplicated, used, or disclosed in whole or
VDC SLA Annex Additional Terms for Virtual Data Centre - SLAs
CONTENTS 1 Introduction... 2 2 Infrastructure Level Objectives... 2 2.1 Availability Calculation:... 2 3 Compute Platform... 2 3.1 Availability Level... 2 3.1.1 Availability Objectives... 2 3.1.2 Unavailability...
OFFICE OF THE STATE AUDITOR General Controls Review Questionnaire
OFFICE OF THE STATE AUDITOR Agency: * University Please answer all of the following questions. Where we ask for copies of policies and procedures and other documentation, we would prefer this in electronic
Ames Consolidated Information Technology Services (A-CITS) Statement of Work
Ames Consolidated Information Technology Services (A-CITS) Statement of Work C.1 Mission Functions C.1.1 IT Systems & Facilities Support System Administration: The Contractor shall provide products and
JOHNSON COUNTY COMMUNITY COLLEGE 12345 College Blvd., Overland Park, KS 66210 Ph. 913-469-3812 Fax 913-469-4429
JOHNSON COUNTY COMMUNITY COLLEGE 12345 College Blvd., Overland Park, KS 66210 Ph. 913-469-3812 Fax 913-469-4429 ADDENDUM #1 September 21, 2015 REQUEST FOR PROPOSALS #16-033 FOR CLOUD BASED BACKUP & RECOVERY
Disaster Recovery Checklist Disaster Recovery Plan for <System One>
Disaster Recovery Plan for SYSTEM OVERVIEW PRODUCTION SERVER HOT SITE SERVER APPLICATIONS (Use bold for Hot Site) ASSOCIATED SERVERS KEY CONTACTS Hardware Vendor System Owners Database Owner
VDC SLA Annex Additional Terms for Virtual Data Centre - SLAs
CONTENTS 1 Introduction... 2 2 Infrastructure Service Level Objectives... 2 2.1 Availability Calculation:... 2 3 Compute Platform... 2 3.1 Availability Service Level... 2 3.1.1 Availability Objectives...
Barracuda Backup Server. Introduction
Barracuda Backup Server Introduction Backup & Recovery Conditions and Trends in the Market Barracuda Networks 2! Business Continuity! Business today operates around the clock Downtime is very costly Disaster
Exhibit to Data Center Services Service Component Provider Master Services Agreement
Exhibit to Data Center Services Service Component Provider Master Services Agreement DIR Contract No. DIR-DCS-SCP-MSA-002 Between The State of Texas, acting by and through the Texas Department of Information
Implementation Guide. Simplify, Save, Scale VoIP: The Next Generation Phone Service. A single source for quality voice and data services.
Implementation Guide Simplify, Save, Scale VoIP: The Next Generation Phone Service A single source for quality voice and data services. > > > > > > > > > > All signs point to VoIP so letês get started.
ICT budget and staffing trends in the UK
ICT budget and staffing trends in the UK Enterprise ICT investment plans to 2013 January 2013 TABLE OF CONTENTS 1 Trends in ICT budgets... 1 1.1 Introduction... 1 1.2 Survey demographics... 1 1.3 IT budget
The Perks of Having a Dedicated Database.
Building Capacity The Perks of Having a Dedicated Database. Host: Ryan Coleman [email protected] Presenter: Berit Johannessen [email protected] TRAINING TOPICS What is a Dedicated
Information Technology White Paper
Information Technology White Paper Virtualization Building an Adaptive, Cost Effective Infrastructure at SSCT October 5, 2009 As the College grows the College needs to be poised to respond faster to market
MICHIGAN AUDIT REPORT OFFICE OF THE AUDITOR GENERAL THOMAS H. MCTAVISH, C.P.A. AUDITOR GENERAL
MICHIGAN OFFICE OF THE AUDITOR GENERAL AUDIT REPORT THOMAS H. MCTAVISH, C.P.A. AUDITOR GENERAL The auditor general shall conduct post audits of financial transactions and accounts of the state and of all
Memorandum. ACTION: Report on Computer Security Controls of Financial Management System, FTA FE-2000-098. May 23, 2000.
U.S. Department of Transportation Office of the Secretary of Transportation Office of Inspector General Memorandum ACTION: Report on Computer Security Controls of Financial Management System, FTA FE-2000-098
Information Technology Services. Roadmap 2014-2016
Information Technology Services Roadmap 2014-2016 Introduction This document charts the direction for Humboldt State University s Information Technology Services department over the next three years. It
Cohesion Managed Services
Cohesion It is s objective to deliver, through its Cohesion managed & hosted services portfolio, the kind of business cohesion that IT managers dream of, but never imagine they can afford. The services
Frequently Asked Questions about Cloud and Online Backup
Frequently Asked Questions about Cloud and Online Backup With more companies realizing the importance of protecting their mission-critical data, we know that businesses are also evaluating the resiliency
IBM Tivoli Storage Manager Suite for Unified Recovery
IBM Tivoli Storage Manager Suite for Unified Recovery Comprehensive data protection software with a broad choice of licensing plans Highlights Optimize data protection for virtual servers, core applications
Broadband Marshall University 2013 Update
Broadband Marshall University 2013 Update Broadband Infrastructure Marshall University s Campus Network, MUnet, is a state-of-the-art 10 Gb Switched Ethernet based backbone network linking all buildings
Configuring Advanced Windows Server 2012 Services
Course 20412D: Configuring Advanced Windows Server 2012 Services Course Details Course Outline Module 1: Implementing Advanced Network Services In this module students will be able to configure advanced
AGENDA ITEM BACKGROUND TO: GOVERNING BOARD ITEM NUMBER
TO: GOVERNING BOARD AGENDA ITEM BACKGROUND DATE FROM: PRESIDENT SUBJECT: Information Technology Update April 11, 2011 ENCLOSURE(S) REASON FOR BOARD CONSIDERATION INFORMATION Storage Area Network (SAN)
Description. Need Statement
Description Brief description of the proposed project: CDVA is currently operating in a "Fat Client" environment for all office automation product applications. CDVA is committed to it's strategic goal
IP Storage On-The-Road Seminar Series
On-The-Road Seminar Series Disaster Recovery and Data Protection Page 1 Agenda! The Role of IP in Backup!Traditional use of IP networks for backup! backup capabilities! Contemporary data protection solutions
Core Data Service 2015 IT Domain Definition Change Overview
Core Data Service 2015 IT Domain Definition Change Overview Administration and Management of IT Administration of central IT organization CIO or CTO position Institutional IT planning Financial planning
The business value of improved backup and recovery
IBM Software Thought Leadership White Paper January 2013 The business value of improved backup and recovery The IBM Butterfly Analysis Engine uses empirical data to support better business results 2 The
Cloud Storage and Backup
Cloud Storage and Backup Cloud Storage and Backup Cloud Storage and Backup services from iomartcloud have been designed to deliver the performance, capacity, security and flexibility needed to address
City of Hapeville, GA VC3Advantage Work Order
City of Hapeville, GA VC3Advantage Work Order ServiceAdvantage Work Order No. [ VC3INC-1097-62019 ] under the Master Services Agreement, dated. July 1, 2015 Atlanta Columbia Raleigh 1301 Gervais Street,
Virtualization & Covance Inc.
Virtualization & Cloud Computing Environment Oleg Trigub Covance Inc. Agenda Disaster Recovery Challenges Benefits of Private Cloud DR RPO versus RTO Data Replication among Data Centers Is DR in the Cloud