Andy Selle. Dam Removal A Primer

Size: px
Start display at page:

Download "Andy Selle. Dam Removal A Primer"

Transcription

1 Andy Selle Dam Removal A Primer

2 Dams in the United States ~ 2.5 million dams in the US ~ 99,000+ small dams (<10m) Death by a Thousand Cuts >700 dams have been removed in the US

3 Dams in United States 85% of Dams will be at their 50 YR design life in <10 ft ft ft ft 100+ ft # Dams Built Year

4 Presentation Outline Dam Removal Economics Impoundment Sediment Stakeholder Involvement Alternatives and Cost Analysis Post Removal Restoration

5 Dam Removal Economics Repair vs. Removal Comparison Design and Construction Costs Property Values Recreational Economics

6 Estimated Removal Dam (removal date) Repair ($) Cost ($) % Less Lake Christopher Dam, CA (1994) 160, ,000 38% Edwards Dam, ME (1999) 9,000,000 2,100,000 77% Grist Mill Dam, ME (1998) 150,000 56,000 63% Sandstone Dam, MN (1995) 1,000, ,000 79% Two-Mile Dam, NM (1994) 4,100,000 3,200,000 22% Rat Lake Dam, WA (1989) 261,000 52,000 80% Waterworks Dam, WI (1998) 694, ,770 69% Mounds Dam, WI (1998) 3,300, ,000 85% Newport No.11 Dam, VT (1996) 783, ,000 30% Includes costs for repair or required fish passage Using low-end estimates for repair Removal is 60% less than Repair, on average Repair vs. Removal Cost

7 Estimate Costs Based on Project Complexity for: Feasibility -- Design -- Construction

8 Phase Range Mean n Feasibility $9, ,000 $106, Design $9, ,000 $88, Construction $6, ,000 $114, Mean total cost = $296,000 Source NOAA Fisheries, Dam removals in NE over last 10 years

9 Dam Removal Costs : Project Specific $30-60/CY for concrete demo and haul off $5-20,000 for dewatering $5-20/CY for excavation $100-$400 / LF for Active Channel Restoration

10 Cost by Height Based on 9 years of removals in PA Dam height (ft) Cost range Median Cost 1-3 $1,500 95,000 $17, , ,000 38, , ,000 45, , ,000 70, , , ,000 Source: American Rivers

11 Property Values Provencher, B.; Sarakinos, H.; and Meyer, T Does small dam removal affect local property values? An empirical analysis. Contemporary Economic Policy 26(2): Lewis, L.; Bohlen, C.; and Wilson, S Dams, dam removal, and river restoration: A hedonic property value analysis. Contemporary Economic Policy 26(2): Properties near dams have lower value than similar properties further away Before dam removal, purchasers willing to pay $2,000 more to be at least ½-mile away from dam Following dam removal, purchasers willing to pay $134 more to be at least ½-mile away from former dam site No statistical impact of dam removal on resale values of waterfront properties relative to properties on intact impoundments

12 Having a hard time revitalizing your downtown? You may want to consider knocking the dam down. --Wall Street Journal, October 18, 2000

13 Recreational Value: Fishing Anglers spend $38 billion annually on fishing Trout Unlimited estimates $108 billion when the ripple effect is considered Removal restores connectivity, opening new habitat areas for

14 Recreational Value: Boating Canoeing/kayaking $100 million annual sales Kayaking is among fastest growing outdoor activities Finding free-flowing stretches is a challenge regional scarcity can increase economic value Kickapoo River, WI Following Ontario Dam removal (early 1990s) Non-local canoeists now spend $1.2 million per year on boat rentals, lodging, gas, and other items in economically depressed area Baraboo River, WI After 3 recent dam removals near downtown Baraboo: New business is supplying boat shuttles per weekend day in summer

15 Impoundment Sediment Estimate the pre-dam surface using DOR and survey Perform temporary drawdown if possible Divide sediment volume into mobile and immobile portions Perform Due Diligence on Contamination

16

17

18

19 Source: Doyle et al. 2003

20 Parameter Screening Benchmarks Dam Impoundment Dstrm Ustrm Impoundment Samples Sample Sample Sample Statistics (Important: Units listed by category below) MCP S1 / GW1 TEC PEC TEL PEL S1 S2 S3 S4 S5 Min Max Mean Human Health Freshwater (1) Marine (2) Metals [mg/kg] Antimony 20.0 NC NC 0 0 Arsenic Cadmium Chromium (TOTAL) Copper NC Lead Mercury Nickel Silver NC NC Zinc 2, SVOCs (PAHs)[ug/kg] Total PAHs 1, , , , Pesticides (ug/kg) 0 0 2,4'-DDT NC NC NC BDL BDL BDL BDL BDL 0 0 4,4'-DDT 3,000.0 NC NC BDL BDL BDL BDL BDL 0 0 Sum DDT BDL BDL BDL BDL BDL 0 0 Total DDTs BDL BDL BDL BDL BDL 0 0 PCBs (ug/kg) 0 0 Total PCBs 2, BDL BDL BDL BDL BDL 0 0 VOCs (mg/kg) 0 0 Methyl tert-butyl ether (MTBE) 0.1 NC NC BDL BDL BDL BDL BDL 0 0 Benzene 2.0 NC NC BDL BDL BDL BDL BDL 0 0 Toluene BDL BDL BDL BDL BDL 0 0 Physical Characterisitcs Total Organic Carbon (mg/kg Dry Weight) BDL Percent Water (%) Grain Size Distribution % Gravel % Sand % Clay

21 Stakeholder Involvement Occurs in the Feasibility Stage Real Information is Critical Visual Concepts Focus Group Discussions

22

23

24

25

26 Design overview Performance criteria Improve fish habitat Restore stream Patient access No increase in flooding

27

28

29

30 Existing Conditions

31 Proposed Conditions

32 Alternatives and Cost Analysis Repair Partial Removal Full Removal Full Removal Active Restoration Full Removal Passive Restoration Repair and Fishway

33

34

35 Post-Removal Restoration 2 Paths to the Same End = Restored Channel Active Restoration accelerates the process of channel and habitat formation BUT adds anywhere from $100-$400 / LF of restored channel Passive Restoration allows the stream to restore itself, a much cheaper option BUT can take decades or centuries to complete

36 Active Restoration

37

38

39 Upper Mill Creek 1998 Headwaters Flow

40

41 After 3 years

42 Passive Restoration

43

44

45

46

47

48

49

50

51 Which Approach? Active vs. Passive Channel Recovery ACTIVE PASSIVE Impoundment Mat l: Cohesive Non-cohesive Sediment Quantity Full Impoundment Channel Maintained Sediment Quality Contaminated Clean Impoundment Width Bankfull Width >>10 <10 Budget Substantial Tight / Fixed T & E Species Present Absent Downstream Channel Condition Intact Degraded

52 Summary Understand Site Complexity Plan a Budget Accordingly Complete Due Diligence on Impoundment Sediment Identify and Understand Unique Site Design Challenges Understand Post-removal Restoration Options Provide Tangible, Factual Information to Stakeholders

53 Economic Implications Active vs. Passive Channel Recovery Active Recovery Estimate Item Unit Unit Cost Quantity Total Cost Dam Demolition LS $20,000 1 $20,000 Channel Design LS $150,000 1 $150,000 Excavation CY $15 10,000 $150,000 Channel Construction LF $ $300,000 Seeding and Tree Planting ACRE $4, $200,000 Invasive Control ACRE $ $25,000 Grand Total: $845,000 Passive Recovery Estimate Item Unit Unit Cost Quantity Total Cost Dam Demolition LS $20,000 1 $20,000 Seeding and Tree Planting ACRE $4, $200,000 ***Active Recovery approximately 2-4X cost of Passive Recovery*** Invasive Control ACRE $ $25,000 Grand Total: $245,000

Stream Monitoring at Tumacácori NHP

Stream Monitoring at Tumacácori NHP Stream Monitoring at Tumacácori NHP Santa Cruz River Researcher s Day Tucson Community Service Center March 27 2009 Presented by E.L.Gwilliam Overview why, what, where, when and how Stream Protocol Importance

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

RESTORING streams to reduce flood loss

RESTORING streams to reduce flood loss RESTORING streams to reduce flood loss Flood Loss Reduction the Natural Way Flood disasters have become a regular Floods can devastate local occurrence. One in your community may have communities. threatened

More information

Steelhead Recovery in San Juan and Trabuco Creeks Watershed

Steelhead Recovery in San Juan and Trabuco Creeks Watershed Steelhead Recovery in San Juan and Trabuco Creeks Watershed Are there fish now? Overview Final San Juan and Trabuco Creeks Watershed Management Plan Fish & Game Implementation NOAA Steelhead Recovery and

More information

The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues

The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary Water Flows & Current Issues Florida Governor Rick Scott August 20, 2013 Upper Chain of Lakes

More information

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Jim Lester, PhD. and Lisa Gonzalez Houston Advanced Research Center Galveston

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

How To Manage Water Resources In The Yakima Basin

How To Manage Water Resources In The Yakima Basin Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

Introduction to Lockheed West Seattle. Working Together. Site Background. Lockheed West Seattle Superfund Site

Introduction to Lockheed West Seattle. Working Together. Site Background. Lockheed West Seattle Superfund Site Lockheed West Seattle Superfund Site Introduction to Lockheed West Seattle From the later years of World War II through 1987, Lockheed Corporation, a predecessor to Lockheed Martin Corporation, performed

More information

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012 King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers Public Meeting December 5, 2012 Goals of the Presentation Cedar and Sammamish R. Plan Update Context - Brief summary info about the

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

DRAFT RESTORATION PLAN FOR MCGIRTS CREEK PARK FOR

DRAFT RESTORATION PLAN FOR MCGIRTS CREEK PARK FOR DEPARTMENT OF THE INTERIOR U.S. FISH AND WILDLIFE SERVICE REGION #4 DRAFT RESTORATION PLAN FOR MCGIRTS CREEK PARK FOR RESTORATION OF INJURIES ASSOCIATED WITH WHITEHOUSE WASTE OIL PITS SUPERFUND SITE JACKSONVILLE,

More information

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: obropta@envsci.rutgers.edu

More information

Skaguay Reservoir. FISH SURVEY AND MANAGEMENT DATA Greg A. Policky - Aquatic Biologist (Salida) greg.policky@state.co.

Skaguay Reservoir. FISH SURVEY AND MANAGEMENT DATA Greg A. Policky - Aquatic Biologist (Salida) greg.policky@state.co. FISH SURVEY AND MANAGEMENT DATA (Salida) greg.policky@state.co.us / 719-530-5525 General Information: Skaguay Reservoir, a 114 acre impoundment, offers good fishing for rainbow and brown trout with an

More information

2012 Program Report. Agricultural Group Drainage Program

2012 Program Report. Agricultural Group Drainage Program 2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout

More information

Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA

Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA Swamp AMD Chemistry Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA A Technical Report for Trout Unlimited and the Kettle Creek Watershed Association Prepared by Hedin Environmental

More information

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 PRESENTATION TOPICS Analysis Objectives Analysis Dam Removal Plan Dam Remediation Plan Effects Analysis Permit Requirements Decision

More information

PHOTO: Jon Waterman THE COLORADO RIVER DELTA, CIRCA NOW OPEN BOOKLET TO SEE CHANGE

PHOTO: Jon Waterman THE COLORADO RIVER DELTA, CIRCA NOW OPEN BOOKLET TO SEE CHANGE PHOTO: Jon Waterman THE COLORADO RIVER DELTA, CIRCA NOW OPEN BOOKLET TO SEE CHANGE 1 OUR VISION RAISE THE RIVER IS AN ENGAGEMENT CAMPAIGN LED BY LIKE-MINDED VISIONARIES Raisetheriver.org sees a day when

More information

Description Quantity Cost Total Cost

Description Quantity Cost Total Cost APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000

More information

Proposal to the Trinity Adaptive Management Working Group (TAMWG)

Proposal to the Trinity Adaptive Management Working Group (TAMWG) Proposal to the Trinity Adaptive Management Working Group (TAMWG) Request that the TAMWG recommend that the Trinity River Restoration Program fund BLM to purchase the Weigel parcel at Gold Bar (river mile

More information

Arkansas River Corridor Vision & Master Plan

Arkansas River Corridor Vision & Master Plan A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013

Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013 NCDA&CS - North Carolina Forest Service Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013 For the N.C. Division of Water Quality

More information

Untreated (left) and treated (right) Sierra Nevada forests in Amador County, CA. Photos: Sierra Nevada Conservancy

Untreated (left) and treated (right) Sierra Nevada forests in Amador County, CA. Photos: Sierra Nevada Conservancy Case Study Mokelumne Watershed, CA and Santa Fe, NM Avoided Costs: The Economics of Watershed Restoration Forested headwaters are the source of much of the West s drinking water. Protecting and restoring

More information

Watershed Program: A Little Known but Powerful Solution for Integrated Estuarine Restoration

Watershed Program: A Little Known but Powerful Solution for Integrated Estuarine Restoration Watershed Program: A Little Known but Powerful Solution for Integrated Estuarine Restoration Cape Cod Water Resources Restoration Project (CCWRRP) Initial farmer, landowner, and municipal official discussions

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

Pamela Birak, Jordan Lake State Park, Chatham County, NC

Pamela Birak, Jordan Lake State Park, Chatham County, NC Pamela Birak, Jordan Lake State Park, Chatham County, NC 3 Lakes, Reservoirs, and Ponds Forty-six states, Puerto Rico, and the District of Columbia (collectively referred to as states in the rest of this

More information

Penticton Creek May 4, 2015 Council Meeting

Penticton Creek May 4, 2015 Council Meeting Penticton Creek May 4, 2015 Council Meeting Penticton Creek Council Meeting May 4, 2015 Penticton Creek in the Early Years Penticton Creek Council Meeting May 4, 2015 Penticton Creek Today Penticton Creek

More information

SMALL DAM REMOVAL. IN PENNSYLVANIA Free-Flowing Watershed Restoration

SMALL DAM REMOVAL. IN PENNSYLVANIA Free-Flowing Watershed Restoration WATERSHED FACT PACK SMALL DAM REMOVAL IN PENNSYLVANIA Free-Flowing Watershed Restoration BEFORE AFTER GOOD HOPE DAM removed from Conodoguinet Creek in Cumberland County in November 2001. Small Dam Removal

More information

Tie CornrnonweaGti of Massaciusetts Wecutive Ofiice of Energy andenvironmentacpfiairs 100 Cam6ndjge Street, Suite 900 Boston, NP 021 14

Tie CornrnonweaGti of Massaciusetts Wecutive Ofiice of Energy andenvironmentacpfiairs 100 Cam6ndjge Street, Suite 900 Boston, NP 021 14 Ocval I.. Palrick CiClVERNOll Ttrnothy P. Murray I IFUTENANl GOVERNOR Ian A. Rowles SECRETARY Tie CornrnonweaGti of Massaciusetts Wecutive Ofiice of Energy andenvironmentacpfiairs 100 Cam6ndjge Street,

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 James L. McIntire Washington State Treasurer Summary The State of Washington offered green bonds to investors in September 2015, with approximately

More information

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background

More information

The Regulatory Impact Analysis (RIA) for the Mercury Air Toxics Standard (MATS)

The Regulatory Impact Analysis (RIA) for the Mercury Air Toxics Standard (MATS) The Regulatory Impact Analysis (RIA) for the Mercury Air Toxics Standard (MATS) Kevin Culligan U.S. Environmental Protection Agency (EPA) Associate Division Director, Sector Policies and Programs Division

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

Comprehensive Sediment Management Services

Comprehensive Sediment Management Services Environment About AECOM AECOM is a global provider of professional technical and management support services to a broad range of markets, including transportation, facilities, environmental, energy, water

More information

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association

More information

How do you treat water based on water quality from different water sources?

How do you treat water based on water quality from different water sources? How do you treat water based on water quality from different water sources? Why? Authors: Wendy Lane and Kim Sciarrone Seattle Public Schools; Seattle, WA Water from different sources will contain different

More information

ASSESSMENT AND MANAGEMENT OF CONTAMINATED SITES IN FLOOD DISASTER IN SERBIA 2014

ASSESSMENT AND MANAGEMENT OF CONTAMINATED SITES IN FLOOD DISASTER IN SERBIA 2014 Ministry of Agriculture and Environmental Protection Serbian Environmental Protection Agency ASSESSMENT AND MANAGEMENT OF CONTAMINATED SITES IN FLOOD DISASTER IN SERBIA 2014 Dragana Vidojević Head of Indicators

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

Frequently Asked Questions FAQ (click to follow link) How Does The Thermal Well System Work? How Much Does It Cost?

Frequently Asked Questions FAQ (click to follow link) How Does The Thermal Well System Work? How Much Does It Cost? Frequently Asked Questions FAQ (click to follow link) How Does The Thermal Well System Work? How Much Does It Cost? Isn't the Power Itself Excessively Expensive? What Are The Risks Of Using ISTD? Which

More information

EPA Trends for wastewater Treatment in California - 2011

EPA Trends for wastewater Treatment in California - 2011 EPA S TECHNOLOGY NEEDS FOR THE WATER AND WASTEWATER INDUSTRY Nancy Stoner Acting Assistant Administrator U.S. EPA Office of Water International Emerging Technology Symposium Arlington, VA April 23rd, 2014

More information

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for: EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study

More information

Nipigon Bay. Area of Concern Status of Beneficial Use Impairments September 2010

Nipigon Bay. Area of Concern Status of Beneficial Use Impairments September 2010 Nipigon Bay Area of Concern Status of Beneficial Use Impairments September 2010 Nipigon Bay is in the most northerly area of Lake Superior. The Area of Concern takes in a large portion of Nipigon Bay and

More information

Amherst Dam. Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM

Amherst Dam. Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM Amherst Dam Public Informational Meeting Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM April 3, 2014 Welcome Michael Juris Village President Introduction

More information

NATURAL RESOURCE RESTORATION LESSON PLAN Fix It!

NATURAL RESOURCE RESTORATION LESSON PLAN Fix It! NATURAL RESOURCE RESTORATION LESSON PLAN Fix It! Theme Repairing Damaged Resources Links to Overview Essays and Resources Needed for Student Research http://oceanservice.noaa.gov/education/corals http://oceanservice.noaa.gov/topics/coasts/restoration/

More information

Howsham fish passage Consultation document

Howsham fish passage Consultation document Howsham fish passage Consultation document Report ENVIMNE000903 Final version 30 June 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing

More information

Habitat rehabilitation for inland fisheries

Habitat rehabilitation for inland fisheries Habitat rehabilitation for inland fisheries FAO FISHERIES TECHNICAL PAPER 484 Global review of effectiveness and guidance for rehabilitation of freshwater ecosystems Cover photos : Left: excavation of

More information

Recreational Enhancements on the Lehigh River Public Information Workshop February 2013

Recreational Enhancements on the Lehigh River Public Information Workshop February 2013 Recreational Enhancements on the Lehigh River Public Information Workshop February 2013 Cooperating Agencies US Army Corps of Engineers Philadelphia District Pennsylvania Fish & Boat Commission Pennsylvania

More information

Passive Restoration 101: Framework and Techniques Overview. Amy Chadwick, Great West Engineering August 26, 2015 Butte, America

Passive Restoration 101: Framework and Techniques Overview. Amy Chadwick, Great West Engineering August 26, 2015 Butte, America Passive Restoration 101: Framework and Techniques Overview Amy Chadwick, Great West Engineering August 26, 2015 Butte, America What Defines Passive Restoration? Process-based, nature-driven Minimal equipment

More information

Thunder Bay. Area of Concern Status of Beneficial Use Impairments September 2010

Thunder Bay. Area of Concern Status of Beneficial Use Impairments September 2010 Thunder Bay Area of Concern Status of Beneficial Use Impairments September 2010 The Thunder Bay Area of Concern extends approximately 28 km along the shoreline of Lake Superior from north of Bare Point

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act Ministry of the Environment April 15, 2011

Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act Ministry of the Environment April 15, 2011 Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act Ministry of the Environment April 15, 2011 PIBS # 7382e01 i TABLE OF CONTENTS TABLE OF CONTENTS...ii

More information

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding New York State Water Resources Institute Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding Emily Vail Hudson River Estuary Program NYS Department of Environmental Conservation

More information

Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute

Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute Healthy Forests Resilient Water Supply Vibrant Economy Ecological Restoration Institute How Water Gets to Your Home MOST OF THE VALLEY S WATER SUPPLY comes from winter precipitation and runoff from Arizona

More information

SECTION 5.4 LOGJAM REMOVAL AND RIVER RESTORATION. Overview. Logjam Removal Using Heavy. Tools. Machinery. Large-Scale River Restoration

SECTION 5.4 LOGJAM REMOVAL AND RIVER RESTORATION. Overview. Logjam Removal Using Heavy. Tools. Machinery. Large-Scale River Restoration SECTION 5.4 LOGJAM REMOVAL AND RIVER RESTORATION Overview Practice 401 Practice 402 Practice 403 Logjam Removal Using Hand-held Tools Logjam Removal Using Heavy Machinery Large-Scale River Restoration

More information

Haynes Recreation Center, Laredo, TX. Data Matrix and Sustainability Benchmarks

Haynes Recreation Center, Laredo, TX. Data Matrix and Sustainability Benchmarks Haynes Recreation Center, Laredo, TX Data Matrix and Sustainability Benchmarks (Updated Spring 2010) 1 Standard Benchmarks BENCHMARKS UNITS PRE PROJECT GOAL Property value (pre/post) Assessed or redevelopment

More information

The Economics of Culvert Replacement: Fish Passage in Eastern Maine

The Economics of Culvert Replacement: Fish Passage in Eastern Maine The Economics of Culvert Replacement: Fish Passage in Eastern Maine Introduction The Natural Resources Conservation Service (NRCS) in Maine is working with Project SHARE (Salmon Habitat and River Enhancement)

More information

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc. Incorporating LID Stormwater Management Practices and Ecological Restoration on Redevelopment Properties Presented to LID Conference Philadelphia, Sept 2011 Presented by Dani Wise Johnson Vanasse Hangen

More information

ALTERNATIVES EVALUATION. SWEET POND DAM VT Dam #90.01 Town of Guilford, Vermont

ALTERNATIVES EVALUATION. SWEET POND DAM VT Dam #90.01 Town of Guilford, Vermont ALTERNATIVES EVALUATION SWEET POND DAM VT Dam #90.01 Town of Guilford, Vermont Prepared for: Vermont Department of Forests, Parks and Recreation Prepared by: January 27, 2012 D&K #221179 SWEET POND DAM

More information

Preliminary Damage Assessment (PDA) Field Guide

Preliminary Damage Assessment (PDA) Field Guide Preliminary Damage Assessment (PDA) Field Guide INDIVIDUAL ASSISTANCE The Purpose of this Preliminary Damage Assessment Field Guide This field guide has been designed to serve as a quick reference tool

More information

Comment Invited on Proposal to Protect the Bristol Bay Watershed

Comment Invited on Proposal to Protect the Bristol Bay Watershed Region 10 Comment Invited on Proposal to Protect the Bristol Bay Watershed July 2014 U.S. Environmental Protection Agency Region 10 requests comment on a proposal to protect one of the world s most valuable

More information

Economic Benefits from Aquatic Ecological Restoration Projects in Massachusetts Summary of Three Phases of Investigation

Economic Benefits from Aquatic Ecological Restoration Projects in Massachusetts Summary of Three Phases of Investigation Economic Benefits from Aquatic Ecological Restoration Projects in Massachusetts Summary of Three Phases of Investigation Massachusetts Department of Fish and Game Division of Ecological Restoration April

More information

How To Build A River Restoration Project In North Korea

How To Build A River Restoration Project In North Korea Changnyeong Haman Weir Project for Nakdong-River Restoration 1. PROJECT A. Description Changnyeong Haman Weir Project for Nakdong-River Restoration stretched from Oisanri, Bukmyeon of Changwon City to

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

FOUR RIVERS RESTORATION PROJECT

FOUR RIVERS RESTORATION PROJECT MLTM Republic of Korea Making Every Drop Count International Workshop on Integrated Urban Water Management WATER & GREEN GROWTH FOUR RIVERS RESTORATION PROJECT Office of National River Restoration, Korea

More information

Mouth of the Columbia River Jetties Major Rehabilitation Study

Mouth of the Columbia River Jetties Major Rehabilitation Study Mouth of the Columbia River Jetties Major Rehabilitation Study PNWA Port of Vancouver January 29, 2010 US Army Corps of Engineers Project Overview Background Corps Guidance for Major Rehab Project Alternatives

More information

The Restoration of the Babb Creek Watershed

The Restoration of the Babb Creek Watershed The Restoration of the Babb Creek Watershed Babb Creek Location Babb Creek Wilson Creek SWP 09A Pabnd.shp 90 0 90 180 Miles Babb Creek Watershed History 1782 Discovery of Coal in Blossburg. 1865-1895 Development

More information

University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery

University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery Yellow Alert for Mayflower Residence hall Peak at 31.5 feet Power Plant floods from steam tunnel and shuts down 1993 Flood

More information

Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop

Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop Welcome to the Mission Reach! The Mission Reach Ecosystem Restoration and Recreation Project is transforming

More information

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT August 2006 Prepared by: NB Department of Environment Environment 1. INTRODUCTION This General Review Statement

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

Text and photos: Juha Siekkinen, Life+ Return of Rural Wetlands Cover drawing: Jari Kostet Maps and aerial photos: National Land Survey of Finland

Text and photos: Juha Siekkinen, Life+ Return of Rural Wetlands Cover drawing: Jari Kostet Maps and aerial photos: National Land Survey of Finland Life+ Return of Rural Wetlands Pikku Nuoluanjärvi Wetlands, Liminka Text and photos: Juha Siekkinen, Life+ Return of Rural Wetlands Cover drawing: Jari Kostet Maps and aerial photos: National Land Survey

More information

Advice note. Linking River and Floodplain Management

Advice note. Linking River and Floodplain Management Advice note Linking River and Floodplain Management Advice note Linking River and Floodplain Management Demonstrating STrategic REstoration And Management (STREAM) is a 1 million four-year conservation

More information

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the

More information

Design And Construction Of The South San Diego Bay Western Salt Pond Restoration Project. 2012 Headwaters To Ocean Conference

Design And Construction Of The South San Diego Bay Western Salt Pond Restoration Project. 2012 Headwaters To Ocean Conference Design And Construction Of The South San Diego Bay Western Salt Pond Restoration Project 2012 Headwaters To Ocean Conference David Cannon, M.C.E., P.E. President/Principal Engineer Everest International

More information

Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program

Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program Angora Fire Restoration Activities June 24, 2007 Presented by: Judy Clot Forest Health Enhancement Program California Tahoe Conservancy Independent California State Agency within the Resources Agency Governed

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

APPENDIX L DATA VALIDATION REPORT

APPENDIX L DATA VALIDATION REPORT APPENDIX L DATA VALIDATION REPORT FIELD AND DATA REPORT DOWNTOWN PORTLAND SEDIMENT CHARACTERIZATION PHASE II WILLAMETTE RIVER PORTLAND, OREGON JUNE 2010 Data Validation Report Downtown Portland Sediment

More information

2013 Hardwater Lake Aquatic Vegetation Control Plan LDWF, Inland Fisheries

2013 Hardwater Lake Aquatic Vegetation Control Plan LDWF, Inland Fisheries a. 2013 Hardwater Lake Aquatic Vegetation Control Plan LDWF, Inland Fisheries 1. Waterbody type natural backwater lake off of Little River in Grant Parish. It is a wooded alluvial floodplain lake that

More information

Estabrook Dam A Discussion of Alternatives. Public Scoping Meeting June 5, 2014

Estabrook Dam A Discussion of Alternatives. Public Scoping Meeting June 5, 2014 Estabrook Dam A Discussion of Alternatives Public Scoping Meeting June 5, 2014 Presenters Kevin Haley, PLA, Milwaukee County Don Pirrung, P.E., PH, AECOM Mike Hahn, P.E., PH, Southeastern Wisconsin Regional

More information

Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008

Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008 Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008 In partnership with Montana Department of Fish, Wildlife, and Parks (FWP), American Wildlands, and Wildlife Forever, the Madison

More information

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014 Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors Recreational Boating Educational Conference December 11, 2014 Operators Face Change and Challenges Environmental Conditions Fluctuating

More information

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant By Ginger Gillin, John Pizzimenti, and Doug Foss, GEI Consultants, Inc., USA, and Jon Jourdonnais, PPL Montana, USA. Abstract The

More information

The Muddy River: A Century of Change

The Muddy River: A Century of Change The Muddy River: A Century of Change Tom Brady, Brookline Conservation Administrator, Tree Warden, Town Arborist 617-730-2088 or tbrady@brooklinema.gov Muddy River Flood Damage Reduction and Environmental

More information

Funded Restoration Projects

Funded Restoration Projects Funded Restoration Projects Anaconda-Deer Lodge City-County Anaconda Water Studies Costs: $107,771 Year(s) Funded: 2007 Anaconda-Deer Lodge City-County has received approval to conduct a water metering

More information

Addendum. Use Attainability Analysis for Site Specific Selenium Criteria: Alkali Creek. February 23, 2009

Addendum. Use Attainability Analysis for Site Specific Selenium Criteria: Alkali Creek. February 23, 2009 Addendum Use Attainability Analysis for Site Specific Selenium Criteria: Alkali Creek February 23, 2009 Prepared by MWH Americas, Inc. Prepared for EnCana Oil and Gas (USA) Inc. Page 2 Responses to Comments

More information

Revealing the costs of air pollution from industrial facilities in Europe a summary for policymakers

Revealing the costs of air pollution from industrial facilities in Europe a summary for policymakers Revealing the costs of air pollution from industrial facilities in Europe a summary for policymakers A new European Environment Agency (EEA report, Revealing the costs of air pollution from industrial

More information

Long Term Flood Solutions

Long Term Flood Solutions Long Term Flood Solutions Things we can do: Structural and Non-Structural Options 28th Annual Red River Basin Land & Water International Summit Conference January 18, 2011, Fargo, ND John Jaschke, Executive

More information