1 Document Retention Guidelines Prepared for: PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE DIVISION Professional Liability Committee Please Note: The material contained in this document is intended to constitute general observations and information about professional practice issues. Nothing contained in this document is intended to constitute legal advice or should be relied upon. For specific advice, consultation with a attorney is strongly recommended.
2 Introduction As a service to its membership, the National Society of Professional Engineers regularly provides guidance to members on issues related to business practices, ethical situations, and other professional matters. One area in which NSPE is consistently solicited for guidance is in setting document retention policies. In response to these inquires, the Professional Engineers in Private Practice s Professional Liability Committee (PLC) has investigated establishing some general guidelines for document retention that could be used by members to create their own company policies. Establishing a set of guidelines for document retention is a somewhat complex task. There are differing and valid opinions on the issue, and laws and statutes vary from state to state making it difficult to develop standard policies. Additional complications result for a number of reasons, some of which are listed below: (1) Companies working in multiple states must consider laws existing in all states of practice. (2) Companies doing work for federal entities or in other countries may be subjected to various laws that do not exist at the state level. (3) The type of work in which a company engages can affect the necessity for document retention. (4) Clients wishes may factor into a firm s document retention policies. Some clients may require consultants to adhere to more strict document retention polices than mandated by law. (5) The expense of maintaining storage facilities must sometimes be weighed against the likelihood that the stored information will be needed or beneficial in the future. (6) A firm s desire to retain certain documents may be completely unrelated to any legal or liability requirements. Data Collection Before developing any guidelines of its own, the PLC reviewed existing articles and studies related to document retention. The underlying principles and rationale behind the various opinions on document retention were also reviewed. In May 2003, a paper summarizing those data collection efforts was developed by the committee. The results presented in the May 2003 paper underscored the fact that document retention policy guidelines were scarce and varied. Opinions concerning document retention were determined to be just as varied. For that reason, the committee desired further information before formulating any specific guidelines. To continue the data collection effort, an electronic survey was distributed to NSPE members in June The survey asked a number of questions concerning document retention policies. 2
3 Almost 480 people responded to the survey. Survey participants were also requested to submit a copy of their company s formal document retention policy to the PLC for review. Almost 20 firms responded to this request, with a number of those submitting detailed plans. Each of the submitted plans was reviewed in depth along with the data obtained from the electronic survey. The results of the survey and the conclusions derived from the evaluation were summarized in a paper by the PLC that was completed in February After the February 2004 paper was finalized, the results of the PLC s effort to date were summarized in an article that appeared in Engineering Times. The article indicated that the PLC would use the results of the studies to develop document retention guidelines for NSPE members. Due to the number of limitations involved in creating specific guidelines that would be applicable to all NSPE members, it was also mentioned that the PLC guidelines would be somewhat general. The following section of this paper serves as the recommended guidelines for document retention that developed as a result of the PLC initiative. They are in no way intended to serve as the sole foundation for development of a company s document retention policies. Rather, the guidelines cover key areas that document retention policies should address along with recommendations on the durations that certain documents should be retained. Those using the guidelines should do so with caution to ensure that whatever formal policy they create takes into consideration their firm s legal and contractual obligations. These guidelines focus on the retention of documents related to engineering practice. Retention policies for other documents, such as human resource data or tax and corporate documents, although briefly mentioned in the guidelines, were not the focus of the study. Document Retention Guidelines The following guidelines are recommended for use in establishing document retention policies. At a minimum, retention policies should be established in the following broad areas: (1) Human resource and administration * (2) Accounting and financial * (3) Legal (including contracts) * (4) Drawings and specifications (5) Studies and reports (6) Calculations and design (7) Construction (8) Approvals and reviews (9) Correspondence The first three general areas in which it is suggested that retention policies be established (*) are not specific to the practice of engineering. Therefore, other than mentioning that policies should be established, no guidelines are offered. Each of the remaining six areas will be discussed. 3
4 Drawings and Specifications Retention policies for drawings and specifications were mentioned in all of the materials that were reviewed during the study. In addition, both the results of the electronic survey and the review of submitted policies indicate that retaining these documents was of primary importance. The PLC recommends that drawings and specifications be maintained in hard copy format, if possible, because electronic data can sometimes be difficult to access when the programs used to create the drawings or specifications become outdated or obsolete. Electronic copies can also be maintained at the discretion of the firm. Due to their importance and the fact that they represent the final product on most jobs, construction drawings and specifications should be retained indefinitely. Retaining these documents in perpetuity could also allow firms to dispose of other related documents, such as calculations involving factors of safety, which can be recreated using information represented on the drawings and in the specifications. At a minimum, the documents should be retained until the statute of repose has passed. In jurisdictions where the statute of limitations is allowed to extend past the statute of repose, retention of these documents should also extend past the statute of repose. Studies and Reports In many engineering projects, the final product is represented by a study or report. Data supporting the conclusion(s) in a study or report is also frequently included with the study or report. The PLC recommends that reports and studies be retained indefinitely in hard copy and/or electronic format. Preliminary reports that are superseded by a final report or become obsolete do not need to be retained in perpetuity. It is recommended that preliminary reports be retained for at least seven years. Calculations and Design Notes The data collected by the PLC indicates that opinions concerning retention of calculations and design notes vary widely. Some studies and published reports recommended retaining these documents forever while others argued that retention either creates a liability or is redundant and unnecessary if design drawings are available. The PLC recommends that firms establish a formal retention policy for calculations and design documents that clearly states whether or not these materials are retained or destroyed. Although the PLC does not recommend destruction of design calculations immediately upon completion of the project, if the firm chooses to destroy the documents after the completion of the project, a written policy that reflects this practice should be created, and the policy should be regularly enforced. If design calculations are retained, it is recommended that as a minimum, the documents should be retained until the statute of repose, and any extended statute of limitation, has passed. Construction Construction documents include, but are not limited to, field reports, shop drawings, correspondence with the contractor, checklists, and documentation of field tests. The engineer s role in construction oversight activities can vary widely for each project. Some contracts involve 4
5 limited construction services from the engineer while others directly involve the engineer, as is the case in design-build contracts. A firm s retention policy for construction documents should be flexible enough to account for the varying degrees of involvement that an engineer has with the construction phase of the project. If the engineer is contracted solely to provide as-needed interpretation and clarification of construction drawing details, the need to retain construction-related documents is less significant. However, if the primary engineering service associated with a contract relates to the construction phase, more stringent retention policies should be instituted. Regardless of the extent of construction-related service being provided by the engineer, liability on a construction project is generally shared with the contractor. Additionally, most contractors will also retain documents related to construction. For these reasons, document retention policies for some construction-related work might not need to be as stringent as those for design projects. It is recommended that construction documents be retained for at least seven years past the date of substantial completion for projects where the involvement of the engineer is limited. On projects where the engineer s involvement was significant, documents should be retained until the end of the statute of repose. In areas where the statute of limitations is allowed to extend beyond the statute of repose, documents should be retained for that extended time period. It should be noted that the guidelines for this type of document retention were intended to be applicable to projects where the engineering services are still primarily related to design. The guidelines are not intended for use in cases where the engineer is acting as the contractor. In those cases, since the primary service the engineer is providing is directly related to construction, more stringent retention policies should be employed. Approvals and Reviews Some types of approvals and reviews have already been covered in the other areas for which document retention policies were discussed. Shop drawing reviews and approvals of contractor pay requests, for example, fall into the Construction category. However, other approvals and reviews do not distinctly fit into the other areas being discussed by these guidelines. This section is meant to address those documents. Many firms have internal policies related to review and approval of drawings and reports to ensure quality and check for potential design errors. Additionally, many clients require interim submittals on drawings and other products to either provide input and approval prior to final design or to review the product for quality and scope compliance. Approvals and reviews can also apply to products that are reviewed and approved by the engineer. This would include, for example, review of a substitute mechanical component, such as a pump, for compliance with the engineer s overall design. All of these types of documents fall into the category of approvals and reviews. If approval of a specific design element or approach that is integral to the project was obtained by a client, that approval should be retained for the same duration as the design documents. This is especially important if approval was sought for a non-standard project approach or if an engineer 5
6 has documented limitations involved in a particular approach and requested acceptance of those limitation from the client. If a firm has a documented internal quality control procedure that allows it to receive special or discounted consideration on its liability insurance premium, it is important that enough documentation be retained to show that the existing policy was followed. This does not mean that all documents related to the quality review be maintained. However, at a minimum, documentation on when the reviews were conducted and by whom should be retained along with the design documentation and for the same duration. It should also be noted that there is an increased possibility for liability if a firm is found to have a formal quality assurance program and that firm cannot produce evidence that it followed those procedures on a particular project. This is another reason that documents providing evidence of adherence to internal formal programs need to be maintained. Review and approval documents that do not involve specific design elements or are not critical to the overall product can be discarded upon completion of the project. This would include approval of a sub-consultant s pay request or approval of an interim design calculation for an element that was removed from the project. Correspondence There are many types of correspondence, including letters, , documentation of telephone conversations, meeting minutes, and written memos to the file. A good deal of this correspondence loses its significance either during or after project completion. The PLC recommends selective retention of project correspondence. Complete retention of all correspondence can significantly increase required storage and hinder the firm s ability to readily locate more critical documents if the volume of stored correspondence is significant. Any correspondence that documents critical project details or direction should be maintained along with the design documents. Other correspondence that is deemed critical or contains information that cannot be derived from other documents should also be retained. The duration of retention should be consistent with that for design documents. 6
7 Other Retention Guidelines Regardless of the document retention policy that is created, some additional standards should be followed: 1. Any document retention policy that is created should be followed consistently for every project. If deviation from the formal policy is made for a particular project, the firm should document why the deviation was made. If retention policies differ for different projects, that should also be included in the written policy. 2. If a policy is created that allows for destruction of documents, ensure that the document destruction is absolute and document the date of destruction. 3. Make sure that document retention polices are written, especially if the policy includes document destruction that otherwise might seem suspicious. 4. Ensure that individuals in charge of document retention or destruction are trustworthy, especially for confidential items, such as items related to lawsuits, payroll, or competitive information. 5. Ensure that stored documents are organized, labeled, secure, and easy to retrieve. 6. Do not destroy documentation after notice of a lawsuit has been served, regardless of the written policy related to those documents. The guidelines offered in this paper are in no means intended to be used as a formal policy. Each firm should create a document retention policy that conforms to its individual needs and addresses its potentially unique liability concerns. Note: As background, Professional engineers face a substantial degree of liability exposure for property damage, economic damages, bodily injury, and wrongful death resulting from their alleged negligence in the design of improvements to real property that has long since been completed, and for which the engineer should not reasonably be held responsible due to reasons outside his or her realm of control. Most state legislatures have responded to this situation by adopting laws known as statutes of repose. Statutes of repose bar actions against design professionals after a certain period of time following the completion of services or the substantial completion of construction. Such statutes are based on the general legal principle that a potential defendant in a lawsuit should not be required to defend him/herself against stale claims that could easily be based upon faded memories, lost evidence, or witnesses who have since disappeared. For example, stale claims are a particular possibility in the construction industry, where the real property or facilities for which or to which services have been provided may last many decades, and during which time the engineer has had no control over operation and maintenance of the property or facility. The language contained in statutes of repose and statutes of limitations is not universal and varies from state to state. It is strongly recommended that engineers and engineering firms familiarize 7
8 themselves with the statutes of repose and statutes of limitation in all states and jurisdictions in which they practice. For a review of statutes of repose and other liability law provisions affecting the practice of engineering, it is suggested that practitioners review A State-by-State Summary of Liability Laws Affecting the Practice of Engineering, 2012 NSPE, 1918-F For more information regarding this publication, please visit Definitions Statute of Repose: (1) Number of years after a project is completed after which the designers and contractors cannot be held responsible for damages or problems that may subsequently occur. (2) Time limit preventing injured parties from recovering from damages suffered as a result of defective or unsafe conditions in an improvement to real property (3) Statute effectively barring claims before they have arisen. Statute of Limitation: (1) Limit on the amount of time that can pass between the injury and the filing of a lawsuit. (2) Statute effectively bars claims after they have arisen and a certain amount of time is passed. 8
Indemnification Clauses, Part 1* Discussion from a/e ProNet's Risk Management and Contract Guide. J. Kent Holland, Jr., Esq.
Indemnification Clauses, Part 1* Discussion from a/e ProNet's Risk Management and Contract Guide J. Kent Holland, Jr., Esq. Issue: Indemnification provisions in contracts may require the design professional
NPSA GENERAL PROVISIONS
NPSA GENERAL PROVISIONS 1. Independent Contractor. A. It is understood and agreed that CONTRACTOR (including CONTRACTOR s employees) is an independent contractor and that no relationship of employer-employee
HOW TO DETERMINE WHETHER YOUR COMMERCIAL GENERAL LIABILITY ( CGL ) INSURANCE CARRIER IS OBLIGATED TO COVER A CLAIM MADE AGAINST YOUR COMPANY
HOW TO DETERMINE WHETHER YOUR COMMERCIAL GENERAL LIABILITY ( CGL ) INSURANCE CARRIER IS OBLIGATED TO COVER A CLAIM MADE AGAINST YOUR COMPANY Every company has a person in charge of its insurance. If your
Do You Have a Case? Truck Accident. ebooklet. Andrew Miller. 201 South 3rd Street Logansport, IN 46947 P: (574) 722-6676. www.starrausten.
Do You Have a Case? Truck Accident ebooklet Andrew Miller 201 South 3rd Street Logansport, IN 46947 P: (574) 722-6676 www.starrausten.com Disclaimer No attempt is made to establish an attorney-client relationship
Hiring or. Becoming an Associate. Are you ready to expand your practice? or Are you looking for an associate position?
Hiring or Becoming an Associate Are you ready to expand your practice? or Are you looking for an associate position? TABLE OF CONTENTS Introduction Hiring an Associate Becoming an Associate Interviewing
ACCIDENT INVESTIGATION GUIDELINES WITH LITIGATION IN MIND
ACCIDENT INVESTIGATION GUIDELINES WITH LITIGATION IN MIND Introduction The purpose of this paper is to alert the reader to concepts used in the defense of construction related lawsuits and to suggest how
PROFESSIONAL LIABILITY INSURANCE COVERAGE
Management Advisory 2002,Victor O. Schinnerer & Company, Inc. The information presented here is for risk management guidance. It is not legal advice nor should it be construed to be a determination on
REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES. Prepared by. City of Richmond Finance Department. February 18, 2016 RESPONSES DUE:
REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES Prepared by City of Richmond Finance Department February 18, 2016 RESPONSES DUE: 2:30 P.M., Monday, March 7, 2016 REQUEST FOR STATEMENTS OF QUALIFICATIONS
PATIENT TRANSFER AGREEMENT
Appendix 2 SAMPLE PATIENT TRANSFER AGREEMENT THIS AGREEMENT is made effective as of by and between ( Children s Hospital) a nonprofit corporation, and ( Hospital ), a corporation. WHEREAS, operates a tertiary
12 Considerations for Managing Foreign Supplier Risk
12 Considerations for Managing Foreign Supplier Risk November 2014 Lockton Companies A growing number of manufacturers over the past VINCE GAFFIGAN, CPA EVP, Director, Risk Consulting Risk Management Services
Incident Reporting Manual
Pillar Income Asset Management, Inc. Incident Reporting Manual For use in reporting: Property Losses General Liability Incidents Workers Compensation Incidents Commercial Auto Incidents Prepared by: The
U.S. Casualty Practice U.S. Construction Practice. November 2012. NY Labor Law 240
U.S. Casualty Practice U.S. Construction Practice November 2012 NY Labor Law 240 NOVEMBER 2012 Scaffold Law Pressures Contractors in New York New York s so-called Scaffold Law Labor Law 240 has created
ASBESTOS/LEAD SURVEY AND CONSULTING AGREEMENT BY AND BETWEEN NEW YORK UNIVERSITY / NYU HOSPITALS CENTER - OWNER - AND - CONSULTANT - --------- PROJECT
APPENDIX A ASBESTOS/LEAD SURVEY AND CONSULTING AGREEMENT BY AND BETWEEN NEW YORK UNIVERSITY / NYU HOSPITALS CENTER - OWNER - AND - CONSULTANT - --------- PROJECT DATED AS OF ASBESTOS/LEAD SURVEY AND CONSULTING
Table of Contents. Selected Iowa Wrongful Death Laws and Rules
Table of Contents 1. What is a wrongful death claim?... 2 2. Who may recover compensation for a wrongful death?... 3 3. How is a wrongful death claim commenced?... 4 4. What types of losses are compensated
California Senate Bill 474 Impact on Owners & Contractors
California Senate Bill 474 Impact on Owners & Contractors Beginning January 1, 2013, project owners, general contractors ( GC ), construction managers ( CM ) and any lower tier contractor who employs subcontractors
The insurance company is also responsible for reasonable towing or storage charges on your vehicle until you receive written notice otherwise.
If you have been in an automobile accident that is not your fault and your vehicle is damaged, you do have certain rights. If total property damage from the wreck to all damages appears to be over $1,000.00,
NAMING OTHER PARTIES AS ADDITIONAL INSUREDS. Roofing contractors typically are required to name owners, general contractors, property
NAMING OTHER PARTIES AS ADDITIONAL INSUREDS INTRODUCTION Roofing contractors typically are required to name owners, general contractors, property managers, architects and others as additional insureds
The Effect of Product Safety Regulatory Compliance
PRODUCT LIABILITY Product Liability Litigation The Effect of Product Safety Regulatory Compliance By Kenneth Ross Product liability litigation and product safety regulatory activities in the U.S. and elsewhere
Memorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information
Memorandum Important information related to requirements of state or local laws to include additional provisions in residential construction contracts Potentially Affected AIA Contract Documents AIA Document
IFRS FOUNDATION DOCUMENT RETENTION AND DESTRUCTION POLICY
IFRS FOUNDATION DOCUMENT RETENTION AND DESTRUCTION POLICY Purpose The purpose of this policy is to provide the IFRS Foundation with a framework to govern management decisions on whether particular documents
Construction Defect Action Reform Act
COLORADO REVISED STATUTES Title 13. Courts and Court Procedure Damages Regulation of Actions and Proceedings Article 20. Actions Part 8. Construction Defect Actions for Property Loss and Damage Construction
MEDICAL LIEN CONTRACT. Date Patient Name Patient Date of Birth Date of Loss
MEDICAL LIEN CONTRACT Date Patient Name Patient Date of Birth Date of Loss Payment to Provider: I, ( Patient ), hereby authorize and direct you ( Attorney ), to pay directly to ( Provider ) AND/OR TO ANY
United States Workers Compensation/Indemnification Overview
United States Workers Compensation/Indemnification Overview January 18, 2012 Jill Kirila [email protected] Kevin Hess [email protected] 36 Offices in 17 Countries Workers Compensation
Establishing a Corporate Policy for Sub-consultant and Subcontractor Insurance
Information Alert Fall 2011 Insights on Developments and Issues for Architects, Engineers and Construction Professionals Establishing a Corporate Policy for Sub-consultant and Subcontractor Insurance Architectural,
Credit Union Board of Directors Introduction, Resolution and Code for the Protection of Personal Information
Credit Union Board of Directors Introduction, Resolution and Code for the Protection of Personal Information INTRODUCTION Privacy legislation establishes legal privacy rights for individuals and sets enforceable
Professional Practice 544
February 15, 2016 Professional Practice 544 Tort Law and Insurance Michael J. Hanahan Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 [email protected] Schiff Hardin LLP.
FOR PROPERTY LOSS AND DAMAGE 1
13-20-801. Short title Colorado Revised Statutes Title 13; Article 20; Part 8: CONSTRUCTION DEFECT ACTIONS FOR PROPERTY LOSS AND DAMAGE 1 This part 8 shall be known and may be cited as the Construction
(1) A person to whom damage to another is legally attributed is liable to compensate that damage.
Principles of European Tort Law TITLE I. Basic Norm Chapter 1. Basic Norm Art. 1:101. Basic norm (1) A person to whom damage to another is legally attributed is liable to compensate that damage. (2) Damage
MUSIC RESOURCES TERMS AND CONDITIONS FOR SCHOOLS ( Conditions )
MUSIC RESOURCES TERMS AND CONDITIONS FOR SCHOOLS ( Conditions ) Please ensure all relevant staff have read and understood these Conditions before signing. Please complete, sign and return the Music Resources
California s Domestic Violence & Mandatory Reporting Law: Requirements for Health Care Practitioners
California s Domestic Violence & Mandatory Reporting Law: Requirements for Health Care Practitioners TABLE OF CONTENTS 1) Most Common Questions and Answers on Mandatory Reporting Requirements for Health
Our standard terms and conditions for Your Advanced Personal Loan.
Our standard terms and conditions for Your Advanced Personal Loan. For loans approved on or after 6 June 2015 6 June 2015 Important Information The information set out below forms part of your disclosure
Master Software Purchase Agreement
Master Software Purchase Agreement This Master Software Purchase Agreement ( Agreement ) is entered into as of Wednesday, March 12, 2014 (the Effective Date ) by and between with principal offices at (
So Your Client Wants to be an Additional Insured
So Your Client Wants to be an Additional Insured Insurance provisions are of prominent importance to most clients when negotiating contracts with designers, contractors and other parties working on their
Selling/Closing a Medical Practice
Selling/Closing a Medical Practice This publication is a snapshot of South Carolina laws, regulations and best practices as of July 2009. The material presented is likely to evolve and change from year
QUESTIONS AND ANSWERS ABOUT ILLINOIS AUTOMOBILE INSURANCE AND ACCIDENTS
QUESTIONS AND ANSWERS ABOUT ILLINOIS AUTOMOBILE INSURANCE AND ACCIDENTS What types of coverages are available? Generally, automobile insurance policies provide Bodily Injury and Property Damage Liability
SUBCHAPTER B. INSURANCE ADVERTISING, CERTAIN TRADE PRACTICES, AND SOLICITATION 28 TAC 21.102-21.104, 21.106-21.109, 21.113-21.116, and 21.119-21.
Part I. Texas Department of Insurance Page 1 of 85 SUBCHAPTER B. INSURANCE ADVERTISING, CERTAIN TRADE PRACTICES, AND SOLICITATION 28 TAC 21.102-21.104, 21.106-21.109, 21.113-21.116, and 21.119-21.122 1.
SPECIAL REPORT TRAIN INJURY CASE Protect Your Rights: 7 Mistakes That Can Derail Your Train Injury Case
SPECIAL REPORT TRAIN INJURY CASE Protect Your Rights: 7 Mistakes That Can Derail Your Train Injury Case If you are employed in the train industry, you should be aware of what to do should you become injured
MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES
MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES THIS AGREEMENT is made and entered into this day of, 2007, by and between the University of Washington ( Owner ) and, ( Project
RUTGERS THE STATE UNIVERSITY OF NEW JERSEY
RUTGERS THE STATE UNIVERSITY OF NEW JERSEY RUTGERS BIOMEDICAL HEALTH SCIENCES PROFESSIONAL LIABILITY PROGRAM OF SELF-INSURANCE Blanket Information Policy Statement for University: Physicians Surgeons Dentists
Background Check Laws: District of Columbia Scott J. Wenner and Joleen Okun, Schnader Harrison Segal & Lewis LLP
Background Check Laws: District of Columbia Scott J. Wenner and Joleen Okun, Schnader Harrison Segal & Lewis LLP This Article is published by Practical Law Company on its PLC Law Department web service
REQUEST FOR QUALIFICATIONS PROFESSIONAL ARCHITECTURAL SERVICES
City of McHenry REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL ARCHITECTURAL SERVICES FOR THE City of McHenry Aquatics and Recreation Center Page 1 REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL ARCHITECTURAL
CHBA Briefing Note on Liability in the Residential Building Industry
CHBA Briefing Note on Liability in the Residential Building Industry Introduction Objectives The objective of this report is to present some recent developments in Canada on the topic of liability in the
Prepared By: Page 1 of 9 Michael Carabash. One-Sided Settlement and Release Agreements
Prepared By: Page 1 of 9 Michael Carabash One-Sided Settlement and Release Agreements DISCLAIMER: Please note that the information provided in this DL Guide is NOT legal advice and is provided for educational
Insurance Coverage In Consumer Class Actions
This article first appeared in the October 2010 issue of The Corporate Counselor. Insurance Coverage In Consumer Class Actions John W. McGuinness and Justin F. Lavella The business world is an increasingly
WORKER S COMPENSATION OR NOT-THAT S THE QUESTION.
WORKER S COMPENSATION OR NOT-THAT S THE QUESTION. Attorney Reed Noble has successfully handled Workers Compensation cases for clients since 1982. The North Carolina Worker's Compensation Act is designed
REQUEST FOR PROPOSAL OFFICE OF THE NEVADA ATTORNEY GENERAL GRANTEE- FORECLOSURE RELIEF PROGRAM MAY 20, 2011
REQUEST FOR PROPOSAL OFFICE OF THE NEVADA ATTORNEY GENERAL GRANTEE- FORECLOSURE RELIEF PROGRAM MAY 20, 2011 SCOPE OF WORK: The Office of the Attorney General (AGO) recently received a settlement from Wells
Best practice guidelines are not ethics, per se, but do recommend practice standards that professional counselors should strive to uphold.
Ethical and Legal Issues in Counseling Ethical Standards and Laws Each professional counselor has an enormous responsibility to uphold the public trust and must seek high levels of training, education,
PHI Air Medical, L.L.C. Compliance Plan
Page No. 1 of 13 Introduction: The PHI Air Medical, L.L.C. is to be used by employees, contractors and vendors to get a high level understanding of the key regulatory requirements relating to our participation
South Dakota Parental Rights and Procedural Safeguards
South Dakota Parental Rights and Procedural Safeguards Special Education Programs Revised July 2011 Prior Written Notice... 1 Definition of Parental Consent... 3 Definition of a Parent... 3 Parental Consent...
WORKERS COMPENSATION & YOUR RIGHTS
WORKERS COMPENSATION & YOUR RIGHTS 655 Florida Grove Road Mailing Address P.O. Box 760 Woodbridge, NJ 07095 (732) 324-7600 GILL & CHAMAS Raymond A. Gill, Jr.* Peter Chamas* James Pagliuca Michael J. Hanus
FDU - Records Retention policy Final.docx
Records and Information Management Program Policy and Procedure Responsible Office Office of the General Counsel Effective Date 04/01/2012 Responsible Official General Counsel Last Revision I. Rationale
Obtaining Indemnity Through Effective Tender Letters
Page 1 of 5 Portfolio Media. Inc. 648 Broadway, Suite 200 New York, NY 10012 www.law360.com Phone: +1 212 537 6331 Fax: +1 212 537 6371 [email protected] Obtaining Indemnity Through Effective
How To Use Etechglobal Online Store
5204 S. Sand Cherry Circle, Sioux Falls SD 57108 www.etechglobal.com Phone: (605) 339-4529 Merchant Service and Licensing Agreement AGREEMENT The EtechGlobal Online Store service ("EtechGlobal Online Store"
DOCUMENT RETENTION STRATEGIES FOR HEALTHCARE ORGANIZATIONS
Overview. DOCUMENT RETENTION STRATEGIES FOR HEALTHCARE ORGANIZATIONS A comprehensive and consistently applied document retention policy is necessary to reduce the risk of being charged with spoliation
Disclaimer: Template Business Associate Agreement (45 C.F.R. 164.308)
HIPAA Business Associate Agreement Sample Notice Disclaimer: Template Business Associate Agreement (45 C.F.R. 164.308) The information provided in this document does not constitute, and is no substitute
South Australia LAW REFORM (CONTRIBUTORY NEGLIGENCE AND APPORTIONMENT OF LIABILITY) ACT 2001
South Australia LAW REFORM (CONTRIBUTORY NEGLIGENCE AND APPORTIONMENT OF LIABILITY) ACT 2001 An Act to reform the law relating to contributory negligence and the apportionment of liability; to amend the
A Litigator s View of the Special Employer Doctrine
A Litigator s View of the Special Employer Doctrine By: Richard M. Williams, Esq. Published By: Employee Benefit Plan Review July 2013 INTRODUCTION It is a well-established principle of common law that
Information Security Plan effective March 1, 2010
Information Security Plan effective March 1, 2010 Section Coverage pages I. Objective 1 II. Purpose 1 III. Action Plans 1 IV. Action Steps 1-5 Internal threats 3 External threats 3-4 Addenda A. Document
Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company
Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company by KEVIN R. CARLIN, ESQ. Roadmap Key Points to Take From This Presentation: Type I, Type II &Type III indemnity How to identify
IMPORTANT! - Please use the attached Application for Payment. All payment requests must be submitted on our form. Thank you!
` SUBCONTRACTOR: PHONE PROJECT: LOCATION: Page 1 of 6 SUBCONTRACT (SHORT FORM) JOB NO.: COST CODE: PRICE: This agreement is made and effective, by and between SUN CONSTRUCTION & FACILITY SERVICES, INC.
a. Employees of the Department of Human Services in their individual capacity at the time of an occurrence covered hereinafter.
1 of 5 1. Background: By virtue of the authority delegated to the Department of Administrative Services (DOAS), a Self Insurance Program to provide Broad Form State Employee Liability Coverage has been
Quality Management Plan Procedure
Quality Management Plan Procedure Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Quality Management Plan Overview... 1 Introduction... 1 Objectives...
POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008
SOCIETY OF FIRE PROTECTION ENGINEERS (SFPE) NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS (NSPE) NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES (NICET) POSITION STATEMENT THE ENGINEER AND
RISK ENGINEERING TECHNICAL GUIDE
Introduction To meet the needs of many of our Producers or Agents who have developed a clientele of well performing general contractors, Crum & Forster s Claims, Risk Engineering and Underwriting Departments
AMERICAN INSTITUTES FOR RESEARCH OPEN SOURCE SOFTWARE LICENSE
AMERICAN INSTITUTES FOR RESEARCH OPEN SOURCE SOFTWARE LICENSE 1. DEFINITIONS. 1.1. "Contributor" means each individual or entity that creates or contributes to the creation of Modifications. 1.2. "Contributor
LOUISIANA PERSONAL INJURY ACCIDENT BASICS
LOUISIANA PERSONAL INJURY ACCIDENT BASICS The Concept of Negligence If you have been injured, only an experienced Louisiana personal injury accident attorney can evaluate the unique facts and circumstances
THIS IS A SAMPLE CONTRACT FORM ONLY. THE ACTUAL CONTRACT MAY OR MAY NOT CONTAIN THE PROVISIONS HEREIN, DEPENDING ON THE SCOPE OF WORK.
CONSULTANT CONTRACT Resolution No. - STATE OF TEXAS COUNTY OF DALLAS THIS CONTRACT is made and entered into by and between the CITY OF DALLAS, a Texas municipal corporation, of Dallas County, Texas, (hereinafter
Chapter One: Understanding Your Business Risks...1 Five Strategies for Managing Your Risks...2
Contents Introduction Part I: Managing Your Business Risks Chapter One: Understanding Your Business Risks.......................1 Five Strategies for Managing Your Risks..............................2
Request for Proposal for Landscape Architect RFP #2014-08
Request for Proposal for Landscape Architect RFP #2014-08 The Corporation of the Township of Cramahe 1 Toronto Street, P.O. Box 357 Colborne, Ontario K0K 1S0 The Corporation of the Township of Cramahe
CALIFORNIA DEPARTMENT OF TRANSPORTATION CONTRACTOR LIABILITY INSURANCE
CALIFORNIA DEPARTMENT OF TRANSPORTATION CONTRACTOR LIABILITY INSURANCE The following are excerpts from Caltrans 2010Standard Specifications. Specifications are subject to change so refer to the project
Question: Would it be ethical for Engineer A to sign off on the change order?
Pg. 1 1 Engineering Judgment Overruled Faulty Workmanship Facts: Engineer A works for the State X Department of Transportation and is the in-house project manager on a construction project being performed
How To Understand A Software License Agreement
SOFTWARE LICENSE AGREEMENTS A PRACTICAL GUIDE By Bradley J. Freedman SOFTWARE LICENSE AGREEMENTS A PRACTICAL GUIDE By Bradley J. Freedman Table of Contents Introduction...1 The Software License...2 Software
ELECTRONIC INDEPENDENT CONTRACTOR AGREEMENT INTRODUCTION
INTRODUCTION This is an AGREEMENT between you and Field Solutions, LLC ( Field Solutions ) that defines the terms and conditions for Field Solutions to engage you to provide services to our customers as
Table of Contents. 1. What should I do when the other driver s insurance company contacts me?... 1
Table of Contents 1. What should I do when the other driver s insurance company contacts me?... 1 2. Who should be paying my medical bills from a car accident injury?... 2 3. What should I do after the
STANDARD CONTINGENT FEE REPRESENTATION AGREEMENT FOR INDIVIDUALS
Notice: This Agreement is not valid unless signed and accepted by an officer of The Feldman Law Firm, P.C., who will make the sole decision whether to accept your case. This Agreement may be digitally
LIQUOR LIABILITY COVERAGE FORM
COMMERCIAL GENERAL LIABILITY CG 00 34 12 07 LIQUOR LIABILITY COVERAGE FORM THIS FORM PROVIDES CLAIMS-MADE COVERAGE. PLEASE READ THE ENTIRE FORM CAREFULLY. Various provisions in this policy restrict coverage.
Pennsylvania Bar Association Legal. Ethics and Professional Responsibility. Formal Opinion 99-120. Retention of Client Files
Pennsylvania Bar Association Legal Ethics and Professional Responsibility Formal Opinion 99-120 Retention of Client Files The Pennsylvania Bar Association Committee-on Legal Ethics and Professional Responsibility
Quality Management. Retention of Project Documentation. Guidelines. Association of Professional Engineers and Geoscientists of British Columbia
Association of Professional Engineers and Geoscientists of British Columbia Quality Management Guidelines Retention of Project Documentation Questions regarding the APEGBC Quality Management Guidelines
Risk Transfer: A Strategy to Help Protect Your Business. Risk Control
Risk Transfer: A Strategy to Help Protect Your Business Risk Control Businesses rely on crucial relationships with contractors, subcontractors, vendors and consumers. In these relationships, agreements
Professional Negligence
1239272 - BCIT 1 Professional Negligence Jeremy T. Lovell Bull, Housser & Tupper LLP 1239272 - BCIT 2 Overview Professional negligence law in context Negligence law in general Duty of care Standard of
Swarthmore College Financial Risk Management Team
Index: Overview Page 1 Definitions Pages 2-4 Responsibilities Page 5 Sample Clause Language Pages 6-9 Contract Review Checklist Pages 10-12 Contract Guideline Statement Revised: May, 2013 Contracts entered
INDEPENDENT CONTRACTOR AGREEMENT
INDEPENDENT CONTRACTOR AGREEMENT This Independent Contractor Agreement (this Agreement ) is made and entered into as of, 20, by and between [INSERT NAME OF CONTRACTING PARTY] (the Contracting Party ),
Request for Proposals WEB-BASED GRANT MANAGEMENT SOFTWARE FOR THE CITY OF MOUNTAIN VIEW S CDBG AND HOME PROGRAMS
COMMUNITY DEVELOPMENT DEPARTMENT NEIGHBORHOOD PRESERVATION DIVISION 500 Castro Street Post Office Box 7540 Mountain View, California 94039 7540 650 903 6379 FAX 650 962 8502 Request for Proposals WEB-BASED
NEW MEXICO SELF-INSURERS' FUND WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY PLAN
NEW MEXICO SELF-INSURERS' FUND WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY PLAN In return for the payment of the premium and subject to all terms of this Policy, we agree with you as follows. GENERAL
Clinical Trial Compensation Guidelines
Clinical Trial Compensation Guidelines Preface These guidelines contain two distinct sections: Phase I Clinical Trials Compensation Guidelines Phases II, III and IV Clinical Trials Compensation Guidelines
CLAIMS AGAINST TRANSLATORS: THE TRILOGY OF PREVENTION, HANDLING AND RESOLUTION PART ONE: PREVENTION AND MITIGATION
CLAIMS AGAINST TRANSLATORS: THE TRILOGY OF PREVENTION, HANDLING AND RESOLUTION PART ONE: PREVENTION AND MITIGATION Martin M. Ween, Esq. Partner Wilson, Elser, Moskowitz, Edelman & Dicker, LLP 150 E. 42