A Generic Bed Planning Model

Size: px
Start display at page:

Download "A Generic Bed Planning Model"

Transcription

1 A Generic Bed Planning Model by Tian Mu Liu A thesis submitted in conformity with the requirements for the degree of Master of Applied Science Graduate Department of Mechanical and Industrial Engineering University of Toronto Copyright by Tian Mu Liu 2012

2 A Generic Bed Planning Model Tian Mu Liu Master of Applied Science Graduate Department of Mechanical and Industrial Engineering University of Toronto 2012 Abstract In April 2008, the Ontario government announced its top two healthcare priorities for the next 4 years, one of which is reducing wait time in emergency rooms. To study the wait time in emergency rooms or any other departments in a hospital, one must investigate resource planning, scheduling, and utilization within the hospital. This thesis provides hospitals with a set of simulation and optimization tools to help identify areas of improvement, particularly when there are a number of alternatives under consideration. A simulation tool (a Monte Carlo simulation model) estimates patient demand for beds in a hospital during a typical week. Two optimization tools (an integer programming mathematical model and a heuristics model) demonstrate opportunities for smoothing the patient demand for beds by adjusting the operating room schedule. Page ii

3 Acknowledgements I would like to thank Dr. Michael Carter, my thesis supervisor, for his patience, guidance and insight during my time as a master s student. I would also like to thank the members of my lab at the Centre for Research in Healthcare Engineering, particularly Daphne Sniekers for her insights on data interpretation from hospitals, as well as Matthew Nelson for his suggestions on the usability and applicability of the simulation model. I further acknowledge the members of PricewaterhouseCoopers, particularly Robert Varga and Laura Van de Bogart, for their assistance in coordinating hospital data requests and meetings in the early stage of this research and for their assistance along the way. In addition, I would like to thank all the representatives from the participating hospitals: William Osler Health System, Hamilton Health Sciences, and Regina General Hospital for sharing their knowledge and for their time. Page iii

4 Table of Contents 1 Introduction Background and Problem Analysis Bed Management Operating Room Scheduling Research Objectives Literature Review Stochastic Models for Bed Capacity Planning Simulation Models Discrete Event Simulation vs. Monte Carlo Simulation Operating Room Scheduling Bed Planning Model Model Design Input Data Simulation Design Process 1: Define Patient Groups Process 2: Create Patient Arrival Distribution for Each Shift of the Week and Each Patient Group Process 3: Generate n Patient Arrivals for Patient Group k at Shift j Process 4: Calculate Number of Inpatients for Current and Subsequent Shifts Process 5: Calculate Mean and Standard Deviation of Patient Demand for Beds for Each Patient Group at Each Shift Model Output Model Validation Bed Capacity Planning Scenario Planning Case Study 1: Benchmark against CIHI Expected Patient LOS Case Study 2: Revising Operating Room Schedule Optimizing the Operating Room Schedule Input Parameters Mixed Integer Programming (MIP) Approach Opt Heuristic Approach Page iv

5 6.4 Numerical Experiments Application Conclusion Future Research...47 Bibliography...48 A Bed Planning Model Outputs...53 B AMPL Code for MIP Model...58 C Numerical Experiments...60 D Graphical User Interface...62 Page v

6 List of Figures 4.1: Sample inpatient admission data : Sample actual surgical service data : Sample operating room schedule : Simulation design : Expected patient demand for beds at acute wards : Bed capacity by target occupancy level for acute wards : Bed capacity by probability of bed blocking for acute wards : Expected acute and ALC patient demand for beds based on the sample operating room schedule : The expected PDB based on the original and the revised operating room schedule : Experimental results for MIP and 2-opt approach : Decrease in patient demand for beds from each step in 2-opt heuristic...41 D.1: Main graphic user interface...62 D.2: Simulation interface for emergent/urgent inpatients...64 D.3: Simulation interface for patient demand for beds...65 D.4: Simulation interface for revising operating room schedule...66 Page vi

7 List of Tables 4.1: Average of expected patient demand for beds for a typical week, by patientday analysis and by simulation : Average of the expected PDB calculated based on actual and CIHI LOS : A sample original operating room schedule : Revised operating room schedule after 3 swaps : A sample original operating room schedule : A sample of expected PDB and surgeon assigned to each block : A sample of operating room restriction for each block : Optimal operating room schedule from MIP : Near-optimal operating room schedule from 2-opt heuristic : Top five swaps for the first step in 2-opt heuristic...42 A.1: Patient demand for beds at emergency department...54 A.2: Patient demand for beds at special-care unit...55 A.3: Patient demand for beds at acute wards...56 A.4: Patient demand for beds at alternative-level-of-care...57 C.1: Expected demand for beds and surgeon assigned to each block...60 C.2: Operating room restriction for each block...61 Page vii

8 Chapter 1 Introduction Emergency department overcrowding has been a longstanding problem in Ontario [1]. In many cases, overcrowding is due to lack of beds in the downstream departments, such as acute wards and the lack of beds generally occurs at peaks in patient demand for beds. Hospital administrators often respond to peaks in demand by opening extra beds. But with growing demand for healthcare resources, pressure on efficient usage of available bed capacity is increasing. Peaks in bed demand are due to variability in admissions and lengths-of-stay. The particular area with which this thesis is concerned is variability in elective admissions. It can be reduced by creating a balanced operating room schedule, which levels the patient demand for beds throughout a week. With a balanced schedule, peak traffic is leveled across the week, hence, reducing overcrowding without turning away any patients or increasing bed capacity. For these reasons, we build a set of simulation and optimization tools to estimate patient demand for beds in a hospital during a typical week. And then, we demonstrate opportunities for smoothing the expected patient demand for beds by adjusting the operating room schedule while preserving the equipment and staff restrictions. The remainder of the thesis is organized as follows. We start by giving a detailed description of the problem and an overview of the necessary background information to understand this problem in Chapter 2. In Chapter 3, we review the relevant literature in four areas: (1) Page 1

9 stochastic models for bed capacity planning; (2) application and development of simulation models; (3) differences between discrete event simulation and Monte Carlo simulation; and (4) scheduling techniques that have been used in the operating room setting. We believe that Monte Carlo simulation is a fast and easy approach for bed capacity planning. In Chapter 4, 5 and 6, we detail both the high-level and specific designs of our simulation and optimization tools. We conclude with Chapter 7 where we discuss the contribution of this paper and describe the main practical insight that can be derived. Page 2

10 Chapter 2 Background and Problem Analysis The Canadian healthcare system is funded through a combination of premiums and taxes, which varies from province to province [3]. For example, each province has its own insurance program, which acts as a single source payor for both hospital and physician services. The insurance programs fund hospitals in advance and pay physicians for the services they provide. The difference in funding methods for hospitals and physicians is designed to promote cost containment while protecting the physician-patient relationship [4]. In the physician-patient relationship, the physician acts the patient s agent, to determine the treatment that is best for the patient [5]. Health Canada, a federal department, publishes surveys of the healthcare system in Canada based on Canadians' first-hand experiences of the healthcare system. Although lifethreatening cases are dealt with immediately, some services are non-urgent and patients are seen at the next-available appointment in their local chosen facility [8]. A study by the Commonwealth Fund found that 57% of Canadians reported waiting 30 days (4 weeks) or more to see a specialist [9]. In April 2008, the Ontario government announced its top two healthcare priorities for the next four years: reducing wait time in emergency rooms and improving access to family health care [10]. To study wait times in emergency rooms or any other departments in a hospital, one should consider resource planning, scheduling, and utilization within the hospital. Page 3

11 2.1 Bed Management Bed management is the allocation and provision of beds. Beds in specialist wards are a scarce resource [11]. The bed in this context represents not simply a place for the patient to sleep, but the services that go with being cared for by the medical facility, such as admission processing, physician time, nursing care, necessary diagnostic work, appropriate treatment, and so forth. It includes all the resources (e.g., physicians, nurses, medical equipments and supplies) that are needed to provide care for the patients. As such, bed management is an essential part of resource planning in a hospital. Hospitals cannot force a patient to leave if they cannot find a place to provide safe and sufficient care. Beds may be unavailable for new, acutely sick patients because of the continued presence of the previous patients. This shortage of beds is sometimes known as a bed blocking. It is one of the primary reasons for cancellations of admissions for planned (elective) surgery, admission to inappropriate wards (medical vs. surgical, male vs. female, etc), delay in admitting emergency patients (long wait time at emergency department), and transfers of patients between wards [12]. Hospital capacity decisions have traditionally been made, both at the government and institutional levels, based on target occupancy levels the average percentage of occupied beds. The number of beds needed at a hospital can be calculated from expected patient demand for beds and target occupancy level, such that number of beds needed is equal to expected demand divided by target occupancy level. The most commonly used occupancy target has been 85% [13]. Lower occupancy levels are often viewed as indicative of operational inefficiency. Higher occupancy levels, on the other hand, result in a higher chance of bed blocking. Page 4

12 Even though this bed capacity planning method is popular at the government and institutional levels, it has many problems. Garling noted that this 85% target occupancy level is based on a theoretical stochastic model derived from a highly simplified view of the dynamics of queues, which ignores a variety of dynamic behavioral responses to work pressure in the real world [14]. Goronescu et al exemplified a better approach to determining the number of beds that a hospital unit should have. They showed that the optimal number of beds depends on the relative cost that is incurred when a patient is blocked compared with that of maintaining an empty bed. The optimal utilization at which the unit should be maintained also depends on this relative cost [15]. Hospital executives and government officials need to be aware of the trade-off between utilization and the ability to provide an appropriate bed in a timely fashion. Green introduced factors such as nursing unit sizes, the variability and time-dependent patterns of demands for beds, and bed allocation policies to determine appropriate bed capacity [16]. Due to the controversy surrounding target occupancy level analysis, we define the patient demand for beds (PDB) as the standard unit of analysis. Given the value of PDB, hospital managers and researchers can plan for bed capacity with the methods that they prefer. 2.2 Operating Room Scheduling The planning and scheduling of operating room time is known as operating room scheduling. Typically, a multiple stage process is used [17]. Stage 1 starts with the long-term allocation of operating room time to the surgical specialties, such as the number of surgery hours per year. This allocation is a strategic decision that reflects patient demand patterns and the priorities defined by hospital management. In stage 2, the master surgical schedule is Page 5

13 developed from this strategic decision. This is a cyclic operating room schedule for a shorter time horizon, which divides operating room time (aggregated into blocks) amongst the specialties. The specific assignment of patients to blocks with the master surgical schedule is commonly referred to as Stage 3. Stage 4 addresses the monitoring and control of the operating room activities on the day of surgery. 2.3 Research Objectives This thesis provides hospitals with a set of simulation and optimization tools to help identify areas of improvement, particularly when there are a number of alternatives under consideration. The simulation tool (a Monte Carlo simulation model) estimates patient demand for beds in hospital during a typical week. The optimization tools (an integer programming mathematical model and a heuristics model) demonstrate opportunities for smoothing the patient demand for beds by adjusting operating room schedule. Using these quantitative decision support tools, hospital management could reduce the overall cost of healthcare system redesign. Page 6

14 Chapter 3 Literature Review Faced with diminishing government subsidies, competition, and the increasing influence of managed care, hospitals are under enormous pressure to cut costs. In this environment, it is more important than ever for hospital managers to identify ways to deploy their resources more effectively [18]. This chapter presents an overview of the work done on the bed capacity planning problem. It further reviews the use of stochastic modeling and, more specifically, of Monte Carlo simulation. Finally, it details operating room scheduling and gives some insight into scheduling techniques by providing a review of the relevant literature. 3.1 Stochastic Models for Bed Capacity Planning A number of researchers have investigated patient demand and bed capacity planning at a specific department within a hospital. McClain has developed a stochastic model to forecast the allocation of non-obstetric patient-days to the obstetric unit and to predict the effect of such allocations on demand for obstetric beds [19]. Dexter and Macario have modeled the distribution of patients at an obstetrical unit as a Poisson distribution and minimized the number of staffed beds subject to remaining below a specified probability of patient overflow [20]. Harris has developed a simulation model to aid decision making in the area of operating theatre time tables and the resultant hospital bed requirements [21]. Page 7

15 Furthermore, many authors have created models for the entire hospital, while capturing the inherent variability in patient arrival and length-of-stay [22, 23]. They have demonstrated that managing capacities based on simple deterministic spreadsheet calculations typically do not provide the appropriate information, and result in underestimating true bed requirements. However, they ignore the patient demand for beds at each department within a hospital, such as emergency rooms, intensive care units, and acute care units. To calculate the patient demand at each department, Gorunescu et al. and Harrison have used compartment models, in which a facility is subdivided into categories of patients with different transition rates to model patient flow through wards [15, 24]. 3.2 Simulation Models Today s healthcare providers recognize the importance of implementing simulation to support quality learning outcomes [25]. It has been applied to practically every topic in healthcare, such as space considerations, physiology, crisis management, critical care, and general surgery [26]. In comparison to analytical models, more procedural details can be included in a computer simulation model [27, 28]. Linear or nonlinear programming models, queuing models and Markov chains often rely on closed-form mathematical solutions [29]. They are more sensitive to the size, complexity and level-of-detail required by the system under study. Simulation models, on the other hand, are much less sensitive to these parameters [29]. However, simulation may be more difficult to use for several reasons [19]. First, the added complexity of constructing a more realistic model requires considerable institution-specific data that may be costly to collect. Second, computer programming is usually expensive and Page 8

16 time-consuming. Third, forecasts of parameters used in such models are often subject to significant error, which may negate gains in accuracy achieved through simulation. Sinreich and Marmor incorporate three principles to minimize the short-comings of simulation, and to increase management s involvement and confidence in their model [29]: 1. The simulation tool has to be general and flexible enough to model different possible hospital settings. 2. The simulation tool has to be intuitive and simple to use. This way, managers, hospital engineers, and other nonprofessional simulation modelers can run the simulation tool with very little effort. 3. The simulation tool has to include reasonable default values for many of the system parameters. This will reduce the need for comprehensive, costly, and time-consuming time and motion studies, which are usually among the first steps taken when building any simulation model. Sinreich and Marmor satisfy the first principle by testing their model against five hospital data sets. They address the second principle by designing a user-friendly interface that mirrors a unified patient process chart, which managers are familiar with. To comply with the third principle, default values are used in the simulation and can be easily accessed through the model s interface. In this thesis, our approach follows these three principles closely to offset the difficulties of developing simulation models. Page 9

17 3.3 Discrete Event Simulation vs. Monte Carlo Simulation Monte Carlo simulation is a recognized approach in healthcare, but it is not used as extensively as the discrete event simulation [30]. In discrete event simulation, the operation of a system is represented as a chronological sequence of events. Each event occurs at an instant in time and marks a change of state in the system. For example, Zhu has developed a discrete event simulation to reflect the complex patient flow of the ICU system and to determine the proper ICU bed capacity which strikes a balance between service level and cost effectiveness [31]. On the other hand, Monte Carlo simulation samples probability distribution for each system variable to produce hundreds or thousands of possible outcomes. Compared to discrete event simulation, Monte Carlo simulation is much more simplistic, as it does not deal with events or time. It therefore cannot be used to investigate wait time in a system. Since we do not investigate wait time in this thesis, Monte Carlo simulation is a fast and easy approach to achieve our goal. 3.4 Operating Room Scheduling Operating room scheduling has received quite some attention in the literature. One of the early works on operating room scheduling is done by Blake and Donald [7]. They use integer programming to model the nurse manager s schedule development process. The model minimizes the shortfalls from target hours allocated to each department. The solutions are bounded by limits on the number of rooms that can be assigned to any department, equipment restrictions, surgeon availability, assumed patient volumes, and by terms of the nurses collective agreement. The benefit of the model is its ability to produce a relatively Page 10

18 unbiased, equitable schedule through a consistent process, thus reducing conflict both amongst surgeons and between surgeons and the nurse manager. Belien and Demeulemeester [32] use a nonlinear integer programming model to construct master surgical schedules. They try to level the bed usage by finding the best allocation of blocks to surgical disciplines. They view the number of patients admitted on a day and length-of-stay for each operated patient as stochastic variables with a distribution depending on the specialty that used the operating room. Van Oostrum et al. [33] find the optimal master surgical schedule, in which they schedule all regularly performed surgeries on a specific day in the planning cycle. Their objective function is a combination of operating time usage and the maximum number of beds needed on every day. They treat the length-of-stay as deterministic, with the length depending on the type of surgery performed. Vanberkel et al. [34] study the effect of a given surgical schedule on the usage of beds, taking emergency arrivals and different ward types into account as well. However, they do not use an optimization algorithm and only try to improve step-by-step by trial and error. Their approach has been applied in practice with good results [7, 32, 33, 34]. Gallivan and Utley [35] present a generic model for determining the distribution of bed occupation for a given cyclic admission schedule. They give an example of how these results could be used in an optimization context. However, they restrict themselves to a single ward. Denton et al. [36] and Jebali et al. [37] demonstrate mathematical models to allocate surgeries to operating rooms (ORs). The objective of the model is to minimize total cost of operating ORs. However, Denton et al. ignore the upstream (intake) and downstream (recovery) resources required to support surgery, under the assumption that ORs tend to be the bottleneck in the overall process. Also, their model is missing constraints that certain Page 11

19 surgeries cannot be scheduled simultaneously. Bekker and Koeleman [38] combine timedependent analysis with a quadratic programming model to determine admission quota for scheduled admissions and to analyze the impact of variability in scheduled admissions on the required bed capacity. They derive three generic practical insights that apply to almost all hospital situations: 1. Reducing the variation in length-of-stay leads to less variable bed occupancy only for stable arrival processes. 2. Scheduling patients with a longer expected length-of-stay on Fridays can help to minimize unused capacity in the absence of scheduled admissions during weekend. 3. More admissions should be scheduled on Mondays compared to the other days of the week in absence of scheduled admissions during weekend. These approaches [35, 36, 37, 38] provide great insights but fail to demonstrate real life implementation. Page 12

20 Chapter 4 Bed Planning Model This thesis provides hospitals with a set of simulation and optimization tools to help identify process improvements, particularly when there are a number of alternatives under consideration. Developing these tools can be seen as a three-stage process. In the first stage, we build a simulation tool (a Monte Carlo simulation model) to estimate the patient demand for beds in a hospital during a typical week. In the second stage, we apply the model to various real-life scenarios to identify areas of improvement. The third stage involves developing optimization tools (an integer programming mathematical model and a heuristic model) to demonstrate opportunities for smoothing the expected patient demand for beds by adjusting operating room schedule. In this chapter, we describe the design, the assumptions, and the outputs of the Monte Carlo simulation model. We will refer it as the bed planning model. The front end of the model is built using Excel UserForm and the back end coding is done in VBA. 4.1 Model Design The purpose of the bed planning model is to estimate the patient demand for beds in a hospital during a typical week. It is designed with following features: 1. The results of the simulation tool are based on patient traffic in a typical busy week, which means doctors are working full time (omitting vacation) and all licensed/certified beds are open (staffed). Page 13

21 2. Within a week, there are 21 shifts (3 shifts a day for 7 days) in which patients could arrive and stay. Each shift is 8 hours long. The start time of each shift is arbitrary (left for the users to decide), but shifts must directly follow each other (sequential without gaps). We define the first shift of the day as the night shift, which is followed by the day shift, and finally the evening shift. We also assume elective surgeries start in the day shift. 3. The patient demand for beds (PDB) in a shift equals the number of inpatients in that shift. To calculate number of inpatients, we assume all patients depart and arrive at the beginning of the shift. Since a bed is available if a patient leaves mid-shift, we do not count this patient as an inpatient in his/her last shift. When patients arrive in the middle of a shift, we assume they enter at the beginning. 4. The PDB is separated into departments in a hospital, such as PDB in the emergency room, the ICU, the acute ward, the ALC, etc. The simulation model must allow the users to define the number of departments in the hospital and the role of each department. 5. The PDB in each department is also separated into patient groups. Patient groups are classified by user defined patient categories. For example, users can classify patient groups by hospital programs (surgical procedure or medical procedure), by specialties (cardiology, oncology, etc.), or even by both hospital programs and specialties (surgical cardiology, medical cardiology, surgical oncology, medical oncology, etc). 6. A distinction is made between emergent/urgent patients and elective patients. Elective patient arrivals depend on the operating room schedule, while emergent/urgent patient Page 14

22 arrivals are based on emergency department arrival patterns. The simulation model must account for this while generating patient arrivals. 7. Patient arrivals are randomly generated from patient arrival distributions. Patient arrival distributions are constructed from patient historical records. 8. Due to the stochastic nature of simulation, PDB is a random variable. The simulation model needs to run multiple trials to estimate the mean and the variability of PDB. 4.2 Input Data To simulate emergent/urgent PDB, inpatient admission data is required. It includes admission time, length-of-stay (LOS) at each department, and service and patient categories for at least six months. However, to simulate elective PDB, three sets of input data are needed: 1. Inpatient admission data (admission time, surgeon, LOS at each department in the order of the visit) with service and patient categories for at least six months 2. Actual surgical service data (surgery date, surgery duration, main surgeon, patient type) for the same time period as the inpatient admission data 3. A typical operating room schedule A sample of inpatient admission data is shown in Figure 4.1. Admission time should include both date and time for the model to identify the shift in which the patients were admitted. LOS is measured in hours. Some examples of patient categories are service received, admission method (elective or emergent/urgent) and ward name. Doctors can be represented by names or identification numbers to protect their identity. Page 15

23 Figure 4.1: Sample inpatient admission data A sample of actual surgical service data is shown in Figure 4.2. Because the model assumes elective patients arrive during the day shift, only the date of surgery is required as the model no longer needs the time stamp to determine the shift in which the patients were admitted. Surgery duration is measured in minutes. Surgeon name must be in the same format as inpatient admission data. Since same day surgery does not result in bed use, the model needs patient type information to distinguish between same day surgery and inpatient surgery. We do not remove same day surgery from actual surgical service data because they are used to determine if a surgeon is given a full day operation or a half day operation. Figure 4.2: Sample actual surgical service data Page 16

24 A typical operating room schedule is shown in Figure 4.3. The first row of the table represents the ID of the operating room. Surgeon name must be in the same format as inpatient admission data. If a surgeon is assigned to both morning and afternoon operation at the same day of the week in an operating room, he/she is given a full day operation. Figure 4.3: Sample operating room schedule 4.3 Simulation Design The bed planning model simulates patient arrivals and patient stays in a hospital, as shown in Figure 4.4. We describe the detailed design of each numbered process Process 1: Define Patient Groups Patient groups are classified by arbitrary patient categories. For example, users can classify patient groups by hospital programs (surgical procedure or medical procedure), by specialties (cardiology, oncology, etc.), or even by both hospital programs and specialties (surgical cardiology, medical cardiology, surgical oncology, medical oncology, etc). Surgical Page 17

25 information, such as assigned operating room and the main surgeon should also be used to further classify elective patients. Start Simulation Design 1 Define patient groups 2 Create arrival distribution for each shift of the week and each patient group i = 1 i = i +1 Begin trial i j = 1 j = j +1 For shift j no k = 1 k = k +1 no 3 Generate n patient arrivals for patient group k at shift j no 4 Calculate number of inpatients for current and subsequent shifts Done all groups? yes Done all shifts? yes Done all trials? yes 5 Calculate mean and standard deviation of patient demand for each patient group at each shift of the week End Figure 4.4: Simulation design Page 18

26 4.3.2 Process 2: Create Patient Arrival Distribution for Each Shift of the Week and Each Patient Group Three sets of data are required to generate the arrival distribution of emergent/urgent patients and elective patients, described in the previous section. A distinction is made between emergent/urgent patients and elective patients. For emergent/urgent patients, we create an arrival distribution for each combination of patient group and arrival shift. For elective patients, we create an arrival distribution for each surgeon. Note that, within a week, there are 21 shifts (3 shifts a day for 7 days) in which patients could arrive and stay. Each shift is 8 hours long. The start time of each shift is arbitrary (left for the users to decide), but shifts must directly follow each other (sequential without gaps). We define the first shift of the day as the night shift, which is followed by the day shift, and finally the evening shift. To generate an emergent/urgent patient arrival distribution for each combination of patient group and arrival shift, the model separates inpatient admission data by patient group and arrival shift. Then, for each portion of the data, the model creates a frequency table for number of patient arrivals. The frequency is the number of times that the given number of patient arrivals has happened on the same shift. Finally, from each frequency table, the model normalizes and creates an empirical distribution for the number of patient arrivals. For example, there are 27 stroke patient arrivals on Monday day shift for the past 32 weeks. From these records, the model finds 1 occurrence of 3 stroke patient arrivals on the same shift, 5 occurrences of 2 arrivals, 14 occurrences of 1 arrival and 12 occurrences of no arrivals. Finally, the model creates an empirical arrival distribution for stroke patients on Monday day shift, such that, probability of no arrivals is 12/32 or 37.5%, probability of 1 arrival is 14/32 Page 19

27 or 43.75%, probability of 2 arrivals is 5/32 or %, and probability of 3 arrivals is 1/32 or 3.125%. To generate the elective patient arrival distribution for each surgeon, the model divides actual surgical service data by surgeon. Then, for each portion of the data, the model creates two frequency tables for number of patient arrivals. The first frequency table stores the number of times that a given number of patient arrivals have happened if the surgeon is given a half day operation (morning or afternoon operation). The second table stores the number of times that a given number of patient arrivals have happened if the surgeon is given a full day operation (the surgeon has booked the whole day). Finally, from each frequency table, the model normalizes and creates an empirical distribution for the number of patient arrivals Process 3: Generate n Patient Arrivals for Patient Group k at Shift j To generate emergent/urgent patients, the model uses the emergent/urgent patient arrival distributions that have been generated in process 2 for each combination of patient group and arrival shift. Given the patient arrival distribution for patient group k at shift j, a random number is used to determine number of arrivals. For n number of patient arrivals, n patient records are randomly drawn from the inpatient admission data for patient group k and shift j. To generate elective patients, the model uses elective patient arrival distributions that are generated in process 2 for each surgeon and a typical operating room schedule that consists of blocks that are assigned to a surgeon. A block is described by four parameters: the name of the operating room (room 1, room 2, etc), the day of the week (Monday, Tuesday, etc), the assigned shifts and the assigned surgeon. We assume surgeons do elective surgeries in the day shift (the second shift of the day). For all surgeons who are working in shift j, the model uses the patient arrival distribution for a surgeon and a random number to determine a Page 20

28 number of patients to arrive for that surgeon. If a surgeon generated n patients, then n patient records from his/her portion of inpatient admission data are randomly drawn to represent them. By collecting patients from all surgeons at shift j, the model now has all patient arrivals at shift j, each associated with a patient record Process 4: Calculate Number of Inpatients for Current and Subsequent Shifts From the previous process, the model has a collection of patient arrivals and a real patient record to represent each of them. Since each patient record comes with patient length-of-stay at each department, the model can determine the location of every patient at current and subsequent shifts. It can then calculate the number of inpatients in each department at current and subsequent shifts Process 5: Calculate Mean and Standard Deviation of Patient Demand for Beds for Each Patient Group at Each Shift For each simulation run, there are number of trials. For each trial run, there are number of weeks as a warm up period to reach a steady state system. The number of trials and the length of warm up period are defined by the user. Result collection period is a week (21 shifts), which means only the last week of each simulation trial is used to calculate the number of inpatients in each department at each shift of the week for each patient group. Finally, the model uses results from all of the trials to calculate mean and standard deviation of patient demand for beds (PDB) in each department at each shift of the week for each patient group. Page 21

29 night day evening night day evening night day evening night day evening night day evening night day evening night day evening 4.4 Model Output The bed planning model outputs the mean and the standard deviation of PDB in each department at each shift of a week for each patient group. Tables A.1 A.4 (see Appendix A) show the mean and the standard deviation of PDB in emergency departments, special care units, acute wards and alternative-level-of-care (ALC) units at each shift. The patients are categorized by the main service that they received. The simulation runs for 50 trials/iterations with 20 weeks of warm up period. The night shift (first shift of a day) starts at 9PM and ends at 5AM. The operating room opens 8 hours for operations. These parameters are user defined and should reflect the actual hospital settings. For example, hospitals with long LOS patients should have longer warm up period to reach steady state Sun Mon Tue Wed Thu Fri Sat Figure 4.5: Expected patient demand for beds at acute wards Page 22

30 The model outputs can be represented graphically, as shown in Figure 4.5 for acute wards. The expected (mean) PDB is represented by solid bars. The results are based on historical patient records that are provided by Hamilton Health Sciences. 4.5 Model Validation This section describes the validation of the bed planning model. We validate our approach by applying patient-day analysis on the bed planning model s input data from Hamilton Health Sciences. Patient-day is a unit in a system of accounting used by healthcare facilities and healthcare planners. Each represents a unit of time during which the services of the institution or facility are used by a patient; thus 50 patients in a hospital for 1 day would represent 50 patient-days. In a time period, the average number of patients per day is equal to the total patient-days divided by the total number of days. We calculate the average number of patients per day using patient-day analysis and compare it with the results (average of expected PDB for a typical week) from the bed planning model, shown in Table 4.1. The difference between the averages is insignificant (less than 2%) and hence the bed planning model is valid. Average of Expected PDB Throughout the Week by Patientday Analysis by Bed Planning Model ED SCU acute wards ALC Table 4.1: Average of expected patient demand for beds for a typical week, by patient-day analysis and by simulation Page 23

31 night day evening night day evening night day evening night day evening night day evening night day evening night day evening 4.6 Bed Capacity Planning Hospital bed capacity decisions have traditionally been made based on target occupancy levels the average percentage of occupied beds. Historically, the most commonly used occupancy target has been 85%. Given an occupancy target, bed capacity is equal to expected PDB divided by target occupancy level. We use target occupancy level method to estimate bed capacity for acute wards at Hamilton Health Sciences, shown in Figure 4.6. The average of expected PDB throughout the week is 246. To achieve the standard 85% occupancy level, 290 beds are needed. However, on Thursday day shift, the expected occupancy level is actually 90% based on 261 expected PDB. On Sunday night shift, the expected occupancy level drops to 80% based on 231 expected PDB Sun Mon Tue Wed Thu Fri Sat Expected PDB Bed capacity with 85% occupancy level Figure 4.6: Bed capacity by target occupancy level for acute wards Page 24

32 night day evening night day evening night day evening night day evening night day evening night day evening night day evening We can also estimate bed capacity given an acceptable probability of bed blocking, such as 5%. A 5% chance of bed blocking means that patient demand for beds is satisfied 95% of the time. Given a bed blocking chance of p and N simulation trials, bed capacity must satisfy PDB for at least (1-p)N trials. For example, for a simulation with 50 trials and 5% bed blocking, bed capacity must satisfy PDB for 48 out of 50 trials. In this case, we would set bed capacity equal to the PDB of the 48 th smallest (third largest) trial. We use probability of bed blocking method to estimate bed capacity for acute wards at Hamilton Health Sciences, shown in Figure 4.7. To achieve the maximum of 5% bed blocking for each and every shift of the week, 288 beds are needed. With this method, we do not have to maintain a constant bed capacity throughout the week. For example, Hamilton could reduce its bed capacity to 266 beds on the weekends Sun Mon Tue Wed Thu Fri Sat Expected PDB Bed capacity with 5% chance of bed blocking Figure 4.7: Bed capacity by probability of bed blocking for acute wards Page 25

33 Due to its simplicity in calculation, occupancy target analysis has been a well-known measure for determining bed requirements at the individual hospital and even hospital unit level. On the other hand, probability of bed blocking is one of the indicators of healthcare accessibility. Planning bed capacity based on this probability provides quantifiable measurement of system performance. In this thesis, we define the patient demand for beds (PDB) as the standard unit of analysis. The bed capacity can be easily calculated by either occupancy targets analysis or by the probability of bed blocking method. The users of the bed planning model can decide which method to use, given the PDB from each simulation trial. Page 26

34 Chapter 5 Scenario Planning The purpose of scenario planning is to identify problems in the existing system and to study the effect of various solutions. In this chapter, we evaluate what-if scenarios with the bed planning model to identify areas of improvement in the existing hospital settings. Specifically, we consider scenarios, such as changes in length-of-stay using the CIHI benchmark and revisions in the operating room schedule. 5.1 Case Study 1: Benchmark against CIHI Expected Patient LOS The Canadian Institute for Health Information (CIHI) collects and analyzes information on health and healthcare in Canada and makes it publicly available. The expected (50 percentile) CIHI LOS is the average acute LOS in hospital for patients with the same case mix group, age category, comorbidity level, and intervention factors. In this case study, we will identify the strengths and weaknesses of Hamilton Health Sciences by benchmarking current patient length-of-stay (LOS) against expected patient LOS from CIHI. We categorized patients by the main service they received because it is a major factor in predicting the nursing time that they will need. We ran two separate simulations: one using the actual patient LOS from Hamilton, and the other one uses the expected LOS from CIHI, while all other input data and parameters stay the same. We compared the results from the two simulation runs in Table 5.1. For most of the services, there is no change to PDB. However, the current patient demand for Orthopedics beds is much higher than the demand based on CIHI LOS. Page 27

35 Daily Average of The Expected PDB Across the Week Service Received based on actual LOS based on CIHI LOS GI Surgery 2 3 Medicine Surgery GI Medicine 6 6 Oncology Hematology Orthopedics Orthopedic Oncology 2 2 Vascular Medicine Gynecology Oncology 0 0 Total Table 5.1: Average of the expected PDB calculated based on actual and CIHI LOS Further investigation has shown that, on average, 13 out of the 53 Orthopedics patients (or 25%) require alternative-level-of-care (ALC). ALC patients, those who have healthcare needs that could be better addressed in other settings, are staying in acute care hospitals for prolonged and often excessive periods of time; the largest proportion of ALC days is for those waiting for long-term care homes placement [39]. By placing ALC patients in less costly long-term care homes, ALC days in acute care facilities would be reduced. We recommend Hamilton to work with its Local Health Integration Network to reduce the number of ALC patients. 5.2 Case Study 2: Revising Operating Room Schedule One of the most expensive resources in a hospital is the operating room department. Since the majority of elective admissions involve surgery [40], optimal utilization of operating room capacity is of paramount importance. Most surgeries are scheduled during weekdays plus a few emergencies on evenings and weekends. In the absence of elective admissions Page 28

36 during the weekend, elective PDB usually peaks on Thursday and Friday. Shifting the PDB to earlier days in the week would lower the peak and reduce the number of beds needed without changing patient volume. When the peak exceeds the actual bed capacity, reducing the peak also reduces cancellations of elective surgeries, which is a major cause of inefficient use of operating room time and a waste of recourses [41]. In this case study, we level the expected PDB throughout a week by modifying the operating room schedule. We revise the operating schedule by assigning blocks to different operating rooms and days of the week. A sample operating room schedule from Hamilton Health Sciences is shown in Table 5.2. Each block is given a full day shift. The blocks on Sunday and Saturday are empty because there are no elective patient admissions during the weekend. The surgeon names are represented by their identification numbers to protect their identity Sunday Monday Tuesday Wednesday Thursday Friday Saturday Table 5.2: A sample original operating room schedule The PDB based on this sample operating room schedule is shown in Figure 5.1, which shows how PDB fluctuates over the course of a week. The expected acute and ALC PDB varies from 48 on the Monday night shift to 81 on the Friday day shift. However, Hamilton only had 70 budgeted surgical beds at the time. This fluctuation in the PDB leads to bed blocking of surgical wards on Wednesday to Saturday. The excess demand for beds is soaked up by medical wards if possible. Otherwise, some elective surgeries are cancelled. Page 29

37 night day evening night day evening night day evening night day evening night day evening night day evening night day evening Sun Mon Tue Wed Thu Fri Sat Expect PDB Number of budgetted surgical beds Figure 5.1: Expected acute and ALC patient demand for beds based on the sample operating room schedule We felt that by revising operating room schedule to shift elective PDB to earlier days of the week, we could reduce the variation in PDB. To illustrate, we revised the sample operating room schedule manually (trial-and-error) by reassigning six blocks, as shown in Table 5.3. We will discuss ways to revise the sample operating room schedule automatically in the next chapter. We assume the lengths-of-stay of all patients remains the same after the blocks are reassigned. There are rules that must be followed when revising the operating room schedule: 1. One block per day of the week per operating room 2. Two blocks with same surgeon cannot be assigned to the same day of the week Page 30

38 3. Surgeons cannot be assigned to the weekend Sunday Monday Tuesday Wednesday Thursday Friday Saturday Table 5.3: Revised operating room schedule after 3 swaps With the revised operating room schedule, we compared the expected PDB between the original and revised operating room schedule, as shown in Figure 5.2. Only the demand during the day shift is shown because it is generally much higher than the other shifts of the day, and we are only interested in the peak number of beds when planning for bed capacity. In Figure 5.2, the expected PDB includes SCU, acute and ALC patients. From Figure 5.2, the peak of the expected PDB has decreased from 88.5 to The revised schedule has therefore freed 3 beds. The results are promising but there are many problems with revising the operating room schedule manually. First of all, it is time-consuming due to the large number of possible permutations of blocks. If we save time by not iterating through all possible permutations, then we may miss good answers. Furthermore, surgeons have individual preferences on which day of the week they can work. This will result in back-and-forth negotiations between surgeons and the nurse manager that is even more time-consuming and may lead to conflict among staff. Page 31

39 Expected patient demand for beds Sun Mon Tue Wed Thu Fri Sat Weekday day shift orginal operating schedule revised operating schedule Figure 5.2: The expected PDB based on the original and the revised operating room schedule In spite of these challenges, we believe Hamilton can revise its operating room schedule, because more elective services could be provided with a more balanced schedule. However, we need a better process to improve the schedule. We address this issue in the next chapter, where we develop optimization models to automatically generate optimal and near-optimal operating room schedules. Page 32

40 Chapter 6 Optimizing the Operating Room Schedule The purpose of this chapter is to propose and compare optimization models for building operating room schedules. We aim to level the patient demand for beds (PDB) throughout a typical week. The optimization models take results from the bed planning model in Chapter 5 as input parameters. We assume the length-of-stay of all patients remain the same after the blocks are reassigned. This assumption might not be true as there are more patient discharges on Friday and fewer on weekend. We keep this assumption for simplicity. 6.1 Input Parameters Our first input parameter is the expected PDB on each day of the week by each block. The second parameter is surgeon information. In order to prevent assigning two blocks with the same surgeon to the same day of the week, the models also need to know the surgeon that each block is assigned to. The third parameter is a list of infeasible days of the week for each block. This parameter adds flexibility to the model in order to deal with surgeons who are not available on certain days of the week. Page 33

41 Sometimes, a surgery cannot be performed in a certain operating room due to specialty equipment or room size restriction. The fourth parameter represents operating room availability for each block. 6.2 Mixed Integer Programming (MIP) Approach The following set notation is used in the mathematical model: i operating room block (i = 1, 2,, I = number of blocks) j the day of the week (j = 1 for Sunday, 2 for Monday,, 7 for Saturday) k operation room (k = 1, 2,, K = number of operations rooms) t days relative to the surgery date (t = -7, -6,, 0,, 6) m surgeon (m = 1, 2,, M = number of surgeons) The following parameter notation is used in the mathematical model: D it S im B ij R ik the expected PDB for block i at the day t starting from the surgery date for convenience, D i(t-7) = D it for t = 0, 1,, 6 1 when block i is performed by surgeon m, 0 otherwise 1 when block i can be assigned to day j, 0 otherwise 1 when block i can be assigned to operating room k, 0 otherwise Then, X ijk can be defined as a decision variable representing whether or not block i is assigned to day j in operating room k. X ijk = 1 if block i is at day j in operating room k, otherwise 0. Define Y ij to be a decision variable representing whether or not block i is assigned to day j. Y ij = 1 if block i is located at day j, otherwise 0. Thus, Define F ij to be the expected patient demand for beds from block i on day j. Page 34

42 To generalize, Define Z to be the peak expected PDB throughout the week. Then, We define the mixed integer programming portion of the problem of allocating blocks as follows: subject to Page 35

43 In the above model, constraints (1) and (2) calculate dummy variables Y ij and F ij respectively. Since Z is minimized in the objective function, constraint (3) is sufficient to calculate Z (the peak expected PDB throughout the week) by restricting it to greater than or equal to the PDB of each day of the week. Constraint (4) is designed to ensure that there is a max of one block per day of the week per operating room. Constraint (5) is designed to ensure that each block is assigned. Constraint (6) restricts blocks to the days of the week that are available to them. This constraint allows surgeons to resolve conflicts with surgery times, if necessary. Constraint (7) ensures that blocks with the same surgeon cannot be assigned to the same day of the week. Constraint (8) is an arbitrary bound on which day of the week a block can be assigned to. In our model, we limit our blocks to weekdays (Monday to Friday). Constraint (9) restricts blocks to operating rooms that are available to them, such as rooms that have the equipment needed for the surgery or rooms that are large enough for the procedure. Constraints (10) and (11) are binary constraints on model variables X ijk and Y ij. When run, this model provides the allocation of blocks to an operating room schedule that minimizes the peak expected PDB throughout a typical week. The model s bounds ensure that the resulting schedule is feasible. The front end of this model is coded in AMPL (an algebraic modeling language for linear and nonlinear optimization problems). Less than a Page 36

44 second is required to generate an optimal solution using the Gurobi solver (a mathematical programming solver). However, Gurobi and AMPL licensing and training are expensive. A sample set of code for AMPL is shown in Appendix B Opt Heuristic Approach A near-optimal and feasible operating room schedule can be generated quickly by an r-opt algorithm, which means the exchanges of r blocks are tested until there is no feasible exchange that improves the current solution; this solution is said to be r-optimal. Since the number of operations increases rapidly with increases in r, r = 2 and r = 3 are most commonly used. A 2-opt heuristic considers pair-wise block swaps, starting from an initial operating room schedule. Our starting point is the sample operating schedule that the hospital has been using. Each pair-wise swap requires the 2-opt to reduce the peak expected PDB throughout the week. The 2-opt algorithm considers all possible swaps in the current solution and chooses the best one to take. It does this while preserving the operating room schedule restrictions, as described in section 6.1. It then repeats this process using the new operating room schedule generated from the previous step, until it cannot find a better solution. At this point, it is assumed that the (local) optimum has been reached. The front end of this model is Excel, and the heuristic is coded in Excel Visual Basic Application. 6.4 Numerical Experiments We evaluate our optimization models with input parameters representing elective patients at Hamilton Health Sciences. The first input parameter, the expected PDB by each block for Page 37

45 each day of the week, is calculated by the bed planning model using a sample operating room schedule from the previous year, shown in Table Sunday Monday Tuesday Wednesday Thursday Friday Saturday Table 6.1: A sample original operating room schedule The value of the first input parameter (the expected PDB on each day of the week for each block) is shown in Table C.1. A sample of Table C.1 is shown below in Table 6.2. Block Block Expected Patient Demand for Beds t Days After Surgery ID Assignment t = 0 t = 1 t = 2 t = 3 t = 4 t = 5 t = 6 Surgeon 1 Mon OR Mon OR Tue OR Wed OR Wed OR Fri OR Tue OR Table 6.2: A sample of expected PDB and surgeon assigned to each block In this experiment, we did not restrict any block to an operating room or day of the week. As a result, the third parameter (list of infeasible days of the week for each block) is an empty list. For our fourth parameter (operating room availability for each block), we have determined the operating room settings from staff at Hamilton. Out of the eight operating rooms, the first four are reserved to Orthopedics surgeries. Operating rooms 5 and 6 are used for general surgeries, and operating rooms 7 and 8 are dedicated to Urology. Based on the sample operating room schedule, we determine the service that each block provides. Blocks Page 38

46 can only be assigned to operating rooms with the same service type, as shown in Table C.3. A sample of Table C.2 is shown below in Table 6.3. Block ID Block Info Procedure Available Operating Rooms 1 Mon OR1 Orth 1, 2, 3, 4 2 Mon OR2 Orth 1, 2, 3, 4 3 Mon OR3 Orth 1, 2, 3, 4 4 Mon OR4 Orth 1, 2, 3, 4 5 Mon OR5 Gen 5, 6 6 Mon OR6 Gen 5, 6 7 Mon OR7 Urol 7, 8 8 Mon OR8 Urol 7, 8 Table 6.3: A sample of operating room restriction for each block Expected Day Shift Patient Demand for Beds Sun Mon Tue Wed Thu Fri Sat original schedule MIP optimal schedule 2-opt local optimal schedule Figure 6.1: Experimental results for MIP and 2-opt approach Figure 6.1 presents the computational results from the optimization models. It displays the expected day shift PDB based on the original operating room schedule from the previous year, the optimal operating room schedule generated by the mixed integer programming model (shown in Table 6.4), and the local optimal operating room schedule generated by the Page 39

47 2-opt heuristic (shown in Table 6.5). The optimal schedule results in a peak expected PDB of 80.8, followed closely by the 2-opt solution with peak expected PDB of 81. These two schedules reduce the peak demand by about 8. Since we simply shift the demand on Thursday or Friday to other days of the week, the average of expected PDB stays the same. Sunday Monday Tuesday Wednesday Thursday Friday Saturday Table 6.4: Optimal operating room schedule from MIP Sunday Monday Tuesday Wednesday Thursday Friday Saturday Table 6.5: Near-optimal operating room schedule from 2-opt heuristic The decrease in peak expected PDB is not without penalties. The optimal schedule moves 35 out 40 blocks in the original schedule and the 2-opt schedule moves 30 blocks. We believe that such dramatic changes to the existing schedule would encounter considerable resistance from the surgeons involved. We believe the mixed integer programming model is useful as a Page 40

48 benchmark tool to show the potential cost savings of an optimal schedule, but it would be difficult to implement in practice. On the other hand, the 2-opt heuristic is capable of generating a near-optimal solution in steps (swaps). This allows the users to evaluate the benefit at each step and perhaps only performs swaps with a significant improvement. The reduction in the peak expected PDB from each swap is presented in Figure 6.2. There is a diminishing return on bed saving while revising the operating room schedule. For example, the first two steps have provided the greatest decrease in PDB, 1.2 and 1 respectively. 4 blocks are moved from these 2 swaps, resulting in 2.2 out of the 7.5 total potential reductions by 2-opt heuristic (almost 30%). The later steps provide considerably less improvement Figure 6.2: Decrease in patient demand for beds from each step in 2-opt heuristic Furthermore, managers have to negotiate with the surgeons on how much change to implement and who is affected. Therefore, the cost and the benefit for each feasible swap at each step should be transparent to all parties. The 2-opt heuristic assesses alternatives at each step and presents the degree of improvement. For example, the top five swaps for the first step in 2-opt heuristic is shown in Table 6.6. This table provides four alternatives at the first Page 41

49 step if the best swap is questioned by the stakeholders and the cost associated with choosing these lesser options. Expected Day Shift Patient Demand for Beds Top Ranked Available Swaps Sun Mon Tue Wed Thu Fri Sat Peak no swap OR 7 on Thursday with OR 8 on Tuesday OR 8 on Tuesday with OR 8 on Thursday OR 1 on Tuesday with OR 3 on Thursday OR 3 on Thursday with OR 4 on Tuesday OR 3 on Tuesday with OR 3 on Thursday Table 6.6: Top five swaps for the first step in 2-opt heuristic In this section, we presented the numerical results from the mixed integer programming model and 2-opt heuristic. Both approaches generate excellent operating room schedule based on the data provided by Hamilton Health Sciences. The mixed integer programming model generates an optimal schedule resulting in a peak expected PDB of 80.8, followed closely by the 2-opt solution with peak expected PDB of 81. However, the optimal schedule moves 35 out 40 blocks in the original schedule. Realistically speaking, such dramatic change to the existing schedule will meet resistance by the stakeholders involved. As a result, the numerical results from the mixed integer programming model could only be used as a benchmark for the 2-opt solution. On the other hand, 2-opt heuristic allows the users to improve the operating room schedule incrementally by showing the trade-off of each feasible swap at each step. Page 42

50 Chapter 7 Application In this chapter, we describe the work we have done for hospitals other than Hamilton Health Sciences. First of all, we were asked to investigate patient demand for beds in each department at William Osler Health Centre (Brampton Civic and Etobicoke General) to derive bed capacity for the upcoming fiscal year. In addition to that, we determined that there is a potential for large bed saving if patients in alternative-level-of-care, were discharged earlier. We also analyzed the hospital bed requirements using the CIHI (Canadian Institute for Health Information) 25 percentile benchmark for ward length-of-stay. Again, this provided a significant reduction in bed capacity required. Furthermore, we worked closely with Regina General Hospital to design dedicated wards capacity and to balance elective patient demand for beds. Allocating proper ward capacity reduces off-service patient placements, thereby improving quality of care. Lowering peak patient demand for beds frees up beds when they are most needed and potentially reduces patient wait time and recovery time. In this case, the peak patient demand for beds occurs on Thursday and Friday. We established two policies with regard to balancing elective patient demand for beds: 1. If possible, move surgical procedures that generate long length-of-stay inpatients to Friday. This will maximize bed utilization on the weekends and the early weekdays. 2. If possible, move surgical procedures that generate a lot of inpatients to Monday and Tuesday. This will shift patient demand for beds to earlier weekdays. Page 43

51 All in all, our tools were not designed specifically for just one hospital setting; instead we built them for generally purpose, in which any hospital can be represented with appropriate parameters and inputs. See Appendix D for a demonstration of the tools. Page 44

52 Chapter 8 Conclusion This thesis detailed the development, validation, and results of a set of simulation and optimization tools. The bed planning (simulation) model estimates patient demand for beds in a hospital during a typical week. The bed capacity can be calculated from patient demand for beds by either the occupancy target level analysis or the probability of bed blocking method. Our simulation model imitates an existing hospital and then manipulates it by adjusting parameters used to build the model. The parameters we tested include patient length-of-stay and operating room schedule. We identified one of the improvement opportunities of a hospital by benchmarking current patient length-of-stay against expected patient length-ofstay from CIHI. The simulation results showed that there are more Orthopedics bed days than expected. We believe it was the result of Orthopedics patients who require alternative-levelof-care are staying for prolonged periods of time while waiting for rehab, home care, longterm care home, or placement. We want to stress that the bed planning model is generic and can easily be implemented in any hospital. As a simulation, the bed planning model has great potential in decision making during the evaluation of alternatives. If a manager could simulate alternatives and predict their outcomes at this point in the decision process, he or she could eliminate much of the guesswork from decision making. Finally, we were able to smooth the expected patient demand for beds (PDB) throughout the weekdays by modifying the operating room schedule, which reduced the maximum number Page 45

53 of beds needed without affecting patient volume. Our approach for revising operating room schedule included mixed integer programming, and a 2-opt heuristic. Both the mixed integer programming model and the 2-opt heuristic lowered the peak elective PDB by about 8%. However, the decrease in peak elective PDB is not without penalties. At least 75% of the blocks in the final operating room schedule are moved. In practice, such dramatic change to an existing schedule would be unpopular by the surgical team. We believe the mixed integer programming model is useful as a benchmark tool to show the potential cost savings of an optimal schedule, but it is hard to implement in practice. 2-opt heuristic not only generates a near-optimal solution, it also shows the trade-off of each feasible swap at each step. Since 2- opt heuristic enables scenario planning for the hospital administration to test alternative operating room schedules quickly, it is useful when there are significant differences of opinion over the relative merits of the different courses of action within a hospital. Page 46

54 Chapter 9 Future Research Future research would involve extending the bed planning model to be more generic. First, the existing model should be applied to more hospital sites to ensure that its assumptions hold and improvements can be found for those sites as well. Secondly, if one or more assumptions are violated in the future application, the bed planning model should be modified to remain generic to any hospital settings. Page 47

55 Bibliography [1] Ontario Hospital Assoiciation. Improving Access to Emergency Care: Addressing System Issues. g_access.pdf, [2] W. P. Pierskalla and D. J. Brailer. Applications of operations research in healthcare delivery. In S. M. Pollock, M. H. Rothkopf, A. Barnett, editors, Handbooks in Operations Research and Management Science, Volume 6: Operations Research and the Public Sector, pp , [3] J. R. Lave, P. Jacobs, and F. Markel. Transitional funding: Changing Ontario's global budgeting system. Health Care Financing Review, 13(3):77-84, [4] D. Dranove and W. D. White. Agency and the organization of healthcare delivery. Inquiry, 24(4): , [5] A. van Ackere. The principal/agent paradigm: Its relevance to various functional fields. European Journal of Operational Research, 70(1):83-103, [6] J. Hay and M. J. Leahy. Physician-induced demand: An empirical analysis of the consumer information gap. Journal of Health Economics, 1(3): , [7] J. T. Blake and J. Donald. Mount Sinai hospital uses integer programming to allocate operating room time. Interfaces, 32(2):63-73, Page 48

56 [8] Healthy Canadians: A Federal Report on Comparable Health Indicators [9] Karen 991 et al., The Commonwealth Fund. Mirror, mirror on the wall: An international update on the comparative performance of American health care. Medical Benefits, 24(14):9, [10] Ministry of Health and Long-Term Care Ontario. Ontario wait times: Emergency room wait times [11] R. Boaden, N. Proudlove, and M. Wilson. An exploratory study of bed management. Journal of Management in Medicine, 13(4): , [12] Audit Commission. Bed Management: Review of National Findings [13] C. Brecher and S. Speizio. Privatization and public hospitals: Choosing wisely for New York City. New York: Twentieth Century Fund, xi, pp. 103, [14] P. Garling. Final report of the Special Commission of Inquiry. Acute care services in NSW public hospitals. Sydney: NSW Government, Volume 3, [15] F. Goronescu, S. I. McClean, and P. H. Millard. A queueing model for bed-occupancy management and planning of hospitals. Journal of Operational Research Society, 53(1):19-24, [16] L. V. Green. How Many Hospital Beds? Inquiry Excellus Health Plan, 39(4):400, Page 49

57 [17] J. M. van Oostrum, E. Bredenhoff, and E. W. Hans. Suitability and managerial implications of a master surgical scheduling approach. Annals of Operations Research, 178(1):91-104, [18] L. V. Green. Capacity planning and management in hospitals. International Series in Operations Research & Management Science. Volume 70, [19] J. O. McClain. A model for regional obstetric bed planning. Heath services research, 13(4): , [20] F. Dexter and A. Macario. Optimal number of beds and occupancy to minimize staffing costs in an obstetrical unit? Canadian Journal of Anesthesia, 48(3): , [21] R. A. Harris. Hospital bed requirements planning. European Journal of Operational Research, 25(1): , [22] P. R. Harper and A. K. Shahani. Modelling for the planning and management of bed capacities in hospitals. The Journal of the Operational Research Society, 53(1):11-18, [23] D. K. K. Lee, S. A. Zenios. Optimal capacity overbooking for the regular treatment of chronic conditions. Operations Research, 57(4): , [24] G. W. Harrison. Implications of mixed exponential occupancy distributions and patient flow models for health care planning. Health Care Management Science, 4(1):37-45, [25] C. Hober, J. Manry, and L. Connelly. Simulation development. Clinical Simulation in Nursing, 5(5):e173-e179, Page 50

58 [26] G. E. Loyd, C. L. Lake, and R. B. Greenberg. Practical health care simulations. Philadelphia, Penn.: Elsevier Mosby, c st edition. [27] W. M. Hancock, D. M. Warmer, S. Heda, and P. Fuhs. Admissions scheduling and control systems. In J. R. Griffith, W. M. Hancock, and F. C. Munson, editors, Cost Control in Hospitals, pp Ann Arbor, MI: Health Administration Press, [28] J. D. Thompson, R. B. Fetter, C. S. McIntosh, and R. J. Pelletier. Use of computer simulation techniques in predicting requirements for maternity facilities. Hospitals, pp , [29] D. Sinreich, and Y. Marmor. Emergency department operations: The basis for developing a simulation tool. IIE Transactions, 37(3): , [30] S. Robinson. Simulation The practice of model development and use. Wiley [31] Z. Zhu, B. H. Hen, and K. L. Teow. Estimating ICU bed capacity using discrete event simulation. International Journal of Health Care Quality Assurance, 25(2): , [32] J. Belien and E. Demeulemeester. Building cyclic master surgery schedules with leveled resulting bed occupancy. European Journal of Operational Research, 176(2): , [33] J. M. van Oostrum, M. van Houdenhoven, J. L. Hurink, E. W. Hans, G. Wullink, and G. Kazemier. A master surgical schedule approach for cyclic scheduling in operating room departments. OR Spectrum, 30(2): , [34] P. T. Vankerkel, R. J. Boucherie, E. W. Hans, J. L. Hurink, W. A. M. van Lent, and W. H. van Harten. An exact approach for relating recovering surgical patient workload to the Page 51

59 master surgical schedule. Journal of the Operational Research Society, 62(10): , [35] S. Gallivan and M. Utley. Modelling admissions booking of elective in-patients into a treatment centre. IMA Journal of Management Mathematics, 16(3):305, [36] B. T. Denton, A. J. Miller, H. J. Balasubramanian, and T. R. Huschka. Optimal allocation of surgery blocks to operating rooms under uncertainty. Operations Research, 58(4-1): , [37] A. Jebali, A. B. Hadj Alouane, and P. Ladet. Operating rooms scheduling. International Journal of Production Economics, 99(1):52-62, [38] R. Bekker and P. M. Koeleman. Scheduling admissions and reducing variability in bed demand. Health Care Management Science, 14(3): , [39] D. Walker. Ministry Report: Caring for Our Aging Population and Addressing Alternative Level of Care aspx, [40] OECD. OECD Health Data 2005 Statistics and indicators for 30 countries [41] W. N. Schofield, G. L. Rubin, M. Piza, Y. Y. Lai, D. Sindhusake, M. R. Fearnside and P. L. Klineberg. Cancellation of operations on the day of intended surgery at a major Australian referral hospital. The Medical Journal of Australia, 182(12): , Page 52

60 Appendix A Bed Planning Model Outputs The bed planning model outputs mean and standard deviation of patient demand on beds in each department at each of 21 shifts for each patient group. Table A.1 A.4 shows the mean and the standard deviation of patient demand on beds in emergency department, special care unit, acute wards and alternative level of care unit at each shift. The patients are categorized by the main service that they received. Page 53

61 Emergency Department Mean of Patient Demand for Beds Patients categorized by service night day evening night day evening night day evening night day evening night day evening night day evening night day evening Average GI Surgery Medicine Surgery GI Medicine Oncology Hematology Orthopedics Orthopedic Oncology V-Medicine Gynecology Oncology SUM Standard Deviation of Patient Demand for Beds Sun Mon Tue Wed Thu Fri Sun Mon Tue Wed Thu Fri Sat Patients categorized by service night day evening night day evening night day evening night day evening night day evening night day evening night day evening Average GI Surgery Medicine Surgery GI Medicine Oncology Hematology Orthopedics Orthopedic Oncology V-Medicine Gynecology Oncology SUM Table A.1: Patient demand for beds at emergency department Sat Page 54

62 Special Care Unit Mean of Patient Demand for Beds Patients categorized by service night day evening night day evening night day evening night day evening night day evening night day evening night day evening Average GI Surgery Medicine Surgery GI Medicine Oncology Hematology Orthopedics Orthopedic Oncology V-Medicine Gynecology Oncology SUM Standard Deviation of Patient Demand for Beds Sun Mon Tue Wed Thu Fri Sun Mon Tue Wed Thu Fri Sat Patients categorized by service night day evening night day evening night day evening night day evening night day evening night day evening night day evening Average GI Surgery Medicine Surgery GI Medicine Oncology Hematology Orthopedics Orthopedic Oncology V-Medicine Gynecology Oncology SUM Table A.2: Patient demand for beds at special-care unit Sat Page 55

63 Acute Wards Mean of Patient Demand for Beds Patients categorized by service night day evening night day evening night day evening night day evening night day evening night day evening night day evening Average GI Surgery Medicine Surgery GI Medicine Oncology Hematology Orthopedics Orthopedic Oncology V-Medicine Gynecology Oncology SUM Standard Deviation of Patient Demand for Beds Sun Mon Tue Wed Thu Fri Sun Mon Tue Wed Thu Fri Sat Patients categorized by service night day evening night day evening night day evening night day evening night day evening night day evening night day evening Average GI Surgery Medicine Surgery GI Medicine Oncology Hematology Orthopedics Orthopedic Oncology V-Medicine Gynecology Oncology SUM Table A.3: Patient demand for beds at acute wards Sat Page 56

64 Alternative Level of Care Unit Mean of Patient Demand for Beds Patients categorized by service night day evening night day evening night day evening night day evening night day evening night day evening night day evening Average GI Surgery Medicine Surgery GI Medicine Oncology Hematology Orthopedics Orthopedic Oncology V-Medicine Gynecology Oncology SUM Standard Deviation of Patient Demand for Beds Sun Mon Tue Wed Thu Fri Sun Mon Tue Wed Thu Fri Sat Patients categorized by service night day evening night day evening night day evening night day evening night day evening night day evening night day evening Average GI Surgery Medicine Surgery GI Medicine Oncology Hematology Orthopedics Orthopedic Oncology V-Medicine Gynecology Oncology SUM Table A.4: Patient demand for beds at alternative-level-of-care Sat Page 57

65 Appendix B AMPL Code for MIP Model The mixed integer programming model is built in AMPL and solved using the Gurobi solver. When run, the model provides the allocation of blocks to operating room schedule that minimizes the peak demand for beds throughout a week. The model s bounds ensure that the resulting schedule is feasible. ORO.run is the run file for AMPL, including calling the proper solver, initiating the model, importing the input parameter values, solving for optimization, and finally, exporting the optimal values of decision variables. ORO.mod is the AMPL model file for the MIP model described in Chapter 6.2. ORO.run # run command: ampl ORO.run reset; option solver gurobi_ampl; model ORO.mod; data ORO.dat; solve; print 'solve system time, solve user time, solve time' >> ORO.out; print _solve_system_time, _solve_user_time, _solve_time >> ORO.out; print 'objective:' >> ORO.out; display obj >> ORO.out; print 'variables:' >> ORO.out; display X >> ORO.out; display Y >> ORO.out; display F >> ORO.out; Page 58

66 ORO.mod set block; set day; set OR; set days_from_surgery; set surgeon; param Demand {block,days_from_surgery}; param SurgeonMapping {block,surgeon}; param DayRestriction {block,day}; param RoomRestriction {block,or}; var X {block,day,or} binary; var Y {block,day} binary; var F {block,day} >= 0; minimize obj: Z; subject to c1 {i in block, j in day}: sum {k in OR} X[i,j,k] == Y[i,j]; subject to c2 {i in block}: sum {j in day} Y[i,j] == 1; subject to c3 {j in day, k in OR}: sum {i in block} X[i,j,k] <= 1; subject to c4 {i in block, j in day}: F[i,j] == sum {x in 1..7} Y[i,x]*Demand[i,j-x]; subject to c5 {j in day}: sum {i in block} F[i,j] <= Z; subject to c6 {i in block, j in day}: sum {k in OR} X[i,j,k] <= DayRestriction[i,j]; subject to c7 {m in surgeon, j in day}: sum {i in block} SurgeonMapping[i,m]*Y[i,j] <= 1; subject to c8 {i in block}: Y[i,1] == 0; subject to c9 {i in block}: Y[i,7] == 0; subject to c10 {i in block, k in OR}: sum {j in day} X[i,j,k] <= RoomRestriction[i,k]; Page 59

67 Appendix C Numerical Experiments Block Block Expected Patient Demand for Beds t Days Since Surgery ID Assignment t = 0 t = 1 t = 2 t = 3 t = 4 t = 5 t = 6 Surgeon 1 Mon OR Mon OR Mon OR Mon OR Mon OR Mon OR Mon OR Mon OR Tue OR Tue OR Tue OR Tue OR Tue OR Tue OR Tue OR Wed OR Wed OR Wed OR Wed OR Wed OR Wed OR Wed OR Wed OR Thu OR Thu OR Thu OR Thu OR Thu OR Thu OR Thu OR Thu OR Fri OR Fri OR Fri OR Fri OR Fri OR Fri OR Fri OR Fri OR Tue OR Table C.1: Expected demand for beds and surgeon assigned to each block Page 60

68 Block ID Block Info Procedure Available Operating Rooms 1 Mon OR1 Orth 1, 2, 3, 4 2 Mon OR2 Orth 1, 2, 3, 4 3 Mon OR3 Orth 1, 2, 3, 4 4 Mon OR4 Orth 1, 2, 3, 4 5 Mon OR5 Gen 5, 6 6 Mon OR6 Gen 5, 6 7 Mon OR7 Urol 7, 8 8 Mon OR8 Urol 7, 8 9 Tue OR1 Orth 1, 2, 3, 4 10 Tue OR2 Orth 1, 2, 3, 4 11 Tue OR3 Orth 1, 2, 3, 4 12 Tue OR5 Gen 5, 6 13 Tue OR6 Gen 5, 6 14 Tue OR7 Urol 7, 8 15 Tue OR8 Urol 7, 8 16 Wed OR1 Orth 1, 2, 3, 4 17 Wed OR2 Orth 1, 2, 3, 4 18 Wed OR3 Orth 1, 2, 3, 4 19 Wed OR4 Orth 1, 2, 3, 4 20 Wed OR5 Gen 5, 6 21 Wed OR6 Gen 5, 6 22 Wed OR7 Urol 7, 8 23 Wed OR8 Urol 7, 8 24 Thu OR1 Orth 1, 2, 3, 4 25 Thu OR2 Orth 1, 2, 3, 4 26 Thu OR3 Orth 1, 2, 3, 4 27 Thu OR4 Orth 1, 2, 3, 4 28 Thu OR5 Gen 5, 6 29 Thu OR6 Gen 5, 6 30 Thu OR7 Urol 7, 8 31 Thu OR8 Urol 7, 8 32 Fri OR1 Orth 1, 2, 3, 4 33 Fri OR2 Orth 1, 2, 3, 4 34 Fri OR3 Orth 1, 2, 3, 4 35 Fri OR4 Orth 1, 2, 3, 4 36 Fri OR5 Gen 5, 6 37 Fri OR6 Gen 5, 6 38 Fri OR7 Urol 7, 8 39 Fri OR8 Urol 7, 8 40 Tue OR4 Orth 1, 2, 3, 4 Table C.2: Operating room restriction for each block Page 61

69 Appendix D Graphical User Interface In this section, we discuss the graphical user interface of our tools and the reasons we think they are generic. The bed planning model and the 2-opt heuristic are built with Excel UserForm while the mixed integer programming model is coded in AMPL. Figure D.1: Main graphical user interface Figure D.1 shows the main user interface. It guides the users through the setup process. Short descriptions are shown upfront while additional instructions and details are easily accessible. Page 62

70 The Simulation Settings button leads to the parameters we use for our simulations and allows other users to update with their own settings. The Simulate Emergent/Urgent Inpatient Bed Demand button leads to emergent/urgent simulation setup, shown in Figure D.2. The instruction for each control (labeled in Figure D.2) is listed below: 1. Click on Load Patients Record, a window will pop up asking the location of patient record Excel file. Then, find and select patient record file. 2. If there is only one worksheet in the patient record Excel file, Excel will automatically load all the fields in that file. Otherwise, this control allows you to choose the name of the worksheet containing patient records. 3. This control allows you to choose a valid arrival period. A valid arrival period of 2009/04/01 to 2009/12/31 means all patients who were admitted between 2009/04/01 and 2009/12/31 inclusive exist in the patient record file. 4. This control allows you to select the name of the field that stores patient s admit date time in the Columns section, and click the right arrow to move it into Admit Date and Time section. 5. This control contains the names of the fields that store patient s length-of-stay in its corresponding departments. Order the names in the order of patient flow between each department, for example, emergency department to special care units to acute wards to alternative-level-of-care. 6. This control contains the name of the fields that store patient categories that you want to use to divide patients into groups. 7. Click to start simulation. Page 63

71 These controls are the foundation of a generic model in which the user can customize simulation inputs and parameters to represent different hospital settings. Figure D.2: Simulation interface for emergent/urgent inpatients Furthermore, the Show Saved Results on Patient Demand for Beds button in Figure D.1 leads to patient demand for beds interface, shown in Figure D.3. This interface allows the user to format and organize simulation outputs. For example, in the Figure D.3, the user chose to exclude patient demand for beds at emergency department and SCU by deselecting those fields. Also, only patient demand for beds at JHCC site is shown by removing the highlight on MUMC sites. And finally, service patient category is activated to categorized patient demand for beds in the output panel, which displays the expected and the standard deviation of the results. Page 64

72 Figure D.3: Simulation interface for patient demand for beds The Integer -> Decimal, Copy to Clipboard, Graph buttons are options to display or plot customized output results. However, the Revised OR Schedule button leads to operating room scheduling interface, shown in Figure D.4. Top ranked available swaps are displayed to show the benefit of each available swap. This could be used as evidence to convince a surgeon regarding improvement opportunities worth pursuing. Also, operating schedule based on the chosen swaps is displayed to keep track of the benefit and the cost of the current progress. Page 65

73 Figure D.4: Simulation interface for revising operating room schedule The mixed integer programming model is not implemented in Excel VBA because Gurobi solver is a commercial product and we want to provide these tools to our users for free. However, the code for our mixed integer programming model is provided in Appendix B, in case some of our users have access to AMPL and Gurobi, and want to try it out. To conclude, we mentioned three principles to minimize the short-comings of simulation in Section 3.2 and we are confident that we have built a comprehensive simulation model that incorporates all those principles. Page 66

Optimization of an Operating Room Surgical Schedule. Anastasia Romanyuk & Alexandra Silva

Optimization of an Operating Room Surgical Schedule. Anastasia Romanyuk & Alexandra Silva Optimization of an Operating Room Surgical Schedule Anastasia Romanyuk & Alexandra Silva Washington University in St. Louis Department of Electrical & Systems Engineering April 27, 2012 Abstract: Operating

More information

An exact approach for relating recovering surgical patient workload to the master surgical schedule

An exact approach for relating recovering surgical patient workload to the master surgical schedule An exact approach for relating recovering surgical patient workload to the master surgical schedule Peter T. Vanberkel 1,2, Richard J. Boucherie 1, Erwin W. Hans 1 Johann L. Hurink 1, Wineke A.M. van Lent

More information

Capacity Strategy: The Science of Improving Future Performance

Capacity Strategy: The Science of Improving Future Performance GE Healthcare Capacity Strategy: The Science of Improving Future Performance Brian Dingman Bree Theobald Jennifer Jefferson In these uncertain times, planning for the future is more difficult than ever.

More information

A multilevel integrative approach to hospital case mix and capacity planning DEPARTMENT OF DECISION SCIENCES AND INFORMATION MANAGEMENT (KBI)

A multilevel integrative approach to hospital case mix and capacity planning DEPARTMENT OF DECISION SCIENCES AND INFORMATION MANAGEMENT (KBI) Faculty of Business and Economics A multilevel integrative approach to hospital case mix and capacity planning Guoxuan Ma & Erik Demeulemeester DEPARTMENT OF DECISION SCIENCES AND INFORMATION MANAGEMENT

More information

Understanding the Role of Physician-Focused At-The-Elbow Support During EMR Go-Live

Understanding the Role of Physician-Focused At-The-Elbow Support During EMR Go-Live Understanding the Role of Physician-Focused At-The-Elbow Support During EMR Go-Live Learnings from a mid-sized hospital Epic EMR Implementation. Contents Data Collection... 1 Results... 2...2 Support Events

More information

LECTURE - 3 RESOURCE AND WORKFORCE SCHEDULING IN SERVICES

LECTURE - 3 RESOURCE AND WORKFORCE SCHEDULING IN SERVICES LECTURE - 3 RESOURCE AND WORKFORCE SCHEDULING IN SERVICES Learning objective To explain various work shift scheduling methods for service sector. 8.9 Workforce Management Workforce management deals in

More information

Mathematical Models for Hospital Inpatient Flow Management

Mathematical Models for Hospital Inpatient Flow Management Mathematical Models for Hospital Inpatient Flow Management Jim Dai School of Operations Research and Information Engineering, Cornell University (On leave from Georgia Institute of Technology) Pengyi Shi

More information

AS-D1 SIMULATION: A KEY TO CALL CENTER MANAGEMENT. Rupesh Chokshi Project Manager

AS-D1 SIMULATION: A KEY TO CALL CENTER MANAGEMENT. Rupesh Chokshi Project Manager AS-D1 SIMULATION: A KEY TO CALL CENTER MANAGEMENT Rupesh Chokshi Project Manager AT&T Laboratories Room 3J-325 101 Crawfords Corner Road Holmdel, NJ 07733, U.S.A. Phone: 732-332-5118 Fax: 732-949-9112

More information

Web&ACTION Program: Improving Patient Flow Getting Started

Web&ACTION Program: Improving Patient Flow Getting Started Web&ACTION Program: Improving Patient Flow Getting Started Session 3: Overview of the Key Components of an Administrative System Concept Design: A System for Hospital Flow Administrative System *Bed management

More information

Patient Flow Software

Patient Flow Software Patient Flow Software You ve heard it all before! Ambulance ramping Bed block Wait lists New hospitals Alternate models of care Overflowing emergency departments Why do we have this problem? Supply Vs

More information

HOSPITAL FULL ALERT CASCADE

HOSPITAL FULL ALERT CASCADE Introduction The purpose of this document is to provide information on the capacity status of (ACH) and to detail the expected actions when occupancy reaches levels that make efficient operation of the

More information

CAPACITY PLANNING IN HOSPITAL MANAGEMENT: AN OVERVIEW

CAPACITY PLANNING IN HOSPITAL MANAGEMENT: AN OVERVIEW General Article CAPACITY PLANNING IN HOSPITAL MANAGEMENT: AN OVERVIEW *Shahnaz Sharifi 1 and Kianoush Saberi 2 1 School of Medical Education Sciences, Shahid Beheshti University of Medical Sciences, Tehran,

More information

QUESTIONS FOR LEUVEN CASE (B)

QUESTIONS FOR LEUVEN CASE (B) Brandeis University The Heller School for Social Policy & Management QUESTIONS FOR LEUVEN CASE (B) Jon Chilingerian, Ph.D Email: chilinge@brandeis.edu Managing Clinics, Care Processes and the Physics of

More information

Patient Flow from Emergency Department to Inpatient Wards: Empirical Observations from a Singaporean Hospital

Patient Flow from Emergency Department to Inpatient Wards: Empirical Observations from a Singaporean Hospital Patient Flow from Emergency Department to Inpatient Wards: Empirical Observations from a Singaporean Hospital Pengyi Shi, J. G. Dai School of Industrial and Systems Engineering Georgia Institute of Technology,

More information

Innovation Series 2003. Optimizing Patient Flow Moving Patients Smoothly Through Acute Care Settings

Innovation Series 2003. Optimizing Patient Flow Moving Patients Smoothly Through Acute Care Settings Innovation Series 2003 Optimizing Patient Flow Moving Patients Smoothly Through Acute Care Settings 2 We have developed IHI s Innovation Series white papers to further our mission of improving the quality

More information

Risk Analysis Overview

Risk Analysis Overview What Is Risk? Uncertainty about a situation can often indicate risk, which is the possibility of loss, damage, or any other undesirable event. Most people desire low risk, which would translate to a high

More information

This document contains four General Surgery placement descriptions:

This document contains four General Surgery placement descriptions: This document contains four General Surgery descriptions: North Central Thames Foundation School Individual Placement Description - Basildon and Thurrock University Hospitals NHS Foundation Trust Placement

More information

Operations Research in Health Care or Who Let the Engineer Into the Hospital?

Operations Research in Health Care or Who Let the Engineer Into the Hospital? Operations Research in Health Care or Who Let the Engineer Into the Hospital? Michael W. Carter Health Care Resource Modelling Group Mechanical and Industrial Engineering University of Toronto 1 Outline

More information

SIMULATION MODELING FOR STAFF OPTIMIZATION OF A COMMUNITY CARE CENTRE IN THE CITY OF TORONTO

SIMULATION MODELING FOR STAFF OPTIMIZATION OF A COMMUNITY CARE CENTRE IN THE CITY OF TORONTO SIMULATION MODELING FOR STAFF OPTIMIZATION OF A COMMUNITY CARE CENTRE IN THE CITY OF TORONTO DEYVISON TALMO BAIA MEDEIROS (UEPA ) deyvison.baiamedeiros@mail.utoronto.ca Aline Neves Alencar (UEPA ) alinenalencar@hotmail.com

More information

Netherlands Cancer Institute Antoni van Leeuwenhoek

Netherlands Cancer Institute Antoni van Leeuwenhoek Accounting for Inpatient Wards When Developing Master Surgical Schedules Peter T. Vanberkel, MASc,* Richard J. Boucherie, PhD,* Erwin W. Hans, PhD, Johann L. Hurink, PhD,* Wineke A. M. van Lent, MSc, and

More information

Modeling and Analysis of OR Nurse Scheduling Using Mathematical Programming and Simulation

Modeling and Analysis of OR Nurse Scheduling Using Mathematical Programming and Simulation Rochester Institute of Technology RIT Scholar Works Theses Thesis/Dissertation Collections 9-9-2015 Modeling and Analysis of OR Nurse Scheduling Using Mathematical Programming and Simulation Clayton Tontarski

More information

Research of Patient s Nursing Care Demand at Emergency Room

Research of Patient s Nursing Care Demand at Emergency Room Research of Patient s Nursing Care Demand at Emergency Room Ching Hsiang Chang, Dept. of Health Care Administration of Chang Jung Christian University Dorgi Harnod, MD MPH, SICU of Shin Kong Memorial Hospital

More information

1. Implementation of a testbed for testing Energy Efficiency by server consolidation using Vmware

1. Implementation of a testbed for testing Energy Efficiency by server consolidation using Vmware 1. Implementation of a testbed for testing Energy Efficiency by server consolidation using Vmware Cloud Data centers used by service providers for offering Cloud Computing services are one of the major

More information

Interactive Dynamic Modeling for the Passenger Flow Bottleneck and Security Checkpoint Management at an Airport

Interactive Dynamic Modeling for the Passenger Flow Bottleneck and Security Checkpoint Management at an Airport Interactive Dynamic Modeling for the Passenger Flow Bottleneck and Security Checkpoint Management at an Airport Yaman BARLAS M. Serdar ÇAKACIASLAN Tolga SAĞLIK Pınar SEKE Mustafa UĞUR Boğaziçi University

More information

Improving Pediatric Emergency Department Patient Throughput and Operational Performance

Improving Pediatric Emergency Department Patient Throughput and Operational Performance PERFORMANCE 1 Improving Pediatric Emergency Department Patient Throughput and Operational Performance Rachel Weber, M.S. 2 Abbey Marquette, M.S. 2 LesleyAnn Carlson, R.N., M.S.N. 1 Paul Kurtin, M.D. 3

More information

Improving Emergency Care in England

Improving Emergency Care in England Improving Emergency Care in England REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1075 Session 2003-2004: 13 October 2004 LONDON: The Stationery Office 11.25 Ordered by the House of Commons to be printed

More information

Policy & Procedure Manual Administration - Role and Expectations of the Most Responsible Physician (MRP)

Policy & Procedure Manual Administration - Role and Expectations of the Most Responsible Physician (MRP) The Scarborough Hospital Policy & Procedure Manual Administration - Role and Expectations of the Most Responsible Purpose To clarify and standardize the role of the Most Responsible at The Scarborough

More information

Addressing Arrival Rate Uncertainty in Call Center Workforce Management

Addressing Arrival Rate Uncertainty in Call Center Workforce Management 1 Addressing Arrival Rate Uncertainty in Call Center Workforce Management Thomas R. Robbins Penn State University Abstract Workforce management is a critical component of call center operations. Since

More information

Examensarbete. Staff scheduling in elderly care - A simulation study of trade-offs. Rebecka Håkansson

Examensarbete. Staff scheduling in elderly care - A simulation study of trade-offs. Rebecka Håkansson Examensarbete Staff scheduling in elderly care - A simulation study of trade-offs Rebecka Håkansson LiTH - MAT - EX - - 2015 / 02 - - SE Staff scheduling in elderly care - A simulation study of trade-offs

More information

POLICY AND PROCEDURE BOARD APPROVAL DATE: N/A

POLICY AND PROCEDURE BOARD APPROVAL DATE: N/A FINAL POLICY AND PROCEDURE SUBJECT/TITLE: Attendance Reporting Policy APPLICABILITY: All staff CONTACT PERSON & DIVISION: Christi Allen, Executive Assistant, Vital Statistics ORIGINAL DATE ADOPTED: 11/04/015

More information

A Heuristic Approach to Efficient Appointment Scheduling at Short-Stay Units

A Heuristic Approach to Efficient Appointment Scheduling at Short-Stay Units Final project report A Heuristic Approach to Efficient Appointment Scheduling at Short-Stay Units Author: A. Stallmeyer, University of Twente Assessment Committee Prof. dr. R.J. Boucherie, University of

More information

Identifying Good Nursing Levels: A Queuing Approach

Identifying Good Nursing Levels: A Queuing Approach OPERATIONS RESEARCH Vol. 59, No. 4, July August 2011, pp. 942 955 issn 0030-364X eissn 1526-5463 11 5904 0942 http://dx.doi.org/10.1287/opre.1110.0943 2011 INFORMS Identifying Good Nursing Levels: A Queuing

More information

Scheduling According to Physician Average Procedure. Times in Endoscopy Suites

Scheduling According to Physician Average Procedure. Times in Endoscopy Suites Abstract Number: 015-0046 Scheduling According to Physician Average Procedure Times in Endoscopy Suites Deborah Loach and Dr. Michael Carter Centre for Research in Healthcare Engineering, Dept. of Mechanical

More information

South Eastern Health and Social Care Trust

South Eastern Health and Social Care Trust South Eastern Health and Social Care Trust JOB DESCRIPTION TITLE OF POST: Consultant General Surgeon LOCATION: This post is part of the South Eastern Trust and will be based at the Ulster Hospital. However,

More information

Making the Most of Your Local Pharmacy

Making the Most of Your Local Pharmacy Making the Most of Your Local Pharmacy Wigan Borough Pharmacy Patient Satisfaction Survey 2015 Introduction A patient satisfaction survey was carried out involving pharmacies in Wigan Borough and supported

More information

The Health Foundation

The Health Foundation The Health Foundation Go with the Flow Improving the emergency care pathway for frail elderly people Helen Crisp Health Foundation 19 May 2014 The Health Foundation is an independent charity working to

More information

Monte Carlo Simulations for Patient Recruitment: A Better Way to Forecast Enrollment

Monte Carlo Simulations for Patient Recruitment: A Better Way to Forecast Enrollment Monte Carlo Simulations for Patient Recruitment: A Better Way to Forecast Enrollment Introduction The clinical phases of drug development represent the eagerly awaited period where, after several years

More information

Improving Outpatient Waiting Time Using Simulation Approach

Improving Outpatient Waiting Time Using Simulation Approach 2014 UKSim-AMSS 8th European Modelling Symposium Improving Outpatient Waiting Time Using Simulation Approach Arwa Jamjoom 1, Manal Abdullah 2, Maysoon Abulkhair 3, Thoria Alghamdi 4, Aisha Mogbil 5 1,2,3,4,5

More information

Academic Calendar for Faculty

Academic Calendar for Faculty Summer 2013 Term June 3, 2013 (Monday) June 3-4, 2013 (Monday Tuesday) June 5, 2013 (Wednesday) June 5-6, 2013 (Wednesday Thursday) June 6, 2013 (Thursday) July 3, 2013 (Wednesday) July 4, 2013 (Thursday)

More information

SIMULATION STUDY OF THE OPTIMAL APPOINTMENT NUMBER FOR OUTPATIENT CLINICS

SIMULATION STUDY OF THE OPTIMAL APPOINTMENT NUMBER FOR OUTPATIENT CLINICS ISSN 1726-4529 Int j simul model 8 (29) 3, 156-165 Professional paper SIMULATION STUDY OF THE OPTIMAL APPOINTMENT NUMBER FOR OUTPATIENT CLINICS Zhu, Z. C.; Heng, B. H. & Teow, K. L. Department of Health

More information

Effective Approaches in Urgent and Emergency Care. Priorities within Acute Hospitals

Effective Approaches in Urgent and Emergency Care. Priorities within Acute Hospitals Effective Approaches in Urgent and Emergency Care Paper 1 Priorities within Acute Hospitals When people are taken to hospital as an emergency, they want prompt, safe and effective treatment that alleviates

More information

Improving Cardiac Surgery Patient Flow through Computer Simulation Modeling

Improving Cardiac Surgery Patient Flow through Computer Simulation Modeling Improving Cardiac Surgery Patient Flow through Computer Simulation Modeling Dana Khayal, Fatma Almadhoun, Lama Al-Sarraj and Farayi Musharavati Abstract In this paper, computer simulation modeling was

More information

A decision support system for bed-occupancy management and planning hospitals

A decision support system for bed-occupancy management and planning hospitals IMA Journal of Mathematics Applied in Medicine & Biology (1995) 12, 249-257 A decision support system for bed-occupancy management and planning hospitals SALLY MCCLEAN Division of Mathematics, School of

More information

KENYATTA UNIVERSITY TITLE: APPLICATION OF GIS TECHNOLOGY TO HOSPITAL MANAGEMENT, PATIENT CARE AND PATIENT FLOW SYSTEMS

KENYATTA UNIVERSITY TITLE: APPLICATION OF GIS TECHNOLOGY TO HOSPITAL MANAGEMENT, PATIENT CARE AND PATIENT FLOW SYSTEMS KENYATTA UNIVERSITY ESRI 2 ND EDUCATIONAL CONFERENCE UNIVERSITY OF DAR ES SALAAM TITLE: APPLICATION OF GIS TECHNOLOGY TO HOSPITAL MANAGEMENT, PATIENT CARE AND PATIENT FLOW SYSTEMS BY MUGAMBI KELVIN MWENDA

More information

State of Bahrain Ministry of Health Salmaniya Medical Complex

State of Bahrain Ministry of Health Salmaniya Medical Complex State of Bahrain Ministry of Health Salmaniya Medical Complex A Handbook January 2001 Appendix Purpose. 3 Introduction. 4 Specialties available at S.M.C. 5 Outpatient Policies and Procedures Source of

More information

Department: Radiology Section: All Effective Date: 1/1/2013 Procedure Number: 4.1 Revision #: Time and Attendance

Department: Radiology Section: All Effective Date: 1/1/2013 Procedure Number: 4.1 Revision #: Time and Attendance Time and Attendance Purpose: A. To set forth guidelines regarding hours of work for University Health Radiology Department employees. B. To provide consistent guidelines for handling and monitoring employee

More information

Visualizing the demand for various resources as a function of the master surgery schedule: A case study

Visualizing the demand for various resources as a function of the master surgery schedule: A case study Visualizing the demand for various resources as a function of the master surgery schedule: A case study Jeroen Beliën Erik Demeulemeester Brecht Cardoen Katholieke Universiteit Leuven Faculty of Economics

More information

Simulation and Lean Six Sigma

Simulation and Lean Six Sigma Hilary Emmett, 22 August 2007 Improve the quality of your critical business decisions Agenda Simulation and Lean Six Sigma What is Monte Carlo Simulation? Loan Process Example Inventory Optimization Example

More information

European Care Pathways Conference 2013

European Care Pathways Conference 2013 European Care Pathways Conference 2013 Peter O Neill Director π 3 Solutions Senior Lecturer, Department of Management, Monash University, Australia peter.oneill@monash.edu Ian Gibson Director π 3 Solutions

More information

RESOURCE CAPACITY ALLOCATION OF INPATIENT CLINICS AMC Academic Medical Centre Amsterdam. F.J. Mak BSc S0092991

RESOURCE CAPACITY ALLOCATION OF INPATIENT CLINICS AMC Academic Medical Centre Amsterdam. F.J. Mak BSc S0092991 RESOURCE CAPACITY ALLOCATION OF INPATIENT CLINICS AMC Academic Medical Centre Amsterdam September 2011 May 2012 F.J. Mak BSc S0092991 Supervisors E.W. Hans PhD MSc University of of Twente A. Braaksma MSc

More information

Surgical and Ambulatory Service Orthopaedic RMO Staffing Increase and Roster Impact

Surgical and Ambulatory Service Orthopaedic RMO Staffing Increase and Roster Impact Surgical and Ambulatory Service Orthopaedic RMO Staffing Increase and Roster Impact Project / Brief Name: Orthopaedic RMO Staffing Increase and Roster Impact Release date: 31 July 2015 Version: Second

More information

Deployment of express checkout lines at supermarkets

Deployment of express checkout lines at supermarkets Deployment of express checkout lines at supermarkets Maarten Schimmel Research paper Business Analytics April, 213 Supervisor: René Bekker Faculty of Sciences VU University Amsterdam De Boelelaan 181 181

More information

OT service design for new emergency care - how we can support integrated practice

OT service design for new emergency care - how we can support integrated practice OT service design for new emergency care - how we can support integrated practice Barbara Kemp Clinical Lead for Occupational Therapy Northumbria Healthcare Foundation Trust #theotshow #theotshowselfie

More information

1. Clarification regarding whether an admission order must be completed before any therapy evaluations are initiated.

1. Clarification regarding whether an admission order must be completed before any therapy evaluations are initiated. Follow-up information from the November 12 provider training call I. Admission Orders 1. Clarification regarding whether an admission order must be completed before any therapy evaluations are initiated.

More information

Perioperative process improvement using discrete event simulation

Perioperative process improvement using discrete event simulation Perioperative process improvement using discrete event simulation by Solmaz Azari-Rad A thesis submitted in conformity with the requirements for the degree of Masters of Applied Science Graduate Department

More information

Extensive operating room (OR) utilization is a goal

Extensive operating room (OR) utilization is a goal Determining Optimum Operating Room Utilization Donald C. Tyler, MD, MBA*, Caroline A. Pasquariello, MD*, and Chun-Hung Chen, PhD *Department of Anesthesiology and Critical Care Medicine, The Children s

More information

Adapted from the Managing Your Time Effectively handout by the Learning Assistance Center at Glendale Community College. TIME MANAGEMENT PACKAGE

Adapted from the Managing Your Time Effectively handout by the Learning Assistance Center at Glendale Community College. TIME MANAGEMENT PACKAGE Adapted from the Managing Your Time Effectively handout by the Learning Assistance Center at Glendale Community College. TIME MANAGEMENT PACKAGE Time Management Habits: What tasks do I know that I have

More information

Virtual Mentor American Medical Association Journal of Ethics November 2006, Volume 8, Number 11: 771-775.

Virtual Mentor American Medical Association Journal of Ethics November 2006, Volume 8, Number 11: 771-775. Virtual Mentor American Medical Association Journal of Ethics November 2006, Volume 8, Number 11: 771-775. Medicine and society Crowded conditions: coming to an ER near you by Jessamy Taylor Most people

More information

Background paper 9: Rehabilitation services

Background paper 9: Rehabilitation services Background paper 9: Rehabilitation services Current services Townsville Health Service District (HSD) provides all rehabilitation services for the District. Within the District, a number of Institutes

More information

University of Michigan Health System Team 1: Cable Management Analysis Program and Operations Analysis Project Final Report

University of Michigan Health System Team 1: Cable Management Analysis Program and Operations Analysis Project Final Report University of Michigan Health System Team 1: Cable Management Analysis Program and Operations Analysis Project Final Report To: Frank J. Krupansky, Materiel Services Department, Director Hank Davis, Materiel

More information

Discharge Information Information for patients This leaflet is intended to help you, your carer, relatives and friends understand and prepare for

Discharge Information Information for patients This leaflet is intended to help you, your carer, relatives and friends understand and prepare for Discharge Information Information for patients This leaflet is intended to help you, your carer, relatives and friends understand and prepare for your discharge or transfer from hospital. Healthcare professionals

More information

Care Management Can We Do It Better?

Care Management Can We Do It Better? Care Management Can We Do It Better? Wilma Acosta, Associate Director Protiviti, Inc. Alex Robison, Managing Director Protiviti, Inc. Agenda I. Care Management Challenges II. Compliance Case Studies Intermittently

More information

Optimization applications in finance, securities, banking and insurance

Optimization applications in finance, securities, banking and insurance IBM Software IBM ILOG Optimization and Analytical Decision Support Solutions White Paper Optimization applications in finance, securities, banking and insurance 2 Optimization applications in finance,

More information

Understanding October 1 st MDS Changes and PEPPER Letters 2013

Understanding October 1 st MDS Changes and PEPPER Letters 2013 Understanding October 1 st MDS Changes and PEPPER Letters 2013 Agenda Changes in the MDS MDS Item Changes Reporting Rehab Minutes Hospital Inpatient Criteria (Two Midnight Provision) Reading PEPPER Letters

More information

Eliminating inefficiencies with PerfectServe. SUCCESS STORY Elimination of delays in consultant care. perfectserve.com 866.844.

Eliminating inefficiencies with PerfectServe. SUCCESS STORY Elimination of delays in consultant care. perfectserve.com 866.844. perfectserve.com 866.844.5484 @PerfectServe SUCCESS STORY Elimination of delays in consultant care Hospital: Munroe Regional Medical Center Location: Ocala, FL Beds: 421 Key results: Standardized clinical

More information

Managing Capacity Using VMware vcenter CapacityIQ TECHNICAL WHITE PAPER

Managing Capacity Using VMware vcenter CapacityIQ TECHNICAL WHITE PAPER Managing Capacity Using VMware vcenter CapacityIQ TECHNICAL WHITE PAPER Table of Contents Capacity Management Overview.... 3 CapacityIQ Information Collection.... 3 CapacityIQ Performance Metrics.... 4

More information

Better decision making under uncertain conditions using Monte Carlo Simulation

Better decision making under uncertain conditions using Monte Carlo Simulation IBM Software Business Analytics IBM SPSS Statistics Better decision making under uncertain conditions using Monte Carlo Simulation Monte Carlo simulation and risk analysis techniques in IBM SPSS Statistics

More information

Business Analytics using Data Mining Project Report. Optimizing Operation Room Utilization by Predicting Surgery Duration

Business Analytics using Data Mining Project Report. Optimizing Operation Room Utilization by Predicting Surgery Duration Business Analytics using Data Mining Project Report Optimizing Operation Room Utilization by Predicting Surgery Duration Project Team 4 102034606 WU, CHOU-CHUN 103078508 CHEN, LI-CHAN 102077503 LI, DAI-SIN

More information

Scenario 1. Scenario 2

Scenario 1. Scenario 2 From the 10 coaching scenarios below, practice at least three within your group of three. Each group member should practice being the coach. Next, construct your own coaching scenario that reflects an

More information

Analysing Patient Flow in Australian Hospitals Using Dynamic Modelling and Simulation Techniques

Analysing Patient Flow in Australian Hospitals Using Dynamic Modelling and Simulation Techniques Flinders University School of Computer Science, Engineering and Mathematics Analysing Patient Flow in Australian Hospitals Using Dynamic Modelling and Simulation Techniques by Thomas McLoughlin Supervised

More information

Project Time Management

Project Time Management Project Time Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A. M. Uhrmacher, eds.

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A. M. Uhrmacher, eds. Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A. M. Uhrmacher, eds. A GENERALIZED SIMULATION MODEL OF AN INTEGRATED EMERGENCY POST Martijn

More information

Patient Flow Through a Hospital. Bria Gottschalk Selena Kaplan Max Raynolds

Patient Flow Through a Hospital. Bria Gottschalk Selena Kaplan Max Raynolds Patient Flow Through a Hospital Bria Gottschalk Selena Kaplan Max Raynolds Introductory Information Industry information Establish and define the nodes Specify the paths Define the modes of travel on the

More information

University of Michigan Health System Program and Operations Analysis. Utilization of Nurse Practitioners in Neurosurgery.

University of Michigan Health System Program and Operations Analysis. Utilization of Nurse Practitioners in Neurosurgery. University of Michigan Health System Program and Operations Analysis Utilization of Nurse Practitioners in Neurosurgery Final Report To: Laurie Hartman, Director of Advanced Practice Nurses, UMHS School

More information

Part-time Diploma in InfoComm and Digital Media (Information Systems) Certificate in Information Systems Course Schedule & Timetable

Part-time Diploma in InfoComm and Digital Media (Information Systems) Certificate in Information Systems Course Schedule & Timetable Certificate in Information Systems Course Schedule & Timetable Module Code Module Title Start Date End Date Coursework Final Exam PTDIS010101 Management Information Tue, April 16, 2013 Tue, 2 April 2013

More information

Quality Information and Referral Service Delivery

Quality Information and Referral Service Delivery Quality Information and Referral Service Delivery Managing High Call Volume Bernice Hutchinson National Aging I&R Support Center National Association of State Units on Aging Washington, DC June 2008 Access

More information

Prescriptive Analytics. A business guide

Prescriptive Analytics. A business guide Prescriptive Analytics A business guide May 2014 Contents 3 The Business Value of Prescriptive Analytics 4 What is Prescriptive Analytics? 6 Prescriptive Analytics Methods 7 Integration 8 Business Applications

More information

Practical Calculation of Expected and Unexpected Losses in Operational Risk by Simulation Methods

Practical Calculation of Expected and Unexpected Losses in Operational Risk by Simulation Methods Practical Calculation of Expected and Unexpected Losses in Operational Risk by Simulation Methods Enrique Navarrete 1 Abstract: This paper surveys the main difficulties involved with the quantitative measurement

More information

Discrete-Event Simulation

Discrete-Event Simulation Discrete-Event Simulation Prateek Sharma Abstract: Simulation can be regarded as the emulation of the behavior of a real-world system over an interval of time. The process of simulation relies upon the

More information

White Paper Operations Research Applications to Support Performance Improvement in Healthcare

White Paper Operations Research Applications to Support Performance Improvement in Healthcare White Paper Operations Research Applications to Support Performance Improvement in Healthcare Date: April, 2011 Provided by: Concurrent Technologies Corporation (CTC) 100 CTC Drive Johnstown, PA 15904-1935

More information

2013 Physician Inpatient/ Outpatient Revenue Survey

2013 Physician Inpatient/ Outpatient Revenue Survey Physician Inpatient/ Outpatient Revenue Survey A survey showing net annual inpatient and outpatient revenue generated by physicians in various specialties on behalf of their affiliated hospitals Merritt

More information

EMPLOYEE SCHEDULING METHODS USING A CALCULATOR. Judith Aronow 5590 Frost Beaumont, TX 77706 aronowju@hal.lamar.edu 409/892404383

EMPLOYEE SCHEDULING METHODS USING A CALCULATOR. Judith Aronow 5590 Frost Beaumont, TX 77706 aronowju@hal.lamar.edu 409/892404383 EMPLOYEE SCHEDULING METHODS USING A CALCULATOR Judith Aronow 5590 Frost Beaumont, TX 77706 aronowju@hal.lamar.edu 409/892404383 EMPLOYEE SCHEDULING METHODS USING A CALCULATOR Scheduling employee times-on

More information

Improving the Scheduling of Operating Rooms at UMass Memorial Medical Center

Improving the Scheduling of Operating Rooms at UMass Memorial Medical Center Improving the Scheduling of Operating Rooms at UMass Memorial Medical Center Major Qualifying Project Report completed In partial fulfillment of the Bachelor of Science degree At Worcester Polytechnic

More information

A MANAGER S ROADMAP GUIDE FOR LATERAL TRANS-SHIPMENT IN SUPPLY CHAIN INVENTORY MANAGEMENT

A MANAGER S ROADMAP GUIDE FOR LATERAL TRANS-SHIPMENT IN SUPPLY CHAIN INVENTORY MANAGEMENT A MANAGER S ROADMAP GUIDE FOR LATERAL TRANS-SHIPMENT IN SUPPLY CHAIN INVENTORY MANAGEMENT By implementing the proposed five decision rules for lateral trans-shipment decision support, professional inventory

More information

Improving the Health Care Systems Performance by Simulation Optimization

Improving the Health Care Systems Performance by Simulation Optimization Journal of mathematics and computer Science 7 (2013) 73-79 Improving the Health Care Systems Performance by Simulation Optimization Hamid Reza Feili 1 Faculty of Engineering, Department of Industrial Engineering,

More information

A model to predict client s phone calls to Iberdrola Call Centre

A model to predict client s phone calls to Iberdrola Call Centre A model to predict client s phone calls to Iberdrola Call Centre Participants: Cazallas Piqueras, Rosa Gil Franco, Dolores M Gouveia de Miranda, Vinicius Herrera de la Cruz, Jorge Inoñan Valdera, Danny

More information

DISCHARGE FOCUS PUTS HOSPITAL CAPACITY ISSUE TO BED By Terry Maher, Healthcare Practice Leader, USC Consulting Group

DISCHARGE FOCUS PUTS HOSPITAL CAPACITY ISSUE TO BED By Terry Maher, Healthcare Practice Leader, USC Consulting Group DISCHARGE FOCUS PUTS HOSPITAL CAPACITY ISSUE TO BED By Terry Maher, Healthcare Practice Leader, USC Consulting Group The exploding demand for healthcare in the U.S. is nothing new. But the growing critical

More information

Anaesthetics, Pain Relief & Critical Care Services Follow-Up Study REGIONAL REPORT. Performance Review Unit

Anaesthetics, Pain Relief & Critical Care Services Follow-Up Study REGIONAL REPORT. Performance Review Unit Anaesthetics, Pain Relief & Critical Care Services Follow-Up Study REGIONAL REPORT Performance Review Unit CONTENTS page I INTRODUCTION... 2 II PRE-OPERATIVEASSESSMENT... 4 III ANAESTHETIC STAFFING AND

More information

Maintaining the Central Management System Database

Maintaining the Central Management System Database CHAPTER 12 Maintaining the Central Management System Database This chapter describes how to maintain the Central Management System (CMS) database using CLI commands as well as using the Content Distribution

More information

Copyright. Network and Protocol Simulation. What is simulation? What is simulation? What is simulation? What is simulation?

Copyright. Network and Protocol Simulation. What is simulation? What is simulation? What is simulation? What is simulation? Copyright Network and Protocol Simulation Michela Meo Maurizio M. Munafò Michela.Meo@polito.it Maurizio.Munafo@polito.it Quest opera è protetta dalla licenza Creative Commons NoDerivs-NonCommercial. Per

More information

INNOVATIVE HOSPITAL BED MANAGEMENT USING SPATIAL TECHNOLOGY

INNOVATIVE HOSPITAL BED MANAGEMENT USING SPATIAL TECHNOLOGY Complete Citation: Nicholls, Angela G. and Young, Frank R. (2007). Innovative hospital bed management using spatial technology. Spatial Science Queensland, 2007 (2), pp. 26-30. ISSN 1032-3848. Accessed

More information

26 OI July August 2013 www.accc-cancer.org

26 OI July August 2013 www.accc-cancer.org 26 OI July August 2013 www.accc-cancer.org Maximizing Patient Flow & Reducing Inpatient Hospital LOS Incremental steps to create culture change by Anne Jadwin, RN, MSN, AOCN, NE-BC perfect storm was brewing

More information

Aachen Summer Simulation Seminar 2014

Aachen Summer Simulation Seminar 2014 Aachen Summer Simulation Seminar 2014 Lecture 07 Input Modelling + Experimentation + Output Analysis Peer-Olaf Siebers pos@cs.nott.ac.uk Motivation 1. Input modelling Improve the understanding about how

More information

Best Practices in Claims Management. Use of treatment guidelines and clinical logic for preauthorization and claims adjudication

Best Practices in Claims Management. Use of treatment guidelines and clinical logic for preauthorization and claims adjudication Best Practices in Claims Management Use of treatment guidelines and clinical logic for preauthorization and claims adjudication The need for standards in claims processing Indian health insurance companies

More information

Load Balancing and Switch Scheduling

Load Balancing and Switch Scheduling EE384Y Project Final Report Load Balancing and Switch Scheduling Xiangheng Liu Department of Electrical Engineering Stanford University, Stanford CA 94305 Email: liuxh@systems.stanford.edu Abstract Load

More information

Evaluating Predictive Analytics for Capacity Planning. HIC 2015 Andrae Gaeth

Evaluating Predictive Analytics for Capacity Planning. HIC 2015 Andrae Gaeth Evaluating Predictive Analytics for Capacity Planning HIC 2015 Andrae Gaeth What is predictive analytics? Predictive analytics is the practice of extracting information from existing data sets, and then

More information

Optimizing PACU Patient Transport Equipment Management at C.S. Mott Children s Hospital and Von Voigtlander Women s Hospital.

Optimizing PACU Patient Transport Equipment Management at C.S. Mott Children s Hospital and Von Voigtlander Women s Hospital. Optimizing PACU Patient Transport Equipment Management at C.S. Mott Children s Hospital and Von Voigtlander Women s Hospital Final Report Submitted To: Kristie Barazsu Administrative Manager C.S. Mott

More information

University of Michigan Health System. Determining Patient Volumes, Staffing Volumes, and Patient-to-Staff Ratios in the Cardiac Procedures Unit

University of Michigan Health System. Determining Patient Volumes, Staffing Volumes, and Patient-to-Staff Ratios in the Cardiac Procedures Unit University of Michigan Health System Determining Patient Volumes, Staffing Volumes, and Patient-to-Staff Ratios in the Cardiac Procedures Unit Final Report To: Robert Keast, Director of Cardiovascular

More information

Ontario s Critical Care Surge Capacity Management Plan

Ontario s Critical Care Surge Capacity Management Plan Ontario s Critical Care Surge Capacity Management Plan Moderate Surge Response Guide Version 2.0 Critical Care Services Ontario September 2013 1 P a g e Ontario s Surge Capacity Management Plan: Moderate

More information