Potentials and Barriers for Implementing BIM in the German AEC Market
|
|
|
- Corey Patterson
- 10 years ago
- Views:
Transcription
1 1 Motivation / Intention Potentials and Barriers for Implementing BIM in the German AEC Market Analysis of the potentials and barriers in the implementation of integrated planning methods Building Information Modeling - BIM - in the German building industry and deduction of an action plan to improve the competitive situation Projektleitung: Prof. Dr.-Ing. Petra von Both Karlsruhe Institute for Technology, Department Building Lifecycle Management, Germany [email protected] Bearbeitung: Dr.-Ing. Volker Koch, Dipl.-Ing. Andreas Kindsvater Das Forschungsvorhaben wurde aus Mitteln der Forschungsinitiative Zukunft Bau des Bundesinstitutes für Bau-, Stadt- und Raumforschung gefördert. (Aktenzeichen: SF / II2-F ) Abstract. The research project BIM Potentials and Barriers aims to analyse the existing practice concerning BIM and the barriers for the implementation of this approach in Germany. Accompanied by an advisory board with nameable representatives from practice, the public authorities and AEC associations, a set of hypotheses has been elaborated that could be evaluated by a detailed survey. Based on the detection of relevant stakeholders, the survey first tries to disclose the real situation of how BIM is currently used in practice. Furthermore the potentials of the application of BIM in the different processes and target groups are determined as well as the barriers and constraints. Thereby the enhancement of the considered thematic areas is an important solution approach of the project: besides technological aspects, the analysis is also focusing on contracting, norms and processes as well as education, knowledge and role perception. Keywords. BIM; survey; collaborative engineering; virtual engineering; product modelling. 1 Motivation / Intention Despite of approaches made toward enhancing efficiency, the construction sector has not been able to improve productivity effectively. An American study of the National Institute of Building Science compares the productivity of the construction sector with other industrial sectors and attests an even negative development within the last 40 years. This indicates the necessity for the application of innovative means and methods (Teicholz, 2004). The implementation of the BIM method in Germany is still at very early stages. In comparison to the USA and the Nordic European countries, the German AEC sector still doesn t internalise the potentials of this method and technology. Although the software vendors are already offering BIM solutions adapted to the German processes 1
2 2 Methodical Approach (like the German-standard-complient quantity takeoff), with exception of a few general contractors and pilot projects of the public authorities, their worth generating application is still missing. It seems that the fine granular organisational structure of the German AEC market is one of the facts that obstruct the integrated adaption of the BIM method. Besides a strong functional segmentation of the processes in separate companies, also the size of the companies involved are critical for generating a global added value: over 92 percent of the construction companies are smaller than 20 persons (German Federal Statistical Office, 2010) and the average size of architects and engineers offices is between three and five employees (Hommerich and Ebers, 2006). In this context, special attention has to be paid to the bad economic situation of architects and other planers in Germany: only about 50% of the architects and engineers are calculating their project oriented work and about 30% of the design offices generate not more than profit per year (Hommerich and Ebers, 2006). Concerning their working methods they mostly adhere to antiquated principles of operation. They do not exploit the benefits of their bought software in the slightest even modern model-based CAD-Systems are used as a pure digital 2D drawing board. Thus, a possible added value by a high density and quality of information in the planning and the following lifecycle phases is not exploited. The elaboration of a specific action plan to ameliorate this situation seems difficult because reliable analyses concerning the state of the application of BIM in Germany are still missing. 2 Methodical Approach The research project BIM Potentials and Barriers that started in May 2010 aims to analyse the existing practice concerning BIM and the existing barriers for the penetration of this approach. Accompanied by an `advisory board with nameable representatives from practice, the public authorities, AEC associations and the buildingsmart initiative, a set of hypotheses has been elaborated that could be evaluated by a online survey. The enhancement of the considered thematic areas is an important solution approach of the project: beside technological aspects, the analysis is also focusing on contracting, norms and processes. Speaking of the generation of added value, the current discussion doesn t make a difference between the project context and the company context but one of the problems of the missing success of BIM seems to be the disparity between the ones who generate the value and the ones who earn the value in later lifecycle phases. Thus, especially in the first project phases, where in the most cases the architect models the first building representation and builds the structural base for the whole BIM life cycle, there is a gap between the created value for the project and the direct company-internal benefit for the architect s office investing more effort than normally demanded in projects. Also the assurance of the model quality and its integration in the contract management has been considered. There is still no answer concerning a reliable specification with quality criteria for BIM models that can serve as a mandatory guideline. Related to the hypotheses outlined above a questionnaire including four parts has been elaborated. First a classification of the participants allows disclosing their functions, their roles in the project, the size of their company, the size of the project volume and so on. Here different target groups are associated to the specific questions addressed: Planners and designer, construction firms, investors/building owner and facilities managers as well as the public authorities. Then the survey tries to disclose the real current situation of how BIM is currently used in the German AEC market. Here the different applied levels of the BIM evolution are detected from 2D drawing to pure geometric 3D modelling up to object oriented modelling. Then the integration of process data (4D) as well as cost and quantity information (5D) is conducted. By asking for specific processes and activities a detailed overview can be expected. After the state of the art, the potentials of the application of BIM in the different processes and target groups are analysed: The expectation of the inexperienced people as well as the experiences of the ones already using BIM. Here the survey tries to collect estimations of the possible (future) benefit and the willingness of implementing BIM in the companies. 2
3 Besides the potentials, the survey also tries to highlight the barriers and constraints of the BIM approach on technological and also on organisational level. 3 Results of the Survey The following chapter describes several of the most noticeable results. 3.1 Participants and Target Groups The survey was addressed to planners, construction companies, investors and project developers, facility managers as well as the public sector. Contacting these target groups was accomplished with the help of the respective German confederations and associations. It also has been possible to use information channels of the AEC software vendors to communicate the survey. Thus a high response could be realized. The main part of the participants are planners (architects and engineers: 57%), followed by building owners (21%) and construction companies (11%). 3.2 Status Quo As the survey showed, the general level of the application of the BIM method is already quite high. However, BIM is only one method among others and is applied as explusive strategie only in the exceptional case. So on average two to three different methods are applied in projects or companies in parallel. Here it showed that still up to date 2D Planning is used the most. Especially planners are still using their sophisticated software in more than 60% of their overall usage for pure 2D Planning - construction companies even more than 70%. Thus, it seems interesting to disclose in which processes the model-based method is applied how much. The following diagram shows the intensity of BIM usage in different AEC processes: Figure 1. Usage of model-based software tools in different AEC processes 3
4 Especially in the early design phases BIM is already a favourite method. So it is used for visualisation over 77% and for design planning over 66%. In the following processes like detailing (52%) sampling (33%) preparation for awarding (37%) and construction work scheduling the frequency recedes. Astonishing is the very low usage of the model-based method in the area of facilities management (22,4%). Also concerning the exchange of data a similar picture can be drawn: the dominating exchange formats, independent of the target group, are still paper, PDF and DWG. Model-based formats are used - also by BIMusers very rarely yet. This can be seen as an indicator for missing model-based working cooperation partners and also unsufficient technical interfaces. Relating to the projects size, the use of BIM rises especially in projects over 2 million. A similar correlation exists concerning the size of the enterprise: in enterprises up to 10 employees more than average Non-BIMusers are represented. On the contrary, BIM-users mostly work in medium sized enterprises from 3 up to 300 employees. Companies over 300 employees are more than average not using BIM at the moment but are willing to do it in the nearer future. Also the question of how the switch toward BIM has been analysed by the participants. It is noticeable that in most of the cases these changes have been made individually for each project and not for the whole company. That shows that on the one hand side the motivation for the change often comes from the project partners and that a project based change minimises the risk as well as the required educated people. The thematic widening of the survey towards economic topics allowed the detection of very interesting correlations: BIM is currently used especially by stakeholders who attach great importance to an efficient corporate management. The biggest correlation could be disclosed concerning quality management, project management as well as process orientation. Thus, 34% of the BIM-users are DIN-ISO 9001 certified but only 9% of the Non-BIM-users. Also regarding to project manuals resp. project protocols with defined standards, processes and responsibilities the BIM-users have the highest application with 47%. The usage of webbased collaboration plattforms by BIM-users is also twice as high (42%) as by Non-BIM-users. Concerning process orientation, the construction firms operate highly process oriented. The feedback from the public sector and the planners especially the architects - points to an only marginal process orientation of these groups. The specification of decission processes, tasks and responsibilities seems also to be a unique feature of the BIMusers 3.3 Experience and Benefit by the BIM Method In summary, all target groups declared an increased benefit by the BIM method (see figure 3). Three groups attract attention here: on the one hand side investors and building owner have the most benefit over all aspects, on the other hand side the public sector and the building services engineers have the lowest named benefit. A detailed query provided feedback to different aspects: in the area of resource management for the project and effort for coordination among the project partners only marginal benefits could be made in all target groups. In the public sector the effort for coordination has not changed, whereas the support of internal sequent processes on average has declined. The building service engineers even state an increased effort for change management in the project whereas the benefit by the reduction of multiple entries could be improved. 4
5 Figure 2. Assessment of the benefits of the BIM method for experienced user groups The resource allocation for the project as well as the expenditure of time have almost remained on the same level with a tendency to the negative. But despite the neutral to slightly negative assessment in these areas, the company s internal added value as well as the project oriented added value could in average be enhanced. In the other target groups (project manager, controller, architects, structural engineers and construction companies) the enhancements lie in similar dimensions (see fig. 3). Only the architects and general contractors remark fewer benefits in the expenditure of time for the project. Figure 3. Assessment of the benefits of the BIM method for experienced users (planners) 5
6 3.4 Technological Barriers for the Implementation of BIM By the evaluation of the hypotheses concerning the technological aspects remarkable differences became obvious: BIM-user and Non-BIM-user differ about the questions regarding hardware requirements and the complexity of model-based software. Whereas BIM-user described the hardware requirements as not problematical, this point seems to be a barrier for Non-BIM-user. Similar the statements concerning the complexity of BIM software differ: The Non-BIM-user agreed on the thesis the complexity of BIM software is too high, whereas the experienced BIM-user couldn t see that as a problem. Interestingly there is an analogy in the agreement of the statement that model-based BIM software has functional limitations. Especially the topic interoperability seems to be one of the main problems. While BIM-user assessed the effort for importing data into the model-based software as medial problematic, this point seems to be a high barrier for the Non-BIM-user (see fig.4). Figure 4. Agreement to the thesis the existing exchange formats for digital building models are not consistently available Asked about the data exchange standards, all groups agreed in the statement that the existing exchange formats for digital building models are not continuously usable. Especially the IFC format respectively its implementation in the software interfaces still cannot fulfil the requirements of the target groups (see figure 5). Figure 5. Assessment of the capability of the IFC format 6
7 3.5 Economic Barriers A high barrier for the Non-BIM-users seems to be the available capital for investment. For the actors already using BIM software the financial aspect is not a barrier or problem. The Non-BIM-users agreed indeed in not having enough financial resources for BIM related investments. Also as a general barrier the phase-oriented award of contracts has been detected. Thereby the involved actors are not able to enhance their added value as it would be possible by a phase overarching integrated work. On the other hand side the model-based method is not being applied continuously. 3.6 Normative Barriers Standardisation is an important auxiliary mean for a simplified and secure contracting: By referring to normative descriptions contracts can be concluded very efficiently and securely between client and planner respectively contractor as well as among the planers themselves. This becomes very important when the contract partners like in Germany are composed newly for each project. Applying the BIM method, the project partners are exchanging models, not blueprints or drawings. This allows an integrated process without media interruption. Especially in cases of model changes it is beneficial to extract the data directly out of the model. This demands a consistent model but also clearly specified exchange parameter and quality criteria. But how does it look in practice? The participants of the survey highly agreed (65%) to the statement that the quality of digital building models in form and content is not adequate standardised yet (see fig. 6). Figure 6. Agreement to the statement that the quality of digital building models in form and content is not adequate standardised yet 3.7 Educational Barriers The abilities of entrants in the BIM relevant areas only with exception of the qualification in CAD - are rated collectively as under average and not sufficient. Especially the constant negative assessments by Non-BIMusers as well as BIM-users of the methodical abilities, inter- and transdisciplinary thinking, process orientation and the comprehension of superordinated interdependencies and also business economics can bee seen as indicators for an urgent need for action. A concluding and detailed statement of the educational situation in Germany is surely outside the scope of this project. Hence, the questions on educational barriers discussed in this survey rather serve to complete the holistic examination of the general situation and to identify possible arrestive factors for the impelementation of BIM. 7
8 4 Conclusions 4 Conclusions In summary the project discloses a strong correlation between an efficient and structured corporate management and the application of BIM. The survey also shows that in general noticeable benefits can be reached by implementing the BIM method - but not as high as communicated by BIM lobbyists as buildingsmart or the BIM software vendors. But interestingly it became obvious that BIM does not seem to be able to increase the benefits concerning the cooperation among the different project partners in the existing German process structures considerably. Presently the BIM method is applied mostly to increase in-house-efficiency not collaborative company superordinated processes. Here seems to be an important future sphere of activity. An improvement of the situation is only possible by eliminating the detected barriers: On technical level this means better technical interfaces, especially the implementation of the neutral IFC-Standard has been rated as not supported sufficiently. A general economic challenge in Germany is also the amelioration of the economic situation of planners. Here a commission of German AEC organisations is currently working on new concepts for fee structures. The BIM method also demands changes in the existing conceptions of roles in the AEC processes here new services and role models are to be elaborated and evaluated. An important part has to be played by the universities and AEC associations with new concepts of education and training here the target should not only focus on a technical level but integrate technological and methodical aspects especially to enhance the understanding of economic issues. Also there is a deficiency in reliable samples of contracts for BIM related services and processes, especially to assure a sufficient quality and content of BIM models. The conspicuous differences in the assessment of the BIM barriers between BIM-users and Non-BIM-users shows the high necessity of education and information by AEC associations and chambers. 5 References Hommerich, Ch., Ebers, Th.: Analyse der Kosten- und Ertragssituation in Architekturbüros (Analysis of the costs and revenues in architectural offices), survey commissioned by the German architectural association (Bundesarchitektenkammer), Bergisch Gladbach Statistisches Bundesamt (Federal Statistical Office): 2010, Statistical Yearbook 2010 for the Federal Republic of Germany, SFG Servicecenter Fachverlage, Reutlingen, available also at: Teichholz, P.: 2004, Labor Productivity Declines in the Construction Industry: Causes and Remedies. AECbytes Viewpoint #4 (April 14, 2004); available at: 8
218 Chapter 11. Conclusions. Therefore, this thesis aims to contribute to improving productivity of SMEs through DM and Project Communication.
218 Chapter 11. Conclusions 11. Conclusions 11.1. General conclusions The final objective of whatever research is to improve the knowledge and provide tools to improve it. In whatever company and in whatever
BuildingSMART International Infrastructure Room Work Plan 2015 Summary
BuildingSMART International Infrastructure Room Work Plan 2015 Background There is a critical need for a comprehensive neutral data model capable of representing both semantic and geometric aspects of
Scope of Building Information Modeling (BIM) in India
Journal of Engineering Science and Technology Review 2 (1) (2009) 165-169 Research Article JOURNAL OF Engineering Science and Technology Review www.jestr.org Scope of Building Information Modeling (BIM)
Sustainable construction criteria to evaluate the thermal indoor climate - further development of the BNB assessment tool and practical implementation
Fraunhofer Institute for Building Physics IBP Directors Univ. Prof. Dr. Ing. Gerd Hauser Univ. Prof. Dr. Ing. Klaus Sedlbauer Holzkirchen Branch Fraunhoferstrasse 10 83626 Valley / Germany IBP-Abstract
Improving Interoperability in Mechatronic Product Developement. Dr. Alain Biahmou, Dr. Arnulf Fröhlich, Dr. Josip Stjepandic
International Conference on Product Lifecycle Management 1 Improving Interoperability in Mechatronic Product Developement Dr. Alain Biahmou, Dr. Arnulf Fröhlich, Dr. Josip Stjepandic PROSTEP AG Dolivostr.
BIM-Guide for Germany
BIM-Guide for Germany Information und guidebook Abstract Research program ZukunftBAU, A research program of the Federal Ministry for Transport, Building and Urban Affairs (BMVBS), Federal Republic of Germany
A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY
ISTANBUL TECHNICAL UNIVERSITY FACULTY OF ARCHITECTURE DEPARTMENT OF DESIGN COMPUTING BIM 2037 / BUILDING INFORMATION MODELS INSTRUCTOR: Salih OFLUOĞLU A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL
Mitra Innovation Leverages WSO2's Open Source Middleware to Build BIM Exchange Platform
Mitra Innovation Leverages WSO2's Open Source Middleware to Build BIM Exchange Platform May 2015 Contents 1. Introduction... 3 2. What is BIM... 3 2.1. History of BIM... 3 2.2. Why Implement BIM... 4 2.3.
Pathways out of Insolvency
Going Concern and Turnaround Process of Insolvent Small and Medium Sized Enterprises Dr. Markus Imgrund Horváth & Partners Management Consultants Bibergasse 15 1010 Vienna Austria Phone: +43-(0)699-14
Automated construction schedule creation using project information model
Automated construction schedule creation using project information model Aleš Mrkela Faculty of civil engineering, University of Maribor, Maribor, Slovenia Danijel Rebolj Faculty of civil engineering,
Sophisticated Common Data Environment (CDE) with BIMaaS Platform
Sophisticated Common Data Environment (CDE) with BIMaaS Platform September 2015 Contents 1. Introduction to BIMaaS Platform... 3 2. What is Common Data Environment?... 3 3. Real World Challenges without
SUSTAINABILITY ASSESSMENT AND/OR PROPERTY RATING?
SUSTAINABILITY ASSESSMENT AND/OR PROPERTY RATING? Thomas Lützkendorf David Lorenz Summary In recent years a variety of tools for assessing a building s environmental friendliness or contribution to sustainable
3 Traditional approach
The Unified Approach to Modeling of Software Project Management Processes Šárka Květoňová 1, Zdeněk Martínek 1 1 Dept. of Information Systems, Faculty of Information Technology, Brno University of Technology,
SUPPORTING LOGISTICS DECISIONS BY USING COST AND PERFORMANCE MANAGEMENT TOOLS. Zoltán BOKOR. Abstract. 1. Introduction
SUPPORTING LOGISTICS DECISIONS BY USING COST AND PERFORMANCE MANAGEMENT TOOLS Zoltán BOKOR Department of Transport Economics Faculty of Transportation Engineering Budapest University of Technology and
Draft guidelines and measures to improve ICT procurement. Survey results
Draft guidelines and measures to improve ICT procurement Survey results Europe Economics Chancery House 53-64 Chancery Lane London WC2A 1QU Tel: (+44) (0) 20 7831 4717 Fax: (+44) (0) 20 7831 4515 www.europe-economics.com
A HUMAN RESOURCE ONTOLOGY FOR RECRUITMENT PROCESS
A HUMAN RESOURCE ONTOLOGY FOR RECRUITMENT PROCESS Ionela MANIU Lucian Blaga University Sibiu, Romania Faculty of Sciences [email protected] George MANIU Spiru Haret University Bucharest, Romania Faculty
Profitable Growth through Service July, 2005
Profitable Growth through Service July, 2005 Executive Lunch Service In todays meeting we would like to discuss following topics with our guests: Results of Arthur D. Little's "Service Innovation" study
Integration of Sustainable Approaches in the Building Design Process
Integration of Sustainable Approaches in the Building Design Process U. Forgber, N. Kohler, V. Koch, University of Karlsruhe Englerstrasse 7 76128 Karlsruhe, Germany F. Schmidt, R. Haller, University of
New Business Models in Construction
New Business Models in Construction Results of the Finnish BIM Survey 2013 CIB BIM & IDDS Seminar, Tokyo 1.11.2013 Dipl. Ing. Helena Soimakallio, M. Sc. (CE), B. Sc. (BA), M. aff. ASCE Managing Director
Service Excellence Study 2014
Please note that the release, publication or distribution of this executive report is not allowed. Study 2014 Executive Report European Institute December 2014 Key Insights 1/2 Study findings I. New technologies
A review of university facilities in Turkey*
ISSN 2072-7925 A review of university facilities in Turkey CELE Exchange 2011/6 OECD 2011 A review of university facilities in Turkey* By Selcen Altınsoy, State Planning Organisation, Turkey As a result
Synchronous Building Information Model-Based Collaboration in the Cloud: a Proposed Low Cost IT Platform and a Case Study
Synchronous Building Information Model-Based Collaboration in the Cloud: a Proposed Low Cost IT Platform and a Case Study J. Munkley 1, M. Kassem 2 and N. Dawood 2 1 Niven Architects, Darlington, DL3 7EH,
OPINION ON GENDER DIMENSION IN THE NEXT PROGRAMMING PERIOD OF THE STRUCTURAL FUNDS 2007-2013
OPINION ON GENDER DIMENSION IN THE NEXT PROGRAMMING PERIOD OF THE STRUCTURAL FUNDS 2007-2013 Advisory Committee on Equal Opportunities Between Women and Men July 2006 1 Opinion 1 on GENDER DIMENSION IN
Statistisches Bundesamt
Statistisches Bundesamt Annette Pfeiffer, Thomas Riede Federal Statistical Office Press Service, Central Information Services, Library United Nations Statistical Commission - Seminar on Innovations in
SysML Modelling Language explained
Date: 7 th October 2010 Author: Guillaume FINANCE, Objet Direct Analyst & Consultant UML, the standard modelling language used in the field of software engineering, has been tailored to define a modelling
Industry Foundation Classes (IFC)
Industry Foundation Classes (IFC) BIM Interoperability Through a Vendor-Independent File Format A Bentley White Paper Volker Thein IFC Product Manager September 2011 Executive Overview buildingsmart International,
Towards an Integration of Business Process Modeling and Object-Oriented Software Development
Towards an Integration of Business Process Modeling and Object-Oriented Software Development Peter Loos, Peter Fettke Chemnitz Univeristy of Technology, Chemnitz, Germany {loos peter.fettke}@isym.tu-chemnitz.de
Software Engineering Practices in Jordan
Software Engineering Practices in Jordan Nuha El-Khalili Faculty of Information Technology, University of Petra, Amman, Jordan [email protected] Dima Damen Faculty of Information Technology, University
A CONCEPTUAL MODEL FOR REQUIREMENTS ENGINEERING AND MANAGEMENT FOR CHANGE-INTENSIVE SOFTWARE
A CONCEPTUAL MODEL FOR REQUIREMENTS ENGINEERING AND MANAGEMENT FOR CHANGE-INTENSIVE SOFTWARE Jewgenij Botaschanjan, Andreas Fleischmann, Markus Pister Technische Universität München, Institut für Informatik
The Future European Constitution
Flash Eurobarometer European Commission The Future European Constitution Fieldwork : January 2004 Publication : February 2004 Flash Eurobarometer 159 - TNS Sofres / EOS Gallup Europe This survey was requested
AVEVA NET Accesses and Manages the Digital Asset. Executive Overview... 3. Project Risk: Inaccessible, Unreliable Information... 4
ARC WHITE PAPER By ARC Advisory Group JUNE 18, 2013 AVEVA NET Accesses and Manages the Digital Asset Executive Overview... 3 Project Risk: Inaccessible, Unreliable Information... 4 AVEVA NET Focuses on
Short Report. Life-Cycle-Oriented Risk Management for PPP-Projects in Public Real Estate
Short Report Life-Cycle-Oriented Risk Management for PPP-Projects in Public Real Estate Project Director: Project Team: Prof. Dr.-Ing. Dipl.-Wirtsch.-Ing. Hans Wilhelm Alfen Dipl.-Ing. Alexander Riemann
Adapting an Enterprise Architecture for Business Intelligence
Adapting an Enterprise Architecture for Business Intelligence Pascal von Bergen 1, Knut Hinkelmann 2, Hans Friedrich Witschel 2 1 IT-Logix, Schwarzenburgstr. 11, CH-3007 Bern 2 Fachhochschule Nordwestschweiz,
Better processes by sprint: Agile process improvement. Timo Karasch, Method Park
Better processes by sprint: Agile process improvement Timo Karasch, Method Park Seite 1 / 14 Abstract The conventional process improvement is more and more unable to cope with its excessive objectives
Module compendium of the Master s degree course of Information Systems
Module compendium of the Master s degree course of Information Systems Information Management: Managing IT in the Information Age Information Management: Theories and Architectures Process Management:
STRATEGIES FOR AVOIDING ASYMMETRIC INFORMATION IN CONSTRUCTION PROJECT MANAGEMENT
Journal of Business Economics and Management 2008 9(1): 47 51 STRATEGIES FOR AVOIDING ASYMMETRIC INFORMATION IN CONSTRUCTION PROJECT MANAGEMENT Martin Schieg Technical University of Munich, Arcisstraße
Digital Assets & Brand Equity. The DAM System
Scan for PDF Digital Assets & Brand Equity Digital assets take on many forms consisting of marketing brochures, video footage, audio files, product images, lifestyle photography and other branded material.
Life cycle optimized system solutions for densified housing with massive wood technology
Life cycle optimized system solutions for densified housing with massive wood technology Michael Zwölfer, Peter Thomas(*), Claus-Jürgen Schink, Volker Koch Ifib, Institut für industrielle Bauproduktion,
Questions and Answers
Autodesk Building Design Suite 2013 Questions and Answers Autodesk Building Design Suite is a comprehensive software solution that combines Building Information Modelling (BIM) and CAD tools to help you
Transform Your Bank in Measurable Steps
Banking Transformation Framework Transform Your Bank in Measurable Steps Table of Contents 2 Establish a Platform for Transformation 3 Transform Your Business 3 Use the Reference Architecture As a Foundation
Lightweight Data Integration using the WebComposition Data Grid Service
Lightweight Data Integration using the WebComposition Data Grid Service Ralph Sommermeier 1, Andreas Heil 2, Martin Gaedke 1 1 Chemnitz University of Technology, Faculty of Computer Science, Distributed
Position Paper. Introduction. General Remarks. Online Platforms
Position Paper UEAPME 1 s reply to the Public Consultation on Regulatory environment for platforms, online intermediaries, data and cloud computing and the collaborative economy. Introduction UEAPME welcomes
Survey report on Nordic initiative for social responsibility using ISO 26000
Survey report on Nordic initiative for social responsibility using ISO 26000 2013 Contents SUMMARY... 3 1. INTRODUCTION... 4 1.1 Objective of the survey... 4 1.2 Basic information about the respondents...
CHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION 1.1 Background The command over cloud computing infrastructure is increasing with the growing demands of IT infrastructure during the changed business scenario of the 21 st Century.
Guideline on Vulnerability and Patch Management
CMSGu2014-03 Mauritian Computer Emergency Response Team CERT-MU SECURITY GUIDELINE 2011-02 Enhancing Cyber Security in Mauritius Guideline on Vulnerability and Patch Management National Computer Board
ABSTRACT OF THE DOCTORAL THESIS BY Cătălin Ovidiu Obuf Buhăianu
ABSTRACT OF THE DOCTORAL THESIS BY Cătălin Ovidiu Obuf Buhăianu Thesis submitted to: NATIONAL UNIVERSITY OF PHYSICAL EDUCATION AND SPORTS, Bucharest, Romania, 2011 Thesis Advisor: Prof. Dr. Adrian Gagea
Supply Chain Analysis of the German Bulk Wine Market
Supply Chain Analysis of the German Bulk Wine Market Marianne E. Steinschulte Geisenheim University, Germany ([email protected]) Abstract Purpose: The bulk wine trade plays a very important
Automated Acceptance Testing of High Capacity Network Gateway
Automated Acceptance Testing of High Capacity Network Gateway Ran Nyman 1, Ismo Aro 2, Roland Wagner 3, 1,2,3 Nokia Siemens Network, PO Box 1 FI-02022 Nokia Siemens Networks 1 [email protected], 2 [email protected],
Family Evaluation Framework overview & introduction
A Family Evaluation Framework overview & introduction P B Frank van der Linden O Partner: Philips Medical Systems Veenpluis 4-6 5684 PC Best, the Netherlands Date: 29 August, 2005 Number: PH-0503-01 Version:
A Methodological Shift in Building Design through Development of Collaborative Design Platforms
ctbuh.org/papers Title: Authors: Subject: Keywords: A Methodological Shift in Building Design through Development of Collaborative Design Platforms Jonatan Schumacher, CORE Studio, Thornton Tomasetti Matthew
TOGAF usage in outsourcing of software development
Acta Informatica Pragensia 2(2), 2013, 68 76, DOI: 10.18267/j.aip.25 Section: Online: aip.vse.cz Peer-reviewed papers TOGAF usage in outsourcing of software development Aziz Ahmad Rais 1, Rudolf Pecinovsky
Research Report IT barometer 2009. A survey on the importance of IT in Finnish companies from the perspective of IT and business management
Research Report IT barometer 2009 A survey on the importance of IT in Finnish companies from the perspective of IT and business management 1. Introduction... 3 1.1. Research Data... 3 1.2. Summary... 4
ONTOLOGY FOR MOBILE PHONE OPERATING SYSTEMS
ONTOLOGY FOR MOBILE PHONE OPERATING SYSTEMS Hasni Neji and Ridha Bouallegue Innov COM Lab, Higher School of Communications of Tunis, Sup Com University of Carthage, Tunis, Tunisia. Email: [email protected];
SDN. Expectations. February 2015. Independent Market Research Commissioned by
SDN Expectations Independent Market Research Commissioned by February 05 Executive Summary: Service configuration (83%), application performance (8%) and network management (63%) are the Top 3 problem
CHALLENGES AND WEAKNESSES OF AGILE METHOD IN ENTERPRISE ARCHITECTURE
CHALLENGES AND WEAKNESSES OF AGILE METHOD IN ENTERPRISE ARCHITECTURE Zahra Askarinejad Amiri 1 1 Department of Computer Engineering, Staffordshire University ABSTRACT [email protected] As Information
Mobile 2D Barcode/BIM-based Facilities Maintaining Management System
Mobile 2D Barcode/BIM-based Facilities Maintaining Management System Yu-Cheng Lin, Yu-Chih Su, Yen-Pei Chen Department of Civil Engineering, National Taipei University of Technology, No.1.Chung-Hsiao E.
CORRALLING THE WILD, WILD WEST OF SOCIAL MEDIA INTELLIGENCE
CORRALLING THE WILD, WILD WEST OF SOCIAL MEDIA INTELLIGENCE Michael Diederich, Microsoft CMG Research & Insights Introduction The rise of social media platforms like Facebook and Twitter has created new
InPro training environment training platform for BIM based collaborative working
icccbe 2010 Nottingham University Press Proceedings of the International Conference on Computing in Civil and Building Engineering W Tizani (Editor) InPro training environment training platform for BIM
Surveying and evaluating tools for managing processes for software intensive systems
Master Thesis in Software Engineering 30 Credits, Advanced Level Surveying and evaluating tools for managing processes for software intensive systems Anuradha Suryadevara IDT Mälardalen University, ABB
Solutions. An introduction to the science & art of system architecture engineering
Solutions Architecture 101 An introduction to the science & art of system architecture engineering » Architecture roles Architecture roles Defining the different types of architect Architecture Roles 2
Summary of the Master Thesis. Masters Degree International Project Management
Summary of the Master Thesis Masters Degree International Project Management in the Building Process Chain Stakeholder Contribution to the Strategic Direction of a Construction Project Submitted by: Dipl.-Ing.
Influence of Project Management Software Tools Usage on Project Success
Influence of Project Management Software Tools Usage on Project Success Kristina Brodar University of Zagreb Faculty of Organization and Informatics, Varaždin [email protected] Igor Pihir University of Zagreb
BUSINESS RULES AS PART OF INFORMATION SYSTEMS LIFE CYCLE: POSSIBLE SCENARIOS Kestutis Kapocius 1,2,3, Gintautas Garsva 1,2,4
International Conference 20th EURO Mini Conference Continuous Optimization and Knowledge-Based Technologies (EurOPT-2008) May 20 23, 2008, Neringa, LITHUANIA ISBN 978-9955-28-283-9 L. Sakalauskas, G.W.
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire
Sustainability in Global Supply Chains Information and Guidance for Companies
Sustainability in Global Supply Chains Information and Guidance for Companies econsense Discussion Paper Publisher/Editor: econsense Forum for Sustainable Development of German Business Oberwallstraße
Ontology based Recruitment Process
Ontology based Recruitment Process Malgorzata Mochol Radoslaw Oldakowski Institut für Informatik AG Netzbasierte Informationssysteme Freie Universität Berlin Takustr. 9, 14195 Berlin, Germany [email protected]
The challenge of reducing non-revenue water by implementing the change management index A first comparative assessment in four development countries
The challenge of reducing non-revenue water by implementing the change management index A first comparative assessment in four development countries Monika Konatar*, Matthias Hitzel** * Human Resource
An Enterprise Architecture and Data quality framework
An Enterprise Architecture and quality framework Jerome Capirossi - NATEA-Consulting [email protected] http://capirossi.org, Pascal Rabier La Mutuelle Generale [email protected] Abstract:
European Commission Consultation document on Voice over IP
STELLUNGNAHME European Commission Consultation document on Voice over IP This paper provides the eco comment on the European Commission consultation document. eco is the association of German internet
SOFTWARE DEVELOPMENT QUALITY MODELS IN ENGINEERING EDUCATION
SOFTWARE DEVELOPMENT QUALITY MODELS IN ENGINEERING EDUCATION Sandra Sproge, Rudite Cevere Latvia University of Agriculture [email protected], [email protected] Abstract. Regarding the quality in
Policy-based Management of Distributed PBX Systems
Policy-based Management of Distributed PBX Systems Category: Dangers of an Increasingly Networked World Rupert, Christian Year of Study: 2 nd year M.Sc. Information Systems Course Title: Research Project
Plans and Lines of Movement 57.1. A studio experiment
Plans and Lines of Movement A studio experiment 57 Douglas Vieira de Aguiar Federal University of Rio Grande do Sul, Brazil Abstract This work is based on a studio experience carried out with 1st year
Figure 1 Cloud Computing. 1.What is Cloud: Clouds are of specific commercial interest not just on the acquiring tendency to outsource IT
An Overview Of Future Impact Of Cloud Computing Shiva Chaudhry COMPUTER SCIENCE DEPARTMENT IFTM UNIVERSITY MORADABAD Abstraction: The concept of cloud computing has broadcast quickly by the information