1 2013 Water Resource Development Act (WRDA) Status Report and Update Flood Risk Management Provisions from the Non-Federal Perspective Silver Jackets Webinar August 21 st, 2013
2 Introduction of Presenters Dusty Williams Dusty Williams (President) General Manager/Chief Engineer Riverside County Flood Control & Water Conservation District Steve Fitzgerald (Secretary) Chief Engineer Harris County Flood Control District Vincent Gin (Flood Management Committee Co-Chair) Engineering Project Management Manager County of Orange Stephen Graham (Flood Management Committee Co-Chair) Assistant General Manager San Antonio River Authority 2
3 About NAFSMA Established in 1978 Public Agency Directed 15 Member Public Agency Board Based on Federal Regions Three Mission-Focused Committees Urban Focus
4 NAFSMA Leadership
5 Flood Management USACE
6 Floodplain Management - FEMA
7 Stormwater Management - EPA
8 Background on the Water Resources Development Act Dusty Williams What is WRDA? - The Water Resources Development Act is critical legislation that authorizes programs and policy initiatives for the U.S. Army Corps of Engineers 8
9 Background on the Water Resources Development Act Dusty Williams WRDA addresses flood risk management, ecosystem restoration, navigation and other waterways issues WRDA has existed a very long time, a major change was made to the legislation when after a long time with reauthorization, WRDA was approved by Congress in 1986 and included cost-sharing provisions which meant that localities and regional entities now assumed a partnership role working with the U.S. Army Corps of Engineers on water resource projects. 9
10 Background on the Water Resources Development Act Dusty Williams Those entities needing flood control projects at that time then assumed a 35 percent contribution to flood damage reduction projects, with the Federal government providing 65 percent of projects funds. These projects are guided by legal agreements that spell out the roles and responsibilities both the non-federal and the federal entity. Those agreements were originally called Local Cooperation Agreements, then Project Cooperation Agreements and are now called Project Partnership Agreements or PPA s. Although WRDA is scheduled to be approved by Congress and signed by the President every two years, the bill was last enacted now in
11 Status of 2013 WRDA Legislation Steve Graham Senate The Senate approved its version of the WRDA Legislation on May 15, 2013 (S. 601) Bipartisan Support Strong vote of Key Senate Leaders on WRDA Senate Environment and Public Works Committee Chair Sen. Barbara Boxer (D-CA) and Committee Ranking Member David Vitter (R-LA). 11
12 Status of 2013 WRDA Legislation Steve Graham House Key House Leaders on WRDA House Transportation and Infrastructure Committee Chair Bill Shuster (R-PA), Ranking Member Nick Rahall (D-WV), House Water Resources and Environment Subcommittee Chair Bob Gibbs (R-OH) and Timothy Bishop (D-NY). Set to mark up a bill in mid-september and plan to take a bill to the House floor consideration in October 12
13 Status of 2013 WRDA Legislation House/Senate differences Steve Graham Details on provisions in the House bill haven t been released, but we expect that the bill will be different from the Senate bill in a number of ways: Individual water resources projects (including flood risk management projects) are expected to be authorized using different approaches. The Senate bill provides the Corps with strong authority to move projects through Chief s Reports, without providing much a role for Congress in the process (different than in the past, but avoids earmark issue) The House legislation is expected to ensure a role for Congress in the process (details have not yet been released). 13
14 Status of 2013 WRDA Legislation House/Senate differences Steve Graham National Levee Safety Program Provisions Senate bill includes most of the recommendations put forward by the National Committee on Levee Safety, which was set up under WRDA 2007, for setting up a National Levee Safety Program House bill could be less involved, possibly providing only technical assistance or other funding to states to start up state levee safety programs Senate bill includes Repair and Rehabilitation Fund for levees ($300 million annual authorization), that will include flood risk management criteria such as emergency preparedness, floodplain management plans, NFIP participation and other criteria still yet to be developed before a levee owner or operator can receive funds addresses pay me now or pay me later questions House bill may not include the levee repair fund, which is critical tool for actually getting funds directly to the levee issues 14
15 Status of 2013 WRDA Legislation Steve Graham House/Senate similarities Acceleration of project delivery. Streamlining of environmental reviews. Enhanced oversight and transparency Increased involvement of local interests and non-federal sponsors 15
16 Status of 2013 WRDA Legislation Steve Graham Next Steps Needed for WRDA to Become Law House of Representatives Needs to Enact A Bill and then it will be conferenced or negotiated out with the Senate bill. Committee leaders from both the House and Senate are included in a conference committee and Sen. Boxer expected to chair that conference committee. 16
17 Why WRDA Is Important to Your Communities and Activities? Vincent Gin Job Creation Senate version estimated: 500K-600K Public Safety American Society of Civil Engineers 2013 Infrastructure Report Card: Levee grade: D- 17
18 Protecting our Communities Vincent Gin Protects life and property 2012 Super-storm Sandy 2005 Hurricane Katrina Proactive Deferred cost greater than investment cost 18
19 Examples of Projects & Studies Vincent Gin Orange County Flood Control District Santa Ana River Mainstem Project - Construction Westminster Watershed- Study San Juan Creek Watershed - Study 19
20 Santa Ana River Project Vincent Gin 20
21 Santa Ana River Project Vincent Gin 21
22 Santa Ana River Project Vincent Gin 22
23 Santa Ana River Project Vincent Gin 23
24 Santa Ana River Project Vincent Gin Corps of Engineers Flood Control Districts Southern California Riverside San Bernardino Orange Protection Prevents $40 Billion in damage Protects over a million lives 24
25 Santa Ana River Project Vincent Gin Authorized by Congress: WRDA 1986 Total Authorized Cost: $2.2 Billion Three Elements 1. Seven Oaks Dam 2. Prado Dam 3. Lower Santa Ana River 25
26 Santa Ana River Project 26
27 What Does WRDA Mean to Local Sponsors? Rulebook & Swiss Army Knife Project authorizations Vincent Gin Project modifications Prado, separable element (saved $100 M) 902 Limit Maximum cost of project Deferral of local sponsor expense Funding for permits 27
28 Key Provisions in WRDA What They Will Mean to You Steve Fitzgerald Flood Damage Reduction, Ecosystem Restoration and Other Water Resource Projects an opportunity to authorize critically important projects and to make modifications to existing projects Streamlining of Environmental Review Process provides for reviews and decisions by environmental resource agencies be made in a timely, coordinated and environmentally responsible manner. 28
29 Key Provisions in WRDA What They Will Mean to You Working with the Corps On Project Planning NAFSMA has requested Congress to support any and all means to expedite the planning process 29
30 Key Provisions in WRDA What They Will Mean to You Steve Fitzgerald Non-Federal Implementation of Feasibility Studies allow non-federal sponsors to carry out feasibility studies for flood risk management projects Non-Federal Project Implementation allow non-federal sponsors to take the lead in the design and construction of flood risk management projects 30
31 Key Provisions in WRDA What They Will Mean to You Steve Fitzgerald Make Section 214 Permanent accelerates review and issuance of Corps permits by allowing local entities to fund regulatory positions at Corps Districts (even more important now with federal budget cuts) Crediting Issues promotes earlier construction of essential projects 31
32 Key Provisions in WRDA What They Will Mean to You Steve Fitzgerald Harmonize Public Safety (Levee Maintenance Issues) with Environmental Requirements resolve impasse between federal agency requirements so non-federal sponsors can perform essential maintenance work Authorize Corps, when Requested, to Carry Out Levee Certifications Assists with burden on non-federal sponsors to certify federally designed and built levees 32
33 Key Provisions in WRDA What They Will Mean to You Steve Fitzgerald Explore Expanding Credit/Reimbursment Incentives for Levee Safety Activities restoration or strengthening federally-partnered flood risk management projects by the non-federal sponsor before the next flood event environmental mitigation or restoration activities 33
34 Key Provisions in WRDA What They Will Mean to You Steve Fitzgerald Clarify Levee Vegetation Policies comprehensive review of Corps policy guidelines 34
35 WRDA and the Non-Federal Perspective Questions?
US Army Corps of Engineers Authorities and Programs
US Army Corps of Engineers Authorities and Programs Section 206; Flood Plain Management Services Program Section 22; Planning assistance to States General Investigations (large-scale flood risk reduction)
More informationFlood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
More informationFlood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
More informationAligning Natural and Built Infrastructure for
Aligning Natural and Built Infrastructure for Houston Climate Resilience National Exercise Program (NEP) Houston Climate Change Preparedness & Resilience Workshop Edmond J. Russo, Jr., PhD, PE, D.CE, D.NE,
More informationA Presentation to the Houston Hispanic Architects and Engineers
A Presentation to the Houston Hispanic Architects and Engineers Alan J. Potok, P.E. Director, Engineering and Construction Division Harris County Flood Control District February 6, 2014 Agenda Overview
More informationImplementing the Water Resources Development Act of 2007
Implementing the Water Resources Development Act of 2007 Rich Worthington U.S. Army Corps of Engineers, Headquarters December 5, 2007 WRDA 2007 (PL 110-114 ) PROVISIONS IMPORTANT TO AAPA STATUS: Passed
More informationRelease of EC 1110-2-6067 USACE Process for the National Flood Insurance Program (NFIP) Levee System Evaluation. Frequently Asked Questions
Release of EC 1110-2-6067 USACE Process for the National Flood Insurance Program (NFIP) Levee System Evaluation Frequently Asked Questions 1. What does Engineer Circular (EC) 1110-2-6067, USACE Process
More informationWater Resource Issues in the 110 th Congress
Order Code RS20569 Updated June 1, 2007 Water Resource Issues in the 110 th Congress Betsy A. Cody Specialist in Natural Resources Policy Resources, Science, and Industry Division H. Steven Hughes Analyst
More informationRE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking Portal at www.regulations.gov.
April 18, 2011 U.S. Army Corps of Engineers Attn: CECW CO R 441 G Street, N.W. Washington, DC 20314 1000 RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking
More informationOne Hundred Thirteenth Congress of the United States of America
H. R. 3080 One Hundred Thirteenth Congress of the United States of America AT THE SECOND SESSION Begun and held at the City of Washington on Friday, the third day of January, two thousand and fourteen
More informationUpper Des Plaines River & Tributaries, IL & WI Feasibility Study
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study
More informationApril 17, 2015 SUMMARY OF SUBJECT MATTER
April 17, 2015 SUMMARY OF SUBJECT MATTER TO: FROM: RE: Members, Subcommittee on Water Resources and Environment Staff, Subcommittee on Water Resources and Environment Hearing on A Review of the President
More informationHurricane Sandy Recovery Efforts
Hurricane Sandy: Recovery Efforts One Year Later There's nothing more important than us getting this right. And we're going to spend as much time, effort and energy as necessary to make sure that all the
More informationJune 16, 2015 PURPOSE
June 16, 2015 BACKGROUND MEMO TO: FROM: RE: Members, Subcommittee on Economic Development, Public Buildings, and Emergency Management Staff, Subcommittee on Economic Development, Public Buildings, and
More informationOklahoma Governor s Water Conference
Oklahoma Governor s Water Conference COL Michael Teague District Commander Tulsa District US Army Corps of Engineers 27 October 2010 US Army Corps of Engineers Tulsa District Over 600 people Arkansas River
More informationSection 19. Basin-wide Mitigation Action Plans
Section 19. Basin-wide Mitigation Action Plans This Mitigation Plan identifies twelve specific hazards that could affect the Basin. Section 20 of this Plan set forth mitigation action plans to be carried
More informationTo authorize the Secretary of the Interior, acting 109TH CONGRESS 1ST SESSION AN ACT H. R. 18
0TH CONGRESS 1ST SESSION H. R. 1 AN ACT To authorize the Secretary of the Interior, acting through the Bureau of Reclamation and in coordination with other Federal, State, and local government agencies,
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000
DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 CEMP-SPD (l105-2-10a) APR 1 5 2012 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on coastal
More informationNAFSMA Position on Floodplain Management Issues
National Association of Flood & Stormwater Management Agencies PO Box 56764, Washington, DC 20040 202-289-8625 www.nafsma.org I. Introduction NAFSMA Position on Floodplain Management Issues (Approved on
More informationA Comprehensive Summary
Minnesota Department of Public Safety Division of Homeland Security and Emergency Management Minnesota Recovers Task Force Fact Sheet 2015 A Comprehensive Summary Purpose This document will review the
More informationwant this Subcommittee to know that I am always interested in challenging myself, my staff, and our partners to do even better.
Testimony of David I. Maurstad Acting Director and Federal Insurance Administrator Mitigation Division Federal Emergency Management Agency Emergency Preparedness and Response Directorate Department of
More informationU.S. Department of Homeland Security
U.S. Department of Homeland Security A COMPARATIVE STUDY ON RISK ASSESSMENT Dams Sector Information-Sharing METHODOLOGIES FOR SECURITY AND PROTECTION OF HSIN-CS CRITICAL INFRASTRUCTURE Dams Portal Daniel
More informationEmergency Streambank Restoration/Stabilization. Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance
Emergency Streambank Restoration/Stabilization Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance Due to the severity of the recent rains and flooding occurrences, the
More informationUSACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect?
USACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect? National Waterways Conference Legislative Summit Steven L. Stockton, P.E. Director of Civil Works, U.S. Army Corps of Engineers
More informationARMY CORPS OF ENGINEERS. Actions Needed to Improve Cost Sharing for Dam Safety Repairs
United States Government Accountability Office Report to Congressional Requesters December 2015 ARMY CORPS OF ENGINEERS Actions Needed to Improve Cost Sharing for Dam Safety Repairs GAO-16-106 December
More informationFocus Areas: Program/Project Management, Repetitive Loss Properties, Flood Map Modernization, Standard Business Processes.
NATIONAL FLOOD INSURANCE PROGRAM Focus Areas: Program/Project Management, Repetitive Loss Properties, Flood Map Modernization, Standard Business Processes. Sponsoring Executive: Lead Executive: Susan Shuback,
More informationFlood System Repair Project
GUIDELINES Flood System Repair Project Authorized Under the Disaster Preparedness and Flood Prevention Bond Act of 2006 (Proposition 1E), and the Flood Control, River and Coastal Protection Bond Act of
More informationManaging Complexity: Implementing an Ecosystem Restoration Program*
Managing Complexity: Implementing an Ecosystem Restoration Program* Program Implementation Framework Program Management Tools Lesson Learned *How I Stopped Worrying and Learned to Love Change and Uncertainty!
More informationH. R. 219 AN ACT. To improve and streamline disaster assistance for Hurricane Sandy, and for other purposes.
TH CONGRESS 1ST SESSION H. R. 1 AN ACT To improve and streamline disaster assistance for Hurricane Sandy, and for other purposes. 1 Be it enacted by the Senate and House of Representa- tives of the United
More informationSTATEMENT BEFORE THE COMMITTEE ON SMALL BUSINESS AND ENTREPRENEURSHIP U.S. SENATE WASHINGTON, D.C.
STATEMENT OF ROY WRIGHT DEPUTY ASSOCIATE ADMINISTRATOR FEDERAL INSURANCE AND MITIGATION ADMINISTRATION FEDERAL EMERGENCY MANAGEMENT AGENCY U.S. DEPARTMENT OF HOMELAND SECURITY BEFORE THE COMMITTEE ON SMALL
More informationTestimony of Tom Woods President, Woods Custom Homes On Behalf of the National Association of Home Builders
Testimony of Tom Woods President, Woods Custom Homes On Behalf of the National Association of Home Builders Before the House Financial Services Committee Subcommittee on Housing and Insurance Hearing on
More informationBob Ivarson, PE, D.WRE. Sustainable Water Technologies Business Conference. June 17, 2014
Bob Ivarson, PE, D.WRE Sustainable Water Technologies Business Conference June 17, 2014 In the old days we use to talk about conservation. Unsustainability, often is the collision of good intentions with
More informationDistribution Restriction Statement
CECW-EP Engineer Regulation 1110-2-1150 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 ER 1110-2-1150 31 August 1999 Engineering and Design ENGINEERING AND DESIGN FOR CIVIL
More informationA. Flood Management in Nevada
Nevada Division of Water Planning A. Flood Management in Nevada Introduction Flooding has been a concern for Nevada communities since the first settlers moved to the territory in the mid-1800 s. Fourteen
More informationWATER QUALITY, SUPPLY, AND INFRASTRUCTURE IMPROVEMENT ACT OF 2014. Funding Summary
WATER QUALITY, SUPPLY, AND INFRASTRUCTURE IMPROVEMENT ACT OF 2014 Funding Summary THE CALIFORNIA DEPARTMENT OF WATER RESOURCES September 2014 The, is a $7.545 billion general obligation bond proposal that
More informationCommon Challenges with CDBG-Disaster Recovery Programs Guidance for Navigating the Recovery Terrain
Common Challenges with CDBG-Disaster Recovery Programs Guidance for Navigating the Recovery Terrain 1 What are the Common Challenges? 2 Common Challenges Unique challenges arise in the administration of
More informationResidual Markets. Residual Markets in which insurers participate to make coverage available to those unable to obtain coverage in Standard Market
Residual Markets David C. Marlett, PhD, CPCU Chair, Department of Finance, Banking and Insurance Appalachian State University marlettdc@appstate.edu 828.262.2849 http://insurance.appstate.edu/ Residual
More informationSTATEMENT BEFORE THE COMMITTEE ON SMALL BUSINESS AND ENTREPRENEURSHIP U.S. SENATE NEW ORLEANS, LA
STATEMENT OF BRAD KIESERMAN DEPUTY ASSOCIATE ADMINISTRATOR FOR INSURANCE FEDERAL INSURANCE AND MITIGATION ADMINISTRATION FEDERAL EMERGENCY MANAGEMENT AGENCY U.S. DEPARTMENT OF HOMELAND SECURITY ROY WRIGHT
More informationINVENTORY OF FLOOD CONTROL AGENCIES
Go to the Table of Contents INVENTORY OF FLOOD CONTROL AGENCIES Prepared By: Performance Review Unit California Department Of Finance November 1997 PREFACE During late December 1996 and early January 1997,
More informationAgua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,
Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework
More informationSaving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS)
Saving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS) Today s Discussion 1. FEMA s Flood Insurance Program: A Brief Overview 2. Flood Insurance Rates: Are they rising?
More informationEMBARGOED UNTIL 6:00AM ET, WEDNESDAY, May 14, 2014. THE WHITE HOUSE Office of the Press Secretary EMBARGOED UNTIL 6:00AM ET, WEDNESDAY, May 14, 2014
THE WHITE HOUSE Office of the Press Secretary EMBARGOED UNTIL 6:00AM ET, WEDNESDAY, May 14, 2014 FACT SHEET Building a 21 st Century Infrastructure: Modernizing Infrastructure Permitting Building a 21
More informationESRI_UC_2015_No843_Integrating Flood Risk Management and Salmon Habitat Restoration_CampbellSW
ESRI_UC_2015_No843_Integrating Flood Risk Management and Salmon Habitat Restoration_CampbellSW Advancing an integrated approach to flood risk management and habitat restoration planning in the Puget Sound
More informationCivil Works - FY 2015 CROmnibus & FY 2016 Budget
Civil Works - FY 2015 CROmnibus & FY 2016 Budget Mark L. Mazzanti Chief, Programs Integration Division Civil Works Directorate, HQUSACE US Army Corps of Engineers BUILDING STRONG 1 BUILDING STRONG USACE
More informationUNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION. United Water Conservation District Project No.
UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION United Water Conservation District Project No. 2153-022 ORDER APPROVING SPOIL MANAGEMENT, EROSION, AND SEDIMENT CONTROL PLAN
More informationHow To Manage Runoff In Southern California
100 YEARS OF RUNOFF MANAGEMENT IN SOUTHERN CALIFORNIA By John Hogan, P.E. Past-President LA Section and Member 2013 Centennial Committee Civil Engineers help build a better world. The work we do directly
More informationFinances. Table 1: Insured Policies. 2005, Center on Federal Financial Institutions 3
The Center on Federal Financial Institutions (COFFI) is a nonprofit, nonpartisan, nonideological policy institute focused on federal insurance and lending activities. original issue date: August 10, 2005,
More informationUnited States Army Corps of Engineers, Civil Works
United States Army Corps of Engineers, Civil Works Fiscal Year 2013 Federal Program Inventory May 2013 Table of Contents Introduction... 2 Program Inventory... 3 1. Navigation... 3 2. Flood Risk Management...
More informationLower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
More informationFlood Protection Structure Accreditation Task Force: Final Report
Flood Protection Structure Accreditation Task Force: Final Report November 2013 Message from the Administrator and the Assistant Secretary of the Army (Civil Works) The United States Army Corps of Engineers
More informationCOMMUNITY CERTIFICATIONS
National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden
More informationChapter 10. The National Flood Insurance Program
Chapter 10 The National Flood Insurance Program Chapter Overview The National Flood Insurance Program has been mentioned in numerous instances in preceding chapters. Its time has arrived in this course!
More informationCRS State Profile: New Mexico
CRS State Profile: New Mexico This is a profile for communities in your state that are participating in the Community Rating System (CRS). This profile is intended to provide information to the State NFIP
More informationHurricane Sandy Rebuilding Task Force
Hurricane Sandy Rebuilding Task Force FACT SHEET: Progress to Date Cutting red tape to help get families back in their homes, get small businesses back on their feet and help communities rebuild their
More informationNW/SW Joint Engineer Training Symposium
NW/SW Joint Engineer Training Symposium COL Mike Farrell Sacramento District Commander November 6, 2014 US Army Corps of Engineers Agenda Sacramento District overview Civil Works and Military Programs
More informationThe answers to some of the following questions are separated into two major categories:
Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the
More informationUS Army Corps of Engineers Los Angeles District. Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY
US Army Corps of Engineers Los Angeles District Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY U.S. Army Corps of Engineers South Pacific Division, Los Angeles District September
More informationSan Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits
Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.
More informationMemorandum CITY OF DALLAS. David A. Neumann (Chairman) Vonciel Jones Hill. Steve Salazar (Vice-Chair) Delia Jasso. Mayor Pro Tem Dwaine Caraway
DATE February 3, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: SUBJECT Dallas Floodway System Update 100-Year Levee Remediation If you have additional questions, please let me
More informationALTERNATIVE SOURCES OF FUNDING FOR
November 2015 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by
More informationMEETING DATE: February 08, 2008
Truckee River Flood Management Project FLOOD PROJECT COORDINATING COMMITTEE STAFF REPORT MEETING DATE: February 08, 2008 DATE: February 1, 2008 TO: Flood Project Coordinating Committee Members FROM: Naomi
More informationNAR Section by Section Highlights Biggert-Waters Flood Insurance Reform Act of 2012 1
NAR Section by Section Highlights Biggert-Waters Flood Insurance Reform Act of 2012 1 On July 6, 2012, the President signed into law a 5-year reauthorization of the National Flood Insurance Program (NFIP)
More informationSTATE OF INDIANA AMENDMENT #4 TO ACTION PLAN FOR CDBG SUPPLEMENTAL DISASTER RECOVERY FUNDS (Method of Distribution Section Only)
STATE OF INDIANA AMENDMENT #4 TO ACTION PLAN FOR CDBG SUPPLEMENTAL DISASTER RECOVERY FUNDS (Method of Distribution Section Only) U.S. Department of Housing and Urban Development Docket No. FR-5256-N-01
More informationTESTIMONY. Legislative Proposals to Reform the National Flood Insurance Program
Association of State Floodplain Managers, Inc. 2809 Fish Hatchery Road, Suite 204 Madison, Wisconsin 53713 www.floods.org Telephone 608-274-0123 Facsimile 608-274-0696 TESTIMONY Legislative Proposals to
More informationPublic Law 84-99 and Non-Structural Alternatives to Levee Repairs
Public Law 84-99 and Non-Structural Alternatives to Levee Repairs Presented by: Mr. Jerry A. Skalak, CFM U.S. Army Corps of Engineers Rock Island District and Mr. Tom Oswald Iowa Homeland Security and
More informationHarris County Flood Control District. Policy, Criteria, and Procedure Manual
Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD
More informationGAO U.S. INFRASTRUCTURE. Funding Trends and Federal Agencies Investment Estimates. Testimony
GAO For Release on Delivery Expected at 3:00 p.m. EST Monday July 23, 2001 United States General Accounting Office Testimony Before the Subcommittee on Transportation and Infrastructure, Committee on Environment
More informationRIVERSIDE COMMUNITY COLLEGE DISTRICT
RIVERSIDE COMMUNITY COLLEGE DISTRICT Board of Trustees Special Meeting June 26, 2012 6:00 p.m. O. W. Noble Administrative Center, Board Room AD 122 Riverside City College, 4800 Magnolia Avenue Riverside,
More informationDecember 2014. Congress Passes FY 2015 Spending Bill
December 2014 Congress Passes FY 2015 Spending Bill During a rare Saturday session on December 13, the Senate passed HR 83, the fiscal year 2015 (FY 15) spending bill, by a vote of 56-40. The Senate passage
More informationWhy does Kittitas County want to form a Flood Control Zone District?
KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS Kirk Holmes, Director What is a Flood Control Zone District (FCZD)? A Kittitas County Flood Control Zone District (FCZD) would be a special-purpose government
More informationFEMA s Risk Mapping, Assessment, and Planning (Risk MAP) Fiscal Year 2011 Report to Congress March 15, 2011. Federal Emergency Management Agency
FEMA s Risk Mapping, Assessment, and Planning (Risk MAP) Fiscal Year 2011 Report to Congress March 15, 2011 Federal Emergency Management Agency Message from the Administrator March 15, 2011 I am pleased
More informationWritten Testimony of Frederick Tombar Senior Advisor for Disaster Recovery to Secretary of U.S. Department of Housing and Urban Development (HUD)
U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT WASHINGTON, DC 20410 Written Testimony of Frederick Tombar Senior Advisor for Disaster Recovery to Secretary of U.S. Department of Housing and Urban Development
More informationInventory of the Wildcat Creek Restoration Collection, 1984-2001. http://oac.cdlib.org/findaid/ark:/13030/tf1w1002kf No online items
http://oac.cdlib.org/findaid/ark:/13030/tf1w1002kf No online items Processed by Randal Brandt. Orbach Science Library, Room 118 PO Box 5900 Phone: (951) 827-2934 Fax: (951) 827-6378 Email: waterarc@ucr.edu
More informationAssociation of State Flood Managers Annual Conference Wednesday, June 4, 2014
Association of State Flood Managers Annual Conference Wednesday, June 4, 2014 Hillsborough County, In the Trenches Local Mitigation Eugene Henry, CFM, AICP Hazard Mitigation Manager Floodplain Administrator
More informationReference: CA Urban Streams Partnership s White Paper on Funding Urban Watershed Projects Recommendations for a 2014 Water Bond
California Urban Streams Partnership A project of the Earth Island Institute 2150 Allston Way, Suite 460, Berkeley, CA 94704 510 859 9197, CUStreams@gmail.com January 30, 2014 Reference: CA Urban Streams
More informationEverglades Restoration: Federal Funding and Implementation Progress
Everglades Restoration: Federal Funding and Implementation Progress Charles V. Stern Specialist in Natural Resources Policy November 18, 2014 Congressional Research Service 7-5700 www.crs.gov R42007 Summary
More informationDisaster Recovery Assistance Program Guidance. Important
Disaster Recovery Assistance Program Guidance April 2015 Purpose: This document provides detailed guidance for implementation of the Disaster Recovery Assistance Program (DRAP) when state and/or federal
More informationProgram Details Notes Flood Mitigation Assistance Program (FMA)
Federal Emergency Agency Flood Mitigation Assistance (FMA) Provides funding to implement measures to reduce or eliminate the long-term risk of flood damage http://www.fema.gov/government/grant/fma/index.shtm
More informationMuddy River Restoration Project Maintenance and Management Oversight Committee 68 Harvard Street Brookline, Massachusetts 02447 www.muddyrivermmoc.
Muddy River Restoration Project Maintenance and Management Oversight Committee 68 Harvard Street Brookline, Massachusetts 02447 www.muddyrivermmoc.org FEDERAL FUNDING OF ENVIRONMENTAL RESTORATION IN PHASE
More informationFederally Supported Water Supply and Wastewater Treatment Programs
Federally Supported Water Supply and Wastewater Treatment Programs Claudia Copeland Specialist in Resources and Environmental Policy Nicole T. Carter Specialist in Natural Resources Policy Betsy A. Cody
More informationSummary: Introduction
Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with
More informationU.S. Army Corps of Engineers Tulsa District
U.S. Army Corps of Engineers Tulsa District Mike Abate, PMP. Chief, Civil Works Branch, PPMD April 17, 2015 US Army Corps of Engineers Civil Works Mission Water Supply 50% of Corps water supply contracts
More informationLocal hazard mitigation plans Disaster recovery plans Flood preparedness activities/public education Mitigation projects (construction) Post-disaster
Local hazard mitigation plans Disaster recovery plans Flood preparedness activities/public education Mitigation projects (construction) Post-disaster recovery and mitigation efforts Others? We have a significant
More informationDisaster Recovery Programs. Pre-Event Best Practices. Many Professions, Many Terms. Disasters happen. Goal is to create resiliency
S54 Disaster Recovery Programs 10/2/14 Disasters Happen in Washington State Disaster Recovery Programs IACC Conference 2014 WA Public Assistance & Hazard Mitigation Funding Overview Peter Tassoni Disaster
More informationPost-Flood Assessment
Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of
More informationGuidelines for Coordinating Flood Emergency Operations
Guidelines for Coordinating Flood Emergency Operations Completed in compliance with the Flood Emergency Action Team (FEAT): Initiative Number 1 Governor s Executive Order W-156-97 Approved by the Standardized
More informationOne Hundred Thirteenth Congress of the United States of America
H. R. 152 One Hundred Thirteenth Congress of the United States of America AT THE FIRST SESSION Begun and held at the City of Washington on Thursday, the third day of January, two thousand and thirteen
More informationHow to Become a Navy Engineer For $78,000 in USD
Presentation to Associated General Contractors COL Mark Deschenes Commander US Army Corps of Engineers Rock Island District February 2014 US Army Corps of Engineers Rock Island District 78,000 Square Miles
More informationSTATE OF TEXAS NOTICE OF OPEN MEETING OF THE COUNTIES OF BEXAR, SAN ANTONIO RIVER AUTHORITY WILSON, KARNES BOARD OF DIRECTORS
STATE OF TEXAS NOTICE OF OPEN MEETING OF THE COUNTIES OF BEXAR, SAN ANTONIO RIVER AUTHORITY WILSON, KARNES BOARD OF DIRECTORS AND GOLIAD REGULAR MEETING TAKE NOTICE that a Regular meeting of the BOARD
More informationEmergency Conservation Program
Materials Prepared for Federation of Southern Cooperatives Epes, Alabama September 11, 2009 Emergency Conservation Program by Karen R. Krub Farmers Legal Action Group, Inc. 360 North Robert Street, Suite
More informationSARASOTA COUNTY Dedicated to Quality Service
SARASOTA COUNTY Dedicated to Quality Service Florida Flood Map Updates and the National Flood Insurance Program Joy Duperault, CFM State of Florida NFIP Coordinator Desiree (Des) Companion, CFM CRS Coordinator
More informationURBAN WATERS. Federal Partnership. LosAngeles River Pilot
URBAN WATERS Federal Partnership LosAngeles River Pilot 1 Urban Waters Federal Partnership Vision, Mission & Principles We believe a deeper connection to local water bodies can bring a new cycle of community
More informationREVIEW PLAN For FLOOD RISK MANAGEMENT FOR DICKENSON COUNTY PUBLIC SCHOOLS LEVISA FORK BASIN DICKENSON COUNTY, VIRGINIA SECTION 202 NONSTRUCTURAL
REVIEW PLAN For FLOOD RISK MANAGEMENT FOR DICKENSON COUNTY PUBLIC SCHOOLS LEVISA FORK BASIN DICKENSON COUNTY, VIRGINIA SECTION 202 NONSTRUCTURAL PROJECT Huntington District October 2010 REVIEW PLAN FLOOD
More informationInfrastructure Flood Protection Guidance and Best Practices
The standards and best practices contained in this document are required elements for new projects seeking State funding under the New Jersey Environmental Infrastructure Finance Program (NJEIFP). Further
More informationSenator Roger F. Wicker Testimony on the Reauthorization of the National Flood Insurance Program Senate Banking Committee June 9, 2011
Senator Roger F. Wicker Testimony on the Reauthorization of the National Flood Insurance Program Senate Banking Committee June 9, 2011 Thank you, Chairman Johnson and Ranking Member Shelby, for holding
More informationThe Army Corps of Engineers and the Flood Risk Challenge
The Army Corps of Engineers and the Flood Risk Challenge Presentation to Association of State Flood Plain Managers Steven L. Stockton, P.E. Director of Civil Works June 12, 2013 US Army Corps of Engineers
More informationAmerican Society of Civil Engineers
American Society of Civil Engineers America s drinking water systems face an annual shortfall of at least $11 billion to replace aging facilities that are near the end of their useful lives and to comply
More informationASFPM Side-by-Side Comparison and Comments on NFIP Reform Bills
ASFPM Side-by-Side Comparison and Comments on NFIP Reform Bills HR 1309 and Committee Passed Senate Bill Topic House Summary Senate Summary ASFPM Comment General - Reauthorization of the NFIP for 5 years
More informationCHAPTER 37 DISASTER RECOVERY AND RECONSTRUCTION
CHAPTER 37 DISASTER RECOVERY AND RECONSTRUCTION 37.01 Authority 37.07 Temporary Regulations 37.02 Purposes 37.08 Demolition of Damaged Buildings 37.03 Definitions 37.09 Temporary and Permanent Housing
More informationFEMA Updates Flood Plain Information For 2006
Flood Insurance Rate Map Changes Informational Meeting For Property Owners Entering the Floodplain Durant Center February 23, 2011 Introductions City of Alexandria Transportation and Environmental Services
More information