1 INSTRUCTIONS FOR REQUESTS FOR CONTRACT VARIATION (FORMAT FOR PRESENTING REVISED COST ESTIMATES) Requests for Contract Variation should be used by consultants for the variation of contracts that have already been negotiated with ADB. The Request Form should be prepared in MS Excel Version 5 and can be accessed in ADB website under and contains instructions and specific guidelines for its preparation, including the accompanying documentation that needs to be submitted to ADB. A completed illustrated sample is also available on the same site for further clarification. All proposals for changes to a contract should be submitted to the Director of the User Division concerned, as shown in the contract, who will forward a recommendation to the Director, Operations Services and Financial Management Department (OSP1 or OSP2) for review and implementation of the changes that have been endorsed, with any adjustments, if necessary. The new format will help clearly illustrate the cost implications of the proposed changes and facilitate expeditious processing of such requests by ADB.
2 INSTRUCTIONS TO CONSULTANT TO REQUEST A CONTRACT VARIATION I. General Guidelines Requests for variation of the contract should be kept to a minimum. The consultant should submit details in writing of proposed changes in the timing, duration, and or nature of their services, and estimate the cost and other implications of the changes, using the Contract Variation Form. This form can be accessed from ADB Website at Explanations or justifications should be provided in a separate sheet, and should correspond with the Reference No. (Column 11) indicated in the form. You should submit all proposals for changes in contracted services, and any further notices to the Director of the User Division (TASU) concerned specified under Clause 12 of the Consultant Services Contract. II. Specific Guidelines The columns shown in the form are self-explanatory. However, the following guidelines for changes in specific items should be adhered to: A. Change(s) in Personnel (International or National Experts) 1. Existing Personnel: Indicate in the respective columns, the expert s name, the contract provision, adjustment to person-month(s) input, and the revised contract amount. 2. New Expert(s): Indicate the Expert s name with an (N), i.e. John Doe (N). Complete the data in columns 7 to 15. Refrain from deploying experts to the field when remuneration rates are not yet negotiated and approved by ADB Operations Services and Financial Management Department (OSFMD). TASU Project Officer cannot make commitments regarding remuneration. Documentation required (forms available in ADB web site at consulting/documents: b) Proposed Monthly Remuneration Rate in ADB format showing the breakdown into basic salary, social charges, overhead, and fees. c) Copy of salary slips (in English) for full-time staff of the firm. Most recent (within the last six months) contract of employment or any relevant documents to support the proposed base rate for independent expert. Rate under a QCBS contract cannot be used as reference. d) Audited financial statement showing social charges and overhead costs as a percentage of remuneration. Not required for replacement experts under QCBS, FBS and LCS.
3 e) Terms of Reference (for additional services). f) Start and end dates of services. g) Government Employer s written confirmation that expert is on leave without pay from h) Health Certificate for experts above 70 years old. i) New expert s services must not overlap with concurrent assignment in another ADB TA/Grant/Loan project. 3. Replacement Expert(s): Indicate in the respective columns, the expert s name being replaced, the existing contract provision, and the no. of person-months (pm) input to be deducted, etc. Immediately below the replaced expert, indicate the name of the replacement expert with an (R) i.e. Paul Simons, and complete columns 7 to 15. Documentation required (forms available in ADB web site at QCBS, FBS and LCS contracts b) Terms of Reference (for additional services). c) Start and end dates of services. d) Reason for replacement of expert(s) (acceptable reasons are resignation from firm, serious illness, or death). e) Replacement expert must have equal (or better) qualifications with expert being replaced. f) Government Employer s written confirmation that expert is on leave without pay from g) Health Certificate for experts above 70 years old. QBS, SSS, CQS contracts
4 b) Proposed Monthly Remuneration Rate in ADB format showing the breakdown into basic salary, social charges, overhead, and fees. c) Copy of salary slips (in English) for full-time staff of the firm. Most recent (within the last six months) contract of employment or any relevant documents to support the proposed base rate for independent expert. Rate under a QCBS contract cannot be used as reference. d) Audited financial statement showing social charges and overhead costs as a percentage of remuneration. Not required for replacement experts under QCBS, FBS and LCS. e) Terms of Reference (for additional services). f) Start and end dates of services. g) Government Employer s written confirmation that expert is on leave without pay from h) Health Certificate for experts above 70 years old. i) Reason for replacement of expert(s). j) Replacement expert must have comparable qualifications with that of expert being replaced. k) Replacement expert s services must not overlap with concurrent assignment with another ADB TA/Grant/Loan project. 4. Person-months Calendar months shall be deemed to be one complete calendar month, e.g February (1 29 February during a Leap Year), 1 31 May, 1 30 June, etc. Inputs of less than 1 month shall be calculated on an hourly basis for time spent in home office (one month being equivalent to 176 hours); and on calendar basis for time spent away from home office, including travel time (one day being equivalent to 1/30th of a month). Indicate up to four decimal places. Example: Home office of 5 days should be shown as ; Field Services of 5 days should be shown as B. Change(s) in out-of-pocket Expenses 1. Indicate the specific line item in column 2, and fill in the rest of the required data from columns 3 to 15. If budget item is new, please show as: Survey, Design (New). Cost details should be given with the explanation to support this new item. 2. Flat rate Items: NO CHANGES will normally be allowed for these items, except, when an extension is approved. The budget may then be increased commensurate to the period of the extension at the same flat rate. 3. Lump Sum items. NO CHANGES will normally be allowed for these items, except, where there is additional requirement necessitating additional costs.
5 4. Savings and/or Additional funds for reimbursable items: Indicate the item in column 2; the existing contract provision; the savings (shown as a deduction) or additional funds (shown as addition). C. Change in Contract s Services Completion Date Indicate expected completion date if different from the date in the contract or previous variation. E. Change in Remittance Instruction/ Bank Details of the Consultant Original copy of request for variation should be signed by the Authorized Representative, specifying the revised Bank details. Bank account should be in the name of the contracting party. F. Change of Company s Name Documentation Required: Copy of Board Resolution authorizing the company to change its name; Certificate of Registration with appropriate agency on change of name; or any other legal document to support the change of name. G. Change of Authorized Representative Documentation Required: Copy of Board Resolution or Power of Attorney or equivalent authorization. Other Matters A. Progress Payment on Time-Based Contracts Progress Payment amounts are indicative only; may increase or decrease based on actual staff inputs as stated in the Monthly Statement of Consultant s Inputs. Please request for reduction of experts inputs through a contract variation, if expected staff inputs will be less than that indicated in the Staffing Schedule. B. Foreign Currency Fluctuation Provision Provision is for ADB use only to cover contractual obligations in currencies other than US Dollars. This amount is earmarked against the contract s Contingency budget. C. Contingencies To be utilized only upon ADB s prior approval. Use of contingency requires contract variation to reallocate amount to a contract line item. Uncommitted contract contingency amount will be reverted to the TA/Grant fund upon contract closure.
Project Administration Instructions
Project Administration Instructions PAI No. 2.06 Page 1 of 7 CONSULTANT CONTRACT MANAGEMENT A. Introduction 1. This project administration instruction (PAI) provides guidelines for the management of consulting
Project Administration Instructions
Project Administration Instructions PAI No. 2.02 Page 1 of 10 PREPARING FOR CONSULTANT RECRUITMENT 1. This project administration instruction (PAI) guides the recruiting party in preparing for consultant
North American Development Bank. Model Bidding Document: Consultant Services
North American Development Bank Model Bidding Document: Consultant Services MODEL DOCUMENTS Sample letter of invitation Outline for typical Terms of Reference Supplementary information for consultants
Principles and Procedures. Applicable to. The Procurement of. Consulting Services. Under. Transaction Advisory Services Provided by
Principles and Procedures Applicable to The Procurement of Consulting Services Under Transaction Advisory Services Provided by Asian Development Bank November 2013 This document has been prepared for ADB
Project Administration Instructions
Project Administration Instructions PAI No. 2.05 Revised December 2014 Page 1 of 10 SPECIFIC REQUIREMENTS FOR RECRUITING CONSULTANTS BY THE EXECUTING AGENCY 1. This project administration instruction (PAI)
Procurement Policy Office
Procurement Policy Office (Established under section 4 of the Public Procurement Act 2006) Ref: SC/EG37/07-12 Evaluation Guide (Consultancy Services) Procurement Policy Office Ministry of Finance and Economic
Project Administration Instructions
Project Administration Instructions PAI No. 2.04 Page 1 of 15 SPECIFIC REQUIREMENTS FOR RECRUITING CONSULTANTS BY ADB 1. This project administration instruction (PAI) explains the specific procedures for
SBERBANK OF RUSSIA OPEN JOINT-STOCK COMPANY. REGULATIONS on the Internal Audit Commission of Sberbank of Russia Open Joint-Stock Company
SBERBANK OF RUSSIA OPEN JOINT-STOCK COMPANY APPROVED BY: General Shareholders' Meeting of Sberbank of Russia Minutes No.27 dated 10 June 2014 REGULATIONS on the Internal Audit Commission of Sberbank of
EA s LETTERHEAD. The EA wishes to engage the Consultant to provide the services for [insert name of Project]
EA s LETTERHEAD [Name of Consulting Firm] [Address] This Agreement is made this day of [month] [year] between [name of the executing agency] (the EA) and [Name of Consultant, if individual or Name of Consulting
Consulting Services for CORPORATE SPONSORSHIP ASSET INVENTORY & VALUATION
REQUEST FOR PROPOSALS RFP No. 14-01-11 Consulting Services for CORPORATE SPONSORSHIP ASSET INVENTORY & VALUATION Proposals will be received on or before 2:00 pm local time Wednesday, February 19, 2014
Standard Request for Proposals. Selection of Consultants
STANDARD PROCUREMENT DOCUMENTS Standard Request for Proposals Selection of Consultants The Islamic Development Bank March 2012 This document is subject to copyright. This document may be used and reproduced
GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS
GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS Japan International Cooperation Agency (JICA) December 2006 (Amended December 2009) version 1.0 CONTENTS INTRODUCTION...
Consultant Services Complex Time-Based Assignments Large Lump-Sum Assignments
REQUEST FOR PROPOSALS Consultant Services Complex Time-Based Assignments Large Lump-Sum Assignments Public Procurement Board Accra, Ghana September 2003 i CONTENTS INTRODUCTION AND INSTRUCTIONS...1 SECTION
Financial Regulations and Rules of the United Nations
9 May 2003 United Nations Financial Regulations and Rules of the United Nations Secretary-General s bulletin 9 May 2003 United Nations Financial Regulations and Rules of the United Nations Secretary-General
INVOICE/FINANCING REQUEST AND CONTRACT FINANCIAL REPORTING INSTRUCTIONS FOR NIH COST-REIMBURSEMENT CONTRACTS, NIH(RC)-4
INVOICE/FINANCING REQUEST AND CONTRACT FINANCIAL REPORTING INSTRUCTIONS FOR NIH COST-REIMBURSEMENT CONTRACTS, Format: Submit payment requests on the Contractor s self-generated form in the manner and format
Guidelines (Rules) for the Procurement of Services 1
Southern African Development Community Project Preparation and Development Facility Guidelines (Rules) for the Procurement of Services 1 Revision 1 November 2013 1 Adapted from the African Development
Project Procurement Management
Project Procurement Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note
Request for Proposals (RFP)
GOVERNMENT OF TAMILNADU Commissionerate of Municipal Administration 6 th Floor, Ezhilagam Annexe Building, Chepauk, Chennai - 600005 Tel: +91 44-044-28549924 Name of Project: Procurement of Hosted Exchange
Standard Request for Proposals Selection of Consultants
STANDARD PROCUREMENT DOCUMENTS Standard Request for Proposals Selection of Consultants September 2012 This document is subject to copyright. This document may be used and reproduced for non-commercial
CATSA Screening Contractor Management System Standard (2015)
Public Works and Government Services Canada Canadian General Standards Board Travaux publics et Services gouvernementaux Canada Office des normes générales du Canada CATSA Screening Contractor Management
Kaukauna Area School District Employee Benefits Booklet 2015. Kaukauna Area School District. 2015 EMPLOYEE BENEFITS GUIDE
Kaukauna Area School District Employee Benefits Booklet 2015 Kaukauna Area School District. 2015 EMPLOYEE BENEFITS GUIDE Quick Reference Guide Benefit Vendor Phone & Website Health Network Health Plan
Project Administration Instructions
Project Administration Instructions PAI No. 2.03 Page 1 of 15 GENERAL PROCEDURE FOR SELECTING AND ENGAGING CONSULTANTS 1. This project administration instruction (PAI) contains general procedures for the
[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices
[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices Schedule of Prices SP1
Contract Administration
Chapter 5 Contract Administration Section 3 Change Orders 5-301 General 5-302 Change Order Policy 5-303 Purpose of Change Orders 5-304 Initiation of Change Orders 5-305 Preliminary Considerations 5-306
OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.
OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS SPECIFIC AUTHORITY Sections 240.209(3)(p), 1001.74, 1013.46, F. S. OBJECTIVE To establish procedures for administration of construction manager
Staff costs Fact sheet on eligibility of staff costs 1
Version: June 2015 Staff costs Fact sheet on eligibility of staff costs 1 Definition Expenditure on costs of staff members employed by the partner organisation, who are formally engaged to work on the
Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013
EUROPEAN COMMISSION European Social Fund Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 Version of June 2015 Please consult http://ec.europa.eu/esf/sco
AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME
AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME GUIDANCE NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED
The South African Council for the Project and Construction Management Professions (SACPCMP)
The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Professional Construction Mentors in terms of Section 18(1) (c) of the Act, 2000 (Act
Schedule of Prices. Project Name Contract No. Contract Number
Schedule of Prices Project Name Contract No. Contract Number C3-LS-BP-Issue 2 SP Page 1 Printed 1 March 2011 >: 1. When preparing the schedule
Preparing a Budget for a Research Grant Proposal. Office of Sponsored Projects Faculty Education Working Group http://www.dartmouth.
Preparing a Budget for a Research Grant Proposal Office of Sponsored Projects Faculty Education Working Group http://www.dartmouth.edu/~osp Table of Contents 1. SOLICITATIONS 2. THE PURPOSE & IMPORTANCE
Manual of Policies and Procedure of Employment of Consultants
Manual of Policies and Procedure of Employment of Consultants CONTENTS Chapter Description Page No I Introduction 1-4 II Expression of Interest 5-6 III Selection of Consultants 7-18 IV Other Methods
FREQUENTLY ASKED QUESTIONS ABOUT ACCOUNTS PAYABLE WHEN DOES THE STATE OF MARYLAND PAY MY VENDORS?
FREQUENTLY ASKED QUESTIONS ABOUT ACCOUNTS PAYABLE WHEN DOES THE STATE OF MARYLAND PAY MY VENDORS? The state attempts to pay all vendors within 30 days of the Service Date. This is defined as the later
Amendments to the Financial Regulations and Financial Rules
EXECUTIVE BOARD EB132/44 132nd session 11 January 2013 Provisional agenda item 12.2 Amendments to the Financial Regulations and Financial Rules Report by the Secretariat 1. The Programme, Budget and Administration
Road Safety and Transport Authority Ministry of Information and Communications Royal Government of Bhutan
S T A N D A R D R E Q U E S T F O R P R O P O S A L S P r o c u r e m e n t o f Consult i n g S e r vices Road Safety and Transport Authority Ministry of Information and Communications Royal Government
World Bank Procurement Guidelines and Business Opportunities
World Bank Procurement Guidelines and Business Opportunities Nancy Bikondo - Omosa Procurement Specialist Procurement Policy and Services Group November 2011 1 AGENDA The Role of the Bank and the Borrower
PROJECT PROCUREMENT MANAGEMENT
12 PROJECT PROCUREMENT MANAGEMENT Project Procurement Management includes the processes required to acquire goods and services from outside the performing organization. For simplicity, goods and services,
sample Gold Disability Income Cover
Gold Disability Income Cover Here is some important information about Gold Disability Income Cover. Please read this policy document and then keep it in a safe place. 1 Please take the time to read this
AGREEMENT BETWEEN. INDEPENDENT SCHOOL DISTRICT 15 St. Francis, Minnesota. and SUPERINTENDENT 2013-2016
AGREEMENT BETWEEN INDEPENDENT SCHOOL DISTRICT 15 St. Francis, Minnesota and SUPERINTENDENT 2013-2016 Approved by the School Board on, 06/24/2013. Effective through 6/30/2016 TABLE OF CONTENTS I. Applicable
City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT
City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT Date original issued: September 28, 2015 Qualifications Statements due: The City of Vallejo will consider Proposals submitted in response
CONSULTING SERVICES MANUAL
Democratic Socialist Republic of Sri Lanka CONSULTING SERVICES MANUAL November 2007 (To be used along with the Guidelines for Selection and Employment of Consultants August 2007) NATIONAL PROCUREMENT AGENCY
A summary of the Collective Labour Agreement for Temporary Agency Workers 2012-2017
A summary of the Collective Labour Agreement for Temporary Agency Workers 2012-2017 July 2015 issue Table of contents 1. Introduction 3 2. Phase system 3 2.1 Phase A 4 2.2 Phase B 4 2.3 Phase C 4 2.4 Interruption
POLICY OF DISTRICT ON TAX SHELTER ANNUITY OPERATION
3013 POLICY OF DISTRICT ON TAX SHELTER ANNUITY OPERATION ESTABLISHMENT OF PROGRAM The Merton Community School District (the District ) sponsors a Tax Sheltered annuity Program ( Program ) intended to quality
Project Management Consultant for Jaipur Smart City Project
Edited by C. Fletcher (Aug 10, 2011) For submission to HOPs (July 28, 2011) REQUEST FOR PROPOSALS RFP No.: 1 of 2016-17 (International Competitive Bidding) Project Management Consultant for Jaipur Smart
Income Preferred Bonus Fixed Indexed Annuity
Income Preferred Bonus Fixed Indexed Annuity 55542 (03/14) What is a fixed indexed annuity? It is a contract between you and an insurance company. In return for your money, or premium, the insurance company
Extract from the MPG Support Guidelines for Junior Scientists - Doctoral Student Support -
Extract from the MPG Support Guidelines for Junior Scientists - Doctoral Student Support - Introduction The Max-Planck-Gesellschaft provides support for graduate students who wish to study for a doctorate.
INFORMATION SHEET ON FACTORING (PURCHASE and MANAGEMENT OF ENTERPRISE S ACCOUNT RECEIVABLES) (update in force as from 01 07 2015)
INFORMATION SHEET ON FACTORING (PURCHASE and MANAGEMENT OF ENTERPRISE S ACCOUNT RECEIVABLES) (update in force as from 01 07 2015) INFORMATION ON THE BANK Banca IFIS S.p.A. Registered office: Via Terraglio
PRIORITY 2 INFORMATION SOCIETY TECHNOLOGIES (IST) FREQUENTLY ASKED QUESTIONS on Project management in FP6
PRIORITY 2 INFORMATION SOCIETY TECHNOLOGIES (IST) FREQUENTLY ASKED QUESTIONS on Project management in FP6 March 2005 Evolution of the consortium 1. If a sum has been allocated within the budget for new
The Special Non-resident Tax Regime for Expatriate Employees in Belgium
H UMAN C APITAL t The Special Non-resident Tax Regime for Expatriate Employees in Belgium Contents 1. Qualifying Conditions 2. The special tax regime a. Generalities b. Non-taxable allowances c. Calculation
Notice of CEO Performance and Remuneration Review Committee
Notice of CEO Performance and Remuneration Review Committee Monday 30 March 2015 MEMBERSHIP Mayor Kevin Knight (Presiding Member) Cr Jim McLafferty Cr Lucas Jones Cr Justin Hanson Cr Paula Luethen-Soper
Democratic Socialist Republic of Sri Lanka GUIDELINES SELECTION & EMPLOYMENT OF CONSULTANTS
Democratic Socialist Republic of Sri Lanka GUIDELINES SELECTION & EMPLOYMENT OF CONSULTANTS August 2007 National Procurement Agency of Sri Lanka Level 22 West Tower World Trade Centre Colombo 1 ii iii
Employees. Table of Contents
Table of Contents 1. Introduction 2 2. Recruitment 2 3. Pay and Leave Administration 5 3.1 Pay Administration 5 3.2 Leave Administration 7 4. Benefits 10 5. Employee Assistance Program 12 6. Conflict Resolution
AWARD IN BUSINESS FINANCE AND BANKING OPERATIONS
Sample Paper AWARD IN BUSINESS FINANCE AND BANKING OPERATIONS Level 4 Subject code: ASE20084 SAMPLE Time allowed: 2 hours INSTRUCTIONS FOR CANDIDATES Answer ALL 4 questions. All questions carry equal marks.
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF ENVIRONMENTAL REMEDIATION
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF ENVIRONMENTAL REMEDIATION TECHNICAL ASSISTANCE GRANTS STATE ASSISTANCE CONTRACT RECORD KEEPING AND PAYMENT GUIDE 1.0 ACCOUNTING SYSTEM
PYXIS SOLUTIONS, LLC, USA
PYXIS SOLUTIONS, LLC, USA REPORT OF THE CHIEF EXECUTIVE OFFICER TO THE SOLE MEMBER, ITC INFOTECH (USA), INC. I take pleasure in presenting my Report together with the Audited Financial Statements of the
SUPPLY, INSTALLATION AND COMMISSIONING OF A LABORATORY INFORMATION MANAGEMENT SYSTEM (LIMS) FOR THE TRINIDAD AND TOBAGO FORENSIC SCIENCE CENTRE
NATIONAL INSURANCE PROPERTY DEVELOPMENT COMPANY LIMITED REQUEST FOR PROPOSALS TO PROVIDE SUPPLY, INSTALLATION AND COMMISSIONING OF A LABORATORY INFORMATION MANAGEMENT SYSTEM (LIMS) FOR THE TRINIDAD AND
25 LEAVE POLICY. Leave Policy
Page 1 of 29 25 LEAVE POLICY Staff members may check information on matters relating to their employment at the HKUST, such as visa requirement, Hong Kong Identity Card, contractual benefits like leave,
MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES
MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES THIS AGREEMENT is made and entered into this day of, 2007, by and between the University of Washington ( Owner ) and, ( Project
JOINT AGREEMENTS. - Cyclistes Professionnels Associés [Associated Professional Riders], hereinafter referred to as CPA,
(version on 01.01.2013) JOINT AGREEMENTS on the working conditions of riders hired by Professional Continental Teams and UCI ProTeams for the year of registration 2013 and the following. Signatories: -
ADB Business Opportunities for Consultants. Presentation by Galia Ismakova, Senior Procurement Specialist, COSO April 2011
ADB Business Opportunities for Consultants Presentation by Galia Ismakova, Senior Procurement Specialist, COSO April 2011 Regional Multi-lateral Development Bank with HQ in Manila, Philippines Asian Development
GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS/FIRM
GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS/FIRM 1 Standard Bidding Document Version Control v0-1 STANDARD REQUEST FOR PROPOSALS SELECTION OF CONSULTANTS/FIRM Introduction
(INSERT NAME OF FIRM)
MASTER AGREEMENT FOR CONSULTING SERVICES (INSERT NAME OF FIRM) THIS AGREEMENT is made and entered into as of the day of by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT"
Sec. 20-90 page 1 (11-04)
Department of Public Health Sec. 20-90 page 1 (11-04) TABLE OF CONTENTS The Board of Examiners for Nursing and Requirements for Registration of Professional Nurses and Certification of Licensed Practical
Project Administration Instructions
Project Administration Instructions PAI No. 2.07 Page 1 of 5 CONSULTANT PERFORMANCE EVALUATION A. Introduction 1. This project administration instruction (PAI) provides policies and procedures for evaluating
University of Illinois at Chicago Effort Reporting Policies
University of Illinois at Chicago Effort Reporting Policies As a recipient of sponsored funds, the University must assure Federal and other sponsors that the assignment of time and associated salary and
EUROPEAN AGREEMENT ON A VOLUNTARY CODE OF CONDUCT ON PRE-CONTRACTUAL INFORMATION FOR HOME LOANS ( AGREEMENT )
EUROPEAN AGREEMENT ON A VOLUNTARY CODE OF CONDUCT ON PRE-CONTRACTUAL INFORMATION FOR HOME LOANS ( AGREEMENT ) This Agreement has been negotiated and adopted by European associations of consumers and the
OAKLAND USD RFP /09) ATTOR RNEY ENSATION WORKERS' COMP
OAKLAND UNIFIED SCHOOL DISTRICTT REQUEST FOR PROPOSALSS ( NO. 15-16/ /09) ATTOR RNEY SERVICES WORKERS' COMP ENSATION DEFENSEE 1 OAKLAND USD RFP (NO. 15 16/ /09) ATTORNEY SERVICES, WORKERS COMPENSATION
MONITORING PERFORMANCE
MONITORING PERFORMANCE Monitoring the performance of the contractor is a key function of proper contract administration. The purpose is to ensure that the contractor is performing all duties in accordance
GENERAL CONDITIONS OF THE FEDERAL DEPARTMENT OF FOREIGN AFFAIRS FOR LOCAL MANDATES
Annex 3 GENERAL CONDITIONS OF THE FEDERAL DEPARTMENT OF FOREIGN AFFAIRS FOR LOCAL MANDATES 1. Phase Prior to Contract Conclusion 1.1. Up to the conclusion of the contract, withdrawal from the negotiations
Frequently Asked Questions to the Marie Curie Actions Financial Guidelines
Frequently Asked Questions to the Marie Curie Actions Financial Guidelines Updated 26/06/2012 Table of contents Q1: FOR CATEGORIES A-C (1-2 AS OF WP2011), WHICH AMOUNT HAS TO BE DECLARED IN THE FORM C
INFORMATION NOTES FOR TEACHERS, INCLUDING PRINCIPALS AND VICE PRINCIPALS.
TNC 2009/4 Appendix B JOB SHARE SCHEME FOR TEACHERS INFORMATION NOTES FOR TEACHERS, INCLUDING PRINCIPALS AND VICE PRINCIPALS. These should be read in conjunction with the Job Share Scheme and Appendix
Frequently asked questions. FP7 Financial Guide
Frequently asked questions FP7 Financial Guide Budgetary matters Eligible costs of a project What are the criteria for determining whether the costs of a project are eligible? First of all, costs must
Minnesota Workers' Compensation. System Report, 2006. minnesota department of. labor & industry. Policy Development, Research and Statistics
Minnesota Workers' Compensation System Report, 2006 minnesota department of labor & industry Policy Development, Research and Statistics Minnesota Workers Compensation System Report, 2006 by David Berry
COUNTY OF TRINITY CASH HANDLING PROCEDURES
COUNTY OF TRINITY CASH HANDLING PROCEDURES Prepared by the Trinity County Auditor/Controller s Office Revised October 1, 2009 TABLE OF CONTENTS I. Introduction--------------------------------------------------------------------1
DISBURSEMENT HANDBOOK FOR PUBLIC SECTOR LOANS. January 2013. Office of the General Counsel
DISBURSEMENT HANDBOOK FOR PUBLIC SECTOR LOANS January 2013 Office of the General Counsel DISBURSEMENT HANDBOOK TABLE OF CONTENTS Page 1. INTRODUCTION... 4 1.1 SOME TERMS EXPLAINED... 6 Loan agreement...
Financial Regulations and Rules
Financial Regulations and Rules Contents Regulation 1. Applicability... 276 Rule 101.1. Applicability and authority... 276 Rule 101.2. Responsibility... 277 Regulation 2. The financial period... 277 Regulation
Template for essential information to be provided for proposals including clinical trials / studies / investigations
Template for essential information to be provided for proposals including clinical trials / studies / investigations Document history Version 2016callsV1 September 2015 Modifications (compared to previous
Selection of Consultants By the World Bank
STANDARD REQUEST FOR PROPOSALS Selection of Consultants By the World Bank The World Bank Washington, D.C. March 2007 CONTENTS Preface... iv Section 1. Letter of Invitation... 7 Section 2. Instructions
Business Opportunities Seminar
Business Opportunities Seminar In Finland, Norway, Denmark, Ireland and The Netherlands (22 29 September 2015) Presented by: Rustam Abdukayumov Senior Procurement Specialist Operations Services and Financial
MATERNITY LEAVE. It is essential that you read all the guidance in these maternity leave pages.
MATERNITY LEAVE This document includes all the guidance given on the Personnel Services website, which can be found at http://www.admin.ox.ac.uk/personnel/during/family/maternity/. It is intended for pregnant
Guidelines on. The Use of Consultants by Asian Development Bank and Its Borrowers
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrowers March 2013 Guidelines on The Use of Consultants by Asian Development Bank and Its Borrowers March 2013 2013 Asian Development
INSTRUCTIONS FOR PROVIDING PROFESSIONAL CONSULTING SERVICES
INSTRUCTIONS FOR PROVIDING PROFESSIONAL CONSULTING SERVICES Prepared by: Engineering Services and Internal Review May 2014 CONTENTS INTRODUCTION... 1 I. AUDIT EVALUATION... 2 II. PERFORMANCE AND POST-PERFORMANCE
Seed Fund Proposal Application Form Template
Seed Fund Proposal Application Form Template Cover Page JSF Seed Fund Proposal Title: Name of implementing agency(s): Proposal location: Implementation Period : Start ---------- Completion----------------
Frequently Asked Questions and Next Steps to Retirement
State Teachers Retirement System Of Ohio Completing My Service Retirement Application Frequently Asked Questions and Next Steps to Retirement for Members Enrolled in the Defined Benefit Plan Dear Member:
Administrative Directive
Administrative Directive Title: Grant Management Index Number: AD 1.05 Date of Adoption: 09/06/94 Date of Revision: 06/30/2006 Page: 1 of 8 1.0 Purpose and Need Grant funds from state, federal, or other
Saudi Cable Company. The composition, responsibilities, and authority of the Committee are set out in this Charter.
Saudi Cable Company CHARTER OF THE NOMINATION AND REMUNERATION COMMITTEE 1. GENERAL As required by the Capital Market Authority (CMA) the Board of Directors (the Board ) of Saudi Cable Company (the Company
Newfoundland and Labrador Teachers Association TEACHERS GUIDE TO EMPLOYMENT INSURANCE
Newfoundland and Labrador Teachers Association TEACHERS GUIDE TO EMPLOYMENT INSURANCE April 2015 ei The Newfoundland and Labrador Teachers Association wishes to thank the Alberta Teachers Association for