BLADEROOM MODULAR DATA CENTRES

Size: px
Start display at page:

Download "BLADEROOM MODULAR DATA CENTRES"

Transcription

1 BladeRoom Group Ltd Malvern View Industrial Park Stella Way Bishop s Cleeve Cheltenham Gloucestershire GL52 7DQ Tel: Fax: postbox@bladeroom.com website: APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL APPROVALS FOR CONSTRUCTION Agrément Certificate 12/4899 Product Sheet 1 PRODUCT SCOPE AND SUMMARY OF CERTIFICATE This Certificate relates to the BladeRoom Modular Data Centres, a factory assembled self-contained modular system specifically designed for accommodating separate power distribution, air treatment systems and IT equipment for use within an existing building structure or as a standalone external building up to two storeys high. AGRÉMENT CERTIFICATION INCLUDES: factors relating to compliance with Building Regulations where applicable factors relating to additional non-regulatory information where applicable independently verified technical specification assessment criteria and technical investigations design considerations installation guidance regular surveillance of production formal three-yearly review. BLADEROOM MODULAR DATA CENTRES KEY FACTORS ASSESSED Strength and stability structural calculations and testing have been used to verify the strength and stability of the Data Centre under permanent loads and of the modules during installation (see section 6). Behaviour in relation to fire tests and assessment show that the Data Centre can meet Building Regulations requirements (see section 7). Thermal performance the floor, wall and roof construction contribute to the overall thermal performance of the Data Centre (see section 8). Weathertightness and damp-proofing the steel supporting structure raises the modules clear of the ground, giving the system an inherent resistance to ground moisture. Walls and roofs can adequately limit the risk of moisture penetration from precipitation and wind-driven spray (see section 10). Durability the steel modular structure has a design life of 60 years the fabric of the Bladeroom can achieve 25 to 60 years (see section 13). The BBA has awarded this Agrément Certificate to the company named above for the system described herein. This system has been assessed by the BBA as being fit for its intended use provided it is installed, used and maintained as set out in this Certificate. On behalf of the British Board of Agrément Date of First issue: 18 April 2012 Brian Chamberlain Greg Cooper Head of Approvals Engineering Chief Executive The BBA is a UKAS accredited certification body Number 113. The schedule of the current scope of accreditation for product certification is available in pdf format via the UKAS link on the BBA website at Readers are advised to check the validity and latest issue number of this Agrément Certificate by either referring to the BBA website or contacting the BBA direct. British Board of Agrément tel: Bucknalls Lane fax: Garston, Watford mail@bba.star.co.uk Herts WD25 9BA 2012 website: Page 1 of 12

2 Regulations In the opinion of the BBA, BladeRoom Modular Data Centres, if used in accordance with the provisions of this Certificate, will meet or contribute to meeting the relevant requirements of the following Building Regulations (the presence of a UK map indicates that the subject is related to the Building Regulations in the region or regions of the UK depicted): The Building Regulations 2010 (England and Wales) Requirements: A1 Requirements: B2 B3 B4 Requirement: C2(a)(b)(c) Requirement: L1(a)(i) Requirement: Regulation 7 Loading The Data Centres will have adequate strength and stability. See sections 6.1 to 6.6 of this Certificate. Internal fire spread (linings) Internal fire spread (structure) External fire spread The Data Centres can meet the relevant requirements within the limitations set out in this Certificate. See sections 7.1 to 7.5 of this Certificate. Resistance to moisture The Data Centres are acceptable. See sections 10.1 to 10.3 of this Certificate. Conservation of fuel and power` The wall, floor and roof elements contribute to meeting the requirement. See sections 8.1 and 8.2 of this Certificate. Materials and workmanship The Data Centres are acceptable. See section 13.1 to 13.4 and the Installation part of this Certificate. The Building (Scotland) Regulations 2004 (as amended) Regulation: 8(1)(2) Fitness and durability of materials and workmanship The Data Centres are acceptable. See sections 12.1 to 12.8, 13.1 to 13.4 and the Installation part of this Certificate. Regulation: 9 Building standards construction Standards: 1.1(a)(b) Structure 1.2 Disproportionate collapse The Data Centres will have adequate strength and stability, with reference to clauses (1) and (1) of these Standards. See sections 6.1 to 6.6 of this Certificate. Standards: 2.1 Compartmentation 2.2 Separation 2.3 Structural protection 2.5 Internal linings 2.6 Spread to neighbouring buildings 2.7 Spread on external walls 2.8 Spread from neighbouring buildings The Data Centres will meet the relevant Standards within the limitations set out in sections 6.1, 6.2 and 6.4 of this Certificate, with reference to clauses (1), (1), (1), (1), (1), (1), (1), (1), (1), (1), (1), (1), (1), (1), (1), (1) and (1) of these Standards. See sections 7.1 to 7.5 of this Certificate. Standards: 3.4 Moisture from the ground 3.10 Precipitation 3.15 Condensation The Data Centres are acceptable, with reference to clauses (1), (1), (1), (1), (1) and (1) of these Standards. See sections 9.2, 10.1 to 10.3 of this Certificate. Standards: 6.1 Carbon dioxide emissions 6.2 Building insulation envelope The wall, floor and roof elements are acceptable, with reference to clauses (1), (1), (1) and (1) of these Standards. See sections 8.1 and 8.2 of this Certificate. Standard: 7.1(a)(b) Statement of sustainability The Data Centres can contribute to meeting the relevant requirements of Regulation 9, Standards 1 to 6, and, therefore, will contribute to a construction meeting a bronze level of sustainability as defined in this Standard. (1) Technical Handbook (Domestic). The Building Regulations (Northern Ireland) 2000 (as amended) Regulation: B2 Fitness of materials and workmanship The Data Centres are acceptable. See section 13.1 to 13.4 and the Installation part of this Certificate. Regulation: B3(2) Suitability of certain materials The Data Centres are acceptable. See sections 12.1 to 12.8 of this Certificate. Regulation: C4 Resistance to ground moisture and weather Regulation: C5 Condensation The Data Centres are acceptable. See sections 9.2 and 10.1 to 10.3 of this Certificate. Regulations: D1 Stability The Data Centres will have adequate strength and stability. See sections 6.1 to 6.5 of this Certificate. Page 2 of 12

3 Regulations: E3 Internal fire spread Linings E4 Internal fire spread Structure E5 External fire spread The Data Centres will meet the relevant Regulations within the limitations set out in this Certificate. See sections 7.1 to 7.5 of this Certificate. Regulation: F2(a)(i) Conservation measures The wall, floor and roof elements are acceptable. See sections 8.1 to 8.2 of this Certificate. Construction (Design and Management) Regulations 2007 Construction (Design and Management) Regulations (Northern Ireland) 2007 Information in this Certificate may assist the client, CDM co-ordinator, designer and contractors to address their obligations under these Regulations. See sections: 3 Delivery and site handling (3.1 and 3.2) and 15 General (15.3) of this Certificate. General This Certificate relates to the BladeRoom Modular Data Centres, a factory assembled self-contained modular system specifically designed (1) for accommodating separate power distribution, air treatment systems and IT equipment for use within an existing building structure or as a standalone external building up to two storeys high. The scope of this Certificate is restricted to the structure of the BladeRoom Modular Data Centres and external envelope only (2). (1) The Data Centres are designed to have a power usage effectiveness (PUE) rating of 1.13 or better dependant on site specific infrastructure used. This is outside the scope of this Certificate (refer to the Certificate holder for further information). (2) The external envelope includes; the complete roof construction, the external wall construction and complete floor construction but excludes door sets, louvres, external mechanical equipment and staircases. Technical Specification 1 Description 1.1 BladeRoom Modular Data Centres are specifically-designed volumetric modules used to form computer data storage centres. The modules are available in a standard size of 15 m long by 4.5 m wide by 3.7 m high and each centre is typically built from between three (1) (BR30) and eleven modules (2) (BR225). Each data centre comprises modules with three different uses: air optimiser, a power room, and an IT room. A typical layout is shown in Figure 1. (1) Comprising an air optimiser module, a power room module, and an IT room module. (2) Comprising an air optimiser module, a power room module, and nine IT room modules. Figure 1 Typical BladeRoom Modular Data Centre layout showing air flow characteristics air intake louvre exhaust louvre Page 3 of 12

4 1.2 The full specification and drawings for the materials and components covered by this Certificate have been examined and are retained by the BBA. This section gives only general details of the system. 1.3 Each volumetric module is factory built and consists of a structural steel framework, an insulated floor, an insulated ceiling/roof structure, and insulated wall cladding on external walls. Structural steel framework 1.4 The steel structure is manufactured from bolted and/or welded hot rolled steel members. The structure incorporates perimeter floor beams and roof beams, corner columns, internal structural steel members (including, if required, lateral cross-bracing), forklift pockets and lifting eye connections. The steelwork is grade S275 and protected with a two-pack epoxy zinc phosphate primer and a single pack Firetex FX2002 intumescent paint finish. All internal columns and posts are encased with plastisol coated steel and mineral wool insulation between the member and the casing. Insulated floor 1.5 Floors/intermediate floors comprise pairs of 220 mm deep by 65 mm SwageBeam cold-worked galvanized steel joists, grade S390 (2.0 mm or 2.4 mm thick), fixed back to back and at 400 mm centres span between the primary beams. A 2 mm thick profiled steel plate is screwed to the underside of the joists and 200 mm mineral wool insulation (maximum λ 90/90 value of W m 1 K 1 ) filled between them. Engineered plywood tongue and groove boards, 25 mm thick, are fixed to the joists with TEK screws and neoprene tape. The floor is finished with 2 mm thick fully welded static dissipative floor covering complying with EN ISO : Insulated ceiling/roof structure 1.6 The roof/ceiling stucture comprise 100 mm by 60 mm hot-rolled rectangular hollow section at nominal 1200 mm centres are connected to both roof perimeter beams and provide support via a continuous ledger plate for 100 mm thick Isoclad Firestop 12 composite panels. The facings to the panels are of 1.5 mm galvanized steel with a plastisol finish on the exposed faces. The sloping flat roof consists of Powerdeck F tapered insulation system comprising rigid polyisocyanurate (PIR) foam board (maximum λ 90/90 value of W m 1 K 1 ) with thicknesses varying from 220 mm to 40 mm to provide a 1 in 80 fall to the insulated galvanized steel gutter incorporating a roof outlet. Each board is mechanically fastened using a minimum of four (1) TKR diameter Ejot fixings with Ejot HTK Plastic extension sleeves. A 1.5 mm thick Rhepanol polymeric roof membrane weatherproofing system (covered by BBA Certificate 02/3922) is bonded to the Powerdeck and trimmed with appropriate flashings and seals to complete the roof construction. (1) The number of fixings to be determined on a case-by-case basis as specified by the design Engineer. External walls 1.7 The external walls are formed from Isoclad Firestop 12 composite wall panels spanning horizontally between supports. On end panels supports are corner columns at 4500 mm centres and for gable walls, corner columns, intermediate posts and gable posts are provided at a maximum of 3800 mm centres. The gable posts are constructed from two cold formed profiles creating a 150 mm by 150 mm by 2 mm thick box section. The posts are secured to the main perimeter frame with bolts through brackets incorporating slotted holes to ensure no vertical load is transferred from the perimeter beams to the gable posts. The panels are third-party approved (against LPC 1208: Issue 2) and comprise steel faces bonded to a mineral fibre core (maximum λ 90/90 value of W m 1 K 1 ). The facings to the panels are of 0.7 mm galvanized steel with a plastisol finish on the exposed faces. Additional structural supports are provided adjacent to each opening. 1.8 Fixings, sealants and trims supplied by the Certificate holder to specifications agreed with the BBA. 2 Manufacture 2.1 The modules are fabricated by the Certificate holder. The steel framework is constructed by bolting and welding. The roof, floor and wall panels are made up separately and assembled to the framework. 2.2 As part of the assessment and ongoing surveillance of product quality, the BBA has: agreed with the manufacturer the quality control procedures and product testing to be undertaken assessed and agreed the quality control operated over batches of incoming materials monitored the production process and verified that it is in accordance with the documented process evaluated the process for management of non-conformities checked that equipment has been properly tested and calibrated undertaken to carry out the above measures on a regular basis through a surveillance process, to verify that the specifications and quality control operated by the manufacturer are being maintained. 3 Delivery and site handling 3.1 Each module is transported on a flat-bed lorry or trailer long enough to fully support the structure. The Air Optimiser module weighs approximately 30 tonnes and the Power Management and IT Room modules weigh 23 tonnes each. During transport, the modules are covered to protect against weather. 3.2 The individual modules are sufficiently robust to be lifted, transported and sited and are unloaded by crane via a proprietary M36 lifting eye bolted into the head of each intermediate prop position via a captive nut. The safe working load for the lifting eye connections is 10 metric tonnes each and the forklift pockets are 30 metric tonnes combined. 3.3 The modules are normally positioned on the day of delivery and the assembly is carried out by the Certificate holder s operatives, thus site storage is not required. Page 4 of 12

5 Assessment and Technical Investigations The following part of the Certificate gives a summary of the assessment and technical investigations carried out on BladeRoom Modular Data Centres. Design Considerations 4 Use BladeRoom Modular Data Centres, typically consisting of three to eleven modules have been assessed for structural stability up to two storeys, for use inside an existing building shell or as an external building within the restrictions defined in section 6. Specifiers must ensure that; plan form, internal subdivision, siting, access for the disabled, access for fire services, and means of escape in case of fire, comply with the relevant requirements of the Building Regulations. 5 Practicability of installation The Data Centres are installed by the Certificate holder s operatives who are responsible for delivery, installation and commissioning. 6 Strength and stability 6.1 BladeRoom modules and the connections between modules have been designed in accordance with BS EN : 2005 and BS EN : 2006 to resist the actions resulting from: self weight and imposed loads given in BS EN : 2002 National Annex to BS EN : 2002 snow load given in BS EN : 2003 National Annex to EN : 2003 wind load given in BS EN : 2005 National Annex to EN : The structural stability of the individual modules is based on the worst case loading for a two storey application defined as follows: Floor Loads maximum line load from computer rows (1) ; at ground floor level = 12 kn m 1 at first floor level (2) = 10 kn m 1 maximum aisle areas load = 3 kn m 2 temporary concentrated load (3) = 10 kn (1) Loads on modules used for air optimisation or plant rooms are less onerous. (2) With a maximum of two rows of computer racks per module. (3) Including resistance to a acting through a 100 mm by 100 mm loading plate (equivalent UDL over the whole area 7.7 kn m 2 ). Roof loads roof load (4) = kn m 2 roof imposed actions snow = kn m 2 roof wind pressure (5) = kn m 2 roof wind suction (5) = kn m 2 roof plant (6) = 3 kn m 2 ceiling load = kn m 2 (4) Imposed load applies to locations where access is not provided, other than that necessary for cleaning or repair. (5) Modules designed for up to two storey applications only, covering UK mainland sites with: a basic wind speed up to 25.5 m s 1 as defined in BS EN : 2002 covering the line drawn approximately between Glasgow and Aberdeen on Figure NA.1 within the UK NAD to BS EN : 2002 maximum site altitiude100 m altitude above sea level, and not located in areas of severe wind exposure, e.g. top of escarpments building taken to be 50 km from the coast, except where the nearest coastline is the East coast of the UK. In this situation the distance to the coast is reduced to 5 km. (6) Roof-top mounted Air Handling Units: maximum 2 pairs of condensers per module. External Wall Loads worst case wind action (5)(7) = kn m 2. (7) When subjected to the wind loads referred to above, calculations indicate that a minimum number of four linked modules are required. Cross bracing is required in one of the 4.5 by 3.75 end panels of each non-gable elevation. Note: For more onerous applications site specific designs by a suitably qualified engineer will be required. 6.3 The sub-structure on which the modules are sited must be designed to withstand the maximum load to the foundation. The maximum loads for a two-storey Data Centre are shown in Table 1. The foundation loads for each Data Centre will be provided by the Certificate holder. The loads may be reduced by the addition of extra supports for each modules perimeter beams (details available from the Certificate holder). Page 5 of 12

6 Table 1 Maximum unfactored foundation support reactions (dead, imposed and wind loads) Zone Location Vertical load (kn) Horizontal Load (kn) A Gable end intermediate props <350 <32 B Internal intermediate props <700 <32 C Central support to long span ground floor <130 - D Corner and end posts <16 <32 D D D D D A B B B A C C C C C A B B B A D D D D D 6.4 Two-storey structures covered by this assessment must be placed one above the other with load transfer via the corner columns and internal posts. 6.5 Provision for access is normally via an external staircase but this is outside the scope of this Certificate. 6.6 For Powerdeck F roof insulation, the building designer needs to check the proposed fixing detail is suitable for the anticipated design wind load. 7 Behaviour in relation to fire 7.1 Data Centres subject to Building Regulations must not be erected within one metre of a boundary and should be sited with due regard of all unprotected areas. 7.2 Internal structural steel members are generally protected by Plastisol coated steel casings and mineral wool insulation. Members that are exposed are coated with intumescent paint to achieve a 60 minute fire protection in accordance with BS : 1987, BS : 1987 and BS EN : The steel face surface provides a class 0 spread of flame. 7.3 The Isoclad firestop12 panels that form part of the external wall construction and ceiling, incorporate Plastisol coated steel panels with a class 0 spread of flame and have accreditation against LPC 1208 : Issue 2. When fire resistance is required: detailing should be in accordance with LPC Certificate 142a, or determined by test from a UKAS accredited laboratory. 7.4 Where it is necessary for fittings, services or ducts to penetrate part of the fire-resisting construction, the detailing must ensure that the relevant fire resistance is not impaired, particularly in relation to the integrity requirements. 7.5 Where it is necessary to meet Building Regulations, the concealed space between the ground floor ceiling and first floor must incorporate adequate fireproof barriers to prevent the unseen spread of smoke and fire. 7.6 BladeRoom Modular Data Centres are provided with a fire suppression system that is outside the scope of this Certificate. 8 Thermal performance 8.1 The U values given below exceed the default values in Building Regulations. Designers must ensure that Data Centres achieve the target carbon emissions reduction for the complete proposed building when compared to the notional building. 8.2 For the purpose of calculations, the element U values may be taken from Table 2. Page 6 of 12

7 Table 2 Thermal performance (1) Element U value (W m 2 K 1 ) External wall 0.27 (2) Roof 0.22 Floor (3) 0.37 (4) 0.27 (5) (1) Based on the maximum thermal conductivity values given in sections 1.5 to 1.7 (2) Plain wall panel this value should be corrected for fixings in accordance with BS EN ISO 6946 : 2007 (3) Calculated in accordance with BS EN ISO : 1998 using: 1 λ soil = 1.5 W m 1 K 1 skirt wall U value = 0.35 W m 2 K 1 floor U value 0.96 W m 2 K void under floor = 230 mm wind shielding factor = average ventilation area = m 1 2 m design wind speed = 0.05 m s 1. (4) For a floor perimeter-to-area ratio (P/A) of approximately 0.28 for the smallest unit. (5) For a floor perimeter-to-area ratio (P/A) of approximately 0.17 for the largest unit. 9 Condensation 9.1 The air temperature and humidity within the modules are controlled by equipment outside the scope of this Certificate. Interstitial condensation 9.2 When the modules (wall panels, ceiling panels, flooring and flashing) are appropriately sealed against the ingress of water vapour, interstitial condensation will not form within the construction. 10 Weathertightness and damp-proofing 10.1 The steel supporting columns raise the modules clear off the ground, giving it an inherent resistance to ground moisture. A damp-proof course (dpc) to protect the galvanizing is required where the steel structure is in contact with the foundations Where relevant, in preparing the site for erection of the BladeRoom Modular Data Centres, adequate drainage must be provided to prevent water collecting beneath or against the structure The roof and external wall surfaces provide adequate weather resistance when installed in accordance with the Certificate holder s instructions. The final weathertightness of the Data Centre is dependent upon correct positioning and sealing of the welded roofing membrane, flashings, gutter/gutter outlets and joints between modules The performance of windows and doors is not covered by this Certificate. 11 Services Electrical and plumbing services are outside the scope of this Certificate. However, in designing and installing these services, precautions must be taken to avoid the possible risk of long-term damage to the module structure or the services by, for example, the ingress of water, water vapour or condensate. 12 Maintenance and repair 12.1 Where used, gutters and downpipes must be inspected regularly and blockages cleared Site-applied seals should be checked as part of the maintenance regime for the structure. The seals should be replaced when required The roof covering should be inspected at regular intervals External surfaces of the wall panels require an occasional washing down with water containing a mild detergent. Where a high aesthetic standard is required, maintenance painting may be required after a period of between 10 and 30 years, depending on colour and environmental conditions, using a paint recommended by the Certificate holder In the event of impact or other damage to an external wall, a replacement panel must be installed by the Certificate holder The ceiling and internal wall surfaces can be cleaned using water containing a mild detergent. These surfaces can be decorated using a paint recommended by the Certificate holder Should it be necessary to replace or repair the floor covering, all joints must be adequately sealed and welded. Any replacement floor covering must be to an equivalent specification as that of the original. Page 7 of 12

8 12.8 The maintenance of the electrical equipment and other hardware used within the Data Centre is outside the scope of the Certificate (1). (1) For further information, the advice of the Certificate holder should be sought. 13 Durability 13.1 The main structural framework is assessed as capable of achieving a design life of 60 years. Other elements can achieve a design life of between 25 and 60 years depending on the materials, construction and degree of maintenance (1). (1) Reference may be made to BS 7543 : 2003, or a relevant Agrément Certificate in this respect Particular care is required in arrangement for damp-proof courses, integrity of joints between wall panels and weathertightness of the building envelope Foot traffic over the roof should be restricted to the purpose of maintenance and suitable precautions taken to avoid the risk of damaging the roof membrane The roof and floor coverings may require replacement during the building s life. 14 Re-use and recyclability The main structural components can be re-used. Installation 15 General 15.1 Erection of the BladeRoom Modular Data Centres is carried out solely by operatives approved by the Certificate holder Due to the size of the modules, it is necessary to plan with respect to access, obstructions and the logistics of using large machinery and equipment required for the installation process. Consideration must also be given to site boundaries and compliance with Building Regulations (see section 7.1) All necessary health and safety procedures must be observed and strictly adhered to. 16 Preparation 16.1 All pre-installation site surveys, checks and considerations must be taken into account, particularly with regard to suitable foundations and drainage and service provisions It is essential to set out level and accurate foundations and service connections and these should be supervised and accurately checked before the system modules are delivered to site. The foundations must be built in accordance with the Certificate holder s design. 17 Procedure 17.1 The modules are placed by crane by the Certificate holder on prepared foundations using purpose-designed lifting points incorporated in the steel frame The modules have protective weatherproofing coverings that are removed prior to lifting and installation into position The foundation connection bar rods for each corner foundation connector and locator plate are installed into the oversized (±25 mm) pre cast or drilled holes within the foundations to allow for structural movement (see Figure 2). Structural galvanized steel levelling shims (25 mm thick) are inserted as appropriate, enabling mortar infill to be applied after unit installation Alternatively, Hilti M16 stud anchor bolts or equivalent can be used to secure the foundation connector locator plates and are fully tightened once the modular units have been bolted together. Figure 2 Foundation locator plate detail Page 8 of 12

9 17.5 The Bladeroom modular unit is fastened using four M bolts at each corner connection and locator plates and six M bolts at module-to-module foundation connection and locator plates. This process is repeated until all units are secured to the module-to-module and corner connecting foundation plates Once all the modules have been securely situated and correctly aligned in the foundation connection and locator plates, the module shoes are then fully tightened to the foundation plate. Any gaps beneath the corner locator plate must be filled with a suitable grout as specified by the Certificate holder. Module-to-module joints Walls 17.7 Before adjacent modules are sealed, additional mineral wool insulation and expanding foam tape is installed between the exposed module posts. The cavity between the modular units is filled with 150 mm deep insulation to the full height of the cavity. Expanding foam tape is applied to full height, floor to ceiling of the external wall to provide a weathertight and airtight seal. The process is completed on the internal wall to encase the insulation securely. Each module connecting post can then be bolted together using the predrilled holes using M mm bolts. Roofs 17.8 On the roof, the bay-to-bay junction of the Rhepanol roof lining membrane must be weather sealed. Overlapped joints and detailing must be clean and dry prior to sealing. A solvent welding agent is necessary in moist and cool weather or where significant dirt has built up. The external weather seal is formed by applying cover tape across the module bay-to-bay joint in accordance with the membrane manufacturer s instructions. Floors 17.9 The internal joint gap between the modules is filled with PVA adhesive and a plywood insertion is cut to fit the gap and secured with screws at 300 mm centres through the plywood and steel floor beam Data Centre modules of the same length can be stacked (see section 6.3). The modules are bolted together at steel column points and along the longitudinal beams On the Air Optimiser module, the plant deck and DX condensing unit and interconnecting pipework are fitted after the installation of the modules. Finishing The completion of external and internal cladding and trims is carried out on site by the Certificate holder. Service connections are made and internal subdivisions and finishes completed at joints between modules. Technical Investigations 18 Investigations 18.1 An analysis was made of data to determine: structural adequacy roof and wall U values to BS EN ISO 6946 : 2007 floor U values to BS EN ISO : An examination was made of existing data to assess: behaviour in fire impact resistance of floor and wall panels load capacity of roof and floor weathertightness durability maintenance requirements The manufacturing process was examined, including the methods adopted for quality control, and details were obtained of the quality and composition of the materials used. Page 9 of 12

10 Bibliography BS : 1987 Fire tests on building materials and structures Method for determination of the fire resistance of elements of construction (general priciples) BS : 1987 Fire tests on building materials and structures Method for determination of the fire resistance of loadbearing elements of construction BS 7543 : 2003 Guide to durability of buildings and building elements, products and components BS 8004 : 1986 Code of practice for foundations BS EN : 2003 Actions on structures General actions Snow loads BS EN : 2003 UK National Annex to Eurocode 1 : Actions on structures General actions Snow loads BS EN : 2005 Actions on structures General actions Wind actions BS EN : 2005 UK National Annex to Eurocode 1 : Actions on structures General actions Wind actions BS EN : 2005 Eurocode 3 : Design of steel structures General rules and rules for buildings BS EN : 2006 Eurocode 3 : Design of steel structures General rules Supplementary rules for cold-formed members and sheeting EN : 2010 Test methods for determining the contribution to the fire resistance of structural members. Applied reactive protection to steel members BS EN ISO 6946 : 2007 Building components and building elements Thermal resistance and thermal transmittance Calculation method BS EN ISO : 1998 Thermal performance of buildings Heat transfer via the ground Calculation methods EN ISO : 2010 Reaction to fire tests for floorings -- Part 1: Determination of the burning behaviour using a radiant heat source Page 10 of 12

11 Conditions of Certification 19 Conditions 19.1 This Certificate: relates only to the product/system that is named and described on the front page is issued only to the company, firm, organisation or person named on the front page no other company, firm, organisation or person may hold or claim that this Certificate has been issued to them is valid only within the UK has to be read, considered and used as a whole document it may be misleading and will be incomplete to be selective is copyright of the BBA is subject to English Law Publications, documents, specifications, legislation, regulations, standards and the like referenced in this Certificate are those that were current and/or deemed relevant by the BBA at the date of issue or reissue of this Certificate This Certificate will remain valid for an unlimited period provided that the product/system and its manufacture and/or fabrication, including all related and relevant parts and processes thereof: are maintained at or above the levels which have been assessed and found to be satisfactory by the BBA continue to be checked as and when deemed appropriate by the BBA under arrangements that it will determine are reviewed by the BBA as and when it considers appropriate The BBA has used due skill, care and diligence in preparing this Certificate, but no warranty is provided In issuing this Certificate, the BBA is not responsible and is excluded from any liability to any company, firm, organisation or person, for any matters arising directly or indirectly from: the presence or absence of any patent, intellectual property or similar rights subsisting in the product/system or any other product/system the right of the Certificate holder to manufacture, supply, install, maintain or market the product/system individual installations of the product/system, including their nature, design, methods, performance, workmanship and maintenance any works and constructions in which the product/system is installed, including their nature, design, methods, performance, workmanship and maintenance any loss or damage, including personal injury, howsoever caused by the product/system, including its manufacture, supply, installation, use, maintenance and removal any claims by the manufacturer relating to CE marking Any information relating to the manufacture, supply, installation, use, maintenance and removal of this product/ system which is contained or referred to in this Certificate is the minimum required to be met when the product/system is manufactured, supplied, installed, used, maintained and removed. It does not purport in any way to restate the requirements of the Health and Safety at Work etc. Act 1974, or of any other statutory, common law or other duty which may exist at the date of issue or reissue of this Certificate; nor is conformity with such information to be taken as satisfying the requirements of the 1974 Act or of any statutory, common law or other duty of care. Page 11 of 12

12 British Board of Agrément tel: Bucknalls Lane fax: Garston, Watford Herts WD25 9BA 2012 website: Page 12 of 12

PRODUCT SHEET 1 MIDLAND LEAD MANUFACTURERS LTD S CAST LEAD SHEET

PRODUCT SHEET 1 MIDLAND LEAD MANUFACTURERS LTD S CAST LEAD SHEET CI/SfB (49) Mh8 Midland Lead Manufacturers Ltd Kiln Way Woodville Swadlincote Derbyshire DE11 8ED Tel: 01283 224555 Fax: 01283 550284 e-mail: sales@midlandlead.co.uk website: www.midlandlead.co.uk Agrément

More information

ALUMASC ROOF WATERPROOFING MEMBRANES EUROROOF MASTERGOLD ROOF WATERPROOFING MEMBRANE

ALUMASC ROOF WATERPROOFING MEMBRANES EUROROOF MASTERGOLD ROOF WATERPROOFING MEMBRANE Alumasc Exterior Building Products Ltd White House Works Bold Road Sutton St Helens Merseyside WA9 4JG Tel: 01744 648 400 e-mail: roofing@alumasc-exteriors.co.uk website: www.alumascroofing.co.uk APPROVAL

More information

MAXFLOW SYPHONIC DRAINAGE SYSTEM

MAXFLOW SYPHONIC DRAINAGE SYSTEM Tamakiş Sifonik Yagmur Suyu Toplama Sistemleri Inşaat San.ve Tic Ltd, STI Park Maya Sitesi Maya Meridyen Iş Merkezi No 2 Kat:7 Akatlar Istanbul 34335 Turkey Tel: 00 90 212 352 4600 Fax: 00 90 212 352 3666

More information

SIKA TANKING MEMBRANES SIKAPROOF A MEMBRANES

SIKA TANKING MEMBRANES SIKAPROOF A MEMBRANES Sika Limited Watchmead Welwyn Garden City Hertfordshire AL7 1BQ Tel: 01707 394 444 Fax: 01707 329 129 e-mail: technical@uk.sika.com website: www.sika.co.uk APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL

More information

KINGSPAN INSULATION KINGSPAN KOOLTHERM K12 FRAMING BOARD INSULATION

KINGSPAN INSULATION KINGSPAN KOOLTHERM K12 FRAMING BOARD INSULATION Kingspan Insulation Limited Pembridge Leominster Herefordshire HR6 9LA Tel: 01544 388601 Fax: 01544 388888 e-mail: general.enquiries@kil.kingspan.co.uk APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL

More information

NUAIRE VENTILATION SYSTEMS FLATMASTER AND FLATMASTER 2000 SYSTEMS

NUAIRE VENTILATION SYSTEMS FLATMASTER AND FLATMASTER 2000 SYSTEMS NuAire Ltd Western Industrial Estate Caerphilly Mid Glamorgan CF83 1NA Tel: 02920 858 200 Fax: 02920 858 300 e-mail: info@nuaire.co.uk website: www.nuaire.co.uk NUAIRE VENTILATION SYSTEMS APPROVAL INSPECTION

More information

HUNTON BITUMEN IMPREGNATED BOARDS HUNTON BITROC SHEATHING BOARD

HUNTON BITUMEN IMPREGNATED BOARDS HUNTON BITROC SHEATHING BOARD Hunton Fiber AS P O Box 633 N 2810 Gjøvik Norway Tel: 00 47 6113 4700 Fax: 00 47 6113 4710 e-mail: hunton@hunton.no website: www.hunton.no APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL APPROVALS

More information

LANGLEY S ROOF WATERPROOFING MEMBRANES PARADIENE/PARAFOR ROOF WATERPROOFING SYSTEMS

LANGLEY S ROOF WATERPROOFING MEMBRANES PARADIENE/PARAFOR ROOF WATERPROOFING SYSTEMS Langley Waterproofing Systems Ltd Bishop Crewe House North Street Daventry Northants NN11 4GH Tel: 01327 704778 Fax: 01327 704845 e-mail: enquiries@langley.co.uk website: www.langley.co.uk APPROVAL INSPECTION

More information

ROOFERS CHOICE BREATHER MEMBRANES FOR USE IN COLD NON-VENTILATED ROOFS

ROOFERS CHOICE BREATHER MEMBRANES FOR USE IN COLD NON-VENTILATED ROOFS Mercury Building Products Ltd 114 Eckington Road Coal Aston Dronfield Sheffield S18 3AY Tel: 01246 292816 Fax: 01246 292867 e-mail: sales@vaprfree.co.uk danny@vaprfree.co.uk website: www.mercurybuildingproducts.com

More information

NUAIRE VENTILATION SYSTEMS DRIMASTER, DRIMASTER 3S, DRIMASTER 2000 AND DRIMASTER 2000 3S SYSTEMS

NUAIRE VENTILATION SYSTEMS DRIMASTER, DRIMASTER 3S, DRIMASTER 2000 AND DRIMASTER 2000 3S SYSTEMS NuAire Ltd Western Industrial Estate Caerphilly Mid Glamorgan CF83 1NA Tel: 029 2085 8200 Fax: 029 2085 8300 e-mail: info@nuaire.co.uk website: www.nuaire.co.uk Agrément Certificate 00/3727 Product Sheet

More information

SIG SIG CAVITY WALL INSULATION

SIG SIG CAVITY WALL INSULATION SIG 6 Park Square Thorncliffe Park Chapeltown Sheffield S35 2PH Tel: 0844 5766 762 Fax: 0114 240 9540 e-mail: cwi@sigplc.co.uk website: www.siginsulations.co.uk APPROVAL INSPECTION TESTING CERTIFICATION

More information

MONARPERM 600, MONARPERM PLUS AND MONARPERM TOP (COLD VENTILATED AND WARM NON-VENTILATED)

MONARPERM 600, MONARPERM PLUS AND MONARPERM TOP (COLD VENTILATED AND WARM NON-VENTILATED) Icopal Limited Barton Dock Road Stretford Manchester M32 0YL Tel: 0161 865 4444 Fax: 0161 866 9859 e-mail: info.uk@icopal.com website: www.icopal.com APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL

More information

ModuSec. Secure and efficient IT room solutions. Turnkey Modular Construction Fast clean build to any size or shape

ModuSec. Secure and efficient IT room solutions. Turnkey Modular Construction Fast clean build to any size or shape ModuSec Secure and efficient IT room solutions Turnkey Modular Construction Fast clean build to any size or shape Room in room Standalone external build Transportable Modusec SR Options Modusec SR Options

More information

WARMFILL CAVITY WALL INSULATION WARMFILL CAVITY WALL INSULATION FOR MASONRY CAVITY WALLS

WARMFILL CAVITY WALL INSULATION WARMFILL CAVITY WALL INSULATION FOR MASONRY CAVITY WALLS Warmfill Limited Unit 5, Port of Larne Business Park Redlands Road Larne BT40 1AX Tel: 028 9042 8260 Fax: 028 9042 7641 e-mail: sales@warmfill.com website: www.warmfill.com APPROVAL INSPECTION TESTING

More information

Agrément Certificate 06/4300 Product Sheet 1

Agrément Certificate 06/4300 Product Sheet 1 Domestic and General Insulation Ltd Energy House Magnis Works Roman Road Hereford HR4 9QR Tel: 0844 543 0043 Fax: 01432 268680 e-mail: headoffice@dgi.org.uk website: www.dgi.org.uk APPROVAL INSPECTION

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

BAUDER BITUMINOUS ROOFING SYSTEMS BAUDERFLEX ROOF WATERPROOFING SYSTEMS

BAUDER BITUMINOUS ROOFING SYSTEMS BAUDERFLEX ROOF WATERPROOFING SYSTEMS Bauder Ltd 70 Landseer Road Ipswich Suffolk IP3 0DH Tel: 01473 257671 Fax 01473 230761 e-mail: mail@bauder.co.uk website: www.bauder.co.uk APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL APPROVALS

More information

FATRA ROOF COVERING SYSTEMS FATRAFOL FF807 AND FATRAFOL FF807/V ROOF COVERING SYSTEMS

FATRA ROOF COVERING SYSTEMS FATRAFOL FF807 AND FATRAFOL FF807/V ROOF COVERING SYSTEMS Fatra UK Ltd Unit 12 The Timber Yard East Moors Road Ocean Park Cardiff CF24 5EE Tel: 029 2048 7954 Fax: 029 2048 9226 e-mail: sales@fatra.co.uk website: www.fatra.co.uk FATRA ROOF COVERING SYSTEMS APPROVAL

More information

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery Part 3 Ancillary technologies Chapter CONTENTS SCOPE Clause Page DESIGN Design standards D1 1 Statutory requirements D2 1 System design D3 1 Building integration D4 2 Noise D5 2 Access and controls D6

More information

ICOPAL POUR AND ROLL ROOF WATERPROOFING ICOPAL POWER ELASTOMERIC ROOF WATERPROOFING SYSTEM

ICOPAL POUR AND ROLL ROOF WATERPROOFING ICOPAL POWER ELASTOMERIC ROOF WATERPROOFING SYSTEM Icopal Limited Barton Dock Road Stretford Manchester M32 0YL Tel: 0161-865 4444 Fax: 0161-864 8433 e-mail: market.uk@icopal.com website: www.icopal.co.uk APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL

More information

Composite Panel Firewall Systems

Composite Panel Firewall Systems Composite Panel Firewall Systems part of the Protecting more than your business Insulated mineral fibre panels have excellent thermal and acoustic properties, ideal for factory and office partition walls.

More information

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Services Enclosures and Protected Shafts - Maintaining Compartmentation Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping

More information

TECHNOELAST ROOF WATERPROOFING MEMBRANES TECHNOELAST APP EPP AND TECHNOELAST APP EKP ROOF WATERPROOFING MEMBRANES

TECHNOELAST ROOF WATERPROOFING MEMBRANES TECHNOELAST APP EPP AND TECHNOELAST APP EKP ROOF WATERPROOFING MEMBRANES TechnoNicol-Vyborg Ltd Ruberoidnaya St 7 Leningradskaya Region Vyborg 188804 Russia Tel: 007 81378 39090 Fax: 007 81378 39091 e-mail: sales@vbg.tn.ru website: www.tn-europe.com APPROVAL INSPECTION TESTING

More information

INSTA-POLYPEARL CAVITY WALL INSULATION INSTA-POLYPEARL PLUS AND INSTA-POLYPEARL PLATINUM CAVITY WALL INSULATION

INSTA-POLYPEARL CAVITY WALL INSULATION INSTA-POLYPEARL PLUS AND INSTA-POLYPEARL PLATINUM CAVITY WALL INSULATION InstaFibre Ltd Insta House Ivanhoe Road Hogwood Business Park Finchampstead Wokingham Berkshire RG40 4PZ Tel: 0118 932 8811 Fax: 0118 932 8314 APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL APPROVALS

More information

RHEPANOL RHEPANOL FK ROOF COVERING SYSTEM

RHEPANOL RHEPANOL FK ROOF COVERING SYSTEM Flachdach Technologie GmbH & Co KG Eisenbahnstrasse 6 8 68199 Mannheim Germany Tel: 00 49 621 8504-372 Fax: 00 49 621 8504-378 e-mail: export@fdt.de website: www.fdt.de APPROVAL INSPECTION TESTING CERTIFICATION

More information

MAXFLOW DRAINAGE SYSTEM MAXFLOW SYPHONIC DRAINAGE SYSTEM

MAXFLOW DRAINAGE SYSTEM MAXFLOW SYPHONIC DRAINAGE SYSTEM Yalitim Çözümleri Sanayi ve Ticaret A.S Park Maya Sitesi Maya Meridyen Is Merkezi No 2 Kat:7 Akatlar Istanbul 34335 Turkey Tel: 00 90 212 352 4600 Fax: 00 90 212 352 3666 e-mail: info@maxflowtr.com website:

More information

CHESTERFLEX ROOF WATERPROOFING MEMBRANES

CHESTERFLEX ROOF WATERPROOFING MEMBRANES CI/SfB (47) Ln2 Chesterfelt Ltd CHESTERFLEX ROOF WATERPROOFING MEMBRANES Certificate No 94/3062 DETAIL SHEET 2 Product THIS DETAIL SHEET RELATES TO CHESTERFLEX ROOF WATERPROOFING MEMBRANES, POLYESTER REINFORCED

More information

DOMESTIC & GENERAL INSULATION LTD BLOWN-IN CAVITY WALL INSULATION THERMABEAD, THERMABEAD CARBON SAVER AND THERMABEAD DIAMOND CWI

DOMESTIC & GENERAL INSULATION LTD BLOWN-IN CAVITY WALL INSULATION THERMABEAD, THERMABEAD CARBON SAVER AND THERMABEAD DIAMOND CWI Domestic & General Insulation Ltd Units 1-2 Shipston Close Worcester WR4 9XN Tel: 0844 543 0043 Fax: 01432 268680 e-mail: headoffice@dgi.org.uk website: www.dgi.org.uk APPROVAL INSPECTION TESTING CERTIFICATION

More information

Hanson Building Products. precast basement solutions

Hanson Building Products. precast basement solutions Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01. Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

Fire safety in timber buildings

Fire safety in timber buildings Fire safety in timber buildings Introduction Fire spread in buildings is a risk to life safety for which the Building Regulations (for England and Wales 1,2, Scotland 3 and Northern Ireland 4 ) aims to

More information

FLAGON PVC SINGLE-PLY ROOF WATERPROOFING SYSTEMS FLAGON SFc, SFb AND SV ROOF WATERPROOFING SYSTEMS

FLAGON PVC SINGLE-PLY ROOF WATERPROOFING SYSTEMS FLAGON SFc, SFb AND SV ROOF WATERPROOFING SYSTEMS Flag-Soprema UK Ltd Unit 640, Avenue West Skyline 120 Great Notley Essex CM77 7AA Tel: 0845 194 8727 Fax: 0845 194 8728 e-mail: enquiries@flag-soprema.co.uk website: www.flag-soprema.co.uk APPROVAL INSPECTION

More information

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in REV 1-12.12.11/TB002 Technical Bulletin Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in conjunction with TRADA Technology and is intended to provide the reader with introductory

More information

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013]

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013] FLASHMAN WINDOW AND DOOR FLASHING SYSTEM This Appraisal replaces BRANZ Appraisal No. 573 (2007). Amended 05 February 2016. BRANZ Appraisals Technical Assessments of products for building and construction.

More information

INSTALLATION. General. Important Note. Design. Transport

INSTALLATION. General. Important Note. Design. Transport General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected

More information

How To Certify The Scottsdale Construction System

How To Certify The Scottsdale Construction System BRE CERTIFICATION LIMITED PRODUCT SCOTTSDALE CONSTRUCTION SYSTEM CERTIFICATE NUMBER 129/07 DATE OF ISSUE December 2007 SUPPLIED BY Scottsdale Construction System Ltd SUMMARY The Scottsdale Construction

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Post and Beam Construction

Post and Beam Construction Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America

More information

DE BOER WATERPROOFING MEMBRANES

DE BOER WATERPROOFING MEMBRANES De Boer Waterproofing Solutions NV Metropoolstraat 33 B-2900 Schoten Belgium Tel: 00 32 3 647 1400 Fax: 00 32 3 646 7703 e-mail: infouk@deboer.be website: www.deboer.be APPROVAL INSPECTION TESTING CERTIFICATION

More information

Loss Prevention Standard

Loss Prevention Standard Loss Prevention Standard : ISSUE 3.0 Requirements for the LPCB Approval and Listing of Companies Undertaking the Maintenance and Repair of Doorsets, Shutters, and Active Smoke/Fire Barriers This standard

More information

STEEL BUILDINGS IN EUROPE. Single-Storey Steel Buildings Part 8: Building Envelope

STEEL BUILDINGS IN EUROPE. Single-Storey Steel Buildings Part 8: Building Envelope STEEL BUILDINGS IN EUROPE Single-Storey Steel Buildings Part 8: Building Envelope Single-Storey Steel Buildings Part 8: Building Envelope 2 - ii Part 8: Building Envelope emissions

More information

INSTABEAD CAVITY WALL INSULATION SYSTEM INSTABEAD WHITE, INSTABEAD CARBON SAVER AND INSTABEAD DIAMOND CAVITY WALL INSULATION

INSTABEAD CAVITY WALL INSULATION SYSTEM INSTABEAD WHITE, INSTABEAD CARBON SAVER AND INSTABEAD DIAMOND CAVITY WALL INSULATION InstaFibre Ltd Insta House Ivanhoe Road Hogwood Business Park Finchampstead Wokingham Berkshire RG40 4PZ Tel: 0118 932 8811 Fax: 0118 932 8314 e-mail: info@instagroup.co.uk website: www.instagroup.co.uk

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

METROTILE ROOFING SYSTEM METROTILE SHINGLE

METROTILE ROOFING SYSTEM METROTILE SHINGLE Metrotile UK Limited Unit 3 Sheldon Business Park Sheldon Corner Chippenham Wiltshire SN14 0RQ Tel: 01249 658514 Fax: 01249 658453 e-mail: sales@metrotile.co.uk website: www.metrotile.co.uk APPROVAL INSPECTION

More information

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,

More information

Insulated Roof & Wall Panels. Product Data Sheet. Trapezoidal Insulated Roof Panels KS1000 RW

Insulated Roof & Wall Panels. Product Data Sheet. Trapezoidal Insulated Roof Panels KS1000 RW Insulated Roof & Wall Panels Trapezoidal Insulated Roof Panels KS1000 RW Overview Kingspan roof panel systems present a superior system compared to conventional multi-part site assembled systems. They

More information

Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5

Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5 Cl Sfb (27-9) Rn7 M2 December 2004 Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5 Fesco, Fesco S, Retrofit, Retrofit S, Fesco Fillet, PF,

More information

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 Commercial rooftops represent the most available, sustainable and secure real estate for new

More information

Module 3.7. Thermal bridging

Module 3.7. Thermal bridging Module 3.7 Thermal bridging Learning Outcomes On successful completion of this module learners will be able to - Describe construction details which influence thermal bridging. 2 Introduction to thermal

More information

BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS.

BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS. Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS. Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance

More information

Chapter 2 Basis of design and materials

Chapter 2 Basis of design and materials Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural

More information

AXTER ROOF WATERPROOFING MEMBRANES EXCEL ROOF SYSTEM

AXTER ROOF WATERPROOFING MEMBRANES EXCEL ROOF SYSTEM Axter Ltd West Road Ransomes Europark Ipswich IP3 9SX Tel: 01473 724056 Fax: 01473 723263 e-mail: info@axterltd.co.uk website: www.axter.co.uk APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL APPROVALS

More information

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Issue of the Guidelines on Prevention of Water Seepage in New Buildings graphic: Buildings Department Your REF 來 函 檔 號 :. OUR REF 本 處 檔 號 :.BD GR/1-55/173 FAX 圖 文 傳 真 :..28400451 TEL 電 話 :..2626 1717 www.info.gov.hk/bd To : All Authorized Persons 7 March 2005 Registered Structural

More information

- - - - Steel Panel Frame. Exterior Steel Sheeting. Optional Rigid Insulation. Optional Steel Insulation Liner

- - - - Steel Panel Frame. Exterior Steel Sheeting. Optional Rigid Insulation. Optional Steel Insulation Liner The Kelly Klosure pre-framed modular panel has 4 components that are factory finished to create an easy and versatile bolt-together system in the field. Steel Panel Frame Exterior Steel Sheeting Optional

More information

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most

More information

Decree of the Ministry of the Environment on fire safety of ventilation systems

Decree of the Ministry of the Environment on fire safety of ventilation systems THE NATIONAL BUILDING CODE OF FINLAND MINISTRY OF THE ENVIRONMENT Housing and Building Department Decree of the Ministry of the Environment on fire safety of ventilation systems Adopted in Helsinki, 18

More information

KEYLITE ROOF WINDOWS KEYLITE CENTRE PIVOT ROOF WINDOWS

KEYLITE ROOF WINDOWS KEYLITE CENTRE PIVOT ROOF WINDOWS Keylite Roof Windows Ltd Unit 5, Derryloran Industrial Estate Sandholes Road Cookstown Co Tyrone Northern Ireland BT80 9LU Tel: 028 8675 8921 Fax: 028 8675 8923 e-mail: info@keylite.co.uk website: www.keylite.co.uk

More information

PRODUCT SHEET 1 COLD FUSION BONDED BUILT-UP ROOFING SYSTEMS

PRODUCT SHEET 1 COLD FUSION BONDED BUILT-UP ROOFING SYSTEMS CI/SfB (47) Ln6 Sika Liquid Plastics Sika House Miller Street Preston Lancashire PR1 1EA Tel: 01772 259781 Fax: 01772 255670 e-mail: liquidplastics@ uk.sika.com website: www.liquidplastics.co.uk Agrément

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

plumbing products guide

plumbing products guide plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly

More information

James M. Pleasants Company

James M. Pleasants Company James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:

More information

Signs of insulation problems In the winter. In the summer. conditioning system

Signs of insulation problems In the winter. In the summer. conditioning system about your house CE 19 While previous generations may have been content to live in drafty houses, most people now want comfortable warm houses. A healthy house today is well sealed, well insulated and

More information

Preformed Metal Roofing and Siding

Preformed Metal Roofing and Siding Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision

More information

Colonnade Security Pipe

Colonnade Security Pipe Description: Round & Square downpipe formed from extruded 6060 T4 aluminium in various sizes (Ø83mm, Ø108mm, 83x83 mm & 108x108mm*) & supplied with a complete range of accessories i.e. Offsets, bends,

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements

More information

Introduction & Principles Issued in support of Junction Details, Parts 1 to 5

Introduction & Principles Issued in support of Junction Details, Parts 1 to 5 Accredited Construction Details (Scotland) 2010 For the limitation of thermal bridging and air infiltration in low and medium rise domestic buildings Introduction & Principles Issued in support of Junction

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

ModuSec. Secure and efficient IT room solutions Composite Panel Systems Compared. Panel Systems are not all the same!

ModuSec. Secure and efficient IT room solutions Composite Panel Systems Compared. Panel Systems are not all the same! Secure and efficient IT room solutions Composite Panel Systems Compared Panel Systems are not all the same! When it comes to accommodating critical IT systems, the first issue to look at is the environment

More information

KALZIP STANDING SEAM ROOF SYSTEMS KALZIP DECK ROOF SYSTEM

KALZIP STANDING SEAM ROOF SYSTEMS KALZIP DECK ROOF SYSTEM Kalzip Ltd Haydock Lane Haydock St Helens Merseyside WA11 9TY Tel: 01942 295500 Fax: 01942 295508 e-mail: enquiries.uk@kalzip.com website: www.kalzip.com APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL

More information

Partitioning & Ceiling Product Information

Partitioning & Ceiling Product Information Partitioning & Ceiling Product Information tel + 44 (0) 1384 412448 fax + 44 (0) 1384 4494 email enquiries@drywallsteelsections.co.uk web www.drywallsteelsections.co.uk tel + 44 (0) 1384 412448 fax + 44

More information

FIRE PERFORMANCE OF STRUCTURAL INSULATED PANEL SYSTEMS

FIRE PERFORMANCE OF STRUCTURAL INSULATED PANEL SYSTEMS INFORMATION PAPER IP 21/10 FIRE PERFORMANCE OF STRUCTURAL INSULATED PANEL SYSTEMS Tom Lennon and Danny Hopkin The use of Structural Insulated Panel (SIP) systems in construction in the UK has increased

More information

Manual lifting and handling

Manual lifting and handling Manual lifting and handling When installing British Gypsum products and systems care should be taken to ensure that appropriate methods of handling and lifting are adopted. The following guidance details

More information

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.

More information

LPCB Red Book Listed Products and Passive Fire Protection Installer Schemes Answering the needs of the market

LPCB Red Book Listed Products and Passive Fire Protection Installer Schemes Answering the needs of the market LPCB Red Book Listed Products and Passive Fire Protection Installer Schemes Answering the needs of the market Ian Stewart Passive installer scheme manager September 2011 Introduction to BRE Global Research,

More information

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

POLYGLASS ROOF WATERPROOFING MEMBRANES POLYSHIELD ROOF WATERPROOFING MEMBRANES

POLYGLASS ROOF WATERPROOFING MEMBRANES POLYSHIELD ROOF WATERPROOFING MEMBRANES Polyglass SpA Via dell Artigianato, 34 31047 Ponte di Piave Treviso Italy Tel: 00 39 042 27547 Fax: 00 39 042 2854118 e-mail: info@polyglass.it website: www.polyglass.com POLYGLASS ROOF WATERPROOFING MEMBRANES

More information

Sika Membran System For Sealing and Waterproofing Construction Gaps in Building Façades

Sika Membran System For Sealing and Waterproofing Construction Gaps in Building Façades Construction Sika For Sealing and Waterproofing Construction Gaps in Building Façades Waterproof and Airtight Flexible Seal Controlled Vapour Diffusion Bonds to any Building Substrate Prevents Interstitial

More information

QUAD-LOCK BUILDING SYSTEMS

QUAD-LOCK BUILDING SYSTEMS Quad-Lock Building Systems 7398-132nd Street Surrey British Columbia V3W 4M7 Canada Tel: +1(604) 590 3111 Fax: +(604) 590 8412 e-mail: info@quadlock.co.uk website: www.quadlock.co.uk APPROVAL INSPECTION

More information

Section 3.1.2. Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining

Section 3.1.2. Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining Section Timber Frame Walls Single layer between studs Product: Earthwool FrameTherm Rolls and Slabs Tf01 Single layer between studs with service void Product: Earthwool FrameTherm Rolls and Slabs Tf02

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the FTP CONTENTS FTP1 Adhesives used in A or B class divisions (FTP Code 3.1, Res A.754 para. 3.2.3) June 2000 FTP2 Pipe and duct

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced

More information

Multi-layer Insulation Blanket for Roofs

Multi-layer Insulation Blanket for Roofs Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof

More information

DULUX MASONRY PAINTS DULUX TRADE WEATHERSHIELD SMOOTH MASONRY PAINT

DULUX MASONRY PAINTS DULUX TRADE WEATHERSHIELD SMOOTH MASONRY PAINT ICI Paints AkzoNobel Wexham Road Slough Berkshire SL2 5DS Tel: 01753 550000 Fax: 01753 877413 e-mail: duluxtrade_advice@ici.com website: www.duluxtrade.co.uk APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of

More information

0845 0098 980 www.nicholsonsts.com

0845 0098 980 www.nicholsonsts.com 0845 0098 980 www.nicholsonsts.com ROOFTRAK The IFP is revolutionising the way we fix things to roofs. Technical Director of a leading UK roofing system manufacturer The ROOFTRAK-IFP A revolutionary solution

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS.

GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS. GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS. This leaflet provides guidance on how to attain compliance with The Building (Amendment) Regulations (Northern Ireland) 2006, Part

More information

Colorcoat Technical Paper Fire performance of pre-finished steel cladding systems

Colorcoat Technical Paper Fire performance of pre-finished steel cladding systems CI/SfB (4-) Nh2 (A3j) May 2013 CI/SfB (4-) Nh2 (A3j) May 2013 Colorcoat Technical Paper Fire performance of pre-finished steel cladding systems MINIMISING FIRE RISK Tata Steel have a long history of product

More information

Rockwool Cladding Roll

Rockwool Cladding Roll Rockwool Cladding Roll High performance industrial insulation has been specifically developed for use in lightweight cladding applications to commercial or industrial framed buildings. Cladding Roll U/F

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,

More information

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2 STANDARD for Plumbing, Heating, Hot Water, Cold Water & Electrical work undertaken by owners within the building known as Sussex Lodge London W2 & 16 Stanhope Terrace London W2 BPME Consulting Engineers

More information

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME 7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved

More information