1 Structural Evaluation of McClung Bldg 4 and 5 Following the February 1, 2014 Fire 500 West Jackson Avenue Knoxville, TN Prepared By: National Resource Management, LLC Carl Oaks, P.E. Jack Thomison, P.E. February 5, 2014 NRM-LLC, PO Box 23858, Knoxville, TN PH: , FAX
2 1.0 Background National Resource Management, LLC (NRM) was requested by KCDC to perform a structural evaluation of the buildings located at Jackson Avenue, Knoxville, TN on February 4, 2014 following a fire that occurred on February 1, The buildings were inspected by structural engineers, Mr. Carl Oaks, P.E. and Mr. Jack Thomison P.E. Prior to this, NRM inspected the building following a previous fire on February 7, NRM made another follow-up inspection and provided a detailed report on June 8, This fire destroyed building 5 and also damaged the building 4 roof and upper (6 th ) floor. The scope of this assessment was: 1. Determine if entry into the remaining shell of building 5 was safe for fire investigators. 2. Determine if it would be safe to reopen Jackson Avenue for public access. 3. Determine if it would be safe to allow the businesses and residences on the south side of the street to reopen. 2.0 Inspection The damaged buildings were surveyed at 9:00 am on February 4, The site was viewed from the Jackson Avenue level and from the KFD ladder truck above and to the south of the site. The remains of building 5 were inspected from above from several angles. The roof of building 4 was inspected from above and through the south side windows that were opened to allow inspection of the interior of the 6 th, 5 th, and 4 th floors. 3.0 Findings The interior of building 5 was found to be completely destroyed by the fire. The south wall below the street level had fallen to the inside of the building. The west wall was seen to be still partially standing about 10 feet above street level and about 30 feet above the rail yard grade. The wall above had fallen to the interior of the building. The north wall was also partially standing with some parts on the east side extending up to the 4 th floor level, about 50 feet above rail yard grade. Some parts in the center were only about 20 feet above the rail yard grade. The northwest corner of the north wall was leaning and was very unstable along with the unsupported sides of the window openings. The east wall was still fully intact and standing up to the roof level, about 70 feet above rail yard grade. The chimney attached to the east wall was also fully intact and extended up about an additional 20 feet. The chimney was leaning toward the west and had moved away from the adjacent building 4 walls by several inches. The center of the building 5 east wall was bowing west toward the building interior. Building 4 was found to be still fully standing with no obvious damage to the walls inspected and no structural connections to the adjacent building 5. There were signs of extensive burning on the roof with several areas where the roof was open and significant charring and complete failure was seen on some of the underlying roof beams. The worst damage to the roof appeared to be on the north end where most of it appeared to be burned-through and open; however, one area of burn-through was about 10 feet from the south end in the east-west center. The 6 th floor level had large amounts of charred and water soaked debris on the floor. Daylight could be seen coming through the extensive roof openings. Major charring was seen on the central girders and the remaining roof beams. Several beams had fallen down to the floor. Other beams were McClung Fire Damage Inspection 2/4/2014 Page 1
3 seen with compromised seats and bowing at the center of beams that had fire damage that appeared to be close to failure. In addition, several large (6 8 dia.) sprinkler header pipes were fallen down to the floor. No fire damage was seen on the 5 th, 4 th, or 3 rd floor levels. They all appeared to have no obvious changes from the last inspection in 2012 and damage from water intrusion was still apparent. The interior of building 5 was found to be completely destroyed by the fire. McClung Fire Damage Inspection 2/4/2014 Page 2
4 The south wall of building 5 below the street level had fallen to the inside of the building. The west wall was seen to be still partially standing about 10 feet above street level and about 30 feet above the rail yard grade. The wall above had fallen to the interior of the building. The north wall of building 5 was also partially standing with some parts on the east side extending up to the 4 th floor level, about 50 feet above rail yard grade. Some parts in the center were only about 20 feet above the rail yard grade. The northwest corner of the north wall was leaning and was very unstable along with the McClung Fire Damage Inspection 2/4/2014 Page 3
5 unsupported sides of the window openings. The east wall of building 5 was still fully intact and standing up to the roof level, about 70 feet above rail yard grade. The chimney attached to the east wall was also fully intact and extended up about an additional 20 feet. McClung Fire Damage Inspection 2/4/2014 Page 4
6 McClung Fire Damage Inspection 2/4/2014 Page 5
7 The building 5 chimney was leaning toward the west and had moved away from the adjacent building 4 walls by several inches. The center of the building 5 east wall was bowing west toward the building interior. There were signs of extensive burning on the building 4 roof with several areas where the roof was open and significant charring. McClung Fire Damage Inspection 2/4/2014 Page 6
8 The worst damage to the building 4 roof appeared to be on the north end where most of it appeared to be burned-through and open; however, one area of burn-through was about 10 feet from the south end in the east-west center. McClung Fire Damage Inspection 2/4/2014 Page 7
9 The building 4 6 th floor level had large amounts of charred and water soaked debris on the floor. Daylight could be seen coming through the extensive roof openings. Several beams had fallen down to the floor. In addition, several large (6 8 dia.) sprinkler header pipes were fallen down to the floor. A few beams, such as the fourth beam from the front in the above photo had significant deflection in the center of the beam and appeared close to collapse. McClung Fire Damage Inspection 2/4/2014 Page 8
10 Major charring was seen on the building 4 6 th floor level central girders and the remaining roof beams. Other beams were seen with compromised seats that appeared close to failure. No fire damage was seen on the 5 th floor level. It appeared to have no obvious changes from the last McClung Fire Damage Inspection 2/4/2014 Page 9
11 inspection in 2012 and damage from water intrusion was still apparent. No fire damage was seen on the 4 th floor level. It appeared to have no obvious changes from the last inspection in 2012 and damage from water intrusion was still apparent. McClung Fire Damage Inspection 2/4/2014 Page 10
12 No fire damage was seen on the 3 rd floor level. It appeared to have no obvious changes from the last inspection in 2012 and damage from water intrusion was still apparent. McClung Fire Damage Inspection 2/4/2014 Page 11
13 4.0 Conclusion Building 5 The remaining structures on building 5 are very unstable. Of primary concern are the east wall and the attached chimney. The chimney is clearly leaning inward and the center of the wall is also bowing toward the building interior. The north wall is very unstable with several unconnected window openings. The west wall is also unsupported and, particularly, the north end has a section leaning precariously toward the building interior. Building 4 Based upon the extent of the water soaked debris that has fallen from the roof level onto the sixth floor it is experiencing heavy loading. The roof beams that appeared to be close to collapse due to fire damage could cause the sixth floor to experience even heavier loading. Additionally, previous examinations and reports have indicated that the beams and girders, particularly in the top levels of the structure have been exposed to moisture deterioration for many years. This has caused rot in the top several inches of many of the beams and has weakened their ability to carry loads. Also there has to be a consideration for impact loads if the roof or upper floors collapse. The 2007 report showed areas of the sixth floor that experienced water damage and rot as well as the fifth floor showed an area of standing water and in one area the floor had rotted completely through. The 2012 inspection showed that no actions had been taken to stop the water intrusion and significant deterioration had occurred since the 2007 inspection. There is a potential for further roof failure that could in-turn cause increased loading on the floor below with a possibility that it may fail and cause a cascading effect on the lower floors. The N-S girders and the E-W beams provide lateral stability to the outer unreinforced masonry brick walls. If a cascading structural failure were to occur, it could destabilize the walls and possibly cause a complete building collapse. 5.0 Recommendations 1. Due to the unstable and leaning remaining structures it is not recommended that entry be made into the remaining shell of building 5 by fire investigators or anyone until those dangers are removed. 2. Due to the severely compromised roof on building 4 and the potential of increased loading on the floor below, the possibility of a cascading floor failure that could destabilize the walls leading to complete building collapse cannot be ruled out. For that reason it is not recommended to reopen Jackson Avenue for public access until building 4 is stabilized or demolished. 3. Since the possibility of complete building collapse as described above cannot be ruled out, it is not recommended to allow the businesses and residences on the south side of the street to reopen until building 4 is stabilized or demolished. McClung Fire Damage Inspection 2/4/2014 Page 12
Engineers, Civil Structural Survey
Engineers, Civil Structural Survey 317 STREET 0 6 3 6 0 886-1966 886-9165 FAX. September 1 1 Mr. Alan Bergren City Manager City of Norwich Broadway, Floor Norwich, 06360 Re: Limited Structural Condition
More informationBuilding Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More information14 September 2015. Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102
Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102 Project No.: 15538.00 Re: Structural Condition Review of the building at 700 4 th St. E. Dear Sarah: We
More informationMarch 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202
Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request
More informationBuilding Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More information423 NORTH HOWARD ST. VISUAL STRUCTURAL ASSESSMENT
Urgent Needs II City of Baltimore No. 1099 423 NORTH HOWARD ST. 423 North Howard Street (circa 1880) is a multi-story building constructed second in row south of Franklin Street and between the vacant
More informationSTRUCTURAL ASSESSMENT
STRUCTURAL ASSESSMENT Project: 1432-1434 East Commerce St. Job. No: 122200 Location: San Antonio, TX Date: Dec. 10, 2012 Weather: Sunny, Windy,60 deg Performed by: Jeff Haughton and Frank Lamas, Alpha
More informationPhoto 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.
May 7,2015 KSANDER & ASSOCIATES CONSULTING PROFESSIONAL ENGINEERS 130 HUINTER STREET, UNIT 103, PETERBOROUGH, ONTARIO K9H2K8 TELEPHONE (705) 743-9221 FAX 743-0904 Ontario Region Conservation Authority
More informationThe Collapse of Building 7 by Arthur Scheuerman December 8, 06
The Collapse of Building 7 by Arthur Scheuerman December 8, 06 WTC s Building 7 was a 47-story office building completed in 1987 by Silverstein Properties on land owned by the Port Authority. It was built
More informationVision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
More informationOctober 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.
117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This
More informationPROFESSIONAL ENGINEERING INSPECTIONS, INC.
PROFESSIONAL ENGINEERING INSPECTIONS, INC. P. O. BOX 271492 HOUSTON, TEXAS 77277 Registered Engineering Firm #1503 http://www.profengineering.com (713) 664-1264 July 8, 2004 Mr. Simple Samson 2831 Octoberfest
More informationFacility Assessment for. 11801 East Main Street, Huntley, IL
Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested
More informationSlavic Village Building Condition Review
Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities
More informationCABIN A Restored & Preserved 1850 Slave Cabin
CABIN A Restored & Preserved 1850 Slave Cabin Cabin A has been restored and preserved to reflect its original 1850 construction and utilization as a slave cabin. This cabin had the most intact architectural
More informationPhotos showing the change in condition from 2006 to 2012 are located in Appendix A.
January 27, 2012 Ms. Theresa Gallavan Economic Development Director City of Lompoc 100 Civic Center Plaza Lompoc, California 93436 RE: Lompoc Theater Limited Visual Condition Assessment Dear Theresa: Representatives
More informationPrestige Home Inspection LLC
Cover Page Prestige Home Inspection LLC IAC2/ESA - Mold Assessment and Water Damage Report 555 W. Brook ave., Client's town MI, 48059 Inspection prepared for: Client's name Inspection Date: 10/15/2012
More informationMEMORANDUM. General: Foundation:
MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010
More informationSECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
More informationNational Home Builder - Name Wednesday, August 20, 2014 Regional Customer Care Manager 1234 Main Street Houston, Texas 77067
Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com
More informationSTRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA
STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael
More informationBernie Nimer, Dave Seton Mayfair Hotel Development Corporation
SITE INVESTIGATION REPORT NO. S1r1 PROJECT: The Mayfair Hotel PROJECT NO: 140565 ATTN: Bernie Nimer, Dave Seton Mayfair Hotel Development Corporation PREPARED BY: Cory Zurell, PhD, P.Eng. DATE: 13 April
More informationMay 5, 2010. Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,
PROPERTY INSPECTION PROFESSIONALS May 5, 2010 Client Client Address Re: Inspection Address, Chicago, Illinois Dear Mr. Client, On May 4, 2010, Tomacor completed a property inspection of the above referenced
More informationBROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208
BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING
More informationRe: Damages to Alaska Building from Legislative Information Office Construction
510 L Street Suite 200 Anchorage, AK 99501-1949 (907) 274-22362236 Phone (907) 274-25202520 Fax www.bbfm.com July 22, 2015 Jim Gottstein Alaska Building 406 G Street, Suite 206 Anchorage, AK 99501 Re:
More informationLighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Engineering Evaluation
More informationPage & Turnbull imagining change in historic environments through design, research, and technology
DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED
More informationBasement Moisture Problems
Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design
More informationBasement & Foundation Damage
Basement & Foundation Damage Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case
More informationLighthouse Engineering, L.L.C.
Wednesday, August 20, 2014 Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website:
More informationTRAINING AND EQUIPMENT MANUAL 304 LADDER PRACTICES 304.006 EXTENSION LADDERS EFFECTIVE: OCTOBER 2007
TRAINING AND EQUIPMENT MANUAL 304 LADDER PRACTICES 304.006 EXTENSION LADDERS EFFECTIVE: OCTOBER 2007 The Department utilizes 10-foot, 14-foot, 24-foot, and 35-foot extension ladders. Extension ladders
More informationDavid C. Barrow Elementary School 100 Pinecrest Drive, Athens, GA 30605
David C. Barrow Elementary School 100 Pinecrest Drive, Athens, GA 30605 Winner of the 2014 Cold-Formed Steel Engineers Institute (CFSEI) Design Excellence Award May 2014 The David C. Barrow Elementary
More information201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
More informationFoundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
More informationHow To Repair A House
Assessing Structural Damages Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case
More informationResidential Foundations and Basements
Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article
More informationChapter. Earthquake Damage: Types, Process, Categories
3 Chapter Earthquake Damage: Types, Process, Categories Earthquakes leave behind a trail of damage and destruction. People s lives are affected by the loss of loved ones, destruction of property, economic
More informationLighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
More informationPRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA 93101 Telephone (805) 450-6658 Email: accole5@yahoo.com
PRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA 93101 Telephone (805) 450-6658 Email: accole5@yahoo.com June 17, 2015 Ms. Kimberley Heaton McCarthy Supervising Planner Building and Safety
More informationMemorandum. July 16, 2008. To: Plan Commission City of Madison
Memorandum July 16, 2008 To: Plan Commission City of Madison From: Marc Schellpfeffer Engberg Anderson Re: Structural/Architectural Assessment of Homes for Proposed Demolition Findorff Yards Office Lofts
More informationBeginning on Friday, Jan 22, and on subsequent investigations, the following issues were identified:
Date: 2/15/2016 Project: To: Middleton Public Library Roof Repair Pamela K. Westby Library Director Middleton Public Library 7425 Hubbard Avenue Middleton WI 53562 Pamela, Strategic Structural Design,
More informationSTRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA
STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA College of Marin c/o Swinerton Management & Consulting P.O. Box 144003 835 College Avenue, Building MS-3 Kentfield, California
More information4.3.5 - Breakaway Walls
4.3.5 - Breakaway Walls Elevation of a structure on a properly designed foundation reduces the potential for water damage from flooding. When the space below the lowest elevated floor is maintained free
More informationEARTHQUAKE SAFETY IN THE WORK PLACE
EARTHQUAKE SAFETY IN THE WORK PLACE COMPANY PLANS All companies have an obligation to their employees to maintain a disaster plan. An emergency evacuation area must be designed, a nearby safe area, preferably
More informationREQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management
More informationArticle 5: Building Regulations
Article 5: Building Regulations Division 37: Additional Building Regulations for Archaic Materials and Methods of Construction (Added Additional Building Regulations for Archaic Materials and Methods of
More informationJackson Gulch Outlet Canal Rehabilitation Project
Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County
More informationPELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT. November 2007
PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT November 2007 PURPOSE OF INVESTIGATION Determine possible locations of moisture intrusion into and through facade. Determine cause of horizontal and vertical
More informationStructural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
More informationSpotting Structural Problems in a Home
Home Inspector s Guide To Spotting Structural Problems in a Home Greg Madsen and Richard McGarry McGarry and Madsen Inspection Here s some suggestions for giving your next potential house purchase a careful
More informationDoughty Environmental Hygiene Associates
Top: Photo #1: View of the top of the elevator shaft from the roof. The open ventilation causes condensation to form inside on the sheetrock. It also allows for the access for insects. Note the discoloration
More informationSewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
More informationWhat is Seismic Retrofitting?
What is Seismic Retrofitting? SEISMIC RETROFITTING A Seismic Retrofit provides existing structures with more resistance to seismic activity due to earthquakes. In buildings, this process typically includes
More informationEAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
More informationProtecting Your Home From Hurricane Wind Damage
T H E W I N D Protecting Your Home From Hurricane Wind Damage During a hurricane, homes may be damaged or destroyed by high winds and high waves. Debris can break windows and doors, allowing high winds
More informationMINNESOTA DEPARTMENT OF PUBLIC SAFETY State Fire Marshal Division STATEMENT OF POLICY. State Fire Marshal
MINNESOTA DEPARTMENT OF PUBLIC SAFETY State Fire Marshal Division STATEMENT OF POLICY Policy #: Subject of Policy: INS-04 (2007) Escape Windows Revised and Approved By: Title: Jerry Rosendahl State Fire
More informationVILLAS OF TRADITIONS AT GREY OAKS
Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard
More informationFINAL FAILURE INVESTIGATION WESTCHESTER NORTH LAGOON BRIDGE. Anchorage, Alaska
FINAL FAILURE INVESTIGATION WESTCHESTER NORTH LAGOON BRIDGE Anchorage, Alaska August 2014 Prepared for: Municipality of Anchorage Project Management and Engineering P.O. Box 196650 Anchorage, Alaska 99519-6650
More informationExcerpts from the Canadian National Building Code (NBC)
Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more
More informationFoundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
More informationAppendix 2-A: Asbestos Assessment Summary Table
Final Environmental Impact Statement Cricket Valley Energy Project Dover, NY Appendix 2-A: Assessment Summary Table Earth Resources 1 Main First Floor A33 Heater Unit 1 EA F Poor Y Assumed ACM 1 Main Second
More informationMarch 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
More informationHow To Build A Two Hour Firewall In Calgary
BUILDING CODE INTERPRETATION February 2008 06-BCI-005-R1 Page 1 of 6 TWO-HOUR FIREWALLS BACKGROUND Historically, firewalls used to subdivide buildings into smaller units have been built using one of two
More informationCITY OF FORT LAUDERDALE Page 1 AGENDA UNSAFE STRUCTURES BOARD CITY COMMISSION MEETING ROOM - CITY HALL APRIL 20, 2006 3:00 PM
CITY OF FORT LAUDERDALE Page 1 CITY COMMISSION MEETING ROOM - CITY HALL RETURN HEARING (OLD BUSINESS) CASE NO: CE05010324 CASE ADDR: OWNER: 809 NW 15 AV MYERS, HERBERT & MYERS, ALBERT, FERNANDEZ, JOYCE
More informationChapter 10 - Scaffolding Systems
Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5
More informationRDH Building Sciences Inc.
MAK LTR 2007 03 26 Proposal for Building Enclosure Consulting Services RDH Building Sciences Inc. 509 FAIRVIEW AVENUE N SEATTLE WA 98109-5507 TEL 206 324 2272 FAX 206 324 6339 SEA@RDHBE.COM WWW.RDHBE.COM
More informationINSPECTION PROPERTY ADDRESS: Fort Bend County, Texas
5006 Cherry Ridge Road Richmond, Texas 77406 281-342-9944 harris31@sbcglobal.net INSPECTION PROPERTY ADDRESS: INSPECTION PERFORMED FOR: XXXX Drive Fort Bend County, Texas Mr. and Mrs. New Construction
More informationNon Invasive Roof Leak Detection Using Infrared Thermography
Non Invasive Roof Leak Detection Using Infrared Thermography Scott Wood Four Star Cleaning and Restoration, Inc. ABSTRACT Residential roofs without attics are typically inspected for leaks by installing
More informationE ER TITAN PRODUCTS. Foundation Repair
E GIN E ER E D N EX CEL ENCE L Foundation Repair ENGINEERED EXCELLENCE Authorized Installer of Titan Products, Inc. Titan Products, Inc. 615.746.6876 2111 Boat Factory Rd., Pleasant View, TN www.titanproductsinc.com
More informationREQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION
RESIDENTIAL: REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION 2 COMPLETE SETS OF PRINTS WITH ENGINEERS STAMP ON FOUNDATION PLAN INCLUDING ELECTRICAL, PLUMBING, ETC. SITE PLAN SHOWING HOUSE LOCATION
More informationStructural Assessment Report
Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive
More information6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
More informationSupplemental Investigation Summary Report
130 Liberty Street New York, New York Supplemental Investigation Summary Report Visual Mold Inspection Summary Prepared for: Lower Manhattan Development Corporation One Liberty Plaza, 20 th Floor, New
More informationDecember 24, 2008. twalker@sedaconstruction.com. SEDA Construction Attn: Ted Walker 2120 Corporate Square Boulevard Jacksonville, Florida 32216
December 24, 2008 twalker@sedaconstruction.com SEDA Construction Attn: Ted Walker 2120 Corporate Square Boulevard Jacksonville, Florida 32216 RE: Georgetown Community 2C - Revised Assessment Date: October
More information5006 Cherry Ridge Road Richmond, Texas 77406 281-342-9944 harris31@sbcglobal.net LIMITATIONS AND DISCLAIMERS
5006 Cherry Ridge Road Richmond, Texas 77406 281-342-9944 harris31@sbcglobal.net INSPECTION PROPERTY ADDRESS: INSPECTION PERFORMED FOR: XXXX Court Richmond, Texas Mr. Foundation Concerns INSPECTION DATE:
More information29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York
Due Diligence Report New York, New York Prepared for Mr. On February 8, 2010 P a g e 1 Table of Contents PAGE 3.. GENERAL INFORMATION PAGE 4 FILINGS PERMITS AND ENCUMBRANCES PAGE 6. CORE AND SHELL PAGE
More informationStuccoSpec Moisture Testing Inspection
e-mail - stuccospec@juno.com StuccoSpec Moisture Testing Inspection Property Located At: 265 Elm Street, Anywhere, USA 01/27/02 Ordered by: Mr. & Mrs. John Doe #2 Song Sparrow Place, The Woodlands, T 77381281-364-0012
More informationINSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
More informationFire is the rapid oxidation of a combustible material, releasing heat, light, smoke, and various toxic gases
VENTILATION Fire is the rapid oxidation of a combustible material, releasing heat, light, smoke, and various toxic gases If a fire is contained in a building, the heat, smoke, and toxic gases will spread.
More informationA Publication of Encharter Insurance. The Insurance Guide To: DISASTERS A GUIDE TO CONVERTING PROSPECTS INOT USTOMERS
A Publication of Encharter Insurance The Insurance Guide To: DISASTERS A GUIDE TO CONVERTING PROSPECTS INOT USTOMERS TABLE OF CONTENTS Melting Snow & Ice.3 Wind & Hurricanes..5 Earthquakes.....6 Brush
More informationOrlando Home Inspection Services
PLEASE NOTE: Orlando Home Inspection Services Serving Central Florida since 1999 P O Box 915451, Longwood, Florida, 32791-5451 Phone: (321) 228-2493 Fax: (407) 374-8505 Web: http://www.orlando-home-inspections.com
More informationThe better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
More informationTITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
More informationRepair of Spalling and Leaking Clay Brick Building Walls
B etter buildings Repair of Spalling and Leaking Clay Brick Building Walls Overview A few years after being built in Waterloo in 1980, a condominium of three, six-storey buildings showed severe spalling
More informationThe Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space
The Stabilizer TM Supplemental support system for sagging beams and floor joists within a crawl space Pre-drilled holes in steel plate allow for connection to beam or floor joists. Benefits Levels and
More informationUse Preservative-treated Wood & Integrated Pest Management When Rebuilding
Southern Regional Extension Forestry A Regional Peer Reviewed Publication SREF-WP-001 May, 2006 Use Preservative-treated Wood & Integrated Pest Management When Rebuilding Todd Shupe, Associate Professor,
More informationDesigned and Engineered to Perform
History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the
More informationRRIO Checklist. Use of checklist: Definitions: Limitations
CITY OF SEATTLE RENTAL REGISTRATION AND INSPECTION ORDINANCE (RRIO) RRIO Checklist Use of checklist: Property owners will use the RRIO Checklist to confirm that their rental housing properties and units
More informationJoist. Reinforcement. Draft 12/7/02
Joist Reinforcement Draft 12/7/02 1 JOIST REINFORCING The purpose of this CSD Design Aid is to provide procedures and suggested details for the reinforcement of open web steel joists. There are three basic
More informationWET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.
WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:
More informationIntegrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue
Cleveland Cuyahoga County Healthy House Project Training Integrating Healthy Housing Considerations into Weatherization Inspections Jim LaRue Joint inspections for housing health hazards Weatherization
More informationElevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
More informationEvanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions
Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations
More informationONTARIO SUPERIOR COURT OF JUSTICE COMMERCIAL LIST
Court File No. CV-15-10891-00CL ONTARIO SUPERIOR COURT OF JUSTICE COMMERCIAL LIST IN THE MATTER OF Section 243(1) of the Bankruptcy and Insolvency Act, R.S.C., 1985, c. B-3, as amended, and Section 101
More informationWEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204
WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204 Structural Inspection Report Client: CSArch Architecture Engineering Construction Management 19 Front Street, Newburgh,
More informationEnvirotest Research Inc. 1108 NE 200 th St. Suite 100 Shoreline, WA 98155-1136 206-522-5449 Fax: 985-9430 email: drdave@airmon.com
Envirotest Research Inc. 1108 NE 200 th St. Suite 100 Shoreline, WA 98155-1136 206-522-5449 Fax: 985-9430 email: drdave@airmon.com Arbor Heights Elementary Indoor Air Investigation Final Report November
More informationOFFICE OF FINANCIAL MANAGEMENT
STATE OF WASHINGTON OFFICE OF FINANCIAL MANAGEMENT Insurance Building, PO Box 43113 Olympia, Washington 985043113 (360) 9020555 June 13, 2012 The Honorable Mary Margaret Haugen, Chair The Honorable Curtis
More informationJ. Historic Buildings Pre- and Post-Disaster Mitigation
J. Historic Buildings Pre- and Post-Disaster Mitigation J.1 Pre-Event Mitigation Throughout the region, old buildings can be further weakened from storms, which can have a long-term toll beyond the immediate
More informationGYPSUM AREA SEPARATION FIREWALLS GA-620-2011
GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein
More information