Easter Earthquake Damage & Repairs. By: Imperial Irrigation District Water Department

Size: px
Start display at page:

Download "Easter Earthquake Damage & Repairs. By: Imperial Irrigation District Water Department"

Transcription

1 Easter Earthquake Damage & Repairs y By: Imperial Irrigation District Water Department

2 We will be going over Emergency Declaration Summary of Damages Summary of Repairs Reimbursement Process Questions

3 Sunday April 4, 2010 Emergency Declaration 4:30 p.m. a 7.2 Earthquake was felt in the Imperial Valley, with the epicenter located southwest of Mexicali, Baja California, Mexico. 5:00 p.m. the IID activated the EOC (Emergency Operations Center). Key personnel was called in to IID headquarters to start assessing the damage. 5:30 p.m. the Director of Emergency Services signed a Proclamation of Emergency/Disaster and submitted to Imperial County Office of Emergency Services. 11:00p p.m. aninitial assessment was done, identifying the majordamage damage, and IID started coordination of the repairs. Monday April 5, 2010 Governor of California declare state of emergency in Imperial Valley. IID crews & contractors mobilized to priority one areas. Tuesday April 6, 2010 The Board of Directors passed & adopted the Emergency Proclamation Directed staff to expedite the repair & replacement of energy and water systems Placed the IID in a position to be eligible to receive reimbursement monies from CalEMA. Saturday May 8, 2010 President Obamasigned the California Earthquake Major Disaster Declaration

4 Summary of Damages

5 Summary of Damages No. Sites Identified Since the Earthquake No. of Sites /2/10 4/7/10 4/12/10 4/17/10 4/22/10 4/27/10 5/2/10 5/7/10 5/12/10 5/17/10 Date The majority of the damage was found within the first 2 weeks Sites

6 Summary of Damages No Damage Imperial Dam Northend Drain System AAC Concrete Lined Portion Major Damage (by priority) AAC (dirt portion), WSM, Central Main Canal Southend Irrigation Canals Drainage System Minor Damage Northend Canal System *** Dividing line between Northend and Southend is Keystone Rd.

7 All American Canal Damage

8 AAC Damage (cont )

9 AAC Damage (cont )

10 West Side Main Canal Damage

11 WSM Damage (cont )

12 WSM Damage (cont )

13 Central Main Canal Damage

14 Southend Irrigation System Damage

15 Southend Canal Damage (cont )

16 Southend Canal Damage (cont )

17 Drainage System Damage

18 Drains Damage (cont )

19 Drains Damage (cont )

20 Drains Damage (cont )

21 Northend Canal System

22 Northend (cont )

23 Summary of Repairs IID Efforts ots All Water Dept equipment & personnel was made available for earthquake repairs. Regular Maintenance was suspended the month of April (regular canal outages postponed). Contractor Support Local contractors were brought in to support the repair efforts Elms, Radco, Granite, Superior (Ryerson), Pyramid, Rain for Rent, anda&r.

24 Summary of Repairs (cont )

25 Summary of Repairs (cont )

26 Summary of Repairs (cont )

27 Reimbursement Process 1 st choice: internal (IID) labor & equipment 2 nd choice: use contractors which have Service Agreements setup with IID (based on the bid solicitation RFQ 640). Picture of bf before & after (with hgps coordinates and project description). Copies of timecards, certified payroll, invoice needs to match timecards, etc

28 Any questions

STATEWIDE AAR BAJA EARTHQUAKE EXECUTIVE SUMARRY. Description of Event

STATEWIDE AAR BAJA EARTHQUAKE EXECUTIVE SUMARRY. Description of Event EXECUTIVE SUMARRY Description of Event A magnitude 7.2 magnitude Sierra El Mayer earthquake struck northern Baja California, Mexico, approximately 40 miles south-southeast of the City of El Centro at 1540

More information

MATCHDAY 1 7-9 September 2014

MATCHDAY 1 7-9 September 2014 MATCHDAY 1 7-9 September 2014 7 September Sunday 18:00 Group D 7 September Sunday 20:45 Group D 7 September Sunday 20:45 Group D 7 September Sunday 18:00 Group F 7 September Sunday 20:45 Group F 7 September

More information

CITY OF DANA POINT AGENDA REPORT BRAD FOWLER, DIRECTOR OF PUBLIC WORKS AND ENGINEERING SERVICES

CITY OF DANA POINT AGENDA REPORT BRAD FOWLER, DIRECTOR OF PUBLIC WORKS AND ENGINEERING SERVICES 03/09/05 Page 1 Item #11 CITY OF DANA POINT AGENDA REPORT Reviewed By: DH X CM X CA DATE: MARCH 9, 2005 TO: FROM CITY MANAGER/CITY COUNCIL BRAD FOWLER, DIRECTOR OF PUBLIC WORKS AND ENGINEERING SERVICES

More information

REQUEST FOR QUOTES (RFQ)

REQUEST FOR QUOTES (RFQ) REQUEST FOR QUOTES (RFQ) Lincoln County Public Works is requesting quotes (RFQ) through its Small Works Roster Process. Quotes are being requested for a project to replace the roof on the Crew Headquarters/Truck

More information

CHAPTER 15 DISASTER COST RECOVERY PROCEDURES

CHAPTER 15 DISASTER COST RECOVERY PROCEDURES Kern County Policy and Administrative Procedures Manual CHAPTER 15 DISASTER COST RECOVERY PROCEDURES 1501. General Statement... 1 1502. Disaster Relief Claim Procedures... 1 1503. Responsibilities... 2

More information

PART 2 LOCAL, STATE, AND FEDERAL EMERGENCY RESPONSE SYSTEMS, LAWS, AND AUTHORITIES. Table of Contents

PART 2 LOCAL, STATE, AND FEDERAL EMERGENCY RESPONSE SYSTEMS, LAWS, AND AUTHORITIES. Table of Contents PART 2 LOCAL, STATE, AND FEDERAL EMERGENCY RESPONSE SYSTEMS, LAWS, AND AUTHORITIES (Updates in Yellow Highlight) Table of Contents Authorities: Federal, State, Local... 2-1 UCSF s Emergency ManagemenT

More information

Procedures for Applying for Financial Assistance

Procedures for Applying for Financial Assistance EMERGENCY OPERATIONS PLAN May, 2009 Procedures for Applying for Financial Assistance GENERAL INFORMATION Financial assistance may come from the state alone or both the state and federal governments. For

More information

Arizona. The following schedule illustrates the direct, indirect, and induced impact of this cut in reimbursement on the state of Arizona.

Arizona. The following schedule illustrates the direct, indirect, and induced impact of this cut in reimbursement on the state of Arizona. The estimated economic impact for Arizona is a reduction of $14,243,537 in business activity, a reduction of $7,176,235 in labor income, and a loss of 213 jobs. reimbursement on the state of Arizona. Arizona

More information

Guidelines for Coordinating Flood Emergency Operations

Guidelines for Coordinating Flood Emergency Operations Guidelines for Coordinating Flood Emergency Operations Completed in compliance with the Flood Emergency Action Team (FEAT): Initiative Number 1 Governor s Executive Order W-156-97 Approved by the Standardized

More information

MANAGEMENT SECTION SUPPORT DOCUMENTATION

MANAGEMENT SECTION SUPPORT DOCUMENTATION REFERENCE DOCUMENTS BY POSITION MANAGEMENT SECTION DEPUTY EMERGENCY SERVICES DIRECTOR (Look in Forms also) EOC VISITOR CONTROL PROCEDURES... MS-3 LEGAL OFFICER (Look in Forms also) LEGAL DOCUMENTS Orders

More information

Nebraska. The following schedule illustrates the direct, indirect, and induced impact of this cut in reimbursement on the state of Nebraska.

Nebraska. The following schedule illustrates the direct, indirect, and induced impact of this cut in reimbursement on the state of Nebraska. The estimated economic impact for Nebraska is a reduction of $11,104,618 in business activity, a reduction of $5,437,754 in labor income, and a loss of 193 reimbursement on the state of Nebraska. Nebraska

More information

REIMBURSEMENT PROCEDURE for FEMA PUBLIC ASSISTANCE

REIMBURSEMENT PROCEDURE for FEMA PUBLIC ASSISTANCE REIMBURSEMENT PROCEDURE for FEMA PUBLIC ASSISTANCE Financial Assistance Availability The impact of major or catastrophic emergencies can exceed local financial resources. Financial aid and assistance may

More information

(Part 2) Lunch Block 7 1:05 PM 2:27 PM

(Part 2) Lunch Block 7 1:05 PM 2:27 PM Wednesday, December 2 (5,1,3,7) Cycle day 3 Module 1 of the Algebra I Exam 4 BLOCK DAY LUNCHES ASSIGNED BY LOCATION DURING 3 RD. 2 nd floor classes (unless assigned b lunch below): A lunch Basement, Health,

More information

Guide for End-of-Year AP Best Practices

Guide for End-of-Year AP Best Practices HOW-TO Guide for End-of-Year AP Best Practices 2015-2016 Contents Year-End Checklist for Accounts Payable Sample Year-End Calendar Master Vendor File Clean-Up and Maintenance 1099 Misc. Reporting and Corrections

More information

SCOPE OF WORK PROVISIONS FOR

SCOPE OF WORK PROVISIONS FOR STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS Office of the Director Research Unit 455 Golden Gate Avenue, 9 th Floor San Francisco, CA 94102 Edmund G. Brown Jr., Governor MAILING ADDRESS: P.

More information

CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES. Proposal Due Date: April 13, 2016

CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES. Proposal Due Date: April 13, 2016 CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Proposal Due Date: April 13, 2016 The City of Kalama (CITY) invites proposals for the services of a registered architect and their team

More information

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri. 12325 Manchester Road. Des Peres, Missouri 63131

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri. 12325 Manchester Road. Des Peres, Missouri 63131 SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK City of Des Peres, Missouri 12325 Manchester Road Des Peres, Missouri 63131 Prepared by City Engineer March 2011 INVITATION TO BID SANITARY

More information

TOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #2015-12

TOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #2015-12 TOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #2015-12 Sealed bids are due by 10:30 am on Friday, January 30, 2015 Bid Specs are

More information

Minutes Executive Board Meeting --- Hearts And Lives. Coldwell Banker Sky Ridge Realty Conference Room

Minutes Executive Board Meeting --- Hearts And Lives. Coldwell Banker Sky Ridge Realty Conference Room Minutes Executive Board Meeting --- Hearts And Lives March 4, 2009 3:00 P.M. Coldwell Banker Sky Ridge Realty Conference Room In Attendance: Ira Maser, Gerry Porter, Cynthia Carley, Stacey McKay Bill Stanley,

More information

IT IS RECOMMENDED THAT YOUR BOARD: 1. Find that this project is statutorily exempt from the provisions of the California Environmental Quality Act.

IT IS RECOMMENDED THAT YOUR BOARD: 1. Find that this project is statutorily exempt from the provisions of the California Environmental Quality Act. October 11, 2011 The Honorable Board of Supervisors County of Los Angeles 383 Kenneth Hahn Hall of Administration 500 West Temple Street Los Angeles, California 90012 Dear Supervisors: ADOPT, ADVERTISE,

More information

Academic Calendar for Faculty

Academic Calendar for Faculty Summer 2013 Term June 3, 2013 (Monday) June 3-4, 2013 (Monday Tuesday) June 5, 2013 (Wednesday) June 5-6, 2013 (Wednesday Thursday) June 6, 2013 (Thursday) July 3, 2013 (Wednesday) July 4, 2013 (Thursday)

More information

Solicitation 1210-014. Web Hosting Services for the Disaster Volunteer Network. State of California

Solicitation 1210-014. Web Hosting Services for the Disaster Volunteer Network. State of California Solicitation 1210-014 Web Hosting Services for the Disaster Volunteer Network State of California Oct 12, 2012 4:28:36 PM PDT p. 1 Bid 1210-014 Web Hosting Services for the Disaster Volunteer Network Bid

More information

FY 2016-2017 Licensed Timber Operators & Tree Service Contractors

FY 2016-2017 Licensed Timber Operators & Tree Service Contractors TUOLUMNE COUNTY ADMINISTRATOR S OFFICE Request for Qualifications (RFQ) AMENDED MAY 2, 2016 SPECIFICATIONS, TERMS, & CONDITIONS For: FY 2016-2017 Licensed Timber Operators & Tree Service Contractors RFQ

More information

New WMHS Construction Management Firm

New WMHS Construction Management Firm New WMHS Construction Management Firm RFQ Schedule November 5, 2013 Board Meeting Approval to Advertise and use revised RFQ Week December 9, 2013 Ad runs in local papers (Thursday Dec. 12 th ) Week December

More information

http://facilities.gwu.edu/greenroof/october/

http://facilities.gwu.edu/greenroof/october/ Page 1 of 9 Green Roof - October 2008 Facilities Alerts Getting Work Done > On Saturday, October 25, 2008 several members of the GW community came together to install the Green Roof. Below, is a description

More information

Interstate 95 is closed from I-26 to I-20 in both directions and is detoured. I-95 will be opened when repairs to these 13 bridges are complete.

Interstate 95 is closed from I-26 to I-20 in both directions and is detoured. I-95 will be opened when repairs to these 13 bridges are complete. 2015 Major Flood Report Statew ide Operations (8:00 AM- REPORT) October 11, 2015 Statewide Summary Interstate I-95: The Contractor has made good progress towards the repair of the substructures of 13 Interstate

More information

WEST VIRGINIA DIVISION OF HIGHWAYS ADMINISTRATIVE OPERATING PROCEDURES SECTION I, CHAPTER 8 FLOOD EMERGENCY RELIEF PROJECTS. Effective 11/15/2004

WEST VIRGINIA DIVISION OF HIGHWAYS ADMINISTRATIVE OPERATING PROCEDURES SECTION I, CHAPTER 8 FLOOD EMERGENCY RELIEF PROJECTS. Effective 11/15/2004 WEST VIRGINIA DIVISION OF HIGHWAYS ADMINISTRATIVE OPERATING PROCEDURES SECTION I, CHAPTER 8 SECTION TITLE: CHAPTER TITLE: GENERAL FLOOD EMERGENCY RELIEF PROJECTS I. INTRODUCTION II. RESPONSIBILITIES A.

More information

Academic Calendar 2015-2016

Academic Calendar 2015-2016 Academic Calendar 2015-2016 Fall 2015 - Full/TCAT Session August 24, 2015 - December 10, 2015 Fall 2015-1st Session August 24, 2015 - October 9, 2015 Fall 2015-2nd Session October 14, 2015 - December 10,

More information

FHWA Emergency Relief (FHWA-ER) Training

FHWA Emergency Relief (FHWA-ER) Training FHWA Emergency Relief (FHWA-ER) Training Training Developed and Coordinated By Colorado Department of Transportation 2 Agenda FHWA Flowchart Policies, Purpose, Agency Roles Application Process Eligibility

More information

Instructions for Completing the Wage Claim Form

Instructions for Completing the Wage Claim Form Instructions for Completing the Wage Claim Form EMPLOYMENT STANDARDS SERVICE 1100 N. EUTAW STREET, ROOM 607 BALTIMORE, MD 21201 410-767-2357 phone 410-767-2117 TTY Please Read Carefully This form must

More information

REQUEST FOR PROPOSALS: Internet Access Service. For: Peach County School District (BEN: 127431)

REQUEST FOR PROPOSALS: Internet Access Service. For: Peach County School District (BEN: 127431) REQUEST FOR PROPOSALS: Internet Access Service For: Peach County School District (BEN: 127431) Project Objectives: 1.0 Objective: Peach County Schools is seeking qualified responses for a managed 100.0

More information

Ocoee, FL May 13, 2016 Advertisement No. 1

Ocoee, FL May 13, 2016 Advertisement No. 1 BID SOLICITATION NOTICE Turnpike FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Ocoee, FL May 13, 2016 Advertisement No. 1 All bids must be completed using Expedite Bid software

More information

FINGERPRINTING LOCATIONS

FINGERPRINTING LOCATIONS FINGERPRINTING LOCATIONS Boulder Police Dept. 1805 33 rd St. Boulder, CO 80301 303.441.3333 If you are a resident of or work in the City of Boulder, the police department can take your fingerprints for

More information

APPENDIX III: EMERGENCY SUPPORT FUNCTION 3 - PUBLIC WORKS AND ENGINEERING

APPENDIX III: EMERGENCY SUPPORT FUNCTION 3 - PUBLIC WORKS AND ENGINEERING APPENDIX III: EMERGENCY SUPPORT FUNCTION 3 - PUBLIC WORKS AND ENGINEERING PRIMARY AGENCY: Department of Transportation SUPPORT AGENCIES: Water Management Districts, Department of Agriculture & Consumer

More information

Los Angeles County Operational Area EMERGENCY PROCLAMATIONS AND DISASTER DECLARATIONS

Los Angeles County Operational Area EMERGENCY PROCLAMATIONS AND DISASTER DECLARATIONS EMERGENCY PROCLAMATIONS AND DISASTER DECLARATIONS Provided by the Disaster Management Area Coordinators and Los Angeles County Office of Emergency Management May 2012 Table of Contents Topic Page Overview

More information

Preparing Your Organization for Disaster. - Preparedness Exercise -

Preparing Your Organization for Disaster. - Preparedness Exercise - Preparing Your Organization for Disaster - Preparedness Exercise - Emergency Preparedness Solutions, LLC Be proactive and be prepared. Prepared for the Association of Gospel Rescue Missions Northeast District

More information

TOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES

TOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES TOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES The Town of Farmington Department of Public Works is seeking proposals for the purpose

More information

Moving Forward: Agricultural Water Conservation, Productivity, and Water Transfers Workgroup

Moving Forward: Agricultural Water Conservation, Productivity, and Water Transfers Workgroup Moving Forward: Agricultural Water Conservation, Productivity, and Water Transfers Workgroup 2015 Colorado River District Water Seminar September 10, 2015 Grand Junction, Colorado Colorado River Basin

More information

Ocoee, FL July 01, 2016 Advertisement No. 1

Ocoee, FL July 01, 2016 Advertisement No. 1 BID SOLICITATION NOTICE Turnpike FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Ocoee, FL July 01, 2016 Advertisement No. 1 All bids must be completed using Expedite Bid software

More information

Post-Disaster Safety Assessment Program

Post-Disaster Safety Assessment Program Post-Disaster Safety Assessment Program Guideline to the Activation and Utilization of Program Resources June 2003 Dallas Jones Director Gray Davis Governor Introduction Preface With California s history

More information

Administrators, Business Managers and Fiscal Operations Personnel

Administrators, Business Managers and Fiscal Operations Personnel Controller s Office DATE: February 2, 2015 TO: FROM: Administrators, Business Managers and Fiscal Operations Personnel Chad Cleveland Interim Assistant Vice President for Accounting Services and Controller

More information

RENEWABLE ENERGY...IT S ALL HERE IN IMPERIAL COUNTY, CA

RENEWABLE ENERGY...IT S ALL HERE IN IMPERIAL COUNTY, CA RENEWABLE ENERGY...IT ALL HERE IN IMPERIAL COUNTY, CA Imperial Business Park ituated at the NE signalized corner of Aten & La Brucherie Roads-Adjacent to the Airport- Imperial, CA Masco-Tenant IBEW Location

More information

REQUEST FOR PROPOSALS LBCAP-IPSS-13 INTEGRATED PHONE SYSTEM AND SERVICES LONG BEACH COMMUNITY ACTION PARTNERSHIP 2013

REQUEST FOR PROPOSALS LBCAP-IPSS-13 INTEGRATED PHONE SYSTEM AND SERVICES LONG BEACH COMMUNITY ACTION PARTNERSHIP 2013 REQUEST FOR PROPOSALS LBCAP-IPSS-13 INTEGRATED PHONE SYSTEM AND SERVICES LONG BEACH COMMUNITY ACTION PARTNERSHIP 2013 Prepared By: Long Beach Community Action Partnership Operations Department Long Beach

More information

TABLE OF CONTENTS 10. ANNEX D... 10-2

TABLE OF CONTENTS 10. ANNEX D... 10-2 TABLE OF CONTENTS 10. ANNEX D... 10-2 10.1 PURPOSE...10-2 10.2 SITUATION AND ASSUMPTIONS...10-2 10.2.1 SITUATION...10-2 10.2.2 ASSUMPTIONS...10-2 10.3 GENERAL PROCEDURES AND RESPONSIBILITIES... 10-3 10.3.1

More information

BASIC PLAN: Appendix 7 Disaster Recovery

BASIC PLAN: Appendix 7 Disaster Recovery Recovery activities involve the restoration of services to the public and returning the affected area(s) to pre-emergency conditions. A disaster may strike quickly, leaving the need for recovery operations

More information

Prepared By SUPPLY CHAIN SERVICES * * * RESUME REQUEST, INSTRUCTIONS TO PROPOSERS, PROPOSAL FORMS, CONTRACT FORMS, AND POSITION DESCRIPTION(S)

Prepared By SUPPLY CHAIN SERVICES * * * RESUME REQUEST, INSTRUCTIONS TO PROPOSERS, PROPOSAL FORMS, CONTRACT FORMS, AND POSITION DESCRIPTION(S) Prepared By SUPPLY CHAIN SERVICES * * * RESUME REQUEST, INSTRUCTIONS TO PROPOSERS, PROPOSAL FORMS, CONTRACT FORMS, AND POSITION DESCRIPTION(S) REQUEST FOR RESUMES NO. 150195.JP SENIOR DOCUMENTUM TECHNICAL

More information

PUBLIC ASSISTANCE DAMAGE ASSESSMENT

PUBLIC ASSISTANCE DAMAGE ASSESSMENT PUBLIC ASSISTANCE DAMAGE ASSESSMENT Who does it? Political Subdivisions, Special Districts, Local/Regional Authorities, Public Schools/Colleges/Universities, Certain Private Non-Profit Organizations (PNP)

More information

HISTORIC DISTRICT RESTORATION PROGRAM APPLICATION INSTRUCTIONS

HISTORIC DISTRICT RESTORATION PROGRAM APPLICATION INSTRUCTIONS APPLICATION INSTRUCTIONS If you have any application or historic preservation questions, please contact the Planning & Community Development Department at (830) 249-9511. If you have any building or sign

More information

The Family Health Services Training Center State Approved Phlebotomy Training Program

The Family Health Services Training Center State Approved Phlebotomy Training Program The Family Health Services Training Center State Approved Phlebotomy Training Program TELEPHONE: 800 838-1221 619 955-1007 FAX: 619 243-5883 1 EMAIL: phlebservices@sbcglobal.net Welcome The Family Health

More information

El Nino in the OC. Orange County Sheriff s Department Emergency Management Division

El Nino in the OC. Orange County Sheriff s Department Emergency Management Division El Nino in the OC Orange County Sheriff s Department Emergency Management Division The mission of the Orange County Sheriff s Department s Emergency Management Division is to promote, facilitate, and support

More information

NIGP Career Seminar Series II Workshop I Bonds (Bid, Performance, and Payment) Bond Excerpts from ARS Title 34

NIGP Career Seminar Series II Workshop I Bonds (Bid, Performance, and Payment) Bond Excerpts from ARS Title 34 NIGP Career Seminar Series II Workshop I Bonds (Bid, Performance, and Payment) Bond Excerpts from ARS Title 34 34-201. Notice of intention to receive bids and enter contract; procedure; doing work without

More information

Request for Proposals July 13, 2015

Request for Proposals July 13, 2015 Maintenance and Skilled Trades Division Request for Proposals July 13, 2015 District Wide Pavement Assessment The East Bay Regional Park District ( District ) is soliciting proposals from consultants to

More information

FORT LAUDERDALE INTERNATIONAL BOAT SHOW BAHIA MAR IN-WATER SET-UP SCHEDULE

FORT LAUDERDALE INTERNATIONAL BOAT SHOW BAHIA MAR IN-WATER SET-UP SCHEDULE IN-WATER SET-UP SCHEDULE 200-221 B DOCK Friday, October 22 9:00 a.m. 1 FACE DOCK Saturday, October 23 10:00 a.m. 222-245 Friday, October 22 11:00 a.m. 2 Sunday, October 24 10:00 a.m. 3 Sunday, October

More information

Rent Adjustment Commission Regulations & Guidelines

Rent Adjustment Commission Regulations & Guidelines Rent Adjustment Commission Regulations Section 250.00 Effective November 20, 1989 250.00 REHABILITATION WORK 250.01 Rehabilitation work is defined for the purposes of this Regulation as any work done on

More information

EMERGENCY SUPPORT FUNCTION - TWELVE ENERGY

EMERGENCY SUPPORT FUNCTION - TWELVE ENERGY EMERGENCY SUPPORT FUNCTION - TWELVE ENERGY PRIMARY AGENCY: SUPPORT AGENCIES: Clallam County Board of Commissioners Emergency Management Public Utility District #1 of Clallam County INTRODUCTION A. Purpose

More information

THE NEW YORK CITY DEPARTMENT OF EDUCATION DIVISION OF HUMAN RESOURCES 65 Court Street Brooklyn, New York 11201

THE NEW YORK CITY DEPARTMENT OF EDUCATION DIVISION OF HUMAN RESOURCES 65 Court Street Brooklyn, New York 11201 THE NEW YORK CITY DEPARTMENT OF EDUCATION DIVISION OF HUMAN RESOURCES 65 Court Street Brooklyn, New York 11201 Post : April 21, 2015 Deadline: May 18, 2015 PER SESSION VACANCY CIRCULAR # 357, Summer 2015

More information

ALTERNATIVE SOURCES OF FUNDING FOR

ALTERNATIVE SOURCES OF FUNDING FOR November 2015 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by

More information

Request for Proposal Internet Bandwidth

Request for Proposal Internet Bandwidth Douglas, GA Request for Proposal Internet Bandwidth E-rate Funding Year 2016-2017 December 2015 Page 1 INTRODUCTION and INSTRUCTIONS TO VENDORS The invites vendors to submit proposals in accordance with

More information

REQUEST FOR QUOTES (RFQ) FOR PLUMBING SERVICES. RFQ Release Date: August 3, 2015. Quote Due Date: August 21, 2015 at 5:00 p.m.

REQUEST FOR QUOTES (RFQ) FOR PLUMBING SERVICES. RFQ Release Date: August 3, 2015. Quote Due Date: August 21, 2015 at 5:00 p.m. REQUEST FOR QUOTES (RFQ) FOR PLUMBING SERVICES RFQ Release Date: August 3, 2015 Quote Due Date: August 21, 2015 at 5:00 p.m. SOUTHEAST MICHIGAN COMMUNITY ALLIANCE (SEMCA) 25363 Eureka Rd. Taylor, MI 48180

More information

Office of Homeland Security

Office of Homeland Security Page Intentionally Left Blank Department Description The San Diego Office of Homeland Security (SD-OHS) oversees the City's Homeland Security, Disaster Preparedness, Emergency Management, and Recovery/Mitigation

More information

CITY AND COUNTY OF DENVER

CITY AND COUNTY OF DENVER CITY AND COUNTY OF DENVER DEPARTMENT OF GENERAL SERVICES P URCHASING D IVISION www.denvergov.org/purchasing WELLINGTON E. WEBB MUNICIPAL OFFICE BUILDING 201 WEST COLFAX AVE., DEPT. 304 DENVER, CO 80202

More information

Those who do not remember the past are condemned to repeat it. - George Santayana - Philosopher

Those who do not remember the past are condemned to repeat it. - George Santayana - Philosopher Those who do not remember the past are condemned to repeat it. - George Santayana - Philosopher ERP Implementation Update Implementation Overview High Level Project Plan Monthly Milestones July Activities

More information

call and ask a question, we are always available for compliance assistance.

call and ask a question, we are always available for compliance assistance. This presentation is to familiarize contractors, subcontractors, laborers and mechanics and state and county contracting agencies as well as other interested parties about the requirements of construction

More information

SMALL BUSINESS LEARNING SESSIONS Fall 2015

SMALL BUSINESS LEARNING SESSIONS Fall 2015 SMALL BUSINESS LEARNING SESSIONS Fall 2015 If you re starting or expanding a business and looking for direction, you can t afford to miss these great training sessions designed to save you time and money.

More information

You've successfully subscribed to this feed! Updated content can be viewed in Internet Explorer and other programs that use the Common Feed List.

You've successfully subscribed to this feed! Updated content can be viewed in Internet Explorer and other programs that use the Common Feed List. Page 1 of 5 You've successfully subscribed to this feed! Updated content can be viewed in Internet Explorer and other programs that use the Common Feed List. View my feeds DCAA News Thursday, May 28, 2009,

More information

CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNTING ACT. FREQUENTLY ASKED QUESTIONS (FAQs)

CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNTING ACT. FREQUENTLY ASKED QUESTIONS (FAQs) Updated: June 25, 2015 CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNTING ACT FREQUENTLY ASKED QUESTIONS (FAQs) 1. What is the? A program created in 1983 which allows local agencies to perform public

More information

May 29, 2015. Ongoing Flood Damages to County Federal-aid Routes

May 29, 2015. Ongoing Flood Damages to County Federal-aid Routes OKLAHOMA DEPARTMENT OF TRANSPORTATION Local Government Division 200 N.E. 21 st Street Oklahoma City, OK 73105-3204 www.odot.org May 29, 2015 Ongoing Flood Damages to County Federal-aid Routes We are anticipating

More information

Georgia Emergency Operations Plan. Emergency Support Function # 14 Annex Long Term Recovery & Mitigation

Georgia Emergency Operations Plan. Emergency Support Function # 14 Annex Long Term Recovery & Mitigation Emergency Support Function # 14 Annex Long Term Recovery & Mitigation 2015 E S F C o o r d i nator and Support Ag e n c i e s ESF C oordi na t or Georgia Emergency Management Agency P rima ry Agenc y Georgia

More information

Sidewalk Rehabilitation Program

Sidewalk Rehabilitation Program REQUEST FOR PROPOSALS FOR ENGINEERING AND CONSTRUCTION MANAGEMENT SERVICES Sidewalk Rehabilitation Program City of Maywood Building and Planning Department 4319 E. Slauson Avenue Maywood, CA 90270 Deadline:

More information

FREEMAN LABOR JURISDICTIONS

FREEMAN LABOR JURISDICTIONS UNION JURISDICTIONS for TAMPA, florida To assist you in planning for your participation in this upcoming exposition, we are certain you will appreciate knowing in advance that union labor may be required

More information

Human Resources Master Calendar

Human Resources Master Calendar July, 2011 2011-2012 Friday, July 01, 2011 First day of 2011-2012 school term for 52 week employees Friday, July 01, 2011 First day for: Senior High School Athletic Directors Monday, July 04, 2011 Independence

More information

REQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING DESIGN SERVICES For the RENOVATION OF THE TUTTLE BUILDING

REQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING DESIGN SERVICES For the RENOVATION OF THE TUTTLE BUILDING Revised to 4/28/2015 REQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING DESIGN SERVICES For the RENOVATION OF THE TUTTLE BUILDING The Borough of Naugatuck is seeking responses from architectural/engineering

More information

DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD

DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD The contactor shall possess a California contractor s license, Class A,

More information

REQUEST FOR QUOTES (RFQ) HEALTH COVERAGE ANALYST/PROJECT MANAGER

REQUEST FOR QUOTES (RFQ) HEALTH COVERAGE ANALYST/PROJECT MANAGER REQUEST FOR QUOTES (RFQ) HEALTH COVERAGE ANALYST/PROJECT MANAGER Applications Due: Tuesday, June 16, 2015, 12:00 pm I. BACKGROUND The San Mateo County Health System (Health System) mission is to help residents

More information

MEETING DATE: February 08, 2008

MEETING DATE: February 08, 2008 Truckee River Flood Management Project FLOOD PROJECT COORDINATING COMMITTEE STAFF REPORT MEETING DATE: February 08, 2008 DATE: February 1, 2008 TO: Flood Project Coordinating Committee Members FROM: Naomi

More information

WORKSHOP. District 6 Resource Center. Dave Clark, ESI Consultants

WORKSHOP. District 6 Resource Center. Dave Clark, ESI Consultants PREPARATION OF FORCE ACCOUNTS WORKSHOP District 6 Resource Center March 31, 2011 Dave Clark, ESI Consultants Mike McCormick, Hutson & Associates PREPARATION OF FORCE ACCOUNTS WORKSHOP An authorization

More information

Fairfield, Connecticut 06824 Purchasing Department

Fairfield, Connecticut 06824 Purchasing Department Sullivan Independence Hall 725 Old Post Road Fairfield, Connecticut 06824 Purchasing Department (203) 256.3060 FAX (203) 256,3080 Bid #20 13-42 Town of Fairfield Purchasing Authority 725 Old Post Road

More information

ALBUQUERQUE EMERGENCY OPERATIONS PLAN ANNEX 8 DAMAGE ASSESSMENT AND REPORTING

ALBUQUERQUE EMERGENCY OPERATIONS PLAN ANNEX 8 DAMAGE ASSESSMENT AND REPORTING ALBUQUERQUE EMERGENCY OPERATIONS PLAN ANNEX 8 DAMAGE ASSESSMENT AND REPORTING PRIMARY RESPONSIBILITY Albuquerque City and Bernalillo County Government SECONDARY RESPONSIBILITY Department of Public Safety,

More information

operations@pay-net.net (this will be forwarded to the appropriate person)

operations@pay-net.net (this will be forwarded to the appropriate person) April, 2009 Welcome to our Forty Fourth Edition of Pay-Net s E-Newsletter. Previous editions of our E- Newsletter are available on our web site, www.pay-net.net, under the Employer Resources Newsletter

More information

CITY OF ALLIANCE REQUEST FOR QUOTES (RFQ) LAWN MOWING SERVICES

CITY OF ALLIANCE REQUEST FOR QUOTES (RFQ) LAWN MOWING SERVICES CITY OF ALLIANCE REQUEST FOR QUOTES (RFQ) I. Introduction: The City of Alliance is seeking a contractor(s) for lawn mowing services, and hereby requests sealed written quotes from contractors to perform

More information

**NOTICE OF REQUEST FOR INFORMATION** Posted/Mailed: 03/25/2010 HILLSBOROUGH COMMUNITY COLLEGE IS ACCEPTING SEALED SUBMISSIONS FOR THE FOLLOWING:

**NOTICE OF REQUEST FOR INFORMATION** Posted/Mailed: 03/25/2010 HILLSBOROUGH COMMUNITY COLLEGE IS ACCEPTING SEALED SUBMISSIONS FOR THE FOLLOWING: **NOTICE OF REQUEST FOR INFORMATION** Posted/Mailed: 03/25/2010 HILLSBOROUGH COMMUNITY COLLEGE IS ACCEPTING SEALED SUBMISSIONS FOR THE FOLLOWING: Hillsborough Community College (HCC), on behalf of the

More information

Theodore Roosevelt Dam WebQuest and Research Report Writing

Theodore Roosevelt Dam WebQuest and Research Report Writing Theodore Roosevelt Dam WebQuest and Research Report Writing Estimated Time: WebQuest, 60 minutes; report, three to five days depending on writing time needed State Standards for Grades 6 8 Standards Taught

More information

Alabama Emergency Management Agency Certified Local Emergency Manager (CLEM) Process

Alabama Emergency Management Agency Certified Local Emergency Manager (CLEM) Process Alabama Emergency Management Agency Certified Local Emergency Manager (CLEM) Process In accordance with Act 2007-462, as passed by the Alabama legislature and signed into law by Governor Bob Riley, the

More information

DEPARTMENT OF WORKFORCE SERVICES LABOR STANDARDS DIVISION CHAPTER 4

DEPARTMENT OF WORKFORCE SERVICES LABOR STANDARDS DIVISION CHAPTER 4 DEPARTMENT OF WORKFORCE SERVICES LABOR STANDARDS DIVISION CHAPTER 4 CERTIFICATION OF RESIDENT CONTRACTORS, SUPPLIERS AND ENFORCEMENT OF PREFERENCE LAWS Section 1. Authority. The Department of Workforce

More information

Private Sewer Lateral Inspection Program Administrative Guidelines Santa Barbara Municipal Code Chapter 14.46

Private Sewer Lateral Inspection Program Administrative Guidelines Santa Barbara Municipal Code Chapter 14.46 Santa Barbara Municipal Code Chapter 14.46 (Revised 01/11/07) TABLE OF CONTENTS Page Section I When Inspection Required 1 Section II Qualified Inspection Companies 3 Section III Procedures for Managing

More information

Request for Quote. 2015 Michigan Works! Conference Photography. Due Date: June 1, 2015. Inquiries and Quotes Should Be Directed To:

Request for Quote. 2015 Michigan Works! Conference Photography. Due Date: June 1, 2015. Inquiries and Quotes Should Be Directed To: Request for Quote 2015 Michigan Works! Conference Photography Due Date: June 1, 2015 Inquiries and Quotes Should Be Directed To: Anisa Mazuca Executive Coordinator mazucaa@michiganworks.org BACKGROUND

More information

Texas State University System. Disaster Management Guide

Texas State University System. Disaster Management Guide Texas State University System Disaster Management Guide 11/3/2010 Table of Contents I. INTRODUCTION... 3 II. PRE DISASTER... 5 A. Overview... 5 B. Procedure... 5 III. POST DISASTER... 10 A. Overview...

More information

STATEWIDE MUTUAL AID FOR EMERGENCY MANAGEMENT MODEL AUTHORIZING RESOLUTION

STATEWIDE MUTUAL AID FOR EMERGENCY MANAGEMENT MODEL AUTHORIZING RESOLUTION Attachment 1 STATEWIDE MUTUAL AID FOR EMERGENCY MANAGEMENT MODEL AUTHORIZING RESOLUTION WHEREAS, the Commonwealth of Virginia Emergency Services and Disaster Law of 2000, (Title 44, Chapter 3.2 of the

More information

Webb County Purchasing Department Dr. Cecilia Moreno, Purchasing Agent

Webb County Purchasing Department Dr. Cecilia Moreno, Purchasing Agent Webb County Purchasing Department Dr. Cecilia Moreno, Purchasing Agent Formal Invitation for Bids (ITB) Bid 2016-93 Annual Contract for Plumbing Repair Due: August 20, 2015 before 2:00p.m. Public Notice

More information

HVAC MAINTENANCE AND REPAIR SERVICE SPECIFICATIONS

HVAC MAINTENANCE AND REPAIR SERVICE SPECIFICATIONS GENERAL PROVISIONS General Requirements Contract Validity Period Option to Extend Subcontracting Estimated Quantities Experience Requirements Work Notification Permits Character of Workers and Equipment

More information

TAX FACTS 99-3. From the State of Hawaii, Department of Taxation CONTRACTORS AND. Revised July, 2007 THE GENERAL EXCISE AND USE TAXES

TAX FACTS 99-3. From the State of Hawaii, Department of Taxation CONTRACTORS AND. Revised July, 2007 THE GENERAL EXCISE AND USE TAXES TAX FACTS From the State of Hawaii, Department of Taxation CONTRACTORS AND 99-3 THE GENERAL EXCISE AND USE TAXES Persons doing business in Hawaii are required to register for and pay the State's general

More information

City and County of San Francisco Vendor Profile Application New Vendor Number Request (Vendor Add) General Instructions for Form VenAdd-2010-09

City and County of San Francisco Vendor Profile Application New Vendor Number Request (Vendor Add) General Instructions for Form VenAdd-2010-09 City and County of San Francisco Vendor Profile Application New Vendor Number Request (Vendor Add) General Instructions for Form VenAdd-2010-09 The Vendor File is part of the City s Accounting and Purchasing

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS Enriching Lives JAMES A. NOYES, Director 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 www.ladpw.org ADDRESS ALL CORRESPONDENCE

More information

Napa County, California, Needs Additional Technical Assistance and Monitoring to Ensure Compliance with Federal Regulations

Napa County, California, Needs Additional Technical Assistance and Monitoring to Ensure Compliance with Federal Regulations Napa County, California, Needs Additional Technical Assistance and Monitoring to Ensure Compliance with Federal Regulations OIG-15-135-D August 28, 2015 August 28, 2015 Why We Did This On August 24, 2014,

More information

Section I - General. Page 1 of 5

Section I - General. Page 1 of 5 Section I - General City of Olivette Residential Sanitary Sewer Lateral Repair Program Policy & Procedures 1200 North Price Road, Olivette, MO 63132 P 314-993-0252 F 314-994-9862 A. The Owner of a single-family

More information

SMALL BUSINESS LEARNING SESSIONS Spring 2015

SMALL BUSINESS LEARNING SESSIONS Spring 2015 SMALL BUSINESS LEARNING SESSIONS Spring 2015 If you re starting or expanding a business and looking for direction, you can t afford to miss these great training sessions designed to save you time and money.

More information

REQUEST FOR PROPOSALS (RFP) For: Water Damage Repairs 1495 N. Tucker Ridge Rd. Okeechobee, FL 34974

REQUEST FOR PROPOSALS (RFP) For: Water Damage Repairs 1495 N. Tucker Ridge Rd. Okeechobee, FL 34974 REQUEST FOR PROPOSALS (RFP) For: Water Damage Repairs 1495 N. Tucker Ridge Rd. Okeechobee, FL 34974 RFP # STOFBR111715-1 Proposal Deadline Tuesday 11/30/2015 REQUEST FOR PROPOSALS PRE-BID Thursday 11/19/2015

More information

Spring 2015 Timeline. College Night Thursday, Jan. 15th

Spring 2015 Timeline. College Night Thursday, Jan. 15th Spring 2015 Timeline College Night Thursday, Jan. 15th 6:15-6:50pm College Advising at MBHS Finding the Right Fit Spring 2015 College Process Timeline 6:50-7:00pm Questions 7:00pm IEP Families College

More information

AGENDA STAFF REPORT. ASR Control 15-000093

AGENDA STAFF REPORT. ASR Control 15-000093 AGENDA STAFF REPORT Agenda Item ASR Control 15-000093 MEETING DATE: 03/03/15 LEGAL ENTITY TAKING ACTION: Board of Supervisors BOARD OF SUPERVISORS DISTRICT(S): 2 SUBMITTING AGENCY/DEPARTMENT: John Wayne

More information

Project Name: Project No.: CONTRACTOR BID FORM. BID FROM: Name: Address:

Project Name: Project No.: CONTRACTOR BID FORM. BID FROM: Name: Address: This bid form must be filled out but is for MPOWER processing purposes only. It does not replace the contractors bid. Your contractors bid should additionally be attached. Project Name: Project No.: CONTRACTOR

More information