1 VDOT Prequalification Suzanne Lucas Construction Division
2 VDOT Prequalification for Highway Contractors in the Commonwealth of Virginia 2
3 What is Prequalification? AASHTO defines a prequalification system as a means of not only pre-determining job experience and work capacity but also to serve as a means of identifying individuals and organizations from whom the agency may be accepting a bid. AASHTO encourages the use of prequalification procedures in its Suggested Guidelines for Strengthening Bidding and Contract Procedures. (a copy of this document will be handed out at the end of the Presentation) AASHTO =American Association of State Highway and Transportation Officials 3
4 What is VDOT s Prequalification Program? VDOT's Contractor Prequalification Program ensures that all contracts for the construction, improvement and maintenance of Virginia's transportation system are awarded to the lowest responsive and responsible bidder. Highway construction and maintenance contracts advertised and let by the Construction Division require prospective bidders to be prequalified. 4
5 Prequalification. VDOT s 2007 Road and Bridge Specifications definition The procedure used by the Department to assure itself of the Contractor s ability to perform the work with attention to quality and safety including his experience in similar work, and sufficiency of equipment to accomplish the work and that the Contractor s financial resources will permit financing the cost in accordance with the Rules Governing Prequalification Privileges. (Note these rules are posted on the Prequalifiction Webpage) 5
6 What does the Code of Federal Regulations indicate about prequalification of contractors? 23CFR Licensing and qualification of contractors states: ( c )..Prequalification of contractors may be required as a condition for submission of a bid or awarded of contract only if the period between the date of issuing a call for bids and the date of opening of bids affords sufficient time to enable a bidder to obtain the required prequalification rating. 6
7 What does the Code of Virginia indicate about prequalification of Highway Contractors? Prequalification generally; prequalification for construction. Item 7, E. The provisions of subsections B, C, and D shall not apply to prequalification for contracts let under General powers and duties of Board, etc.; definitions. The Commonwealth Transportation Board shall be vested with the following powers and shall have the following duties: (2)(b).Such objective criteria will include requirements for prequalification of contractors and competitive bidding processes. These contracts shall be of such size and scope to encourage maximum competition and participation by agency prequalified and otherwise qualified contractors. 7
8 What does VDOT s Road and Bridge Specifications indicate on who should be Prequalified? SECTION 102 BIDDING REQUIREMENTS AND CONDITIONS Prequalification of Bidders All prospective Bidders, including all members of a joint venture, must prequalify with the Department All subcontractors must be prequalified prior to performing any work on the contract- (VDOT recognizes subcontractors as first tier subs) Contractors eligible for DBE credit under Special Provision for Section , DBE federal-aid contract subcontractors must be VDOT prequalified and DMBE certified at the time of bid submission. 8
9 What does VDOT s Road and Bridge Specifications indicate on who is not required to be Prequalified? SECTION 102 BIDDING REQUIREMENTS AND CONDITIONS Prequalification of Bidders indicates: Contractors may be waived by a project-specific provision in the bid proposal Not required if performing work items noted in the proposal as "Specialty Items Not required if subcontractors only performing a service as defined by the Code of Virginia- 9
10 Examples of firms supplying services Firms supplying services only do not need to be prequalified Examples of services are: Engineering Design Inspection Surveying Traffic control Hauling Materials supply Shop fabrication 10
11 Prequalification Rules and Regulations The rules for prequalification reflect VDOT s commitment to Safety Quality Construction Ability to perform (on time) Increased Competition 11
12 Work Classes Work classes are determined by work history and equipment readily available VDOT promotes firms to gain work experience in other areas therefore a firm is not limited to the Work Classes listed on their prequalified list posting. As long as the firm proves their ability to perform work in other Work Classes by readily available expert work force and equipment. 12
13 Safety Safety is an integral and essential part of becoming, and remaining prequalified. Safety evaluation includes: Industry standard Experience Modification Rate (EMR) OSHA logs Contractor s safety program Contractor s safety violations by any governmental agency 13
14 Quality Quality Level Contractor s Performance Evaluations A CPE Annual/Final is done on every contractor or subcontractor (first tier) on every project every year. A Contractor needs an aggregate score of 85% or better in order to be a considered for the highest Prequalification level 14
15 Prequalification Levels Five levels of prequalification 1. Full Prequalification Safety Index Score is at least 70 & CPE aggregate score at least 85% As much as a firm can be bonded for 2. Conditional Prequalification For firms with failing Safety Index Score and/or CPE scores No more than one job under $1 million 3. Currently Inactive Prequalification For firms with no work history with VDOT No more than 3 jobs; each must be valued under $2 million ( so < $6M total) 15
16 Prequalification Levels (continued) 4. Probationary Prequalification For Newly prequalified firms with no work history with VDOT No more than 3 jobs; each must be valued under $2 million ( so < $6M total) 5. Subcontractor only Does not meet minimum criteria to bid as a Prime No established safety or work history * A firm s level does not affect how much work can be undertaken as a subcontractor 16
17 How is a firm s level calculated? A firm s prequalification score is calculated by: 70% (Aggregate CPE Annual/Final score) + 30% (Safety Index Score/3) P = 80 + PC = 70 + PP/PCI= 75+ Denied=
18 Evaluation of a Contractor s Application Considerations for prequalification: Registered with the State Corporation Commission In accordance with the VA CODE a firm shall be registered in good standing with the Commonwealth of Virginia s State Corporation Commission (SCC) to transact business in the Commonwealth. 18
19 Work History Evaluation of a Contractor s Application Current contracts on hand as a Prime & Sub Past three years of completed projects Safety History Established EMR ratings for the past 6 years OSHA 300 & 300A for three past completed years 19
20 Evaluation of a Contractor s Application Equipment Readily available to perform the work Finances Liabilities vs. Assets 20
21 Hand-outs 1.Suggested Guidelines for Strengthening Bidding and Contract Procedures 2.Prequalification Levels Worksheet Descriptions 3.Safety Index Rating Form 4.Prequalification Process Webpage 21
22 Prequalification Webpage Go to the website Click on Business Center in the header Scroll down to Engineering and Support Pick Construction Division Under the Procurement Phase, select Prequalification Click on the link For Prequalification Information and references Web Page Or go directly to 22
23 QUESTIONS?? 23
OAKLAND UNIFIED SCHOOL DISTRICT FOR LOCAL FIRST TIER SUBCONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS
OAKLAND UNIFIED SCHOOL DISTRICT FOR LOCAL FIRST TIER SUBCONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS THIS QUESTIONNAIRE MUST BE PRINTED ON BLUE PAPER OAKLAND UNIFIED SCHOOL DISTRICT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874
ADVERTISEMENT FOR LETTERS OF INTEREST FOR A DESIGN BUILD PROJECT (PROCUREMENT METHOD SHORTLISTING OF PROPOSERS WITH TECHNICAL AND PRICE EVALUATION BY ADJUSTED SCORE) PROCUREMENT NUMBER: E2N44 Financial
Morgan Hill Unified SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS. October 19, 2015
Morgan Hill Unified SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS October 19, 2015 The Morgan Hill Unified School District ( District ) has determined that contractors on future
ANNUAL PREQUALIFACTION APPLICATION. Interested Subcontractor:
ANNUAL PREQUALIFACTION APPLICATION Interested Subcontractor: Each Frank L. Blum Construction subcontractor that has the potential of having a contract greater than $50,000 must submit a completed Subcontractor
CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB
Getting Connected with the Colorado Department of Transportation (CDOT)
Getting Connected with the Colorado Department of Transportation (CDOT) INTRODUCTION Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges State government agency with funding
State of North Carolina Prequalification for First Tier Subcontractors under CM at Risk
NC General Statute 143.128.1.c states, The construction manager at risk shall contract directly with the public entity for all construction; shall publicly advertise as prescribed in G.S. 143 129; and
BOND MEASURE E CONTRACTOR OUTREACH
FREMONT UNIFIED SCHOOL DISTRICT BOND MEASURE E CONTRACTOR OUTREACH May 4, 2015 INTRODUCTIONS Therese Gain, Director of Facilities, Fremont Unified School District Carol Lemos, Administrative Assistant
DENVER URBAN RENEWAL AUTHORITY GUIDELINES FOR UTILIZATION OF SMALL BUSINESS ENTERPRISES IN URBAN REDEVELOPMENT PROJECTS.
DENVER URBAN RENEWAL AUTHORITY GUIDELINES FOR UTILIZATION OF SMALL BUSINESS ENTERPRISES IN Policy Statement URBAN REDEVELOPMENT PROJECTS November 2014 The Denver Urban Renewal Authority ("DURA") has determined
CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE
CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE SANTEE SCHOOL DISTRICT 1 .......... 2 1. Effective January 1 st, 2014,
Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School
Carmel Unified School District Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School January 4, 2016 1 NOTICE REGARDING PREQUALIFICATION FOR BLEACHER AND PRESSBOX
CDOT Resources for Small Businesses
General Information Resources Civil Rights & Business Resource Center is responsible for promoting and maintaining equal opportunity and participation for highway construction contractors and consultants
BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
State of North Carolina Prequalification Form for Prime Contractor
Pursuant to the statute, this form gathers information about the contractors seeking to qualify for the work and provides a general format for the prequalification criteria. Completing this questionnaire
Pre-qualification for Construction Services Using a Qualifying System in Publicly Bid Projects
Pre-qualification for Construction Services Using a Qualifying System in Publicly Bid Projects Introduction: Pre-qualification provides a formal, comprehensive method of identifying companies that meet
The School Board of Miami-Dade County, Florida Department of Contractor Prequalification Frequently Asked Questions and Answers
The School Board of Miami-Dade County, Florida Department of Contractor Prequalification Frequently Asked Questions and Answers Question 1: How long will the prequalification process take? Answer: The
CULVER CITY UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE CONTRACTORS. May 21, 2015
I. BACKGROUND AND OVERVIEW PREQUALIFICATION INFORMATION FOR PROSPECTIVE CONTRACTORS May 21, 2015 The Culver City Unified School District ( District ), is prequalifying contractors to perform construction
ADVERTISING, SALE & AWARD
ADVERTISING, SALE & AWARD PRIMARY ROLES & RESPONSIBILITIES PRIMARY TASK ODOT LPA DEVELOP BID PROPOSAL If project estimate exceeds $500,000, submit engineer estimate to LPA Coordinator to obtain DBE goal.
PREQUALIFICATION APPLICATION REQUIREMENTS
PREQUALIFICATION APPLICATION REQUIREMENTS To be eligible to bid and contract work with Webcor, subcontractors are required to be prequalified annually. If you have any questions, please contact Webcor
ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects
Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Pursuant to Revised Statute of Missouri Section 8.250(3), Ozarks Technical
IRVINE UNIFIED SCHOOL DISTRICT. 100 Nightmist Irvine, California 92618 (949) 936-5317 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20
100 Nightmist Irvine, California 92618 (949) 936-5317 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Irvine Unified School District ( District ) has determined that bidders on an annual basis must
COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION SMALL BUSINESS ENTERPRISE PROGRAM OVERVIEW OF THE VDOT SMALL BUSINESS ENTERPRISE PROGRAM
COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION SMALL BUSINESS ENTERPRISE PROGRAM OVERVIEW OF THE VDOT SMALL BUSINESS ENTERPRISE PROGRAM The Virginia Department of Transportation (VDOT) in accordance
PITTSBURG UNIFIED SCHOOL DISTRICT
PITTSBURG UNIFIED SCHOOL DISTRICT New Construction and Modernization Projects PRE-QUALIFICATION PROGRAM QUESTIONNAIRE FOR PROJECTS $20 MILLION AND OVER TABLE OF CONTENTS PAGE NO. GENERAL INFORMATION.......i
Policy Number: 3-804 Policy Name: Professional Services and Construction Services Procurement
Page 1 3-804 Professional Services and Construction A. Project Delivery Methods 1. A university may procure design services, construction and construction services, as applicable, under any of the following
The Vermont Agency of Transportation Small Business Element of the Disadvantaged Business Enterprise (DBE) Program
The Vermont Agency of Transportation Small Business Element of the Disadvantaged Business Enterprise (DBE) Program Introduction and Overview of the Small Business Element: The Vermont Agency of Transportation
1. Purpose. 2. Scope of Procurement Authority.
Rules Governing Procurement of Goods, Services, Insurance, and Construction by a Public Institution of Higher Education of the Commonwealth of Virginia Governed by Subchapter 3 of the Restructured Higher
PREQUALIFICATION APPLICATION REQUIREMENTS
PREQUALIFICATION APPLICATION REQUIREMENTS To be eligible to bid and contract work with Webcor, subcontractors are required to be prequalified annually. If you have any questions, please contact Webcor
CHAPTER 3.0: PROCUREMENT AND CONTRACTING
CHAPTER 3.0: PROCUREMENT AND CONTRACTING This chapter outlines the requirements for using Federal funds to purchase materials, products, or services under the CDBG Entitlement program. Whether you are
Policy Number: 3-803 Policy Name: Bidding and Source Selection Procedures
Page 1 3-803 Bidding and Source Selection Procedures A. Definitions In ABOR Policies 3-803 (Bidding and Source Selection Procedures) and 3-804 (Professional Services and Construction Services Procurement):
Prequalification Document for Procurement of Works
STANDARD PROCUREMENT DOCUMENT Prequalification Document for Procurement of Works Caribbean Development Bank September 2007 ii Foreword This Standard Procurement Document Prequalification Document for Procurement
PREQUALIFICATION QUESTIONNAIRE
PREQUALIFICATION QUESTIONNAIRE BAW&G/WHW/JWF/172861.2 Revision Date: 01-14/14 1 Contractor Prequalification Package CONTACT INFORMATION Firm Name: Check One: Corporation (as it appears on license) Partnership
BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
Subcontractor Prequalification Statement
To: NUNN CONSTRUCTION, INC. 925 ELKTON DRIVE COLORADO SPRINGS, CO 80907 (719) 599-7710, FAX (719) 599-4744 From: Firm Name: GENERAL INFORMATION Subcontractor Prequalification Statement Company Name Address
SUBCONTRACTOR / VENDOR PREQUALIFICATION QUESTIONNAIRE
Return to: Phone: 1-208-323-4500 1. General Information Name of Business: SUBCONTRACTOR / VENDOR PREQUALIFICATION QUESTIONNAIRE Petra, Inc. 1097 North Rosario St. Meridian, ID 83642 1-208-323-1147 E-Mail:
PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List
PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List At their Board meeting of August 21, 2013, the Trustees of the
EMR as Qualifier to Bid on Construction Projects
EMR as Qualifier to Bid on Construction Projects July 14, 2011 Introduction This white paper discusses the use of the experience rating modification (commonly referred to as EMR in the construction trades)
The Michigan Department of Transportation s (MDOT s) Small Business Program
The Michigan Department of Transportation s (MDOT s) Small Business Program MDOT s Small Business Program (SBP) is a race- and gender-neutral program designed to provide contracting opportunities for small
1. Subcontractor Prequalification Questionnaire a. Please complete with assistance from your insurance agent(s)
3208 Tazewell Pike, Suite 103 Tel: 865.688.1335 / Fax: 865.688.9291 www.creativestructuresinc.com Attention: Prospective Subcontractors Re: Prequalification Applications Creative Structures, Inc., appreciates
12-15-08 DRAFT 2009FL-0004/018
1 HEALTH REFORM - HEALTH INSURANCE 2 COVERAGE IN STATE CONTRACTS 3 2009 GENERAL SESSION 4 STATE OF UTAH 5 6 LONG TITLE 7 General Description: 8 This bill requires certain state entities to require a contractor
Colorado Mesa University CMU 2489 REQUEST FOR QUALIFICATIONS SMALL BUSINESS GENERAL CONTRACTOR PREQUALIFICATION
CMU 2489 REQUEST FOR QUALIFICATIONS SMALL BUSINESS GENERAL CONTRACTOR PREQUALIFICATION BACKGROUND, OVERVIEW AND GOALS Colorado Mesa University is soliciting the submittal of qualifications from General
North American Development Bank. Model Prequalification Document: Prequalification of Contractors
North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried
Project Management On-line Guide
Project Management On-line Guide Project Life Cycle Processes Flowchart Department Policy Memorandum Project Management Policy To support the Project Management Initiative, respond to Policy Agreement
CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY
Exhibit 1 CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY The undersigned certifies on behalf of the Contractor or Subcontractor
Pinner Construction Company, Inc. SUBCONTRACTOR PREQUALIFICATION QUESTIONNAIRE
Pinner Construction Company, Inc. SUBCONTRACTOR PREQUALIFICATION QUESTIONNAIRE Pinner Construction thanks you for completing our subcontractor prequalification application. Subcontractors have been paramount
Ocoee, FL July 01, 2016 Advertisement No. 1
BID SOLICITATION NOTICE Turnpike FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Ocoee, FL July 01, 2016 Advertisement No. 1 All bids must be completed using Expedite Bid software
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and
The Surety Safeguard for Third Party Vendor Contracts. How Surety Bonds Protect Taxpayer Dollars
The Surety Safeguard for Third Party Vendor Contracts How Surety Bonds Protect Taxpayer Dollars The Surety Safeguard for Third Party Vendor Contracts How Surety Bonds Protect Taxpayer Dollars The Surety
Puget Sound Regional Council
Puget Sound Regional Council PSRC Request for Qualifications for Legal Services Consultant Services Solicited by the Puget Sound Regional Council Released: November 12, 2009 Submissions Due: 4:30pm, November
CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN-OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY
EXHIBIT 1 TO ATTACHMENT CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN-OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY The undersigned certifies on behalf of the Contractor
Bureau of Recreation and Conservation (BRC) Administrative Policy/Grant Guidelines
COMMONWEALTH OF PENNSYLVANIA Department of Conservation and Natural Resources Bureau of Recreation and Conservation (BRC) Administrative Policy/Grant Guidelines SUBJECT: Development Project Management
Project Name: Project No.: CONTRACTOR BID FORM. BID FROM: Name: Address:
This bid form must be filled out but is for MPOWER processing purposes only. It does not replace the contractors bid. Your contractors bid should additionally be attached. Project Name: Project No.: CONTRACTOR
NEW JERSEY ADMINISTRATIVE CODE Copyright 2015 by the New Jersey Office of Administrative Law
Page 1 NEW JERSEY ADMINISTRATIVE CODE Copyright 2015 by the New Jersey Office of Administrative Law *** This file includes all Regulations adopted and published through the *** *** New Jersey Register,
Tel: (617) 727-4050 Fax: (617) 727-5363. OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2
The Commonwealth of Massachusetts Executive Office for Administration and Finance Division of Capital Asset Management One Ashburton Place Boston, Massachusetts 02108 Tel: (617) 727-4050 Fax: (617) 727-5363
PART 252 SERVICE-DISABLED VETERAN-OWNED-BUSINESS ENTERPRISE PROGRAM. (Statutory authority: Executive Law, 200, 369-i[5])
PART 252 SERVICE-DISABLED VETERAN-OWNED-BUSINESS ENTERPRISE PROGRAM Sec. (Statutory authority: Executive Law, 200, 369-i[5]) 252.1 Definitions. 252.2 State agency responsibilities: purpose, scope and applicability.
Work Breakdown Structure Element Dictionary Construction
Initiation CON 5.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope, including the solicitation for a contractor
TRAVIS UNIFIED SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES CONSTRUCTION MANAGER MULTI-PRIME
TRAVIS UNIFIED SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES CONSTRUCTION MANAGER MULTI-PRIME QUESTIONS PAGE 11 200.325 BONDING REQUIREMENTS Please confirm that construction
GUIDELINES FOR RECRUITMENT AND SELECTION OF MINORITY BUSINESSES FOR PARTICIPATION IN STATE CONSTRUCTION CONTRACTS
GUIDELINES FOR RECRUITMENT AND SELECTION OF MINORITY BUSINESSES FOR PARTICIPATION IN STATE CONSTRUCTION CONTRACTS In accordance with G.S. 143-128.2 (effective January 1, 2002) these guidelines establish
DOING BUSINESS WITH CDOT
DOING BUSINESS WITH CDOT Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges One of the largest state government agencies with an annual budget of $1.2 billion Primarily
International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya
International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya PRE-QUALIFICATION TENDER NO. IPSTC/PREQ/2014/2015/043 FOR PROVISION OF PLUMBING SERVICES FOR 2014/2015 July, 2014
FIRM APPROVAL OF BIDDER'S PROOF OF RESPONSIBILITY DATE RECEIVED PRE-QUALIFIED BY DATE CLASS OF WORK DESCRIPTION OF JOB LOCATION OF JOB DEPARTMENT
To: Shelly Billingsley, P.E. Director of Engineering Division 625 52nd Street Kenosha, Wisconsin 53140 FIRM APPROVAL OF BIDDER'S PROOF OF RESPONSIBILITY DATE RECEIVED PRE-QUALIFIED BY DATE CLASS OF WORK
Chapter 200 1999 EDITION. Disadvantaged, Minority, Women and Emerging Small Business Enterprises
Chapter 200 1999 EDITION Disadvantaged, Minority, Women and Emerging Small Business Enterprises GENERAL PROVISIONS 200.005 Definitions for ORS 200.005 to 200.075 200.015 Legislative findings 200.025 Advocate
Consultant Administration Services Procedure Manual
Consultant Administration Services Procedure Manual July 15, 2015 Prepared by NORTH DAKOTA DEPARTMENT OF TRANSPORTATION Bismarck, North Dakota www.dot.nd.gov DIRECTOR Grant Levi, P.E. OFFICE OF PROJECT
Hunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR:
Hunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR: San Diego State University Basketball Practice Facility Project Number: 03400200 October 2013 San
FORT PIERCE UTILITIES AUTHORITY Committed to Quality
FORT PIERCE UTILITIES AUTHORITY Committed to Quality FORT PIERCE UTILITIES AUTHORITY SPECIAL TERMS AND CONDITIONS November 6, 2012 TABLE OF CONTENTS SPECIAL TERMS AND CONDITIONS Section 1. DEFINITION...
Subcontractor Prequalification Form
Policy: Gordon Prill's Policy is to prequalify potential subcontractors with whom we have not worked previously. All potential subcontractors must obtain prior approval before they may bid to Gordon Prill.
How-To-Tutorial for MoDOT s Consultant Prequalification Process. How-To-Tutorial for MoDOT s Consultant Annual Financial Prequalification Process
How-To-Tutorial for MoDOT s Consultant Prequalification Process Why has MoDOT developed the Annual Financial Prequalification Process MoDOT s has developed an Annual Financial Pre-Qualification process
SUBCONTRACTOR S QUALIFICATION STATEMENT. Give complete answers to the following questions (attach additional pages if necessary).
1 SUBCONTRACTOR S QUALIFICATION STATEMENT Submitted to: B.C. Construction Co., Inc. 385 Main Street Wakefield, MA 01880 For consideration with regard to: (Name of Project) Date: Give complete answers to
SUBCONTRACTOR PRE-QUALIFICATION APPLICATION
APPLICATION SUBCONTRACTOR IDENTITY Date Submitted Company Name Complete Address Phone Number Contact Name Federal Tax ID # DUNS # Fax Number Email Address NAICS Code States Registered to do Business Include
ACCOUNTING PROCEDURES IN DETERMINATION OF CONTRACTOR S FINANCIAL RESOURCES BULLETIN NO. 2
ACCOUNTING PROCEDURES IN DETERMINATION OF CONTRACTOR S FINANCIAL RESOURCES BULLETIN NO. 2 Revised June 2010 ACCOUNTING PROCEDURES DETERMINATION OF FINANCIAL RESOURCES OF COMMERCIAL ORGANIZATIONS ENGAGED
REGULATIONS GOVERNING PARTICIPATION BY MINORITY BUSINESS ENTERPRISES IN STATE FUNDED AND DIRECTED PUBLIC CONSTRUCTION
REGULATIONS GOVERNING PARTICIPATION BY MINORITY BUSINESS ENTERPRISES IN STATE FUNDED AND DIRECTED PUBLIC CONSTRUCTION PROJECTS, CONSTRUCTION CONTRACTS AND PROCUREMENT CONTRACTS FOR GOODS AND SERVICES I.
Design Build Procurement Guide
Design Build Procurement Guide DESIGN BUILD PROCUREMENT GUIDE Page 1 of 29 TABLE OF CONTENTS Abbreviations... 4 Chapter 1 Design Build Introduction.. 1.1 Purpose 1.2 Authority 1.3 Scope 1.4 Background
SUBMISSION REQUIREMENTS
GREATER ORLANDO AVIATION AUTHORITY REQUEST FOR CONTRACTOR STATEMENT OF QUALIFICATIONS (RFQ) FOR BP-459 SECURED AREA ACCESS POINT CCTV IMPROVEMENTS ORLANDO INTERNATIONAL AIRPORT SUBMISSION REQUIREMENTS
Honeywell Energy Services Group
Honeywell Energy Services Group Minnesota State Colleges and Universities Riverland Community College Guaranteed Energy Savings Program (GESP) Project Request for Qualifications (RFQ) Phase 3 Lighting
SAN BERNARDINO MOUNTAINS COMMUNITY HEALTHCARE DISTRICT
SAN BERNARDINO MOUNTAINS COMMUNITY HEALTHCARE DISTRICT CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE 1 PRE-QUALIFICATION QUESTIONNAIRE 000 CONTACT INFORMATION Firm Name: Check One: Corporation (as it appears
HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL
HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL Pennsylvania Department of Transportation PUB 412 (12-05) TABLE OF CONTENTS FOREWORD 3 DISCLAIMER 3 1.0 Doing Business with PennDOT 4 1.1 Contractor Requirements
REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES Various Projects RFQ/RFP No. 15-16-02
Banning Unified School District 161 West Williams Street, Banning, CA 92220 (951) 922-2706 phone (951) 922-0227 fax January 12, 2016 REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT