1 MAJOR INFRASTRUCTURE PROJECT MANAGEMENT SYSTEM IN HONG KONG CHOW Che King Hong Kong Academy of Engineering Sciences Abstract Within a few decades after World War II, the infrastructure development and economic growth, supporting each other reciprocally, have transformed Hong Kong into an international metropolis in the world. Following introduction of new technology, attraction of requisite staff and resources, we have built many world class infrastructure projects in this small place. The project management system gradually builds up with high transparency, and large variety, catching up with international standards. The paper introduces the advancement of infrastructure development in Hong Kong from the simple and basic forms to sophiscated systems developed to suit the large variety of projects nowadays. It touches on policy formulation, financial arrangement, organization, consultants employment, choice of contracts, site supervision, safety and quality control. In addition, it briefly described some of the major projects carried out in different stages, the methods adopted and the background at that time. These include early water supply schemes, land formation, transport, and new town development following, and later the airport core projects, expansion of road and rail networks, plus the recent cross-border projects. The article tries to illustrate the magnitude of infrastructure development in Hong Kong, its contribution to the economic growth, and the flexibility and multi-lateral characteristics of the management system. Keywords major infrastructure, project management, Hong Kong (1) Introduction Located at the southern coast of China, Hong Kong has a small area of only 1103km 2. Starting from a small fishing community, it has grown to become a modern world city, a prosperous trading port, and an important financial centre. Its gross domestic product exceeds US$150 billion. With a population of 6.8 million, the average GDP per capita ranks favourably with those in developed countries. Throughout this period, an important contribution comes from the development of its infrastructure systems. The 2000km of highways comprises of many expressways, major bridges and tunnels, linking up with Mainland China in the north. The railway systems are modernized, with still a number under planning. The container terminal is the busiest in the world, and the new airport efficiently serves as the region hub. The new town development programme is probably the largest in the world, housing half of the population in a well planned environment. At the same time, the project management also advances with time to international level. (2) Early Infrastructure Development After World War II, there were so much to be carried out. Due to resource shortage, works were concentrated on repairs and reconstruction. The maintenance contracts are spilt into areas with a definite period, based on adoption of a Schedule of Rates. Items are grouped together according to trades with fixed rates. Works are measured up on completion and priced under appropriate items. Contracts are tendered on ±% of the Schedule of Rates basis. During the 1950 s, population increased rapidly and industry grew up. Water shortage was most critical. The Tai Lam Chung Water Supply Scheme, started in 1953, was the largest engineering work in Hong Kong. Designed in UK, it comprised mainly of a 200 ft high concrete gravity dam and 4 earth dams. The contractor employed a capable project team with over 1000 directly employed residential site staff and workers. There was no detailed quality control manual and large site management staff of current scale, the works were efficiently executed and completed within 4 years. Later water supply came from enclosed seainlets cut off by dams, and water transport from East River in Guangdong. There is no longer water supply problem. (3) Project Management Manual In the 1960 s, economic development was led by massive export from manufacturing industry, resulting in high demand of land supply and transport infrastructure. To manage the vast number of projects, the Public Works Department started compiling a Project Administration Handbook, which covers the following chapters: 1. Project Planning 2. Project Approval 3. Land Matters 4. Design and Estimates 5. Contract Documents 6. Tender Procedure 7. Contract Management

2 8. Maintenance and Minor Works, and Works for and by Others 9. Measurement Procedure The Handbook was gradually expanded into 3 thick volumes listing out relevant project management details for executive staff to follow. Hong Kong being an international city, engaging many overseas consultants, contractors, materials and plant suppliers, it is important also for relevant bodies outside the Department to understand the local management system. (4) Project Categorisation Infrastructure projects are mostly public works led. Those under government are divided into 6 categories for management by different professional departments, viz, Civil Engineering, Highways, Drainage, Waterworks, Territory Development and Building. There is a Capital Works Reserve Fund, established within the Budget to provide funds for the Public Works Programme with hundred billions project costs. There are over a thousand items in the Programme. Besides categorisation according to the nature of projects, they are also divided into Category A, B and C on the basis of their importance, likely progress and funds available. The items are reviewed regularly for follow-up actions, such as upgrading, down grading or deletion, and works estimate revision. Category C Category B Category A (5) Project Approval Project agreed by the relevant government committee in principle for inclusion in the Public Works Programme. Acceptance for implementation within 5 years. To proceed with detailed feasibility study, engineering design, contract preparation, land acquisition process, and relevant works as required by Ordinance. Project scope and cost approved. Design and contract ready for calling tenders. If the project is considered socially important, the public will be consulted, before it is included in the Public Works Programme for approval by the Finance Committee of Legislative Council, which is responsible for vetting the government budget, annual revenue and expenditure. Project details are initially submitted to the Public Works Sub-committee for recommendation. The Project Director needs to attend the monthly PWSC meeting for any explanations required. Differences in opinions would be decided by formal voting after discussion in the Finance Committee. Tender invitation can start after project inclusion in Category A. If the tender sum is higher than approved estimate, or increase of project cost is necessary due to various reasons during construction period, prior approval must be sought. The Audit Department within government, and the Public Accounts Committee of LegCo. will also regularly check the financial situations of these projects. (6) Tender Qualification Calling tenders for public works contracts is published in weekly government gazette, stating the extent of works, the Category and Group of eligible tenderers, and the closing date. The management department will analyse the tenders received according to established procedures, and submit recommendation for acceptance by the Central Tender Board comprising members from relevant departments. There is a fairly comprehensive system formulated for management of tenderers for public works contracts. They need to apply to the Works Bureau for admission, with details including their past contracting record, financial status, management staff and their experience, works depot and plants. After confirmation of contents, the contractors would be classified into 5 categories on the basis of their experience, viz, Buildings, Port Works, Site Formation, Waterworks, Roads and Drainage. A contractor can be listed under more than one category. Each category is divided into Group A, B and C with reference to the status of the contractor. Group A can tender contracts of value up to $20 million, Group B up to $50 million, and Group C exceeding $50 million. Contractors are normally given probation status before confirmation. They can be upgraded with proven performance, or down-graded on deterioration, and even deletion. Overseas contractors with track records can be included directly in Group C. Other specialist contractors or suppliers have their own lists. For exceptionally large projects that require special technology and plants, international tender procedure and pre-qualification are needed. Tenderers will submit their relevant skill, equipment, finance and management capability for checking. Those with special expertise can also form joint ventures to tender after approval. Since joining the World Trade Organisation, Hong Kong is required to inform other countries to let their eligible contractors to tender. (7) Contract Management Before starting work on site, the contractor needs to submit a works programme, listing out the important events in time sequences. For major contracts, a critical path network is often prepared to

3 show the related critical events and the consequence due to delay. The site management staff on both sides would need to meet at regular intervals to examine the progress and quality of works. Any deficiency should be drawn to the contractor s attention to improve, failing which a written warning would be issued, or disciplinary action taken. Moderate offence takes the form of suspension for tendering, with downgrading or deletion for the serious cases. Each year, the contractor is required to submit a satisfactory audited report, failing which, similar action would be taken. In executing large complicated contracts, unforeseen variations may arise. The supervisory staff needs to make a fair settlement proposal on the basis of true records, for acceptance by the project manager and contractor. If necessary, it may need to go for mediation, adjudication, or arbitration according to contract conditions and seriousness of the disputes. (8) Site Safety and Quality Management Both safety and quality control call for great attention in site management. In the early days, not much attention was paid to site safety, resulting in high accident rates. Later government strengthens safety regulations, and promotes greater consciousness of precautionary measures. Various guidelines are issued for control of site noise, dust, foul gas, pollution, waste and demolition works. In 1990 s, Works Bureau introduced a checking system and a safety plan to incluce payment to contractor up to 2% of contract value for complying with safety measures. A safety officer is engaged on large sites to educate the workers, to strengthen precautionary measures and to monitor the execution. Government would send independent checking teams for regular inspection. For dangerous events and works, such as deep trenching, formwork for large concreting, contractors need to obtain independent design check certificate from consulting engineers before proceeding with the work. Similar procedure is applied to design of major complicated structures. For instance, a particular expert was engaged to carry out an independent check of the Tsing Ma Bridge, on completion of its suspension deck design, and wind tunnel model test verification. Concurrently, Hong Kong also follows the adoption of international quality management system (ISO9001). Tenderers for major contracts would need such qualification. There is an approved supervisory manual and guidelines for working staff to follow. Later, consulting engineers and government departments also undertake to adhere to similar certification procedures. (9) Contract Forms and Financial Arrangement In late 1960 s, the rising economy had created strong demand on many infrastructure projects of greater complexity and magnitude. New technology was needed and more varied forms of contracts were introduced. The private developers became more interested in such investment. International consultants and overseas contractors flocked to Hong Kong for more business opportunities. Project management also advanced a big step forward. (10) Design and Build Contract In 1967, Hong Kong started to build the widest road to modern traffic engineering standard, the new Waterfront Road along the northern shore, 4km long, 50m wide, dual 3 lanes carriageway with verges and service road. Ten flyovers and footbridges were then built with prestressed concrete construction. Contractors collaborated with prestressing system manufacturers, or employed consultants to submit their own design for the structures at lump sum price. The group of contracts attracted a number of international prestressed systems to establish themselves in Hong Kong. The technology was first applied in precast beams and pretensioned piles, and later expanded to continuous curved decking and box girders. About the same time, a private developer has completed the ocean terminal project, catering for berthing of 80,000 ton ship at Tsimshatsui with upper decks for shopping arcades. The work was designed and built by a British contractor, starting a new area both for tourism and international contracting. Since then, this form of contract was adopted in many major infrastructure projects, recent cases being 2 cable stayed bridges at Kap Shui Mun and Ting Kau. Such contract is simpler for the project manager to administer, but there exists a higher risk for contractor, who may have to overcome some unforeseen difficulties. (11) Build and Transfer Form Government may require the developer to undertake an engineering project under the land lease conditions, and to transfer it for public use on completion. The first Tsing Yi South Bridge set an example. The southern part of Tsing Yi Island was planned for industrial development, including power station, oil storage and cement works. The developers were required to jointly construct this bridge to link up with Tsuen Wan. The work itself was supervised by the Highways Office. A new technique, double cantilever prestressing segmental construction was introduced in this bridge construction, and was widely adopted in later similar works.

4 In some private development projects, government may also require the developer to undertake certain community facilities, footbridges, or access road to comply with town planning requirements, and to transfer them to public on completion under land lease conditions. (12) Build, Operate and Transfer Project Certain projects, such as the Hong Kong Cross Harbour Tunnel, was deemed to be financially viable for adoption of this form of contract. The government do not have to invest; the developer will derive profits on tolls during operation; and the work will be handed back to public at the end of a fixed period. The initial shareholders of the company included a bank, several commercial firms and government. The consultants first introduced the submerged tube tunnel construction technique to Hong Kong. The contracting consortium comprised of 3 companies from UK, USA and HK. Huge circular steel segments were fabricated on a waterfront site, after which they were towed to be sunk in a pre-dredged trench in the seabed, and linked together. The tunnel was open to traffic in As it was the first fixed crossing between Hong Kong Island and Kowloon, the traffic flow increased rapidly, and so was the toll revenue. The UK bank loan was quickly paid up. The high profit did favour the floating of shares to the public later. At the end of 30 years contract period, the tunnel became public. The subsequent tunnel projects were also contracted on similar terms, including the Eastern Harbour Crossing with 4 traffic lanes and 2 MTR tracks, the 4km long Tate s Carin Tunnel in N.T. East, the 6 lane Western Harbour Crossing, and the Tai Lam Tunnel in N.T. West. However, the traffic flow is not as high as initially expected, the operators have to bear financial hardship in their early years of operation. (13) Public Infrastructure Corporation Many infrastructure projects are important to the area development, but are difficult to impose charges, or they are commercially not viable, because of low usage level. For those systems that are capable of staged development and financially viable, public corporations will be set up for operation on commercial principles. They will be granted fabvourable lease conditions and equity shares for establishment, and can borrow loans from banks; so as to reduce demand on public funds. The Kowloon Canton Railway and the Mass Transit Corporation took over the original facilities and planning from Government, and continued with railway construction and operation. 190km length of railways are now completed, and many still under planning. They are allowed to carry out podium property developments in conjunction with private companies for profits that help to subsidize fares. Shares can also be floated in the stock market. Similarly, the Airport Authority was set up for developing Chek Lop Kok Airport and subsequent operation. Besides, there are Industrial Estate Corporation, Science Park and Urban Renewal Authority established to deal with their relevant project implementation. (14) Private Infrastructure Development Some infrastructure projects are basically commercial enterprises. There is no need for them to become public. Thus, the private sector is encouraged to develop container terminals in stages. Starting from 1974, container throughput has risen to over 20 million TEU (twenty foot equivalent unit) in 2003 (including mid-stream handling), the highest in the world. Such projects are planned by Government to phase with long term development. Subject to confirmation by feasibility study, sites are tendered by public auction. The developer would proceed with reclamation and installation of mechanical equipment. The latest Terminal No. 9 is now partially completed. However, due to the high development cost over HK$10 billion, and keen competition from nearby similar facilities being closer to the production base in the region, there are doubts on further expansion in Hong Kong, hence the site of Terminal 10 is further delayed. Besides container terminals, energy projects are all developed by the private sector. The earlier electricity power stations adjacent to urban areas have all been relocated to more remote sites, that can satisfy stringent environmental requirements. With quite favourable development terms, there is no shortage in electricity over the years. The same applies to telecommunication. With the rapid advancement in technology and the popularity of mobile system, Hong Kong maintains to be an important information centre. Fuel supply with oil and gas also depends on market economy, as long as they can satisfy government requirements and environmental protection considerations. (15) New Town Development The New Town Development Programme is a large conglomerate of super projects in Hong Kong. The building up of each new town is a major item of its own. It takes over 20 years from planning to substantial completion of each community, stretching over commercial/residential, industry, education, medical, and recreation development, besides infrastructure. Management-rise, it also succeeds in establishment of a new matrix system. The Programme was established in 1973, when Hong Kong economy strength was felt sustainable to provide a reasonable environment for a massive population to improve their poor living

5 conditions. A dedicated Department was set up to build 3 major new towns in Shatin, Tsuen Wan and Tuen Mun. A separate multi-discipline team of engineers, town planners, architects, and landscape architects led by a senior Project Manager was made responsible for development of each area, designed to modern planning standards and balanced development principles with housing, commercial/industrial uses, and community facilities to be added in phase with population build-up. Each new town development was subject to detailed site selection and feasibility study, in accord with the Territory Development Strategy. The development area, population and external infrastructure links were formulated, based on which an Outline Development Plan, detailed Layout Plan for individual areas, and overall Development Programme were prepared. The 10 years Programme contained all relevant information such as land uses, population distribution and growth, housing, commercial/industrial development, community projects and infrastructure items. Progress was updated each year with annual editions for circulation to all relevant bodies and available for public information. With continuous dedication efforts from both public and private sectors and adequate resources, the Progamme gained great success, and was later expanded to include urban development areas. Within 30 years, 9 new towns are built up, 10,000 ha of land formed, about 1000 km roads extended, many river courses improved, sewage treatments plants built, new water and electricity supply systems added, 3 million people housed and numerous community facilities completed, at a combined cost of several hundred billion dollars. (16) New Airport Core Projects This Programme originated in 1977 when Government decided to relocate the airport from Kai Tak to Chek Lap Kok. The overall planning was completed in 1983, and Tsing Ma Bridge contract was ready for tender. However, it was suspended then. In 1989, the whole project re-started and expanded in scope to include 10 major items. An overall coordination department was established with the support of an international expert management team. Under a high level monitoring committee headed by the Chief Secretary, the Airport Authority was made responsible for the airport itself, Highway Department for 4 related items, viz, North Lantau Expressway, Lantau Link, Route 3 (Tsing Yi section) and West Kowloon Expressway, Territory Development Department managing Tung Chung, West Kowloon Reclamation, Central Reclamation Stage 1 and supporting infrastructures. The only commercially viable West Harbour Tunnel Crossing project was tendered to private with Build, Operate and Transfer contract. Besides, Kap Shui Mun Bridge contract was awarded on Design and Build method. Most other contracts were entrusted to consulting engineers for design and supervision, with government departments taking up the rest. Throughout the construction period, the managing departments had monthly meeting to review progress and related matters. For the Airport and Railway items, the equity fund issue had to be settled with Sino-British Agreement. With joint efforts, most items were completed before the 1997 handover date, with the airport and railway projects 1 year later. The combined costs of these project add to HK$160 billion. (17) Recent Infrastructure Development In recent years, there are some changes in the economic pattern and social opinions in Hong Kong. While public infrastructure works slow down a little, there are some new major Private Finance Initiatives projects coming up, such as the Cyber Port in south western Hong Kong Island, and the Disneyland Park in north western Lantau. Both projects were negotiated with a single developer without going through tender procedure, while government is supporting them with concerted planning and infrastructure building. The Penny Bay is reclaimed for the American company to develop their tourism project, with all related designs being mutually agreed prior to construction. For public works, the managing departments are promoting a new non-binding post-award project partnering approach in a few selected contracts. Procedures and technical proposals in structured format are developed to implement the concept and process of partnering with the common view of improved works quality and higher cost effectiveness. Design and Built contracts are practiced on a large scale, cases being the Ting Kau stayed bridge construction, and the major culvert construction contract in Tseung Kwan O, where the contractor proposed large precast culvert segments by launching to replace the original consultants design of traditional cast-in-situ method. In the field of funding, government recently adopts a new public loan fund to enable more public infrastructure projects be started. Both private develops and government are also looking for opportunities to create new Public Private Partnership projects for mutual benefits. (18) Cross Border Projects Following agreement on the future of Hong Kong, the local government and Guangdong authority have collaborated to implement several cross border projects with good progress. The Shenzhen River

6 training works are far advanced with most sections widened and re-aligned. New bridges at Lo Wu and Lok Ma Chau are completed. The Shenzhen Western Corridor project is under construction with both sides handling respective sections and approach roads. Two even larger projects are under active consideration, the new high speed rail link between Guangzhou and Hong Kong, and the Hong Kong/Zhuhai/Macau Bridge across the Pearl River Delta. The latter scheme can be an ideal one for public/private partnership infrastructure. The author of this paper has made some suggestions for this work in earlier seminars held in Hong Kong, Zhuhai and Beijing. (1) A corporation be formed with supports from municipal governments in the region and interested private sector to appoint a joint consulting firm for production of a best overall scheme including design, financing and management organization structure. (2) Consider rail addition to the crossing and an all weather route, as with Lantau Link in Hong Kong. (3) Overall planning of navigation requirements for the whole Delta to produce the most cost benefit arrangement, not only for port development, and also for the crossing design. (4) Consider adjacent land development in conjunction with the crossing to improve its financial viability, as in the earlier route proposal from Zhuhai, making use of the 2 islands as intermediate landing points, rather than building artificial islands for a new alignment. (19) Conclusion The demands on infrastructure projects are increasing with time. Besides works progress, quality and cost, greater attention is needed on site safety, environmental considerations, financial arrangement, and social opinion. The success depends on a comprehensive management system, flexible implementation skill, promotion of new technology, and right choice of the most cost effective contract form. The recent Pan Pearl River Delta 9+2 Regional Development Agreement, will open up further the huge potential available in Mainland China. The development of professional services under The Closer Economic Partnership Arrangement (CEPA) will also facilitate mutual co-operation for an even better project management systems to the benefit of our infrastructure development and continuous economic growth. Reference 1. 工 程 人 生 香 港 基 建 五 十 年 - 周 子 京 著, 香 港 大 學 出 版 社 2003, My Life as an Engineer 50 years of Infrastructure Development in Hong Kong (in Chinese), Hong Kong University Press, 2003 (ISBN ). 2. Engineering Hong Kong 50 years of Achievements Hong Kong Academy of Engineering Services and Hong Kong Institution of Engineers, Hong Kong 2003 (Report) Information Services Department, HKSAR About the Author Age 70, male, born in Hong Kong. Graduated in University of Hong Kong in He serves continuously for 40 years in HK Government works departments, having occupied senior positions as Head of Civil Engineering Office and Director, Territory Development Department before retirement. Some of the major projects undertaken by him include site supervision of Tai Lam Chung dams, leading Tsing Ma Bridge design, feasibility study of Chek Lap Kok International Airport, and later Shatin and Tseung Kwan O new town development, as well as urban expansion schemes. In addition, he participated in university education and professional training. After retirement, he was appointed Honorary Professor in University of Hong Kong, and Hong Kong Affairs Adviser by Central Government, PRC. He is a Fellow of Hong Kong Institution of Engineers, and a Council Member of Academy of Hong Kong Engineering Sciences. He has written many papers for local and international seminars, and helped to organise conferences. His book on 50 years of Infrastructure Development in Hong Kong published by Hong Kong University Press summarizes the progress of public works and their management system.

Transit Oriented Development and Value Capture Hong Kong

Transit Oriented Development and Value Capture Hong Kong UNESCAP Regional Expert Group Meeting on Sustainable and Inclusive Transport Development and 2 nd Asia BRTS Conference, 29 Sep 1 Oct 2014, Ahmedabad Transit Oriented Development and Value Capture Hong

More information

Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks

Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks Raymond wai-man, Wong Professor chi-ming, Tam City University of Hong Kong The background Before 2007, HK s railway networks

More information

53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress

53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress 53km will be added to our Hong Kong network Deliver the New Era Network 4 New Railway Projects are in progress Island Line Extension opened in December 2014 Executive Management s Report Hong Kong Network

More information

Property Development

Property Development Property Development The Group will continue strengthening its reputation by enhancing the quality of its products and services and branding individual projects. High project marketability and improved

More information

Planning for Office Land in Hong Kong

Planning for Office Land in Hong Kong Seminar on Office Development in Hong Kong Planning for Office Land in Hong Kong Mr. Jimm my y C.F. Leung, Director of Planning 12 March 2011 1 1 Outline of Presentation Introduction Office Development

More information

PROVISION OF CYCLE TRACK NETWORK IN THE NEW TERRITORIES. Executive Summary

PROVISION OF CYCLE TRACK NETWORK IN THE NEW TERRITORIES. Executive Summary PROVISION OF CYCLE TRACK NETWORK IN THE NEW TERRITORIES Executive Summary 1. Cycling is one of the popular recreational activities in Hong Kong. Many cyclists ride bicycles on cycle tracks for recreational

More information

Legislative Council Panel on Environmental Affairs. 209DS Outlying Islands sewerage, stage 1, phase 1 - consultants fees and investigations

Legislative Council Panel on Environmental Affairs. 209DS Outlying Islands sewerage, stage 1, phase 1 - consultants fees and investigations For discussion On 8 May 2001 Legislative Council Panel on Environmental Affairs 209DS Outlying Islands sewerage, stage 1, phase 1 - consultants fees and investigations Purpose This paper seeks Members

More information

The Group s attributable gross rental income in Hong Kong increased by 12% to HK$5,466 million

The Group s attributable gross rental income in Hong Kong increased by 12% to HK$5,466 million Review of Operations Business in Hong Kong Property Investment 2012 Highlights The Group s attributable gross rental income in Hong Kong increased by 12% to HK$5,466 million Held a total attributable gross

More information

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS For discussion on 2 April 2001 LC Paper No. CB(1)907/00-01(03) LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS PWP Item No. 277CL Tseung Kwan O development, phase II, Remaining engineering works

More information

Hong Kong: the premier gateway for doing business in China and Asia

Hong Kong: the premier gateway for doing business in China and Asia Hong Kong: the premier gateway for doing business in China and Asia Miss Gloria Lo Director of Hong Kong Economic and Trade Office 23 May 2012 Hong Kong Economic and Trade Office (Toronto) 1 Hong Kong

More information

Legislative Council Panel on Commerce and Industry. The 15 th Working Meeting of the Hong Kong/Guangdong Co-operation Joint Conference

Legislative Council Panel on Commerce and Industry. The 15 th Working Meeting of the Hong Kong/Guangdong Co-operation Joint Conference LC Paper No. CB(1)2737/09-10(01) For Information Legislative Council Panel on Commerce and Industry The 15 th Working Meeting of the Hong Kong/Guangdong Co-operation Joint Conference Purpose This paper

More information

ENVIRONMENTAL PROTECTION IN HONG KONG

ENVIRONMENTAL PROTECTION IN HONG KONG ENVIRONMENTAL PROTECTION IN HONG KONG Our environment What is your impression of Hong Kong? A fastgrowing, dynamic city, a great centre for manufacturing and commerce and a world leader in trade? Or a

More information

The Economic Outlook of Hong Kong. in the Context of China s 12th Five-Year Plan

The Economic Outlook of Hong Kong. in the Context of China s 12th Five-Year Plan The Economic Outlook of Hong Kong in the Context of China s 12th Five-Year Plan A Speech by Dr Victor Fung to the Students and Professionals at Savantas Liberal Arts Academy 匯 賢 智 庫 學 苑 on 21 May 2011

More information

Environmentally Responsible Development

Environmentally Responsible Development Preamble Environmentally responsible development is about the delivery of a better quality of life for every one of our citizens, for now and for generations to come. We will support environmental protection

More information

770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2

770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2 770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2 Introduction The T1/P1/P2 junction is situated, north of Tseung Kwan O (TKO) Town Centre, at the junction of TKO Tunnel

More information

HONG KONG ZHUHAI MACAO LINK

HONG KONG ZHUHAI MACAO LINK Available online at www.sciencedirect.com Procedia Engineering 14 (2011) 1485 1492 The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction HONG KONG ZHUHAI MACAO LINK N.HUSSAIN

More information

Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu

Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Abstract This article summarises the general situation of Shanghai s integrated transport system and then determines the trends

More information

THE MAINLAND AND HONG KONG CLOSER ECONOMIC PARTNERSHIP ARRANGEMENT FURTHER LIBERALIZATION MEASURES IN 2012

THE MAINLAND AND HONG KONG CLOSER ECONOMIC PARTNERSHIP ARRANGEMENT FURTHER LIBERALIZATION MEASURES IN 2012 THE MAINLAND AND HONG KONG CLOSER ECONOMIC PARTNERSHIP ARRANGEMENT FURTHER LIBERALIZATION MEASURES IN 2012 INTRODUCTION This note sets out the latest state of the enhancement of economic and trade cooperation

More information

Examples of major projects with environmental permits :

Examples of major projects with environmental permits : Examples of major projects with environmental permits : Cyberport Development at the Telegraph Bay KCRC East Rail Extension From Hung Hom to Tsimshatsui Hong Kong Disneyland West Rail Phase I 1800 MW Gas-fired

More information

INFORMATION NOTE. Electricity Market in Hong Kong

INFORMATION NOTE. Electricity Market in Hong Kong INFORMATION NOTE Electricity Market in Hong Kong 1. Background 1.1 At a special meeting held on 30 March 2006, the Panel on Economic Services requested the Research and Library Services Division to provide

More information

A Clean Harbour for Hong Kong. Government s Initial Response To The Report of the International Review Panel On Sewage Treatment for the Harbour Area

A Clean Harbour for Hong Kong. Government s Initial Response To The Report of the International Review Panel On Sewage Treatment for the Harbour Area A Clean Harbour for Hong Kong Government s Initial Response To The Report of the International Review Panel On Sewage Treatment for the Harbour Area CONTENTS Page 1 Glossary of Terms... 1 2 Introduction...

More information

Hong Kong means business in sustainable development

Hong Kong means business in sustainable development SHOWCASING THE Achievements the Hong Kong Civil Service of Hong Kong means business in sustainable development ENVIRONMENTAL PROTECTION DEPARTMENT Hong Kong s status as Asia s world city is backed by its

More information

Western Canadian Place the corporate headquarters of Husky Oil.

Western Canadian Place the corporate headquarters of Husky Oil. Western Canadian Place the corporate headquarters of Husky Oil. Hongkong Electric s engineers in the system control room use advanced technology to efficiently monitor and coordinate all aspects of electricity

More information

MTR Corporation. 2012 Annual Results. 11 March 2013. MTR Corporation Limited. MTR Corporation

MTR Corporation. 2012 Annual Results. 11 March 2013. MTR Corporation Limited. MTR Corporation 2012 Annual Results 11 March 2013 Limited 2013/3/11 Forward-looking statements Certain statements contained in this presentation may be viewed as forward-looking statements. Such forwardlooking statements

More information

ACQWS Paper No. 20 Total Water Management Strategy in Hong Kong

ACQWS Paper No. 20 Total Water Management Strategy in Hong Kong ACQWS Paper No. 20 Total Water Management Strategy in Hong Kong INTRODUCTION 1. The 2003 Policy Address pledged the implementation of a Total Water Management (TWM) programme to enhance water conservation

More information

ADVANTAGES OF INCORPORATING A TRADING COMPANY IN HONG KONG AND STRUCTURING CHINA INVESTMENTS VIA HONG KONG

ADVANTAGES OF INCORPORATING A TRADING COMPANY IN HONG KONG AND STRUCTURING CHINA INVESTMENTS VIA HONG KONG ADVANTAGES OF INCORPORATING A TRADING COMPANY IN AND STRUCTURING INVESTMENTS VIA Map of Guangdong province, China, and Hong Kong, SAR INCORPORATING A TRADING COMPANY IN & AT A SNAPSHOT CATEGORY Incorporating

More information

Legislative Council Panel on Health Services Subcommittee on Health Protection Scheme. Role and Development of Public and Private Healthcare Services

Legislative Council Panel on Health Services Subcommittee on Health Protection Scheme. Role and Development of Public and Private Healthcare Services LC Paper No. CB(2)448/12-13(02) For discussion on 14 January 2013 Legislative Council Panel on Health Services Subcommittee on Health Protection Scheme Role and Development of Public and Private Healthcare

More information

ECONOMIC CONTRIBUTION

ECONOMIC CONTRIBUTION ECONOMIC CONTRIBUTION HKIA works around the clock to support Hong Kong s role as a financial, logistics and transportation hub by connecting the city, the PRD and Southeast Asia through its large network

More information

The Path to Environmental Impact Assessment in Hong Kong

The Path to Environmental Impact Assessment in Hong Kong The Path to Environmental Impact Assessment in Hong Kong 6 The effort to formulate a set of administrative EIA procedures for public and private sector projects, with regard to developmental pressures

More information

MTR Corporation. 2015 Interim Results 13 August 2015

MTR Corporation. 2015 Interim Results 13 August 2015 2015 Interim Results 13 August 2015 Page 1 Forward-looking statements Certain statements contained in this presentation may be viewed as forward-looking statements. Such forwardlooking statements involve

More information

Hong Kong: The gateway to Mainland markets. Hong Kong Economic and Trade Office (Toronto)

Hong Kong: The gateway to Mainland markets. Hong Kong Economic and Trade Office (Toronto) Hong Kong: The gateway to Mainland markets Hong Kong Economic and Trade Office (Toronto) October, 2013 1 Hong Kong Special Administrative Region SAR of the People s Republic of China since 1 July 1997

More information

Law of Mongolia on Concessions

Law of Mongolia on Concessions Economic Policy Reform and Competitiveness Project April 2005 Ulaanbaatar, Mongolia This publication was produced for review by the United States Agency for International Development The views expressed

More information

KAIZEN 启 源 HONG KONG. Limited Liability Company GENERAL INFORMATION

KAIZEN 启 源 HONG KONG. Limited Liability Company GENERAL INFORMATION KAIZEN 启 源 Limited Liability Company HONG KONG GENERAL INFORMATION Location Hong Kong is on the south east coast of China and consists of a large number of islands and a part of the mainland totalling

More information

Maritime and Civil Aviation

Maritime and Civil Aviation inserts in December 2010 and December 2011 respectively, the regulatory regime of Chinese medicines has been fully implemented. In recent years, Chinese medicine has been developing along the direction

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE

More information

SAM WOO CONSTRUCTION GROUP LIMITED 三 和 建 築 集 團 有 限 公 司. (Incorporated in the Cayman Islands with limited liability) (Stock Code: 3822)

SAM WOO CONSTRUCTION GROUP LIMITED 三 和 建 築 集 團 有 限 公 司. (Incorporated in the Cayman Islands with limited liability) (Stock Code: 3822) Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Waste management in Hong Kong/business opportunities

Waste management in Hong Kong/business opportunities Waste management in Hong Kong/business opportunities Author: Netherlands Consulate General in HK Introduction Waste and waste management create a number of challenges for the Hong Kong (HK) government.

More information

Opening Remarks at Business Seminar Hong Kong: Seize Now Your Opportunities for Business in China and Beyond

Opening Remarks at Business Seminar Hong Kong: Seize Now Your Opportunities for Business in China and Beyond Opening Remarks at Business Seminar Hong Kong: Seize Now Your Opportunities for Business in China and Beyond co-organised by HKETO(Sing) and THTA on 27 October 2009 at Conrad Hotel, Bangkok, Thailand Your

More information

ENVIRONMENTAL MANAGEMENT STRATEGY

ENVIRONMENTAL MANAGEMENT STRATEGY Jos& M. Cabral 36 1 ENVIRONMENTAL MANAGEMENT STRATEGY FOR INFRASTRUCTURE AGENCIES IN DEVELOPING COUNTRIES Jose M. Cabral' INTRODUCTION This paper describes an environmental management strategy for agencies

More information

THE URBAN DEVELOPMENT CONSULTING MARKET IN CHINA. Yu Li Centre of International Co-operation and Training, People s Republic of China *

THE URBAN DEVELOPMENT CONSULTING MARKET IN CHINA. Yu Li Centre of International Co-operation and Training, People s Republic of China * THE URBAN DEVELOPMENT CONSULTING MARKET IN CHINA Yu Li Centre of International Co-operation and Training, People s Republic of China * Introduction The economic development of China has experienced rapid

More information

Elevated Roads for Sri Lanka

Elevated Roads for Sri Lanka Elevated Roads for Sri Lanka M.T.R. Jayasinghe (Senior Professor, Structural Engineering, University of Moratuwa) Senior Professor M.T.R. Jayasinghe is a Professor of Structural Engineering, University

More information

International Boundary Study. China Hong Kong Boundary

International Boundary Study. China Hong Kong Boundary International Boundary Study No. 13 April 13, 1962 China Hong Kong Boundary (Country Codes: CH-HK) The Geographer Office of the Geographer Bureau of Intelligence and Research INTERNATIONAL BOUNDARY STUDY

More information

Thailand focus 2014 Competencies & Growth potentials. Arkhom Termpittayapaisith

Thailand focus 2014 Competencies & Growth potentials. Arkhom Termpittayapaisith Thailand Focus 2014 What s new in Thailand s Economic Development Strategy Thailand focus 2014 Competencies & Growth potentials Arkhom Termpittayapaisith Secretary-General Office of the National Economic

More information

Role in the project (e.g. Prime Engineering Consultant or Contractor), and summary of professional Duties : Name Professional Duties Contract Awarded?

Role in the project (e.g. Prime Engineering Consultant or Contractor), and summary of professional Duties : Name Professional Duties Contract Awarded? PROPOSAL FORM FOR SINGLE PROJECT PROFESSIONAL INDEMNITY NOTE: THIS IS A PROPOSAL FOR A CLAIMS MADE POLICY Note : Please provide any necessary explanations or additional details by attachment to this Proposal

More information

CAPITAL INVESTMENT FUND

CAPITAL INVESTMENT FUND Memorandum Note On 1 April 1990, the Legislative Council established the Capital Investment Fund by Resolution for the purpose of financing investments in the Mass Transit Railway Corporation (which became

More information

INFORMATIONTECHNOLOGYSERVICESINDUSTRYINHONGKONG

INFORMATIONTECHNOLOGYSERVICESINDUSTRYINHONGKONG INFORMATIONTECHNOLOGYSERVICESINDUSTRYINHONGKONG Overview The information technology(it) sector of Hong Kong is among the most advanced in the world. According to the World Economic Forum's Networked Readiness

More information

Demolition Works Measures for Public Safety

Demolition Works Measures for Public Safety Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-21 Buildings Department Practice Note

More information

LEGISLATIVE COUNCIL BRIEF ELECTRONIC ROAD PRICING

LEGISLATIVE COUNCIL BRIEF ELECTRONIC ROAD PRICING TBCR 2/1/2061/89 Pt 16 LEGISLATIVE COUNCIL BRIEF ELECTRONIC ROAD PRICING INTRODUCTION At the meeting of the Executive Council on 24 April 2001, the Council ADVISED and the Chief Executive ORDERED that

More information

Water Supplies Department Active WSD Capital Works Contracts

Water Supplies Department Active WSD Capital Works Contracts No. Title Active WSD Capital s Location of or Start 17/WSD/14 Improvement to waterworks facilities at Lantau South and Sha Tin Fuk Shing 42.600 16-Nov-15 Nov-18 Lantau South and mainlaying at Keung South

More information

立 法 會 Legislative Council

立 法 會 Legislative Council 立 法 會 Legislative Council LC Paper No. CB(3) 801/10-11 Ref : CB(3)/M/MM Tel : 2869 9205 Date : 26 May 2011 From : Clerk to the Legislative Council To : All Members of the Legislative Council Council meeting

More information

ITEM FOR FINANCE COMMITTEE

ITEM FOR FINANCE COMMITTEE For discussion on 8 June 2012 FCR(2012-13)40 ITEM FOR FINANCE COMMITTEE LOAN FUND HEAD 252 LOANS TO SCHOOLS/TEACHERS Subhead 104 Loans to non-profit-making international schools Capital assistance loan

More information

(I) CONTINUING CONNECTED TRANSACTIONS; (II) PROPOSED AMENDMENTS TO ARTICLES OF ASSOCIATION; AND

(I) CONTINUING CONNECTED TRANSACTIONS; (II) PROPOSED AMENDMENTS TO ARTICLES OF ASSOCIATION; AND Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Holman Fenwick Willan CONSTRUCTION CAPABILITY

Holman Fenwick Willan CONSTRUCTION CAPABILITY Holman Fenwick Willan CONSTRUCTION CAPABILITY WHY CHOOSE HFW FOR YOUR NEEDS IN CONSTRUCTION? HFW s construction law team is one of the largest specialist international groups in the market. The partners

More information

Construction Project Management in China and Its Development Prospect

Construction Project Management in China and Its Development Prospect CIB TG 23 International Conference, October 2003, Hong Kong Page 1 of 8 Construction Project Management in China and Its Development Prospect Bosen He Email: hetju@hotmail.com Management School, Tianjin

More information

GUIDELINES FOR TOTAL PROJECT COST MANAGEMENT

GUIDELINES FOR TOTAL PROJECT COST MANAGEMENT GUIDELINES FOR TOTAL PROJECT COST MANAGEMENT March 2013 MINISTRY OF STRATEGY AND FINANCE TABLE OF CONTENTS CHAPTER Ⅰ GENERAL PROVISIONS Article 1 (Purpose)... 1 Article 2 (Definition of Total Project Cost)...

More information

Key services. Safety Accident reduction Passive safety Road safety audits Safety in construction and maintenance

Key services. Safety Accident reduction Passive safety Road safety audits Safety in construction and maintenance ighways Highways Skills and services Key services Safety Accident reduction Passive safety Road safety audits Safety in construction and maintenance Sustainability Air quality monitoring Energy efficiency

More information

B. INFORMATION ON ACT HOLDINGS, COSCO PACIFIC AND CHINA SHIPPING

B. INFORMATION ON ACT HOLDINGS, COSCO PACIFIC AND CHINA SHIPPING (a business trust constituted on 25 February 2011 under the laws of the Republic of Singapore and managed by Hutchison Port Holdings Management Pte. Limited) ACQUISITION OF A SUBSIDIARY/ASSOCIATED COMPANY

More information

CHINA LNG GROUP LIMITED * (incorporated in the Cayman Islands with limited liability) (Stock Code: 931)

CHINA LNG GROUP LIMITED * (incorporated in the Cayman Islands with limited liability) (Stock Code: 931) Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Competitive Advantage of Libyan Business Environment

Competitive Advantage of Libyan Business Environment Economics World, ISSN 23287144 May 2014, Vol. 2, No. 5, 325332 D DAVID PUBLISHING Competitive Advantage of Libyan Business Environment Salem Abdulla Azzaytuna University, Tripoli, Libya The economic development

More information

Hong Kong. Airport Railway

Hong Kong. Airport Railway Hong Kong Airport Railway This report was compiled by the University of Hong Kong. Please Note: This Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport

More information

Technical seminar - Modern Technology for Solid Waste Management

Technical seminar - Modern Technology for Solid Waste Management Technical seminar - Modern Technology for Solid Waste Management co-organized by: Hong Kong Waste Management Association Environmental Division of Hong Kong Institute of Engineers Preparations at Wembley

More information

Dr. Simon Chee, Professor Michael Hor, Distinguished Guests, Ladies and. 2. Hong Kong has never been short of infrastructure and construction

Dr. Simon Chee, Professor Michael Hor, Distinguished Guests, Ladies and. 2. Hong Kong has never been short of infrastructure and construction Speech by the Hon Rimsky Yuen, SC, JP, Secretary for Justice Hong Kong Construction Arbitration Centre & University of Hong Kong Joint Conference on Construction Dispute Resolution 2015 Resolution of Construction

More information

China Wireless Technologies Limited

China Wireless Technologies Limited THIS CIRCULAR IS IMPORTANT AND REQUIRES YOUR IMMEDIATE ATTENTION This circular is for information purposes only and does not constitute an invitation or offer to acquire, purchase or subscribe for securities

More information

PROFESSIONAL INDEMNITY INSURANCE ARCHITECTS

PROFESSIONAL INDEMNITY INSURANCE ARCHITECTS Form PROFESSIONAL INDEMNITY INSURANCE ARCHITECTS All questions must be answered to enable a quotation to be given. The completion and signature of this proposal form does not bind the Proposer(s) or the

More information

DISCLOSEABLE TRANSACTION AND CONNECTED TRANSACTION

DISCLOSEABLE TRANSACTION AND CONNECTED TRANSACTION The Stock Exchange of Hong Kong Limited takes no responsibility for this announcement, makes no representation as to its accuracy or completeness and expressly disclaims any liability whatsoever for any

More information

Internet Professional Association

Internet Professional Association Submission to Financial Secretary The Government of the Hong Kong Special Administrative Region on ICT Industry Recommendation to The Fiscal Budget in 2011-2012 Internet Professional Association February

More information

Supported Employment Service (As at August 2014)

Supported Employment Service (As at August 2014) (As at August 2014) Region District Name / Address Tel Fax Capacity Note Hong Kong Central & Western Sheung Wan Rehabilitation Centre Yan Chai Hospital 5/F - 6/F, 28 Ko Sing Street, Sheung Wan, HK Eastern

More information

THE CONTRACT FOR SINO-FOREIGN EQUITY JOINT VENTURE

THE CONTRACT FOR SINO-FOREIGN EQUITY JOINT VENTURE THE CONTRACT FOR SINO-FOREIGN EQUITY JOINT VENTURE Chapter 1 General Provisions In accordance with the Law of the People s Republic of China on Joint Ventures Using Chinese and Foreign Investment (the

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing

More information

Mainland and Hong Kong Closer Economic Partnership Arrangement (CEPA) Frequently Asked Questions. Sector-specific: Legal Services Sector

Mainland and Hong Kong Closer Economic Partnership Arrangement (CEPA) Frequently Asked Questions. Sector-specific: Legal Services Sector Mainland and Hong Kong Closer Economic Partnership Arrangement (CEPA) Frequently Asked Questions Legal Services (18) Sector-specific: Legal Services Sector Last Updated: January 2015 I. Employment by Mainland

More information

ITEM FOR FINANCE COMMITTEE

ITEM FOR FINANCE COMMITTEE For discussion on 25 May 2012 FCR(2012-13)28 ITEM FOR FINANCE COMMITTEE LOAN FUND HEAD 252 LOANS TO SCHOOLS/TEACHERS Subhead 104 Loans to non-profit-making international schools Capital assistance loan

More information

Architects and Engineers Professional Liability Proposal Form

Architects and Engineers Professional Liability Proposal Form AIG Insurance Hong Kong Limited Architects and Engineers Professional Liability Proposal Form I. Applicant Details Name of Insured: Address(es): Web Site Address: Establishment Date: II. Business Activities

More information

H ng Kong GLOBAL SWITCH

H ng Kong GLOBAL SWITCH H ng Kong GLOBAL SWITCH IN A FAST MOVING AND EVER CHANGING WORLD, WHEN YOU NEED TO MINIMISE YOUR RISK AND MAXIMISE YOUR BUSINESS AGILITY, GLOBAL SWITCH IS YOUR PREMIER DATA CENTRE PARTNER. Global Switch

More information

HONG KONG Corporate information:

HONG KONG Corporate information: HONG KONG Corporate information: Hong Kong is the richest city in China, its economy is one of the most liberal in the world. It is a financial and commercial hub of global significance. Hong Kong is a

More information

Tel: 86-020-83486962 Tel: 86-757-8327 6090 Fax: 86-020-83486990 Fax: 86-757-8327 6100

Tel: 86-020-83486962 Tel: 86-757-8327 6090 Fax: 86-020-83486990 Fax: 86-757-8327 6100 GUANGZHOU FOSHAN Room 1801, TIMES PROPERTY CENTER 2/F, 17 Hongxiang First North Street 410 Dong Feng Zhou Road, Caihong Road Guangzhou, China Foshan, China Tel: 86-020-83486962 Tel: 86-757-8327 6090 Fax:

More information

SUMMARY OF CONTENTS. Economic Cooperation

SUMMARY OF CONTENTS. Economic Cooperation SUMMARY OF CONTENTS Economic Cooperation The Chinese central government and the government of the Hong Kong SAR have signed a Supplement IV to the Mainland and Hong Kong Closer Economic Partnership Arrangement

More information

Hong Kong: The Gateway to China InvestHK; Strengthening Hong Kong s Leading Position in Asia Cambridge, Thursday May 3 rd 2012

Hong Kong: The Gateway to China InvestHK; Strengthening Hong Kong s Leading Position in Asia Cambridge, Thursday May 3 rd 2012 Welcome to Hong Kong Hong Kong: The Gateway to China InvestHK; Strengthening Hong Kong s Leading Position in Asia Cambridge, Thursday May 3 rd 2012 David Parker, Head of Investment Promotion About InvestHK

More information

Green Hong Kong: Environmental Protection, Renewable Energy and Electric Vehicles

Green Hong Kong: Environmental Protection, Renewable Energy and Electric Vehicles Green Hong Kong: Environmental Protection, Renewable Energy and Electric Vehicles 8 October 2009 Fachhochschule der Wirtschaft, Graz Mr. Stephen Kai Wong Director, Hong Kong Economic and Trade Office,

More information

Architects and Engineers Professional Liability Proposal Form

Architects and Engineers Professional Liability Proposal Form Notice:Statement pursuant to Section 25(5) of the Insurance Act (Cap 142) or any amendments thereof; You are to disclose in this application, fully and faithfully, all the facts which you know or ought

More information

Property management. Executive management s report Property review

Property management. Executive management s report Property review 032 Executive management s report Property review This caused revenue from investment properties for the year to decline slightly by 1% over 2002 to HK$888 million. Our staff performed outstandingly during

More information

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by

More information

A guide to appointing an architect

A guide to appointing an architect A guide to appointing an architect and to being a good client Hurditch Architecture, 24 Botallack, St Just, Penzance, Cornwall, TR19 7EP Page 1 of 7 RIBA Chartered Architects Architects act 1997 In the

More information

Global conglomerate China Sonangol buys 15 million OKP Holdings shares; move prepares ground for future business collaboration

Global conglomerate China Sonangol buys 15 million OKP Holdings shares; move prepares ground for future business collaboration China Sonangol International (S) Pte Ltd No. 6 Tagore Drive 9 Temasek Boulevard #42-01 #B1-06 Tagore Building #42-01, Suntec Tower 2 Singapore 787623 Singapore 038989 Tel: (65) 6456 7667 Tel: (65) 6808

More information

Single Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy

Single Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy Single Project Professional Indemnity Insurance Proposal Form Note: This is a proposal form for a claims made policy Please provide any necessary explanations or additional details by attaching separate

More information

IMPORTANT INFORMATION REGARDING COMPLETION OF THIS FORM

IMPORTANT INFORMATION REGARDING COMPLETION OF THIS FORM Consulting Engineers Professional Indemnity Insurance Proposal Form IMPORTANT INFORMATION REGARDING COMPLETION OF THIS FORM Method of Completion This proposal form may be completed in ink or electronically

More information

Urban Renewal Strategy

Urban Renewal Strategy People First - A Caring Approach to Urban Renewal Urban Renewal Strategy Consultation paper Planning and Lands Bureau July 2001 PREFACE Section 20 of the Urban Renewal Authority Ordinance (Chapter 563)

More information

Legislative Council Panel on Security. Construction of an Ambulance Depot at Choi Shun Street, Sheung Shui

Legislative Council Panel on Security. Construction of an Ambulance Depot at Choi Shun Street, Sheung Shui LC Paper No. CB(2)2452/11-12(03) For discussion on 4 July 2012 Legislative Council Panel on Security Construction of an Ambulance Depot at Choi Shun Street, Sheung Shui PURPOSE This paper consults the

More information

Legislative Council Panel on Security Creation of a permanent Chief Superintendent of Police post of the Cyber Security and Technology Crime Bureau

Legislative Council Panel on Security Creation of a permanent Chief Superintendent of Police post of the Cyber Security and Technology Crime Bureau LC Paper No. CB(2)1621/13-14(05) For discussion on 3 June 2014 Legislative Council Panel on Security Creation of a permanent Chief Superintendent post of the Cyber Security and Technology Crime Bureau

More information

Legislative Council Panel on Transport Subcommittee on matters relating to railways

Legislative Council Panel on Transport Subcommittee on matters relating to railways LC Paper No. CB(1)1023/04-05(01) Legislative Council Panel on Transport Subcommittee on matters relating to railways MTR Performance and Asset Management - Follow up measures to Lloyd's Report by MTRCL

More information

S.B. NO. JAN 2 2 2016

S.B. NO. JAN 2 2 2016 THE SENATE TWENTY-EIGHTH LEGISLATURE, 0 STATE OF HAWAII S.B. NO. JAN 0 A BILL FOR AN ACT RELATING TO STATEWIDE INFRASTRUCTURE CAPACITY BUILDING CONSTRUCTION FINANCING. BE IT ENACTED BY THE LEGISLATURE

More information

LCQ17: Cycling safety *********************

LCQ17: Cycling safety ********************* LCQ17: Cycling safety ********************* Following is a question by the Hon Miriam Lau Kin-yee and a written reply by the Secretary for Transport and Housing, Ms Eva Cheng, at the Legislative Council

More information

TOP SPRING INTERNATIONAL HOLDINGS LIMITED

TOP SPRING INTERNATIONAL HOLDINGS LIMITED Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

LEGISLATIVE COUNCIL PANEL ON ENVIRONMENTAL AFFAIRS. Promoting Green Economy. 2. Follow-up questions raised by Members are as follows:

LEGISLATIVE COUNCIL PANEL ON ENVIRONMENTAL AFFAIRS. Promoting Green Economy. 2. Follow-up questions raised by Members are as follows: CB(1) 2860/10-11(01) For information Introduction LEGISLATIVE COUNCIL PANEL ON ENVIRONMENTAL AFFAIRS Promoting Green Economy The Administration issued an information paper on 23 May 2011 highlighting our

More information

Legislative Council Panel on Economic Services

Legislative Council Panel on Economic Services For discussion on 25 January 1999 Legislative Council Panel on Economic Services PROMOTION OF HONG KONG AS AN INTERNATIONAL SHIPPING CENTRE Purpose This paper aims to inform members of a series of new

More information

OKP HOLDINGS LIMITED SECURES S$9.8 MILLION PUB PROJECT FOR DRAINAGE IMPROVEMENT WORKS AT VARIOUS LOCATIONS IN WESTERN REGION OF SINGAPORE

OKP HOLDINGS LIMITED SECURES S$9.8 MILLION PUB PROJECT FOR DRAINAGE IMPROVEMENT WORKS AT VARIOUS LOCATIONS IN WESTERN REGION OF SINGAPORE 30 Tagore Lane Singapore 787484 Tel: (65) 6456 7667 Fax: (65) 6459 4316 For Immediate Release OKP HOLDINGS LIMITED SECURES S$9.8 MILLION PUB PROJECT FOR DRAINAGE IMPROVEMENT WORKS AT VARIOUS LOCATIONS

More information

arrangements typified by joint working between the public and private sectors covering all types of collaboration across the private-public sector

arrangements typified by joint working between the public and private sectors covering all types of collaboration across the private-public sector 20//204 PUBLIC PARTNERSHIP PRIVATE on Institutional Arrangement and Policy Implications Case Studies from the Republic of Korea November 8, 204 Seung-Jin Baek Economic Development Division UN ECLAC What

More information

Legislative Council Panel on Security

Legislative Council Panel on Security LC Paper No. CB(2)2585/03-04(01) Legislative Council Panel on Security Progress Report on the Implementation of the Drug Dependent Persons Treatment and Rehabilitation s (Licensing) Ordinance (Cap. 566)

More information

香 港 特 別 行 政 區 政 府. The Government of the Hong Kong Special Administrative Region. Development Bureau Technical Circular (Works) No.

香 港 特 別 行 政 區 政 府. The Government of the Hong Kong Special Administrative Region. Development Bureau Technical Circular (Works) No. 政 府 總 部 發 展 局 工 務 科 香 港 特 別 行 政 區 政 府 The Government of the Hong Kong Special Administrative Region Works Branch Development Bureau Government Secretariat 香 港 添 馬 添 美 道 2 號 政 府 總 部 西 翼 1 8 樓 18/F, West

More information

CHAIRMAN S STATEMENT. I announce that provisions of approximately HK$1,153. million has been made for the property development

CHAIRMAN S STATEMENT. I announce that provisions of approximately HK$1,153. million has been made for the property development CHAIRMAN S STATEMENT I announce that provisions of approximately HK$1,153 million has been made for the property development projects in Hong Kong and the investments in Ryoden Development Limited acquired

More information

Hong Kong: Gateway to China for Estonian Businesses

Hong Kong: Gateway to China for Estonian Businesses Hong Kong: Gateway to China for Estonian Businesses Mrs Agnes ALLCOCK, Director-General Hong Kong Economic and Trade Office (London) 2 June 2011 1 Hong Kong: The Latest Economic Situation Real GDP Growth:

More information