ACTION ITEM: Approval of the W.P. Carey School of Business Online MBA Program Outsourcing Project - ASU
|
|
- Sabrina Allison
- 8 years ago
- Views:
Transcription
1 Page 1 of 5 EXECUTIVE SUMMARY ACTION ITEM: Approval of the W.P. Carey School of Business Online MBA Program Outsourcing Project - ASU ISSUE: ASU seeks approval for the $1 million project to outsource the delivery component of the W.P. Carey School of Business Online MBA program. BACKGROUND: The W. P. Carey MBA online academic programs are supported by a complex server and Storage Area Network (SAN) environment, designed to provide stability and security for our customers. The online programs currently serve 500 students per year and they are expected to expand their enrollment to over 1000 students per year within the next two years. The system currently supports fifty concurrent connections and often supports 200 concurrent connections during peak periods of activity. The students participating in the online programs are globally distributed creating a 24/7 (continuous operation) need for system availability. The W. P. Carey School utilizes web-based course content in support of several online graduate programs. The course content also fills an ancillary role in traditional graduate and undergraduate programs within the school. The content is delivered primarily through the Blackboard Learning System and includes audio, video and Flash as well as other delivery methods. Applications utilize Cold Fusion, SQL, Java and other technologies are also supported to enable a maximum degree of flexibility for students and administrative support. DISCUSSION: As noted in the body of this request, the W.P. Carey School of Business is terminating its existing outsourcing contract with Ensynch at the end of the Fall 2003 semester since it was determined that they may not have a valid contract with the state to provide these services. The School of Business needs to have a new outsourcing contract in place to provide support for the Online MBA program beginning with the Spring 2004 semester. It is critical that there not be an interruption in service. RECOMMENDATION: That the Board of Regents approve the Online MBA Outsourcing Project submitted by the W.P. Carey School of Business. Contact: William Lewis, University CIO and Vice Provost Phone: (480) William.lewis@asu.edu
2 University IT Project Justification SUMMARY SHEET Page 2 of 5 Institution Arizona State University W.P. Carey School of Business Information Technology Contact Name and Phone September 8, 2003 Project Overview The W. P. Carey MBA online academic programs are supported by a complex server and Storage Area Network (SAN) environment, designed to provide stability and security for our customers. The online programs currently serve 500 students per year and they are expected to expand their enrollment to over 1000 students per year within the next two years. The system currently supports fifty concurrent connections and often supports 200 concurrent connections during peak periods of activity. The students participating in the online programs are globally distributed creating a 24/7 (continuous operation) need for system availability. The W. P. Carey School utilizes web-based course content in support of several online graduate programs. The course content also fills an ancillary role in traditional graduate and undergraduate programs within the school. The content is delivered primarily through the Blackboard Learning System and includes audio, video and Flash as well as other delivery methods. Applications utilize Cold Fusion, SQL, Java and other technologies are also supported to enable a maximum degree of flexibility for students and administrative support. The W. P. Carey School of Business is soliciting proposals for internet hosting services from vendors for its family of websites and services. The non-traditional demographic and global distribution of the students served by the online programs at the School of Business generates the need for 99.99% system availability. Once it was revealed that the current vendor, Ensynch, may not have a valid contract with the State it was determined that that the School needed to ensure that it was conducting its business relations properly. The situation as it exists today calls for the School of Business to issue a Request for Proposal for data center hosting. It has been decided by the School of Business that a stable environment must be maintained in order to provide 24/7 continuous access for the MBA Online community. The expectations of the Online students continue to be elevated due to the extra fees that are associated with these Online programs. The School of Business is looking for a complete turnkey delivery model with comprehensive services for architecting, designing, integrating, and implementing solutions. This should be with a vendor that provides the facilities, infrastructure, and services to operate and support servers, networks and bandwidth, database, storage, and security through its data center team and is located near Tempe, Arizona.
3 Deliverables Page 3 of 5 The School desires a vendor capable of providing a competitive service level backed in writing that guarantees 99.9% uptime. Service, maintenance and support of the following server environment: Manufacturer Server Type Procs HDD Ram Compaq 1850R 2x550MHz 2x18.2GB 512MB Compaq 1850R 1x550MHz 2x18.2GB 512MB Compaq DL380G2 2x1.4GHz 6x36.4GB 5632MB Compaq DL380G2 2x1.4GHz 6x36.4GB 5632MB Compaq DL380G2 2x1.4GHz 6x36.4GB 3840MB Compaq DL380G2 2x1.4GHz 6x36.4GB 3840MB
4 Page 4 of 5 In addition to the general maintenance and monitoring of the equipment the School of Business will be looking for: 1. Security 2. High availability 3. Scalability 4. Change Control processes 5. Access Procedures 6. 24/7 Staffed Help Desk 7. Managed Backups 8. VPN services Service and Economic Benefits Provision of an off campus portal and course management system allows customization, branding, services, flexibility and fault tolerance needed to support our Online MBA programs. The ASU network and course management systems have had significant technical difficulties and disruptions in services that are not acceptable, especially in situations where the student s entire experience is online. Project Roles and Responsibilities This project is the responsibility of the W. P. Carey School of Business, Information Technology Unit and a vendor outside of ASU. Project Management Timeline RFP September 10 October 3, 2003 System launch December 20, 2003 Opportunities for Collaboration Experiences and service statistics can be shared with other units, colleges or universities. Summary of Proposed Costs (All Funds) Five Year Total ($000) Description FY03 FY 04_ FY05 FY06_ FY07 Total Implementation Cost Operating Cost Total Cost
5 Recommendation Page 5 of 5 Implementation Costs and Marginal Operating Costs in Thousands Development / Operating Costs in thousands ($000) Description FY03 FY04 FY05 FY06 FY07 Total Personnel Number of IT FTE Number of User FTE Personnel Cost IT FTE Salary Cost (Include ERE) User FTE Salary Cost (Include ERE) IT Services 985 (Professional and Outside Consultants ) Hardware Software Communications Facilities Licensing and Maintenance Fees Other TOTAL Notes: This project is supported by existing FTE of Business Information Technology which requires two hours per week beyond the initial startup time. It does not incur any additional costs.
Storage Area Network environment to provide reliable data storage and management in The Biodesign Institute at Arizona State University
Page 1 of 5 ACTION ITEM: Storage Area Network environment to provide reliable data storage and management in The Biodesign Institute at Arizona State University ISSUE: The Board is requested to approve
More informationInteractive Television (ITV) System Upgrade Project
Page 1 of 7 EXECUTIVE SUMMARY ACTION ITEM: Interactive Television (ITV) System Upgrade Project ISSUE: NAU seeks the Board s approval to upgrade its Interactive Television (ITV) System. Distance Learning
More informationThat the Board of Regents approve ASU upgrading its current Avaya Definity PBX System.
Page 1 of 5 EXECUTIVE SUMMARY ACTION ITEM: ASU Avaya Definity PBX System Upgrade ISSUE: ASU s current Avaya Definity PBX system can not support the current release of the operating system. To allow us
More informationCollege Project Description and Management
PROGRAM PLAN STATUS and OIT BEST PRACTICES 2017-018 Approved Program Plan? Waived Date Approved: October 29, 2015 PRIORITY NUMBERS Prioritized By Priority DeptInst 1 of 1 CCCS priority 3 of 4. CCHE 25
More informationOutlookSoft Budget & Planning Software (Business Performance Management System)
Page 1 of 6 EXECUTIVE SUMMARY ACTION ITEM: OutlookSoft Budget & Planning Software (Business Performance Management System) ISSUE: NAU seeks the Board s approval to purchase and implement a Business Performance
More informationARIZONA STATE UNIVERSITY W. P. CAREY SCHOOL OF BUSINESS BUSINESS INFORMATION TECHNOLOGY
ARIZONA STATE UNIVERSITY W. P. CAREY SCHOOL OF BUSINESS BUSINESS INFORMATION TECHNOLOGY Audit Report No. ASU 04 04 June 30, 2004 Arizona Board of Regents Audit Services 2020 N. Central Avenue, Suite 230
More informationInnovation through Outsourcing
Innovation through Outsourcing Timothy Gehrig timothy.gehrig@cedarcrestone.com David Moore david.moore@cedarcrestone.com Agenda Expectations CedarCrestone Introduction Market Direction Outsourcing Solutions
More informationNC Community Colleges Moodle Cloud Service
NC Community Colleges Moodle Cloud Service NCCCS Learning Technology Systems Team: Wanda Barker Kathy Davis Tom Hill Jonathon Sweetin In partnership with Agenda NC Moodle History RFP Summary What is the
More informationBusiness Plan for Implementing Electronic Commerce
Introduction to Electronic Commerce Business Plan for Implementing Electronic Commerce Objectives In this chapter, you will learn about: Planning electronic commerce initiatives Strategies for developing
More informationOff-Site Data Storage Audit Number 09-07 June 9, 2009
Audit Number 09-07 June 9, 2009 University Audit and Advisory Services EXECUTIVE SUMMARY Objectives and Scope The objectives of the audit included reviewing compliance with the terms of off-site data storage
More informationACTION ITEM: Student Health & Wellness Practice Management System, Arizona State University.
April 28 & 29, 2005 EXECUTIVE SUMMARY Page 1 of 5 ACTION ITEM: Student Health & Wellness Practice Management System, Arizona State University. ISSUE: The Board is requested to approve the Student Health
More informationINFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES June 2012
INFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES June 2012 Program Description Network Services is a service unit in Information Technology Services responsible for designing, acquiring, deploying, operating,
More informationilinc Web Conferencing
system architecture overview introduction ilinc is a suite of Web conferencing products designed to allow participants to interact and collaborate online in a number of different types of sessions, including
More informationTechnology and the New Normal at Winona State University Thriving in a world of continuous change Technology Fee Presentation
Technology and the New Normal at Winona State University Thriving in a world of continuous change Technology Fee Presentation Student Fee Management Committee January 13, 2015 (FY16) Overview of Presentation
More informationBusiness Hosting Partner Program - Making Simple
Business Hosting Partner Program Hos$ng, Made Simple Why Offer Business Hosting Services? IT infrastructure outsourcing is growing as companies look to keep costs down while staying current with technology.
More informationStephen M. Phillips, Ph.D., P.E. Professor of Electrical Engineering Director of the School
Online delivery of an undergraduate engineering program School of Electrical, Computer and Energy Engineering Arizona State University Tempe Stephen M. Phillips, Ph.D., P.E. Professor of Electrical Engineering
More informationSaaS Due Diligence Checklist
SaaS Due Diligence Checklist Company Overview: 1. List business name, DBA names and web addresses: 2. Headquarters address: 3. Other locations and purposes: 4. List owners with their equity %: 5. List
More informationInformation Technology Strategic Plan and Review Colorado State University Pueblo 2013-2018
Information Technology Strategic Plan and Review Colorado State University Pueblo 2013-2018 Table of Contents Table of Contents... 2 Introduction... 5 Mission... 5 Vision Statement... 5 Organizational
More informationQuinsigamond Community College Computing Environment
Quinsigamond Community College Computing Environment Technology Lifecycle: To ensure technologically current access to information resources, the College employs a Build Forward approach to replacing Desktop
More informationNAU, UA, and ASU seek funding to implement and deploy a vulnerability scanning and management solution. Funding amount requested: $195,000.
Technology Oversight Committee April 23, 2008 Item 5 Page 1 of 1 EXECUTIVE SUMMARY ACTION ITEM Tri-University Vulnerability Scanning/Management Solution ISSUE NAU, UA, and ASU seek funding to implement
More informationMIGRATING TO MOODLE. Candy M. Center, Dean, Academic and Student Affairs, Science, Technology, Math and Business September 21, 2010
MIGRATING TO MOODLE Candy M. Center, Dean, Academic and Student Affairs, Science, Technology, Math and Business September 21, 2010 SO, HOW DID WE GET HERE? What is working? What isn t working? What do
More informationDRAFT. FY15 UW-Stout Institutional IT Plan
DRAFT FY15 UW-Stout Institutional IT Plan A. & University Strategic Objectives [1-2 pages] 1. How was the plan developed? The UW-Stout IT Planning is tightly integrated into the campus planning model.
More informationPrivate Cloud. One solution managed by Applied
Private Cloud : : C L O U D S E R V I C E S : : One solution managed by Applied THE CLOUD IS NO LONGER AN IT CONSIDERATION ALONE IT IS FUNDAMENTALLY CHANGING THE WAY EXECUTIVES ACROSS DEPARTMENTS VIEW
More information2010-2011 Annual Report: Talking Points and Institutional Effectiveness Statements
Division of Information Technology Services 2010-2011 Annual Report: Talking Points and Institutional Effectiveness Statements Department: Information Technology Services University of North Carolina at
More informationThe revised AZUN Portal Development Plan with elements as requested by the Committee will be discussed.
Page 1 of 8 EXECUTIVE SUMMARY INFORMATION ITEM: AZUN Portal Development Plan ISSUE: The revised AZUN Portal Development Plan with elements as requested by the Committee will be discussed. BACKGROUND: AZUN
More informationService Level Agreement
This document outlines the Service Level Agreement (SLA) between University Technology Services (UTS) and our Customers for the delivery and support of Emory s service. The purpose of this agreement is
More informationThe guiding principles of this service are to deliver a hosting solution fit for the customers needs; this includes features such as;
Hosting Service Service Level Definition Aims of Service The service provides a central hosting environment that encompasses a range of solutions for hosting, from simple HTML websites through to resilient
More informationCloud Computing. Chapter 1 Introducing Cloud Computing
Cloud Computing Chapter 1 Introducing Cloud Computing Learning Objectives Understand the abstract nature of cloud computing. Describe evolutionary factors of computing that led to the cloud. Describe virtualization
More information(Under Review) Policies and Procedures For Distance Learning @ Alcorn State University. Prepared by: Distance Learning Committee
(Under Review) Policies and Procedures For Distance Learning @ Alcorn State University Prepared by: Distance Learning Committee & Office of Academic Technologies 1 Table of Contents Overview of Academic
More informationStrategic Plan. for the. Department of Information Technology 2008-2012
Strategic Plan for the Department of Information Technology 2008-2012 Submitted by Frank Williams Director, Information Technology October 20, 2008 Strategic Plan Information Technology 2008-2012 Information
More information4000 OPERATIONS AND MAINTENANCE OF PLANT
4000 OPERATIONS AND MAINTENANCE OF PLANT Most of the expenditures in this category are specific to the Department of Public Facilities and have been transferred out of the School Department budget. However,
More informationThe Ultimate Business & Enterprise Hosting Solutions. www.radonhosting.com
The Ultimate Business & Enterprise Hosting Solutions Radon is for businesses that demand high performance, versatile and scalable solutions. From hosting your Website, Email, Voice, SMS and Business Applications,
More information83. Standard 9. Financial Resources. 1. Description. 1.1. Financial stability
83. Standard 9. Financial Resources 1. Description 1.1. Financial stability Bentley University has not reported an operating deficit since it became a not-for-profit organization in 1948. Fiscal year 2012
More informationTexas Transportation Institute Information Resources Strategic Plan 2012 2016
Texas Transportation Institute Information Resources Strategic Plan 2012 2016 June 2012 Information Resources Strategic Plan 2012 2016 Texas Transportation Institute The Texas A&M University System The
More informationBest Practices for Consolidation Projects
Best Practices for Consolidation Projects Lynne Glickman Solution Architect Hewlett-Packard 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without
More informationThe Case for Cloud Computing - A strategic Perspective
Executive Summary The case for cloud computing is becoming more clear. Cloud computing has been a hot topic lately, and for good reason. With it, companies can gain potential competitive advantages that
More informationResearch Administration at the University of Maryland
Research Administration at the University of Maryland Anne S. Geronimo, M.S. Director, Research Development Division of Research University of Maryland June 2007 Tokyo, Japan University of Maryland Profile
More informationProactive IT Solutions More Reliable Networks Are Our Business
Proactive IT Solutions Logo Proactive IT Solutions More Reliable Networks Are Our Business Copyright 2005 Primetime, Inc. All rights reserved. Catalin Ursu info@catcomcomputers.com 973-233-1888 B 973-233-1887
More informationAWARD INFORMATION FOR Quote # 12-115 Internet Streaming Media Hosting
AWARD INFORMATION FOR Quote # 12-115 Internet Streaming Media Hosting AWARD DATE: May 8, 2012 AWARDED TO: EarthChannel Communications, Inc. ADDRESS: P.O. Box 870027 Stone Mountain, GA 30087 PHONE NUMBER:
More informationATTACHMENT J WINDOWS PLATFORM
1 DESCRIPTION OF SERVICE 1.1 WINDOWS CAPACITY UNIT Provides processing capacity when dedicated server resources are required to support the associated Windows Managed Server service. Capacity Units are
More informationSTUDENT TECHNOLOGY ENHANCEMENT PROGRAM PLAN 2005-2009
STUDENT TECHNOLOGY ENHANCEMENT PROGRAM PLAN 2005-2009 EXECUTIVE SUMMARY In an effort to upgrade and increase the availability of technology on the UL Lafayette Campus, the Student Government Association,
More informationUniversity of Maine System Liferay 6 EE Solution - RFP# 34-15 ADDENDUM #01
QUESTIONS 1. Does the University of Maine System have the ability to utilize the GSA Schedule? ANSWER: Yes and pricing offered to higher educational institutions. 2. Support of which Liferay portals are
More informationService Level Agreement
This document outlines the Service Level Agreement (SLA) between University Technology Services (UTS) and our Customers for the delivery and support of. The purpose of this agreement is threefold: 1. To
More informationNine Considerations When Choosing a Managed Hosting Provider
Nine Considerations When Choosing a Managed Hosting Provider Selecting the right managed hosting provider for your business is a critical part of your success. This white paper provides a roadmap for companies
More informationRequest for Proposal Outsourced IT & Managed Services
Request for Proposal Outsourced IT & Managed Services Issue Date: January 2, 2015 Submission Deadline: January 30, 2015 at 5:00 p.m. CST RFP Coordinator: Katie Kosseff, Operations Manager kkosseff@womenventure.org
More informationCreating the Best Student Experience. DIY or Not? What are your options?
Creating the Best Student Experience DIY or Not? What are your options? Improving Customer Service How do your students feel when they walk into your One Stop? How does it look? What is the experience?
More informationUnited Nations Development Programme
United Nations Development Programme 1. 2. 3. TERMS OF REFERENCE (ToR) For Provision of Private Lease Line Background UNDP Sudan currently has the lease line between its Main Office compound located
More informationManaged IT Solutions. More Reliable Networks Are Our Business
Managed IT Solutions Logo Managed IT Solutions More Reliable Networks Are Our Business Copyright 2005 Primetime, Inc. All rights reserved. Catalin Ursu info@catcomcomputers.com 973-233-1888 B 973-233-1887
More informationWVNET Schedule of Rates
West Virginia Network for Educational Telecomputing 837 Chestnut Ridge Road Morgantown, WV 26505 Phone: (304)293-5192 Fax: (304)293-5540 www.wvnet.edu WVNET Schedule of Rates VIRUS AND SPAM FILTERING,
More informationApplication Tracking System for Brokers and Agents
Application Tracking System for Brokers and Agents 2009 Coventry Health Care, Inc. For Broker/Agent Use ONLY Not intended for distribution to beneficiaries. System Requirements to View Here are the minimum
More informationCloud Computing. Chapter 1 Introducing Cloud Computing
Cloud Computing Chapter 1 Introducing Cloud Computing Learning Objectives Understand the abstract nature of cloud computing. Describe evolutionary factors of computing that led to the cloud. Describe virtualization
More informationMSP Dashboard. Solution Guide
Solution Guide MSP Dashboard This document discusses the Cisco Meraki Managed Services Dashboard, which contains features purpose-built for Managed Service Providers offering cloud-managed networking as
More informationPHILADELPHIA GAS WORKS Bill Analysis Application RFP # 27801 Addendum #1 Questions & Answers Emailed Questions and Answers June 26, 2013
Q1 QUESTIONS Can you please provide detailed information regarding the billing system, and all other systems, to be integrated? a. What vendor? b. What software versions? c. Database vendor and version?
More informationUO Academic Extension / InTRO
Initial Comparator Research Oregon State University (LMS = Canvas, completing migration from Blackboard) General Impression: OSU is a model of a strategic, organically grown online program which fulfills
More informationHow To Get The Best Out Of Your It Investments On Mtn.Com
MTN Data Centre services. MTN Business Data Centre Services. Getting the best out of your IT investments For forward looking 21st century organisations, outsourcing IT infrastructure and services has become
More informationRequest for Proposal for Backup Medium
Request for Proposal for Backup Medium Vermont Energy Investment Corporation 06/07/2012 Draft v1.5 1 Contents RFP Definition... 3 Organizational Background... 3 Description... 3 Objectives... 3 Eligible
More information2015 2015 2 1, 2014 30, 2015. 2014 2015 FY
FY 2015 Budget The Connect for Health Colorado FY 2015 budget is the final budget that will incorporate federal grant funding under the Exchange Implementation Level 2 grant. The following narrative explains
More informationMissouri Baptist University Center for Distance Learning
Missouri Baptist University Center for Distance Learning Policies and Procedures Manual MBU Center for Distance Learning Vision, Mission and Goals Through technologically-enhanced teaching-learning opportunities,
More informationPricing Guide. Overview FD Enterprise License SaaS Packages Dedicated SaaS Shared SaaS. Page 2 Page 3 Page 4 Page 5 Page 8
Pricing Guide Overview FD Enterprise License SaaS Packages Dedicated SaaS Shared SaaS Page 2 Page 3 Page 4 Page 5 Page 8 Overview Dexero FD is an innovative information management solution that offers
More informationPROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER
UNIVERSITY OF WASHINGTON OFFICE OF THE VICE PROVOST PLANNING AND BUDGETING Capital and Space Planning PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER JULY 31, 2006 University of Washington
More informationGEORGIA STATE UNIVERSITY Proposal for the Use of FY2003 Technology Fees
FY03_2.1.7 Undergraduate Psychology Laboratory Research Enhancement Page 1 of 8 GEORGIA STATE UNIVERSITY Proposal for the Use of FY2003 Technology Fees Submitting Organization(s) Major Unit: College of
More informationCase Study. Case Study. Performance Testing For Student Application. US-based For-profit University (Higher Education) 1 2014 Compunnel Software Group
Performance Testing For Student Application US-based For-profit University (Higher Education) 1 2014 Compunnel Software Group Compunnel s Performance Testing Solution Delivers Impressive Student Experience
More informationRails Environment Upgrade (VM Migration, Framework Upgrade) ABBA Category Two: Information Technology
AVCIT & CIO FY 201112 BUDGET PLANNING INTERNAL USE Rails Environment Upgrade (VM Migration, Framework Upgrade) ABBA Category Two: Information Technology 1. Amount of OneTime Funding Request (FY 1112):
More informationMemorandum of Understanding for Microsoft SQL Server Hosting
Memorandum of Understanding for Microsoft SQL Server Hosting Contents Executive Summary... 2 Objectives and Scope... 2 Terms and Conditions... 4 Roles and Responsibilities... 5 Services and Charges...
More informationUNIVERSITY OF NEVADA, LAS VEGAS DIFFERENTIAL FEE PROPOSAL FOR UNLV MASTERS OF ARTS IN URBAN LEADERSHIP PROGRAM
UNIVERSITY OF NEVADA, LAS VEGAS DIFFERENTIAL FEE PROPOSAL FOR UNLV MASTERS OF ARTS IN URBAN LEADERSHIP PROGRAM The Masters of Arts in Urban Leadership is a redesign of a PK 12 leadership concentration
More informationHow to Create an Online Program For College Departments
i Application for Support to Create an Online Program at NIU Departments interested in developing an online program (e.g. a major, a baccalaureate completion program, a certificate and/or a graduate degree
More informationContact Centers in the Cloud: A Better Way to Source
Contact Centers in the Cloud: A Better Way to Source By Irwin Lazar Vice President and Service Director, Nemertes Research Executive Summary Contact Center Software as a Service (CCSaaS) solutions provide
More informationA Case Study. Content Delivery and Aggregation. at A&N Media
A Case Study Content Delivery and Aggregation at A&N Media An Introduction to A&N Media Associated and Northcliffe Media (A&N Media), the consumer media company of DMGT (Daily Mail and General Trust) plc,
More informationSUNY Learning Network Service Level Agreement Blackboard Learn Application and Hosting Services
SUNY Learning Network Service Level Agreement Blackboard Learn Application and Hosting Services Scope The SUNY Learning Network (SLN) offers SUNY campuses a managed hosting environment for the Blackboard
More informationHow can I deploy a comprehensive business continuity and disaster recovery solution in under 24 hours without incurring any capital costs?
SOLUTION BRIEF: CA INSTANT RECOVERY ON DEMAND How can I deploy a comprehensive business continuity and disaster recovery solution in under 24 hours without incurring any capital costs? CA Instant Recovery
More informationCloud Computing and Amazon Web Services
Cloud Computing and Amazon Web Services Gary A. McGilvary edinburgh data.intensive research 1 OUTLINE 1. An Overview of Cloud Computing 2. Amazon Web Services 3. Amazon EC2 Tutorial 4. Conclusions 2 CLOUD
More informationCisco Unified Workforce Optimization 1.0 for Unified Contact Center Express
Cisco Unified Workforce Optimization 1.0 for Unified Contact Center Express Cisco Unified Communications is a comprehensive IP communications system of voice, video, data, and mobility products and applications.
More informationWhite Paper. Archiving Blackboard Courses at UMBC. by Bob Armstrong & John Fritz
White Paper Archiving Blackboard Courses at UMBC by Bob Armstrong & John Fritz UMBC White Paper Archiving Blackboard Courses I. Summary...3 II. Overview of Blackboard Management...4 Course Creation and
More informationPrivate Cloud Hosting
Private Cloud Hosting Quick Guide 7/30/2015 2015 EarthLink. Trademarks are property of their respective owners. All rights reserved. 2 Private Cloud Hosting Service Positioning Create Your Own Private
More informationRequest for Proposals (RFP)
Request for Proposals (RFP) To From Subject : Offerors : Institute of International Education, Inc. (IIE) : Humphrey Program Website Hosting & Support RFP Issue Date : June 8, 2016 RFP Closing Date : June
More informationARIZONA STATE UNIVERSITY AT THE WEST CAMPUS FY 2012 LEGISLATIVE BUDGET REQUEST TABLE OF CONTENTS SCHEDULE PAGE NO. Transmittal Statement Formula..
ARIZONA STATE UNIVERSITY AT THE WEST CAMPUS FY 2012 LEGISLATIVE BUDGET REQUEST TABLE OF CONTENTS SCHEDULE PAGE NO. Transmittal Statement Formula.. 1 Administrative Costs Formula.. ADMIN 1, 2, 3 2-4 FY
More informationNAREIM Session: Dangers and challenges of The Cloud. President, NiceNets Consulting, LLC
Main Types of Cloud Environments: - Public Cloud: A service built on an external platform run by a cloud service provider such as IBM, Amazon Web Services or Microsoft Azure. Subscribers can get access
More informationDistributed Learning Course Development Grant Program
Office of the Provost University of South Carolina Distributed Learning Course Development Grant Program Program Guidelines Announcement Release Date: September 9, 2014 Application Receipt Deadline: December
More informationUNLV Differential Fee Proposal Business
UNLV Differential Fee Proposal Business (BOARD OF REGENTS' AGENDA 03/10/2011 & 03/11/2011) Ref. BOR-22, Page 3 of 24 UNIVERSITY OF NEVADA LAS VEGAS DIFFERENTIAL FEE PROPOSAL FOR UNLV COLLEGE OF BUSINESS
More informationInstitute of International Education (IIE) 1800 West Loop South, Suite 250 Houston, TX 77027. Request for Proposal
Institute of International Education (IIE) 1800 West Loop South, Suite 250 Houston, TX 77027 Request for Proposal Gilman Scholarship Online System & Database Prepared: December 17, 2015 Closing Date: January
More informationEvaluation Report: Accelerating SQL Server Database Performance with the Lenovo Storage S3200 SAN Array
Evaluation Report: Accelerating SQL Server Database Performance with the Lenovo Storage S3200 SAN Array Evaluation report prepared under contract with Lenovo Executive Summary Even with the price of flash
More informationNAVIGATING THE MAZE. 2013 LEGAL CIO ROUNDTABLE RETREAT March 3-5, 2013 The Boulders Hotel Carefree, Arizona. 2013 CIO Roundtable Retreat
NAVIGATING THE MAZE 2013 LEGAL CIO ROUNDTABLE RETREAT March 3-5, 2013 The Boulders Hotel Carefree, Arizona The Legal Cloud What is Cloud Computing? Working in the Cloud Cloud Computing is A way to work
More informationSPring-8 User Portal. User Services Workshop Three-Way Meeting. Keiichi SHIMBE JASRI / SPring-8
SPring-8 User Portal User Services Workshop Three-Way Meeting Keiichi SHIMBE JASRI / SPring-8 1 Topics History of User Support System Problems of Former System Database Architecture of New System About
More informationProject Charter. Office 365 2015 Migrations Document Version 2.0 Prepared by Sabina Winters, ITS Last Edited February 19, 2015
Prepared by Sabina Winters, ITS Last Edited February 19, 2015 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Executive Summary In December of 2014, the IT Governance Architecture
More informationAppendix A-2 Generic Job Titles for respective categories
Appendix A-2 for respective categories A2.1 Job Category Software Engineering/Software Development Competency Level Master 1. Participate in the strategic management of software development. 2. Provide
More informationMedia Company Reduces Time-to-Market by 80 Percent with Cloud-Hosting Solution
Microsoft Customer Solution Customer Solution Case Study Media Company Reduces Time-to-Market by 80 Percent with Cloud-Hosting Solution Overview Country or Region: United States Industry: Media and cable
More informationHow To Create An Online Learning Portal For A University
Microsoft Higher Education Customer Solution Case Study University Launches Online Courses, Measures Learning Outcomes with Education Portal Overview Country or Region: United States Industry: Education
More informationMinimum Hardware Configurations for EMC Documentum Archive Services for SAP Practical Sizing Guide
Minimum Hardware Configurations for EMC Documentum Archive Services for SAP Practical Sizing Guide Abstract The sizing of hardware in a deployment of EMC Document Archive Services for SAP is determined
More informationFinal Report Course Management System Subcommittee
2007 Final Report Course Management System Subcommittee Flagship Information Technology Strategic Plan: Action Item 7.01 Louisiana State University and A & M 9/14/2007 Final Report of the Course Management
More informationAPPENDIX E ISU ERP PROJECT REVIEW REPORT
APPENDIX E ISU ERP PROJECT REVIEW REPORT ISU ERP Project Review Report September 18, 2009 1. Project Summary a. Type of Project: ERP b. Project Description: Idaho State University s ERP project, dubbed
More informationHARDWARE JUMPSTART YOUR PERFORMANCE SERVICE CORE
BE FREE BE FREE OF HARDWARE JUMPSTART YOUR PERFORMANCE SERVICE CORE TALK TO OUR EXPERTS 1.877.222.8615 www.bestit.com Copyright 2013 BestIT.com Inc. JUMPSTART YOUR PERFORMANCE The BestIT Jumpstart Your
More information272 Avenue Road Toronto Ontario M4V 2G7. Client Name. Technical Support and Website Hosting Service Level Agreement. Date. Prepared by: Cam Hawkins
272 Avenue Road Toronto Ontario M4V 2G7. Client Name Technical Support and Website Hosting Service Level Agreement Date Prepared by: Cam Hawkins 1 Baseline CMS: Technical Support 1.1 Purpose NMA will support
More informationIT Labor (Hourly Billable) Data Base Hosting
Cost Pool Definitions for Information Technology (IT) Services FY16/17 (Effective July 1, 2015) IT Labor (Hourly Billable) B/A 1365 - Programmer/Developer: EITS provides a variety of software development
More informationUniversity at Buffalo Learning Management and Performance Management System Request for Information # 14CBW0036
University at Buffalo Learning Management and Performance Management System Request for Information # 14CBW0036 Background The University at Buffalo (UB), The State University of New York is a major public
More informationCAMAvision v18.5.x System Specification Guide 7/23/2014
The computer industry is very fast moving, with larger and faster technologies supplanting previous hardware releases within six to nine months. Some of the specifications listed may no longer be available,
More informationPerformance Progress Report
U.S. DEPARTMENT OF COMMERCE 2. Award or Grant Number 48-50-M09064 4. Report Date (MM/DD/YYYY) 10-01-2012 1. Recipient Name Connected Nation, Inc - Texas 6. Reporting Period End Date: 09-30-2012 3. Street
More informationCommon Issues For Blackboard Collaborate Web Conferencing V. 11
Page 1 of 5 Home Self Service My Support Welcome Guest. Sign in Exit Knowledge Base Downloads Knowledge Base Blackboard Collaborate > First Time Users > Blackboard Collaborate > Web Conferencing > What
More informationInstructional Technology Course Materials and Service Fee
Instructional Technology Course Materials and Service Fee University of California, Irvine October 14, 2011 PROBLEM STATEMENT Technology plays a critical role in university education, and students benefit
More informationSUNY Learning Network Service Level Agreement ANGEL Application and Hosting Services
SUNY Learning Network Service Level Agreement ANGEL Application and Hosting Services Scope The ANGEL Application and Hosting Service is offered only to SUNY Campuses that have previously contracted for
More information