Essex Fire Authority. Fleet Management. Internal Audit Report (4.12/13) 28 February 2013 FINAL. Overall Opinion

Size: px
Start display at page:

Download "Essex Fire Authority. Fleet Management. Internal Audit Report (4.12/13) 28 February 2013 FINAL. Overall Opinion"

Transcription

1 Essex Fire Authority Fleet Management Internal Audit Report (4.12/13) 28 February 2013 FINAL Overall Opinion

2 Essex Fire Authority Fleet Management 4.12/13 CONTENTS Section Page Executive Summary 1 Action Plan 4 Findings and Recommendations 6 Debrief meeting 13 August 2012 Draft report issued Revised Draft issued Responses received 10 January August January December 2012 Auditors Mark Jones, Director Dan Harris, Associate Director Suzanne Lane, Senior Manager Andrew Pattison, Assistant Manager Sammy Olugboji, Auditor Final report issued 28 February 2013 Client sponsor Peter Warner, Engineering Manager, Fleet and Equipment Services. Distribution Peter Warner, Engineering Manager, Fleet and Equipment Services. This review has been performed using RSM Tenon s bespoke internal audit methodology, i-ris. The matters raised in this report are only those which came to our attention during our internal audit work and are not necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required. Whilst every care has been taken to ensure that the information provided in this report is as accurate as possible, based on the information provided and documentation reviewed, no complete guarantee or warranty can be given with regard to the advice and information contained herein. Our work does not provide absolute assurance that material errors, loss or fraud do not exist. This report is prepared solely for the use of Essex Fire Authority. Details may be made available to specified external agencies, including external auditors, but otherwise the report should not be quoted or referred to in whole or in part without prior consent. No responsibility to any third party is accepted as the report has not been prepared, and is not intended for any other purpose RSM Tenon Limited RSM Tenon Limited is a member of RSM Tenon Group RSM Tenon Limited is an independent member firm of RSM International an affiliation of independent accounting and consulting firms. RSM International is the name given to a network of independent accounting and consulting firms each of which practices in its own right. RSM International does not exist in any jurisdiction as a separate legal entity. RSM Tenon Limited (No ) is registered in England and Wales. Registered Office 66 Chiltern Street, London W1U 4GB. England

3 Essex Fire Authority 1 Fleet Management 4.12/13 1 EXECUTIVE SUMMARY 1.1 INTRODUCTION An audit of Fleet Management was undertaken as part of the approved internal audit periodic plan for 2012/13. Essex County Fire and Rescue Service (referred to as the Service hereafter) operate a fleet workshop at Lexden where maintenance and servicing is carried out on the Authority s vehicle and equipment fleet. The Service s fleet consists of 1040 in service items of equipment, operational appliances, and other vehicles. It has a total budget of 3.1m for fleet management for the year. The Service uses an Information Management system known as Sophtlogic MIS to maintain vehicle records including servicing and inspection carried out on its fleet and equipment. The Engineering Manager is in overall charge of fleet management, supported by an assistant, a Transport Manager and a Workshop Manager. A Vehicle and Equipment Asset Strategy has been established to set the direction of the Service in managing its fleet of vehicles and equipment. External legislation is set by Vehicle and Operator Services Agency (VOSA), Driver and Vehicle Licencing Agency (DVLA) and Department for Transport (DfT) as well as manufacturer s recommendations on service schedules and service content and the Chief Fire Officers Association Transport Officers Group Best Practice Manual are followed for the maintenance requirements for the different types of vehicles. The audit was designed to assess the controls in place to manage the following objective and risk: Objective Risk The Service manages its fleet to ensure both operational and support functions have access to vehicles and equipment that are fit for purpose, safety and legally compliant. The Service is unable to respond to emergencies appropriately due to an inadequate fleet of vehicles and is at risk from legal challenge if vehicles and equipment are not maintained and controlled in accordance with Road Traffic legislation. 1.2 CONCLUSION Taking account of the issues identified, the Auhority can take reasonable assurance that the controls upon which the organisation relies to manage this risk are suitably designed, consistently applied and effective. However we have identified issues that, if not addressed, increase the likelihood of the risk materialising. The above conclusions feeding into the overall assurance level are based on the evidence obtained during the review. The key findings from this review are as follows: Design of control framework We found that the following controls were designed adequately: The Service has established a Vehicle and Equipment Asset Strategy 2011 that has been communicated to relevant staff through surgery sessions. The Service has established fleet management system on which Vehicle records are adequately maintained. Sample testing confirmed that vehicles were appropriately procured through the National Framework agreement. Sample testing confirmed that scheduled inspections and services are completed as planned.

4 Essex Fire Authority 2 Fleet Management 4.12/13 Sample testing confirmed that monthly and quarterly inspections are conducted on the organisation s fleet of vehicles as planned. Sample testing confirmed that vehicles are appropriately insured. Daily and weekly checks are to be completed by the drivers of the vehicles. Records of this are maintained in the vehicle log book. Compliance issues with this control were identified and of which the Service were aware and were in the process of addressing through the Service Delivery department. Sample testing confirmed that Fleet Workshops are notified of all defects and defects are prioritised and the necessary works completed as per the timeframes of their priority. The Service monitors several Key Performance Indicators (KPIs) relating to vehicle maintenance on a monthly basis. These include completed jobs against planned maintenance. A stock taking programme exists to ensure the Fleet Services stock is regularly monitored for completeness. The Service has undertaken activities to benchmarked Fleet Management to ascertain whether it is providing value for money. A 2008 study found the workshops to be a beacon of best practice and the review demonstrates that an external market testing exercise is unlikely to generate any notable long-term operational or commercial benefit. In 2011/12 the Workshops carried out maintenance for a trial number of vehicles for Braintree District Council and were found to be cheaper and more effective than Braintree District Council s existing contractor. The only identified weaknesses in relation to the design of the controls resulted in a low priority recommendation detailed within the Action Plan. Application of and compliance with control framework We found that one of the controls identified above was not fully complied with which resulted in a medium priority recommendation: Three out of five vehicles sampled had not had daily and weekly checks evidenced. This could lead to a potential avoidable incident occurring with a vehicle which could have health and safety and reputational implications. We also made a further two low priority recommendations, which are detailed within the action plan that follows. 1.3 SCOPE OF THE REVIEW To evaluate the adequacy of risk management and control within the system and the extent to which controls have been applied, with a view to providing an opinion. Control activities are put in place to ensure that risks to the achievement of the organisation s objectives are managed effectively. When planning the audit, the following controls for review and limitations were agreed: Control activities relied upon: Framework for Fleet Management; Fleet management financial reviews; Maintenance programme; and Insurance for fleet vehicles. Limitations to the scope of the audit: The following limitations to the scope of the audit were agreed when planning the audit: Testing has been on a sample basis only; We have not provided an opinion as to whether the correct or appropriate vehicles have been purchased; We have not provided an opinion as to whether the vehicles are in a fit for purpose condition; In addition, our work does not provide any guarantee against material errors, loss or fraud or provide an absolute assurance that material error, loss or fraud does not exist. It should not, therefore, be considered as a comprehensive review of all aspects of noncompliance that may exist now or in the future.

5 Essex Fire Authority 3 Fleet Management 4.12/13 The approach taken for this audit was a Risk-Based Audit. 1.4 RECOMMENDATIONS SUMMARY The following tables highlight the number and categories of recommendations made. The Action Plan at Section 2 details the specific recommendations made as well as agreed management actions to implement them. Recommendations made during this audit: Our recommendations address the design and application of the control framework as follows: Priority High Medium Low Design of control framework Application of control framework Total ADDITIONAL FEEDBACK Good Practice Identified During the Audit We observed that Fleet Services had undertaken a number of exercises which have confirmed the value offered by this service. This includes a 2008 study which found the workshops to be a beacon of best practice and demonstrated that an external market testing exercise was unlikely to generate any notable long-term operational or commercial benefit to the Service. In 2011/12 the Workshops carried out maintenance for a trial number of vehicles for Braintree District Council and were found to be cheaper and more effective than the Council s existing contractor. We have also made a suggestion where we have identified good practice that the organisation may wish to consider: Suggestions Made During the Audit It would be beneficial for a next review date to be included on the Quality Manual to assist in identifying when the guidance becomes obsolete.

6 Essex Fire Authority 4 2 ACTION PLAN The priority of the recommendations made is as follows: Priority High Medium Low Description Recommendations are prioritised to reflect our assessment of risk associated with the control weaknesses. Ref Recommendation Categorisation Accepted (Y/N) Management Comment Implementation Date Manager Responsible 1 The disposal of vehicles and equipment should be documented, referring specifically to financial aspects and secure disposal within an appropriate policy / procedure. Low Y Clarification on the disposal process will be added to the Vehicle and Equipment Asset Strategy Manual. September 2013 Peter Warner, Engineering Manager, Fleet and Equipment Services 2 Local Station Managers should be required to verify that daily checks have been conducted and recorded within vehicle log books. Medium Y Agreed September 2013 Peter Warner, Engineering Manager, Fleet and Equipment Services 3 The Service should ensure that job cards take minimal time whilst being moved around departments for authorisation. Low Y Fleet services are aware of the possible causes to delays to processing job cards and are addressing these with suppliers and Fleet staff. Changes to the recording method of job dates will be implemented. Supervisors and Engineers will Completed Peter Warner, Engineering Manager, Fleet and Equipment Services

7 Essex Fire Authority 5 Ref Recommendation Categorisation Accepted (Y/N) Management Comment Implementation Date Manager Responsible receive instruction on the new processes in due course. 4 The stock checking programme should be delivered to an appropriate timeframe to ensure stock is regularly checked. Low Y Agreed September 2013 Peter Warner, Engineering Manager, Fleet and Equipment Services

8 Essex Fire Authority 6 3 FINDINGS AND RECOMMENDATIONS This report has been prepared by exception. Therefore, we have included in this section, only those areas of weakness in control or examples of lapses in control identified from our testing and not the outcome of all audit testing undertaken. Controls (actual and/or missing) Adequate Design (yes/no) Test Result / Implications Recommendation Categorisation Risk: The Service is unable to respond to emergencies appropriately due to an inadequate fleet of vehicles and is at risk from legal challenge if vehicles and equipment are not maintained and controlled in accordance with Road Traffic legislation. 1 The Vehicle and Equipment Asset Strategy nor any other written policies provide sufficient guidance on the process for disposals. No We noted that the Vehicle and Equipment Asset Strategy did not provide adequate guidance on vehicle disposal. Whilst we understand from the Engineering Manager that a clear process is in place a lack of adequate guidance regarding vehicle disposal increases the risk of it not being fit for purpose and not being effective in guiding staff in the conduct of fleet management tasks. If disposals are not conducted appropriately the organisation could incur financial loss if such assets are potentially disposed of at an inappropriate value or vehicles may be disposed of insecurely. The disposal of vehicles and equipment should be documented, referring specifically to financial aspects and secure disposal within an appropriate policy / procedure. Low 2 Daily and weekly checks are completed by the drivers of the vehicles. Records of this are maintained in the vehicle log book. Faults noted are escalated to the Reception Engineer who then makes arrangements for the Yes We reviewed the vehicle log books relating to five vehicles which were under servicing/repair at the workshop during the audit for evidence of daily and weekly checks as well as maintenance of service handbooks and operator manuals. We found that daily checks were not evidenced within the log book for three out of the five vehicles on a regular basis. A review of the vehicles Local Station Managers should be required to verify that daily checks have been conducted and recorded within vehicle log books. Medium

9 Essex Fire Authority 7 Controls (actual and/or missing) vehicle to be brought in for servicing/repair. Adequate Design (yes/no) Test Result / Implications Recommendation Categorisation servicing handbooks and operator manuals in the five vehicles revealed that in two cases, the servicing handbooks had not been stamped as evidence that the service due was carried out. We understand from the Engineering Manager that they receive regular notifications of issues identified during daily checks, therefore he has confidence that these are taking place, however, they are not being recorded. It was noted that the Engineering Manager was taking steps to address the need to evidence the check carried out with the operations department which we understand includes the production and issuing of a DVD explaining how a daily check should be undertaken. However, non-completion of daily and weekly checks could lead to vehicles having defects that are not picked up on time and could cause further damage to the vehicle. This could result in the malfunction of a vehicle which could impact on the health and safety of employees and members of the public. 3 It is a requirement for the service s fleet to receive a quarterly and annual inspection. The Reception Engineer raises the quarterly and annual inspection report on a monthly basis. Job cards are issued to the workshop for completion of the scheduled inspection. Yes We reviewed a sample of 10 cars in the authority's fleet for regular conduct of quarterly and annual inspection. We confirmed from records and the MIS system that inspections were completed as and when required. The job cards relating to the inspections were also fully completed and signed off by the workshop supervisor. Discussions with the Engineering Manager and Workshop Supervisor however revealed that the The Service should ensure that job cards take minimal time whilst being moved around departments.. Low

10 Essex Fire Authority 8 Controls (actual and/or missing) Inspections are then notified to the engineers by means of schedule sheets printed off the MIS system. The Workshop Manager signs off on the job card for completion of the inspection and passes the job cards to fleet department for input on the fleet management system. Adequate Design (yes/no) Test Result / Implications Recommendation Categorisation job cards report the time from when the job card is issued to when the job has been notified to the driver or keeper of the vehicle as complete. Job cards could however still be in the process of passing around several departments for recording purposes whilst the vehicle has already left the workshop. A report prepared by the Engineering Manager revealed several job cards still circulating among departments whereas the vehicle had already left the workshop. We were able to confirm that Jobs were completed within the expected time lines. 4 A stock of spares is maintained at the workshop. This is controlled by the Stock Supervisor who issues out stock for repairs based on need. Stocks of spares are placed in the stores by bin location, labelled with stock code and description as appropriate. Items subject to warranty claims are segregated and labelled with the claim details. A stock-taking programme is delivered to ensure Fleet Services maintain an appropriate level of stock. Yes A review and observation of the stockholding process revealed the following: Stocks were kept in a locked store next to the workshop. Access was by means of a locked door and keys were held by the Stores Supervisor and his Assistant. The engineers make verbal requests for parts needed to the stores officers. Stores Officers create the order on the MIS system putting details of the part and supplier code and details. They then send this off to the supplier by e- mail. The supplier delivers the part with a receipt. The receipt was signed and stamped by stores officers to confirm agreement with the order. The issue of stock is recorded on the system against the record for the job. Once entered, the stock for the item is updated. The stock checking programme should be delivered to an appropriate timeframe to ensure stock is regularly checked. Low We obtained the Stock Check Programmes for 2012 and not that a programme for checking the organisations stock existed. However, the programme did not demonstrate that any stock had

11 Essex Fire Authority 9 Controls (actual and/or missing) Adequate Design (yes/no) Test Result / Implications Recommendation Categorisation been checked since July We observed that some items of stock of small parts had not been labelled in the store and were informed that a stock check of these items was to be conducted in due course. If regular stock taking is not conducted it will be more difficult for the Service to identify any potential misuse of stock or be assured that all stock is accounted for.

Essex Fire Authority

Essex Fire Authority Internal Audit Report (2.13/.14) FINAL with the Civil Contingencies Act 1 October 2013 Contents Section Page Executive Summary 1 Action Plan 5 Findings and Recommendations 6 Debrief meeting 15 August 2013

More information

Coleg Gwent. Business Continuity Plan Test - Post Implementation Review (PIR) Internal Audit Report (12.09/10)

Coleg Gwent. Business Continuity Plan Test - Post Implementation Review (PIR) Internal Audit Report (12.09/10) Internal Audit Report 1 June 2010 Business Continuity Plan Test Post Implementation Review (PIR) CONTENTS Section Page Executive Summary 1 Action Plan 4 Findings and Recommendations 5 Debrief meeting 28

More information

The Learning Zone - Project Management Arrangements

The Learning Zone - Project Management Arrangements Coleg Gwent Internal Audit Report () 6 June 2012 Overall Opinion The Learning Zone - Project Management Arrangements CONTENTS Section Page Executive Summary 1 Action Plan 4 Findings and Recommendations

More information

ESSEX FIRE AUTHORITY. Internal Audit Progress Report. Audit Sub-Committee Meeting: April 2012

ESSEX FIRE AUTHORITY. Internal Audit Progress Report. Audit Sub-Committee Meeting: April 2012 ESSEX FIRE AUTHORITY Internal Audit Progress Report Audit Sub-Committee Meeting: April Essex Fire Authority CONTENTS Section Page 1 Introduction 1 2 Final reports 1 3 Key Findings from Internal Audit Work

More information

Police and Crime Commissioner for Avon and Somerset and Avon and Somerset Constabulary

Police and Crime Commissioner for Avon and Somerset and Avon and Somerset Constabulary Avon and Somerset Constabulary Traffic Accidents Internal Audit Report (10.12/13) 12 February 2013 Overall Opinion: Amber/Green CONTENTS Section Page Executive Summary 1 Action Plan 5 Findings and Recommendations

More information

Cheshire Fire Authority

Cheshire Fire Authority Cheshire Fire Authority Internal Plan 2013/2014 Presented at the Cheshire Fire Authority meeting of: 17 April 2013 Lisa Randall Head of Internal 1 INTRODUCTION This document sets out the approach we have

More information

Report 7 Appendix 1d Final Internal Audit Report Sundry Income and Debtors (inc. Fees and Charges) Greater London Authority February 2010

Report 7 Appendix 1d Final Internal Audit Report Sundry Income and Debtors (inc. Fees and Charges) Greater London Authority February 2010 Report 7 Appendix 1d Final Internal Audit Report Sundry Income and Debtors (inc. Fees and Charges) Greater London Authority February 2010 This report has been prepared on the basis of the limitations set

More information

Dacorum Borough Council Final Internal Audit Report

Dacorum Borough Council Final Internal Audit Report Dacorum Borough Council Final Internal Audit Report ICT Change Management Distribution list: Chris Gordon Group Manager Neil Telkman - Information, Security and Standards Officer Gary Osler ICT Service

More information

Coleg Gwent. Wireless Audit. Internal Audit Report (2.10/11) 23 May 2011. Overall Opinion: Amber Green

Coleg Gwent. Wireless Audit. Internal Audit Report (2.10/11) 23 May 2011. Overall Opinion: Amber Green Coleg Gwent Wireless Audit Internal Audit Report (2.10/11) 23 May 2011 Overall Opinion: Amber Green Coleg Gwent CONTENTS Section Page Executive Summary 1 Action Plan 5 Findings and Recommendations 10 Debrief

More information

Cambridgeshire and Peterborough Fire Authority. Internal Audit Progress Report Overview & Scrutiny Committee meeting 16 October 2014

Cambridgeshire and Peterborough Fire Authority. Internal Audit Progress Report Overview & Scrutiny Committee meeting 16 October 2014 Cambridgeshire and Peterborough Fire Authority Internal Audit Progress Report Overview & Scrutiny Committee meeting 16 October 2014 Cambridgeshire & Peterborough Fire Authority 1 Introduction This report

More information

SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012

SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012 SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012 INTERNAL AUDIT PLAN Report of the: Director of Finance Contact: John Turnbull or Gillian McTaggart Urgent Decision?(yes/no) No If yes, reason urgent decision required:

More information

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS LEC (Company Audit) Guidance Notes Glossary of Terms Transport for London (TfL) London Low Emission

More information

CENTRAL LINCOLNSHIRE LOCAL PLAN HIGHLIGHT REPORT

CENTRAL LINCOLNSHIRE LOCAL PLAN HIGHLIGHT REPORT Public Sector Auditing.. Private Sector Thinking CENTRAL LINCOLNSHIRE LOCAL PLAN HIGHLIGHT REPORT Date: 7 th November 2014 Author: Rachel Abbott Principal Auditor Introduction & Scope The National Planning

More information

Aberdeen City Council. Fleet Management Final Report

Aberdeen City Council. Fleet Management Final Report Aberdeen City Council Fleet Management Final Report Internal Audit Report 2013/2014 for Aberdeen City Council February 2014 Internal Audit KPI Targets Target Dates Actual Dates Red/Amber/ Green Commentary

More information

Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010

Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010 Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010 This report has been prepared on the basis of the limitations set out on page 16. Contents Page

More information

FLEET ROAD RISK POLICY

FLEET ROAD RISK POLICY FLEET ROAD RISK POLICY SGPilliner U:\PolicieandProcedures\FleetRoadRiskPolicy\FleetRoadRiskPolicy040903 1 Fleet Road Risk Policy. 1.0 Introduction. Carmarthenshire County Council is committed to manage

More information

Aberdeen City Council IT Asset Management

Aberdeen City Council IT Asset Management Aberdeen City Council IT Asset Management Internal Audit Report 2014/2015 for Aberdeen City Council January 2015 Terms or reference agreed 4 weeks prior to fieldwork Target Dates per agreed Actual Dates

More information

Aberdeen City Council IT Security (Network and perimeter)

Aberdeen City Council IT Security (Network and perimeter) Aberdeen City Council IT Security (Network and perimeter) Internal Audit Report 2014/2015 for Aberdeen City Council August 2014 Internal Audit KPIs Target Dates Actual Dates Red/Amber/Green Commentary

More information

Area Manager - Head of Operational Policy & Assurance

Area Manager - Head of Operational Policy & Assurance JOB DESCRIPTION Job Title: Fleet Manager Department: Operational Assurance Location: FSHQ Post Number: Grade/Role: PM2 Special Allowances: Essential Car User Responsible to: Area Manager - Head of Operational

More information

Office of the Police and Crime Commissioner for Avon and Somerset and Avon and Somerset Constabulary

Office of the Police and Crime Commissioner for Avon and Somerset and Avon and Somerset Constabulary Office of the Police and Crime Commissioner for Avon and Somerset and Avon and Somerset Constabulary Internal Audit Report () FINAL Risk Management: Follow Up of Previous Internal Audit Recommendations

More information

CASE STUDIES MANAGEMENT INFORMATION SYSTEMS FOR BUS SAFETY. Case Studies for Management Information Systems for Bus Safety / / 1

CASE STUDIES MANAGEMENT INFORMATION SYSTEMS FOR BUS SAFETY. Case Studies for Management Information Systems for Bus Safety / / 1 CASE STUDIES MANAGEMENT INFORMATION SYSTEMS FOR BUS SAFETY February 2012 Case Studies for Management Information Systems for Bus Safety / / 1 Each accredited bus operator must develop its own management

More information

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee LIFT MANAGEMENT Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee This is a controlled document. It should not be altered in any way without the express permission of the author

More information

Caedmon College Whitby

Caedmon College Whitby Caedmon College Whitby Data Protection and Information Security Policy College Governance Status This policy was re-issued in June 2014 and was adopted by the Governing Body on 26 June 2014. It will be

More information

PROCEDURE Transaction Monitoring and Audit. Number: G 0811 Date Published: 6 June 2013

PROCEDURE Transaction Monitoring and Audit. Number: G 0811 Date Published: 6 June 2013 1.0 Summary of Changes This procedure has been amended to include the Police National Database (PND). 2.0 About this Procedure The Chief Constable will assume the responsibilities of the data controller

More information

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems). FAT MEDIA QUALITY ASSURANCE STATEMENT NOTE 1: This is a CONTROLLED Document as are all quality system files on this server. Any documents appearing in paper form are not controlled and should be checked

More information

Basildon Council - Motor Vehicle Claim Form

Basildon Council - Motor Vehicle Claim Form Basildon Council - Motor Vehicle Claim Form Please ensure you read the following information before completing this claims form and that you complete this form thoroughly, failure to complete the form

More information

HIGHWAY INCIDENT CLAIM FORM Please read the information provided before completing this form

HIGHWAY INCIDENT CLAIM FORM Please read the information provided before completing this form Page 1 of 6 S HIGHWAY INCIDENT CLAIM FORM Please read the information provided before completing this form Please report any dangerous defects to the Surrey Highways team as soon as possible by logging

More information

B37: Managing Occupational Road Risk: Guidance. This document should be read in conjunction with Section B37: Managing Occupational Road Risk: Policy.

B37: Managing Occupational Road Risk: Guidance. This document should be read in conjunction with Section B37: Managing Occupational Road Risk: Policy. B37: Managing Occupational Road Risk: Guidance This document should be read in conjunction with Section B37: Managing Occupational Road Risk: Policy. 1. Introduction 1.1 This document outlines the mechanisms

More information

Appendix 6c. Final Internal Audit Report Disaster Recovery Planning. June 2007. Report 6c Page 1 of 15

Appendix 6c. Final Internal Audit Report Disaster Recovery Planning. June 2007. Report 6c Page 1 of 15 Appendix 6c Final Internal Audit Report Disaster Recovery Planning June 2007 Report 6c Page 1 of 15 Contents Page Executive Summary 3 Observations and Recommendations 8 Appendix 1 - Audit Framework 13

More information

SOUTH NORTHAMPTONSHIRE COUNCIL. 11/31 ICT Capacity Management FINAL REPORT. June 2011

SOUTH NORTHAMPTONSHIRE COUNCIL. 11/31 ICT Capacity Management FINAL REPORT. June 2011 SOUTH NORTHAMPTONSHIRE COUNCIL 11/31 ICT Capacity Management FINAL REPORT June 2011 This report and the work connected therewith are subject to the Terms and Conditions of the contract dated 18/06/07,

More information

Draft Internal Audit Report Software Licensing Audit. December 2009

Draft Internal Audit Report Software Licensing Audit. December 2009 Draft Internal Audit Report Software Licensing Audit December 2009 Contents Page Executive Summary 3 Observations and Recommendations 6 Appendix 1 Audit Framework 9 Appendix 2 - Staff Interviewed 10 Statement

More information

OH&S Management Systems Audit Checklist (NAT, E3)

OH&S Management Systems Audit Checklist (NAT, E3) 3.1.2 3.1.1 Introduction OH&S Management Systems Audit Checklist (NAT, E3) This audit checklist is based on Element 3 (Implementation) of the National Self-Insurers OHS Audit Tool. For a full copy of the

More information

Queensland Taxi Security Camera Program Changes

Queensland Taxi Security Camera Program Changes Queensland Taxi Security Camera Program Changes Frequently Asked Questions GENERAL INFORMATION 1. What is the taxi security camera program? It is a program administered by the Department of Transport and

More information

AUDIT COMMITTEE 19 MARCH 2014

AUDIT COMMITTEE 19 MARCH 2014 AUDIT COMMITTEE 19 MARCH 2014 AGENDA ITEM 11 Subject: Report by: ITEMS TO BE BROUGHT TO MEMBERS ATTENTION, OUTSTANDING HIGH RISK RECOMMENDATIONS, INTERNAL AUDIT REPORTS INCLUDING HIGH RISK RECOMMENDATIONS,

More information

Dacorum Borough Council Final Internal Audit Report. IT Business Continuity and Disaster Recovery

Dacorum Borough Council Final Internal Audit Report. IT Business Continuity and Disaster Recovery Dacorum Borough Council Final Internal Audit Report IT Business Continuity and Disaster Recovery Distribution list: Chris Gordon Group Manager Performance, Policy and Projects John Worts ICT Team Leader

More information

Measuring your capabilities in Fleet Safety Management

Measuring your capabilities in Fleet Safety Management Page 1 Measuring your capabilities in Fleet Safety Management ACC Fleet Saver programme for rental fleets Audit Standards 1 July 2014 V2.0 Page 2 Table of Contents 1 Introduction... 3 2 Critical Element

More information

Coleg Gwent Internal Audit Report 2012/13 Assets and Inventory. Assurance Rating:

Coleg Gwent Internal Audit Report 2012/13 Assets and Inventory. Assurance Rating: Coleg Gwent Internal Audit Report 2012/13 Assets and Inventory Assurance Rating: Distribution List: Draft Report: Principal Vice Principal, (Finance, Estates and Information Services) Clerk to the Corporation

More information

Internal Audit Report Project Management

Internal Audit Report Project Management Audit Committee, 20 Internal Audit Report Project Management Executive summary and recommendations Introduction As part of the Internal Audit Plan for 2013-14 Mazars have undertaken a review of arrangements

More information

Financial Services Guidance Note Outsourcing

Financial Services Guidance Note Outsourcing Financial Services Guidance Note Issued: April 2005 Revised: August 2007 Table of Contents 1. Introduction... 3 1.1 Background... 3 1.2 Definitions... 3 2. Guiding Principles... 5 3. Key Risks of... 14

More information

Phoenix Security (Essex) Ltd.

Phoenix Security (Essex) Ltd. DESCRIPTION PROCEDURES INDEX. APPENDICES INDEX. CIRCULATION LIST OP 101 CONTRACT REVIEW. OP 102 PURCHASING. OP 103 RECORDS OP 104 DOCUMENT CONTROL. OP 105 APPROVED SUPPLIERS. OP 106 GOODS IN INSPECTION.

More information

REVIEW OF THE FIREWALL ARRANGEMENTS

REVIEW OF THE FIREWALL ARRANGEMENTS WEST DORSET DISTRICT COUNCIL REVIEW OF THE FIREWALL ARRANGEMENTS Report issued: December 2007 The matters raised in this report are only those, which came to the attention of the auditor during the course

More information

Guidelines for Disposal of Goods & Equipment

Guidelines for Disposal of Goods & Equipment Guidelines for Disposal of Goods & Equipment Public Procurement Board Accra, Ghana Preface Procurement and disposal of goods and equipment by Procurement Entities under projects financed from the Public

More information

1.1 Terms of Reference Y P N Comments/Areas for Improvement

1.1 Terms of Reference Y P N Comments/Areas for Improvement 1 Scope of Internal Audit 1.1 Terms of Reference Y P N Comments/Areas for Improvement 1.1.1 Do Terms of Reference: a) Establish the responsibilities and objectives of IA? b) Establish the organisational

More information

Internal Audit Strategic and Annual Plans 2015/16

Internal Audit Strategic and Annual Plans 2015/16 Internal Audit Strategic and Annual Plans 2015/16 Financial Scrutiny and Audit Committee 10 February 2015 Agenda Item No 8 Summary: This report provides an overview of the stages followed prior to the

More information

REPORT OF THE ACTING MUNICIPAL MANAGER 1. INTRODUCTION / BACKGROUND TO REPORT

REPORT OF THE ACTING MUNICIPAL MANAGER 1. INTRODUCTION / BACKGROUND TO REPORT GOOD GOVERNANCE: SUPPLY CHAIN MANAGEMENT REPORT: IMPLEMENTATION OF THE SUPPLY CHAIN MANAGEMENT REGULATIONS WITHIN THE PERIOD 01 JULY 2014 TO 30 JUNE 2015 (2014//2015 FINANCIAL YEAR) REPORT OF THE ACTING

More information

Fleet Safety Matters at Arval. Tracey Scarr 17 th January 2012

Fleet Safety Matters at Arval. Tracey Scarr 17 th January 2012 Fleet Safety Matters at Arval Tracey Scarr 17 th January 2012 Welcome Tracey Scarr Arval Fleet & Road Safety Manager 2 The Journey Proactive We actively look for problems and work on reducing risks Target

More information

Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 3 February 2014 Item No. 11

Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 3 February 2014 Item No. 11 For Publication Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 3 February 2014 Item No. 11 REPORT AUTHOR: SUBJECT: HEAD OF OPERATIONAL SUPPORT PROPOSED VEHICLE FLEET

More information

Operational Audit and. Asset Management System Review. Shire of Coolgardie

Operational Audit and. Asset Management System Review. Shire of Coolgardie Shire of Coolgardie Operational Audit and Asset Management System Shire of Review Dowerin 2011 (Water Services Operating Licence) Water Services Operating Licence (Sewerage and Non-Potable Water) DRAFT

More information

NHS Dorset Clinical Commissioning Group. Internal Audit Annual Report 2014/15. May 2015

NHS Dorset Clinical Commissioning Group. Internal Audit Annual Report 2014/15. May 2015 Internal Audit Annual Report 2014/15 May 2015 Internal Audit Annual Report INTRODUCTION This is the 2014/15 Annual Report by TIAA on the internal control environment at Dorset Clinical Commissioning Group.

More information

Table of Contents. 1 P a g e

Table of Contents. 1 P a g e Table of Contents Financial Regulations 2 General... 2 Accounting Procedures... 2 Internal Audit... 3 Budget Planning And Preparation... 3 Power To Incur Expenditure Within Approved Estimates... 4 Budget

More information

Certificate of Acceptance

Certificate of Acceptance Product Description Product Image < Scope of Acceptance Full Acceptance / Trial Acceptance (delete as appropriate) Network

More information

Basildon Council - Public Liability Claim Form

Basildon Council - Public Liability Claim Form Basildon Council - Public Liability Claim Form Please ensure you read the following information before completing this claims form and that you complete this form thoroughly, failure to complete the form

More information

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot JOB DESCRIPTION JOB TITLE: DIRECTORATE: SECTION: GRADE: Team Leader Fleet Engineering Environment & Sustainable Communities / Highways Transport Operations / Vehicle Fleet & Depot BBCU11 DATE PREPARED:

More information

Aberdeen City Council

Aberdeen City Council Aberdeen City Council Internal Audit Report Final Contract management arrangements within Social Care & Wellbeing 2013/2014 for Aberdeen City Council January 2014 Internal Audit KPI Targets Target Dates

More information

APPENDIX 23 ATTACHMENT 1. City of Joondalup. 2014 Review of Financial Management Systems and Procedures. March 2015

APPENDIX 23 ATTACHMENT 1. City of Joondalup. 2014 Review of Financial Management Systems and Procedures. March 2015 APPENDIX 23 ATTACHMENT 1 City of Joondalup 2014 Review of Financial Management Systems and Procedures March 2015 Deloitte Touche Tohmatsu ABN 74 490 121 060 Woodside Plaza Level 14 240 St Georges Terrace

More information

Procedure: OHS CONTRACTOR MANAGEMENT

Procedure: OHS CONTRACTOR MANAGEMENT Procedure: OHS CONTRACTOR MANAGEMENT. Purpose This procedure outlines the occupational health and safety (OHS) requirements for the management of contractors engaged to perform tasks or services for Greater

More information

SOUTH NORTHAMPTONSHIRE COUNCIL 10/11 REMOTE WORKING FINAL REPORT MARCH 2011

SOUTH NORTHAMPTONSHIRE COUNCIL 10/11 REMOTE WORKING FINAL REPORT MARCH 2011 SOUTH NORTHAMPTONSHIRE COUNCIL 10/11 REMOTE WORKING FINAL REPORT MARCH 2011 This report and the work connected therewith are subject to the Terms and Conditions of the contract dated 18/06/07 between South

More information

Measuring your capabilities in Fleet Safety Management ACC Fleet Saver

Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety

More information

REACTIVE REPAIRS, CYCLICAL & PLANNED MAINTENANCE POLICY

REACTIVE REPAIRS, CYCLICAL & PLANNED MAINTENANCE POLICY POLICY REF : AM05 Version No. 4.0 August 2012 REACTIVE REPAIRS, CYCLICAL & PLANNED MAINTENANCE POLICY 1.0 INTRODUCTION 1.1 This policy describes our arrangements for ensuring that our properties are well

More information

Compliance. Group Standard

Compliance. Group Standard Group Standard Compliance Serco is committed to good governance practices and the management of risks supported by a robust business compliance process SMS-GS-G2 Compliance July 2014 v1.0 Serco Public

More information

AMS Asset Management Redkite Asset Management System When only the best will do.

AMS Asset Management Redkite Asset Management System When only the best will do. Defects AMS Asset Management Redkite Asset Management System When only the best will do. Redkite Systems Ltd 2014 AMS Overview You ll wonder how you managed without it! What can I record on Redkite AMS?

More information

Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy. Submitted: 29 September 2013

Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy. Submitted: 29 September 2013 Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy Submitted: 29 September 2013 To be Reviewed: September 2015 VERSION: AUTHOR: OWNER: v2.3 Barry

More information

APPENDIX C. Internal Audit Report South Holland District Council Project Management

APPENDIX C. Internal Audit Report South Holland District Council Project Management APPENDIX C Internal Audit Report South Holland District Council Project Management Date: 20th December 2012 Contents Introduction and Scope 1 Executive Summary Assurance Opinion Key Messages 2 3 Management

More information

Quality Procedures and Work Instructions Manual

Quality Procedures and Work Instructions Manual Quality Procedures and Work Instructions Manual Revision Number: (1) ISSUED TO: MANUAL NO: REVISION NO: ISSUE DATE: President Date 1 ii. Table of Contents 1 of 4 0 Section Number Name Revision Date i.

More information

Health and safety policy

Health and safety policy 1. General statement of intent The Company recognises and accepts its responsibilities as an employer to ensure, so far as is reasonably practicable, the health, safety and welfare of its employees and

More information

Chapter 15 Saskatchewan Government Insurance Monitoring Certified Vehicle Inspection Stations 1.0 MAIN POINTS

Chapter 15 Saskatchewan Government Insurance Monitoring Certified Vehicle Inspection Stations 1.0 MAIN POINTS Chapter 15 Saskatchewan Government Insurance Monitoring Certified Vehicle Inspection Stations 1.0 MAIN POINTS On behalf of the Saskatchewan Auto Fund (Fund), Saskatchewan Government Insurance (SGI) is

More information

SECTION 2 Insurance March 2014

SECTION 2 Insurance March 2014 SECTION 2 Insurance March 2014 Paragraph Insurance 2.1 Accident/Insurance Claims 2.2 Insurance Cover whilst travelling abroad 2.3 Windscreen/Windows Replacement Service 2.4 Loan of County Minibus Vehicles

More information

LGRF. Procurement Probity Plan. July 2012

LGRF. Procurement Probity Plan. July 2012 LGRF July 2012 When to develop a : A probity plan is best used for any procurement of medium complexity and size and above. A probity plan can be implemented without use of a probity advisor/auditor. Description

More information

AUDITING GUIDELINES FOR CERTIFICATION BODIES FOR PSA 28:2013

AUDITING GUIDELINES FOR CERTIFICATION BODIES FOR PSA 28:2013 AUDITING GUIDELINES FOR CERTIFICATION BODIES FOR PSA 28:2013 June 2014 www.psa.gov.ie 1. AUDITING GUIDELINES...4 2. GENERAL...5 2.1 PSA Licensing Requirements...5 2.2 Audits...5 2.3 Audit Compliance...7

More information

Annual Governance Statement 2013/14

Annual Governance Statement 2013/14 31 Annual Governance Statement 2013/14 1. SCOPE OF RESPONSIBILITY ESPO is responsible for ensuring that its business is conducted in accordance with the law and proper standards, and that public money

More information

Audit and Governance Committee Report. 4 July 2011. quarter. Internal audit activity report. one 2011/2012 1/2012. Purpose of Report. Report No.

Audit and Governance Committee Report. 4 July 2011. quarter. Internal audit activity report. one 2011/2012 1/2012. Purpose of Report. Report No. Audit and Governance Committee Report 4 July 2011 Report of Audit Manager Author: Adrianna Partridge Telephone: 01235 547615 Telephone: 01491 823544 E-mail: adrianna.partridge@southandvale.gov.uk Cabinet

More information

Safety Management System (SMS) Guidelines

Safety Management System (SMS) Guidelines Safety Management System (SMS) Guidelines Pursuant to section 9D (2) (c) of the Passenger Transport Act 1990 For Bus and Coach Operators in NSW Roads and Maritime Services Level 5, 27-31 Argyle Street

More information

Welcome to the Future of Fleet Management & Vehicle Tracking Business Transformation Today

Welcome to the Future of Fleet Management & Vehicle Tracking Business Transformation Today Welcome to the Future of Fleet Management & Vehicle Tracking Business Transformation Today Supporting Compliance Delivering Savings A New Approach to Fleet Management wwwblackboxtelematicscouk Blackbox

More information

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF:

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF: THE QUALITY POLICY STATEMENT OF: MP Plumbing & Heating Ltd Unit 8,The Metro Centre, Bridge Road, Orpington BR5 2BE Telephone: 01689 822188 Fax: 01689 897 733 E-Mail: info@mpplumbingheating.co.uk Web page:

More information

Protection for business Motor Fleet Insurance

Protection for business Motor Fleet Insurance Protection for business Motor Fleet Insurance Haulage Factfinder Motor Fleet Insurance Haulage Factfinder The information you provide in this form will be used to assess your motor fleet insurance risk

More information

CONTROLLED DOCUMENT. Traffic Management Policy

CONTROLLED DOCUMENT. Traffic Management Policy CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: PURPOSE Controlled Number: Document Version Number: 1 Controlled Sponsor: Controlled Lead: Approved By: On: Document Document Policy Governance To set out

More information

Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 17 September 2013 Item No. 10

Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 17 September 2013 Item No. 10 For publication REPORT AUTHOR: SUBJECT: Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 17 September 2013 Item No. 10 HEAD OF OPERATIONAL SUPPORT PROPOSED VEHICLE FLEET

More information

TRANSPORT FOR LONDON AUDIT COMMITTEE STRATEGIC RISK MANAGEMENT PROGRESS REPORT

TRANSPORT FOR LONDON AUDIT COMMITTEE STRATEGIC RISK MANAGEMENT PROGRESS REPORT AGENDA ITEM 4 TRANSPORT FOR LONDON AUDIT COMMITTEE SUBJECT: STRATEGIC RISK MANAGEMENT PROGRESS REPORT DATE: 3 MARCH 2009 1 PURPOSE AND DECISION REQUIRED 1.1 The purpose of this paper is to update the Audit

More information

APPENDIX: CHECKLIST COMPLIANCE WITH THE CODE

APPENDIX: CHECKLIST COMPLIANCE WITH THE CODE AEDIX: CHECKLIST COMLIACE WITH THE CODE lease tick to indicate = ES, = ARTIAL, = O. Where partial or no, you should give reasons for any noncompliance, and any compensating measures in place or actions

More information

X2 CONNECT NETWORKS SUPPORT SERVICES PRODUCT DEFINITION LEVEL 1, 2 & 3

X2 CONNECT NETWORKS SUPPORT SERVICES PRODUCT DEFINITION LEVEL 1, 2 & 3 X2 CONNECT NETWORKS SUPPORT SERVICES PRODUCT DEFINITION LEVEL 1, 2 & 3 Date : 09/08/06 Issue: 6 This is an unpublished work the copyright in which vests in X2 Connect Limited. All rights reserved. The

More information

Data Quality - A Review of the Audit Committee

Data Quality - A Review of the Audit Committee AGENDA ITEM 6 TRANSPORT FOR LONDON AUDIT COMMITTEE SUBJECT: DATA QUALITY REVIEW 2007/08 DATE: 25 NOVEMBER 2008 1 PURPOSE AND DECISION REQUIRED 1.1 As part of its assessments of TfL, the Audit Commission

More information

Annual Governance Statement

Annual Governance Statement Annual Governance Statement 2014/15 1 Fareham Borough Council Civic Offices, Civic Way, Fareham PO16 7AZ Scope of Responsibility Fareham Borough Council is responsible for ensuring that its business is

More information

CHECKLIST OF COMPLIANCE WITH THE CIPFA CODE OF PRACTICE FOR INTERNAL AUDIT

CHECKLIST OF COMPLIANCE WITH THE CIPFA CODE OF PRACTICE FOR INTERNAL AUDIT CHECKLIST OF COMPLIANCE WITH THE CIPFA CODE OF PRACTICE FOR INTERNAL AUDIT 1 Scope of Internal Audit 1.1 Terms of Reference 1.1.1 Do terms of reference: (a) establish the responsibilities and objectives

More information

COLOCATION SERVICE SCHEDULE

COLOCATION SERVICE SCHEDULE COLOCATION SERVICE SCHEDULE 1. DEFINITIONS AND INTERPRETATION 1.1 Definitions Capitalised terms in this Service Schedule not otherwise defined here have the meaning given in the Standard Terms and Conditions:

More information

Coleg Gwent Internal Audit Report 2014/15 Staff Performance Management. Assurance Rating:

Coleg Gwent Internal Audit Report 2014/15 Staff Performance Management. Assurance Rating: Coleg Gwent Internal Audit Report 2014/15 Staff Performance Management Assurance Rating: Distribution List: Final Report Audit Committee Principal Vice Principal, (Resources and Financial Planning)/Director

More information

PASSENGER AND LIGHT COMMERCIAL VEHICLE

PASSENGER AND LIGHT COMMERCIAL VEHICLE Governance Division Employment Policy Section ACTPS NON-EXECUTIVE PASSENGER AND LIGHT COMMERCIAL VEHICLE MANAGEMENT GUIDELINES May 2010 CONTENTS 1. DEFINITIONS 2. INTRODUCTION 3. FLEET MANAGEMENT AND REPORTING

More information

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties

More information

Internal audit report Information Security / Data Protection review

Internal audit report Information Security / Data Protection review Audit Committee 29 September 2011 Internal audit report Information Security / Data Protection review Executive summary and recommendations Introduction Mazars have undertaken a review of Information Security

More information

COLOCATION SERVICE SCHEDULE

COLOCATION SERVICE SCHEDULE COLOCATION SERVICE SCHEDULE 1. DEFINITIONS AND INTERPRETATION 1.1 Definitions Capitalised terms in this Service Schedule not otherwise defined here have the meaning given in the Master Services Agreement:

More information

INFORMATION REQUIRED FOR EMPLOYEE HANDBOOK

INFORMATION REQUIRED FOR EMPLOYEE HANDBOOK INFORMATION REQUIRED FOR EMPLOYEE HANDBOOK Registered Company Name Company Trading Name Address Email Address Contact number We have enclosed a standard employee handbook. You should read through the details

More information

Certificate of Acceptance

Certificate of Acceptance Critical Rail Temperature Monitor 3000 Product Description Product Image The CRTM 3000 (Critical Rail Temperature Monitor) monitoring system enables people to monitor rail temperature in real time. The

More information

How To Audit A Windows Active Directory System

How To Audit A Windows Active Directory System South Northamptonshire Council Windows Active Directory Final Internal Audit Report - September Distribution list: Mike Shaw IT & Customer Services Manager David Price Director of Community Engagement

More information

Operations. Transport Officer OP199. Operations Manager. Administration Officer

Operations. Transport Officer OP199. Operations Manager. Administration Officer Job Description Service Job Title Post No Salary Grade Operations Transport Officer OP199 E Hours 37 Responsible to Responsible for Operations Manager Administration Officer Purpose of Post: To support

More information

Note the Chief Internal Auditor s findings to date and gain assurance from Officers that key issues raised are being addressed.

Note the Chief Internal Auditor s findings to date and gain assurance from Officers that key issues raised are being addressed. Agenda Item No: 9 To: Joint Audit Committee Date: 24 September 2014 By: Chief Internal Auditor Title: Internal Audit Update Report 2014-15 Purpose of Report: The purpose of this report is to give an opinion

More information

Internal Audit at the University of Cambridge.

Internal Audit at the University of Cambridge. Internal Audit at the University of Cambridge. Contents Introduction to Deloitte 1 Our team 2 What is Internal Audit? 4 Our approach to Internal Audit 5 Authority and reporting lines 7 Planning 8 Ad Hoc

More information

Newcastle University Information Security Procedures Version 3

Newcastle University Information Security Procedures Version 3 Newcastle University Information Security Procedures Version 3 A Information Security Procedures 2 B Business Continuity 3 C Compliance 4 D Outsourcing and Third Party Access 5 E Personnel 6 F Operations

More information

Equipment and Fleet Maintenance Review

Equipment and Fleet Maintenance Review Internal Audit Issue Date: July 2014 Report Number: FY2014-04 Executive Summary AUDIT OF: Equipment and Fleet Maintenance Review DATE: Fieldwork performed May 2014 June 2014 AUDIT RATING: Acceptable [

More information

RE: REQUEST FOR PROPOSAL RFP 06 18 FLEET MANAGEMENT CONSULTING SERVICES

RE: REQUEST FOR PROPOSAL RFP 06 18 FLEET MANAGEMENT CONSULTING SERVICES Our File No.: RFP 06 18 Company name Attn: xxxxxxx address address RE: REQUEST FOR PROPOSAL RFP 06 18 FLEET MANAGEMENT CONSULTING SERVICES You have been invited to submit a proposal to the District of

More information

RISK MANAGEMENT STRATEGY

RISK MANAGEMENT STRATEGY RISK MANAGEMENT STRATEGY 1 Introduction The purpose of this document is to outline a which facilitates the effective recognition and management of risks facing the University. The Combined Code on Corporate

More information

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April 2012. Authorised by: Managing Director.

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April 2012. Authorised by: Managing Director. Quality Manual Issue 4 Forth Engineering (Cumbria) Limited QUALITY MANUAL Copy Number: 1 The information contained in this Manual is the property of Forth Engineering (Cumbria) Limited and must not be

More information