1 DATE: August 25, 2015 TO: All Plan Holders ARCHITECTURAL PARTNERS, P.C. 10 Ninth Street, Lynchburg, Va / Fax 434/ FROM: Jim Vernon, Architectural Partners PROJECT NAME: Nelson County Courthouse Complex, Phase 2 COMM. # ADDENDUM #6 Bid Date: September 2, 2015 Time: 2:00 p.m., local prevailing time This addendum becomes part of the Construction Documents. The following changes, additions, and deletions shall be made to the following documents; all other conditions shall remain the same. Please attach to all copies of the Construction Documents which you are holding. All Contractors are to state in their bid the receipt of this addendum. Instruction to Bidders: Addendum To The Drawings: none Addendum To The Procurement and Contracting Requirements none Addendum To The Specifications: Spec Section Data Networking Equipment and Cabling: Replace Section 3.3 Network Backbone Internet with revised Section 3.3, included as a part of this addendum. Questions/Answers and Clarifications: none END OF ADDEMDUM #6

2 3.3. Network Backbone Interconnect This section of the document defines the horizontal cable runs which will be necessary for the network backbone. The network backbone will leverage existing fiber and copper cabling where possible. The following figure shows a detailed map of existing. Figure 3.3 1: Existing Fiber and Copper Interconnect The following additions or changes will need to be implemented as part of this project. Please refer to the diagram below reflecting these additions or changes. 1. A new 12 Strand multimode OM2 62.5/125 fiber run, Run #1, should be implemented between Room 214 and First Floor Data Closet 136. This run should be terminated in the 2 post telecommunication racks in these respective rooms per the termination specification as set forth in Section 2.6. This run will be utilized to connect the Supreme Court router to the Supreme Court Network A new 12 Strand multimode OM2 62.5/125 fiber run, Run #3, should be implemented between Second Floor Data Closet 224 and Server Room 225. This run should be terminated in the 2 post telecommunication racks in these respective rooms per the termination specification as set forth in Section 2.6. This run will be utilized to connect the new server room into the existing network backbone.

3 3. A new 12 Strand multimode OM2 62.5/125 fiber run, Run #4, should be implemented between Second Floor Data Closet 224 and First Floor Data Closet 136. This run should be terminated in the 2 post telecommunication racks in these respective rooms per the termination specification as set forth in Section 2.6. This run will be utilized to connect the First Floor Data Closet into the existing network backbone. 4. Jefferson Building Connectivity There is an existing fiber and copper run from the north wall of the courthouse to the Jefferson Building that will be impacted by construction. This connection exits the existing courthouse on the north wall above ground and the runs underground to the Jefferson Building surfacing on the exterior of the Jefferson Building. In order to minimize the impact of this connection, a new fiber and copper run will be completed in a new conduit outside the limits of construction PRIOR TO ANY DEMOLITION which may interrupt the existing fiber and copper runs. There is currently a 12 Strand fiber run from 224 through the existing Clerk s Office to the Jefferson Building on the north wall of the existing building underground as shown in Figure There is also 50 pair 24 AWG copper running through the same conduit from the Jefferson Building back to 136. This copper is then extended from 136 up to 224 for connection to the telephone system. The following photo shows the existing termination of the copper in 136 and the fiber and copper termination in the Jefferson Building. 34 Copper Termination in 136 Fiber and Copper Termination in Jefferson Building

4 4.1 The existing fiber and copper runs from the Jefferson Building must be maintained until new runs are completed, terminated and migration of services has been completed. Contractor must work with Nelson County Information Technology to coordinate transition of services from the existing connections to the new connections. 4.2 A new 3 PVC conduit should be installed to handle the new fiber and copper run from the Jefferson Building through Room 002 with final termination in First Floor Data Closet 136. The following diagram, Figure 3.3 4, reflects the recommend path for the new conduit. It is also recommended that two flush mounted, secure, 24 pull boxes be implemented to support routing. Figure 3.3 4: New Conduit to Jefferson Building 4.3 A 3 sleeve should be implemented through the basement wall into room A new contiguous 12 Strand multimode OM2 62.5/125 fiber run, Run #5 as shown below, should be implemented in a new fiber patch panel in the Jefferson Building and First Floor Data Closet 136. This fiber run should utilize the new conduit as noted in 4.2 above. This fiber run should be terminated in the fiber patch panel in First Floor Data Closet 136.

5 4.5 A new 12 Strand multimode OM2 62.5/125 fiber run, Run #2 as shown below, should be implemented between First Floor Data Closet Room 136 and terminated in the Second Floor Data Closet 224 fiber termination panel. 4.6 A new run of 50 pair 24 awg copper, Run #6, should be implemented to interconnect the Jefferson Building to the County s telephone system located in Second Floor Data Closet 224. This should be a contiguous run terminated in a new 110 style punch down block in the Jefferson Building and should run through the new conduit as noted in 4.2 above and should terminate in a new 110 style punch down block in First Floor Data Closet 136. Existing copper will then be utilized to complete the connections between 136 and 224. Figure 3.3 2: Network Interconnect Additions 36

6 Figure 3.3 3: Fiber Routing 3.4. Network Interconnect Design and Specification This section of the document sets forth the logical network design and specification reflecting the network switches and other equipment which will be implemented. 1. Server Room 225: 1 network switch will be installed in the 2 post telecommunication rack to support network connections on the second floor. This switch will be Cisco 2960X 48FPD L which have 48 10/100/1000 ports and 2 SFP+ uplinks, all PoE capable to position the County to implement devices such as wireless access points or VoIP telephones. This switch should be connected via Cisco FlexStack Plus (C2960X STACK) modules and FlexStack cables (CAB STK E 0.5M). This switch will be connected to the existing County network via an OM3 multimode fiber run between room 225 and room Cisco 2960X 48FPD L Switch 1 Cisco SFP (mini GBIC) transceiver module 1 Gbps with LC/PC Multi Mode 2. First Floor Data Closet 136: 1 network switch will be installed in the 2 post telecommunication rack to support network connections on the second floor. This switch will be Cisco 2960X 48FPD L which have 48 10/100/1000 ports and 2 SFP+

Request for Quote E-Rate Eligible Services Scope of Work - Internal Connections: Network Infrastructure Equipment and Cabling

Request for Quote E-Rate Eligible Services Scope of Work - Internal Connections: Network Infrastructure Equipment and Cabling Request for Quote E-Rate Eligible Services Scope of Work - Internal Connections: Network Infrastructure Equipment and Cabling Due Date: Allowable Contract Date from Posted 470 The Saddle Mountain Unified

More information

ADDENDUM #1 RFQ # 11-11 KPOB CABLE TERMINATION SERVICES

ADDENDUM #1 RFQ # 11-11 KPOB CABLE TERMINATION SERVICES Date Prepared: February 15, 2011 ADDENDUM #1 RFQ # 11-11 KPOB CABLE TERMINATION SERVICES Community Transit 7100 Hardeson Road Everett, WA 98203 THIS SIGNED ADDENDUM BECOMES PART OF THE CONTRACT DOCUMENTS

More information

2015 Piqua City Schools RFP for Network Equipment under E-Rate Category 2

2015 Piqua City Schools RFP for Network Equipment under E-Rate Category 2 2015 Piqua City Schools RFP for Network Equipment under E-Rate Category 2 Section 1: Responses and contact information 1.0 RFP responses to: If by E:mail: Richard Kevern, E-Rate Connection: richardkevern@e-rateconnection.com

More information

Network Design. Yiannos Mylonas

Network Design. Yiannos Mylonas Network Design Yiannos Mylonas Physical Topologies There are two parts to the topology definition: the physical topology, which is the actual layout of the wire (media), and the logical topology, which

More information

Security & Surveillance Cabling Systems

Security & Surveillance Cabling Systems Security & Surveillance Cabling Systems Security and Surveillance Cabling Systems The video security industry is growing and ever-changing, offering a wealth of opportunity for today s security professionals.

More information

i. Each building s network connections are routed through Cisco Small Business Switch SG 200-18 or 36.

i. Each building s network connections are routed through Cisco Small Business Switch SG 200-18 or 36. 1501 E. Valencia Road, Fort Mohave, AZ 86426 Office: 928-704-1100 Fax: 928-704-1177 Request for Proposals Wi-Fi Internet Connections, Wireless Network Security and Maintenance Funding Year: 7/1/2015-6/30/2016

More information

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Fiber Optic and Data Cabling Project Shelby Township Police Building

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Fiber Optic and Data Cabling Project Shelby Township Police Building CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL The Charter Township of Shelby is soliciting proposals to install fiber optic and data cabling to serve a new Police Building that is under construction

More information

Addendum SOLICITATION NAME ADDENDUM NUMBER. VOIP Telephone System C12018 2 DATE 05-15-12

Addendum SOLICITATION NAME ADDENDUM NUMBER. VOIP Telephone System C12018 2 DATE 05-15-12 Addendum SOLICITATION NAME VOIP Telephone System C12018 ADDENDUM NUMBER 2 DATE 05-15-12 KCDC is providing this addendum to answer questions that have been raised about this solicitation. To aid in readability,

More information

Seward County Community College

Seward County Community College Seward County Community College REQUEST FOR PROPOSALS Telephone System Replacement Response to Vendors Questions Issued: January 5, 2006 1. Please clarify counts, which includes detail on receptionist

More information

Top of Rack: An Analysis of a Cabling Architecture in the Data Center

Top of Rack: An Analysis of a Cabling Architecture in the Data Center SYSTIMAX Solutions Top of Rack: An Analysis of a Cabling Architecture in the Data Center White paper Matthew Baldassano, Data Center Business Unit CommScope, Inc, June 2010 www.commscope.com Contents I.

More information

InstaPATCH Cu Cabling Solutions for Data Centers

InstaPATCH Cu Cabling Solutions for Data Centers SYSTIMAX Solutions InstaPATCH Cu Cabling Solutions for Data Centers Design Guidelines August 2008 www.commscope.com Contents Overview 1 Instapatch Cu Solution Specification 2 Harness Assembly Design 3

More information

Request for Proposal (RFP) IP Cameras/Door Access Control

Request for Proposal (RFP) IP Cameras/Door Access Control WAHPETON PUBLIC SCHOOLS Information Technology Department Request for Proposal (RFP) IP Cameras/Door Access Control Inquiries and requests regarding this RFP should be directed to: Jason Pfahl, Director

More information

Request for Proposal- Network Switches and Professional Services

Request for Proposal- Network Switches and Professional Services Request for Proposal- Network Switches and Bids may be faxed, emailed, or mailed. It is the vendor s responsibility to make sure that the proposal is received. All bids must be received no later than 2:00

More information

RFP No. DPS FY15 UC. ANSWER: Yes, we are seeking Priority 1 Cloud Based solutions.

RFP No. DPS FY15 UC. ANSWER: Yes, we are seeking Priority 1 Cloud Based solutions. RFP No. DPS FY15 UC 1. The RFP states that the agreement will be effective for up to 36 months. Are you willing to have 2 additional 1 year extensions if everyone agrees? ANSWER: Yes, each annual extension

More information

Data Center Optimization: Component Choice. Innovative Design. Enabling Infrastructure

Data Center Optimization: Component Choice. Innovative Design. Enabling Infrastructure Data Center Optimization: Component Choice and Innovative Design Combine to Allow the Creation of an Enabling Infrastructure Data Center Spaces Data Center Spaces as Defined by the TIA 942 Standard Source:

More information

ECONOMICS OF DATA CENTER OPTICS SPIE PHOTONICS WEST INVITED PAPER (9775-2) FEBRUARY 16, 2016

ECONOMICS OF DATA CENTER OPTICS SPIE PHOTONICS WEST INVITED PAPER (9775-2) FEBRUARY 16, 2016 ECONOMICS OF DATA CENTER OPTICS SPIE PHOTONICS WEST INVITED PAPER (9775-2) FEBRUARY 16, 2016 Lisa Huff, CDCM Principal Analyst, Discerning Analytics lisa.huff@discerninganalytics.com AGENDA Discerning

More information

ADDENDUM NO. 4 DATE: January 13, 2015

ADDENDUM NO. 4 DATE: January 13, 2015 FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4568 Fax: (850) 414-4951 ADDENDUM NO. 4 DATE: January 13, 2015 BID#:

More information

Wired and Wireless Network Request for Proposal New Washington County High School Facility

Wired and Wireless Network Request for Proposal New Washington County High School Facility Washington County Board Of Education P.O. Box 716 501 Industrial Drive Sandersville, GA 31082 (478) 552-3981 FAX (478) 552-3128 Description Wired and Wireless Network Request for Proposal New Washington

More information

Beaver Dam Unified School District Request for Proposal Video Surveillance and Door Access Control Systems

Beaver Dam Unified School District Request for Proposal Video Surveillance and Door Access Control Systems Beaver Dam Unified School District Request for Proposal Video Surveillance and Door Access Control Systems The Beaver Dam Unified School District (BDUSD) is requesting proposals from qualified companies

More information

DeltaV Smart Switches Displace Cisco Switches

DeltaV Smart Switches Displace Cisco Switches June 2009 Page 1 This whitepaper announces the status change of the Cisco switches sold for use within the DeltaV network. The DeltaV Smart Switch displaces Cisco Switches as the Ethernet switch used in

More information

Le Sueur County, MN Tuesday, June 2, 2015 Board Meeting

Le Sueur County, MN Tuesday, June 2, 2015 Board Meeting Le Sueur County, MN Tuesday, June, 0 oard Meeting Item 7 0:00 am Scott Gerr, MIS (0 min) RE: Courthouse infrastructure upgrade Staff Contact: Le Sueur County oard Meeting - //0 Page / 7 County Courthouse

More information

DALLAS INDEPENDENT SCHOOL DISTRICT PURCHASING DEPARTMENT ADDENDUM No. 2 NETWORK ELECTRONICS

DALLAS INDEPENDENT SCHOOL DISTRICT PURCHASING DEPARTMENT ADDENDUM No. 2 NETWORK ELECTRONICS DALLAS INDEPENDENT SCHOOL DISTRICT PURCHASING DEPARTMENT ADDENDUM No. 2 REQUEST FOR PROPOSAL NO. BID #TF- 203970 NETWORK ELECTRONICS Amendment to RFP #TF-203970 NETWORK ELECTRONICS The purpose of Addendum

More information

Upgrading Path to High Speed Fiber Optic Networks

Upgrading Path to High Speed Fiber Optic Networks SYSTIMAX Solutions Upgrading Path to High Speed Fiber Optic Networks White Paper April, 2008 www.commscope.com Contents Connectivity Method A 4 Upgrading Method A to Parallel Optics 4 Connectivity Method

More information

Structured and Point to Point Network Cabling for Industrial Automation

Structured and Point to Point Network Cabling for Industrial Automation Structured and Point to Point Network Cabling for Industrial Automation Introduction Industrial automation systems are undergoing dramatic transformations that require businesses to adopt new strategies

More information

Quick Installation Guide 24-port PoE switch with 2 copper Gigabit ports and 2 Gigabit SFP ports (af Version 15.4W)

Quick Installation Guide 24-port PoE switch with 2 copper Gigabit ports and 2 Gigabit SFP ports (af Version 15.4W) Quick Installation Guide 24-port PoE switch with 2 copper Gigabit ports and 2 Gigabit SFP ports (af Version 15.4W) Table of Contents Introduction.. Power Over Ethernet (PoE) & Features.... Unpacking and

More information

Telecommunications Systems Narrative Page 1 The Engineering Enterprise

Telecommunications Systems Narrative Page 1 The Engineering Enterprise I. TELECOMMUNICATIONS GENERAL REQUIREMENTS A. The project consists of a renovation to the historic Clinical Sciences building, originally built in 1933. The existing building has a total area of 105,000

More information

ADDENDUM No. #3. No Event Date* Deadline to Submit Questions 2/10//2016 10:00 AM. Deadline to City Responses to Questions 2/16/2016 10:00 AM

ADDENDUM No. #3. No Event Date* Deadline to Submit Questions 2/10//2016 10:00 AM. Deadline to City Responses to Questions 2/16/2016 10:00 AM ADDENDUM No. #3 Project Name: RFP NO. High Definition Security Cameras for the City s Gibson Bethel Community Center PR2016-02 Date: February, 3, 2016 Sent: Fax/E-mail/webpage This addendum submission

More information

21 st Century Campus Network Responsibility Matrix 5/26/10

21 st Century Campus Network Responsibility Matrix 5/26/10 Definitions: DoIT Standards This column details the minimal configuration, which DoIT has defined in order to provide a campus-wide standard level of service. Departments may request services, which exceeds

More information

ATTACHMENT F 050R6800016 - CABLE AND WIRING SERVICES FUNCTIONAL AREA I PRICE PROPOSAL FORM Amendment 6

ATTACHMENT F 050R6800016 - CABLE AND WIRING SERVICES FUNCTIONAL AREA I PRICE PROPOSAL FORM Amendment 6 050R6800016 CABLE AND WIRING SERVICES (Column A) (Column B) (Column C) (Column D) (Column E) (Column F) (Column G) (B+C+D+E)*F= G Item Description PER 100' RUN PER 150' RUN PER 200' RUN PER 300' RUN QUANTITY

More information

HIGHSPEED ETHERNET THE NEED FOR SPEED. Jim Duran, Product Manager - Americas WHITE PAPER. Molex Premise Networks

HIGHSPEED ETHERNET THE NEED FOR SPEED. Jim Duran, Product Manager - Americas WHITE PAPER. Molex Premise Networks HIGHSPEED ETHERNET THE NEED FOR SPEED Jim Duran, Product Manager - Americas WHITE PAPER Molex Premise Networks EXECUTIVE SUMMARY Over the years structured cabling systems have evolved significantly. This

More information

Structured Cabling Statement of Work

Structured Cabling Statement of Work Structured Cabling Statement of Work Multiple Locations June 15, 2010 Page 1 A. GENERAL a. San Joaquin County (referred to as Owner ) is requesting proposals for a new structured cabling infrastructure

More information

Further information can be found at the USAC Website www.universalservice.org.

Further information can be found at the USAC Website www.universalservice.org. Southeast Dubois County School Corporation REQUEST FOR PROPOSAL (RFP) Issue Date: 1/15/15 Network Infrastructure Upgrade The purpose of this Request for Proposal (RFP) is to solicit sealed proposals to

More information

Dallas County R-1 School District 309 W. Commercial Buffalo, MO 65622

Dallas County R-1 School District 309 W. Commercial Buffalo, MO 65622 Dallas County R-1 School District 309 W. Commercial Buffalo, MO 65622 Network Infrastructure Upgrade RFP Erate Category Two February 5, 2015 Dallas County R-1 School District is seeking bids to upgrade

More information

Request for Proposals 2014-2015 E-Rate Wireless Project Bolivar High School Bolivar R-1 School District

Request for Proposals 2014-2015 E-Rate Wireless Project Bolivar High School Bolivar R-1 School District Request for Proposals 2014-2015 E-Rate Wireless Project Bolivar High School Bolivar R-1 School District Notice to Bidders Notice is hereby given to interested bidders that the Bolivar R-1 School District

More information

Technology Solution Guide. Deploying Omnitron PoE Media Converters with Aruba Access Points and AirMesh Routers

Technology Solution Guide. Deploying Omnitron PoE Media Converters with Aruba Access Points and AirMesh Routers Technology Solution Guide Deploying Omnitron PoE Media Converters with Aruba Access Points and AirMesh Routers WARRANTY DISCLAIMER THE FOLLOWING DOCUMENT, AND THE INFORMATION CONTAINED HEREIN IS PROVIDED

More information

Village of Oak Park Village-Wide Telecommunications System Selection Project Addendum #1 Vendor Questions and Answers February 18, 2014

Village of Oak Park Village-Wide Telecommunications System Selection Project Addendum #1 Vendor Questions and Answers February 18, 2014 Village of Oak Park Village-Wide Telecommunications System Selection Project Addendum #1 Vendor Questions and Answers February 18, 2014 Following are Questions and Answers discussed during the pre-proposal

More information

1. Furnish and install faceplate and modular jacks at each single gang outlet as described below:

1. Furnish and install faceplate and modular jacks at each single gang outlet as described below: Washington University in St. Louis Building: Communication Specification: Research Voice/Network/Typical 1. Furnish and install faceplate and modular jacks at each single gang outlet as described below:

More information

Optimizing Infrastructure Support For Storage Area Networks

Optimizing Infrastructure Support For Storage Area Networks Optimizing Infrastructure Support For Storage Area Networks December 2008 Optimizing infrastructure support for Storage Area Networks Mission critical IT systems increasingly rely on the ability to handle

More information

SECTION 27 13 24 COMMUNICATIONS OPTICAL FIBER OSP CABLING

SECTION 27 13 24 COMMUNICATIONS OPTICAL FIBER OSP CABLING SECTION 27 13 24 COMMUNICATIONS OPTICAL FIBER OSP CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete

More information

AMP NETCONNECT Data Center Cabling Solutions

AMP NETCONNECT Data Center Cabling Solutions AMP NETCONNECT Data Center Cabling Solutions Modern business and administrative environments require today more and more sophisticated IT services, what leads to an increasing demand for data provision

More information

Data and Voice Network Infrastructure

Data and Voice Network Infrastructure Data and Voice Network Infrastructure Denis Levesque Mike Milne Sponsored By Data and Voice Network Infrastructure Page 1 Copyright APPA 2015 Published by APPA: APPA is the association of choice serving

More information

CAT 6 UTP Network Drops

CAT 6 UTP Network Drops Data Wiring of Campuses (Network and Access Points Wiring) District Identifier: 319- ND & AP Wiring Posting Date: 12-16-2015 Background The Calcasieu Parish School Board (CPSB) is requesting proposals

More information

Supermicro Standalone Switch Products

Supermicro Standalone Switch Products Supermicro Standalone Switch Products SuperBlade GPU Solutions Storage Universal I/O Double-Sided Twin Architecture Datacenter Optimized SSE-G24-TG4 and SSE-G48-TG4 Can be used as: Top-of-rack aggregation

More information

The ABC of Direct Attach Cables

The ABC of Direct Attach Cables The ABC of Direct Attach Cables Thomas Ko, RCDD Product Manager TE Connectivity Network Speed and Technology 10/40/100 Gbps the transition is occurring right now What are Customers Saying about their 10/40/100

More information

Virtual Stacking. White Paper

Virtual Stacking. White Paper White Paper Virtual Stacking November 2012 This document describes the benefits of Meraki s Virtual Stacking technology and how you can use it to manage a distributed network. In addition, this document

More information

The Optical Fiber Ribbon Solution for the 10G to 40/100G Migration

The Optical Fiber Ribbon Solution for the 10G to 40/100G Migration The Optical Fiber Ribbon Solution for the 10G to 40/100G Migration Bill Charuk, SR Product Manager, Data Center Solutions Introduction With the advent of data centers in communication infrastructure, various

More information

Whitepaper. 10 Things to Know Before Deploying 10 Gigabit Ethernet

Whitepaper. 10 Things to Know Before Deploying 10 Gigabit Ethernet Whitepaper 10 Things to Know Before Deploying 10 Gigabit Ethernet Table of Contents Introduction... 3 10 Gigabit Ethernet and The Server Edge: Better Efficiency... 3 SAN versus Fibre Channel: Simpler and

More information

IS Network Services Senior Facilities Management Group 2 Hill Farms West Division of State Facilities

IS Network Services Senior Facilities Management Group 2 Hill Farms West Division of State Facilities POSITION SUMMARY Under the general supervision of the DOA/DSF and the DSF Telecom Supervisor, this position works closely with other Agency Telecom Services, Voice Services, Network Services, and Wide

More information

Your Network. Our Connection. 10 Gigabit Ethernet

Your Network. Our Connection. 10 Gigabit Ethernet Your Network. Our Connection. 10 Gigabit Ethernet t Agenda Why 10G? Applicable 10GbE Standards Distance Restrictions Copper Fiber Fiber Repeaters 3R s Fiber Module Types Form Factors of 10G modules Future

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO. SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO. 1 PROJECT: Paul Revere School DATE: March 25, 2015 Modernization

More information

BUSINESS DEPARTMENT Financial Services Technology and Information Services Branch

BUSINESS DEPARTMENT Financial Services Technology and Information Services Branch BUSINESS DEPARTMENT Financial Services Technology and Information Services Branch November 1, 2007 (Updated November 9, 2007) Long Beach Unified School District Billed Entity 143528 Erate Funding Year

More information

MOUNTAIN EMPIRE UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSAL

MOUNTAIN EMPIRE UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSAL MOUNTAIN EMPIRE UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSAL VOIP Communication System E-Rate Funding Year 2016 RFP No. 1004 Submittals due on or before: 3PM on January 15th, 2016 ATTN: Rob Foraker Information

More information

Request for Proposal

Request for Proposal January 30, 2015 Form 470 Application#: 559990001327506 BREITUNG TOWNSHIP SCHOOL DISTRICT 2000 Pyle Drive Kingsford, MI 49802 906-779-2650 WIFI in Classrooms Project NOTICE OF BIDDERS The Breitung Township

More information

TCTC Cabling Specifications

TCTC Cabling Specifications TCTC Cabling Specifications Purpose: To provide a standard specification that will be used for all Tri County Technical College (TCTC) facilities requiring structured cabling installation. Product specifications,

More information

Annex D TEST PLAN. Page 1 of 11

Annex D TEST PLAN. Page 1 of 11 Annex D TEST PLAN Page 1 of 11 1. CONTEXT Purpose The purpose of this document is to outline the test scenarios required to support the DND Carling Campus Local Area Network. Government of Canada (GoC)

More information

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents and Prior Addenda if any, as identified above.

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents and Prior Addenda if any, as identified above. To: All Vendors Bidding on The College of New Jersey Security Cameras Phase III From: Roselle Horodeski Finance and Business Services Date: April 10, 2015 ADDENDUM NO. 1 ISSUE DATE: April 10, 2015 REFERENCE:

More information

INTERIM MARKET DOCUMENT CHANGE

INTERIM MARKET DOCUMENT CHANGE INTERIM MARKET DOCUMENT CHANGE Title: MPLS and Alternative Communications for Medium Performance Facilities File #: IESO_IMDC_0169 Version #: 0.2 Part 1 General Information Document Affected: Market Manual

More information

DESIGN GUIDELINES. Local Area Network

DESIGN GUIDELINES. Local Area Network DESIGN GUIDELINES Local Area Network The total oversight and management responsibilities for information assurance (IA) and protection of DoDEA s critical infrastructure fall under the purview of the DoDEA

More information

Due Time: 2:00 p.m. Power & Telephone Supply Company Commski, LLC

Due Time: 2:00 p.m. Power & Telephone Supply Company Commski, LLC COUNTY OF HENRICO BID TABULATION IFB # 13-9451-7YD Bid #13-9451-7YD UPS Back-UP Systems and Due Date: August 6, 2013 Fiber Optic Cabling Due Time: 2:00 p.m. BIDDERS Power & Telephone Supply Company Commski,

More information

10 Gigabit Aggregation and Next-Gen Edge 96-Port Managed Switch Starter Kits

10 Gigabit Aggregation and Next-Gen Edge 96-Port Managed Switch Starter Kits 10 Gigabit Aggregation and Next-Gen Edge 96-Port Managed Switch Starter Kits XSM96PSKT XSM96GSKT (See details page 2) Promotion valid until 30th June 2012 Managed infrastructure Mid-sized businesses, hospitals

More information

ADDENDUM #1. Request for Proposals. COMMUNICATIONS SYSTEM UPGRADE Proposal # 12-IS-001. Kenneth J. Schmidt

ADDENDUM #1. Request for Proposals. COMMUNICATIONS SYSTEM UPGRADE Proposal # 12-IS-001. Kenneth J. Schmidt Racine County Purchasing Racine County Courthouse Kenneth J. Schmidt 730 Wisconsin Avenue Purchasing Coordinator Racine, WI 53403-1274 Phone (262) 636-3706 Fax (262) 636-3700 ADDENDUM #1 Request for Proposals

More information

CABLING REQUIREMENTS:

CABLING REQUIREMENTS: CABLING REQUIREMENTS: All cabling (copper and fiber) should be Belden or be of equivalent specifications. All cabling (copper and fiber) should be installed to meet or exceed manufacturer s warranty requirements.

More information

Specifying an IT Cabling System

Specifying an IT Cabling System Specifying an IT Cabling System This guide will help you produce a specification for an IT cabling system that meets your organisation s needs and gives you value for money. You will be able to give your

More information

IT Services stakeholder roles & responsibilities in Capital Projects

IT Services stakeholder roles & responsibilities in Capital Projects IT Services/Facilities Management Directorate IT Services stakeholder roles & responsibilities in Capital Projects University of Reading 2011 Page 1 of 10 Document Approval Originator Approved for Issue

More information

REQUEST FOR PROPOSALS FOR INTERNAL CONNECTIONS. INCLUDING EQUIPMENT and. VoIP TELEPHONE SYSTEM FOR THE ALTERNATE HIGH SCHOOL BUILDING

REQUEST FOR PROPOSALS FOR INTERNAL CONNECTIONS. INCLUDING EQUIPMENT and. VoIP TELEPHONE SYSTEM FOR THE ALTERNATE HIGH SCHOOL BUILDING REQUEST FOR PROPOSALS FOR INTERNAL CONNECTIONS INCLUDING EQUIPMENT and VoIP TELEPHONE SYSTEM FOR THE ALTERNATE HIGH SCHOOL BUILDING BLOOM TOWNSHIP HIGH SCHOOL DISTRICT 206, CHICAGO HEIGHTS, ILLINOIS Bloom

More information

Project Scope Statement

Project Scope Statement Project Scope Statement Project Name: Going Digital Department: Information Technology Department/Operations Department Project Manager: Colby Clark, Director of Information Technology Date: January 17,

More information

http://www.usac.org/sl/applicants/beforeyoubegin/eligible-services/priority-one.aspx

http://www.usac.org/sl/applicants/beforeyoubegin/eligible-services/priority-one.aspx Coronado Unified School District RFP# 2012-02 Addendum - Wide Area Network Lease Contractor shall indicate on Carrier Proposal Form that Addendum #1 issued on November 10, 2012 and Addendum #2 issued on

More information

AMP NETCONNECT CABLING SYSTEMS FOR DATA CENTERS & STORAGE AREA NETWORKS (SANS) High-density, High Speed Optical Fiber and Copper Solutions

AMP NETCONNECT CABLING SYSTEMS FOR DATA CENTERS & STORAGE AREA NETWORKS (SANS) High-density, High Speed Optical Fiber and Copper Solutions AMP NETCONNECT CABLING SYSTEMS FOR DATA CENTERS & STORAGE AREA NETWORKS (SANS) High-density, High Speed Optical Fiber and Copper Solutions TABLE OF CONTENTS TABLE OF CONTENTS... 2 INTRODUCTION... 3 CABLING

More information

FiberLAN Optical LAN Solution

FiberLAN Optical LAN Solution FiberLAN Optical LAN Solution Bandwidth Changes Everything! LEARN MORE Experience the Network of the Future... Today FiberLAN FiberLAN is the most cost effective, efficient and environmentally friendly

More information

1.1 SYSTEM DESCRIPTION.1 Data system includes data outlets and wiring for office and school applications.

1.1 SYSTEM DESCRIPTION.1 Data system includes data outlets and wiring for office and school applications. Issued 2005/06/01 Section 16743 Data System Page 1 of 7 PART 1 GENERAL 1.1 SYSTEM DESCRIPTION.1 Data system includes data outlets and wiring for office and school applications..2 Data system equipment

More information

1 Campus Cabling Systems Introduction

1 Campus Cabling Systems Introduction 1 Campus Cabling Systems Introduction This document represents the campus cable and infrastructure standards adopted and supported by the XXXX. All new construction and renovation should conform to these

More information

Your single source for network transmission solutions.

Your single source for network transmission solutions. Transmission Network Solutions Safety Security Certainty Your single source for network transmission solutions. Robust performance and complete flexibility to meet all your current and future transmission

More information

Chapter 4 Connecting to the Internet through an ISP

Chapter 4 Connecting to the Internet through an ISP Chapter 4 Connecting to the Internet through an ISP 1. According to Cisco what two things are essential to gaining access to the internet? a. ISPs are essential to gaining access to the Internet. b. No

More information

The Mashpee satellite office is connected to the Mashpee main office by a wireless point to point connection.

The Mashpee satellite office is connected to the Mashpee main office by a wireless point to point connection. Community Health Center of Cape Cod (CHC) would like to invite you to bid on the telephone system for their offices in Mashpee, Bourne, and Falmouth. All interested bidders will find a copy of the request

More information

Meraki Stacking. White Paper

Meraki Stacking. White Paper White Paper Meraki Stacking OCTOBER 2015 This document describes the benefits of Meraki Stacking technology and how it can be used to manage a distributed network. In addition, this document will cover

More information

1.3. The network element must have the ability to be configured in a point to point, point to multi point, and daisy chain configuration.

1.3. The network element must have the ability to be configured in a point to point, point to multi point, and daisy chain configuration. DESCRIPTION This work shall consist of furnishing and installing 10/100 Ethernet over Twisted Pair (TWP) Copper Modems in accordance with the contract documents and as directed by the Engineer. MATERIALS

More information

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Voice over IP System

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Voice over IP System CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL Voice over IP System The Charter Township of Shelby is soliciting proposals to install a complete Voice over IP telephone system, including call control

More information

Transformation of the Enterprise Network Using Passive Optical LAN

Transformation of the Enterprise Network Using Passive Optical LAN WHITE PAPER Transformation of the Enterprise Network Using Passive Optical LAN Passive Optical LAN Study Completed by Network Strategy Partners, LLC Contents Executive Summary... 3 Introduction... 4 Modeling

More information

BILOXI PUBLIC SCHOOL DISTRICT. Ethernet Switches

BILOXI PUBLIC SCHOOL DISTRICT. Ethernet Switches BILOXI PUBLIC SCHOOL DISTRICT Ethernet Switches Request for Proposals E-Rate 2015-2016 - Internal Connections Submit Proposals To: Purchasing Department Attn: Kassie Bourque 160 St. Peter Street or Bids@biloxischools.net

More information

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS SECOND ADDENDUM TO RFP DOCUMENTS REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS 11/9/2015 To All Potential Bidders: This

More information

WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2014/2015

WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2014/2015 WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2014/2015 Platform Architecture Standards: End User Software Platform Architecture Standards: End User Hardware Platform Architecture Standards: Hand Held

More information

FITNESS FACILITY WIRING SPECIFICATIONS. NETPULSE Inc. 2331 3rd Street San Francisco, CA 94107 Phone: 415.643.0223

FITNESS FACILITY WIRING SPECIFICATIONS. NETPULSE Inc. 2331 3rd Street San Francisco, CA 94107 Phone: 415.643.0223 FITNESS FACILITY WIRING SPECIFICATIONS NETPULSE Inc. 2331 3rd Street San Francisco, CA 94107 Phone: 415.643.0223 CONTENTS: - Scope of work Summary - Equipment list - Technical specifications - Map of data

More information

PERFORM BEYOND EXPECTATIONS. THE PREMIER SHOWCASE FOR EMERGING APPLICATIONS

PERFORM BEYOND EXPECTATIONS. THE PREMIER SHOWCASE FOR EMERGING APPLICATIONS PERFORM BEYOND EXPECTATIONS. THE PREMIER SHOWCASE FOR EMERGING APPLICATIONS THE TEK CENTER At Berk-Tek, we know that selecting the right network infrastructure is a critically important decision. In this

More information

Building Telecommunications Infrastructure Requirements

Building Telecommunications Infrastructure Requirements Building Telecommunications Infrastructure Requirements This page identifies specific requirements for the design of telecommunications infrastructure for buildings at Clemson University. (Revised October,

More information

Structured Cabling Network Services & Equipment Inside/Outside Plant Design Trenching

Structured Cabling Network Services & Equipment Inside/Outside Plant Design Trenching Structured Cabling Network Services & Equipment Inside/Outside Plant Design Trenching 502 Buffalo Rd., Ft. Pierre, SD 57532 (605) 224-1111 or (800) 747-6427 www.windcircle.net sales@windcircle.net Computers

More information

Managing High-Density Fiber in the Data Center: Three Real-World Case Studies

Managing High-Density Fiber in the Data Center: Three Real-World Case Studies Managing High-Density Fiber in the Data Center: Three Real-World Case Studies CHALLENGE In today s data center, fiber optic links have become more vital than ever for transmitting data to and from a large

More information

Data Centers. Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions

Data Centers. Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions Data Centers Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions 1 Introduction The growing speed and footprint of data centers is challenging

More information

Reliable, Consistent, Quality

Reliable, Consistent, Quality Reliable, Consistent, Quality 1-877-320-3143 www.fibertronics.com Reliable, Consistent, Quality Welcome To Fibertronics Inc. Reliability, consistency, and quality is what we put behind every Fiber optic

More information

Profitably Get High Speed, Reliable CE 2.0 Services Out to Small and Medium Business Using EFM over Copper

Profitably Get High Speed, Reliable CE 2.0 Services Out to Small and Medium Business Using EFM over Copper Profitably Get High Speed, Reliable CE 2.0 Services Out to Small and Medium Business Using EFM over Copper The Small and Medium Business (SMB) Ethernet services market is creating huge access, value added

More information

DIVISION 27 COMMUNICATIONS. A. System design shall be completed by a Registered Communications Distribution Designer (RCDD).

DIVISION 27 COMMUNICATIONS. A. System design shall be completed by a Registered Communications Distribution Designer (RCDD). DIVISION 27 COMMUNICATIONS 27 00 00 COMMUNICATIONS A. System design shall be completed by a Registered Communications Distribution Designer (RCDD). B. Comply with American National Standards Institute

More information

NOTICE TO BIDDERS ADDENDUM #1 AB2009-43

NOTICE TO BIDDERS ADDENDUM #1 AB2009-43 NOTICE TO BIDDERS ADDENDUM #1 AB2009-43 SPECIFICATIONS FOR CONVERGED NETWORK WITH SIP TRUNKING AND MANAGED CISCO UNIFIED COMMUNICATIONS PLATFORM FOR PERIOD OF WITH THE OPTION TO EXTEND TWO YEARS AB2009-43

More information

PRICE PROPOSAL Freedom Wireless Broadband Distributed T1 Service

PRICE PROPOSAL Freedom Wireless Broadband Distributed T1 Service PRICE PROPOSAL Freedom Wireless Broadband Distributed T1 Service Prepared For: Prepared By: The Client Bruce Hall 1429 Xxxxxx St. CTO Freedom Wireless Broadband Baltimore, MD 21231 (410) 259-3901 bruce@freedomwirelessbroadband.net

More information

SECTION 13850 (28 31 00) FIRE DETECTION AND ALARM SYSTEM

SECTION 13850 (28 31 00) FIRE DETECTION AND ALARM SYSTEM SECTION 13850 (28 31 00) FIRE DETECTION AND ALARM SYSTEM ENGINEERING SPECIFICATION INTELLIGENT REPORTING FIRE DETECTION SYSTEM PART 1 GENERAL 1.1 DESCRIPTION A. This specification includes the furnishing,

More information

REQUEST FOR PROPOSALS ADDENDUM #1

REQUEST FOR PROPOSALS ADDENDUM #1 REQUEST FOR PROPOSALS ADDENDUM #1 Arlington Public Schools Purchasing Office October 15, 2015 ADDENDUM #1 Questions & Answers- Attachment A Location of NOC Attachment B Pre-proposal conference attendees

More information

FIBER OPTIC CABLE PLANT DOCUMENTATION

FIBER OPTIC CABLE PLANT DOCUMENTATION C H A P T E R 13 FIBER OPTIC CABLE PLANT DOCUMENTATION JIM HAYES Documenting the fiber optic cable plant is a necessary part of the design and installation process for the fiber optic network. Documenting

More information

Intelligent Cable Management Systems

Intelligent Cable Management Systems Intelligent Cable Management Systems Bringing Practical Application Karen Pearson - Leviton Why Cable Management Matters Performance Cooling and air-handling Maintenance ANSI/TIA 569* Telecommunication

More information

Request for Proposals Voice over Internet Protocol Unified Communications System 10-2015/2016

Request for Proposals Voice over Internet Protocol Unified Communications System 10-2015/2016 Request for Proposals Voice over Internet Protocol Unified Communications System 10-2015/2016 Addendum #2, September 22, 2015 Is there an electronic drawing that shows the system? Attached. What is the

More information

Low Cost 100GbE Data Center Interconnect

Low Cost 100GbE Data Center Interconnect Low Cost 100GbE Data Center Interconnect Chris Bergey VP Marketing, Luxtera cbergey@luxtera.com February 2012 1 Low Cost 100GbE Data Center Interconnect Where does 100GbE come into the data center Challenges

More information

Automating Infrastructure A connectivity perspective for BICSI SEA meeting, November 2011

Automating Infrastructure A connectivity perspective for BICSI SEA meeting, November 2011 Automating Infrastructure A connectivity perspective for BICSI SEA meeting, November 2011 Opportunities in Automating Infrastructure Why Automation in Data Center? Tiers, compartments and complexity Work

More information

Cabling Requirements for the District of Columbia on behalf of the Criminal Justice Coordinating Council

Cabling Requirements for the District of Columbia on behalf of the Criminal Justice Coordinating Council Cabling Requirements for the District of Columbia on behalf of the Criminal Justice Coordinating Council Date: 6/19/2013 Version: 1.0 Prepared by: Gregory Cotten Department of General Services District

More information