Review of Transport Asset Management Plans For the Department for Transport

Size: px
Start display at page:

Download "Review of Transport Asset Management Plans For the Department for Transport"

Transcription

1 Review of Transport Asset Management Plans For the Department for Transport January 2008

2

3 Executive Summary Local Transport Plan guidance encourages local authorities to develop Transport Asset Management Plans (TAMPs) to guide management of their transport assets. In this respect, transport is following the example of other sectors such as water, property and rail, where production of asset management plans is widely recognised as best practice and has been in place for a number of years. There has been some concern about progress made with TAMPs, DfT requirements, guidance, and impact of the process on the service delivered. To further understand and address these concerns, the DfT, supported by CSS and TAG, commissioned a research project to determine progress made not only with the development but also implementation of TAMPs in England, outside London, and to identify examples of good practice. The project used a variety of tools to collect information, including a review of all final LTP2 submissions, a telephone survey of more than 100 local authorities, assessment of 16 TAMPs against current guidance, and in depth interviews with 7 authorities that have embraced asset management and adopted it as an approach guiding their day to day activities. One of the first findings of the work was that the requirements for development of TAMPs are unclear. There is confusion about what a TAMP should include, the difference between a TAMP and a Highway Asset Management Plan, the timeframe for production, and available advice. As a result, progress has been hesitant and inconsistent, with some authorities producing good quality TAMPs reflecting effective practices and realistic targets, and others not commencing the process, or being unambitious in their intended TAMP development. Our evidence shows that delays in the development of TAMPs are mainly due to lack of appropriate resources, uncertainty over requirements, and organisational issues. Smaller local authorities have generally made slower progress than larger ones. However, the vast majority of authorities work in regional groups, supporting each other and offering opportunities to share examples of good practice and move the asset management agenda forward. Local authorities would welcome additional support and guidance on the development of TAMPs. Many local authorities have a good understanding of some of the benefits of adopting an asset management approach, but have limited resources available to deliver the required changes. TAMPs are typically produced by the team responsible for highway maintenance and, in many cases, interaction with the teams responsible for developing and delivering the LTP programme is limited. This can result in TAMPs having weak links to the wider strategic objectives of the authority, potentially weak targets and poor demonstration of how an asset management approach can improve value for money in the use of resources. The research has shown that there are examples of good practice amongst local authorities and that there is evidence that adopting an asset management approach brings benefits to the organisation in delivering an improved service to their customers. Based on the findings of the research, recommendations are made on the additional guidance that is needed, the communications strategy and the future status of TAMPs.

4

5 Contents 1 Introduction Project Objective and Scope Background Project Steering Group and Project Team Report Outline 3 2 Research Methodology Overview Task 0: Project Initiation Meeting and Inception Report Task 1: Review of TAMP Progress Task 2: Review of Completed TAMPs Task 3: Review of TAMP Embedment Dissemination of research findings 11 3 Findings of Task Aims of Task Starting position with TAMPs End Position with TAMPs Current Position of TAMPs 15 4 Findings of Task Aims of Task Task 2 Authorities Task 2 Templates Examples of good practice 26 5 Findings of Task Aims of Task Task 3 Authorities Cornwall County Council Hertfordshire County Council Leeds City Council Liverpool City Council Portsmouth City Council Somerset County Council Tameside Borough Council 32 6 Discussion on Findings Task 1 Overall Progress with TAMPs Task 2 Examples of Good Practice Task 3 TAMP embedment The future for TAMPs 37 7 Summary of Conclusions Recommendations Guidance 44 i

6 8.2 Future status of TAMPs Communications strategy 44 References Acknowledgements Appendices Appendix A Articles and Presentation ii

7 1 Introduction In October 2006 The Department for Transport (DfT) commissioned Atkins to carry out a research project Review of Transport Asset Management Plans. This report explains the background of the project, details the work carried out, discusses the findings of the research and makes recommendations about the future of TAMPs in England. 1.1 Project Objective and Scope The objective of the project was to review the process and quality of TAMPs in order to provide the Department with assurance that TAMPs are being produced to a high quality. This will provide an opportunity for sharing of good practice and will encourage and assist authorities in developing their TAMPs in the future. In accordance with the project brief and the Atkins research proposal, the work was carried out under 4 separate tasks. Task 0: Inception report, aiming to set out the approach for delivering the project. Task 1: Review of TAMPs progress, aiming to ascertain the state of play among all English local authorities (outside London) in preparing and implementing their TAMPs. Task 2: Review of completed TAMPs, aiming to review a number of completed, published TAMPs in order to identify examples of good practice and provide an analysis of the extent to which TAMPs are meeting the original aims set for them. Task 3: Review of TAMP embedment, aiming to review the way in which a selection of authorities are using and embedding their TAMPs in the authority s work. One of the key issues of the research was to identify how the produced TAMPs linked to the second round of Local Transport Plans (LTP) submitted by local authorities in the Spring of Therefore, the scope of the project, as defined in the project brief, covered all local authorities in England, excluding London Boroughs, which did not submit LTPs. 1.2 Background The LTP2 Guidance [Ref. 1] strongly recommends that all highway authorities in England (outside London) should develop a Transport Asset Management Plan (TAMP). Unlike other new processes, such as Accessibility Planning and Strategic Environmental Assessment, there is no mandatory requirement for authorities to include their emerging TAMP in their second round of LTP. Asset management is a well established discipline that is practiced across a wide range of industries (including highways, railways, petro-chemical, water, aerospace, and nuclear). However, it has only been adopted recently by authorities in the UK, in particular since the publication of the CSS/TAG Framework [Ref. 2] and the aforementioned statement in the LTP2 guidance. The basis and principles of asset management are well documented and good sources of guidance are available, including: CSS/TAG Framework for Highway Asset Management [Ref. 2]; International Infrastructure Management Manual, UK Edition [Ref. 3]; PAS 55-1: Asset Management: Specification for the optimized management of physical infrastructure assets [Ref. 4]; Well-maintained Highways: Code of Practice for Highway Maintenance Management [Ref. 5]; Management of Highway Structures: A Code of Practice [Ref. 6]. 1

8 Authorities have been using the available guidance and the services of consultants, particularly in the last two years, to develop and implement their asset management practices and to develop their TAMPs. The activities this involves and the benefits it is considered to provide are well documented in the above guidance documents. Also, the LTP2 guidance identifies a number of areas where the development of a TAMP will benefit an authority, including: Providing detailed information on the assets enabling better definition of longer-term corporate need; Establishing and communicating a clear relationship between the programme of work/expenditure set out in the TAMP and the LTP targets and objectives; and Enabling value for money of local highway maintenance to be considered more effectively against other local transport spending. The LTP2 Guidance required authorities to report progress on their TAMP development in their LTP2 submission. As a result, it became apparent that there were a number of issues associated with the development of TAMPs, as described below: TAMP Progress it was recognised that progress on the development of TAMPs varied considerably, with some authorities producing their second or even third generation TAMPs while others had yet to make a meaningful start. TAMP Development it was generally accepted that the quality of TAMPs and the process used to develop them varied considerably, with some based on poor information and unable to demonstrate a link to supporting processes and systems, while others are using good quality data and were linked directly to and supported by robust and reliable processes and systems. TAMP Usage it was also recognised that the usage of TAMPs varied considerably, with some authorities treating it as a paper exercise to gain a tick in the box, while others were linking it to their LTP objectives and using it to challenge existing working practices, to make improvements to their way of working, and to determine and secure long-term budget requirements. TAMP Good practice - many authorities have requested further guidance on the development and usage of TAMPs, for example, the sharing of good practice. The DfT recognised that a number of these issues had the potential to undermine the credibility and value of TAMPs and give cause for concern. 1.3 Project Steering Group and Project Team The project was managed by the DfT and was overseen by a Steering Group with members from both the CSS and TAG. The members of the Steering Group were: Edward Bunting, Department for Transport Bob Barratt, Wolverhampton City Council Robert Biggs, Derbyshire County Council Paul Fearon, St Helens Council Anthony Radford Foley, Bracknell Forest Borough Council Nick Atkinson, Transport for London (watching brief). The members of the Atkins Project Team were: Alan Taggart, Project Director Lila Tachtsi, Project Manager 2

9 Dr Garry Sterritt, Consultant Jonathan Spear, Consultant Mike Bordiss, Consultant Bill Moss, Consultant. 1.4 Report Outline The report includes 8 sections, as described below: Section 1: Introduction includes the project objectives, project background, Steering Group and Project Team. Section 2: Methodology describes the approach adopted to meet the project objectives. Section 3: Task 1- details the work carried out under Task 1 and discusses the findings of the Task. Section 4: Task 2 - describes the work carried out under Task 2 and discusses the findings of the Task. Section 5: Task 3 describes the work carried out under Task 3 and discusses the findings of the Task. Section 6: Summary of Findings summarises the key findings of Tasks 1, 2 and 3. Section 7: Conclusions lists the conclusions of the work Section 8: Recommendations describes the recommendations on the future of TAMPs in England. 3

10 2 Research Methodology 2.1 Overview This Section describes the agreed methodology for delivering the research. The findings are presented in Sections 3, 4 and 5, and further discussed in Section 6 of this report. The project was carried out under four separate tasks: Task 0: Project Initiation Meeting and Inception Report to clarify the project objectives, approach, deliverables and programme. Task 1: Review of TAMPs Progress - to ascertain the state of play among all English local authorities (outside London) in preparing and implementing their TAMPs. Task 2: Review of Completed TAMPs - to review a number of completed, published TAMPs in order to identify examples of good practice and provide an analysis of the extent to which TAMPs were meeting the original aims set for them. Task 3: Review of TAMP Embedment - to review the way in which a selection of authorities were using and embedding their TAMPs in the authority s work. 2.2 Task 0: Project Initiation Meeting and Inception Report A Project Initiation Meeting was held in the Axis in Birmingham on 16 October 2006, attended by representatives of the Project Steering Group and the Project Team. In the meeting, the project objectives together with the proposed methodology were discussed. An Inception Report was prepared and issued to the Steering Group and the Project Team on 19 November The Report stated the agreed objectives of the project, the method of delivery, the project programme and key dates and the project deliverables. An up-to-date list of local authorities that had received or were receiving support from Atkins in the development of their TAMP was also included to ensure that the Steering Group were aware of any potential conflicts of interest and mitigate the risk of bias in the assessment of TAMPs. Following the Project Initiation Meeting, an article was prepared to be submitted to the Surveyor magazine in order to introduce the project to local authorities and motivate them to respond to the Task 1 survey, which was due to follow. The article, which is included in Appendix A, was published in the Surveyor magazine on 30 th November Task 1: Review of TAMP Progress The methodology for delivering Task 1 was based on the following steps: 1. Agree criteria for assessing TAMPs; 2. Agree criteria for selecting local authorities for Task 2; 3. Review of LTP2 submissions to establish starting (benchmark) position and determine when the TAMP is due to be in place; 4. Carry out telephone survey to determine current status of TAMP development; and 5. Select and agree 20 authorities for Task 2. The following paragraphs describe the agreed approach to delivering the steps listed above. It must be noted that, as discussed in Section 1.1 of this report, the scope of the research was to cover all local authorities in England, excluding London Boroughs. Table 1 shows the split of these 117 local authorities in the different types. 4

11 Table 1 Types of local authorities under the scope of the research Type of LA Number of LAs County 34 Unitary 48 Metropolitan 35 Total 117 Agree Criteria for Assessing TAMPs It was agreed that TAMPs were to be assessed in two different ways. Firstly, the LTP2 submissions were to be reviewed to establish the starting position for all local authorities. In LTP2 all local authorities were required to report on progress they had made with the developments of their TAMPs and on their intentions regarding further development of TAMPs. It was agreed with the Steering Group that a review of LTP2s would allow the starting position to be established. During the same exercise, and by recording the intentions of local authorities for future developments of TAMPs, it was agreed that it would be possible to establish the end position for TAMPs, or simply, when did local authorities intend to complete their TAMPs. Agree Criteria for Selecting Local Authorities for Task 2 The aim of Task 2 was to identify 20 local authorities who have completed their TAMPs and assess them to be of high quality, hence identify examples of good practice. From the early stages of the research and based on the experience of the Project Team and the Steering Group, it was agreed that it may be difficult to identify 20 local authorities with complete advanced TAMPs. However, there was confidence that there would be sufficient local authorities that have completed specific elements of their TAMPs and these could be used as examples of good practice. It was agreed that the following criteria would be used to select local authorities for Task 2: Progress made with the TAMP to ensure that the entire document, or parts of it were complete and in a state that could be shared not only with the Project Team, but also with other local authorities, as example of good practice. To this end, local authorities that adopted potentially innovative approaches to developing their TAMPs could be taken forward to Task 2, providing the opportunity to share their experience with others. Type of Authority - to provide a mix of authority types, i.e. county, metropolitan and unitary. It was important to ensure that larger, as well as smaller local authorities were identified for Task 2, as it was felt that the size of the authority had an impact on the resources available to invest on the development of the TAMP and hence, on progress made. Geographical Location to provide a mix of authorities from different regions. It was also important to ensure that local authorities from all parts of England were represented in Task 2, as there was a view that local authorities in some parts of the country, namely the South, may be making faster progress with TAMPs that others. Approach for Developing the TAMP to provide a range of approaches used for TAMP development, e.g. in-house, in groups or assisted by consultants. It was felt that the approach adopted for developing the TAMP would present different challenges to authorities and it would be important to consider the different issues under Task 2. 5

12 Review of LTP2 Submissions (starting and end position) It was agreed that it was important to establish the starting position for all local authorities, by reviewing their statement in LTP2 on progress made with the development of TAMPs. The same review would also establish when local authorities intended to complete their TAMPs, based on their assessment in March 2006 (time of submission of LTP2). It was agreed that the review would be carried out over the internet. In terms of staring position, information was to be collected in three themes, namely status of TAMP, method of development and contents of the TAMP. More specifically, it was agreed that the questions in Table 2 were to be answered. Table 2 Agreed questions to determine starting and end position Theme Status Question Was the TAMP mentioned in LTP2? Starting Position End Position Method Content Was a draft TAMP attached? Had work started when LTP2 was submitted? When did work on the TAMP start? Is the local authority part of a consortium aiming to produce a template TAMP? Is the local authority part of a regional group working on specific elements of the TAMP? Are consultants employed and to what extend? Is the LTP2 referring to a HAMP or a TAMP? What asset groups are covered in the TAMP? What does the LTP2 state as the desirable end status for the TAMP? Did the LTP2 define when the draft TAMP would be in place? At this point in time (time of LTP2 submission), when is the first draft TAMP due to be in place? What asset types does / will the TAMP cover? The review of LTP2s for the purposes of this research started on 6 November 2007 and was completed on 20 November No problems were found in accessing LTP2s electronically. The findings of this element of the research are described in Section 3 of this report. Determine Current Position In accordance with the research proposal, it was agreed that the current position of TAMPs was to be determined based on a telephone survey of all 117 local authorities under the scope of the project. The option of a written or electronic questionnaire had been considered. However, based on the experience of the Project Team, and with the agreement of the 6

13 Steering Group, it was believed that this type of questionnaire was unlikely to generate the high levels of response that would be desired for this research project. Hence, it was agreed that the telephone survey, even though time consuming, would be the most appropriate approach. It was agreed that the information to be collected to assess the current position with TAMPs was to be grouped in three different themes, as per the starting position. Table 3 lists the agreed questions. Table 3 Agreed questions to determine current position Theme Status Question What is the current status of the TAMP? (not started, in progress, draft, complete, advance) Have there been any delays in the development of the TAMP, and if yes, what caused them? When is the final draft TAMP due to be ready? What is the length of the expenditure profile? How would you rate the current quality of the TAMP with regards to Levels of Service, Performance Management, Whole Life Planning, Forward Planning, Risk Management, Data (Inventory and condition), Asset Valuation, Reporting? (not started, basic, improvement needed, near completion advanced) Content Method What asset groups are currently covered in the Asset Management Plan? Is the local authority part of a consortium aiming to produce a template TAMP? Is the local authority part of a regional group working on specific elements of the TAMP? Are consultants employed and to what extend? Is a corporate asset manager appointed in the local authority? Is an asset management working group appointed? What additional support do you need to facilitate the development and/or implementation of the TAMP? At the early stage of the research, it was believed that officers involved with the development of the LTP2 should be contacted to respond to the questions in Table 3. To this end, the DfT provided a list of the LTP officers for all 117 local authorities, together with their contact details. However, after contacting some of the officers on the list, it became apparent that LTP officers had limited, if any, involvement with the developments of TAMPs. This was due to the fact that typically, the responsibility for developing TAMPs falls with highway maintenance officers and their Departments. Consequently, a database was developed with contact details of highway asset managers in local authorities. The information for this 7

14 database was collected from personal contacts of the Project Team. It must be noted that the Highway Asset Management Network from CIPFA provided some valuable information for the names of the people who have the title of asset manager and belong to the network. The prepared questionnaire, after being agreed with the Steering Group, was tried on 3 separate local authorities as a trial, to ensure that the questions were clear, easy to answer and provided the responses that were needed. It was found that there were no concerns about the questionnaire, the type of questions or the length of the interview. The telephone survey began on 6 December 2006 and was completed on 21 January Overall, only one officer refused to answer questions over the telephone and asked for a written questionnaire, which was not provided, as the response rate achieved already was very high. One other officer found the length of the telephone interview excessively long. In total, 101 responses were received. A breakdown of the type of local authorities is given in Table 4. Table 4 Number of local authorities that responded to the telephone survey Type of LA Number of LAs Responded Percentage County % Unitary % Metropolitan % Total % The findings of the telephone survey are discussed in Section 3 of this report. Select and Agree the 20 Authorities for Task 2 Following the findings of the telephone survey, and based on the criteria discussed earlier in this section, 20 local authorities were selected to take part in Task 2 of the research. All of them were contacted and confirmed that they would be willing to support the research. Unfortunately, 3 of these authorities felt that their TAMPs were still under development and would not be able to provide copies to the Project Team. Furthermore, 2 authorities could not provide complete TAMPs, however, they provided information and details on the work they did. In total 17 TAMPS (2 not complete) were taken forward to Task 2. A list of these authorities, together with the rationale for selecting them, is given in Section 4 of this report. Table 5 shows a breakdown based on the type of authority. Table 5 Types of local authorities considered under Task 2 Type of LA Number of LAs County 8 Unitary 4 Metropolitan 5 Total Task 2: Review of Completed TAMPs The methodology for delivering Task 2 was based on the following activities: 1. Develop a Template for Assessing TAMPs; 2. Analyse selected TAMPs and identify examples of good practice; 8

15 3. Select and agree six authorities for Task 3; and 4. Hold workshop to share findings. The following paragraphs describe the details of the method adopted, in agreement with the Steering Group. Develop Template for Assessing TAMPs In accordance with the research proposal and the project brief, it was agreed that the selected TAMPs were going to be assessed in terms of how they achieve the aims set out for them in current guidance. To undertake this assessment, a template was developed based on the CSS/TAG Framework [Ref. 2] as a starting point. Table 6 lists the themes for the questions included in the template. Table 6 Themes for Questions for assessing TAMPs under the CSS Framework Overview Starting point Goals, Objectives and Levels of Service Inventory and Network Referencing Levels of Service Option Identification Decision Making Service Delivery Additionally, a second, much shorter template was developed based on Well-maintained Highways [Ref. 5]. A full list of the questions in both templates is included in Section 4 of this report. Review the Selected TAMPs and identify examples of Good Practice All 17 TAMPs selected for Task 2 were analysed using both templates described above. The results of this analysis are described in Section 4 of this report and are further discussed in Section 6. The elements of the work that were identified as good practice were also highlighted. It must be noted that collating the selected TAMPs was a lengthy process. Some of the local authorities were still working on developing elements or finalising work for their TAMP and delayed making their work available to the Project Team. It was also highlighted that their work was work in progress and changes were made on the TAMPs on a continuous basis. As a result, updated versions of TAMPs were provided during the analysis period, which caused delays in the completion of this Task. Select and Agree Six Authorities for Task 3 The aim of Task 3 was to identify a small number of local authorities that could demonstrate that they had embedded asset management principles in the way they manage their highway network, understand their drivers and recognise potential benefits resulting from their approach. The authorities were to be selected from the ones that were considered under Task 2. The criteria to be employed were the level of completeness of the TAMP and how this was used within the authority. The type of authority and its geographical location was also to be considered to ensure a satisfactory spread of different types and geographical 9

16 coverage was achieved. Initially, 6 local authorities were selected. With the agreement of the Steering Group, a seventh authority was added to the list, to ensure that a variety of approaches was covered under Task 3. A list of the authorities is given in Section 5 of this report. Table 7 shows their breakdown in terms of type of authority. Table 7 Types of local authorities selected for Task 3 Type of LA Number of LAs County 3 Unitary 1 Metropolitan 3 Total 7 All seven selected local authorities were contacted and agreed to participate in Task 3 of the research. Hold Workshops to Share Findings In accordance with the research proposal, two workshops were held as part of Task 2. The aim of these workshops was to discuss the findings of this Task with the authorities participating and hence, ensure that there were no misinterpretations or any points missed. The first workshop was held in Euston Tower, London on 13 February 2007 and the second in the Axis, Birmingham on 14 February Both workshops were chaired by Mike Bordiss. The following topics were covered in both workshops: Overall progress with TAMPs; Levels of Service and Performance Management; Data and Lifecycle Plans; Asset Valuation and Risk Management; and Integration with LTPs. All 20 local authorities that were proposed for Task 2 were invited to the workshops. Furthermore, representatives from other stakeholders (eg. The Highways Agency, CIPFA, the Steering Group) were invited. The issues discussed in the workshops informed the findings of the project and the development of the recommendations in Section 9 of this report. 2.5 Task 3: Review of TAMP Embedment The methodology for delivering Task 3 was based on the following steps: 1. Develop list of questions for assessing TAMPs usage and embedment; 2. Arrange and carry out interviews; and 3. Hold workshop to share findings; The following provides the rationale behind each of these activities and describes how we would approach each of them. Develop List of Questions for Assessing TAMPs Usage and Embedment It was agreed that to investigate the way that the 7 Task 3 local authorities had embedded asset management, a series of one to one interviews was to be carried out with a number of 10

17 stakeholders from each authority. It was agreed that a member of the Project Team would spend a whole day in each of the 7 local authorities and would aim to interview the following: Asset manager Elected member Head of Service Transport Planner Representative from Operations It was accepted, and agreed with the Steering Group that not all stakeholders listed above would be available for all local authorities under considerations, but every effort would be made to ensure that as many views as possible were recorded. Arrange and Carry Out Interviews and Analyse Findings All local authorities contacted were very supportive of the research and it proved very efficient to organise the required series of interviews. The details for these interviews and the findings of the work are discussed in Section 5 of this report. Hold Workshops to Share Findings It was agreed that at the end of Task 3, and in order to complete the research, a final workshop was to be held to discuss the list of findings of the project. The workshop was held in the Axis, Birmingham on 9 May 2006 and was chaired by Mike Bordiss. All local authorities considered under Task 2 of the research were invited, together with other relevant stakeholders. During the workshop, the key findings of the research were presented and discussed, together with possible recommendations on the future of TAMPs and the identified needs for further guidance and advice. 2.6 Dissemination of research findings As required in the project brief, the key findings of the research were to be presented in a national conference. It was agreed that the Surveyor Highway Maintenance would provide an appropriate forum for this purpose. Hence, following arrangements with the conference organisers, a second article was published in the Surveyor on 31 May 2007 and a presentation was given in the above mentioned conference on 5 June Copies of both the article and the presentation are attached in Appendix A of this report. 11

18 3 Findings of Task 1 This section presents the findings of Task 1 of the research. These are further discussed in Section 6 of this report. 3.1 Aims of Task 1 The aim of Task 1 was to ascertain the state of play among all English local authorities (outside London) in preparing and implementing their TAMPs. As described in Section 2.3 of this report, the starting and end position for TAMPs was established through a review of LTP2 submissions. The current position of TAMPs was determined through a telephone survey. The findings are presented in the following paragraphs. 3.2 Starting position with TAMPs Status of TAMPs Question 1: Was the TAMP mentioned in LTP2? 115 local authorities have mentioned their TAMP in the LTP2 submission. One County Council and one Unitary authority made indirect reference to their Asset Management Plan, without specifically mentioning a TAMP or a HAMP. The results are shown in Figure 1. Figure 1 Was the TAMP mentioned in LTP2? Was the TAMP mentioned in the LTP2? Yes No Other Question 2: Was a draft TAMP attached to the LTP2? 4 County Councils and one Metropolitan authority had attached a draft TAMP. One Unitary authority attached a summary of their TAMP. The results are shown in Figure 2. Figure 2 Was a draft TAMP attached to the LTP2? Was a draft TAMP attached to the LTP2? Yes No other 12

19 Question 3: Had work on the TAMP started when LTP2 was submitted? 9 local authorities had started work on their TAMPs when LTP 2 was submitted. A breakdown by type is given in Figure 3. Figure 3 Breakdown of local authorities who started work on their TAMP when LTP2 was submitted. Types of LAs who started work on TAMP when LTP2 was submitted County (Shire) Metropolitian Borough Unitary Question 4: When did work on the TAMP start? The majority of local authorities were unclear about when work on the TAMP started. The results are shown in Figure 4. Figure 4 When did work on the TAMP start? When did work on the TAMP start? 2004 or earlier Unknown Method for producing TAMPs Question 5: Is the LA part of a Regional Group? 89 local authorities (22 Counties, 33 Metropolitan and 34 Unitary) were members of regional groups working on elements of their TAMP. The results are shown in Figure 5. Figure 5 Is the LA member of a regional group? Part of a regional AM group? Yes No 13

20 Question 6: Is the authority part of a consortium aiming to produce a template TAMP? 99 local authorities were not developing a template TAMP. Question 7: Are consultants employed and to what extend? 63 local authorities (18 Counties, 33 Metropolitan and 26 Unitary) have employed consultants for the development of their TAMPs. In the majority of cases, consultants were employed when a group of authorities were working together to produce a template TAMP. The aim of the consultant was typically to customise the TAMP. In other cases, consultants were employed to provide advice as and when needed. The number of local authorities who employed consultants to fully develop a TAMP was very limited. Figure 6 Are consultants employed for the development of the TAMP? Are consultants assisting the authority? Yes No Contents of TAMPs Question 8: Is the LTP2 referring to a TAMP or a HAMP? 80 of the local authorities referred to a TAMP. 35 local authorities referred to the HAMP, explaining that it would be the starting point for producing a TAMP later. Interestingly, no local authority refers to a HAMP as the final product. Question 9: What Asset Groups are included in the TAMP? The majority of TAMPs were covering highways, footways, structures, street lighting, street furniture. A limited number of TAMPs also included (or planned to include) depots, car parks and bus stations. 3.3 End Position with TAMPs Question 1: Did the LTP2 define when the draft TAMP would be in place? Almost all local authorities (apart from 2) described in their LTP2, directly or indirectly, when their TAMP would be in place. It is worth noting that most local authorities referred to a draft or first draft TAMP, at that stage. Question 2: At this point in time, when is the first draft due to be in place? 92 local authorities stated that they planned to have a draft TAMP in place by the end of local authorities stated that their TAMP would be available by the end of 2007, whilst only one local authority planned to have a draft TAMP in place in The results are shown in Figure 7. 14

21 Figure 7 When will the TAMP be in place? When will the TAMP be ready? Current Position of TAMPs Status of TAMPs This part of the telephone survey aimed to determine the current status of TAMPs, by investigating how much progress had been made in preparing the document, what was the reason for any delays and provide an assessment of the quality of the TAMP produced. It must be noted that the data described below were provided by the local authorities and are based on a self assessment approach. 101 local authorities responded to the telephone survey. A breakdown of these by type of authority is given in Section 2 of this report. Question 1: What is the current status of the TAMP? (Not started, in progress, draft, complete, advanced). 3% of Local authorities had not started work on their TAMP, 64% stated that their TAMP was work in progress, 24% said that they had a draft in place and 9% had a complete TAMP. No local authorities had an advanced TAMP. The results are shown in Figure 8. Figure 8 What is the current status of the TAMP? Current Status of TAMP - Overall Not Started In Progress Draf t Complete Advanced 15

22 Question 2: Have there been any delays in the development of the Asset Management Plan and if yes, what caused them? 69% of local authorities acknowledged that there had been delays in the development of their TAMPs. There were no significant variations on this based on the type of authority. The main reasons given for the delays are shown in Figure 9. Figure 9 Reasons for delays in developing the TAMP? Cause of delays in the development of the TAMPs Resources Organisational Issues Unclear Requirements Question 3: What is the length of the expenditure profile? 56% of local authorities developed an expenditure profile for a period of 5 years. 9% of local authorities were considering a time period longer than 10 years, whereas 11% had not decided yet. The results are shown in Figure 10. Figure 10 Length of expenditure profile in the TAMP? Length of Expenditure Profile 1-2 years 3 years 5 years 10+ years Undecided 16

23 Question 4: When is the final draft TAMP due to be ready? 44% of local authorities planned to have their TAMP in place by April 2007 and 27 % by the end of Only 7% of local authorities stated that they planned to have their TAMP in place by the end of Figure 11 shows a summary of the results. Figure 11 When is the draft TAMP due to be in place? When is the draft TAMP due to be in place In place now By April 2007 By December Question 5: How would you rate the current quality of the TAMP with regards to: Overall, Levels of Service, Performance Management, Information, Whole Life Planning, Risk Management, Forward Planning, Asset Valuation and Reporting? (Not started, Basic, Improvement Needed, Near Completion, Advanced). 47% of local authorities rated their TAMP as needing improvement, with no variations based on geographical location or type of authority. Only 2% of local authorities (Unitary and Metropolitan) rated their TAMP as advanced. Figures 12.1 to 12.9 show the results of the survey for the different elements of the TAMP. Figure 12.1 Overall quality of the TAMP Overall Quality of TAMP Not Started Basic Improvement Needed Near Completion Advanced 17

24 Figure 12.2 Quality of TAMP, Levels of Service Quality of Levels of Service v Not Started Basic Improvement Needed Near Completion Advanced Figure 12.3 Quality of TAMP, Performance Management Quality of Performance Management Not Started Basic Improvement Needed Near Completion Advanced Figure 12.4 Quality of TAMP, Information Quality of Information Not Started Basic Improvement Needed Near Completion Advanced 18

25 Figure 12.5 Quality of TAMP, Whole Life Planning Quality of Whole Life Planning Not Started Basic Improvement Needed Near Completion Advanced Figure 12.6 Quality of TAMP, Risk Management Quality of Risk Management Not Started Basic Improvement Needed Near Completion Advanced Figure 12.7 Quality of TAMP, Forward Planning Quality of Forward Planning Not Started Basic Improvement Needed Near Completion Advanced 19

26 Figure 12.8 Quality of TAMP, Asset Valuation Quality of Asset Valuation Not Started Basic Improvement Needed Near Completion Advanced Figure 12.9 Quality of TAMP, Reporting Quality of Reporting Not Started Basic Improvement Needed Near Completion Advanced Contents of the TAMP Question 6: What asset groups are currently covered in the TAMP? It was generally unclear exactly what was covered in the TAMP. Most officers had to refer to documents or state that this element of the work was still under discussion. The majority of local authorities included highways, structures, footways an street lighting in their TAMP. Figure 13 shows the results of the telephone survey. (Where H - Highways, F - Footways, S - Structures, SL - Street Lighting, SF - Street Furniture, Dep - Depots, car parks, bus stations, offices etc.) 20

27 Figure 13 Asset Groups included in the TAMP. Asset Groups Covered H,F H,F,S H,F,S,SL H,F,S,SL,SF H,F,S,SL,SF, Dep Other Method of producing the TAMP Question 7: Is the authority part of a regional group working on specific elements of the TAMP? 92% of local authorities were participating in regional groups working on elements of the TAMP. Asset valuation was the most popular element to be considered by the regional groups. There was no variation between different types of local authorities. Figure 14 shows the results for this question. Figure 14 Local authorities working as part of regional groups. Working in regional groups Yes No Question 8: Is the authority part of a consortium aiming to produce a template TAMP? 50% of local authorities were working with other authorities to produce a template TAMP. There were no regional variations. However, County Councils generally were not producing template TAMPs, whereas Metropolitan authorities were often working with neighbouring authorities to produce templates. All authorities who were producing template TAMPs aimed to customise them. 21

28 Question 9: Are consultants employed and to what extent? 68% of local authorities had employed consultants to support them with the development of their TAMPs. The use of consultants was more common with County Councils than any other type of authority. Of those local authorities who employed consultants, 66% used them to provide advise as and when needed. The results to this question are shown in Figure 15. Figure 15 Consultants support Extent of Consultant Involvement Draf t Advise Review Question 10: Is a corporate asset manager appointed in the authority? Are highways under his/her remit? 42% of local authorities had a corporate asset manager appointed. In almost all cases, the corporate asset manager covered property and highways was not under his or her remit. In many cases, the officer responding to the telephone survey was unsure about the remit or even the existence of a corporate asset manager. Question 11: Is a highways asset manager appointed in the authority? 41% of local authorities had a highways asset manager appointed. However, in many cases, there was an acting highways asset manager in place, or there was a vacant post. Question 12: Is there an asset management working group appointed? Overall, in 74% of local authorities there was an established asset management working group. In most cases, this was formed informally and it was meeting in regular time intervals. It is worth noting that there was significant variation in the results based on the type of authority. 84% of County Councils, 74% of Metropolitan and 69% of Unitary authorities had established an asset management working group. Additional Support Question 13: What additional support do you need to facilitate the development and implementation of the TAMP? 51% of local authorities would like some additional guidance, either written or in the form of DfT supported workshops and training sessions. Asset valuation, levels of service and lifecycle planning are the elements that were mentioned by most local authorities as needing further guidance. A limited number of local authorities would like to have examples of a template TAMP to follow. Sharing good practice was also mentioned under the same concept. 12.5% of local authorities felt that additional resources should be provided by the DfT, mainly financial support to collect the required data. Only 7% of local authorities would like them to become mandatory, as they felt that this would provide the necessary incentive for developing a TAMP. At the same time, 2 local authorities felt strongly that TAMPs should not be made mandatory. 22

29 4 Findings of Task 2 This sections summarises the findings of Task 2 of the research. These are further discussed in Section 6 of this report. 4.1 Aims of Task 2 The aim of Task 2 was to review a number of completed, published TAMPs in order to identify examples of good practice and provide an analysis of the extent to which TAMPs are meeting the original aims set for them.. The findings are presented in the following paragraphs. 4.2 Task 2 Authorities As described in Section 2.4 of this report, 20 local authorities were selected for consideration under this Task. Table 8 lists these authorities and describes the rationale for selecting them, based on the selection criteria agreed with the Steering Group. Table 8 Local authorities for Task 2 Local authority Type of authority Region Consultants Bournemouth Unitary South West Atkins, Opus Cornwall County South West No Stockton Unitary North East Opus Derbyshire County East Midlands Opus through MSIG, Atkins East Sussex County South East Through SE Group Hampshire County South East Opus, Atkins, CBC Hertfordshire County East Anglia Opus Kent County South East Jacobs, Aspen Leeds Met Y & the H No Liverpool Met North West No Manchester City Nottingham Unitary East Midlands Opus Peterborough Unitary East Anglia Atkins Portsmouth Unitary South East CBC Shropshire County West Midlands Opus through MSIG Somerset County South West Atkins Suffolk County East Anglia Opus Tameside Met North West Atkins West Berkshire Unitary South East WSP Wolverhampton Met West Midlands Opus 23

30 4.3 Task 2 Templates Overview Goals, Objectives and Policies Inventory and Network Referencing As discussed in Section 2, three of the local authorities listed in Table 8, namely Bournemouth, West Berkshire and Manchester, were not able to provide access to their TAMP. The rest of the authorities supplied either a complete TAMP/HAMP or elements of it, for the purposes of this project. All of the available TAMPs were assessed against the requirements set for them in the CSS Framework for Highway Asset Management, using the list of questions in the Table 9. Furthermore, the selected TAMPs were assessed against the requirements for developing a TAMP, as described in the documents listed in Section 1.2. Table 10 lists the questions adopted for this assessment. A scale of 1 to 5 was adopted, where 1 is strongly agree and 5 is strongly disagree. This was done in order to identify examples of good practice. Table 9 Template for Task 2 TAMPs, based on CSS Framework for Highway Asset Management Is the TAMP document complete? Is the TAMP available to the public? Is the TAMP presented in a way that is easily understood by all stakeholders? Does the TAMP state the progress made in developing an effective asset management planning process? Does the TAMP state the gaps to implementing an effective asset management planning process? Does the TAMP describe how these gaps are to be addressed? Does the TAMP report on progress towards achieving LTP targets? Is the relationship between asset management priorities and other corporate goals and objectives defined? Do the asset management goals and objectives reflect those that exist within other documentation used in the authority? Is the context and scope of the TAMP established? Is the relationship of the TAMP with other policy documents established? Is a Highway Improvement Plan in place? Is a Network Management Plan in place? Is a Highway Maintenance Plan in place? Is Well-maintained highways being applied? Is the Code of Practice for the maintenance of highway structures being applied? Is Well-lit highways being applied? Is the relationship between the TAMP and other corporate documents defined? Is there an asset register in place? Is the inventory complete? Is the inventory accurate? Is the inventory up to date? Has a data review been carried out? Is there an up to date referencing system available? Is there an integrated referencing system available? Have gaps in data been identified? Has data collection been prioritised? Has a data collection programme been developed? 24

31 Service delivery Decisions making Performance Gaps Levels of service Have levels of service been developed? Do the levels of service reflect the authority's strategic goals and objectives? Are the links between the levels of service and the strategic objectives clearly identified? Are the levels of service in accordance with the legislative framework that applies to the business of highway management? Were the customers' views taken into account in the development of the levels of service? Were customers directly involved in establishing the target performance for the network? Are customer surveys regularly used to establish the degree of satisfaction with current levels of service? Are the levels of service available in a customer charter or similar document? Were best practice guidelines considered in the development of the levels of service? Are performance targets for each level of service documented in the TAMP? Has a desired level of performance been established? Have performance gaps been identified for each level of service? Where performance gaps have been identified, have programmes of works been developed? Have life cycle plans been developed for all assets? Do the life cycle plans reflect show how different options are evaluated and selected? Have long term programmes been developed for all services? Are competing demands addressed through otpimisation and forward works programmes? Where gaps are identified, have the reasons for the gap been established? Is the reason for the gap considered when developing a plan to address the gap? Have the options for closing the gaps been identified and documented? Is the optimal regime for the operation and maintenance of the network identified in the TAMP? Is optimisation applied to the demands on different parts of the physical asset? Is optimisation applied to the different service areas? Is a robust process fro optimisation established and described in the TAMP? Are budget considerations taken into account when optimising and prioritising works? Are organisational constraints taken into account in the optimisation and prioritisation process? Is a risk assessment framework established and documented? Have risk been identified? Have risks been analysed and assessed? Have risk reduction actions been identified and documented? Are risks regularly reviewed? Is a process established for developing a forward works programme? Is a process established for evaluating and ranking alternative improvement projects and maintenance treatments? Is the forward works programme covering at least 10 years? Does the forward works programme integrate the works required from various funding streams? Is good quality condition data available to allow projection of future condition? Are future works co-ordinated to ensure that work carried out is not destroyed by consequent tasks? Are suppliers' commercial needs reflected in the development of forward works programmes? 25

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Committee and Date Cabinet 14 th October 2015 Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Responsible Officer

More information

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and

More information

The Region s Transport Authority

The Region s Transport Authority Agenda Item No. 12 The Region s Transport Authority Meeting: Integrated Transport Authority Date: Monday 28 April 2014 From: Subject: Lead Member: Head of Sustainability Cycle Charter Fair, Accessible

More information

11. Managing our Transport Assets

11. Managing our Transport Assets 11. Managing our Transport Assets 11.1 The Need for an Asset Management Plan 11.1.1 A key challenge is to make transport assets work for the city in a way which fully contributes to the delivery of corporate

More information

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

List of approved programmes approved mental health professionals

List of approved programmes approved mental health professionals Education and Training Committee 12 June 2012 List of approved programmes approved mental health professionals Executive summary and recommendations This paper provides Committee with an update on the

More information

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK July 2013 1 P age Contents Page 1.0 Definition 3 2.0 Context 3 3.0 Purpose and aim of the policy 4 4.0 Policy Statement 4 5.0 Framework for Performance Management

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Transport and Highways June 2013 Asset Management Strategy (June 2013) Page 1 of 10 CONTENTS INTRODUCTION 3 SECTION 1: WHY ASSET MANAGEMENT 4 1.1 Background 4 1.2 Strategic Framework

More information

GLOUCESTERSHIRE HOSPITALS NHS FOUNDATION TRUST

GLOUCESTERSHIRE HOSPITALS NHS FOUNDATION TRUST GLOUCESTERSHIRE HOSPITALS NHS FOUNDATION TRUST MAIN BOARD FEBRUARY 2015 2014 STAFF SURVEY RESULTS 1. Aim 1.1 To present to the Trust Board the key findings from the 2014 staff survey results and to outline

More information

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT GUIDANCE DOCUMENT MAY 2013 Although this report was commissioned by the Department for Transport (DfT), the findings and recommendations are those of the authors

More information

Digital Inclusion Programme Started. BL2a

Digital Inclusion Programme Started. BL2a PROJECT BRIEF Project Name Digital Inclusion Programme Status: Started Release 18.05.2011 Reference Number: BL2a Purpose This document provides a firm foundation for a project and defines all major aspects

More information

Benchmarking Services Report

Benchmarking Services Report Benchmarking Services Report Prepared by: Nancy Weir and Richard Beevers Date: March 2011 Contents 1. Executive Summary 3 2. Introduction, Objectives and Method 4 2.1 Introduction 4 2.2 Objectives 5 2.3

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

Slough Borough Council. Highway Asset Management Strategy

Slough Borough Council. Highway Asset Management Strategy Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand

More information

Request for feedback on the revised Code of Governance for NHS Foundation Trusts

Request for feedback on the revised Code of Governance for NHS Foundation Trusts Request for feedback on the revised Code of Governance for NHS Foundation Trusts Introduction 8 November 2013 One of Monitor s key objectives is to make sure that public providers are well led. To this

More information

Review of the Implementation of IOSCO's Principles for Financial Benchmarks

Review of the Implementation of IOSCO's Principles for Financial Benchmarks Review of the Implementation of IOSCO's Principles for Financial Benchmarks The Board OF THE INTERNATIONAL ORGANIZATION OF SECURITIES COMMISSIONS OR02/2015 FEBRUARY 2015 Copies of publications are available

More information

Background Quality Report: Community Care Statistics 2009-10: Grant Funded Services (GFS1) Report - England

Background Quality Report: Community Care Statistics 2009-10: Grant Funded Services (GFS1) Report - England Background Quality Report: Community Care Statistics 2009-10: Grant Funded Services (GFS1) Report - England Dimension Introduction Assessment by the author Context for the quality report The Grant Funded

More information

Effective Internal Audit in the Financial Services Sector

Effective Internal Audit in the Financial Services Sector Effective Internal Audit in the Financial Services Sector Recommendations from the Committee on Internal Audit Guidance for Financial Services: How They Relate to the Global Institute of Internal Auditors

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

Oversight of financial management in local authority maintained schools

Oversight of financial management in local authority maintained schools Department for Education Oversight of financial management in local authority maintained schools Detailed Methodology OCTOBER 2011 2 Oversight of financial management in local authority maintained schools

More information

PERARES PROJECT EVALUATIONS

PERARES PROJECT EVALUATIONS PERARES PROJECT EVALUATIONS The checklist and survey forms in the following pages are proposed for use in 2012 2014 by Perares partners in evaluation of projects they undertake within Perares or independently

More information

Single Stage Light Business Case Template

Single Stage Light Business Case Template Better Business Cases Single Stage Light Business Case Template Prepared by: Prepared for: Date: Version: Status: Better Business Cases Single Stage Light Business Case Template Document Control Document

More information

Evidence Review: Developing a Money Advice Performance Management Framework for Local Authorities in Scotland. February 2015

Evidence Review: Developing a Money Advice Performance Management Framework for Local Authorities in Scotland. February 2015 Evidence Review: Developing a Money Advice Performance Management Framework for Local Authorities in Scotland February 2015 Contents Contents 2 Purpose 3 Background 4 Key Points from Local Authority Submissions

More information

The overall aim for this project is To improve the way that the University currently manages its research publications data

The overall aim for this project is To improve the way that the University currently manages its research publications data Project Plan Overview of Project 1. Background The I-WIRE project will develop a workflow and toolset, integrated into a portal environment, for the submission, indexing, and re-purposing of research outputs

More information

The Risk Management strategy sets out the framework that the Council has established.

The Risk Management strategy sets out the framework that the Council has established. Derbyshire County Council Management Policy Statement The Authority adopts a proactive approach to Management to achieve Best Value and continuous improvement and is committed to the effective management

More information

AER reference: 52454; D14/54321 ACCC_09/14_865

AER reference: 52454; D14/54321 ACCC_09/14_865 Commonwealth of Australia 2014 This work is copyright. In addition to any use permitted under the Copyright Act 1968, all material contained within this work is provided under a Creative Commons Attribution

More information

How to Communicate With Health Professionals in Review of Obesity

How to Communicate With Health Professionals in Review of Obesity Process Mapping Tool for Evaluation SW UK Partnership There are three areas of Recommendation developed by the work of the SW UK partnership. These are set out in the SW UK published Policy Analysis. They

More information

Review of the Management of Sickness Absence Conwy County Borough Council

Review of the Management of Sickness Absence Conwy County Borough Council Audit 2004/2005 Date: December 2005 Authors: Ros Adams and George Jones Ref: 1072A2005 Review of the Management of Sickness Absence Conwy County Borough Council Contents Summary Report Introduction 3 Background

More information

QUAๆASSURANCE IN FINANCIAL AUDITING

QUAๆASSURANCE IN FINANCIAL AUDITING Table of contents Subject Page no. A: CHAPTERS Foreword 5 Section 1: Overview of the Handbook 6 Section 2: Quality Control and Quality Assurance 8 2. Quality, quality control and quality assurance 9 2.1

More information

Project Acronym: CRM ACCORD Version: 2 Contact: Joanne Child, Doncaster College Date: 30 April 2010. JISC Final Report CRM ACCORD

Project Acronym: CRM ACCORD Version: 2 Contact: Joanne Child, Doncaster College Date: 30 April 2010. JISC Final Report CRM ACCORD Project Acronym: CRM ACCORD JISC Final Report CRM ACCORD Page 1 of 22 Document title: JISC Final Report Last updated: April 2007 Table of Contents Acknowledgements... 3 Executive Summary... 4 Background...

More information

Bracknell Forest Council. Highways Infrastructure Asset Management Plan

Bracknell Forest Council. Highways Infrastructure Asset Management Plan Bracknell Forest Council Highways Infrastructure Asset Management Plan October 2015 Contents Main and Appendices Executive Summary... 1 Executive Overview... 2 HIGHWAYS INFRASTRUCTURE ASSET MANAGEMENT

More information

Curriculum Development Project Knowledge in Sales and Marketing Education and Training

Curriculum Development Project Knowledge in Sales and Marketing Education and Training Curriculum Development Project Knowledge in Sales and Marketing Education and Training End of Project Report Project summary and key achievements against original aims The original project bid aims of

More information

Please contact me on 0207 213 4378 or geoff.lane@uk.pwc.com if you would like to discuss this further.

Please contact me on 0207 213 4378 or geoff.lane@uk.pwc.com if you would like to discuss this further. House of Commons Public Bill Committee, Scrutiny Unit, 7 Millbank, London, SW1P 3JA. 8 September 2014 Dear Sirs, Modern Slavery Bill call for written evidence We appreciate the opportunity to respond to

More information

Part B1: Business case developing the business case

Part B1: Business case developing the business case Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

Working with Local Criminal Justice Boards

Working with Local Criminal Justice Boards Working with Local Criminal Justice Boards Guidance for youth offending teams Youth Justice Board for England and Wales 2005 www.youth-justice-board.gov.uk Youth Justice Board for England and Wales Contents

More information

Highway Asset Management Strategy

Highway Asset Management Strategy w Highway Asset Management Strategy May 2014 - Version 2 Page 5 Surrey County Council Asset Management Strategy 1 Priorities, Vision and Objectives 1.1 Surrey County Council (SCC) recognises the importance

More information

Referrals to Local Authority Adoption Agencies from First4Adoption by region. Q4 January-March 2015

Referrals to Local Authority Adoption Agencies from First4Adoption by region. Q4 January-March 2015 Referrals to Local Authority Adoption Agencies from FirstAdoption by region Q January-March 0 Yorkshire & The Humber LA Adoption Agencies North East LA Adoption Agencies Leeds City Council Barnsley Adoption

More information

www.monitor.gov.uk The NHS Foundation Trust Code of Governance

www.monitor.gov.uk The NHS Foundation Trust Code of Governance www.monitor.gov.uk The NHS Foundation Trust Code of Governance About Monitor Monitor is the sector regulator for health services in England. Our job is to protect and promote the interests of patients

More information

the role of the head of internal audit in public service organisations 2010

the role of the head of internal audit in public service organisations 2010 the role of the head of internal audit in public service organisations 2010 CIPFA Statement on the role of the Head of Internal Audit in public service organisations The Head of Internal Audit in a public

More information

1.1 Terms of Reference Y P N Comments/Areas for Improvement

1.1 Terms of Reference Y P N Comments/Areas for Improvement 1 Scope of Internal Audit 1.1 Terms of Reference Y P N Comments/Areas for Improvement 1.1.1 Do Terms of Reference: a) Establish the responsibilities and objectives of IA? b) Establish the organisational

More information

Highway Infrastructure Asset Management Strategy

Highway Infrastructure Asset Management Strategy Highway Infrastructure Asset Management Strategy City Development Highways and Transportation Highways Asset Management Page i Asset Management Strategic Documents Contents Page Foreword 4. 1 Introduction)...)))))))))))))))))))))))...

More information

Information Governance Strategy

Information Governance Strategy Information Governance Strategy Document Status Draft Version: V2.1 DOCUMENT CHANGE HISTORY Initiated by Date Author Information Governance Requirements September 2007 Information Governance Group Version

More information

Infrastructure Asset Management Report

Infrastructure Asset Management Report Infrastructure Asset Management Report From Inspiration to Practical Application Achieving Holistic Asset Management 16th- 18th March 2015, London Supported by Table of contents Introduction Executive

More information

Highway Asset Management Quick Start Guidance Note. Getting Started

Highway Asset Management Quick Start Guidance Note. Getting Started Highway Asset Management Quick Start Guidance Note Getting Started Table of Contents 1 Getting Started with Asset Management... 1 2 What is Asset Management?... 3 3 Getting Started Checklist... 6 4 Getting

More information

NWSRG, Lincolnshire County Council

NWSRG, Lincolnshire County Council Minutes of the 43rd meeting of the UK Roads Board meeting held at Roads Service Northern Ireland, Clarence Court, Belfast on 18 June 2013 Present: Andrew Murray Andy Best David Davies Representing: Roads

More information

2014 changes to TUPE

2014 changes to TUPE 2014 changes to TUPE Acas can help with your employment relations needs Every year Acas helps employers and employees from thousands of workplaces. That means we keep right up to date with today s employment

More information

Number of participants engaged Year 1 (2013-14) 560 96,400 Year 2 (2014-15) 1250 131,866 Year 3 (2015-16) 1250 75,033 Year 4 (2016-17) N/A N/A Total

Number of participants engaged Year 1 (2013-14) 560 96,400 Year 2 (2014-15) 1250 131,866 Year 3 (2015-16) 1250 75,033 Year 4 (2016-17) N/A N/A Total Satellite clubs NGB Delivery information template NGB NGB Satellite clubs lead contact Cricket - Chance to Shine Steve Peyman, 07920 477040, steve.peyman@chancetoshine.org 2013-17 Whole Sport Plan satellite

More information

Review of Financial Planning and Monitoring. City of York Council Audit 2008/09 Date

Review of Financial Planning and Monitoring. City of York Council Audit 2008/09 Date Review of Financial Planning and Monitoring City of York Council Audit 2008/09 Date Contents Introduction and Background 3 Audit approach 4 Main conclusions 5 Financial Planning Findings 6 Financial Monitoring

More information

Agenda Item 9 Report PP17/14. Policy & Programme Committee. Date 24 July 2014

Agenda Item 9 Report PP17/14. Policy & Programme Committee. Date 24 July 2014 Report to Date 24 July 2014 By Title of Report Purpose of Report Policy & Programme Committee Sustainable Futures Manager Our Work with Local Enterprise Partnerships To consider a consultants report on

More information

Pavement Condition Information Systems support contract

Pavement Condition Information Systems support contract Pavement Condition Information Systems support contract UK Roads Board Advisory Group Presented by Barry Cleave 17 th March 2009 Objective Support for Local Authority Pavement Condition Information Systems..to

More information

Guideline. Records Management Strategy. Public Record Office Victoria PROS 10/10 Strategic Management. Version Number: 1.0. Issue Date: 19/07/2010

Guideline. Records Management Strategy. Public Record Office Victoria PROS 10/10 Strategic Management. Version Number: 1.0. Issue Date: 19/07/2010 Public Record Office Victoria PROS 10/10 Strategic Management Guideline 5 Records Management Strategy Version Number: 1.0 Issue Date: 19/07/2010 Expiry Date: 19/07/2015 State of Victoria 2010 Version 1.0

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

Research Report. Customer Perceptions Survey 2015 Fire and Rescue Authorities and Services

Research Report. Customer Perceptions Survey 2015 Fire and Rescue Authorities and Services Research Report Customer Perceptions Survey 2015 Fire and Rescue Authorities and Services Prepared for: Local Government Association (LGA) Prepared by: BMG Research Customer Perceptions Survey 2015 Fire

More information

Aberdeen City Council. Performance Management Process. External Audit Report o: 2008/19

Aberdeen City Council. Performance Management Process. External Audit Report o: 2008/19 Aberdeen City Council Performance Management Process External Audit Report o: 2008/19 Draft Issued: 11 February 2009 Final Issued: 6 April 2009 Contents Pages Pages Management Summary Introduction 1 Background

More information

Strengthening UK Based Supply Chains: Construction and Infrastructure

Strengthening UK Based Supply Chains: Construction and Infrastructure Industrial strategy: government and industry in partnership Strengthening UK Based Supply Chains: Construction and Infrastructure Introduction Setting the scene We have set out our vision for an Industrial

More information

Financial Planning Assessment Vale of Glamorgan County Borough Council. Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014

Financial Planning Assessment Vale of Glamorgan County Borough Council. Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014 Financial Planning Assessment Vale of Glamorgan County Borough Council Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014 Status of report This document has been prepared for the internal

More information

Audit Committee. Directors Report. Gary Hughes Chairman, Audit Committee. Gary Hughes Chairman, Audit Committee

Audit Committee. Directors Report. Gary Hughes Chairman, Audit Committee. Gary Hughes Chairman, Audit Committee Audit Committee Dear Shareholder, We are satisfied that the business has maintained robust risk management and internal controls, supported by strong overall governance processes, and that management have

More information

Volunteer Managers National Occupational Standards

Volunteer Managers National Occupational Standards Volunteer Managers National Occupational Standards Contents 00 Forward 00 Section 1 Introduction 00 Who are these standards for? 00 Why should you use them? 00 How can you use them? 00 What s in a Standard?

More information

GREATER LINCOLN AREA MAJOR INFRASTRUCTURE PROJECTS

GREATER LINCOLN AREA MAJOR INFRASTRUCTURE PROJECTS GREATER LINCOLN AREA MAJOR INFRASTRUCTURE PROJECTS COMMUNICATIONS PLAN 1 2 LINCOLN MAJOR SCHEMES COMMUNICATION PLAN Scope This document sets out the aims, roles and responsibilities of Lincolnshire County

More information

Strategic Environmental Assessment of Local Implementation Plans: Scoping Report Template

Strategic Environmental Assessment of Local Implementation Plans: Scoping Report Template Strategic Environmental Assessment of Local Implementation Plans: Scoping Report Template by C Treleven 4 UNPUBLISHED PROJECT REPORT Centre for Sustainability at UNPUBLISHED PROJECT REPORT STRATEGIC ENVIRONMENTAL

More information

building confidence in changing times

building confidence in changing times CIPFA Property building confidence in changing times Comprehensive service you can trust 2 CIPFA property www.cipfa.org.uk/property CIPFA property CIPFA Property is a trusted partner to public finance

More information

APPENDIX 1 POSITION DESCRIPTION. Name Signature Date. Name Signature Date. Principal/ Senior Asset Management Engineer (Career Progression

APPENDIX 1 POSITION DESCRIPTION. Name Signature Date. Name Signature Date. Principal/ Senior Asset Management Engineer (Career Progression APPENDIX 1 POSITION DESCRIPTION Employee: Manager: Position: Level 5-6) Location: Reports to: Purpose: Principal/ Senior Asset Management Engineer (Career Progression Manukau, New Zealand Group Manager

More information

Effective Internal Audit in the Financial. Services Sector. Non Executive Directors (NEDs) and the Management of Risk

Effective Internal Audit in the Financial. Services Sector. Non Executive Directors (NEDs) and the Management of Risk Consultation document Effective Internal Audit in the Financial A survey of heads of internal audit Services Sector Non Executive Directors (NEDs) and the Management of Risk Draft recommendations to the

More information

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA Appendix 1c DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA REVIEW OF CORPORATE GOVERNANCE, STRATEGIC PLANNING AND PERFORMANCE FRAMEWORKS INTEGRATING NEW AREAS OF GLA BUSINESS

More information

Benefits of conducting a Project Management Maturity Assessment with PM Academy:

Benefits of conducting a Project Management Maturity Assessment with PM Academy: PROJECT MANAGEMENT MATURITY ASSESSMENT At PM Academy we believe that assessing the maturity of your project is the first step in improving the infrastructure surrounding project management in your organisation.

More information

Performance Monitoring

Performance Monitoring 7 Chapter 17 Performance Monitoring Performance Monitoring Contents: 17.1 Introduction 17.2 A Wider Perspective 17.3 Requirements for a Good Performance Indicator 17.4 Types of Performance Monitoring 17.5

More information

Do you agree with the Government s proposal on how to implement the 1% reduction to the Local Government Expenditure Limit (LG DEL)?

Do you agree with the Government s proposal on how to implement the 1% reduction to the Local Government Expenditure Limit (LG DEL)? Local Government Finance Settlement Do you agree with the Government s proposal on how to implement the 1% reduction to the Local Government Expenditure Limit (LG DEL)? The application of the 1% reduction

More information

Developing Asset Management

Developing Asset Management Developing Asset Management Contents: 2.1 Implementation Process 2.2 Towards an Asset Management Culture 2.3 Current State Analysis 2.4 Desired State Analysis 2.5 Gap Analysis 2.6 Implementation Plan 2.7

More information

JOB DESCRIPTION. Contract Management and Business Intelligence

JOB DESCRIPTION. Contract Management and Business Intelligence JOB DESCRIPTION DIRECTORATE: DEPARTMENT: JOB TITLE: Contract Management and Business Intelligence Business Intelligence Business Insight Manager BAND: 7 BASE: REPORTS TO: Various Business Intelligence

More information

Data Communications Company (DCC) price control guidance: process and procedures

Data Communications Company (DCC) price control guidance: process and procedures Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required

More information

Sector Led Improvement Peer Challenge. of the. London Borough of Haringey Direct Payments Support Services. May 2013

Sector Led Improvement Peer Challenge. of the. London Borough of Haringey Direct Payments Support Services. May 2013 Sector Led Improvement Peer Challenge of the London Borough of Haringey Direct Payments Support Services May 2013 Peer Challenge Authors Barry Holland Justin Walker December 2013 Document Control Version

More information

COMMISSIONING SUPPORT BUSINESS REVIEW CHECKPOINT TWO OUTCOMES

COMMISSIONING SUPPORT BUSINESS REVIEW CHECKPOINT TWO OUTCOMES COMMISSIONING SUPPORT BUSINESS REVIEW CHECKPOINT TWO OUTCOMES 14 May 2012 1 Purpose Over the last six weeks the NHS Commissioning Board Authority has been undertaking the second checkpoint of the commissioning

More information

Highway Asset Management Strategy

Highway Asset Management Strategy Highway Asset Management Strategy April 2015 to March 2021 WiganCouncilOnline wigancouncil @wigancouncil wigan.gov.uk Highway Asset Management Strategy 1. Background This document forms our Highway Asset

More information

RISK & INSURANCE ANNUAL REPORT 2015

RISK & INSURANCE ANNUAL REPORT 2015 Committee and Date Item Audit Committee 17 th September 2015 RISK & INSURANCE ANNUAL REPORT 2015 Responsible Officer Angela Beechey e-mail: Angela.beechey@shropshire.gov.uk Tel: (01743) 252073 Fax (01743)

More information

HEALTHCARE SALARY SURVEY MARCH 2010

HEALTHCARE SALARY SURVEY MARCH 2010 HEALTHCARE SALARY SURVEY MARCH 21 Contents Introduction 2 An Overview of the Respondents to the Salary Survey 3 Nursing Home Managers 6 Residential Home Managers 7 Staff Nurses (including RGN, RMN and

More information

Project, Programme and Portfolio Management Delivery Plan 6

Project, Programme and Portfolio Management Delivery Plan 6 Report title Agenda item Project, Programme and Portfolio Management Delivery Plan 6 Meeting Performance Management and Community Safety Panel 27 April 2009 Date Report by Document number Head of Strategy

More information

Agenda item: Environment & Community Safety Decision meeting

Agenda item: Environment & Community Safety Decision meeting Title of meeting: Agenda item: Environment & Community Safety Decision meeting Date of meeting: 14 th November 2014 Subject: Report by: Wards affected: Key decision: Full Council decision: Waste Disposal

More information

Highways Asset Management Plan Version 3. August 2009

Highways Asset Management Plan Version 3. August 2009 Highways Asset Management Plan Version 3 August 2009 London Borough of Hounslow Streetcare Services Highways Asset Management Plan Version 3: 2009 Foreword to HAMP Version 1 At Hounslow we are continuously

More information

School Business Management (SBM) National Scholarship Fund

School Business Management (SBM) National Scholarship Fund School Business Management (SBM) National Scholarship Fund Applicant Guidance Round Three: Autumn 2015 1 Contents 1. Summary 2. Introduction 3. The third round 4. Scholarship funding 5. Eligibility 6.

More information

Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager

Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework + = Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework Background Middlesbrough Council is going through significant

More information

Demand for Long Distance Travel

Demand for Long Distance Travel Demand for Long Distance Travel April 2011 Demand for long distance travel 1 Structure of this paper 1.1 This paper is structured as follows: Section 2 sets out past trends in the demand for long distance

More information

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives Research and information management strategy 2015-18 Using research and managing information to ensure delivery of the Commission s objectives 1 1. Introduction This strategy sets out a range of research

More information

Creative Scotland April 2015 March 2018 Regular funding Application Guidance

Creative Scotland April 2015 March 2018 Regular funding Application Guidance Creative Scotland April 2015 March 2018 Regular funding Application Guidance Regular funding will replace Foundation Funding, Projects Forming Programmes and Annual Client Funding from April 2015. This

More information

Performance Management Development System (PMDS) for all Staff at NUI Galway

Performance Management Development System (PMDS) for all Staff at NUI Galway Performance Management Development System (PMDS) for all Staff at NUI Galway PMDS.doc 1 1. Introduction The Performance and Development Review System (PMDS) for NUI Galway has its foundation in Sustaining

More information

Item: 16 Page: 5. 1. Purpose

Item: 16 Page: 5. 1. Purpose Item: 16 Page: 5 1. Purpose 1.1 Improving Choice in Verification of Building Standards. A Scottish Government consultation on the introduction of the National House Building Council (NHBC) for the verification

More information

Derbyshire County Council Performance and Improvement Framework. January 2012

Derbyshire County Council Performance and Improvement Framework. January 2012 Derbyshire County Council Performance and Improvement Framework January 2012 Contents 1. Introduction 3 2. About the framework 4 3. Planning 7 5. Monitoring Performance 8 6. Challenge and Review 11 7.

More information

Lessons learned from creating a change management framework

Lessons learned from creating a change management framework Lessons learned from creating a change management framework Author Melanie Franklin Director Agile Change Management Limited Contents Introduction 3 What is a Change Management Framework? 3 Why is it called

More information

Brokerage & Advocacy Review. February 2010

Brokerage & Advocacy Review. February 2010 Brokerage & Advocacy Review February 2010 South East Brokerage & Advocacy Review February 2010 2 Table of Contents 1. Introduction and context... 3 2. Independent Brokerage... 6 2.1. Independent Brokerage

More information

PERFORMANCE & PERSONAL DEVELOPMENT PROGRAMME Launched: April 2010

PERFORMANCE & PERSONAL DEVELOPMENT PROGRAMME Launched: April 2010 PERFORMANCE & PERSONAL DEVELOPMENT PROGRAMME Launched: April 2010 1 PERFORMANCE & PERSONAL DEVELOPMENT PROGRAMME INDEX Page Introduction 3 PPDP Cycle 4 Performance planning meeting 5 Performance planning

More information

Network Rail October 2007 Strategic Business Plan. Supporting Document. Demand Forecasting in the SBP

Network Rail October 2007 Strategic Business Plan. Supporting Document. Demand Forecasting in the SBP Network Rail October 2007 Strategic Business Plan Supporting Document 2 Executive Summary The capacity strategy in the SBP is drawn from a range of sources. The HLOSs specify a small number of key schemes

More information

Linking Disabled Facilities Grants to Social Care Data

Linking Disabled Facilities Grants to Social Care Data Linking Disabled Facilities Grants to Social Care Data A Freedom of Information Survey Version 1.0. November 2015 Copyright Astral PS Limited - All rights reserved No part of this publication may be reproduced,

More information

SUMMARY OF MONITOR S WELL-LED FRAMEWORK FOR GOVERNANCE REVIEWS: GUIDANCE FOR NHS FT S PUBLICATION Report by Trust Secretary

SUMMARY OF MONITOR S WELL-LED FRAMEWORK FOR GOVERNANCE REVIEWS: GUIDANCE FOR NHS FT S PUBLICATION Report by Trust Secretary SUMMARY OF MONITOR S WELL-LED FRAMEWORK FOR GOVERNANCE REVIEWS: GUIDANCE FOR NHS FT S PUBLICATION Report by Trust Secretary 1. Introduction Under the Risk Assessment Framework and in line with the NHS

More information

ACADEMIC POLICY FRAMEWORK

ACADEMIC POLICY FRAMEWORK ACADEMIC POLICY FRAMEWORK Principles, Procedures and Guidance for the Development & Review of Academic Policies [V.1] Page 2 of 11 TABLE OF CONTENTS 1. FRAMEWORK OVERVIEW... 3 2. PRINCIPLES... 4 3. PROCESS...

More information

Access Fund for Sustainable Travel Guidance on Bidding. Moving Britain Ahead

Access Fund for Sustainable Travel Guidance on Bidding. Moving Britain Ahead Access Fund for Sustainable Travel Guidance on Bidding Moving Britain Ahead July 2016 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this

More information

Assessment of compliance with the Code of Practice for Official Statistics

Assessment of compliance with the Code of Practice for Official Statistics Assessment of compliance with the Code of Practice for Official Statistics Statistics from the National Travel Survey (produced by the Department for Transport) Assessment Report 58 October 2010 Crown

More information

APPENDIX 1. Dear Governor

APPENDIX 1. Dear Governor Dear Governor I am delighted to offer you this self-review tool, produced by the Merseyside and Cheshire Area (MCA) partnership, in conjunction with the Learn Together Partnership (LTP), which I chair.

More information

Workforce Management Plan (April 2014-15)

Workforce Management Plan (April 2014-15) Workforce Management Plan (April 2014-15) Date: 12 March 2014 Version: Final www.archerygb.org/coach Our aim Our aim is to support archers better by improving their access to support from coaches and judges.

More information

APPENDIX 1 POSITION DESCRIPTION. Name Signature Date. Name Signature Date. Position: Intermediate/Senior Planner (Career Progression Level 3-4)

APPENDIX 1 POSITION DESCRIPTION. Name Signature Date. Name Signature Date. Position: Intermediate/Senior Planner (Career Progression Level 3-4) APPENDIX 1 POSITION DESCRIPTION Employee: Manager: Position: Intermediate/Senior Planner (Career Progression Level 3-4) Location: Reports to: Purpose: Gisborne, New Zealand Senior Projects Engineer (Water

More information

Annual Governance Statement

Annual Governance Statement Annual Governance Statement 2014/15 1 Fareham Borough Council Civic Offices, Civic Way, Fareham PO16 7AZ Scope of Responsibility Fareham Borough Council is responsible for ensuring that its business is

More information