1 Community Risk Management This policy covers the Community Risk Management model which formalises the process of identifying and prioritising risk in order to achieve the Service s aims and objectives through IRMP. OWNER Philip Usher LAST REVIEW March 2013 REVIEW DUE DATE September 2013 VERSION CONTROL/AMEND Version 1 SCHEDULE CROSS REFERENCES CONTENTS Section Title PART 1 POLICY SECTION Page 1 Policy Statement Specific Commitments Ownership / Monitoring PART 2 PROCEDURE SECTION Community Risk Management Model Overview Strategic Cycle Tactical Cycle
2 PART 1 POLICY SECTION 1. Policy Statement Cheshire Fire & Rescue Service currently operates with three corporate aims, each of which contains three objectives: Aim 1: Protecting our communities and reducing local risk. 1. Maintain a detailed understanding of our communities and carry out risk analysis and assessment to identify the people and property most at risk. 2. Deliver campaigns and projects to reduce antisocial behaviour and increase awareness of fire and road safety. 3. Ensure fire safety legislation is implemented effectively. Aim 2: Responding promptly and effectively to emergencies. 1. Ensure plans and resources are in place to provide a flexible, efficient and resilient response to emergency incidents. 2. Use intelligence and data to match resources to risk and demand. 3. Ensure the safety of our people by providing them with the right equipment, training and skills. Aim 3: Developing an excellent organisation, accountable to our communities. 1. Ensure our workforce is competent and able to deliver our vision. 2. Inform and involve our communities and our staff in developing services and policies which are open, transparent and accountable. 3. Deliver value for money services which maximise community safety and minimise our impact on the environment. 2
3 The Service s annual IRMP presents a summary of the key risks facing the community and plans and proposals related to achieving the Service s vision, aims and objectives. This policy is key to ensuring that the IRMP is risk and community focused in achieving these goals. Fire & Rescue Services (FRSs) are assessed by the Operational Assurance and Fire Peer Challenge (OpA) process which is based on a combination of self assessment and peer review. OpA focuses on how FRSs understand and allocate their own and partner resources based on community risk while considering health, safety and development of their staff under seven key assessment areas; Community Risk Management, Protection, Prevention, Response, Health and Safety, Training and Development and Call Management and Incident Support. This policy focuses on how the Service uses IRMP to identify, analyse, plan and evaluate community focused risk using the OpA key assessment area; the Community Risk Management (CRM). The CRM area is summarised by one overarching question: How well is the Authority identifying and prioritising the risks faced by the community? The three sections of the CRM toolkit cover: Identifying the communities most at risk and prioritising them through IRMP, using risk analysis outcomes to plan, implement and deliver service activities and measuring and evaluating the performance of risk analysis processes. Through the evaluation of risk the Service will understand how Prevention and Protection activity contributes to risk reduction in its communities. 2. Specific Commitments Cheshire Fire & Rescue Service is committed to providing services that are risk-led and community focused. This policy details how the Service delivers the CRM model in accordance with it s corporate aims and objectives and the OpA process. 3. Ownership / Monitoring The policy is owned by Planning, Performance & Communications and will be reviewed in 6 months to incorporate advancements in the risk analysis and intelligence methodologies described within the procedure section of the document. 3
4 PART 2 PROCEDURE SECTION Community Risk Management Model Overview 1. The CRM model has two cycles; Strategic and Tactical. Strategic Cycle 2. The Service recognises the importance of setting clear priorities therefore IRMP is part of a hierarchy of plans including Departmental / Unitary, Community Action Plans and Appraisals ensuring that employees, stations and departments are delivering against the Service s vision, aims and objectives. 3. The Strategic cycle aims to generate risk based and sustainable, medium and long-term plans through IRMP by considering a variety of intelligence inputs including: 4
5 Geographical and temporal trends of different incident types (Spatial Analysis), historical incident and workload levels (Station Profiles), modelling risk, workload, speed and weight of response (Phoenix and FSEC), understanding risk and the community (Geo-demographics and feedback) external factors including the local resilience (PESTLE and Civil Contingencies) 4. Through analysis of this information the impact and likelihood of a variety of issues is considered and high, medium and low risk areas are identified which drives suitable Prevention and Protection activity (see Home Safety Assessment Policy). 5. By using a variety of sources, intelligence information can often provide different perspectives on a subject. The Service Management Team recognise this and apply professional judgement to the intelligence to collectively assess the risk in each station area and make suitable Response proposals through IRMP. 6. IRMP proposals are subject to thorough public and partner consultation and feedback in order to understand the expectations and concerns of the community. This includes presenting findings of the relevant risk analysis to provide context for the proposals. 7. Each IRMP proposal is subject to an Equality and Diversity impact assessment in order to fully understand how different communities are affected by Service plans. Tactical Cycle 8. Based upon achieving the Service Delivery objectives the tactical cycle of the CRM model uses the Scan, Analyse, Respond and Assess (SARA) model. This four step process involves identifying the key issues, understanding the problem through analysis, putting appropriate plans in place and evaluating the activity to understand the impact. 9. The tactical cycle drives all unitary and station activity providing local level (household or street) priority of risk through Performance Management Group (PMG). 10. PMG is a quarterly meeting chaired by the Deputy Chief Fire Officer and attended by the relevant prevention, protection and response leads. 11. Every response, protection and prevention plan is assigned relevant Performance Indicators (PIs) which are monitored quarterly through PMG. 5
6 12. The key Response PI is the 10 minute standard for the first fire appliance, which is also analysed under the Strategic Cycle to understand areas of Response improvement. 13. The tactical risk analysis methodologies are reviewed in the strategic cycle to provide direction and ensure their continuous improvement and relevancy which supports the Service Core Value of Aiming for Excellence. This includes understanding how risk-led activity contributes to risk reduction and using the process to develop better procedures in the future. This is review is presented annually at PMG by the Risk Analysis & Intelligence Manager. 6
Performance Management Framework
Purpose of the framework: To explain how we manage in Poole. It applies to all directly managed services of the Council. Introduction: Effective management at the council will: Ensure our goals are prioritised
More informationA review of service reform in Scottish fire and rescue authorities
A review of service reform in Scottish fire and rescue authorities Key messages/prepared for the Accounts Commission March 2007 1 Key messages Introduction 1. A National Joint Council (NJC) agreement in
More informationThe Risk Management strategy sets out the framework that the Council has established.
Derbyshire County Council Management Policy Statement The Authority adopts a proactive approach to Management to achieve Best Value and continuous improvement and is committed to the effective management
More informationDORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy
Not Protectively Marked Item 6 Appendix B DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Management Policy The Dorset & Wiltshire Fire and Rescue Authority () is the combined fire and rescue authority for
More informationCorporate Services Business Plan 20015/16- Day to Day Tasks. Corporate Services, Performance Management. Signed off: G Walsh 19.05.
Corporate Services Business Plan 20015/16- Day to Day Tasks Directorate: Officer: Corporate Services, Performance Management Gary Walsh, Deputy Chief Fire Officer Signed off: G Walsh 19.05.2015 The purpose
More informationBedford Group of Drainage Boards
Bedford Group of Drainage Boards Risk Management Strategy Risk Management Policy January 2010 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise
More informationCHESHIRE FIRE AUTHORITY : INTEGRATED RISK MANAGEMENT PLAN 2015-16 (IRMP12)
CHESHIRE FIRE AUTHORITY Item 4 MEETING OF : FIRE AUTHORITY ITEM: 4 DATE : 11 th FEBRUARY, 2015 REPORT OF : CHIEF FIRE OFFICER AUTHOR : TIM BEVINGTON, HEAD OF PLANNING, PERFORMANCE AND COMMUNICATIONS SUBJECT
More informationPROGRESS THROUGH PARTNERSHIP MAKING A DIFFERENCE GUIDANCE PERFORMANCE MANAGEMENT FRAMEWORK AND CONTINUOUS IMPROVEMENT
PROGRESS THROUGH PARTNERSHIP MAKING A DIFFERENCE GUIDANCE PERFORMANCE MANAGEMENT FRAMEWORK AND CONTINUOUS IMPROVEMENT July 2014 Contents Page Introduction 3 What is continuous improvement? 4 Why do we
More informationMaking Cheshire Safer
Making Cheshire Safer Cheshire Fire Authority Corporate Plan and Integrated Risk Management Plan 2010/11 7 Consultation Draft www.cheshirefire.gov.uk Location of the Service s community fire stations Warrington
More informationSFJCCAD2 Promote business continuity management
Overview This unit is about providing advice and assistance on business continuity management, including general advice for the business and voluntary sectors, and specific advice and assistance to individual
More informationRisk Management Policy. Corporate Governance Risk Management Policy
Corporate Governance Risk Management Policy Approved by the Council of Ministers, May 2006 1. Background The Isle of Man Government is working to promote better risk management, with emphasis on the importance
More informationSFJFRSFF2 SQA Unit Code (FA6J 04) Take responsibility for effective performance in fire and rescue
Overview The standard is recommended for firefighters, control room staff, and others with a remit for community safety within fire and. This standard is about making a positive contribution to the work
More informationNorth West Fire and Rescue Management Board Newsletter. Issue 1 November 2008
North West Fire and Rescue Management Board Newsletter Issue 1 November 2008 North West Fire and Rescue Management Board Newsletter Issue 1 November 2008 Welcome to the first edition of the North West
More informationRisk Management Within an Organisation
COUNTY DURHAM AND DARLINGTON FIRE AND RESCUE SERVICE Administration and General Order No. AD/1/TBC CORPORATE RISK MANGEMENT POLICY 1. INTRODUCTION 1.1 County Durham and Darlington Combined Fire Authority
More informationPerformance objectives
Performance objectives are benchmarks of effective performance that describe the types of work activities students and affiliates will be involved in as trainee accountants. They also outline the values
More informationWEST YORKSHIRE FIRE & RESCUE SERVICE. Business Continuity Management Strategy
WEST YORKSHIRE FIRE & RESCUE SERVICE Business Continuity Management Strategy Date Issued: 12 November 2012 Review Date: 12 November 2015 Version Control Version Number Date Author Comment 0.1 June 2011
More informationRisk Management Strategy
Risk Management Strategy Version: 8 Approved by: Quality and Governance Committee Date approved: 31 July 2014 Ratified by: Trust Board of Directors Date ratified: Name of originator/author: Head of Patient
More informationShepway District Council Risk Management Policy
Shepway District Council Risk Management Policy Contents Section 1 Risk Management Policy... 3 1. Updates and amendments... 3 2. Definition... 3 3. Policy statement... 3 4. Objectives... 3 Section 2 Risk
More informationIPDS. Green Book Employees. An Integrated Performance Management, Pay and Grading System. Technical 2. Making West Midlands Safer. www.wmfs.
An Integrated Performance Management, Pay and Grading System Technical 2 Making West Midlands Safer Prevention Protection Response www.wmfs.net Role Profile Role Title Technical 2 Role Ref T2 Overall Purpose
More informationCFAM&LBB2 Develop, maintain and evaluate business continuity plans and arrangements
Develop, maintain and evaluate business continuity plans and arrangements Overview This standard is about developing, maintaining and evaluating business continuity plans to ensure that organisations continue
More informationStates of Jersey Fire and Rescue Service Inspection Report 2008
States of Jersey Fire and Rescue Service Inspection Report 2008 abcdefghijklmnopqrstu Scottish Fire and Rescue Advisory Unit St Andrews House Edinburgh Contents Page 1 Executive Summary 1 2 Introduction
More informationHARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK
HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK July 2013 1 P age Contents Page 1.0 Definition 3 2.0 Context 3 3.0 Purpose and aim of the policy 4 4.0 Policy Statement 4 5.0 Framework for Performance Management
More informationMiddlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager
Middlesbrough Manager Competency Framework + = Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework Background Middlesbrough Council is going through significant
More informationCommunication and Engagement Strategy 2014 2017. Final Version 30 th June 2014
Communication and Engagement Strategy 2014 2017 Final Version 30 th June 2014 Contents Introduction 4 Strategic Objectives and Role of Communications 6 Communications now and by 2017 7 Communications and
More informationTeam Leader, Data Intelligence
Team Leader, Data Intelligence New Zealand Fire Service Position Description Job #: 4007 Business Area: Location: Reports to: Data & Spatial Intelligence (DSI) Unit Information, Communications & Technology
More informationJOB DESCRIPTION. To provide a high level of customer care to all business users who raise faults or service requests via the Service Desk.
Job Title: Service Desk Analyst JOB DESCRIPTION Job Holder: Date: Overview of role To provide a high level of customer care to all business users who raise faults or service requests via the Service Desk.
More informationDORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy
Part Two Part One Not Protectively Marked DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy. The Dorset & Wiltshire Fire and Rescue Authority (DWFRA)
More informationRiver Stour (Kent) Internal Drainage Board Risk Management Strategy and Policy
River Stour (Kent) Internal Drainage Board Risk Management Strategy and Policy Page: 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise 4. Embedding
More informationCompliance Policy AGL Energy Limited
Compliance Policy AGL Energy Limited November 2013 Table of Contents 1. About this Document... 3 2. Policy Statement... 4 3. Purpose... 4 4. AGL Compliance Context... 4 5. Scope... 5 6. Objectives... 5
More informationLFRS Business Continuity Planning
LFRS Business Continuity Planning 1.1 INTRODUCTION The LFRS Business Continuity Plan provides a framework for the activation, allocation and deployment of Lancashire Fire and Rescue Services resources
More informationMEMBERS CONSIDER THE RISK STRATEGY AND RECOMMEND APPROVAL TO COUNCIL.
Agenda item: 8 Committee: Audit & Standards Committee Date of meeting: 19 th September 2011 Subject: Risk Management Strategy Lead Officer: Head of Finance Portfolio Holder: Resources - Councillor T Oliver
More informationESSEX FIRE AUTHORITY Essex County Fire & Rescue Service
ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service MEETING Essex Fire Authority AGENDA ITEM 14 MEETING DATE 5 September 2012 REPORT NUMBER SUBJECT REPORT BY Risk and Business Continuity Department
More informationWest Midlands Fire Service Fire Peer Challenge
West Midlands Fire Service Fire Peer Challenge 9 th - 12 th July 2012 Report Table of contents Leadership and Corporate Capacity...5 Organisational Capacity...7 Community risk management...9 Response...11
More informationKEY RESPONSIBILITIES:
1. TITLE: FIELD MAINTENANCE MANAGER 2. CLASSIFICATION: SENIOR EXECUTIVE OFFICER (SEO) 3. DEPARTMENT: OPERATIONS 4. POSITION OBJECTIVES: 4.1. Objectives of Position: 4.1.1. To manage and provide direction
More informationWest Midlands Police Job Description. Deputy Chief Constable
West Midlands Police Job Description Post title: Department: Corporate Communications Responsible to: Deputy Chief Constable Responsible for: All staff within the Corporate Communications Department Grade:
More informationStrategic Plan. New Zealand Fire Service Commission to 2005 2010
Strategic Plan New Zealand Fire Service Commission to 2005 2010 Table of contents Forward from the Chairperson...3 Summarises the purpose, content and logic behind the Commission s strategic direction.
More informationDerbyshire County Council Performance and Improvement Framework. January 2012
Derbyshire County Council Performance and Improvement Framework January 2012 Contents 1. Introduction 3 2. About the framework 4 3. Planning 7 5. Monitoring Performance 8 6. Challenge and Review 11 7.
More informationTEC Capital Asset Management Standard January 2011
TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining
More informationHealth and Safety Management Standards
Health and Safety Management Standards Health and Safety Curtin University APR 2012 PAGE LEFT INTENTIONALLY BLANK Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Health and Safety Documents...
More informationJOB DESCRIPTION. Corporate Governance and Corporate Support Services. All staff in Corporate Governance and Corporate Support Services
JOB DESCRPTON Position Title and Number: Grade: Department: Section: Responsible to: Responsible for: Head of Corporate Governance PO7 Resources Corporate Governance and Corporate Support Services Director
More informationPerformance Management and Service Improvement Framework
Performance Management and Service Improvement Framework Author Marcus Evans, Operational Director - Performance and Customer Insight Date: September 2014 Contents Page 1. Introduction 3 2. Strategic ning
More informationROLE PROFILE. Performance Consultant (Fixed Term) Assistant Director for Human Resources
ROLE PROFILE Job Title Reports to Service area No. of staff responsible for Budget responsibility ( ) Performance Consultant (Fixed Term) Assistant Director for Human Resources HR 0 None Purpose of Job
More informationAppendix 1: Performance Management Guidance
Appendix 1: Performance Management Guidance The approach to Performance Management as outlined in the Strategy is to be rolled out principally by Heads of Service as part of mainstream service management.
More informationInformation, Communications and Technology Strategy. Purpose 2. Strategic Aims 2. Introduction 2. ICT Vision for 2015-2020 3. Key themes and aims: 4
Brigade Order Operations Brigade Order Administration 16 Part Part 1 Section Title Information, Communications and Technology Strategy Contents No. Purpose 2 Strategic Aims 2 Introduction 2 ICT Vision
More informationNOT PROTECTIVELY MARKED SOUTH WALES POLICE JOB DESCRIPTION
SOUTH WALES POLICE JOB DESCRIPTION TITLE: Helpdesk Officer GRADE: Scale 4/5 LOCATION: RESPONSIBLE TO: South Wales Police Senior Service Support Officer MAIN PURPOSE OF JOB: To ensure a high quality, timely
More informationHPF Tool. Template for the Performance and Accountability Statement Second round reviews. Amended December 2012
HPF Tool Template for the Performance and Accountability Statement Second round reviews Amended December 2012 The High Performance Framework was developed by the Public Sector Performance Commission. This
More informationDERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY
DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1
More informationCentral Services. Business Support Service JOB DESCRIPTION
Central Services Business Support Service JOB DESCRIPTION POST: GRADE: Grade: Band 12 RESPONSIBLE TO: A Head of Business Support STAFF MANAGED: Team Leaders. In some instance, a Business Support Manager
More informationFire and Rescue Service Operational guidance. Operational Risk Information
Fire and Rescue Service Operational guidance Operational Risk Information Contents 1 Foreword 2 2 Preface 3 3 Introduction 4 4 Legal framework 9 5 Strategic perspective 17 6 Data and information management-
More informationRelease: 1. TLIP5008A Manage a transport and logistics business unit
Release: 1 TLIP5008A Manage a transport and logistics business unit TLIP5008A Manage a transport and logistics business unit Modification History Not Applicable Approved Page 2 of 10 Unit Descriptor Unit
More informationThe integrated leadership system. ILS support tools. Leadership pathway: Individual profile APS6
The integrated leadership system ILS support tools Leadership pathway: Individual profile APS6 APS 6 profile Supports strategic direction Achieves results Supports productive working relationships Displays
More informationBusiness Continuity Management Policy and Framework
Management Policy and Framework Version: Produced by: Date Produced: Approved by: Updated: 7 University Manager with the assistance of the Operational Group 11 th March 2010 Steering Group (14 December
More informationMARCH 2012. Strategic Risk Policy Update March 2012 v1.10.doc
MARCH 2012 Version 1.10 Strategic Risk Policy Update March 2012 v1.10.doc Document History Current Version Document Name Risk Management Policy Statement and Strategic Framework Last Updated By Alan Till
More informationBusiness Continuity Management
Annex A Business Continuity Management Programme Business Continuity Management Policy 1. Introduction This Business Continuity Management (BCM) Policy defines the scope of the SPCB s ability to maintain
More informationCouncillor role descriptions
Councillor role descriptions All Councillors:- Community Leader Champion your division Deal with casework Represent the community within the Council and other agencies Campaign on local issues Keep in
More informationFire and Rescue Operational Assessment of Service Delivery
Fire and Rescue Operational Assessment of Service Delivery Toolkit and Guidance Fire and Rescue Operational Assessment of Service Delivery Toolkit and Guidance July 2006 Department for Communities and
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY Version No: 1 Issue Status: awaiting Trust Board approval Date of Ratification: 11th April 2012 Ratified by: Risk Management Committee Policy Author(s): Stuart Coalwood
More informationSuccession Planning Policy and Procedure
Succession Planning Policy and Procedure Reference No. P08:2012 Implementation date 07022013 Version Number V1.0 Reference No: Name. Linked documents P14:2002 Police Staff Recruitment and Selection Policy
More informationRiver Clyde Homes: Officer Service Desk Analyst
Job Role: Officer Service Desk Analyst Directorate: Business Support Role reports to: ICT Manager Roles Reporting to this role: N/A Total number of team members within team: 5 Grade: River Clyde Homes
More informationCustomer Service Strategy 2010-2013
Service Strategy 2010-2013 Introduction Our vision for customer service is: Oxfordshire County Council aims to deliver excellent customer service by putting our customers at the heart of everything we
More informationHead of Engineering Job Description
Head of Engineering Job Description (Job Code and Level: E006) Definition: Overall responsibility and accountability for the Engineering function across the UK which will include people and budgetary management.
More informationPosition Profile. Council s Mission. Organisation Chart
www.gdc.govt.nz Post Holder:... Position Profile Position Title: IT SERVICE DESK ANALYST (Fixed Term Two Years) Reports to: Information Technology Team Leader Department: Finance & Information Section:
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John
More informationAssistant Chief Officer (ACO) Application to Attend the Strategic Command Course (SCC)
Assistant Chief Officer (ACO) Application to Attend the Strategic Command Course (SCC) Guidance Notes for Applications 2014 Limited (2014) All rights reserved. No part of this publication may be reproduced,
More informationData Quality. Carlisle City Council Audit 2008-2009 January 2009
Data Quality Carlisle City Council Audit 2008-2009 January 2009 Contents Introduction 3 Detailed findings 5 Appendix 1 Action Plan 9 Status of our reports The Statement of Responsibilities of Auditors
More informationPolicy. VBA Enterprise Risk Management. Governance Unit
Policy VBA Enterprise Risk Management Governance Unit Keywords: Policy; risk; governance. ID: Version no: Status: VBAPOL-0074 2.0 Final Issue date: Date of effect: Next review date: 14/07/2015 14/07/2015
More informationCareNZ Job Description GENERAL MANAGER HUMAN RESOURCES
CareNZ Job Description GENERAL MANAGER HUMAN RESOURCES Responsible to: Responsible for: Chief Executive HR and Payroll Administrator HR Interns and Volunteers Dimensions Location of work Other information
More informationBridgend County Borough Council. Corporate Risk Management Policy
Bridgend County Borough Council Corporate Risk Management Policy December 2014 Index Section Page No Introduction 3 Definition of risk 3 Aims and objectives 4 Strategy 4 Accountabilities and roles 5 Risk
More informationDisability ACT. Policy Management Framework
Disability ACT Policy Management Framework OCT 2012 Disability ACT Policy Management Framework Version October 2012 Page 1 of 19 1. Context... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 Background... 3 1.4
More informationBusiness (Development) Co-ordinator. 18,754-20,548 per annum. 37 hours per week. Business Hub. Cheltenham/Gloucester/Forest of Dean
Post number: N230 Closing date: 22:00, Sunday 13 September 2015 Short listing date: Monday 14 September 2015 Interview date: Wednesday 30 September 2015 We are committed to ensuring all individuals are
More information1.0 Policy Statement / Intentions (FOIA - Open)
Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies
More informationMember Development Strategy 2012-2014. Draft: March 2012
Member Development Strategy 2012-2014 Draft: March 2012 Member Development Strategy 2012-2014 Appendix 1 to Item 3 Contents 1. Introduction 2. Aims of the Strategy 3. Key Objectives 3.1 Members Personal
More informationThe Human Resources Department Work Plan for the period 1 April 2015 to 31 March 2016 is attached.
Council, 25 March 2015 Human Resources Department Work Plan 2015-2016 Executive summary and recommendations Introduction The Human Resources Department Work Plan for the period 1 April 2015 to 31 March
More informationVISION FOR LEARNING AND DEVELOPMENT
VISION FOR LEARNING AND DEVELOPMENT As a Council we will strive for excellence in our approach to developing our employees. We will: Value our employees and their impact on Cardiff Council s ability to
More informationService and Improvement Plan 2015 18
Service and Improvement Plan 2015 18 Property and Risk 1. Introduction Property and Risk Service and Improvement Plan 2015 2018 1.1 The Property and Risk Service and Improvement Plan covers the period
More informationAn evaluation of the fire safety emergency cover toolkit
icccbe 2010 Nottingham University Press Proceedings of the International Conference on Computing in Civil and Building Engineering W Tizani (Editor) An evaluation of the fire safety emergency cover toolkit
More informationCustomers and Corporate Services Directorate (Corporate Support) Plan 2015-16
Appendix 2 Action Plan Due Date Status Customers and Corporate Services Directorate (Corporate Support) Plan 2015-16 CS1027 ICT Improvement Programme 31 January 2016 Objectives: CORPORATE SERVICES: ICT
More informationEquality & Diversity Strategy
Equality & Diversity Strategy Last updated March 2014 1 Statement of commitment Ombudsman Services is committed to equality of opportunity and respect for diversity. As an equal opportunities employer,
More informationStrategic Programme Manager- fixed term 12-14 months
Strategic Programme Manager- fixed term 12-14 months New Zealand Fire Service Position Description Job #: 2759 Business Area: Location: Reports to: Programme and Change Management National Headquarters
More informationNOT PROTECTIVELY MARKED. Date: 30 JULY 2015 DIANE VINCENT, DIRECTOR OF PEOPLE AND ORGANISATIONAL DEVELOPMENT
Agenda Item: 13 Report To: Report No: SCOTTISH FIRE AND RESCUE SERVICE BOARD B/POD/07-15 Date: 30 JULY 2015 Report By: DIANE VINCENT, DIRECTOR OF PEOPLE AND ORGANISATIONAL DEVELOPMENT Subject: SCOTTISH
More informationCORPORATE RISK MANAGEMENT POLICY
CORPORATE RISK MANAGEMENT POLICY 1. INTRODUCTION 1.1 The North Wales Fire & Rescue Authority provides services to a diverse range of people and organisations. It operates in an ever-changing environment,
More informationCompany Synlait Milk Ltd Date: August 2014
Position Reports to Senior Marketing Advisor Marketing and Communications Manager Company Synlait Milk Ltd Date: August 2014 Location 1028 Heslerton Road, Dunsandel, Canterbury Purpose Our marketing champion,
More informationStaffordshire County Council. Civil Contingencies Policy
Staffordshire County Council Civil Contingencies Policy Version 1 September 2012 Staffordshire County Council s Civil Contingencies Policy 1.1 Introduction The County Council aims to protect the wellbeing
More informationCare service inspection report
Care service inspection report Full inspection Newcross Healthcare Solutions Aberdeen Branch Nurse Agency Suite K Woodburn House 4/5 Golden Square Aberdeen Inspection completed on 16 May 2016 Service provided
More informationIntegrated Risk Management Planning Guidance Note 4:
Integrated Risk Management Planning Guidance Note 4: A risk assessment based approach to managing a fire safety inspection programe www.communities.gov.uk community, opportunity, prosperity Integrated
More informationD 1. Working with people Develop productive working relationships with colleagues. Unit Summary. effective performance.
1 Develop productive working relationships with colleagues Unit Summary What is the unit about? This unit is about developing working relationships with colleagues, within your own organisation and within
More informationGuidance on testing the handover from Response to Recovery
Guidance on testing the handover from Response to Recovery Exercising the handover phase from response (from the Strategic Co-ordinating Group) to recovery (to the Recovery Co-ordinating Group) is an important
More informationNational Business Continuity 5 year Strategy. Chief Officer Mike Bowron QPM States of Jersey Police
National Business Continuity 5 year Strategy Chief Officer Mike Bowron QPM States of Jersey Police Introduction Purpose This five-year strategy sets out ACPO s vision for delivering business continuity
More informationBusiness Plan 2015/18
Business Plan 2015/18 BUSINESS PLAN 2015/18 FORWARD In May 2015 a new Government will be ushered in. However, whatever the outcome the same challenge remains, to tackle local government's projected 12.4
More informationJOB AND PERSON SPECIFICATION Position Title: Education Manager Reports Directly to: General Manager Commercial. Non-EBA Senior Manager
JOB AND PERSON SPECIFICATION Position Title: Education Manager Reports Directly to: General Manager Commercial Responsible for: Member of: Grade: Team Leader Education Leadership Team Non-EBA Senior Manager
More informationExternal Performance Assessment Improvement Plan 2006/8 - Monitoring 6
Report title Agenda item External Performance Assessment Improvement Plan 2006/8 - Monitoring 6 Meeting Performance Management & Community Safety Panel 15 September 2008 Date Report by Document Number
More informationHow To Manage A Fire Risk
Greater Manchester Fire and Rescue Service Integrated Risk Modelling 2013/14 Contents Contents... 1 Introduction... 2 Our Legal Responsibilities... 2 Integrated Risk Management... 3 Integrated Risk Assessment
More informationPosition Profile. GDC s Mission. Organisation Chart
www.gdc.govt.nz. Post Holder:... Position Profile Position Title: INFORMATION TECHNOLOGY SERVICE DESK ANALYST Reports to: Information Technology Team Leader Department: Corporate Services Section: Information
More informationKnowledge Management Strategy 2011-2014. Version 0.8
Knowledge Management Strategy 2011-2014 Version 0.8 25 October 2011 1 1. Introduction 1.1 What is knowledge management? Knowledge management is creating, capturing, sharing and using the skills and experience
More informationPS 170 Business Continuity Management Policy
PS 170 Business Continuity Management Policy July 2013 Version 2 Statement of legislative compliance This document has been drafted to comply with the general and specific duties in the Equality Act 2010;
More informationBUSINESS CONTINUITY STRATEGY
BUSINESS CONTINUITY STRATEGY January 2009 CONTENTS Page BACKGROUND 1 OVERVIEW 1 AIM AND OBJECTIVES 1 CORE BUSINESS OF THE COUNCIL 2 ORGANISATION STRUCTURE 2 RISK IDENTIFICATION AND MITIGATION STRATEGIES
More informationContact Centre. National Occupational Standards May 2011
Contact Centre National Occupational Standards May 2011 Skills CFA 6 Graphite Square, Vauxhall Walk, London SE11 5EE T: 0207 0919620 F: 0207 0917340 Info@skillscfa.org www.skillscfa.org 2012 Skills CFA
More informationWest Sussex County Council Resilience Policy
West Sussex County Council Resilience Policy INDEX page 2 Policy Statement page 3 Vision Statement,Values and General Principles page 4 Introduction and purpose page 4 Scope of the Policy page 4 The Council
More informationHuman Resources & Facilities Services. Service Delivery Plan 2014/15. Overview of the Human Resources Service
Human Resources & Facilities Services Service Delivery Plan 2014/15 Overview of the Human Resources Service The role of the HR Service is to support the Council in achieving its corporate objectives, priorities
More informationNorthern Ireland Blood Transfusion Service
Northern Ireland Blood Transfusion Service Risk Management Strategy Northern Ireland Blood Transfusion Service Lisburn Road Belfast BT9 7TS Telephone No. 028 9032 1414 www.nibts.org Page 1 of 12 CONTENTS
More information