1 Durango, CO Cortez, CO Pagosa Springs, CO Santa Fe, NM Farmington, NM Site Characterization and Adapted Monitoring of a Flood-Disturbed Reclamation Area Swastika/Dillon Canyon Reclamation Project Raton, NM

2 Location Located on Vermejo Park Ranch west of Raton, NM Coal mining early 1900s into the 1950s

3 History Gob piles from Swastika Mine Blocked Dillon Canyon drainage Eroded coal waste into stream Leached chemicals into drainage Source; EMNRD AMLP

4 History Stream artificially straightened for railroad and coal loadout access Caused severe incising of channel Created channel instability, including down-cutting and bank erosion

5 History NM EMNRD AMLP completed reclamation work Relocated straightened stream channel away from gob Re-incorporated sinuosity Capped gob piles Installed erosion control and mitigation plantings

6 History Completed under USACE NWP 27 Ecosphere hired to start monitoring in 2014

7 History Flash floods in Fall 2013 USACE needs: Re-characterization of existing conditions Re-evaluation of mitigation and monitoring activities Revised reporting in 2014 instead of monitoring Full monitoring and reporting to begin in 2015 Additional discussions on future monitoring and reclamation/remediation requirements

8 Goals and Objectives Collect post-flood baseline data Determine recovery status of affected reaches Identify the need for channel stabilization and grade control Identify if supplemental plantings needed Determine if reclamation performance standards are being met, could be met, or need to be modified Determine if monitoring protocols need to be modified

9 Challenges Cultural sites Recurring large run-off events Meeting USACE permit performance standards requirements

10 Methods Rapid Response Evaluation Reach Characterization Data Form 14 reaches and 2 wetland areas identified and evaluated Compared existing conditions in reclaimed area with undisturbed areas Generated ratings for vegetation, hydrology, and soil conditions for each reach

11 Methods Vegetation Ratings: 1 = Ideal existing vegetation is adequate, no modifications required 2 = Minor Planting limited planting recommended, but optional 3 = Major Planting no wetland species currently identified in reach, major supplemental planting recommended 4 = Major Planting with channel modification major supplemental planting and channel stabilization or control structures are recommended

12 Methods Soil Ratings: Soil saturation, soil texture and depth, chroma, and hydric soil indicators recorded No ranking since soils heavily impacted by reclamation and flooding

13 Methods Hydrology Ratings: 1 = Good channel form and hydrology stable banks and no evidence of headcutting, no channel stabilization and grade control measures recommended 2 = Good hydrology, but channel form is not optimal stabilization or grade control measures optional 3 = Minor mechanical modifications required 4 = Bank stabilization or grade control structures required

14 Methods Cost/Benefit Determinations Rating of 3-4 = little work required Rating of 5-6 = moderate work required Rating of 7-8 = significant work required to bring the reach into compliance Rating of A = good wetland enhancement potential with structural modifications and additional plantings Rating of B = little improvement anticipated even with additional plantings and structural modifications

15 Results All but one reach exceeded 15% total vegetative cover by 2nd growing season (by ocular estimate) (reclamation performance standard) 3 reaches No supplemental planting needed 3 reaches Benefit from plantings, but not mandatory 10 remaining reaches Supplemental plantings needed 8 reaches Need channel stability or grade control remediation measures 7 reaches Good cost/benefit ratio for remediation work

16 Conclusions Vegetation and channel stability goals needed assistance at some sites/reaches Vegetation in the project area within parameters of performance standards No changes to the reclamation performance standards recommended Monitoring methodology needed to be modified to better capture vegetation density and diversity

17 Goals and Objectives Met? Collect post-flood baseline data Determine recovery status of affected reaches Identify if supplemental plantings needed Identify in-channel stabilization or grade control areas Determine if reclamation performance standards are being met, could be met, or need to be modified Determine if monitoring protocols need to be modified

18 2015 Project Updates Used Rapid Characterization data form to compare reaches from 2014 to 2015 First monitoring year using modified approach 2015 storm events continued to impact reclamation area High bedload volumes, channel incision, and channel instability continue to prevent vegetation establishment In-channel stabilization design and planning is underway and expected to be implemented in

19 Acknowledgements Special thanks to: Mark Oliver from Basin Hydrology, Inc. (Durango, CO), who was instrumental in the development and implementation of the geomorphic reach analysis on this project Ken Carlson and Robin Bay of Habitat Management, Inc. (Englewood, CO) Richard Spotts, P.E. and Kate Malers, P.E. of Water and Earth Technologies, Inc. (Fort Collins, CO)

20 Questions? Lower Reach 10 looking upstream 07/24/2013 after high-flow event 08/19/2014 two years post-construction 08/19/2015 three years post-construction

Sims Bayou Federal Flood Damage Reduction Project

Sims Bayou Federal Flood Damage Reduction Project Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

The answers to some of the following questions are separated into two major categories:

The answers to some of the following questions are separated into two major categories: Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the

More information

7.0 Stream Restoration

7.0 Stream Restoration 7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1

MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1 MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1 Mitigation Goals and Objectives o Describe functions lost at impact site o Describe functions to be gained at mitigation site o Describe overall watershed

More information

P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM

P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM A. INTRODUCTION Peter Mattejat, PE KCI Technologies, Inc.; Laurel, Maryland Bruce Thompson

More information

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

APPLICATION PROCESS FOR LAND DISTURBING PERMIT PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing

More information

Post Construction Stormwater Management Checklist Program

Post Construction Stormwater Management Checklist Program Post Construction Stormwater Management Checklist Program Anahid Damerau, CPESC, CPSWQ Christopher Smith, P.E. Department of Environmental Protection Stormwater Section Watershed Management Program The

More information

How To Assess An Area For Erosion

How To Assess An Area For Erosion SKY BASIN (UPPER CA 1 WATERSHED) EROSION ASSESSMENT Prepared by Kevin Drake, CPESC Integrated Environmental Restoration Services, Inc. August 2014 COMMON GROUND UNCOMMON SOLUTIONS P.O. BOX 7559 2780 LAKE

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

Mine Plan of Operations Reclamation Bond Checklist

Mine Plan of Operations Reclamation Bond Checklist Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,

More information

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation

More information

Flood Hazard Area Technical Manual Section 8 Bank Stabilization and Stream Restoration

Flood Hazard Area Technical Manual Section 8 Bank Stabilization and Stream Restoration Flood Hazard Area Technical Manual Section 8 Bank Stabilization and Stream Restoration Prepared by: New Jersey Section American Water Resources Association Stream Restoration Committee FHA Subcommittee

More information

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental

More information

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework

More information

RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking Portal at www.regulations.gov.

RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking Portal at www.regulations.gov. April 18, 2011 U.S. Army Corps of Engineers Attn: CECW CO R 441 G Street, N.W. Washington, DC 20314 1000 RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking

More information

A Stream Restoration Case Study in the California Central Coast

A Stream Restoration Case Study in the California Central Coast International Erosion Control Association Annual Conference 2009, Reno, Nevada Case Study Technical Presentation A Stream Restoration Case Study in the California Central Coast Justin S. Rogers, P.E.,

More information

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local

More information

Thank you to all of our 2015 sponsors: Media Partner

Thank you to all of our 2015 sponsors: Media Partner Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

UGIP Technical Committee Key Principles of Grazing Management

UGIP Technical Committee Key Principles of Grazing Management UGIP Technical Committee Key Principles of Grazing Management Why Grazing Management? Sustain land health and productivity Demonstrate good land stewardship Ensure a future for livestock grazing Monitoring

More information

Appendix C. Municipal Planning and Site Restoration Considerations

Appendix C. Municipal Planning and Site Restoration Considerations Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning

More information

e, EPA mental Wastewater Treatment Facilities for the City of New Bedford, MA Executive Summary Final Environmental Impact Statement July 1991

e, EPA mental Wastewater Treatment Facilities for the City of New Bedford, MA Executive Summary Final Environmental Impact Statement July 1991 e, EPA United mental States Region I protection JFK Federal Building Boston, MA 02203 Wastewater Treatment Facilities for the City of New Bedford, MA Executive Summary Final Environmental Impact Statement

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

Concepts for Post Flood River Corridor Restoration

Concepts for Post Flood River Corridor Restoration Concepts for Post-Flood River Corridor Restoration Dave Rosgen, P.H., Ph.D. Wildland Hydrology Fort Collins, Colorado A Special Thanks to our Sponsors: Copyright 2014 Wildland Hydrology 1 Workshop Goals

More information

Passive Restoration 101: Framework and Techniques Overview. Amy Chadwick, Great West Engineering August 26, 2015 Butte, America

Passive Restoration 101: Framework and Techniques Overview. Amy Chadwick, Great West Engineering August 26, 2015 Butte, America Passive Restoration 101: Framework and Techniques Overview Amy Chadwick, Great West Engineering August 26, 2015 Butte, America What Defines Passive Restoration? Process-based, nature-driven Minimal equipment

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami). Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties.

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties. DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties. There were 10 comments received in response to an April 14, 2014

More information

E&SC Training & Certification

E&SC Training & Certification E&SC Training & Certification 5 Chapter E&SC training involves educating, training and certifying individuals involved with managing stormwater, erosion and sediment on NCDOT construction projects. The

More information

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus EFB 496.10/696.03 Wetland Restoration Techniques Online Class Syllabus SUNY-ESF College of Environmental Science and Forestry Summer Session II 2015 Wetland Restoration Techniques is a graduate and undergraduate

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Assessing Rivers for Restoration Purposes. Ann L. Riley Waterways Restoration Institute

Assessing Rivers for Restoration Purposes. Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration Purposes Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration Purposes Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration

More information

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014 Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,

More information

Tres Rios del Norte Feasibility Study

Tres Rios del Norte Feasibility Study Tres Rios del Norte Feasibility Study Santa Cruz River Pima County, Arizona February 2011 Study Area: 18 Miles of Santa Cruz River (Prince to Sanders), portions of City of Tucson, Town of Marana, and unincorporated

More information

Post-Flood Assessment

Post-Flood Assessment Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of

More information

Watersheds, Streams, & Highways: Resiliency in Disaster Recovery Through Partnerships and Innovation

Watersheds, Streams, & Highways: Resiliency in Disaster Recovery Through Partnerships and Innovation Watersheds, Streams, & Highways: Resiliency in Disaster Recovery Through Partnerships and Innovation Chris Sturm Colorado Water Conservation Board Stream Restoration Coordinator 303 866 3441 chris.sturm@state.co.us

More information

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.

More information

Photo Credit: Geoff Brosseau

Photo Credit: Geoff Brosseau Objectives Contain Educate Reduce/Minimize Description As a consequence of its function, the stormwater conveyance system collects and transports urban runoff that may contain certain pollutants. Maintaining

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

Experience Summary. KINA MURPHY, M.S. Ecologist / Community Planner 9 Stone Ridge Road, Santa Fe, NM 87505 Cell: 505-603- 7188. Education / Training

Experience Summary. KINA MURPHY, M.S. Ecologist / Community Planner 9 Stone Ridge Road, Santa Fe, NM 87505 Cell: 505-603- 7188. Education / Training Ecologist / Community Planner 9 Stone Ridge Road, Santa Fe, NM 87505 Cell: 505-603- 7188 Education / Training Universities/Colleges Ph.D Candidate, Biology/ Ecology, University of New Mexico, Collins Lab,

More information

Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.

Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods. Week 10 River Hydraulics Rehabilitating Urban Waterways (From http://hubpages.com/hub/river-bank-erosion-control-methods) See also the resources placed on Moodle. Water channels should be viewed as a resource

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

National Environmental Policy Act and Permitting Services for the Mining Industry

National Environmental Policy Act and Permitting Services for the Mining Industry Imagine the result Imagine the result National Environmental Policy Act and Permitting Services for the Mining Industry INNOVATIVE, SUSTAINABLE AND GROUNDED SOLUTIONS National Environmental Policy Act

More information

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan State of Louisiana Coastal Protection and Restoration Authority of Louisiana 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan for East Marsh Island Marsh Creation State Project Number TV-21

More information

Joel Tillery, P.E., CH2M HILL. SESWA 2010 Annual Conference October 7, 2010

Joel Tillery, P.E., CH2M HILL. SESWA 2010 Annual Conference October 7, 2010 Joel Tillery, P.E., CH2M HILL SESWA 2010 Annual Conference October 7, 2010 The need for water quality improvement is a reason to play the game. Local governments dealt a variety of federal, state, and

More information

Waste Handling & Disposal

Waste Handling & Disposal Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

Colorado Wildfires & Flash Floods

Colorado Wildfires & Flash Floods Colorado Wildfires & Flash Floods Brian Varrella, P.E., CFM Floodplain Administrator & High Park Fire Specialist Fort Collins, Colorado 970-416-2217 bvarrella@fcgov.com @COriverdude 1 Photo: Varrella,

More information

THE POND-AND-PLUG TREATMENT FOR STREAM AND MEADOW RESTORATION: RESOURCE EFFECTS AND DESIGN CONSIDERATIONS

THE POND-AND-PLUG TREATMENT FOR STREAM AND MEADOW RESTORATION: RESOURCE EFFECTS AND DESIGN CONSIDERATIONS THE POND-AND-PLUG TREATMENT FOR STREAM AND MEADOW RESTORATION: RESOURCE EFFECTS AND DESIGN CONSIDERATIONS A Briefing Paper for Plumas National Forest Resource Specialists and Managers The Red Clover McReynolds

More information

The Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table.

The Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table. The Hydrologic Cycle Page 1 of 1 Name Directions: The hydrologic cycle consists of the processes that change and move water through the earth s system. Use the terms below to label the hydrologic cycle.

More information

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

CASFM Stormwater Quality Field Trip June 23rd, 2011

CASFM Stormwater Quality Field Trip June 23rd, 2011 CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined

More information

Appendix J Online Questionnaire

Appendix J Online Questionnaire Appendix J Online Questionnaire In accordance with the Paperwork Reduction Act, this questionnaire was approved by the Office of Management and Budget (OMB). The OMB control number and expiration date

More information

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Liquid Capital Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Basic Bank Permitting Process Submit Prospectus to IRT. If approved then: Conduct site visit with IRT. If approved then:

More information

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects

More information

Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners

Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners In recent years, multiple flood events in the New York City

More information

Neversink River East Branch

Neversink River East Branch Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station

More information

Preventing Basement Flooding

Preventing Basement Flooding Preventing Basement Flooding Perry Lindquist Land Resources Manager Waukesha County Dept. of Parks & Land Use Waukesha County Storm Water Workshop April 10, 2013 Presentation Outline Background Case study

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008

Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008 Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008 In partnership with Montana Department of Fish, Wildlife, and Parks (FWP), American Wildlands, and Wildlife Forever, the Madison

More information

STATE OF INDIANA AMENDMENT #4 TO ACTION PLAN FOR CDBG SUPPLEMENTAL DISASTER RECOVERY FUNDS (Method of Distribution Section Only)

STATE OF INDIANA AMENDMENT #4 TO ACTION PLAN FOR CDBG SUPPLEMENTAL DISASTER RECOVERY FUNDS (Method of Distribution Section Only) STATE OF INDIANA AMENDMENT #4 TO ACTION PLAN FOR CDBG SUPPLEMENTAL DISASTER RECOVERY FUNDS (Method of Distribution Section Only) U.S. Department of Housing and Urban Development Docket No. FR-5256-N-01

More information

Work Breakdown Structure Element Dictionary. Final Design

Work Breakdown Structure Element Dictionary. Final Design Initiation FD 4.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope. The lead office develops these project parameters

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded.

Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded. Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded. Key Messages Shelters and settlements should be sited above the highest

More information

February 4, 2011. hoffman.stephen@epa.gov. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth

February 4, 2011. hoffman.stephen@epa.gov. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth February 4, 2011 VIA E-MAIL AND CERTIFIED MAIL #7010 0290 0002 0577 6226 Mr. Stephen Hoffman US Environmental Protection Agency (5304P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 hoffman.stephen@epa.gov

More information

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Introductions Brett Long, PE Project Permitting & Construction Oversight Chris Streb, PE Project Designer & Construction Oversight Assistance WHO WE ARE

More information

The Teton Creek Restoration Project Summary:

The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens

More information

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association

More information

Prepared By: Tom Parker Geum Environmental Consulting, Inc.

Prepared By: Tom Parker Geum Environmental Consulting, Inc. Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs

More information

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE

More information

SECTION 5.4 LOGJAM REMOVAL AND RIVER RESTORATION. Overview. Logjam Removal Using Heavy. Tools. Machinery. Large-Scale River Restoration

SECTION 5.4 LOGJAM REMOVAL AND RIVER RESTORATION. Overview. Logjam Removal Using Heavy. Tools. Machinery. Large-Scale River Restoration SECTION 5.4 LOGJAM REMOVAL AND RIVER RESTORATION Overview Practice 401 Practice 402 Practice 403 Logjam Removal Using Hand-held Tools Logjam Removal Using Heavy Machinery Large-Scale River Restoration

More information

Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation

Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation 702 E. Johnson Street, Madison, Wisconsin 53703 (608) 441-2677 Fax (608) 441-2676 soc@wlwca.org

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Integrated Restoration Prioritization

Integrated Restoration Prioritization Integrated Restoration Prioritization Habitat Restoration and Environmental Monitoring Projects Section Restoration Services Division Definition Restoration Prioritization is a process of combining various

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT Section 24.0 Summary of s VE51988 KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT SUMMARY OF COMMITMENTS TABLE OF CONTENTS TABLE OF CONTENTS... 24-I 24.0 SUMMARY

More information

REGULATORY GUIDANCE LETTER

REGULATORY GUIDANCE LETTER REGULATORY GUIDANCE LETTER. 07-02 Date: July 4, 2007 SUBJECT: Exemptions for Construction or Maintenance of Irrigation Ditches and Maintenance of Drainage Ditches Under Section 404 of Clean Water Act 1.

More information

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association

More information

ALTERNATIVE SOURCES OF FUNDING FOR

ALTERNATIVE SOURCES OF FUNDING FOR November 2015 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by

More information