1 FINAL Environmental Impact Statement (EIS) for the Mississippi River-Gulf Outlet (MRGO), Louisiana, and Lake Borgne Wetland Creation and Shoreline Protection Project U.S. Army Corps of Engineers New Orleans District June 2009

2 Please direct inquiries on this Final Environmental Impact Statement to Dr. William P. Klein, Jr., Environmental Manager, U.S. Army Corps of Engineers New Orleans District; P.O. Box 60267, New Orleans, LA , (504) , Cover picture is Lake Borgne (foreground), MGRO Channel (middle), and the community of Yscloskey (background). Picture provided by Kenneth Duffy, Ph.D., BEM Systems, Inc.

3 Abstract FINAL ENVIRONMENTAL IMPACT STATEMENT MISSISSIPPI RIVER-GULF OUTLET (MRGO), LOUISIANA, AND LAKE BORGNE Wetland Creation and Shoreline Protection LEAD AGENCY: U.S. Army Corps of Engineers- Mississippi Valley, New Orleans District (CEMVN). ABSTRACT: The U.S. Army Corps of Engineers, New Orleans District (CEMVN), proposes to construct shoreline protection features along the Lake Borgne shoreline and restore and nourish wetlands in the Mississippi River Gulf Outlet (MRGO) and Lake Borgne estuarine complex. Construction of the MRGO, in synergistic combination with other natural and man-made factors, has caused land loss, shoreline erosion, saltwater intrusion, habitat modification, and adversely impacted wildlife and fisheries within the project area. Without action, land loss in the project area is predicted to continue at the same or accelerated rates, with approximately 9,850 acres (3,991 hectares [ha]), including 6,255 acres (2,534 ha) of brackish marsh and 3,595 acres (1,456 ha) of saline marsh, projected to be lost over the 50-year period of analysis. Without action, critical landscape components of this estuarine complex, such as the land bridge separating Lake Borgne and the MRGO, would continue to degrade and fragment thereby increasing the number and size of breaches through the land bridge. The land bridge is an important geomorphic feature that isolates tidal processes in the lake and channel; protects inland barge traffic on the Gulf Intracoastal Waterway; and provides critical and essential fish and wildlife habitat. Recent numerical sensitivity studies generally show that protecting wetlands (preventing their loss) has a net effect of lowering storm surge and wave heights compared to a future condition with extensive wetland loss. However, because the acreage of wetlands lost, levee heights and alignments, shoreward depths and storm characteristics all affect the height of storm surge, it is difficult to determine at this stage of scientific knowledge the effect of wetland loss in the area around Lake Borgne on storm surge. Ten alternative plans, with various combinations of wetland creation and nourishment and shoreline protection, were developed and evaluated with the assistance of the U.S. Fish and Wildlife Service as a Cooperating Agency. Screening criteria were developed to select an alternative plan that would best meet the planning goals and objectives. Seven alternative plans were eliminated from further consideration because they did not adequately address the problems or meet all of the planning goals or objectives. Three alternatives (Alternatives 2, 3, and 10) were examined in detail. These three alternatives maximized the number of wetland acres that would be protected and restored, contained elements that would work together to produce a greater overall benefit to the land bridge, and limited detrimental environmental impacts to the project area. Alternative 2 would initially create, nourish, and protect a total of 3,897 acres (1,579 ha) of wetlands with a net total of 2,264 acres (917 ha) of wetlands and a value of 1,278 Average Annual Habitat Units (AAHUs) over the 50-year period of analysis. Alternative 3 would initially create, nourish, and protect a total of 4,050 acres (1,640 ha) of wetlands with a net total of 2,284 acres (925 ha) of wetlands and a value of 1,423 AAHUs over the 50-year period of analysis. Alternative 10 would initially create, nourish, and protect a total of 3,867 acres (1,567 ha) of wetlands with a net total of 2,162 acres (876 ha) of wetlands and a value of 1,189 AAHUs over the 50-year period of analysis. Alternative 10, with total estimated cost of $62,400,000 inclusive of associated investigation, environmental, engineering and design, construction, and supervision, is the Selected Plan (SP). The SP best meets the screening criteria; would accomplish the planning objectives and goals; would be consistent with the Environmental Operating Principles; and would best satisfy the Congressional mandate provided in Public Law and Public Law for the repair, construction or provision of measures or structures necessary to protect, restore or increase wetlands, to prevent saltwater intrusion or storm surge along the MRGO. Comments: Please direct inquiries on this Final Environmental Impact Statement (FEIS) to the U.S. Army Corps of Engineers, New Orleans District, Attention: Dr. William P. Klein, Jr., P.O. Box 60267, New Orleans, Louisiana Telephone: (504) ; FAX: (504) The official closing date for receipt of comments will be 30 days from the date on which the Notice of Availability of the FEIS appeared in the Federal Register (July 20, 2009). Abstract 1

4

5 Executive Summary EXECUTIVE SUMMARY S.1 PURPOSE AND NEED FOR ACTION The U.S. Army Corps of Engineers, Mississippi Valley Division, New Orleans District (CEMVN), proposes to construct shoreline protection features along the Lake Borgne shoreline and restore and nourish wetlands in the Mississippi River Gulf Outlet (MRGO) and Lake Borgne estuarine complex. Construction of the MRGO, in synergistic combination with other natural and man-made factors, has caused land loss, shoreline erosion, saltwater intrusion, habitat modifications, and adversely impacted wildlife and fisheries within the project area. Without action, land loss in the project area is predicted to continue at the same or accelerated rates, with approximately 9,850 acres (3,991 hectares [ha]) including 6,255 acres (2,534 ha) of brackish marsh and 3,595 acres (1,456 ha) of saline marsh, projected to be lost over the 50-year period of analysis. Without action, critical landscape components of this estuarine complex, such as the land bridge separating Lake Borgne and the MRGO, would continue to degrade and fragment thereby increasing the number and size of breaches through the land bridge. The land bridge is an important geomorphic feature that isolates tidal processes in the lake and channel; protects inland barge traffic on the Gulf Intracoastal Waterway (GIWW); and provides critical and essential fish and wildlife habitat. Tropical storms and hurricanes with varying levels of storm surge and flood stages have impacted, and would likely continue to impact southeastern Louisiana. Recent numerical sensitivity studies generally show that protecting wetlands (preventing their loss) has a net effect of lowering storm surge and wave heights compared to a future condition with extensive wetland loss. However, because the acreage of wetlands lost, levee heights and alignments, shoreward depths, and storm characteristics all affect the height of storm surge, it is difficult to determine at this stage of scientific knowledge the effect of wetland loss in the area around Lake Borgne on storm surge. Environmental impacts from the continued degradation and fragmentation of the land bridge would include disruption of natural littoral flows; increased tidal prism; increased hydraulic flushing; degradation and loss of wetlands that provide critical and essential fish and wildlife habitats used for shelter, nesting, feeding, roosting, cover, nursery, and other life requirements; reduction in productivity; degradation and loss of essential fish habitat (EFH), especially transitional habitat between estuarine and marine environments; and increased inter- and intraspecific competition between resident and migratory fish and wildlife species for decreasing wetland resources. S.2 STUDY AUTHORITY In December 2005, the Department of Defense, Emergency Supplemental Appropriations to Address Hurricanes in the Gulf of Mexico, and Pandemic Influenza Act, 2006 (Public Law ) directed the USACE to repair navigation channels and other projects damaged by the 2005 hurricanes and to restore flood damage reduction and hurricane and storm damage reduction projects to the level of protection for which they were designed. The Act appropriated $75,000,000 for authorized operation and maintenance activities along the ES 1

6 Executive Summary Mississippi River-Gulf Outlet channel. In June 2006, Congress clarified the intended purpose of the $75,000,000 appropriated for authorized operation and maintenance activities along the MRGO. Consistent with the language in the Third Supplemental Conference Report, Section 2304 in Title II, Chapter 3 of the Emergency Supplemental Appropriations Act for Defense, the Global War on Terror, and Hurricane Recovery, 2006 (Public Law ) states that the $75,000,000 is to be used for the repair, construction or provision of measures or structures necessary to protect, restore or increase wetlands, to prevent saltwater intrusion or storm surge. S.3 STUDY AREA The 92,217-acre (37,361 ha) project area, part of the Pontchartrain Basin, is located in the vicinity of New Orleans in Orleans and St. Bernard parishes, Louisiana. The project area is located within the St. Bernard delta complex, the oldest deltaic complex within the Mississippi Deltaic Plain Region. The project area is part of the Lake Borgne estuarine complex and is comprised of the MRGO navigation channel and Lake Borgne land bridge and the southern portion of Lake Borgne. S.4 PUBLIC INVOLVEMENT The National Environmental Policy Act provides for an early and open public process for determining the scope of issues, resources, impacts, and alternatives to be addressed in the draft environmental impact statement (DEIS). A Notice Requesting Scoping Comments was sent out on December 8, 2006, to all individuals, organizations, and agencies believed to have an interest in or that may be affected by the proposed action project. The CEMVN also held an interagency meeting on December 19, 2006 to present the proposed action and request comments. A DEIS was released to the public on October 31, 2008, followed by a 45-day public review period. This Final Environmental Impact Statement incorporates the comments received from the 45-day review period of the DEIS. S.5 AREAS OF CONTROVERSY AND UNRESOLVED ISSUES Construction and operation of the MRGO, in synergistic combination with other natural and man-made factors, has caused direct, indirect and cumulative land loss, shoreline erosion, saltwater intrusion, habitat modification, and impacts to wildlife and fisheries resources throughout the project area. Determining the extent to which the construction and operation of the MRGO contributes to these impacts and what, if any, actions would be necessary to remediate any such impacts remains a controversial issue. Based upon recent sensitivity studies conducted by the Engineer Research and Development Center (ERDC) in support of the South Louisiana Comprehensive Coastal Protection and Restoration (LACPR) evaluation of comprehensive hurricane protection analysis and designs, the loss of wetland areas does increase storm surge and wave potential at the nearby hurricane protection system. However, because the acreage of wetlands lost, levee heights and alignments, shoreward depths, and storm characteristics all affect the height of storm surge, it is difficult to determine at this stage of scientific knowledge the effect of wetland loss in the area around Lake Borgne on storm surge. ES 2

7 Executive Summary S.6 ALTERNATIVES Alternative plan features were developed as specific solutions that, when properly combined into alternative plans, would meet the project goals and objectives and be consistent with the Congressional mandate. Based upon the problems of wetland loss, shoreline erosion, saltwater intrusion, and storm surge threats in the project area, the PDT initially considered alternative plan features including wetland creation and nourishment, shoreline protection, surge barriers or wave breaks, ridge restoration, vegetative plantings, freshwater diversion, and saltwater barriers. Alternative plan features were combined into ten alternative plans, each with a total construction cost of about $55,000,000. Various combinations and sizes of wetland creation and nourishment and shoreline protection features were developed and evaluated to determine the best combinations of features that would meet the planning objectives. In addition to the No Action Alternative, ten alternative plans with various combinations of wetland creation and nourishment and shoreline protection features were developed and evaluated. Initial evaluation of the ten alternative plans examined how well the combination of features would protect the critical land bridge and complement existing projects, as well as meet the other sorting criteria. Seven alternative plans were eliminated from further consideration and not carried over for detailed analyses. While the features in all of the alternative plans would provide benefits, the alternative plans eliminated from further consideration either did not adequately complement existing/authorized projects along the Lake Borgne shoreline or would not sufficiently meet the other planning objectives, such as protecting the critical land bridge. Initial analysis found Alternatives 2, 3, and 10 would best meet the planning goals and objectives. These three alternatives were subsequently analyzed in greater detail to allow a more thorough comparison of potential benefits. Benefits were measured in three ways: (1) the initial acres created/protected/restored; (2) the net acres created/protected/restored over the 50-year study period; and, (3) Average Annual Habitat Units (AAHUs). Alternative 2. This alternative would create 1,500 acres (608 ha) and nourish 1,350 acres (547 ha) of brackish marsh in the Golden Triangle. Alternative 2 would also construct five shoreline protection features. Foreshore rock dikes would be located along the Lake Borgne shoreline in the Golden Triangle area (17,700 linear feet [lf]; 5,395 m) to protect 223 acres (90 ha); in the vicinity of Bayou Bienvenue (16,230 lf; 4,946 m) to protect 186 acres (75 ha); in the vicinity of Bayou Dupre (17,650 lf; 5,379 m) to protect 142 acres (58 ha); and west of Shell Beach (15,400 lf; 4,694 m) to protect 194 acres (79 ha). One shoreline protection feature would consist of the installation of ACM between Mile 45 and Mile 47 along the southern shoreline of the MRGO (10,840 lf; 3,304 m) to protect 301 acres (122 ha). These shoreline protection features would protect a total of 1,047 acres (424 ha) of adjacent fragmented wetlands from degradation and wave erosion. Alternative 2 would require a total 9.5 million cubic yards (cy) (7.3 million cubic meters) of borrow for wetland creation and nourishment that would be removed from approximately 1,070 acres (433 ha) of Lake Borgne waterbottoms. Alternative 2 would place a total of 284,350 square yards (sq yd) (238,020 sq m) of geotextile fabric and 572,800 tons (565,728 metric tons) of rock for the Lake Borgne shoreline protection features, and 24,600 tons (24,296 metric tons) of crushed rock and 10,840 lf (3,304 m) of ACM along the MRGO shoreline. A total of acres (75.4 ha) of Lake Borgne and MRGO waterbottoms ES 3

8 Executive Summary would be dredged for floatation access. Material dredged for floatation access would be used beneficially to the maximum extent practicable to create wetlands between the shoreline protection dike and the shoreline, or temporarily stockpiled adjacent to the floatation channel and returned to the channel following completion of construction features. Over the 50-year period of analysis Alternative 2 would protect, create and nourish a net total of 2,264 acres (917 ha) and provide 1,278 AAHUs. Alternative 3. This alternative would create 1,400 acres (567 ha) and nourish 1,350 acres (547 ha) of brackish marsh in the Golden Triangle; and create 500 acres (203 ha) and nourish 420 acres (170 ha) of saline marsh in the area west of Shell Beach. Alternative 3 would also construct two shoreline protection features located along the Lake Borgne shoreline in the vicinity of Bayou Bienvenue (16,230 lf; 4,946 m) to protect 186 acres (75 ha) and west of Shell Beach (15,400 lf; 4,694 m) to protect 194 acres (79 ha). These shoreline protection features would protect a total of 381 acres (154 ha) of adjacent fragmented wetlands from degradation and wave erosion. Alternative 3 would require a total 11.4 million cy (8.7 million cubic meters) of borrow for wetland creation and nourishment that would be removed from approximately 1,850 acres (750 ha) of Lake Borgne waterbottoms. Alternative 3 would place a total of 134,000 sq yd (112,167 sq m) of geotextile fabric and 286,200 tons (282,667 metric tons) of crushed rock along the Lake Borgne shoreline. A total of 59.9 acres (24.3 ha) of Lake Borgne waterbottoms would be dredged for floatation access. Material dredged for floatation access would be used beneficially to the maximum extent practicable to create wetlands between the shoreline protection dike and the shoreline, or temporarily stockpiled adjacent to the floatation channel and returned to the channel following completion of construction features. Over the 50-year period of analysis Alternative 3 would protect, create and nourish a net total of 2,284 acres (925 ha) and provide 1,423 AAHUs. Alternative 10. This alternative would create 1,250 acres (506 ha) and nourish 1,400 acres (567 ha) of brackish marsh in the Golden Triangle; and create 425 acres (172 ha) and nourish 270 acres (109 ha) of saline marsh west of Shell Beach. Alternative 10 also includes three shoreline protection features located along the Lake Borgne shoreline: in the vicinity of Bayou Bienvenue (16,230 lf; 4,946 m) to protect 186 acres (75 ha); in the vicinity of Bayou Dupre (17,650 lf; 5,379 m) to protect 142 acres (58 ha); and west of Shell Beach (15,400 lf; 4,694 m) to protect 194 acres (79 ha). These shoreline protection features would protect a total of 522 acres (211 ha) of adjacent wetlands from degradation and wave erosion. Alternative 10 would require a total 9.7 million cy (7.4 million cubic meters) of borrow for wetland creation and nourishment that would be removed from approximately 1,850 acres (750 ha) of Lake Borgne waterbottoms. Alternative 10 would place a total of 208,650 sq yd (174,654 sq m) of geotextile fabric and 423,200 tons (417,975 metric tons) of rock along the Lake Borgne shoreline. A total of acres (47.9 ha) of Lake Borgne waterbottoms would be dredged for floatation access. Material dredged for floatation access would be used beneficially to the maximum extent practicable to create wetlands between the shoreline protection dike and the shoreline, or temporarily stockpiled adjacent to the floatation channel and returned to the channel following completion of construction features. Over the 50-year period of analysis Alternative 10 would protect, create and nourish a net total of 2,162 acres (876 ha) and provide 1,189 AAHUs. ES 4

9 Executive Summary S.7 COMPARISION OF IMPACTS No Action Alternative. Proposed wetland creation/nourishment and shoreline protection features would not be implemented under the No Action Alternative. The No Action Alternative would have no direct impacts on significant resources. Rather, impacts would primarily be indirect and cumulative, and related to continued land loss and shoreline erosion of Lake Borgne and the MRGO, including the eventual loss of the critical land bridge separating these two water bodies. Although the MRGO channel is deauthorized for navigation, land loss in the project area would continue at the same or accelerated rates, with approximately 9,850 acres (3,991 ha), including 6,255 acres (2,534 ha) of brackish marsh and 3,595 acres (1,454 ha) of saline marsh, projected to be lost over the 50-year period of analysis. Continued wetland fragmentation and the eventual conversion to shallow open water habitat would have negative consequences on a variety of important environmental resources in the project area. Indirect impacts would primarily result from the continued wetland loss, degradation, and fragmentation from the land bridge between Lake Borgne and the MRGO. Impacts would include an increase in the acres of water bottoms, disruption of natural littoral flows, increased tidal prism, increased hydraulic flushing, degradation and loss of wetlands that provide important and essential fish and wildlife habitats used for shelter, nesting, feeding, roosting, cover, nursery, and other life requirements; reduction in productivity; conversion of essential fish habitat (EFH) from higher quality categories to lower quality categories, especially from emergent wetlands to open water bottoms; localized decline in commercial fisheries and oyster leases; and increased inter- and intra-specific competition between resident and migratory fish and wildlife species, including endangered and threatened species, for decreasing wetland resources. Plankton and benthic populations would continue their shift towards more salinetolerant species. Continued land loss in the Lake Borgne estuarine complex would threaten cultural and historic resources as well as reduce the aesthetic visual complexity of the area. Wetland-related recreation resources would be potentially lost. Projected land loss would result in increased flows and water levels as area is converted from an estuarine system to a more marinedominated system. There would also be some redistribution of eroded sediments, especially during tropical storms. Other hydrology resources including water use and supply, and groundwater would remain similar to existing conditions. Socioeconomic and human resources within the uninhabited project area would generally be similar to existing conditions, with the following exceptions. Wetland degradation and loss throughout the project area would continue to threaten the stability of existing infrastructure and likely result in increased maintenance and possibly some relocation. Deauthorization of the MRGO provided in the Water Resources Development Act (WRDA) of 2007, coupled with the authorized construction of a closure structure and the Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS), would eliminate navigation access from the Gulf of Mexico to New Orleans along this channel. Increasing human populations and infrastructure in surrounding areas would indirectly adversely effect air and water quality in the project area. Under the No Action Alternative, the land bridge between Lake Borgne and the MRGO channel would continue to degrade thereby reducing the storm buffering capability of this estuarine complex. Based upon recent sensitivity studies conduced by the ERDC in support of the ES 5

10 Executive Summary LACPR evaluation of comprehensive hurricane protection analysis and designs, the loss of wetland areas does increase storm surge and wave potential at the hurricane protection system. Increasing the acreage of wetlands in the proposed action area (landbridge between Lake Borgne and the MRGO) will not significantly change storm surge height in this area. A significant increase in wetland acreage in the area could have an effect on storm surge. Cumulative impacts would be the synergistic combination of wetland loss within the land bridge between Lake Borgne and the MRGO with the impacts of other coastal wetland loss, and the benefits of restoration activities. Negative impacts would be offset, to some extent, by the positive benefits of restoration activities in and near the project area, including: the Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) PO-30 project; the MRGO 2006 Lake Borgne Shoreline Protection, (Doullut's Canal to Jahncke's Ditch), St. Bernard Parish, LA (06-C-0210) project; the MRGO 2007 North Bank Foreshore Dike Construction and Repairs, Mile 44.4 to Mile 39.9 (Non-Continuous), St. Bernard Parish, LA (07-C-0089) project; and other wetland restoration efforts authorized under the LCA Plan in WRDA of Features of the authorized GNOHSDRRS as well as the closure structure on the MRGO channel near the Bayou La Loutre ridge could affect the hydrology of the study area. The closure structure near Bayou La Loutre would reduce tidal exchange between Lake Borgne and Breton Sound, which is projected to reduce salinities in the project area by up to 6.6 ppt. Additionally, the closure structure and sector gates on the GIWW and Bayou Bienvenue planned near the confluence of the GIWW and the MRGO channel for the authorized improvements to the GNOHSDRRS would alter flow patterns in and near the western end of the project area. These features, in combination with the authorized diversion near Violet, Louisiana, would further reduce salinities to an unknown level. Alternative 10 (Selected Plan [SP]). The land bridge between Lake Borgne and the MRGO is a critical geomorphic feature of the Lake Borgne estuarine complex. Direct impacts of implementing Alternative 10 (SP) include the creation, nourishment, and protection of a total of 3,867 acres (1,567 ha) of brackish and saline wetlands of this critical geomorphic feature. Approximately 1,850 acres (750 ha) of Lake Borgne water bottoms would be unavoidably impacted by removing 9,700,000 cy (7,406,454 cubic meters) of borrow material for marsh creation and nourishment. Other adverse direct impacts would be localized, temporary and primarily related to construction activities. These impacts would include increased turbidity, water temperatures and biological oxygen demand (BOD), and decreased dissolved oxygen. However, these impacts would generally be temporary and waters would return to ambient conditions following completion of construction. Any slow-moving or sessile organisms (e.g., benthic organisms) would likely suffer unavoidable injury or mortality due to dredging operations and placement of fill and rock. Indirect impacts of implementing Alternative 10 (SP) include the creation, nourishment, and protection of a net total of 2,162 acres (876 ha) of brackish and saline wetlands with a value of 1,189 AAHUs over the 50-year period of analysis. Alternative 10 (SP) would restore and protect a large portion of the Lake Borgne estuarine complex that provides important and essential vegetated habitats, especially transitional habitat between estuarine and marine environments. These habitats are used by fish and wildlife for spawning, nursery, nesting, foraging, cover, and predator refugia habitats that support numerous economically and recreationally important fish and wildlife species. Increased wetland vegetative growth and ES 6

11 Executive Summary productivity would also reduce inter- and intra- specific competition between resident and migratory fish and wildlife species for limited coastal vegetated wetland resources. Shoreline protection features would reduce wave-induced erosion and alter sheet flows from Lake Borgne into adjacent emergent wetlands. However, shoreline protection features would be constructed to maintain interconnectivity and allow the ingress and egress of aquatic organisms throughout the Lake Borgne estuarine complex. In addition, natural bayous and other waterways and channels would not be affected by the proposed actions and their existing connectivity would continue. There would be localized changes in flows and sediment accretion and deposition patterns due to shoreline protection features. Shoreline protection features would impede previously open access between Lake Borgne and the brackish and saline emergent wetland marshes. However, shoreline protection features would reduce the wave energy between the dikes and the shoreline, which would encourage deposition of suspended sediments. The project area is remote and uninhabited. Consequently, there would be no direct, indirect or cumulative impacts to socioeconomic and human resources such as populations, employment and personal income, agriculture, or forestry. However, implementing Alternative 10 (SP) would protect and restore some portions of the land bridge between Lake Borgne and the MRGO channel that would provide some socioeconomic and human resource benefits. Alternative 10 (SP) would protect and restore portions of the land bridge that is an important geomorphic feature that isolates tidal processes in the lake and channel; protects inland barge traffic on the Gulf Intracoastal Waterway (GIWW); and provides critical and essential fish and wildlife habitat, especially transitional habitat between estuarine and marine environments that are important for commercial fisheries. Cumulative impacts would be the synergistic effect of the combination of impacts of other wetland loss and the benefits from other restoration efforts. Project benefits would be partially supplemented by the overall net acres created, nourished, and protected by other Federal, state, local, and private restoration efforts including: CWPPRA 33,690 acres (13,649 ha); State 2,543 acres (1,030 ha); Mitigation Civil Works 4,990 acres (2,022 ha); Mitigation Regulatory Permits 6,411 acres (2,597 ha); Vegetation 535 acres (217 ha); Section 204/1135, Beneficial Use 226 acres (92 ha); WRDA 16,000 acres (6,482 ha) for a total of 64,410 acres (26,095 ha). The CWPPRA PO-30 and 32 projects are under construction, including the Lake Borgne shoreline between Doulluts Canal and Jahncke s Ditch and the north bank of the MRGO between Mile 40 and Mile These projects would provide shoreline protection near or adjacent to the features in this plan, and would protect portions of the land bridge area between the MRGO channel and Lake Borgne. Additionally, a diversion near Violet, Louisiana, coupled with the closure structure south of Bayou La Loutre and the features of the GNOHSDRRS, would serve to decrease salinities in the project area by up to 6.6 ppt. Alternative 10 (SP) would work synergistically with those projects to provide more complete protection for the land bridge, and increased habitat resources for wildlife and aquatic organisms, including fishery species. These projects would also interact synergistically to increase opportunities for recreation. Alternative 2. Direct, indirect and cumulative impacts of Alternative 2 would be similar to those described for Alternative 10 (SP), with the following exceptions. Alternative 2 would create, nourish, and protect a total of 3,897 acres (1,579 ha) of brackish and saline wetlands. Indirect impacts of implementing Alternative 2 include the creation, nourishment, and ES 7

12 Executive Summary protection of a net total of 2,264 acres (917 ha) of brackish and saline wetlands with a value of 1,278 AAHUs over the 50-year period of analysis. Alternative 3. Direct, indirect and cumulative impacts of Alternative 3 would be similar to those described for Alternative 10 (SP), with the following exceptions. Alternative 3 would create, nourish, and protect a total of 4,050 acres (1,640 ha) of brackish and saline wetlands. Indirect impacts of implementing Alternative 3 include the creation, nourishment, and protection of a net total of 2,284 acres (925 ha) of brackish and saline wetlands with a value of 1,423 AAHUs over the 50-year period of analysis. S.8 THE SELECTED PLAN Of the three alternative plans carried over for detailed analysis, Alternative 10 would best satisfy the Congressional mandate for the repair, construction, or provision of measures or structures necessary to protect, restore or increase wetlands, to prevent saltwater intrusion or storm surge. Alternative 10 best meets the screening criteria and would accomplish the planning objectives and goals. In addition, Alternative 10 would best meet the Economic and Environmental Principles and Guidelines for Water and Related Land Implementation Studies (P&G) criteria of completeness, effectiveness, efficiency, and acceptability. Alternative 10 would also be consistent with the USACE Environmental Operating Principles. Hence, Alternative 10 is the Selected Plan (SP). The SP would create a total of 1,675 acres (679 ha) of marsh and nourish an additional 1,670 acres (677 ha) of emergent wetlands in the Golden Triangle and Shell Beach vicinities. The SP would also provide shoreline protection in the form of foreshore rock dikes along three reaches of the Lake Borgne. Shoreline protection features would protect a total of 522 acres (211 ha) of adjacent wetlands from degradation and wave erosion. Over the 50-year period of analysis, the SP would create, nourish and protect a net total of 2,162 acres (876 ha). S.9 CONCLUSIONS The Selected Plan (SP) would create and nourish approximately 3,345 acres (1,355 ha) of brackish and saline wetlands within the Lake Borgne estuarine complex and provide 49,280 ft (15,020 m), or approximately 9.3 miles (15.0 km), of shoreline protection along Lake Borgne. Primary features of the SP include: 1. Wetland creation and nourishment along the MRGO and Lake Borgne critical land bridge at the Golden Triangle and in the Shell Beach area. 2. Shoreline protection (using foreshore rock dikes) in the vicinity of Bayou Bienvenue, Bayou Dupre, and west of Shell Beach in Lake Borgne. Wetland creation/nourishment and shoreline protection features of the SP would restore fragmented brackish and saline wetlands in the Golden Triangle and Shell Beach areas of the Lake Borgne estuarine complex. This action would also protect and restore a large portion of the MRGO and Lake Borgne critical land bridge; contribute to the overall goals of hurricane protection and wetlands restoration in southeast Louisiana; and foster advancing salinity reduction goals in the Pontchartrain Basin. The SP is the plan that would best meet the planning objectives implicit in the Congressional mandate to repair, construct, or provide measures or structures necessary to protect, restore or ES 8

13 Executive Summary increase wetlands, to prevent saltwater intrusion or storm surge in the MRGO. The SP would also best meet the four P&G criteria of completeness, effectiveness, efficiency, and acceptability. S.10 RECOMMENDATIONS The recommended plan presented in this report is in the overall public interest and a justified expenditure of Federal funds. As a comprehensive approach to protect, stabilize, and augment the land bridge between Lake Borgne and the MRGO, the District Commander recommends the construction of rock dikes for shoreline protection along the south bank of Lake Borgne in the reaches referenced as Bayou Bienvenue, Bayou Dupre, and West of Shell Beach. The District Commander also recommends the construction of marsh creation projects in the Golden Triangle and Shell Beach area. The total estimated cost for the project is $62,400,000 inclusive of associated investigation, environmental, engineering and design, construction, and supervision. Construction of this project is funded 100 percent by the Federal Government. However, the operations and maintenance of this project would be assumed by the non-federal sponsor (Coastal Protection and Restoration Authority of Louisiana) as recommended by the Legislative EIS prepared for the closure of the MRGO channel. The recommendation contained herein reflects the information available at this time, January 2008 price levels, and current Departmental policies governing the formulation of individual projects. They do not reflect program and budgeting priorities inherent in the formulation of a national civil works construction program, nor the perspective of higher levels of review within the Executive Branch. Consequently, the recommendation may be modified before they are transmitted to the Congress as proposals for authorization and/or implementation funding. ES 9

14

15 Table of Contents TABLE OF CONTENTS CHAPTER 1 INTRODUCTION AUTHORITY FOR THE PROPOSED ACTION PROJECT AREA DESCRIPTION PURPOSE AND NEED FOR ACTION Purpose of Action Problems and Need for Action Opportunities GOALS AND OBJECTIVES NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS PRIOR STUDIES, REPORTS, AND PROJECTS Gulf Intracoastal Waterway (GIWW) 1826 and others Mississippi River and Tributaries (MR&T), Bayous La Loutre, St. Malo and Yscloskey, Mississippi River-Gulf Outlet, September Inner Harbor Navigation Canal Lock Study, Lake Pontchartrain and Vicinity, Louisiana, Hurricane Protection Project, Mississippi River Outlets, Venice, Louisiana, MRGO St. Bernard Parish, Louisiana, Reconnaissance Report, February Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA), MRGO North Bank Foreshore Protection Evaluation, Coast 2050: Toward a Sustainable Coastal Louisiana, MRGO Reevaluation Study, Environmental Assessment for the Lake Borgne Shoreline Protection Project, Ecological Review, Lake Borgne and MRGO Shoreline Protection, Continuing Authorities Program Louisiana Coastal Area Ecosystem Restoration Study (LCA Plan), Second Emergency Supplemental Appropriations Act to Meet the Immediate Needs Arising from the Consequences of Hurricane Katrina, 2005 (Public Law ) Emergency Supplemental Appropriations Acts, Coastal Impact Assistance Program, TOC i

16 Table of Contents Louisiana Coastal Protection & Restoration (LACPR), Investigation of the Performance of the New Orleans Flood Protection Systems in Hurricane Katrina on August 29, 2005, Final Report, July Performance Evaluation of the New Orleans and Southeast Louisiana Hurricane Protection System, Draft Final Report of the Interagency Performance Evaluation Task (IPET) Force, USACE, Violet Freshwater Distribution (Deauthorized as of September 11, 2006) Integrated Ecosystem Restoration and Hurricane Protection: Louisiana s Comprehensive Master Plan for a Sustainable Coast, Water Resources Development Act of Individual Environmental Report (IER), #11 Improved Protection on the Inner Harbor Navigation Canal, Orleans and St. Bernard Parishes, Louisiana, Mississippi River Gulf Outlet Environmental Restoration, ongoing efforts Integrated Final Report to Congress and Legislative Environmental Impact Statement for the MRGO Deep-Draft Deauthorization Study, Mississippi River Gulf Outlet Operations and Maintenance Mississippi River Gulf Outlet Ecosystem Restoration Plan Feasibility Study Storm Surge Risk Reduction Projects Environmental Assessments and Environmental Impact Statements CHAPTER 2 ALTERNATIVES GENERAL PLAN FORMULATION Overview Preliminary Alternative Plan Formulation Environmental Operating Principles Planning Approach DEVELOPMENT AND EVALUATION OF FEATURES Development of Alternative Plan Features Wetland Creation and Nourishment Shoreline Protection Features Surge Barriers and/or Wave Breaks Ridge Restoration Vegetative Plantings Freshwater Diversions Saltwater Barriers Screening Alternative Plan Features TOC ii

17 Table of Contents Features Having Major Value Wetland Creation and Nourishment Shoreline Protection Features Features Having Limited or No Value DEVELOPMENT AND SCREENING OF ALTERNATIVE PLANS Development of Alternative Plans Description of Alternative Plans Plans Not Carried Over for Detailed Analysis Alternative Plans Retained for Detailed Analysis Plan 2 Summary Plan 3 Summary Plan 10 Summary NO-ACTION ALTERNATIVE PLAN FORMULATION RESULTS Description of the Selected Plan (SP) Components of the Selected Plan Effectiveness of the SP in Meeting Objectives and Goals Effectiveness of the SP in Meeting Environmental Operating Principles Project Costs Plan Implementation and Accomplishments Summary of Tentatively Selected Plan Accomplishments CHAPTER 3 AFFECTED ENVIRONMENT GENERAL CLIMATE GEOMORPHIC AND PHYSIOGRAPHIC SETTING SOILS Historic and Existing Conditions COASTAL VEGETATION RESOURCES Historic and Existing Conditions WILDLIFE RESOURCES Historic and Existing Conditions FISHERY RESOURCES General Historic and Existing Conditions Finfish Shrimp TOC iii

18 Table of Contents Blue Crab Oyster PLANKTON RESOURCES Historic and Existing Conditions WATER BOTTOMS AND BENTHIC RESOURCES ESSENTIAL FISH HABITAT Historic and Existing Conditions ENDANGERED AND THREATENED SPECIES Historic and Existing Conditions HYDROLOGY Flow and Water Levels Historic and Existing Conditions Sediment Historic and Existing Conditions WATER QUALITY Historic and Existing Conditions Salinity RECREATIONAL RESOURCES Historic and Existing Conditions PUBLIC LANDS Historic and Existing Conditions CULTURAL RESOURCES INCLUDING NATIONAL REGISTER LISTINGS Historic and Existing Conditions Cultural Setting Previous Investigations Previously Conducted Cultural Resources Surveys AESTHETICS Historic and Existing Conditions Scenic Rivers and Streams NOISE Historic and Existing Conditions AIR QUALITY Historic and Existing Conditions SOCIECONOMIC AND HUMAN RESOURCES Historic and Existing Conditions Population TOC iv

19 Table of Contents Infrastructure Employment and Income Navigation Oil, Gas and Utilities Pipelines Commercial Fisheries Oyster Leases Flood Control and Hurricane Protection Levees HAZARDOUS, TOXIC AND RADIOACTIVE WASTES Historic and Existing Conditions CHAPTER 4 ENVIRONMENTAL CONSEQUENCES SOILS The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts COASTAL VEGETATION RESOURCES The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts WILDLIFE RESOURCES The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts FISHERY RESOURCES The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts PLANKTON RESOURCES The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts WATER BOTTOMS AND BENTHIC RESOURCES TOC v

20 Table of Contents The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts ESSENTIAL FISH HABITAT (EFH) The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts ENDANGERED AND THREATENED SPECIES The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts HYDROLOGY RESOURCES Flow and Water Levels The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Condition Indirect Impacts Future With Project Conditions Cumulative Impacts Sediment The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Condition Indirect Impacts Future With Project Conditions Cumulative Impacts WATER QUALITY RESOURCES The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts Salinity Regimes The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts RECREATIONAL RESOURCES The No-Action Alternative Future With Project Conditions Direct Impacts TOC vi

21 Table of Contents Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts PUBLIC LANDS The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts CULTURAL RESOURCES INCLUDING NATIONAL REGISTER LISTINGS The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts AESTHETICS The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts NOISE The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts AIR QUALITY The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts SOCIOECONOMIC AND HUMAN RESOURCES Population The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts Infrastructure The No-Action Alternative Future With Project Conditions Direct Impacts TOC vii

22 Table of Contents Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts Employment and Income The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts Navigation The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts Oil, Gas and Utilities Pipelines The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts Commercial Fisheries The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts Oyster Leases The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts Flood Control and Hurricane Protection Levees The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts HAZARDOUS, TOXIC, AND RADIOLOGICAL WASTE (HTRW) The No-Action Alternative Future With Project Conditions Direct Impacts Future With Project Conditions Indirect Impacts Future With Project Conditions Cumulative Impacts TOC viii

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan State of Louisiana Coastal Protection and Restoration Authority of Louisiana 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan for East Marsh Island Marsh Creation State Project Number TV-21

More information

New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012

New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012 New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012 Host: Falcolm E. Hull, Vice President/Technical Expert, ARCADIS, U.S. Inc. Attending: Cherie Coffman, Coastal Projection

More information

Comprehensive Recommendations Supporting the Use of the Multiple Lines of Defense Strategy to Sustain Coastal Louisiana 2008 Report (Version I)

Comprehensive Recommendations Supporting the Use of the Multiple Lines of Defense Strategy to Sustain Coastal Louisiana 2008 Report (Version I) Comprehensive Recommendations Supporting the Use of the Multiple Lines of Defense Strategy to Sustain Coastal Louisiana 2008 Report (Version I) This report recommends integrated coastal projects and levee

More information

Greater New Orleans Hurricane and Storm Damage Risk Reduction System

Greater New Orleans Hurricane and Storm Damage Risk Reduction System Greater New Orleans Hurricane and Storm Damage Risk Reduction System Mike Park Chief Task Force Hope Mississippi Valley Division U.S. Army Corps of Engineers March 15, 2011 US Army Corps of Engineers BUILDING

More information

Gulf Intracoastal Waterway

Gulf Intracoastal Waterway TEXAS DEPARTMENT OF TRANSPORTATION Gulf Intracoastal Waterway Photo by TexasGulfCoastOnline.com Gulf Intracoastal Waterway in Texas Figure 1 - Texas GIWW Executive Summary The Texas Department of Transportation

More information

Multiyear Implementation and Expenditure Plan

Multiyear Implementation and Expenditure Plan Louisiana s Draft RESTORE Act Multiyear Implementation and Expenditure Plan I. EXECUTIVE SUMMARY The Resources and Ecosystems Sustainability, Tourist Opportunities, and Revived Economies of the Gulf Coast

More information

New Orleans Hurricane and Storm Damage Risk Reduction System

New Orleans Hurricane and Storm Damage Risk Reduction System New Orleans Hurricane and Storm Damage Risk Reduction System Luis A. Ruiz, P.E. Hurricane Protection Office U.S. Army Corps of Engineers August 27, 2009 US Army Corps of Engineers New Orleans Area Hurricane

More information

Restore Americas Estuaries 5 th National Conference

Restore Americas Estuaries 5 th National Conference Restore Americas Estuaries 5 th National Conference Richard Raynie Chief, LACES Division OCPR Patricia Strayer, PE Principal Engineer Dynamic Solutions, LLC KRR and LCA are bookends in progress of federal

More information

JOINT PUBLIC NOTICE June 28, 2016

JOINT PUBLIC NOTICE June 28, 2016 DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT CORPS OF ENGINEERS REGULATORY FUNCTIONS BRANCH P.O. BOX 60267 NEW ORLEANS, LA 70160 JOINT PUBLIC NOTICE June 28, 2016 STATE OF LOUISIANA DEPARTMENT OF ENVIRONMENTAL

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

United States Army Corps of Engineers, Civil Works

United States Army Corps of Engineers, Civil Works United States Army Corps of Engineers, Civil Works Fiscal Year 2013 Federal Program Inventory May 2013 Table of Contents Introduction... 2 Program Inventory... 3 1. Navigation... 3 2. Flood Risk Management...

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS .-ro:'j - I US Army Corps of Engineers r& New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Craig Martin nae-pn-nav@usace.army.mil Programs/Project Management

More information

Louisiana-Mississippi Gulf Coast Ecosystem Restoration Working Group. Roadmap for Restoring Ecosystem Resiliency and Sustainability March 2010

Louisiana-Mississippi Gulf Coast Ecosystem Restoration Working Group. Roadmap for Restoring Ecosystem Resiliency and Sustainability March 2010 I. Introduction Louisiana-Mississippi Gulf Coast Ecosystem Restoration Working Group Roadmap for Restoring Ecosystem Resiliency and Sustainability March 2010 And here on the Gulf Coast, we're working to

More information

Golden Triangle Marsh Creation. RESTORE Proposal Coastal Protection & Restoration Authority

Golden Triangle Marsh Creation. RESTORE Proposal Coastal Protection & Restoration Authority I. Summary Sheet Golden Triangle Marsh Creation Appendix A: Council Member Applicant and Proposal Information Summary Sheet Point of Contact: Jerome Zeringue Council Member: State of Louisiana Phone: (225)

More information

Coastal Management Definitions

Coastal Management Definitions Coastal Management Definitions Administrator the administrator of the Office of Coastal Management of the Department of Natural Resources. Advanced Mitigation Project a project implemented to create, restore,

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

Restoring Ecosystems. Ecosystem Restoration Services

Restoring Ecosystems. Ecosystem Restoration Services Restoring Ecosystems Ecosystem Restoration Services 2 Ecosystem Restoration Services AECOM s integrated approach sciencebased planning, with innovative design and execution delivers sustainable and cost-effective

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS by Hany Elwany, Ph.D. Scripps Institution of Oceanography Headwaters to Oceans Conference 25 October 2003 CE Ref #03-22 San Diego County Lagoons

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

Background Information: The Mamquam River Floodplain Restoration Project

Background Information: The Mamquam River Floodplain Restoration Project Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 CEMP-SPD (l105-2-10a) APR 1 5 2012 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on coastal

More information

Section 401 Water Quality Certification

Section 401 Water Quality Certification Section 401 Water Quality Certification Department of Health Environmental Management Division Clean Water Branch Voice: (808) 586-4309 Fax: (808) 586-4352 http://www.hawaii.gov/health/environmental/water/cleanwater/index.html

More information

RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking Portal at www.regulations.gov.

RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking Portal at www.regulations.gov. April 18, 2011 U.S. Army Corps of Engineers Attn: CECW CO R 441 G Street, N.W. Washington, DC 20314 1000 RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking

More information

April 17, 2015 SUMMARY OF SUBJECT MATTER

April 17, 2015 SUMMARY OF SUBJECT MATTER April 17, 2015 SUMMARY OF SUBJECT MATTER TO: FROM: RE: Members, Subcommittee on Water Resources and Environment Staff, Subcommittee on Water Resources and Environment Hearing on A Review of the President

More information

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects Eligibility Checklist This Ecological Restoration Limited Project Eligibility Checklist guides the applicant in determining if their project is eligible to file as an Inland or Coastal Ecological Restoration

More information

The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues

The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary Water Flows & Current Issues Florida Governor Rick Scott August 20, 2013 Upper Chain of Lakes

More information

Civil Works - FY 2015 CROmnibus & FY 2016 Budget

Civil Works - FY 2015 CROmnibus & FY 2016 Budget Civil Works - FY 2015 CROmnibus & FY 2016 Budget Mark L. Mazzanti Chief, Programs Integration Division Civil Works Directorate, HQUSACE US Army Corps of Engineers BUILDING STRONG 1 BUILDING STRONG USACE

More information

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Jim Lester, PhD. and Lisa Gonzalez Houston Advanced Research Center Galveston

More information

Bolinas Lagoon Ecosystem Restoration Feasibility Project Marin County Open Space District

Bolinas Lagoon Ecosystem Restoration Feasibility Project Marin County Open Space District Bolinas Lagoon Ecosystem Restoration Feasibility Project Marin County Open Space District With Funding from the California State Coastal Conservancy & the U.S. Army Corps of Engineers July 2006 Bolinas

More information

Aligning Natural and Built Infrastructure for

Aligning Natural and Built Infrastructure for Aligning Natural and Built Infrastructure for Houston Climate Resilience National Exercise Program (NEP) Houston Climate Change Preparedness & Resilience Workshop Edmond J. Russo, Jr., PhD, PE, D.CE, D.NE,

More information

Michigan Wetlands. Department of Environmental Quality

Michigan Wetlands. Department of Environmental Quality Department of Environmental Quality Wetlands are a significant component of Michigan s landscape, covering roughly 5.5 million acres, or 15 percent of the land area of the state. This represents about

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

Appendix B: Cost Estimates

Appendix B: Cost Estimates Appendix B: Estimates This appendix presents the estimated costs of the monitoring and supplemental research components presented in Section 3 of this document. A 20% quality assurance and quality control

More information

7.0 Stream Restoration

7.0 Stream Restoration 7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational

More information

The project site lies within an AE Zone and portions lie within the regulated floodway. Development of this site is subject to TCLUO, Section 3.060.

The project site lies within an AE Zone and portions lie within the regulated floodway. Development of this site is subject to TCLUO, Section 3.060. Introduction This application is for the Southern Flow Corridor-Landowner Preferred Alternative, a flood mitigation and tidal wetland restoration project. The Port of Tillamook Bay is the applicant in

More information

CHAPTER 4 ALTERNATIVES COMPARISON

CHAPTER 4 ALTERNATIVES COMPARISON CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections

More information

Greater New Orleans Hurricane & Storm Damage Risk Reduction System

Greater New Orleans Hurricane & Storm Damage Risk Reduction System Greater New Orleans Hurricane & Storm Damage Risk Reduction System SLFPA-East Update Col. Robert Sinkler, Commander Hurricane Protection Office July 15, 2010 US US Army Army Corps Corps of of Engineers

More information

Using the Carbon Market to Provide Financial Support for Coastal Restoration and Protection. fact SHEET

Using the Carbon Market to Provide Financial Support for Coastal Restoration and Protection. fact SHEET Using the Carbon Market to Provide Financial Support for Coastal Restoration and Protection fact SHEET Using the Carbon Market to Provide Financial Support for Coastal Restoration and Protection Coastal

More information

AP ENVIRONMENTAL SCIENCE 2010 SCORING GUIDELINES

AP ENVIRONMENTAL SCIENCE 2010 SCORING GUIDELINES AP ENVIRONMENTAL SCIENCE 2010 SCORING GUIDELINES Question 4 (a) Based on the rate cited above, calculate the expected increase in sea level, in meters, during the next 50 years. One point can be earned

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

GAO HURRICANE KATRINA. Strategic Planning Needed to Guide Future Enhancements Beyond Interim Levee Repairs. Report to Congressional Committees

GAO HURRICANE KATRINA. Strategic Planning Needed to Guide Future Enhancements Beyond Interim Levee Repairs. Report to Congressional Committees GAO United States Government Accountability Office Report to Congressional Committees September 2006 HURRICANE KATRINA Strategic Planning Needed to Guide Future Enhancements Beyond Interim Levee Repairs

More information

Remaining Wetland Acreage 1,500,000 915,960 584,040-39%

Remaining Wetland Acreage 1,500,000 915,960 584,040-39% NEW JERSEY Original Wetland Acreage Remaining Wetland Acreage Acreage Lost % Lost 1,500,000 915,960 584,040-39% New Jersey Wetlands: Nearly 99 percent of New Jersey s wetlands are palustrine or estuarine.

More information

Policy & Management Applications of Blue Carbon. fact SHEET

Policy & Management Applications of Blue Carbon. fact SHEET Policy & Management Applications of Blue Carbon fact SHEET Policy & Management Applications of Blue Carbon Coastal Blue Carbon - An Important Wetland Ecosystem Service Coastal Blue Carbon refers to the

More information

Offshore Alabama Prepared by the University of South Alabama MBA Consulting Group in December 2010

Offshore Alabama Prepared by the University of South Alabama MBA Consulting Group in December 2010 Offshore Alabama Prepared by the University of South Alabama MBA Consulting Group in December 2010 Executive Summary The Mobile Area Chamber of Commerce s Oil and Gas Task Force (Task Force) was created

More information

U.S. Army Corps of Engineers Tulsa District

U.S. Army Corps of Engineers Tulsa District U.S. Army Corps of Engineers Tulsa District Mike Abate, PMP. Chief, Civil Works Branch, PPMD April 17, 2015 US Army Corps of Engineers Civil Works Mission Water Supply 50% of Corps water supply contracts

More information

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction Instructions and Supporting Materials Table of Contents Introduction Permit fact sheet Completeness checklist Introduction MassDEP Permit Applications, as well as Instructions & Support Materials, are

More information

Sims Bayou Federal Flood Damage Reduction Project

Sims Bayou Federal Flood Damage Reduction Project Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

How the Chicago District, US Army Corps of Engineers Conducts Project Management 20 November 2013

How the Chicago District, US Army Corps of Engineers Conducts Project Management 20 November 2013 How the Chicago District, US Army Corps of Engineers Conducts Project Management 20 November 2013 Lieutenant Colonel Kevin Lovell Deputy Commander Chicago District US Army Corps of Engineers US Army Corps

More information

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants OMB Approval No.: 0648-0538 Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants Instructions The National Environmental Policy

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

Most informed people realize that cumulative impacts have had

Most informed people realize that cumulative impacts have had Welcome to the First Issue of Rivers & Coast! The goal of the new Rivers & Coast newsletter is to keep readers well informed of current scientific understanding behind key environmental issues related

More information

NATURAL RESOURCE RESTORATION LESSON PLAN Fix It!

NATURAL RESOURCE RESTORATION LESSON PLAN Fix It! NATURAL RESOURCE RESTORATION LESSON PLAN Fix It! Theme Repairing Damaged Resources Links to Overview Essays and Resources Needed for Student Research http://oceanservice.noaa.gov/education/corals http://oceanservice.noaa.gov/topics/coasts/restoration/

More information

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT August 2006 Prepared by: NB Department of Environment Environment 1. INTRODUCTION This General Review Statement

More information

Water Resource Issues in the 110 th Congress

Water Resource Issues in the 110 th Congress Order Code RS20569 Updated June 1, 2007 Water Resource Issues in the 110 th Congress Betsy A. Cody Specialist in Natural Resources Policy Resources, Science, and Industry Division H. Steven Hughes Analyst

More information

2011 Annual Inspection Report

2011 Annual Inspection Report State of Louisiana Office of Coastal Protection and Restoration 2011 Annual Inspection Report for TERREBONNE BAY SHORE PROTECTION DEMONSTRATION State Project Number TE45 Priority Project List 10 February

More information

33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136.

33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136. 33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136. Source: 73 FR 19670, Apr. 10, 2008, unless otherwise noted.

More information

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Deepwater Horizon Oil Spill Phase I Early Restoration Plan and Environmental Assessment

Deepwater Horizon Oil Spill Phase I Early Restoration Plan and Environmental Assessment Deepwater Horizon Oil Spill Phase I Early Restoration Plan and Environmental Assessment Prepared by the Deepwater Horizon Natural Resource Trustees from State of Alabama State of Florida State of Louisiana

More information

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters. Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. Z0314-1000

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. Z0314-1000 DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. Z0314-1000 REPLY TO ATTENTION OF: CECW-PC (l0-1-7a).oi9 MAY 1996. THE SECRETARY OF THE ARMY ". 1. I submit for transmission to Congress

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project

PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project Regulatory Division 1455 Market Street, 16 th Floor San Francisco, CA 94103-1398 PUBLIC NOTICE NUMBER: 2004-28512S PUBLIC

More information

New Orleans Hurricane and Storm Damage Risk Reduction System Managing Risk

New Orleans Hurricane and Storm Damage Risk Reduction System Managing Risk New Orleans Hurricane and Storm Damage Risk Reduction System Managing Risk by Karen Durham-Aguilera, P.E. Director Task Force Hope U.S. Army Corps of Engineers Aug 18, 2008 2 U.S. Army Corps of Engineers

More information

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014 Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors Recreational Boating Educational Conference December 11, 2014 Operators Face Change and Challenges Environmental Conditions Fluctuating

More information

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH ST, SW, ROOM 10M15 ATLANTA, GEORGIA 30303-3490

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH ST, SW, ROOM 10M15 ATLANTA, GEORGIA 30303-3490 DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH ST, SW, ROOM 10M15 ATLANTA, GEORGIA 30303-3490 CESAD-CG REPLY TO ATIENTION OF: 12 Jan 2015 MEMORANDUM FOR Commander,

More information

Decision Memo. Restore Act Land Acquisition

Decision Memo. Restore Act Land Acquisition Decision Memo Restore Act Land Acquisition USDA Forest Service National Forests in Mississippi Background A broad coalition of federal. state, and municipal government agencies and private conservation

More information

Coastal Restoration Spending in Louisiana Economic Impact Analysis

Coastal Restoration Spending in Louisiana Economic Impact Analysis Coastal Restoration Spending in Louisiana Economic Impact Analysis Louisiana Workforce Commission www.lmi.laworks.net/green September 2011 In 2009, Louisiana and Mississippi partnered to research economic

More information

The answers to some of the following questions are separated into two major categories:

The answers to some of the following questions are separated into two major categories: Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the

More information

Channel Maintenance Management Plan

Channel Maintenance Management Plan Channel Maintenance Management Plan Upper Mississippi River Navigation System St. Paul District 1.0 Project Location And Description. The St. Paul District is responsible for maintaining various navigation

More information

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment SR 89/Fanny Bridge Community Revitalization Project Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment 2015 Meeting Purpose Provide a summary description of alternatives

More information

U.S. Army Corps of Engineers

U.S. Army Corps of Engineers Walla Walla District U.S. Army Corps of Engineers Hurricane Katrina Response Briefer: Joseph Saxon Today s Briefing U.S. Army Corps of Engineers Mission Events leading up to New Orleans flooding Corp s

More information

Beach Management Funding Assistance Program

Beach Management Funding Assistance Program FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF WATER RESOURCE MANAGEMENT Beach Management Funding Assistance Program Local Government Funding Requests: Ranking Criteria for Beach and Inlet

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

Protecting Floodplain. While Reducing Flood Losses

Protecting Floodplain. While Reducing Flood Losses Protecting Floodplain Natural and Beneficial i Functions While Reducing Flood Losses Jon Kusler Association of State Wetland Managers 518 872 1804; jon.kusler@aswm.org Report available at: http://aswm.org/pdf_lib/nbf.pdf

More information

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami). Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

DECISION DOCUMENT NATIONWIDE PERMIT 27

DECISION DOCUMENT NATIONWIDE PERMIT 27 DECISION DOCUMENT NATIONWIDE PERMIT 27 This document discusses the factors considered by the Corps of Engineers (Corps) during the issuance process for this Nationwide Permit (NWP). This document contains:

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

RESUME for Christopher G. Creed, P.E.

RESUME for Christopher G. Creed, P.E. Page One of Five Current Position Senior Engineer / Vice-President for Olsen Associates, Inc. a coastal engineering consulting firm in Jacksonville, Florida. Education Master of Civil Engineering, 1992.

More information

PART 2 NEW ORLEANS DRAINAGE CANALS

PART 2 NEW ORLEANS DRAINAGE CANALS PART 2 NEW ORLEANS DRAINAGE CANALS The Old Basin drainage canal was excavated in the 1790s.. This shows the systems of drainage ditches and canals established by 1829, leading to Bayou St. John. Cross

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

Subactivity: Habitat Conservation Program Element: National Wetlands Inventory

Subactivity: Habitat Conservation Program Element: National Wetlands Inventory HABITAT CONSERVATION FY 29 BUDGET JUSTIFICATION Subactivity: Habitat Conservation Program Element: National Wetlands Inventory National Wetlands Inventory ($) FTE 27 4,7 2 28 Enacted 5,255 2 Fixed Costs

More information

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 J. Bonham 2 and K. Stephenson Abstract Recently the US Army Corps of Engineers (the Corps) has increased

More information

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT PUBLIC NOTICE Engineering/Planning 696 Virginia Road Concord, MA 01742 Date: 10 November, 2015 Comment Period Ends: 10 December, 2015 In Reply, Refer To: Robert Russo Or by e-mail: Robert.S.Russo@usace.army.mil

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden

More information

4.2 Buena Vista Creek Watershed

4.2 Buena Vista Creek Watershed Buena Vista Creek Watershed 4.2 Buena Vista Creek Watershed Watershed Overview The Buena Vista Creek Watershed is the fourth-largest system within the Carlsbad Hydrologic Unit. The watershed extends approximately

More information

Shoreline Master Programs Handbook Chapter 15, Shoreline Stabilization

Shoreline Master Programs Handbook Chapter 15, Shoreline Stabilization Shoreline Master Programs Handbook Chapter 15, Shoreline Stabilization Publication Number: 11-06-010 7/15 Contents Introduction... 1 Chapter overview... 2 Description of shoreline stabilization... 2 Design

More information

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we

More information

REGULATORY GUIDANCE LETTER

REGULATORY GUIDANCE LETTER REGULATORY GUIDANCE LETTER. 07-02 Date: July 4, 2007 SUBJECT: Exemptions for Construction or Maintenance of Irrigation Ditches and Maintenance of Drainage Ditches Under Section 404 of Clean Water Act 1.

More information

US Army Corps of Engineers. New Orleans District 2011 Flood Response

US Army Corps of Engineers. New Orleans District 2011 Flood Response US Army Corps of Engineers New Orleans District 2011 Flood Response US Army Corps of Engineers BUILDING STRONG BUILDING STRONG 2011 Flood Fight The safety of the public is the Corps number one priority.

More information

Chapter 2: Project Identification, Feasibility, and Planning

Chapter 2: Project Identification, Feasibility, and Planning Chapter 2: Project Identification, Feasibility, and Planning Project identification is the first step in the strategic planning process. Before spending significant time and resources on a project, restoration

More information

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

U.S. Environmental Protection Agency, Region IX Response to Comments on the Goleta Sanitary District Draft NPDES Permit and 301(h) TDD

U.S. Environmental Protection Agency, Region IX Response to Comments on the Goleta Sanitary District Draft NPDES Permit and 301(h) TDD U.S. Environmental Protection Agency, Region IX Response to Comments on the Goleta Sanitary District Draft NPDES Permit and 301(h) TDD A. Kamil S. Azoury of Goleta Sanitary District provided comments on

More information