SIGAR. Afghan National Security Forces: Actions Needed to Improve Plans for Sustaining Capability Assessment Efforts FEBRUARY

Size: px
Start display at page:

Download "SIGAR. Afghan National Security Forces: Actions Needed to Improve Plans for Sustaining Capability Assessment Efforts FEBRUARY"

Transcription

1 SIGAR Special Inspector General for Afghanistan Reconstruction SIGAR Audit Report Afghan National Security Forces: Actions Needed to Improve Plans for Sustaining Capability Assessment Efforts FEBRUARY 2014 SIGAR AR/ANSF Capability Assessments

2 SIGAR Special Inspector General for Afghanistan Reconstruction WHAT SIGAR REVIEWED Since 2005, Congress has appropriated almost $53 billion for the Afghanistan Security Forces Fund the single largest U.S. fund for the reconstruction of Afghanistan to train, equip, and sustain the Afghan National Security Forces (ANSF). The process of transferring security responsibility to the Afghans is expected to be completed by the end of 2014, which will coincide with the completion of the current drawdown of U.S. and coalition forces. The North Atlantic Treaty Organization s Strategic Plan for Afghanistan calls for the Afghan army and police to achieve a combined surge strength of 352,000 personnel by the end of 2013, and to remain at that level through at least 2015, to allow for continued progress toward a sustainable, secure environment in Afghanistan. SIGAR s prior work and the work of others have expressed concern with the reliability and consistency of ANSF assessments. Reliable measures of the ANSF s progress toward becoming a selfsustaining force that is capable of assuming full security responsibility for Afghanistan are critical as the ANSF assume increasing responsibility for their country s security from U.S. and coalition forces. The objectives of this audit were to assess the extent to which (1) the International Security Assistance Force s (ISAF) tool for evaluating the manning, training, and equipping capacity of the ANSF the Commander s Unit Assessment Tool (CUAT) was consistently applied to assess ANSF units, and (2) ISAF is taking steps to plan for the continued collection, validation, analysis, and reporting of ANSF capacity assessments during the military drawdown and the transition of security responsibility to the Afghan government. February 2014 Afghan National Security Forces: Actions Needed to Improve Plans for Sustaining Capability Assessment Efforts SIGAR AUDIT REPORT WHAT SIGAR FOUND The National Defense Authorization Act for Fiscal Year 2008 directs the Department of Defense (DOD) to report on its assessment of the operational readiness of Afghan National Security Forces (ANSF) units. Specifically, the Act requires DOD to report on the number of ANSF units that are capable of conducting operations independently, units that are capable of conducting operations with U.S. and coalition support, and units that are not ready to conduct operations. To help meet this requirement, from April 2010 through July 2013, the International Security Assistance Force (ISAF) Joint Command (IJC) used the Commander s Unit Assessment Tool (CUAT) as a key tool for assessing and reporting on the ANSF s manning, training, and equipping capacity. The CUAT was a two-part assessment of ANSF units. The first part consisted of quantitative data, such as the total number of assigned personnel and equipment on-hand. IJC advisor teams then used this data to inform their qualitative evaluations, the second portion of the CUAT, which consisted of one overall assessment and an assessment of 14 component assessment areas. Based on their assessment findings, advisor teams assigned one of six color-coded rating definition levels to the ANSF units in each area and provided narrative comments to justify the assigned rating definition levels. From August 2011 to July 2013, these rating definition levels were (1) independent with advisors, (2) effective with advisors, (3) effective with partners, (4) developing with partners, (5) established, and (6) not assessed. CUAT assessments, combined with battlefield reporting, informal commander s assessments, and other data, served as the basis for DOD s and ISAF s overall assessment of the ANSF s operational effectiveness and readiness during this time. CUAT rating definition levels for ANSF units assessed from January 2012 to July 2013 show that there has been some improvement in the ANSF s capacity to man, train, and equip its forces. For example, the number of ANA units rated as independent with advisors increased from 20 to 93 between January 2012 and July However, the number of ANA and ANP units not assessed also increased during this time due to the drawdown of coalition forces. Between April 2010 and August 2011, IJC changed the CUAT rating definition level titles four times. Despite these changes, SIGAR s analysis of the standards supporting each level shows that the standards for the overall assessment generally remained consistent from change to change. However, the thresholds included in the standards for some of the component assessment areas changed in some cases. For example, under the September 2010 revision, an ANA unit could achieve a rating definition level of effective with advisors for equipment if its level of critical equipment was greater than 85 percent of its authorized equipment level. Under the August 2011 revision, an ANA unit could achieve that same rating definition with greater than or equal to 75 percent of its authorized equipment level. The CUAT Standard Operating Procedure outlined requirements for advisor For more information, contact SIGAR Public Affairs at (703) or sigar.pentagon.ccr.mbx.public-affairs@mail.mil.

3 teams completing the qualitative evaluation, and encouraged advisor teams to use their judgment when assessing ANSF units to assign rating definition levels and provide comments within the assessment areas. However, the CUAT Standard Operating Procedure did not provide clear guidance on the level of detail that is necessary to support a team s rating or what the team s subjective assessments should contain. This unclear guidance led to disparities in the quantity and quality of information across CUAT assessments and inconsistencies in the evaluations of ANSF units capacity to man, train, and equip its forces. In July 2013, IJC replaced the CUAT with the Regional ANSF Status Report (RASR). IJC officials stated the command replaced the system because ISAF senior leadership found the CUAT to be difficult to read, inconsistently applied, and not useful. In addition, IJC officials expect that the RASR will simplify, streamline, and improve assessments of the ANSF by allowing the command to better track the extent to which ANSF units are able to employ their manning, equipping, and training capacity, which were the focus of the CUAT, to successfully engage the enemy in combat. The RASR uses six color-coded rating definition levels (1) fully capable, (2) capable, (3) partially capable, (4) developing, (5) established, and (6) not assessed to evaluate ANSF units at the brigade and regional levels each month. In addition, the RASR focuses on assessing specific components of the units, such as infantry and communications, against one overall and five targeted categories: combined arms, command and control, leadership, sustainment, and training. These five targeted categories replace the one overall assessment and 14 component assessment areas previously used in the CUAT. As coalition forces draw down and fewer advisor teams are assigned to ANSF units, IJC officials stated they will have less insight into the ANSF s capabilities and will rely more on the ANSF for assessment data. Officials stated this will decrease their overall confidence in ANSF assessments as a whole. IJC, in coordination with the Afghan government, is taking steps to improve the ANSF s internal assessment capabilities and discussing ways to mitigate the risks of declining presence and reduced coalition oversight of the ANSF. For example, in July and August 2013, the Ministry of Interior selected nearly 100 ANP candidates to send to Turkey to learn assessment methodology and develop a new police assessment tool that would standardize assessments across the ANP. Despite these efforts, ISAF has not developed a plan that details how it will (1) ensure the continued collection, analysis, validation, and reporting of ANSF capability assessments as coalition forces drawdown and (2) address the challenges associated with having fewer advisor teams available to conduct assessments and relying on the ANSF s processes for conducting its own internal assessments. Without such a plan, ISAF may not be able to obtain an accurate understanding of ANSF units capability information that feeds into broader assessment reports on the ANSF s overall effectiveness and readiness. Note: IJC color coded the CUAT and RASR rating definition levels titles. This table reflects the command s color scheme. Source: IJC response to SIGAR data call, 12/20/2012; IJC meeting with SIGAR, 4/12/13. WHAT SIGAR RECOMMENDS SIGAR is making one recommendation. Specifically, SIGAR recommends that the ISAF Commander develop and implement a plan for collecting, validating, analyzing, and reporting ANSF capability assessments that details how ISAF will assess the ANSF s capability with fewer advisors to conduct the assessments and mitigate the challenges associated with the ANSF reporting on its own assessment results. In providing comments on a draft of this report, U.S. Force-Afghanistan stated that it concurs with the overall recommendations, but nonconcurs with some specific recommendations. SIGAR deleted one recommendation based on information provided in U.S. Forces- Afghanistan s comments. These comments, along with SIGAR s responses, are reproduced in appendix IV. For more information, contact SIGAR Public Affairs at (703) or sigar.pentagon.ccr.mbx.public-affairs@mail.mil.

4 February 5, 2014 The Honorable Charles T. Hagel Secretary of Defense The Honorable Dr. James N. Miller Under Secretary of Defense for Policy General Lloyd J. Austin III Commander, U.S. Central Command General Joseph F. Dunford, Jr. Commander, U.S. Forces-Afghanistan, and Commander, International Security Assistance Forces Lieutenant General Mark A. Milley Commander, International Security Assistance Forces Joint Command This report discusses the results of SIGAR s audit to determine if the International Security Assistance Force (ISAF) consistently applied its tools for evaluating the manning, training, and equipping capacity of the ANSF, specifically the Commander s Unit Assessment Tool. It also discusses the steps ISAF is taking to plan for the continued collection, validation, analysis, and reporting of ANSF capacity assessments during the military drawdown and the transition of security responsibility to the Afghan government. It includes one recommendation to the ISAF Commander to develop and implement a plan for collecting, validating, analyzing, and reporting ANSF capability assessments that details how ISAF will assess the ANSF s capability with fewer advisors to conduct the assessments and mitigate the challenges associated with the ANSF reporting on its own assessment results. U.S. Forces-Afghanistan (USFOR-A) provided comments on a draft of this report. In its response, USFOR-A stated that it concurs with the overall recommendations, but nonconcurs with some specific recommendations. We deleted one recommendation from our final report based on information USFOR-A provided in its comments. USFOR-A s comments, along with our responses, are reproduced in appendix IV. SIGAR conducted this work under the authority of Public Law No , as amended, and the Inspector General Act of 1978, as amended, and in accordance with generally accepted government auditing standards. John F. Sopko Special Inspector General for Afghanistan Reconstruction

5 TABLE OF CONTENTS Background... 2 Although CUAT Results Show that ANSF Capacity Has Improved, Unclear Guidance Resulted in Inconsistencies in the Quality of Data Supporting Assigned Rating Definition Levels... 4 DOD Lacks a Plan for Collecting, Validating, Analyzing, and Reporting on ANSF Assessments during the Drawdown... 8 Conclusion Recommendations Agency Comments Appendix I - Scope and Methodology Appendix II - CUAT Qualitative Assessment Areas Appendix III - CUAT Rating Definition Levels Appendix IV - Comments from U.S. Forces-Afghanistan Appendix V - Acknowledgments TABLES Table 1 - CUAT Rating Definition Levels for ANA Units Assessed from January 2012 to July Table 2 - CUAT Rating Definition Levels for ANP Units Assessed from January 2012 to July Table 3 - History of Changes to CUAT Rating Definition Level Titles, April 2010 to August Table 4 - Number of CUAT Assessments Completed during Cycle 14 through Cycle 19 (January 2012 to July 2013)... 9 FIGURES Figure 1 - Flow of ANSF Assessment Data... 4 Figure 2 - CUAT Qualitative Assessment Areas and Topics Figure 3 - Overall CUAT Rating Definition Levels Starting in August SIGAR AR/ANSF Capacity Assessments Page i

6 ABBREVIATIONS ANA ANP ANSF CM CUAT DOD IJC ISAF NATO RASR USFOR-A Afghan National Army Afghan National Police Afghan National Security Forces Capability Milestone Commander s Unit Assessment Tool Department of Defense ISAF Joint Command International Security Assistance Force North Atlantic Treaty Organization Regional ANSF Status Report U.S. Forces-Afghanistan SIGAR AR/ANSF Capacity Assessments Page ii

7 Since 2005, Congress has appropriated approximately $52.75 billion for the Afghanistan Security Forces Fund the single largest U.S. funding resource for the reconstruction of Afghanistan to train, equip, and sustain the Afghan National Security Forces (ANSF). 1 For fiscal year 2013, Congress appropriated $5.1 billion for the fund. The process of transferring security responsibility to the Afghans began in July 2011, and is expected to be completed by the end of Concurrent with this transition of security responsibility to the Afghans, since 2011, U.S. and coalition forces have been decreasing their military forces in Afghanistan and plan to complete this drawdown process in December Under the North Atlantic Treaty Organization (NATO) 3 Strategic Plan for Afghanistan, agreed upon at the Chicago Summit in May 2012, NATO announced its vision for a new mission to train, advise, and assist the ANSF after 2014, and a political commitment to provide funding for the ANSF. NATO s plan calls for the Afghan army and police to achieve a combined strength of 352,000 personnel by the end of 2013 and to remain at that level through at least 2015 to allow for continued progress toward a sustainable, secure environment in Afghanistan. From 2005 to 2010, the International Security Assistance Force (ISAF) used the Capability Milestone (CM) tool to monitor and report on progress in developing a self-sustaining and capable ANSF by evaluating units in areas such as personnel, equipment, training, and facilities. In April 2010, ISAF implemented the Commander s Unit Assessment Tool (CUAT) to assess the manning, 4 training, and equipping capacity of the ANSF on a quarterly basis, the results of which contributed to overall assessments of the forces operational effectiveness and readiness. Reliable measures of the ANSF s progress toward becoming a self-sustaining force that is capable of assuming full security responsibility for Afghanistan are critical as the ANSF assumes increasing responsibility for its country s security from U.S. and coalition forces. Further, having reliable and consistent measures of the ANSF s capacity to man, train, and equip its forces is key to ensuring that decision makers in the United States and other coalition countries have a clear understanding of the extent to which progress is being made in developing the forces. Our prior work and the work of others have expressed concern with the reliability and consistency of ANSF assessments. 5 The objectives of this audit were to assess the extent to which: 1. ISAF s tool for evaluating the manning, training, and equipping capacity of the ANSF the CUAT was consistently applied to assess ANSF units, and 2. ISAF is taking steps to plan for the continued collection, validation, analysis, and reporting of ANSF capacity assessments during the military drawdown and the transition of security responsibility to the Afghan government. 6 We did not conduct an independent assessment of the ANSF s capacity to man, train, and equip its forces. Rather, we determined whether the tool ISAF used to assess the ANSF s capacity to man, train, and equip its forces the CUAT provided users with sufficient information to inform decision making. To accomplish our objectives, we reviewed key Department of Defense (DOD) and ISAF policies and documents, such as mandated reports and relevant standard operating procedures for conducting ANSF 1 The ANSF consists of the Afghan National Army (ANA) and Afghan National Police (ANP). Currently, the authorized strength of the ANSF is 352,000. In September 2013, the ANA had an assigned force level of 192,595, including 6,778 personnel assigned to the air force, and the ANP had an assigned force level of 152, U.S. and coalition nations plan to end their combat role in Afghanistan by the end of 2014, which will involve the withdrawal of a significant number of military forces and resources. 3 The United States is one of 28 member countries of NATO. 4 Manning refers to an inventory of personnel at an activity in terms of numbers, grades, and occupations. 5 SIGAR Audit 10-11, Actions Needed to Improve the Reliability of Afghan Security Force Assessments, June 29, 2010; U.S. Government Accountability Office, Afghanistan: Key Oversight Issues, GAO SP, February 11, 2013; DOD Inspector General, Assessment of the U.S. Government Efforts to Train, Equip, and Mentor the Expanded Afghan National Police, SPO , March 3, In a separate review, we are examining the methods and tools used to determine ANSF personnel strength and plan to issue a report in the first half of SIGAR AR/ANSF Capacity Assessments Page 1

8 capacity assessments, with a focus on the CUAT. We reviewed data on CUAT results conducted from April 2011 through July 2013, and analyzed CUAT rating definition levels from April 2010 through July We interviewed officials from each of these organizations representing several offices, including ISAF Joint Command s (IJC) Campaign Transition Assessment Group. We visited select locations in Kandahar, Helmand, and Kabul provinces in Afghanistan to meet with coalition advisor teams; observe capacity assessment data collection, analysis, and verification processes; and review capacity assessment documents, which are classified. We conducted our work in Kabul, Helmand, and Kandahar provinces in Afghanistan, and Washington, D.C., from February 2013 to February 2014, in accordance with generally accepted government auditing standards. A more detailed discussion of our scope and methodology is in appendix I. BACKGROUND The National Defense Authorization Act for Fiscal Year 2008 directs DOD to, among other things, report on its assessment of the operational readiness of ANSF units. 7 Specifically, the Act calls for DOD to report on a comprehensive set of performance indicators and measures of progress toward sustainable long-term security and stability in Afghanistan, including the operational readiness status of ANSF units that are (1) capable of conducting operations independently; (2) capable of conducting operations with the support of the United States, NATO ISAF forces, or other coalition forces; (3) or not ready to conduct operations. Further, the Act requires DOD to include in its report a description of: a comprehensive and effective long-term strategy and budget, with defined objectives, for activities relating to strengthening the resources, capabilities, and effectiveness of the Afghanistan National Army (ANA) and the Afghanistan National Police (ANP) of the ANSF, with the goal of ensuring that a strong and fully-capable ANSF is able to independently and effectively conduct operations and maintain security and stability in Afghanistan. To comply with the Act, DOD provides Congress with its semiannual Report on Progress Toward Security and Stability in Afghanistan. 8 NATO s transition strategy rests on supporting an ANSF that is sustainable, of sufficient size, and capable of securing Afghanistan. A capable and sustainable ANSF will help guarantee that hard-fought security gains in the country will be preserved. The NATO-led ISAF s main effort is to facilitate the conditions under which the ANSF can successfully assume full security responsibility for Afghanistan. As such, NATO is shifting ISAF s main efforts from partnering and engaging in combat to advising using teams that train and assist the ANSF at the tactical and operational levels until Afghan forces are able to conduct operations independently. 9 As ANSF capabilities improve, ISAF plans to adjust its support levels, allowing the ANSF to move into the operational lead. From 2005 to 2010, ISAF used the CM tool to monitor and report on progress in developing a self-sustaining and capable ANSF by evaluating units in areas such as personnel, equipment, training, and facilities, with variations in assessment areas between the ANA and ANP. In June 2010, we reported that the CM rating system created a disincentive for units to achieve the highest rating, CM1, which indicated that the unit was capable of operating independently. 10 When an ANSF unit attained a CM1 rating, coalition forces withdrew assistance, such as force protection, supplies, and expertise. As a result, there was an incentive for the unit to report that it was less capable of operating independently in order maintain coalition assistance. We also 7 Pub. L. No , 1230, 122 Stat. 3, (2008) (amended 2013). 8 DOD, Report on Progress Toward Security and Stability in Afghanistan, November According to IJC, the tactical level is concerned with the execution of battles and engagements, such as the Corps, brigade, or kandak. At the operational level military forces attain strategic objectives through the design, organization, and conduct of campaigns and major operations, such as National Coordination Centers and Ground Forces Command. 10 See SIGAR Audit SIGAR AR/ANSF Capacity Assessments Page 2

9 noted in this audit that the CM rating system often overstated unit ratings by relying on misleading quantitative measures, such as the number of supplies or assigned personnel, and failing to take disparities into account. For example, some units had a full supply of vehicles but few trained drivers. We also found a lack of quality control as assessment ratings were reviewed through the chain of command. For instance, ANSF capability ratings regularly used out-dated information, and high-ranking personnel did not have access to the underlying assessment reports used to generate the summary rating reports. In April 2010, IJC introduced the CUAT as its primary tool for specifically assessing the manning, training, and equipping capacity of ANA and ANP units at the operational level. 11 The CUAT was a two-part assessment of ANSF units. The first portion of the assessment consisted of quantitative data that ANSF units provided directly to IJC s Security Force Assistance Advisor Teams. This quantitative data included the total number of personnel authorized, assigned, and present-for-duty; equipment authorized, on-hand, and operational; and required and completed training. 12 IJC s advisor teams then used this data to inform their qualitative evaluations the second portion of the CUAT, which consisted of one overall assessment and 14 component assessment areas. The qualitative evaluations were the advisor teams subjective assessments of the unit s capacities in several areas, such as communications, leadership, logistics, operations, and personnel. 13 For example, when assessing a unit s leadership, advisor teams were required to comment on leadership s competence, unit morale, and whether the ANSF unit s leaders were present and actively participated in planning and execution of operations. IJC officials told us this evaluation also allowed coalition advisors to describe the challenges, strengths, weaknesses, opportunities, and threats ANSF units face. 14 Based on their assessment findings, the advisor teams assigned one of six color-coded rating definition levels to the ANSF units in each area and provided narrative comments to justify the assigned rating definition levels. From August 2011 to July 2013, these rating definition levels were (1) independent with advisors (green), (2) effective with advisors (yellow), (3) effective with partners (orange), (4) developing with partners (red), (5) established (gray), and (6) not assessed (no color). 15 IJC scheduled CUAT assessments on a quarterly basis. The CUAT assessments helped inform ISAF and the Regional Commands of current issues regarding the development and sustainment of the ANSF. Military officials also used these assessments to determine where to place coalition advisor teams. In addition, IJC used the results of CUAT assessments along with other information, such as battlefield reporting, informal commander s assessments, and ISAF s assessments of the Ministries of Defense and Interior the ministries that oversee the ANA and ANP, respectively to develop an overall assessment of the ANSF s operational effectiveness and readiness. This overall assessment was intended to provide stakeholders with a regular update on the ANSF s overall progress toward becoming a self-sustaining force that is capable of assuming full security responsibility for Afghanistan at the end of NATO and ISAF compiled and reported the results of these assessments to a wide range of stakeholders, such as the White House, DOD, Congress and NATO, to inform decision making. Figure 1 demonstrates the process for collecting and reporting ANSF assessments. 11 IJC officials indicated that the strategic level is concerned with national or, in specific cases, alliance or coalition objectives, and includes the Ministry of Defense, Ministry of Interior, and the ANA General Staff. 12 This audit focused on the qualitative portion of the CUAT. However, during the course of the audit, we identified several weaknesses affecting the reliability of the quantitative data the ANSF provides ISAF, such as issues associated with manual reporting and low levels of literacy and numeracy within the ANSF. We plan to issue a subsequent audit report on the reliability of ANSF-provided data, with a focus on personnel data. 13 See appendix II for a list of the assessment areas and topics included in the qualitative portion of the CUAT. 14 Individual CUAT assessments and ratings are classified. 15 See appendix III for a detailed description of the overall CUAT rating definition level standards implemented in August SIGAR AR/ANSF Capacity Assessments Page 3

10 Figure 1 - Flow of ANSF Assessment Data Note: CUAT data was typically compiled with other information, such as battlefield reporting and commander s assessments, to develop an overall assessment of the ANSF. Source: SIGAR analysis of IJC documents. ALTHOUGH CUAT RESULTS SHOW THAT ANSF CAPACITY HAS IMPROVED, UNCLEAR GUIDANCE RESULTED IN INCONSISTENCIES IN THE QUALITY OF DATA SUPPORTING ASSIGNED RATING DEFINITION LEVELS CUAT Assessment Results Have Shown that ANSF Capacity Has Improved CUAT rating definition levels for ANSF units assessed from January 2012 to July 2013 show that there has been some improvement in the ANSF s capacity to man, train, and equip its forces. Specifically, the number of ANA units rated as independent with advisors increased from 20 to 93 between January 2012 and July The number of units not assessed, however, also increased from 4 to 121 during that time as coalition forces have drawn down. The number of ANP units rated as independent with advisors has decreased by 1 between January 2012 and July 2013, and, similar to the ANA, the number of units not SIGAR AR/ANSF Capacity Assessments Page 4

11 assessed also increased from 24 to 401. Tables 1 and 2 show a breakdown of the CUAT ratings for ANA and ANP units assessed from January 2012 to July Table 1 - CUAT Rating Definition Levels for ANA Units Assessed from January 2012 to July 2013 Cycle Cycle 14 (Jan Apr 2012) Cycle 15 (Apr Jul 2012) Cycle 16 (Jul Oct 2012) Cycle 17 (Oct 2012 Jan 2013) Cycle 18 (Jan Apr 2013) Cycle 19 (Apr Jul 2013) Rating Definition Level Independent Effective with Effective with Developing with with Advisors Advisors Partners Partners Established Not Assessed Note: This data reflects the CUAT rating definition levels implemented in August Source: SIGAR analysis of IJC data. Table 2 - CUAT Rating Definition Levels for ANP Units Assessed from January 2012 to July 2013 Cycle Cycle 14 (Jan Apr 2012) Cycle 15 (Apr Jul 2012) Cycle 16 (Jul Oct 2012) Cycle 17 (Oct 2012 Jan 2013) Cycle 18 (Jan Apr 2013) Cycle 19 (Apr Jul 2013) Rating Definition Level Independent with Effective Effective Developing Advisors with Advisors with Partners with Partners Established Not Assessed Note: This data reflects the CUAT rating definition levels implemented in August Source: SIGAR analysis of IJC data. SIGAR AR/ANSF Capacity Assessments Page 5

12 CUAT Rating Definition Levels Changed Four Times, but the Standards for Each Level Generally Stayed Consistent Since the CUAT s inception in 2010, IJC has changed the CUAT rating definition levels four times. According to IJC officials, the changes were necessary because, over time, rating definition levels had become artificially inflated, and officials conducting the assessments had a limited understanding of the differences between rating definition levels. Officials stated the new levels would better enable IJC to determine when a particular ANSF unit no longer needs coalition assistance, allowing the command to reassign advisor teams to less developed or newly formed units. Table 3 shows the changes to the CUAT rating definition level titles from April 2010 to August Table 3 - History of Changes to CUAT Rating Definition Level Titles, April 2010 to August 2011 Note: IJC color coded the CUAT rating definition level titles. This table reflects the command s color scheme as it changed those titles. Source: IJC response to SIGAR data call, 12/20/2012; IJC meeting with SIGAR, 4/12/13. Our analysis of the CUAT rating definition levels showed that although IJC used four different rating definition level titles the September 2010 change maintained the July 2010 rating definition levels, but changed the color coding the standards supporting each level for the overall assessment generally remained consistent from change to change. However, the thresholds included in the standards for the 14 component assessment areas changed in some cases. For example, under the September 2010 revision, an ANA unit could achieve a rating definition level of effective with advisors for equipment if its level of critical equipment was greater than 85 percent of its authorized equipment level. Under the August 2011 revision, an ANA unit could achieve that same rating definition with greater than or equal to 75 percent of its authorized equipment level, representing a decrease in the amount of equipment required. In other cases, the thresholds increased. For example under the April 2010 rating definition levels, an ANP unit could achieve a rating definition level of dependent on coalition forces for success the third highest rating definition level for training if greater than 33 percent of personnel had undergone basic training. Under the subsequent revision in July 2010, this unit would have had to have at least 50 percent of personnel complete basic training to maintain a third tier rating definition level, which had changed to effective with assistance. SIGAR AR/ANSF Capacity Assessments Page 6

13 IJC Did Not Provide Advisor Teams with Guidance on the Level of Detail Required To Support ANSF Unit Rating Definition Levels Assigned Using the CUAT As previously noted, the CUAT was a two-part assessment of ANSF units that consisted of quantitative data that ANSF units provided directly to IJC s advisor teams and the advisor teams qualitative evaluations of the units on one overall assessment and 14 component assessment areas. The CUAT Standard Operating Procedure outlined requirements for advisor teams completing the qualitative evaluation, and encouraged advisor teams to use their military judgment when assessing ANSF units to assign rating definition levels and provide comments within the assessment areas. However, the CUAT Standard Operating Procedure did not provide specific criteria defining the level of detail that was necessary to support a unit s assigned rating definition level or what these subjective portions of the assessment should contain. In addition, the fragmentary orders 16 issued at the beginning of each CUAT cycle to provide advisor teams with timelines for conducting the assessments and submitting their reports did not clearly describe the level of detail for advisor teams to include in the comments supporting their assigned rating definition levels. 17 Further, some regional commands interpreted the CUAT Standard Operating Procedure for completing the qualitative portion of the CUAT differently. This lack of clear guidance led to inconsistencies in the narrative comments included in the qualitative evaluations of ANSF units. For example, IJC officials told us that advisors in Regional Command- North commonly provided succinct responses, such as a yes or no, to the qualitative topics without additional details. In contrast, advisors in Regional Command-West provided detailed responses that sometimes did not address the individual topics. Further, IJC officials stated that some advisor teams comments only partially responded to the assessment topics. IJC officials also stated there was a tendency for new advisor teams to rate ANSF units lower than their immediate predecessors. Officials told us this was because new teams approached assessments without access to the observations the prior teams had made over time, resulting in varying rating definition levels. To address this issue, some regional commanders took it upon themselves to review assessments before approving the results, in order to avoid decreases in unit rating definition levels that were not supported with appropriate justification. As an additional control, officials told us IJC reviewed all unit assessments that resulted in a change in rating definition level. As part of this review, the command examined the justification in the narratives to ensure it supported the rating change. If the justification did not support the rating change or was not clear to the reviewer, IJC solicited additional information from the responsible advisor team. IJC officials stated that in cases in which a unit s ratings were not changed, they did not review the assessments due to limited manpower and the volume of assessments submitted each cycle. IJC Replaced the CUAT with a New Assessment System in July 2013 The IJC replaced the CUAT with a new monthly assessment system, known as the Regional ANSF Status Report (RASR), in July According to IJC s Commanding General, the CUAT was replaced because it was inconsistent and not useful to leadership. The RASR is intended to improve upon the CUAT by allowing IJC to, for example, (1) better track the extent to which ANSF units are able to employ their capacity manning, equipping, and training, which were the focus of the CUAT to successfully engage the enemy in combat in an effort to measure the capability of those units; (2) adapt advisor teams to resource constraints; and (3) better assess the varying branches of the ANSF. The RASR uses six color-coded rating definition levels (1) independent with advisors (green), (2) effective with advisors (yellow), (3) effective with partners (orange), (4) developing with partners (red), (5) established (gray), and (6) not assessed (no color) to assess ANSF unit 16 A fragmentary order is a military order used to send timely changes of existing orders to subordinate and supporting commanders while providing notification to higher and other applicable commands. 17 The fragmentary orders issued for each CUAT reporting cycle are classified. Therefore, we could not report on the specific contents of the orders. 18 With the exception of what we are reporting, much of the information on the RASR is currently classified. Therefore, we could not report specific data and guidance at the time we completed our review. SIGAR AR/ANSF Capacity Assessments Page 7

14 capabilities at the brigade and regional levels on a monthly basis. 19 In addition, the RASR will focus on assessing specific ANA and ANP components, such as infantry and communications, against one overall and five targeted categories combined arms, command and control, leadership, sustainment, and training depending on the individual component, rather than the one overall assessment and 14 component assessment areas in the CUAT s qualitative evaluation. IJC officials stated the RASR is more focused than the CUAT because it targets fewer units with greater consistency by assessing the same units each month. This approach, IJC officials stated, allows the command to better identify trends in unit capabilities, in contrast with the CUAT, with which advisor teams assessed units on a quarterly cycle but did not necessarily assess every unit each quarter. In addition, according to U.S. Forces-Afghanistan s (USFOR-A) comments on a draft version of this report, IJC issued a fragmentary order on September 30, 2013, with specific instructions on the information advisor units are to include in the comments supporting their assigned rating in each category for the assessed unit. USFOR-A s comments also noted that IJC conducts a quality control check of every narrative to ensure adequate information is provided. DOD LACKS A PLAN FOR COLLECTING, VALIDATING, ANALYZING, AND REPORTING ON ANSF ASSESSMENTS DURING THE DRAWDOWN As noted, IJC has shifted its ANSF unit-level assessment from focusing on capacity, as was done under the CUAT, to focusing on units capabilities under the RASR. Although ISAF is taking some steps to mitigate the risks associated with decreased insight into the ANSF s capability as the military drawdown continues, ISAF has not developed a formal plan that details how it will ensure the continued collection, validation, analysis, and reporting of accurate, reliable, and useful ANSF assessment data during this time. IJC plans to assign fewer advisor teams to the kandak-level of the ANA, focusing instead on advising at the higher brigade and corps levels. 20 Similarly, IJC will be assigning fewer advisor teams at the ANP provincial headquarters, instead planning to focus its advising efforts on the regional headquarters level. 21 Thus, the ANSF will have a steadily decreasing number of advised units, which will result in a reduction in the number of assessments conducted. IJC experienced the negative impact of the decrease in the number of IJC advisor teams on the number of ANSF units assessed when it still used the CUAT. From January to April 2012, IJC advisor teams assessed 98 percent of ANA units. During that same time period the following year, advisor teams only assessed 63 percent of ANA units. Table 4 shows the declining number of CUAT assessments completed from January 2012 through July When IJC developed these rating definition levels in July 2013, the command initially intended to use them under the CUAT. This would have constituted a fifth change in the CUAT rating definition levels since April However, the command did not implement this change under the CUAT, instead opting to use these rating definition levels when it introduced the RASR. 20 Combat forces form the basic operational arm of the ANA and are divided into six corps and one division, each responsible for a specific part of Afghanistan. Each ANA corps or division is made up of one to four brigades, and each brigade typically consists of six kandaks. A kandak consists of approximately 800 soldiers and is the Afghan equivalent to a U.S. Army battalion. 21 According to IJC, the command will advise the Afghan Uniformed Police at the Type A headquarters, which are regional headquarters that recently replaced the zone headquarters structure but reside in the same six provinces as the zone headquarters. SIGAR AR/ANSF Capacity Assessments Page 8

15 Table 4 - Number of CUAT Assessments Completed during Cycle 14 through Cycle 19 (January 2012 to July 2013) Note: CUAT assessments were conducted on a quarterly basis. a Estimated. IJC expects the total number of ANA and ANP units in Cycle 19 to remain the same as Cycle 18 and up to a 10 percent decrease in the number of assessed units, due to a reduction in the number of advisor teams during Cycle 19. Source: SIGAR analysis of ISAF data. Further, IJC officials told us that as ISAF continues to draw down and advises a decreasing number of ANSF units, their overall confidence in the overall assessment of the ANSF as a whole decreases. According to these officials, as assessment information collected loses fidelity, ISAF s ability to maintain its current level of insight into the ANSF s capabilities will decrease, resulting in the need to rely more heavily on the Afghans for both the quantitative and qualitative portions of the assessments. ISAF is currently working with the ANSF to ensure that timely, accurate, and mutually beneficial information can be collected and transmitted throughout the ANSF command structure. This effort is intended to facilitate the ANSF s ability to effectively track and manage its own training and readiness status and to assess itself in an effort to ensure that it can sustain these assessments beyond For example, IJC s ANSF Internal Assessment Mechanism information papers which provide updates on efforts to improve the quality and reliability of assessments as reporting shifts to the ANSF report that as coalition forces decline and insight into ANSF units reduces, IJC is working to enhance ANSF internal assessments by October Enhanced internal assessments will enable IJC to shift from advisor team reporting to ANSF reporting. Internal assessments are not new to the ANSF, as the ANA implemented its Readiness Reporting System in April 2005, and the ANP implemented its Force Readiness Report in December However, IJC reports that these ANSF readiness systems are complicated, out of date, poor at assessing or measuring effectiveness, and lacking in true measures of literacy, leader qualifications, operational and sustainment systems effectiveness, and long-term sustainability. IJC, the NATO Training Mission-Afghanistan, and the International Police Coordination Board are coordinating with the ANSF to refine the systems to make them more efficient, userfriendly, and compatible with the reporting needs of the international community. 22 IJC also reports that operational planning teams meet regularly to work to improve effectiveness of these systems. The teams goal is for the coalition to be confident in the adequacy of the ANSF reports produced under these systems by October In addition, IJC s ANSF Internal Assessment Mechanism paper indicates that the command plans to conduct three validation checks of the reliability of the Afghan internal readiness reports by comparing the results ANA s Readiness Reporting System and the ANP s Force Readiness Report against the results of the RASR. IJC conducted the first check in August 2013, and plans to conduct the second check in February 2014, and the third check in August According to IJC officials, the command received the ANSF s internal assessments data for the August 2013 validation check in October 2013, and plans to complete its analysis of this data by the end of December According to officials, because IJC will increasingly rely on the ANSF s reporting, the command is working with the ANA and ANP to develop the Afghan government s ability to conduct internal assessments at the 22 The NATO Training Mission-Afghanistan is tasked with overseeing training and equipping of Afghan forces throughout Afghanistan. The International Police Coordination Board acts as the main coordination board for institutional and police reform within Afghanistan. SIGAR AR/ANSF Capacity Assessments Page 9

16 operational level. For example, IJC officials told us that the ANA created 168 tashkil 23 positions for literate officers to conduct assessment reporting for their own units. In addition, in July and August 2013, the Ministry of Interior selected nearly 100 ANP candidates to send to Turkey to learn assessment methodology and develop a new police assessment tool with the goal of standardizing assessments across the ANP. 24 Despite these efforts, ISAF does not have a formal plan that details how it will ensure the continued collection, validation, analysis, and reporting of accurate, reliable, and useful ANSF capability assessment data as coalition forces drawdown. U.S. Central Command and Joint Staff officials expressed concern over the ability of coalition forces to continue to collect useful ANSF data during and after the drawdown. U.S. Central Command officials told us they meet with ISAF and NATO counterparts biweekly to discuss and mitigate pending assessment challenges, such as resourcing, accountability, and reliability of data that will arise from reduced coalition force levels in Afghanistan. They also informed us that a task list designed to mitigate some of these challenges was developed following a November 2012 Afghanistan Assessments Conference. The task list identifies nine discreet tasks, including developing a plan for collecting data for ANSF assessments and continuing to develop the Ministry of Defense s and the Ministry of Interior s assessment abilities. In addition, IJC officials stated that ISAF is considering alternatives for the continued assessment of ANSF units, such as using advisor teams to conduct spot assessments of particular ANSF units. The use of spot assessments had not been confirmed or documented at the time we completed our review. The National Defense Authorization Act for Fiscal Year 2008, as amended, requires DOD to report on a longterm, detailed plan for sustaining the ANSF. This plan is to include defined objectives and any actions taken to assist the Afghan government in establishing strong ANSF readiness assessment tools and metrics, and the results of these actions. 25 DOD s 2010 sustainment plan included actions taken to continue assessment of the ANSF based on recommendations from the Commander of ISAF. 26 However, because a drawdown had not been announced at the time of the 2010 plan issuance, that sustainment plan did not consider the possible impact on the ability of coalition forces to collect, analyze, verify, or report ANSF assessments with fewer available resources. DOD and ISAF officials told us they have not developed a successor to the 2010 sustainment plan that addresses the collection, analysis, verification and reporting of ANSF assessments during the drawdown. 27 Because ISAF will have fewer available coalition teams and be relying increasingly on ANSF-provided information, it is important for ISAF to have a plan detailing how it will assess the ANSF s capability and address the challenges associated with the ANSF reporting its own assessment results. Without a plan for collecting, validating, analyzing, and reporting on ANSF assessments during the military drawdown, ISAF may not be able to obtain an accurate understanding of ANSF units capability information that feeds into broader assessment reports on the ANSF s overall effectiveness and readiness. 28 CONCLUSION As IJC increasingly focuses its efforts on assessing the capability of ANSF units at the brigade and regional levels using its new RASR assessment system in place of the CUAT, it is imperative that IJC develop plans that were lacking under the CUAT in order to better ensure that the RASR will provide consistent and reliable 23 The tashkil is the Afghan government s official list of required ANA and ANP personnel by position and rank. 24 Candidates for the ANP assessment training course in Turkey will include 30 police officers from the Ministry of Interior as well as an additional 68 police officers 2 from each province. 25 Pub. L. No , 1231, 122 Stat. 3, (2008) (amended 2013). 26 ISAF ultimately tasked IJC with undertaking these assessments. 27 Although DOD s reports to Congress in April 2012 and November 2013 include reporting on ANSF assessment efforts, DOD and ISAF officials did not identify either of these as a successor to the April 2010 sustainment plan. 28 DOD officials told us that they are awaiting strategic direction from the President regarding the post-2014 Security Force Assistance mission s strength and structure before planning can begin. SIGAR AR/ANSF Capacity Assessments Page 10

17 reporting of the ANSF s capability. As ISAF forces draw down and transition to a more advisory role rather than partnering with the ANSF to jointly engage in combat the United States and its coalition partners will have fewer of their own advisors conducting assessments and will have to rely increasingly on the ANSF to conduct its own assessments. This will introduce new challenges into the assessment process, including more limited ISAF oversight of Afghan capability assessment efforts. With the security transition scheduled to be completed by the end of 2014, there is a narrow window of opportunity for coalition forces to implement a plan that will help enable the continued collection, validation, analysis, and reporting on the status of the ANSF s manning, training, and equipping capability. Without such a plan, decision makers in the United States, other coalition countries, and the Afghan government may not have reasonable assurance that the ANSF is making progress toward becoming a self-sustaining force that is capable of assuming full security responsibility for Afghanistan after the transition is completed in December Further, without an updated plan DOD may not be able to make fully informed decisions based on ANSF capability RECOMMENDATIONS To ensure that assessments of the ANSF continue during and after the drawdown of U.S. and coalition military forces in Afghanistan, we recommend that the Commander of the International Security Assistance Force: 1. Develop and implement a formal, written plan for collecting, validating, analyzing, and reporting on ANSF capabilities that details how ISAF will a. assess the ANSF s capability with fewer advisors to conduct the assessments and b. mitigate the challenges associated the ANSF reporting its own assessment results. AGENCY COMMENTS U.S. Forces-Afghanistan (USFOR-A) provided written comments on a draft of this report, which, along with our responses, are reproduced in appendix IV. USFOR-A concurred with the overall recommendations of our audit report, but also stated that it did not concur with some specific recommendations. In addition, IJC provided us informal comments on a draft of this report, which we have incorporated, as appropriate. Our draft report recommended that the Commander of the International Security Assistance Force develop and issue guidance by the end of April 2014 that provides clear instruction on the level of detail advisor teams are to include in the comments supporting their assigned rating definition levels for the ANSF units they assess. USFOR-A did not concur with this recommendation, calling it unnecessary. Specifically, USFOR-A noted that IJC issued a fragmentary order with specific instructions on the information the advisor units are to include in the comments supporting their assigned rating in each category for the assessed unit. This fragmentary order directs that each comment should focus on answering three questions, the answers to which provide not only the what, but the why behind the issues that need addressing by the coalition and confirm the accuracy of the [Regional Command s] assessment of a particular unit. USFOR-A further stated that IJC conducts a quality control check of every narrative to ensure adequate information is provided. Based on USFOR-A s comment and the referenced fragmentary order, we agree that the recommended guidance has already been provided to the advisor units and, therefore, we have deleted this recommendation and revised the report as appropriate. Regarding our recommendation to develop and implement a formal, written plan for collecting, validating, analyzing, and reporting on ANSF capabilities, USFOR-A stated that IJC will work with ISAF to codify all ongoing efforts into a single document that acts as an overarching roadmap of the way ISAF intends to retain the capability of assessing the progress of the ANSF now and in the future. It appears that the creation of such a document would mostly satisfy our recommendation. We will follow up with USFOR-A to review this document once it is complete and determine at that time whether our recommendation has been implemented. SIGAR AR/ANSF Capacity Assessments Page 11

SIGAR. Afghan National Army: Millions of Dollars at Risk Due to Minimal Oversight of Personnel and Payroll Data A P R I L

SIGAR. Afghan National Army: Millions of Dollars at Risk Due to Minimal Oversight of Personnel and Payroll Data A P R I L SIGAR Special Inspector General for Afghanistan Reconstruction SIGAR 15-54 Audit Report Afghan National Army: Millions of Dollars at Risk Due to Minimal Oversight of Personnel and Payroll Data A P R I

More information

N. Special Inspector General for Afghanistan Reconstruction

N. Special Inspector General for Afghanistan Reconstruction SIGAR N. Special Inspector General for Afghanistan Reconstruction SIGAR 15-26 Audit Report Afghan National Police: More than $300 Million in Annual, U.S.-funded Salary Payments Is Based on Partially Verified

More information

Distribution of Funds and Mentoring of Finance Officers for the Afghanistan National Army Payroll Need Improvement

Distribution of Funds and Mentoring of Finance Officers for the Afghanistan National Army Payroll Need Improvement Report No. DODIG-2012-058 February 29, 2012 Distribution of Funds and Mentoring of Finance Officers for the Afghanistan National Army Payroll Need Improvement Additional Copies To obtain additional copies

More information

SIGAR Testimony. Before the Subcommittee on National Security, Committee on Oversight and Government Reform U.S. House of Representatives

SIGAR Testimony. Before the Subcommittee on National Security, Committee on Oversight and Government Reform U.S. House of Representatives Special Inspector General for Afghanistan Reconstruction SIGAR Testimony Before the Subcommittee on National Security, Committee on Oversight and Government Reform U.S. House of Representatives Why ANSF

More information

COMPREHENSIVE RISK ASSESSMENTS OF MOD AND MOl FINANCIAL MANAGEMENT CAPACITY COULD IMPROVE OVERSIGHT OF OVER $4 BILLION IN DIRECT ASSISTANCE FUNDING

COMPREHENSIVE RISK ASSESSMENTS OF MOD AND MOl FINANCIAL MANAGEMENT CAPACITY COULD IMPROVE OVERSIGHT OF OVER $4 BILLION IN DIRECT ASSISTANCE FUNDING SIGAR Special Inspector General for Afghanistan Reconstruction COMPREHENSIVE RISK ASSESSMENTS OF MOD AND MOl FINANCIAL MANAGEMENT CAPACITY COULD IMPROVE OVERSIGHT OF OVER $4 BILLION IN DIRECT ASSISTANCE

More information

SIGAR. Gereshk Cold and Dry Storage Facility: Quality of Construction Appears To Be Good, but the Facility Has Not Been Used to Date J U L Y

SIGAR. Gereshk Cold and Dry Storage Facility: Quality of Construction Appears To Be Good, but the Facility Has Not Been Used to Date J U L Y SIGAR Special Inspector General for Afghanistan Reconstruction SIGAR 14-82 Inspection Report Gereshk Cold and Dry Storage Facility: Quality of Construction Appears To Be Good, but the Facility Has Not

More information

GAO AFGHANISTAN GOVERNANCE. Performance-Data Gaps Hinder Overall Assessment of U.S. Efforts to Build Financial Management Capacity

GAO AFGHANISTAN GOVERNANCE. Performance-Data Gaps Hinder Overall Assessment of U.S. Efforts to Build Financial Management Capacity GAO United States Government Accountability Office Report to Congressional Committees September 2011 AFGHANISTAN GOVERNANCE Performance-Data Gaps Hinder Overall Assessment of U.S. Efforts to Build Financial

More information

DOD BUSINESS SYSTEMS MODERNIZATION. Additional Action Needed to Achieve Intended Outcomes

DOD BUSINESS SYSTEMS MODERNIZATION. Additional Action Needed to Achieve Intended Outcomes United States Government Accountability Office Report to Congressional Committees July 2015 DOD BUSINESS SYSTEMS MODERNIZATION Additional Action Needed to Achieve Intended Outcomes GAO-15-627 July 2015

More information

DEFENSE ACQUISITION WORKFORCE

DEFENSE ACQUISITION WORKFORCE United States Government Accountability Office Report to Congressional Committees December 2015 DEFENSE ACQUISITION WORKFORCE Actions Needed to Guide Planning Efforts and Improve Workforce Capability GAO-16-80

More information

ELECTRONIC HEALTH RECORDS. Fiscal Year 2013 Expenditure Plan Lacks Key Information Needed to Inform Future Funding Decisions

ELECTRONIC HEALTH RECORDS. Fiscal Year 2013 Expenditure Plan Lacks Key Information Needed to Inform Future Funding Decisions United States Government Accountability Office Report to Congressional July 2014 ELECTRONIC HEALTH RECORDS Fiscal Year 2013 Expenditure Plan Lacks Key Information Needed to Inform Future Funding Decisions

More information

General Joseph F. Dunford, Jr. Commander, U.S. Forces Afghanistan, and Commander, International Security Assistance Force

General Joseph F. Dunford, Jr. Commander, U.S. Forces Afghanistan, and Commander, International Security Assistance Force March 18, 2014 General Lloyd J. Austin III Commander, U.S. Central Command General Joseph F. Dunford, Jr. Commander, U.S. Forces Afghanistan, and Commander, International Security Assistance Force Lieutenant

More information

April 28, 2011. GAO-11-524R NSPS Transition. United States Government Accountability Office Washington, DC 20548

April 28, 2011. GAO-11-524R NSPS Transition. United States Government Accountability Office Washington, DC 20548 United States Government Accountability Office Washington, DC 20548 April 28, 2011 The Honorable J. Randy Forbes Chairman The Honorable Madeleine Z. Bordallo Ranking Member Subcommittee on Readiness Committee

More information

GAO MAJOR AUTOMATED INFORMATION SYSTEMS. Selected Defense Programs Need to Implement Key Acquisition Practices

GAO MAJOR AUTOMATED INFORMATION SYSTEMS. Selected Defense Programs Need to Implement Key Acquisition Practices GAO United States Government Accountability Office Report to Congressional Addressees March 2013 MAJOR AUTOMATED INFORMATION SYSTEMS Selected Defense Programs Need to Implement Key Acquisition Practices

More information

before the Subcommittee on National Security, Homeland Defense, and Foreign Operations House Oversight and Government Reform on

before the Subcommittee on National Security, Homeland Defense, and Foreign Operations House Oversight and Government Reform on September 12, 2012 Expected Release 9:45 a.m. Statement of Ambassador (Ret.) Kenneth P. Moorefield Deputy Inspector General for Special Plans and Operations Department of Defense Office of Inspector General

More information

SIGIR AGENCIES NEED IMPROVED FINANCIAL DATA REPORTING FOR PRIVATE SECURITY CONTRACTORS. October 30, 2008. What SIGIR Found. Why SIGIR Did This Study

SIGIR AGENCIES NEED IMPROVED FINANCIAL DATA REPORTING FOR PRIVATE SECURITY CONTRACTORS. October 30, 2008. What SIGIR Found. Why SIGIR Did This Study OFFICE OF THE SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION AGENCIES NEED IMPROVED FINANCIAL DATA REPORTING FOR PRIVATE SECURITY CONTRACTORS SIIGIIR--09--005 OCTOBER 30,, 2008 SIGIR Special Inspector

More information

FEDERAL AVIATION ADMINISTRATION. Improved Tracking of Results Needed to Provide Confidence in Benefits of Streamlining Activities

FEDERAL AVIATION ADMINISTRATION. Improved Tracking of Results Needed to Provide Confidence in Benefits of Streamlining Activities United States Government Accountability Office Report to Congressional Requesters January 2015 FEDERAL AVIATION ADMINISTRATION Improved Tracking of Results Needed to Provide Confidence in Benefits of Streamlining

More information

GAO CONTRACT MANAGEMENT. Small Businesses Continue to Win Construction Contracts. Report to Congressional Committees

GAO CONTRACT MANAGEMENT. Small Businesses Continue to Win Construction Contracts. Report to Congressional Committees GAO United States General Accounting Office Report to Congressional Committees June 2001 CONTRACT MANAGEMENT Small Businesses Continue to Win Construction Contracts GAO-01-746 Contents Letter 1 Results

More information

HOMELAND SECURITY ACQUISITIONS

HOMELAND SECURITY ACQUISITIONS United States Government Accountability Office Report to Congressional Requesters March 2015 HOMELAND SECURITY ACQUISITIONS DHS Should Better Define Oversight Roles and Improve Program Reporting to Congress

More information

GAO INFORMATION TECHNOLOGY DASHBOARD. Opportunities Exist to Improve Transparency and Oversight of Investment Risk at Select Agencies

GAO INFORMATION TECHNOLOGY DASHBOARD. Opportunities Exist to Improve Transparency and Oversight of Investment Risk at Select Agencies GAO United States Government Accountability Office Report to Congressional Requesters October 2012 INFORMATION TECHNOLOGY DASHBOARD Opportunities Exist to Improve Transparency and Oversight of Investment

More information

GAO. DEFENSE INFRASTRUCTURE Funding Risks in Services 1999 Central Training Programs

GAO. DEFENSE INFRASTRUCTURE Funding Risks in Services 1999 Central Training Programs GAO United States General Accounting Office Report to the Chairman, Committee on the Budget, House of Representatives February 1999 DEFENSE INFRASTRUCTURE Funding Risks in Services 1999 Central Training

More information

d Special Inspector General for Afghanistan Reconstruction

d Special Inspector General for Afghanistan Reconstruction SIGAR d Special Inspector General for Afghanistan Reconstruction SIGAR Audit 13-8 Taxes: Afghan Government Has Levied Nearly a Billion Dollars in Business Taxes on Contractors Supporting U.S. Government

More information

SOFTWARE LICENSES. DOD s Plan to Collect Inventory Data Meets Statutory Requirements

SOFTWARE LICENSES. DOD s Plan to Collect Inventory Data Meets Statutory Requirements United States Government Accountability Office Report to Congressional July 2014 SOFTWARE LICENSES DOD s Plan to Collect Inventory Data Meets Statutory Requirements GAO-14-625 July 2014 SOFTWARE LICENSES

More information

MAJOR AUTOMATED INFORMATION SYSTEMS. Selected Defense Programs Need to Implement Key Acquisition Practices

MAJOR AUTOMATED INFORMATION SYSTEMS. Selected Defense Programs Need to Implement Key Acquisition Practices United States Government Accountability Office Report to Congressional Committees March 2014 MAJOR AUTOMATED INFORMATION SYSTEMS Selected Defense Programs Need to Implement Key Acquisition Practices GAO-14-309

More information

STRATEGIC SOURCING. Opportunities Exist to Better Manage Information Technology Services Spending

STRATEGIC SOURCING. Opportunities Exist to Better Manage Information Technology Services Spending United States Government Accountability Office Report to Congressional Requesters September 2015 STRATEGIC SOURCING Opportunities Exist to Better Manage Information Technology Services Spending GAO-15-549

More information

Department of Homeland Security Office of Inspector General. Review of U.S. Coast Guard Enterprise Architecture Implementation Process

Department of Homeland Security Office of Inspector General. Review of U.S. Coast Guard Enterprise Architecture Implementation Process Department of Homeland Security Office of Inspector General Review of U.S. Coast Guard Enterprise Architecture Implementation Process OIG-09-93 July 2009 Contents/Abbreviations Executive Summary...1 Background...2

More information

DEFENSE BUSINESS SYSTEMS. Further Refinements Needed to Guide the Investment Management Process

DEFENSE BUSINESS SYSTEMS. Further Refinements Needed to Guide the Investment Management Process United States Government Accountability Office Report to Congressional Committees May 2014 DEFENSE BUSINESS SYSTEMS Further Refinements Needed to Guide the Investment Management Process GAO-14-486 May

More information

380 Special Inspector General for Afghanistan Reconstruction

380 Special Inspector General for Afghanistan Reconstruction SIGAR 380 Special Inspector General for Afghanistan Reconstruction SIGAR Audit 13-13 Afghan Special Mission Wing: DOD Moving Forward with $771.8 Million Purchase of Aircraft that the Afghans Cannot Operate

More information

political Campaign Intervention and Review of 2012 Tax-Elected Applications

political Campaign Intervention and Review of 2012 Tax-Elected Applications TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION Inappropriate Criteria Were Used to May 14, 2013 Reference Number: 2013-10-053 This report has cleared the Treasury Inspector General for Tax Administration

More information

DEFENSE LOGISTICS. Army Should Track Financial Benefits Realized from its Logistics Modernization Program. Report to Congressional Requesters

DEFENSE LOGISTICS. Army Should Track Financial Benefits Realized from its Logistics Modernization Program. Report to Congressional Requesters United States Government Accountability Office Report to Congressional Requesters November 2013 DEFENSE LOGISTICS Army Should Track Financial Benefits Realized from its Logistics Modernization Program

More information

United States Government Accountability Office November 2010 GAO-11-148

United States Government Accountability Office November 2010 GAO-11-148 GAO United States Government Accountability Office Report to November 2010 HEALTH INFORMATION TECHNOLOGY DOD Needs to Provide More Information on Risks to Improve Its Program Management GAO-11-148 November

More information

Terms of Reference for LEAP II Final Evaluation Consultant

Terms of Reference for LEAP II Final Evaluation Consultant UNESCO Office Kabul, Afghanistan November 2015 Terms of Reference for LEAP II Final Evaluation Consultant Post Title: Final Evaluation Specialist Organization: UNESCO Office Kabul Location: Kabul, Afghanistan

More information

INSPECTOR GENERAL DEPARTMENT OF DEFENSE 4800 MARK CENTER DRIVE ALEXANDRIA, VIRGINIA 22350-1500

INSPECTOR GENERAL DEPARTMENT OF DEFENSE 4800 MARK CENTER DRIVE ALEXANDRIA, VIRGINIA 22350-1500 INSPECTOR GENERAL DEPARTMENT OF DEFENSE 4800 MARK CENTER DRIVE ALEXANDRIA, VIRGINIA 22350-1500 MAY 2 8 2014 MEMORANDUM FOR DISTRIBUTION SUBJECT: Government Accountability Office (GAO) Weekly Activity Repati

More information

THE U.S. COST OF THE AFGHAN WAR: FY2002-FY2013

THE U.S. COST OF THE AFGHAN WAR: FY2002-FY2013 - THE U.S. COST OF THE AFGHAN WAR: FY2002-FY2013 COST IN MILITARY OPERATING EXPENDITURES AND AID AND PROSPECTS FOR TRANSITION Anthony H. Cordesman Arleigh A. Burke Chair in Strategy May 14, 2012 To comment,

More information

VA Office of Inspector General

VA Office of Inspector General VA Office of Inspector General OFFICE OF AUDITS AND EVALUATIONS Department of Veterans Affairs Review of Alleged System Duplication in the Virtual Office of Acquisition Software Development Project September

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 5120.39 October 1, 2015 USD(P&R) SUBJECT: DoD Wage Fixing Authority - Appropriated Fund and Nonappropriated Fund Compensation Programs References: See Enclosure

More information

GAO AFGHANISTAN DEVELOPMENT. Agencies Could Benefit from a Shared and More Comprehensive Database on U.S. Efforts. Report to Congressional Requesters

GAO AFGHANISTAN DEVELOPMENT. Agencies Could Benefit from a Shared and More Comprehensive Database on U.S. Efforts. Report to Congressional Requesters GAO United States Government Accountability Office Report to Congressional Requesters November 2012 AFGHANISTAN DEVELOPMENT Agencies Could Benefit from a Shared and More Comprehensive Database on U.S.

More information

AFGHANISTAN: FRANCE IS ALSO IN THE SOUTH

AFGHANISTAN: FRANCE IS ALSO IN THE SOUTH FRENCH EMBASSY IN CANADA? Ottawa, June 2008 AFGHANISTAN: FRANCE IS ALSO IN THE SOUTH "France will maintain its forces in Afghanistan. Our country wishes to adapt the role of its forces to make them more

More information

WEAPONS ACQUISITION REFORM

WEAPONS ACQUISITION REFORM GAO United States Government Accountability Office Report to the Committee on Armed Services, U.S. Senate September 2011 WEAPONS ACQUISITION REFORM Actions Needed to Address Systems Engineering and Developmental

More information

MARKET RESEARCH. Better Documentation Needed to Inform Future Procurements at Selected Agencies

MARKET RESEARCH. Better Documentation Needed to Inform Future Procurements at Selected Agencies United States Government Accountability Office Report to the Subcommittee on Financial and Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate October 2014 MARKET

More information

REVIEW OF NASA S INTERNAL CONTROLS FOR AWARDS WITH SMALL BUSINESSES

REVIEW OF NASA S INTERNAL CONTROLS FOR AWARDS WITH SMALL BUSINESSES FEBRUARY 28, 2013 AUDIT REPORT OFFICE OF AUDITS REVIEW OF NASA S INTERNAL CONTROLS FOR AWARDS WITH SMALL BUSINESSES OFFICE OF INSPECTOR GENERAL National Aeronautics and Space Administration REPORT NO.

More information

JOINT STATEMENT COMMISSION ON WARTIME CONTRACTING

JOINT STATEMENT COMMISSION ON WARTIME CONTRACTING JOINT STATEMENT COMMISSION ON WARTIME CONTRACTING TOTAL FORCE POLICY, THE QDR, AND OTHER DEFENSE OPERATIONAL PLANNING: WHY DOES PLANNING FOR CONTRACTORS CONTINUE TO LAG? JULY 12, 2010 Chairman Thibault,

More information

Information Technology

Information Technology May 7, 2002 Information Technology Defense Hotline Allegations on the Procurement of a Facilities Maintenance Management System (D-2002-086) Department of Defense Office of the Inspector General Quality

More information

Report No. D-2008-047 February 5, 2008. Contingency Planning for DoD Mission-Critical Information Systems

Report No. D-2008-047 February 5, 2008. Contingency Planning for DoD Mission-Critical Information Systems Report No. D-2008-047 February 5, 2008 Contingency Planning for DoD Mission-Critical Information Systems Additional Copies To obtain additional copies of this report, visit the Web site of the Department

More information

DEPARTMENT-LEVEL ACCOUNTING ENTRIES FOR FY1999. Report No. D-2000-179 August 18, 2000. Office of the Inspector General Department of Defense

DEPARTMENT-LEVEL ACCOUNTING ENTRIES FOR FY1999. Report No. D-2000-179 August 18, 2000. Office of the Inspector General Department of Defense DEPARTMENT-LEVEL ACCOUNTING ENTRIES FOR FY1999 Report No. D-2000-179 August 18, 2000 Office of the Inspector General Department of Defense Additional Copies To obtain additional copies of this audit report,

More information

COUNTERING OVERSEAS THREATS

COUNTERING OVERSEAS THREATS United States Government Accountability Office Report to Congressional Addressees March 2014 COUNTERING OVERSEAS THREATS Gaps in State Department Management of Security Training May Increase Risk to U.S.

More information

GAO WARFIGHTER SUPPORT. DOD Needs Strategic Outcome-Related Goals and Visibility over Its Counter-IED Efforts. Report to Congressional Requesters

GAO WARFIGHTER SUPPORT. DOD Needs Strategic Outcome-Related Goals and Visibility over Its Counter-IED Efforts. Report to Congressional Requesters GAO United States Government Accountability Office Report to Congressional Requesters February 2012 WARFIGHTER SUPPORT DOD Needs Strategic Outcome-Related Goals and Visibility over Its Counter-IED Efforts

More information

The Army s Information Technology Contracts Awarded Without Competition Were Generally Justified

The Army s Information Technology Contracts Awarded Without Competition Were Generally Justified Inspector General U.S. Department of Defense Report No. DODIG 2015 096 MARCH 25, 2015 The Army s Information Technology Contracts Awarded Without Competition Were Generally Justified INTEGRITY EFFICIENCY

More information

How To Write A Defense Science And Technology Policy Report

How To Write A Defense Science And Technology Policy Report United States Government Accountability Office Report to Congressional Committees March 2015 DEFENSE SCIENCE AND TECHNOLOGY Further DOD and DOE Actions Needed to Provide Timely Conference Decisions and

More information

WHISTLEBLOWER PROTECTION. DOD Needs to Enhance Oversight of Military Whistleblower Reprisal Investigations

WHISTLEBLOWER PROTECTION. DOD Needs to Enhance Oversight of Military Whistleblower Reprisal Investigations United States Government Accountability Office Report to Congressional Requesters May 2015 WHISTLEBLOWER PROTECTION DOD Needs to Enhance Oversight of Military Whistleblower Reprisal Investigations GAO-15-477

More information

FEDERAL PERSONNEL Observations on the Navy s Managing To Payroll Program

FEDERAL PERSONNEL Observations on the Navy s Managing To Payroll Program United States General Accounting Office GAO Report to the Chairman, Subcommittee * on Federal Services, Post Office and Civil Services, Committee on Governmental Affairs, U.S. Senate March 1990 FEDERAL

More information

Audit of Veterans Health Administration Blood Bank Modernization Project

Audit of Veterans Health Administration Blood Bank Modernization Project Department of Veterans Affairs Office of Inspector General Audit of Veterans Health Administration Blood Bank Modernization Project Report No. 06-03424-70 February 8, 2008 VA Office of Inspector General

More information

U.S. Army Corps of Engineers Transatlantic District-North Needs To Improve Oversight of Construction Contractors in Afghanistan

U.S. Army Corps of Engineers Transatlantic District-North Needs To Improve Oversight of Construction Contractors in Afghanistan Report No. DODIG-2014-010 I nspec tor Ge ne ral U.S. Department of Defense NOVEMBER 22, 2013 U.S. Army Corps of Engineers Transatlantic District-North Needs To Improve Oversight of Construction Contractors

More information

Implementation of the DoD Management Control Program for Navy Acquisition Category II and III Programs (D-2004-109)

Implementation of the DoD Management Control Program for Navy Acquisition Category II and III Programs (D-2004-109) August 17, 2004 Acquisition Implementation of the DoD Management Control Program for Navy Acquisition Category II and III Programs (D-2004-109) Department of Defense Office of the Inspector General Quality

More information

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved GAO United States Government Accountability Office Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate July 2011 AIR FORCE WORKING CAPITAL FUND Budgeting

More information

GAO. VA HEALTH CARE Reported Outpatient Medical Appointment Wait Times Are Unreliable

GAO. VA HEALTH CARE Reported Outpatient Medical Appointment Wait Times Are Unreliable GAO United States Government Accountability Office Statement for the Record to the Committee on Veterans Affairs, U.S. House of Representatives For Release on Delivery Expected at 10:00 a.m., EST Wednesday,

More information

Supply Inventory Management

Supply Inventory Management December 6, 2002 Supply Inventory Management Accountability and Control of Materiel at the Naval Air Depot, North Island (D-2003-033) Department of Defense Office of the Inspector General Quality Integrity

More information

Navy and Marine Corps Have Weak Procurement Processes for Cost reimbursement Contract Issuance and Management

Navy and Marine Corps Have Weak Procurement Processes for Cost reimbursement Contract Issuance and Management Inspector General U.S. Department of Defense Report No. DODIG-2014-092 JULY 11, 2014 Navy and Marine Corps Have Weak Procurement Processes for Cost reimbursement Contract Issuance and Management INTEGRITY

More information

DoD Methodologies to Identify Improper Payments in the Military Health Benefits and Commercial Pay Programs Need Improvement

DoD Methodologies to Identify Improper Payments in the Military Health Benefits and Commercial Pay Programs Need Improvement Report No. DODIG-2015-068 I nspec tor Ge ne ral U.S. Department of Defense JA N UA RY 1 4, 2 0 1 5 DoD Methodologies to Identify Improper Payments in the Military Health Benefits and Commercial Pay Programs

More information

GAO DEFENSE CONTRACTING. Contract Risk a Key Factor in Assessing Excessive Pass-Through Charges. Report to Congressional Committees

GAO DEFENSE CONTRACTING. Contract Risk a Key Factor in Assessing Excessive Pass-Through Charges. Report to Congressional Committees GAO United States Government Accountability Office Report to Congressional Committees January 2008 DEFENSE CONTRACTING Contract Risk a Key Factor in Assessing Excessive Pass-Through Charges GAO-08-269

More information

Department of Labor U.S. Office of Inspector General Office of Audit AUDIT OF WORKFORCE INVESTMENT ACT DATA VALIDATION FOR THE ADULT

Department of Labor U.S. Office of Inspector General Office of Audit AUDIT OF WORKFORCE INVESTMENT ACT DATA VALIDATION FOR THE ADULT Department of Labor U.S. Office of Inspector General Office of Audit EMPLOYMENT AND TRAINING ADMINISTRATION AUDIT OF WORKFORCE INVESTMENT ACT DATA VALIDATION FOR THE ADULT AND DISLOCATED WORKER PROGRAMS

More information

GAO AFGHANISTAN SECURITY

GAO AFGHANISTAN SECURITY GAO United States Government Accountability Office Report to the Committee on Foreign Affairs, House of Representatives March 2009 AFGHANISTAN SECURITY U.S. Programs to Further Reform Ministry of Interior

More information

Page 1. June 26, 2012. The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate

Page 1. June 26, 2012. The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate United States Government Accountability Office Washington, DC 20548 June 26, 2012 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate

More information

GAO VA HEALTH CARE. Spending for Mental Health Strategic Plan Initiatives Was Substantially Less Than Planned. Report to Congressional Requesters

GAO VA HEALTH CARE. Spending for Mental Health Strategic Plan Initiatives Was Substantially Less Than Planned. Report to Congressional Requesters GAO United States Government Accountability Office Report to Congressional Requesters November 2006 VA HEALTH CARE Spending for Mental Health Strategic Plan Initiatives Was Substantially Less Than Planned

More information

DEFENSE CONTRACT AUDIT AGENCY. Additional Guidance Needed Regarding DCAA's Use of Companies Internal Audit Reports

DEFENSE CONTRACT AUDIT AGENCY. Additional Guidance Needed Regarding DCAA's Use of Companies Internal Audit Reports United States Government Accountability Office Report to Congressional Committees November 2014 DEFENSE CONTRACT AUDIT AGENCY Additional Guidance Needed Regarding DCAA's Use of Companies Internal Audit

More information

DOE LOAN PROGRAMS. DOE Should Fully Develop Its Loan Monitoring Function and Evaluate Its Effectiveness

DOE LOAN PROGRAMS. DOE Should Fully Develop Its Loan Monitoring Function and Evaluate Its Effectiveness United States Government Accountability Office Report to Congressional Committees May 2014 DOE LOAN PROGRAMS DOE Should Fully Develop Its Loan Monitoring Function and Evaluate Its Effectiveness GAO-14-367

More information

April 17, 2006. Human Capital. Report on the DoD Acquisition Workforce Count (D-2006-073) Department of Defense Office of Inspector General

April 17, 2006. Human Capital. Report on the DoD Acquisition Workforce Count (D-2006-073) Department of Defense Office of Inspector General April 17, 2006 Human Capital Report on the DoD Acquisition Workforce Count (D-2006-073) Department of Defense Office of Inspector General Quality Integrity Accountability Additional Copies To obtain additional

More information

Air Force Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance

Air Force Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance Inspector General U.S. Department of Defense Report No. DODIG-2016-043 JANUARY 29, 2016 Air Force Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance INTEGRITY

More information

March 14, 2013. The Honorable Carl Levin Chairman The Honorable James N. Inhofe Ranking Member Committee on Armed Services United States Senate

March 14, 2013. The Honorable Carl Levin Chairman The Honorable James N. Inhofe Ranking Member Committee on Armed Services United States Senate United States Government Accountability Office Washington, DC 20548 March 14, 2013 The Honorable Carl Levin Chairman The Honorable James N. Inhofe Ranking Member Committee on Armed Services United States

More information

a GAO-06-530 GAO DEFENSE WORKING CAPITAL FUND Military Services Did Not Calculate and Report Carryover Amounts Correctly

a GAO-06-530 GAO DEFENSE WORKING CAPITAL FUND Military Services Did Not Calculate and Report Carryover Amounts Correctly GAO United States Government Accountability Office Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives June 2006 DEFENSE WORKING CAPITAL FUND Military

More information

UNITED STATES DEPARTMENT OF EDUCATION OFFICE OF INSPECTOR GENERAL

UNITED STATES DEPARTMENT OF EDUCATION OFFICE OF INSPECTOR GENERAL UNITED STATES DEPARTMENT OF EDUCATION OFFICE OF INSPECTOR GENERAL AUDIT SERVICES August 24, 2015 Control Number ED-OIG/A04N0004 James W. Runcie Chief Operating Officer U.S. Department of Education Federal

More information

GAO COMPETITIVE SOURCING. Health Benefits Cost Comparison Had Minimal Impact, but DOD Needs Uniform Implementation Process

GAO COMPETITIVE SOURCING. Health Benefits Cost Comparison Had Minimal Impact, but DOD Needs Uniform Implementation Process GAO United States Government Accountability Office Report to Congressional Committees December 2005 COMPETITIVE SOURCING Health Benefits Cost Comparison Had Minimal Impact, but DOD Needs Uniform Implementation

More information

Office of Inspector General Evaluation of the Consumer Financial Protection Bureau s Consumer Response Unit

Office of Inspector General Evaluation of the Consumer Financial Protection Bureau s Consumer Response Unit Office of Inspector General Evaluation of the Consumer Financial Protection Bureau s Consumer Response Unit Consumer Financial Protection Bureau September 2012 September 28, 2012 MEMORANDUM TO: FROM: SUBJECT:

More information

Funding Invoices to Expedite the Closure of Contracts Before Transitioning to a New DoD Payment System (D-2002-076)

Funding Invoices to Expedite the Closure of Contracts Before Transitioning to a New DoD Payment System (D-2002-076) March 29, 2002 Financial Management Funding Invoices to Expedite the Closure of Contracts Before Transitioning to a New DoD Payment System (D-2002-076) Department of Defense Office of the Inspector General

More information

1 GAO-12-281R Equipment Lease versus Purchase Analysis

1 GAO-12-281R Equipment Lease versus Purchase Analysis United States Government Accountability Office Washington, DC 20548 February 7, 2012 The Honorable Joseph I. Lieberman Chairman The Honorable Susan M. Collins Ranking Member Committee on Homeland Security

More information

DOD ADVERTISING. Better Coordination, Performance Measurement, and Oversight Needed to Help Meet Recruitment Goals

DOD ADVERTISING. Better Coordination, Performance Measurement, and Oversight Needed to Help Meet Recruitment Goals United States Government Accountability Office Report to Congressional Committees May 2016 DOD ADVERTISING Better Coordination, Performance Measurement, and Oversight Needed to Help Meet Recruitment Goals

More information

Small Business Contracting at Marine Corps Systems Command Needs Improvement

Small Business Contracting at Marine Corps Systems Command Needs Improvement Inspector General U.S. Department of Defense Report No. DODIG-2016-019 NOVEMBER 10, 2015 Small Business Contracting at Marine Corps Systems Command Needs Improvement INTEGRITY EFFICIENCY ACCOUNTABILITY

More information

Quarterly Afghanistan UK Patient Treatment Statistics: RCDM and DMRC Headley Court 8 October 2007-30 June 2015

Quarterly Afghanistan UK Patient Treatment Statistics: RCDM and DMRC Headley Court 8 October 2007-30 June 2015 Quarterly Afghanistan UK Patient Treatment Statistics: RCDM and DMRC Headley Court 8 October 2007-30 June 2015 Published 30 July 2015 This report provides statistical information on United Kingdom (UK)

More information

U.S. Department of the Treasury. Treasury IT Performance Measures Guide

U.S. Department of the Treasury. Treasury IT Performance Measures Guide U.S. Department of the Treasury Treasury IT Performance Measures Guide Office of the Chief Information Officer (OCIO) Enterprise Architecture Program June 2007 Revision History June 13, 2007 (Version 1.1)

More information

United States Government Accountability Office August 2013 GAO-13-123

United States Government Accountability Office August 2013 GAO-13-123 United States Government Accountability Office Report to Congressional Requesters August 2013 DOD FINANCIAL MANAGEMENT Ineffective Risk Management Could Impair Progress toward Audit-Ready Financial Statements

More information

DLA Needs to Strengthen Its Investment Management Capability

DLA Needs to Strengthen Its Investment Management Capability GAO United States General Accounting Office Report to Congressional Committees March 2002 INFORMATION TECHNOLOGY DLA Needs to Strengthen Its Investment Management Capability GAO-02-314 Contents Letter

More information

GAO DATA CENTER CONSOLIDATION. Agencies Need to Complete Inventories and Plans to Achieve Expected Savings. Report to Congressional Requesters

GAO DATA CENTER CONSOLIDATION. Agencies Need to Complete Inventories and Plans to Achieve Expected Savings. Report to Congressional Requesters GAO United States Government Accountability Office Report to Congressional Requesters July 2011 DATA CENTER CONSOLIDATION Agencies Need to Complete Inventories and Plans to Achieve Expected Savings GAO-11-565

More information

Department of Defense INSTRUCTION. Measurement and Signature Intelligence (MASINT)

Department of Defense INSTRUCTION. Measurement and Signature Intelligence (MASINT) Department of Defense INSTRUCTION NUMBER 5105.58 April 22, 2009 USD(I) SUBJECT: Measurement and Signature Intelligence (MASINT) References: See Enclosure 1 1. PURPOSE. This Instruction reissues DoD Instruction

More information

FEDERAL INFORMATION SECURITY. Mixed Progress in Implementing Program Components; Improved Metrics Needed to Measure Effectiveness

FEDERAL INFORMATION SECURITY. Mixed Progress in Implementing Program Components; Improved Metrics Needed to Measure Effectiveness United States Government Accountability Office Report to Congressional Committees September 2013 FEDERAL INFORMATION SECURITY Mixed Progress in Implementing Program Components; Improved Metrics Needed

More information

Department of Defense DIRECTIVE. SUBJECT: United States Security Authority for North Atlantic Treaty Organization Affairs (USSAN)

Department of Defense DIRECTIVE. SUBJECT: United States Security Authority for North Atlantic Treaty Organization Affairs (USSAN) Department of Defense DIRECTIVE NUMBER 5100.55 February 27, 2006 USD(P) SUBJECT: United States Security Authority for North Atlantic Treaty Organization Affairs (USSAN) References: (a) DoD Directive 5100.55,

More information

GAO ELECTRONIC GOVERNMENT ACT. Agencies Have Implemented Most Provisions, but Key Areas of Attention Remain

GAO ELECTRONIC GOVERNMENT ACT. Agencies Have Implemented Most Provisions, but Key Areas of Attention Remain GAO United States Government Accountability Office Report to the Committee on Homeland Security and Governmental Affairs, U.S. Senate September 2012 ELECTRONIC GOVERNMENT ACT Agencies Have Implemented

More information

CHAPTER 3 FINANCIAL MANAGEMENT SYSTEMS: POLICY, ROLES AND RESPONSIBILITIES FOR CONFORMANCE, EVALUATION, AND REPORTING

CHAPTER 3 FINANCIAL MANAGEMENT SYSTEMS: POLICY, ROLES AND RESPONSIBILITIES FOR CONFORMANCE, EVALUATION, AND REPORTING CHAPTER 3 FINANCIAL MANAGEMENT SYSTEMS: POLICY, ROLES AND RESPONSIBILITIES FOR CONFORMANCE, EVALUATION, AND REPORTING 0301. GENERAL. By statute the head of a Federal agency is responsible for establishing

More information

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION Inappropriate Criteria Were Used to May 14, 2013 Reference Number: 2013-10-053 This report has cleared the Treasury Inspector General for Tax Administration

More information

GAO ARMED FORCES INSTITUTE OF PATHOLOGY

GAO ARMED FORCES INSTITUTE OF PATHOLOGY GAO United States Government Accountability Office Report to Congressional Committees June 2005 ARMED FORCES INSTITUTE OF PATHOLOGY Business Plan s Implementation Is Unlikely to Achieve Expected Financial

More information

Improvements Needed for Triannual Review Process at Norfolk Ship Support Activity

Improvements Needed for Triannual Review Process at Norfolk Ship Support Activity Report No. DODIG-2014-070 I nspec tor Ge ne ral U.S. Department of Defense M AY 6, 2 0 1 4 Improvements Needed for Triannual Review Process at Norfolk Ship Support Activity I N T E G R I T Y E F F I C

More information

ODIG-AUD (ATTN: Audit Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA 22202-4704

ODIG-AUD (ATTN: Audit Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA 22202-4704 Additional Copies To obtain additional copies of this report, visit the Web site of the Department of Defense Inspector General at http://www.dodig.mil/audit/reports or contact the Secondary Reports Distribution

More information

Followup Audit: Enterprise Blood Management System Not Ready for Full Deployment

Followup Audit: Enterprise Blood Management System Not Ready for Full Deployment Inspector General U.S. Department of Defense Report No. DODIG 2015 008 OCTOBER 23, 2014 Followup Audit: Enterprise Blood Management System Not Ready for Full Deployment INTEGRITY EFFICIENCY ACCOUNTABILITY

More information

December 18, 2009. The Honorable Daniel K. Akaka Chairman The Honorable Richard Burr Ranking Member Committee on Veterans Affairs United States Senate

December 18, 2009. The Honorable Daniel K. Akaka Chairman The Honorable Richard Burr Ranking Member Committee on Veterans Affairs United States Senate United States Government Accountability Office Washington, DC 20548 December 18, 2009 The Honorable Daniel K. Akaka Chairman The Honorable Richard Burr Ranking Member Committee on Veterans Affairs United

More information

Information Technology

Information Technology September 11, 2002 Information Technology The Defense Advanced Research Projects Agency s Transition of Advanced Information Technology Programs (D-2002-146) Department of Defense Office of the Inspector

More information

GAO MILITARY EDUCATION. Improved Oversight and Management Needed for DOD s Fellowship and Training-with-Industry Programs

GAO MILITARY EDUCATION. Improved Oversight and Management Needed for DOD s Fellowship and Training-with-Industry Programs GAO United States Government Accountability Office Report to Congressional Committees April 2012 MILITARY EDUCATION Improved Oversight and Management Needed for DOD s Fellowship and Training-with-Industry

More information

AUDIT REPORT 12-1 8. Audit of Controls over GPO s Fleet Credit Card Program. September 28, 2012

AUDIT REPORT 12-1 8. Audit of Controls over GPO s Fleet Credit Card Program. September 28, 2012 AUDIT REPORT 12-1 8 Audit of Controls over GPO s Fleet Credit Card Program September 28, 2012 Date September 28, 2012 To Director, Acquisition Services From Inspector General Subject Audit Report Audit

More information

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION An Improved Project Management Process Is Needed to Measure the Impact of Research Efforts on Tax Administration July 21, 2009 Reference Number: 2009-10-095

More information

VA Office of Inspector General

VA Office of Inspector General i VA Office of Inspector General OFFICE OF AUDITS AND EVALUATIONS Veterans Benefits Administration Audit of Liquidation Appraisal Oversight Cleveland and Phoenix Regional Loan Centers October 4, 2012 10-04045-124

More information

EXPLOSIVE ORDNANCE DISPOSAL

EXPLOSIVE ORDNANCE DISPOSAL GAO United States Government Accountability Office Report to Congressional Committees April 2013 EXPLOSIVE ORDNANCE DISPOSAL DOD Needs Better Resource Planning and Joint Guidance to Manage the Capability

More information

DISTRIBUTION: ASSISTANT G-1 FOR CIVILIAN PERSONNEL POLICY, DEPARTMENT OF THE ARMY DIRECTOR, PLANS, PROGRAMS, AND DIVERSITY, DEPARTMENT OF THE NAVY

DISTRIBUTION: ASSISTANT G-1 FOR CIVILIAN PERSONNEL POLICY, DEPARTMENT OF THE ARMY DIRECTOR, PLANS, PROGRAMS, AND DIVERSITY, DEPARTMENT OF THE NAVY DISTRIBUTION: ASSISTANT G-1 FOR CIVILIAN PERSONNEL POLICY, DEPARTMENT OF THE ARMY DIRECTOR, PLANS, PROGRAMS, AND DIVERSITY, DEPARTMENT OF THE NAVY DEPUTY DIRECTOR, PERSONNEL FORCE MANAGEMENT, DEPARTMENT

More information

The Certification and Accreditation of Computer Systems Should Remain in the Computer Security Material Weakness. August 2004

The Certification and Accreditation of Computer Systems Should Remain in the Computer Security Material Weakness. August 2004 The Certification and Accreditation of Computer Systems Should Remain in the Computer Security Material Weakness August 2004 Reference Number: 2004-20-129 This report has cleared the Treasury Inspector

More information