INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

Size: px
Start display at page:

Download "INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION"

Transcription

1 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated March 31, 2008 BUTLER COUNTY SR 79(254) PROPOSAL:$6.12 PLANS:$6.84 EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: Bridge preservation including preventative maintenance repairs and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 79, SECTION 254, in BUTLER COUNTY, JACKSON and MUDDY CREEK TOWNSHIPS. Approximate geographical location of the structures are at segment 0844 offset 0556, segment 0845 offset 0585, segment 0950 offset 0024 and segment 0951 offset DBE 2%, Anticipated Notice to Proceed , Required Completion CAMBRIA COUNTY SR 4031(MC1) PROPOSAL:$8.52 PLANS:$ X18:$ X36:$46.80 The description and location of the project is as follows: For the resurfacing of approximately miles of bituminous roadway as indicated on the approved drawings included in the bid package for STATE ROUTE 4031, SECTION MC1, in CAMBRIA COUNTY at the approximate locations: S.R From Segment 0010, Offset 0000 to Segment 0010, Offset 1256 S.R From Segment 0080, Offset 2147 to Segment 0090, Offset 2779 S.R From Segment 0050, Offset 0550 to Segment 0050, Offset 0930 S.R From Segment 0011, Offset 0000 to Segment 0011, Offset 1115 S.R From Segment 0010, Offset 0000 to Segment 0040, Offset MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion LACKAWANNA COUNTY SR 407(270) PROPOSAL:$11.16 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$19.50 For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LACKAWANNA COUNTY, ABINGTON TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0407, SECTION 270. The project being situated as follows: From a point approximately linear feet (2.72 miles) north of the intersection with US Route 6/11 at Segment 0040, Offset 1628 (Station ) to a point approximately 3021 linear feet (0.57 mile) south of the intersection with SR 0632 at Segment 0040, Offset 2033 (Station ) along SR For the removal of an existing structure and replacement with a reinforced concrete box culvert, full depth pavement consisting of superpave base course, binder course and wearing course, new shoulders, detour signing, erosion and environmental measures, drainage items, new guiderail, new traffic impact attenuating devices, landscaping, pavement markings and other miscellaneous construction all contained within an overall project length of linear feet (0.058 mile) as indicated on the approved drawings included in the bid package. MBE 1%, WBE 1%, Anticipated Notice to Proceed , Required Completion LUZERNE COUNTY SR 7304(BRG) PROPOSAL:$22.44 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$31.20 For the rehabilitation and improvement of a certain section of HIGHWAY in LUZERNE COUNTY, CITY OF WILKES- BARRE, Commonwealth of Pennsylvania, BARNEY STREET BRIDGE. The project being situated as follows: From a point approximately 0.2 miles northeast of the Hanover Township line at Station to a point approximately 1.8 miles southwest of the intersection with SR 0309 at Station For the removal of an existing steel single span I- beam bridge and replacement with a single span composite prestressed adjacent box beam bridge, sheet pile retaining wall, repairs on an existing wall, bituminous approach work, drainage and pavement markings all contained within an overall project length of linear feet (0.095 mile) as indicated on the approved drawings included in the bid package. MBE 2%, WBE 3%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 1

2 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated March 28, 2008 LUZERNE COUNTY SR 0 PROPOSAL:$15.00 PLANS:$6.96 Group 4-08-ST9 This project is located as follows: Lackawanna County: S.R from Segment 1786 Offset 0000 to Segment 1844 Offset 2721 S.R from Segment 1787 Offset 1075 to Segment 1845 Offset 0000 S.R from Segment 0214 Offset 0485 to Segment 0340 Offset 2000 S.R from Segment 0010 Offset 0000 to Segment 0070 Offset 1414 S.R from Segment 0010 Offset 0000 to Segment 0120 Offset 3786 S.R from Segment 0010 Offset 0000 to Segment 0110 Offset 2073 Luzerne County: S.R from Segment 0050 Offset 0000 to Segment 0084 Offset 0255 S.R from Segment 0120 Offset 0000 to Segment 0170 Offset 0576 S.R from Segment 0010 Offset 0000 to Segment 0100 Offset 2031 S.R from Segment 0200 Offset 0399 to Segment 0260 Offset 2477 Pike County S.R from Segment 0010 Offset 0000 to Segment 0090 Offset 1698 S.R from Segment 0290 Offset 0000 to Segment 0370 Offset 1284 Wayne County: S.R from Segment 0190 Offset 0000 to Segment 0300 Offset 2215 Wyoming County: S.R from Segment 0010 Offset 0000 to Segment 0050 Offset 3263 For the resurfacing of approximately 69.4 miles of existing bituminous roadway on VARIOUS STATE ROUTES in LACKAWANNA, LUZERNE, PIKE, WAYNE and WYOMING COUNTIES, VARIOUS MUNICIPALITIES in the COMMONWEALTH OF PENNSYLVANIA with Cold-in-Place Recycled Base Course, Micro-Surfacing, Bituminous Surface Treatment, Manual Patching, Crack Sealing, Line Painting and Pavement Markings. MBE 0%, WBE 0%, anticipated Notice to Proceed , Required completion BUCKS COUNTY SR 0(GRB) PROPOSAL:$11.64 For the repair and/or replacement of guide rail, median barrier, structure mounted signs and/or their hardware, and Right-Of-Way fence on various State Routes in Bucks County. It is proposed, after execution of the contract, to begin work on the date specified in the Notice to Proceed or as otherwise provided in the specifications, and, after that specified date, to prosecute all of said work so as to complete on or before June 30, MBE 1%, WBE 1%, Anticipated Notice to Proceed , Required Completion LEHIGH COUNTY SR 378(A44) PROPOSAL:$10.32 PLANS:$1.32 The description and location of the project is as follows: For the accelerated concrete patching, milling, bituminous overlay and other miscellaneous construction, all as indicated on the approved drawings for STATE ROUTE 378, SECTION A44, in LEHIGH COUNTY, BETHLEHEM CITY from approximately Hill-to-Hill Bridge at segment 0080/0081 offset 0136/0132 to approximately State Route 22 interchange at segment 0140/0141 offset 1952/2400. A distance of approximately 2.5 miles. MBE 2%. WBE 2%, Anticipated Notice to Proceed , Required Completion WASHINGTON COUNTY SR 1035(01M) PROPOSAL:$13.92 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 The description and location of the project is the rehabilitation, including deck replacement, of the existing bridge carrying SR 1035 over I-79 in North Strabane Township in Washington County. The extent of the approach work is expected to be the minimum required to provide necessary safety improvements and to satisfactorily transition the existing roadway, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 1035, SECTION 01M, in WASHINGTON COUNTY NORTH STRABANE TOWNSHIP from approximately Elm Street at segment 0020 offset 0837 to approximately Canon McMillan High School Driveway at segment 0020 offset MBE 4%, WBE 2%, Anticipated Notice to Proceed , Required Completion WESTMORELAND COUNTY SR 1045(A11) PROPOSAL:$17.64 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: This is phase 2 of relocating SR 1045 (St. Vincent Drive). The project involves constructing a two lane roadway on a new alignment. Also involved in the replacement of a single span bridge carrying Beatty County Road over Monastery Run and the construction of a rural roundabout along with other miscellaneous construction, all as indicated on the drawings approved for STATE ROUTE 1045, SECTION A11, in WESTMORELAND COUNTY UNITY TOWNSHIP from approximately SR 1045 (phase 1)/College Access Road intersection at segment 0020 offset 1068 to approximately Beatty County Road/Mission Road intersection at segment 0020 offset DBE 5%, Anticipated Notice to Proceed , Required Completion

3 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated March 25, 2008 SCHUYLKILL COUNTY SR 61(16B) PROPOSAL:$8.76 [LANS:$ X18:$ X36:$42.90 EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: The project is located in Schuylkill County, West Brunswick Township. The limits are seg. 10 offset 0(N.B.) to seg. 10 offset 1264(N.B.) and seg. 11 offset 0(S.B.) to seg. 11 offset 1291(S.B.). The work consists of bridge deck patching, a latex overlay, expansion joint replacement, approach slabs and pavement relief joint and other miscellaneous construction. MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion LUZERNE COUNTY SR 309(352) PROPOSAL:$14.40 PLANS:$ X18:$ X36:$ For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LUZERNE COUNTY, BOROUGH OF KINGSTON, Commonwealth of Pennsylvania, STATE ROUTE 0309, SECTION 352. From the Kingston Exit on SR 0309 at Segment 0640 offset 679 (Station ) to a point at the Luzerne Exit on SR 0309 at Segment 0640 offset 1297 for an overall project Length of linear feet or mile. For the rehabilitation of a existing concrete structure consisting of concrete bridge deck repair, scarification of deck, latex modified wearing surface, joint sealing, pier repair, pressure mortar surfacing,bituminous approach work, traffic detour and pavement markings as indicated on the approved plans in the bid package. MBE 0%, WBE 2%, Anticipated Notice to Proceed , required Completion PERRY COUNTY SR 849(010) PROPOSAL:$10.20 PLANS:$ X18:$ X36:$ SR and SR is a PennDOT oversight General Maintenance project consisting of base repair, milling and overlaying, updating existing drainage, guiderail, line painting, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid package for STATE ROUTE 0849, SECTION 010 and STATE ROUTE 0849, SECTION 011, in PERRY COUNTY, OLIVER & JUNIATA TOWNSHIPS, from Creek Road at Segment 0240 Offset 1898 to Fourth Street at Segment 0294 Offset 1077, for an overall project length of 14, linear feet (2.69 miles). MBE 4%, WBE 2%, Anticipated Notice to Proceed , Required Completion ERIE COUNTY SR 3025(071) PROPOSAL:$5.52 PLANS:$ X18:$ X36:$54.60 For the furnishing and setting-in-place of Precast Reinforced Concrete Box Culverts on STATE HIGHWAY in ERIE COUNTY, WASHINGTON TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 3025, SECTION 071 AND SECTION 081. This project being situated as follows: At approximately 583 feet north of the intersection with SR 3022 (Kinter Hill Road) at Segment 0030 Offset 0583 and at approximately 793 feet north of the intersection with SR 3022 (Kinter Hill Road) at Segment 0030 Offset For the furnishing and setting-in-place of a Precast Reinforced Concrete Box Culvert over unnamed tributaries of Little Conneauttee Creek as indicated on the approved drawings. MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion CLEARFIELD COUNTY SR 53(248) PROPOSAL:$7.68 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in CLEARFIELD COUNTY, MORRIS TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0053, SECTION 248. The project being situated as follows: On SR 0053 approximately 0.3 mile north of its intersection with SR 0322 and continuing northward for approximately 0.5 mile. For the addition of left turn lanes and a traffic signal at the intersection of SR 0053 and Ninth Street (SR 2043). Construction includes Superpave Asphalt Mixture Designs for the base, binder and wearing courses, installation of reinforced concrete pipe, inlets, pavement base drains, guide rail, traffic signal supports, conduit, loop sensors, pavement markings and legends and miscellaneous construction as indicated on the approved construction drawings. DBE 3%, Anticipated Notice to Proceed , Required Completion

4 WARREN COUNTY SR 69(081) PROPOSAL:$4.08 PLANS:$ X18:$ X36:$19.50 For the furnishing and setting-in-place of a Precast Reinforced Concrete Box Culvert on STATE HIGHWAY in WARREN COUNTY, FARMINGTON TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0069, SECTION 061. This project being situated as follows: At approximately 1.16 miles north of the intersection with SR 1003 (Scranton Hill Road) at Segment 0150 Offset For the furnishing and setting-in-place of a Precast Reinforced Concrete Box Culvert over unnamed tributaries of Branch of Jackson Run as indicated on the approved drawings. MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion COLUMBIA COUNTY SR 1023(006) PROPOSAL:$11.04 PLANS:$4.32 The description and location of the project are as follows: For the painting of 9 existing structures including containment, disposal of bridge waste, and other related work within an overall length of 2278 linear feet (0.43 miles) all as indicated on the approved drawings included in the bid package for VARIOUS ROUTES in VARIOUS MUNICIPALITIES in COLUMBIA AND MONTOUR COUNTIES. MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion CRAWFORD COUNTY SR 89(A02) PROPOSAL:$17.64 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ For the construction or improvement of a certain section of STATE HIGHWAY in CRAWFORD COUNTY, Oil Creek Township, Commonwealth of Pennsylvania, STATE ROUTE 0089, SECTION A02. This project being situated as follows: From approximately 6448 feet north of the City of Titusville and Oil Creek Township Line at Segment 0050 Offset 0733 (Station ) to approximately 16 feet south of the intersection with Warner Road (T-599) at Segment 0070 Offset 0052 (Station ). For the relocation and construction of a two lane roadway with Superpave Asphalt Mixture Designs; also for Plain Cement Concrete pavement, Drainage Improvements, Stream Bed Relocation, Reinforced Slope Stabilization, Guide Rail, Pavement Markings and Signing all within a project length of linear feet (0.504 miles) as indicated on the approved drawings. DBE 3%, Anticipated Notice to Proceed , Required Completion CHESTER COUNTY SR 100(M01) PROPOSAL:$21.72 PLANS:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: Concrete pavement patching and repair as required, bituminous overlay, removal of existing concrete pavement and reconstruction with bituminous in designated locations, shoulder and median restoration, replacement and upgrading of metal box beam median barrier and end treatments, upgrading of guiderail and guiderail end treatments, rehabilitating and bridge structural painting of five structures, removing existing pavement markings, installing durable pavement markings, upgrading existing signs, and other miscellaneous construction all as indicated on the drawings approved March 11, 2008 for STATE ROUTE 100, SECTION M01 in CHESTER COUNTY WEST WHITELAND TOWNSHIP and WEST GOSHEN TOWNSHIP from US Route 202 at segment 0164/0165 offset 0000/0019 to US Route 30 at segment 0210/0211 offset 1820/1780 and STATE ROUTE 2011 SECTION SP1 in CHESTER COUNTY WEST GOSHEN TOWNSHIP at the bridge over PA Route 100 at segment 0050 offset 0104 to segment 0050 offset 0403 and STATE ROUTE 2100 SECTION SP2 in CHESTER COUNTY WEST WHITELAND TOWNSHIP and WEST GOSHEN TOWNSHIP at the bridge over PA Route 100 at segment 0010 offset 0000 to segment 0010 offset 0198 and STATE ROUTE 3100 SECTION SP3 in CHESTER COUNTY WEST WHITELAND TOWNSHIP and WEST GOSHEN TOWNSHIP from Burke Road at segment 0170 offset 0861 to PA Route 100 at segment 0200/0201 offset 3074/1181 and STATE ROUTE 202 SECTION WCG in CHESTER COUNTY WEST GOSHEN TOWNSHIP at the bridge over US Route 322 Business at segment 7074/7075 offset 0077/0077 to segment 0080/0081 offset 0102/0102 for a total distance of 25, linear feet or miles. MBE 7%, WBE 3%, Anticipated Notice to Proceed 6-208, Required Completion LANCASTER COUNTY SR 741(009) PROPOSAL:$9.96 PLANS:$ X18:$ X36:$ This project consists of Superpave overlay, base replacement, drainage improvements, bridge deck membrane waterproofing, roadside development items, pavement markings, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0741, SECTION 009, in LANCASTER COUNTY, WEST LAMPETER & STRASBURG TOWNSHIPS and STRASBURG BOROUGH, from the intersection with SR 0222 at Segment 0290 Offset 0000 to the intersection with SR 2030 at Segment 0350 Offset 2243, for an overall project length of 12, linear feet (2.43 miles). MBE 5%, WBE 3%, Anticipated Notice to Proceed , Required Completion

5 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated March 24, 2008 BRADFORD COUNTY SR 187(7PM) PROPOSAL:$11.52 PLANS:$ X18:$ X36:$ The description and location of the project are as follows: For the rehabilitation of three (3) existing bridge structures including removal of portion of existing bridges, adhesive anchors, diversion dike systems, Class A cement concrete, Class C cement concrete, selected borrow excavation rock, 6 x 6 steel wire fabric, and other miscellaneous construction within an overall length of 105 linear feet (0.020 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 187, SECTION 7PM; STATE ROUTE 220, SECTION 7PM; and STATE ROUTE 2017, SECTION 7PM in BRADFORD COUNTY, WYSOX, MONROE, and ASYLUM TOWNSHIPS - SR 187-7PM from approximately 2.0 miles northeast of the intersection with State Route 6 at Segment 540 Offset 2491 to approximately 2.8 miles southwest of the intersection with State Route 467 at Segment 550 Offset 0127; SR 220-7PM from approximately 3.8 miles northwest of the Albany Township Line at Segment 250 Offset 1768 to approximately 1.7 miles southeast of the intersection with State Route 414 at Segment 250 Offset 2002; and SR PM from approximately 1.1 miles northwest of the intersection with State Route 2020 at Segment 70 Offset 2919 to approximately the intersection with State Route 2024 at Segment 70 Offset MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated March 20, 2008 MERCER COUNTY SR 3003(441) PROPOSAL:$6.84 PLANS:$2.76 For the milling and resurfacing of various state routes in MERCER COUNTY, Commonwealth of Pennsylvania with Superpave Asphalt Mixtures; also for pavement markings, bridge deck waterproofing, guiderail, concrete curbs, loop sensors, and sidewalk construction as indicated on the approved drawings. MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion WESTMORELAND COUNTY SR 982(SIG) PROPOSAL:$11.16 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: New traffic signal installation and traffic signal enhancements which includes upgrading of the existing traffic signal or specific components as follows: traffic signal poles, signal heads, controller, and loop sensors and miscellaneous roadway work at 10 (ten) locations in Westmoreland County, all as indicated on the drawings approved for STATE ROUTE 0982, SECTION SIG, in WESTMORELAND COUNTY in the following municipalities: Intersection S.R Ramps(SR 8006 Ramps A,B,C,& D)/Mount Pleasant Rd. (County Road) and Mount Pleasant Road/Town Square Drive/Weatherwood Lane, Hempfield Township. Starting at Sta to Sta on Mt. Pleasant Road (Three New Traffic Signals). Intersection S.R. 0051/S.R (Fellsburg Road) Rostraver Township S.R Segment 0110/0111 Offset 2465 NB/2427 SB to Segment 0120/0121 Offset 1000 NB & SB Intersection S.R. 0906/S.R (Tyrol Blvd) City of Monesson S.R Segment 0100/0101 Offset 0840 NB/0840 SB to Segment 0100/0101 Offset 1861 NB/1861 SB Intersection S.R. 0982/Main Street Borough of Youngstown S.R Segment 0210 Offset 0621 to Segment 0220 Offset 0365 Intersection S.R. 0982/S.R Derry Township S.R Segment 0290 Offset 2374 to Segment 0300 Offset 0700 Intersection S.R (Pittsburgh Street)/Vaneer Ave/Bell Way City of Greensburg S.R Segment 0050 Offset 1100 to Segment 0050 Offset 1600 Intersection S.R (Pittsburgh Street)/Hamilton Avenue City of Greensburg S.R Segment 0040 Offset 0495 to Segment 0040 Offset 0695 Intersection S.R (Pittsburgh Street)/Washington Ave/N. Spring Ave City of Greensburg S.R Segment 0040 Offset 0824 to Segment 0040 Offset 2104 Intersection S.R (Pittsburgh Street)/Westminster Avenue City of Greensburg S.R Segment 0050 Offset 0675 to Segment 0040 Offset 0875 Intersection S.R (West Newton Street)/Spring Ave City of Greensburg S.R Segment 0010 Offset 0894 to Segment 0010 Offset 1444 Intersection S.R (Lowry Ave)/S.R (Baughman Ave & Park Str) City of Jeannette S.R Segment 0010 Offset 0000 to Segment 0010 Offset 0237 includes 193 feet of County Road. DBE 5%, Anticipated Notice to Proceed , Required Completion

6 BLAIR COUNTY SR 453(001) PROPOSAL:$22.08 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: This project is for the rehabilitation of the two-span steel plate girder bridge spanning the Little Juniata River, Norfolk Southern Railroad and a private road. In addition to the structure rehab, this project will include guide rail and drainage updates, all as indicated on the approved drawings included in the bid package for STATE ROUTE 0453, SECTION 001, in HUNTINGDON AND BLAIR COUNTY, WARRIORS MARK, SPRUCE CREEK AND TYRONE TOWNSHIPS at the following location: HUNTINGDON COUNTY STATION TO STATION SEGMENT 0070, OFFSET 0691 TO SEGMENT 0070, OFFSET 0000 BLAIR COUNTY STATION TO STATION SEGMENT 0030, OFFSET 2049 TO SEGMENT 0030, OFFSET DBE 5%, Anticipated Notice to Proceed , Required Completion LACKAWANNA COUNTY SR 380(201) PROPOSAL:$7.56 PLANS:$2.04 Lackawanna County Interstate Route 380 Section 201 For the resurfacing of a certain section of INTERSTATE ROUTE 380 in LACKAWANNA COUNTY, ROARING BROOK TOWNSHIP in the COMMONWEALTH OF PENNSYLVANIA. S.R (201) This project is located as follows: S.R from Segment 0194 Offset 0000 to Segment 0240 Offset 2305 Northbound For the milling and resurfacing of approximately 4.1 miles of the existing Interstate roadway with Superpave Asphalt Mixture Design and the replacement of traffic lines and markings. MBE 0%, WBE 1%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated March 19, 2008 COLUMBIA COUNTY SR 42(57M) PROPOSAL:$13.32 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: For the resurfacing of the existing roadway including milling, plain cement concrete curb, membrane waterproofing, cement concrete sidewalk, sidewalk detectable warning surfaces, superpave base, binder, scratch, and wearing courses, paved shoulders, pavement markings and legends, and other related work within an overall length of 35,282 linear feet (6.68 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 42 SECTION 57M from the intersection with State Route 487 at Segment 0340 Offset 0120 to the intersection with State Route 11 at Segment 0430 Offset 1990 and for STATE ROUTE 487 SECTION 50M from the intersection with State Route 3003 at Segment 0080 Offset 1093 to the intersection with State Route 42 at Segment 0140 Offset 3305 and also STATE ROUTE 8003 (Ramp A, B, C, D) at the intersection with State Route 11 in CATAWISSA BOROUGH and MONTOUR, CATAWISSA, and FRANKLIN TOWNSHIPS, COLUMBIA COUNTY. MBE 1%, WBE 1%, Anticipated Notice to Proceed , Required Completion LACKAWANNA COUNTY SR 7219(BRG) PROPOSAL:$21.00 PLANS:$ X18:$ X36:$ For the rehabilitation and improvement of a certain section of HIGHWAY in LACKAWANNA COUNTY, SOUTH ABINGTON TOWNSHIP, Commonwealth of Pennsylvania, TOWNSHIP ROAD 442 BURCHER AVENUE BRIDGE. The project being situated as follows: From a point at the intersection of Burcher Avenue and SR 0006 at Station to a point approximately linear feet east of the intersection of Burcher Avenue and SR 0006 at Station For the removal of an existing steel/timber single span bridge and replacement with a single span composite prestressed spread box beam bridge, concrete curbing and sidewalk, bituminous approach work, drainage and pavement markings all contained within an overall project length of linear feet (0.095 mile) as indicated on the approved drawings included in the bid package. DBE 3%, Anticipated Notice to Proceed , Required Completion

7 HUNTINGDON COUNTY SR 655(MC3) PROPOSAL:$9.24 PLANS:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$66.30 The description and location of the project is as follows: This project consists of improving drainage, resurfacing, and resetting guiderail on SR 655 all as indicated on the approved drawings included in the bid package for STATE ROUTE 0655, SECTION MC3, in HUNTINGDON COUNTY, MILL CREEK BOROUGH & BRADY TOWNSHIP located at the following location: Station to Station Segment 0500, Offset 0020 to Segment 0520, Offset DBE 5%, Anticipated Notice to Proceed , Required Completion SOMERSET COUNTY SR 1001(02B) PROPOSAL:$16.20 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$27.30 The description and location of the project is as follows: This project is for the replacement of the structure over Schrock Run with minimal approach roadway work and miscellaneous construction all as indicated on the approved drawings included in the bid package for STATE ROUTE 1001, SECTION 02B, in SOMERSET COUNTY, STONEYCREEK TOWNSHIP located west of Shanksville at the following location: Station to Station Segment 0140, Offset 0130 to Segment 0140, Offset MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion COLUMBIA COUNTY SR 11(071) PROPOSAL:$13.56 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$27.30 EXSTRUCT:$ X18:$ X36:$54.60 The description and location of the project are as follows: For the rehabilitation of the existing bridge over Briar Creek including superpave asphalt mixture design, HMA base, scratch, and wearing courses, milling, mechanical splice systems, fabricated structural steel, adhesive anchors, bridge deck high performance concrete, temporary excavation support and protection system, guide rail upgrade, pavement markings, and other miscellaneous construction within an overall length of linear feet (0.123 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 11, SECTION 071 in BRIAR CREEK BOROUGH, COLUMBIA COUNTY - From approximately 1.1 miles northeast of the intersection with State Route 1015 at Segment 350, Offset 0184 to approximately 2.1 miles southwest of the intersection with State Route 93 at Segment 350, Offset DBE 2%, Anticipated Notice to Proceed , Required Completion LYCOMING COUNTY SR 15(121) PROPOSAL:$37.08 PLANS:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: For the reconstruction of the existing roadway including milling of concrete surfaces, concrete pavement spall repair, concrete pavement patching, patching joint, superpave base, binder, scratch, and wearing courses, sawing and sealing bituminous overlays, guide rail upgrades, structure safelane surface overlay, pavement markings, and other related work within an overall length of 41,043 linear feet (7.77 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 15 SECTION 66M from the intersection with State Route 3026 at Segment 1380 Offset 0507 to the intersection with State Route 14 at Segment 1550 Offset 0700 and for STATE ROUTE 15 SECTION 133 from approximately 2.4 miles north of the intersection with State Route 3026 at Segment 1430 Offset 2084, Northbound and Segment 1431 Offset 1663, Southbound to approximately 5.0 miles south of the intersection with State Route 14 at Segment 1440 Offset 0752, Northbound and Segment 1441 Offset 1253, Southbound in OLD LYCOMING, LYCOMING, HEPBURN, and LEWIS TOWNSHIPS, LYCOMING COUNTY. DBE 2%, Anticipated Notice to Proceed , Required Completion

8 NORTHUMBERLAND COUNTY SR 44(48M) PROPOSAL:$23.04 PLANS:$ X18:$ X36:$ The description and location of the project are as follows: For resurfacing the existing roadway with superpave asphalt mixture design, flexible base replacement, superpave asphalt mixture design, HMA scratch and wearing courses, drainage improvements, milling, paved shoulders, concrete curbs and sidewalks, rehabilitation of the existing bridge over I-180 eastbound and westbound, membrane waterproofing system, asphaltic plug expansion dam system, and other miscellaneous construction within an overall length of 26,983 linear feet (5.11 miles) all as indicated on the approved drawings for STATE ROUTE 44, SECTION 48M; STATE ROUTE 54, SECTION 60M; STATE ROUTE 1045, SECTION 001; and TOWNSHIP ROAD T-666 in NORTHUMBERLAND COUNTY, LEWIS and DELAWARE TOWNSHIPS, and TURBOTVILLE BOROUGH - State Route 44, Section 48M from approximately the intersection with State Route 4001 at Segment 10 Offset 0000 to approximately the intersection with State Route 1006 at Segment 70 Offset 0500; State Route 54, Section 60M from approximately 1.8 miles southeast of the intersection with State Route 1005 at Segment 120 Offset 0561 to approximately the intersection with State Route 44 at Segment 180 Offset 2403; State Route 1045, Section 001 from approximately 0.1 miles west of State Route 1007 at Segment 10 Offset 0000 to approximately Township Road T-666 at Segment 10 Offset 0278; and Township Road T-666 from approximately State Route 1045 at Station 2+11 to approximately the intersection with State Route 1007 at Station MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion ALLEGHENY COUNTY SR 279(A72) PROPOSAL:$27.84 PLANS:$ X18:$ X36:$1, EX The description and location of the project is as follows: For the concrete pavement patching, drainage, guide rail, signing, pavement marking, bridge rehabilitation, and other miscellaneous construction, all within a length of 94,143 linear feet (17.83 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0279, SECTION A72, in ALLEGHENY COUNTY, CITY OF PITTSBURGH, FRANKLIN PARK BOROUGH, ROSS and OHIO TOWNSHIPS, Commonwealth of Pennsylvania. This project being situated as follows: From the Fort Duquesne Bridge at Segment 0064/0065 Offset 0400 (Station ) to the intersection with SR 0079 at Segment 0190/0191 Offset 2462/2622 (Station /608+89). DBE 6%, Anticipated Notice to Proceed , Required Completion SCHUYLKILL COUNTY SR 54(POC) PROPOSAL:$7.20 The description and location of the project is as follows: For the surface improvement of State Route 54 with superpave asphalt mixture design, scratch and wearing courses; milling; legends and pavement markings; and other miscellaneous construction as indicated on the approved drawings included in the bid package for GROUP 5-08-POC6C, STATE ROUTE 54, SECTION POC, in Schuylkill COUNTY in Rush Township from segment 540 offset 0000 to segment 620 offset MBE 2%, WBE 0%, Anticipated Notice to Proceed , Required Completion ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated March 14, 2008 DAUPHIN COUNTY SR 1009(009) PROPOSAL:$9.12 PLANS:$ X18:$ X36:$31.20 The project consists of overlay out to out with Superpave wearing and leveling courses, base replacement, replacing existing centerline rumble strips and raised pavement markings, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 1009, SECTION 009, in DAUPHIN COUNTY, LYKENS TOWNSHIP, from Segment 0070 Offset 0000 to Segment 0090 Offset 3299, a length of 9, linear feet (1.72 miles). Also included is SR in DERRY & SOUTH HANOVER TOWNSHIPS, from Segment 0010 Offset 0000 to Segment 0050 Offset 0075, a length of 11, linear feet (2.12 miles). Overall project length is 20, linear feet (3.84 miles). MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion , Required Completion. 8

9 DAUPHIN COUNTY SR 2007(009) PROPOSAL:$10.56 PLANS:$ X18:$ X36:$35.10 This project consists of Superpave scratch and wearing courses from out to out or curb to curb with pavement markings, minor drainage work, guide rail updates, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 2007, SECTION 009, in DAUPHIN COUNTY, CONEWAGO and LONDONDERRY TOWNSHIPS, from the intersection of Harrisburg Pike (SR 0230) at Segment 0030 Offset 0000 to the intersection of Colebrook Road (SR 0341) at Segment 0090 Offset 3076, a length of 16, linear feet (3.05 miles). Also included is STATE ROUTE 0241, SECTION 007, in LANCASTER COUNTY, CONOY & WEST DONEGAL TOWNSHIPS and ELIZABETHTOWN BOROUGH, from the intersection of River Road (SR 0441) at Segment 0010 Offset 0000 to Masonic Drive at Segment 0120 Offset 0000, a length of 24, linear feet (4.60 miles). Overall project length is 40, linear feet (7.65 miles). MBE 3%, WBE 2%, Anticipated Notice to Proceed , Required Completion CUMBERLAND COUNTY SR 11(062) PROPOSAL:$9.36 PLANS:$ X18:$ X36:$39.00 Construction consists of overlaying the existing roadway and shoulders, minor drainage improvements, guide rail updates, base replacement, membrane waterproofing, pavement markings, and other miscellaneous construction, all as indicated on the approved drawings for STATE ROUTE 0011, SECTION 062, in CUMBERLAND COUNTY, PENN & WEST PENNSBORO TOWNSHIPS, from the intersection with SR 0233 at Segment 0220 Offset 1720 to the intersection with Mount Rock Road at Segment 0280 Offset 0850, a length of 15, linear feet (2.959 miles). Also included are STATE ROUTE 3006, SECTION 012, in PENN TOWNSHIP, from Segment 0010 Offset 0000 to Segment 0100 Offset 0050, a length of 25, linear feet (4.898 miles), and STATE ROUTE 4003, SECTION 011, in SOUTHAMPTON TOWNSHIP, from Segment 0050 Offset 1947 to Segment 0110 Offset 0050, a length of 11, linear feet (2.235 miles). Overall project length is 53, linear feet ( miles). MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion LYCOMING COUNTY SR 180(66M) PROPOSAL:$5.40 PLANS:$1.44 The description and location of the project are as follows: For the repair of two accident damaged prestressed concrete I-beams with FRP (Fiber Reinforced Polymer) repair of concrete I-beams and other related work within an overall length of 20 linear feet (0.01 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 180, SECTION 66M from approximately 0.6 miles northeast of the intersection with State Route 2014 at Segment 0445, Offset 0979 to approximately 0.66 miles southwest of the intersection with State Route 2051 at Segment 0445, Offset 1171 in MUNCY TOWNSHIP, LYCOMING COUNTY. MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion NORTHUMBERLAND COUNTY SR 147(70M) PROPOSAL:$7.32 PLANS:$ X18:$ X36:$31.20 The description and location of the project are as follows: For milling and resurfacing including superpave base and wearing courses, pavement markings, and other miscellaneous construction within an overall length of 1861 linear feet (0.35 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 147 SECTION 70M in UPPER AUGUSTA TOWNSHIP, NORTHUMBERLAND COUNTY from approximately 0.2 miles northwest of the intersection with State Route 4008 at Segment 580 Offset 0562 to approximately 0.2 miles west of the intersection with State Route 11 at Segment 590 Offset MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion MCKEAN COUNTY SR 155(LTX) PROPOSAL:$12.72 PLANS:$ X18:$ X36:$85.80 The description and location of the project is as follows: for the improvement of two bridges in MCKEAN COUNTY, PORT ALLEGANY BOROUGH and LIBERTY TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0155, SECTION LTX. The project being situated as follows: On State Route 0155 over the Allegheny River in the Borough of Port Allegany from Segment 0160/2237 to Segment 0160/2713 and on State Route 0155 over Hamilton Run in Liberty Township from Segment 0080/0710 to Segment 0080/0843. Segment 0160 Structure: For the construction of approach work including Superpave Asphalt Mixture Designs for the base and wearing course, replacement of expansion joints, Type 3 deck repair, Latex modified overlay of bridge deck, painting of structural steel with organic zinc coating system, construction of rock blanket, guide rail and miscellaneous construction. Segment 0080 Structure: For painting and preservation involving Type 2 deck repair, painting of structural steel with organic zinc coating system, placement of membrane waterproofing system, and miscellaneous construction. For a total construction length of both structures of approximately 448 feet as indicated on the approved drawings included in the bid package. MBE 0%, WBE 2%, Anticipated Notice to Proceed , Required Completion

10 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated March 13, 2008 BERKS COUNTY SR 61(A44) PROPOSAL:$8.76 PLANS:$5.88 This project is located in Berks County, on various SR'S in various townships and boroughs. The work consists of the following items; base repair, scratch course, wearing course, milling where needed and other miscellaneous items, all as indicated on the appproved drawings included in the bid package for the following State Routes: SR Segment 170 Offset 1926 to Segment 210 Offset Segment 171 Offset 1928 to Segment 211 Offset Segment 320 Offset 0000 to Segment 390 Offset Segment 321 Offset 0000 to Segment 391 Offset 2984 SR Segment 100 Offset 2455 to Segment 230 Offset 1564 SR 100 -Segment 90 Offset 1948 to Segment 180 Offset 2617 SR Segment 10 Offset 0200 to Segment 50 Offset Segment 290 Offset 0000 to Segment 410 Offset 0000 SR 183 -Segment 300 Offset 0985 to Segment 440 Offset 0915 SR 724 -Segment 162 Offset 0000 to Segment 262 Offset Segment 292 Offset 0000 to Segment 392 Offset MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion SULLIVAN COUNTY SR 87(61M) PROPOSAL:$13.80 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$1, EXSTRUCT:$ X18:$ X36:$ The description and location of the project are as follows: For the overlaying of the existing roadway in addition to the design and construction of the deck joint replacement of two existing structures, a single span steel thru truss and a two span steel pony truss, over Loyalsock Creek on STATE ROUTE 87, SECTION 61M, from the LYCOMING/SULLIVAN county line at Segment 10 Offset 0000 to approximately 0.25 miles northeast of the intersection with SR 4001 at Segment 140 Offset 1333 in HILLSGROVE TOWNSHIP, SULLIVAN COUNTY. The scope of work as indicated on the approved drawings included in the bid package consists of widening the existing shoulders, overlaying the existing pavement surface, drainage improvements, guide rail upgrades, surveying, two design/build temporary traffic signals, and two design/build bridge rehabilitations including excavation behind abutments, membrane waterproofing, removal of portion of existing bridges, installing strip seal dams, reconstruction of the approach roadway, and other miscellaneous construction within a length of 31,525 linear feet (5.971 miles). DBE 3%, Anticipated Notice to Proceed , Required Completion NORTHAMPTON COUNTY SR 1033(A44) PROPOSAL:$8.04 The description and location of the project is as follows: For the surface improvement of State Routes 1013, 1017, 1019, 1033, and 8011 with superpave asphalt mixture design, leveling and wearing courses, milling, legends and pavement markings and other miscellaneous construction, all as indicated on the approved drawings included in the bid package for Group 5-07-ACT44. Drawings approved for STATE ROUTE 1033, SECTION POC, in NORTHAMPTON COUNTY in Lower Mount Bethel, Plainfield, Upper Mount Bethel & Washington Townships and the Borough of Bangor. SR 1013 from segment 0010 offset 0000 to segment 0080 offset SR 1017 from segment 0010 offset 0000 to segment 0140 offset SR 1019 from segment 0010 offset 0000 to segment 0030 offset SR 1033 from segment 0010 offset 0000 to segment 0060 offset SR 8011 from segment 0010 offset 0000 to segment 0010 offset MBE 1%, WBE 1%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 10

11 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated March 12, 2008 MONROE COUNTY SR 33(01M) PROPOSAL:$9.96 PLANS:$2.28 This project is an Act 44 Contract for the improvement of SR 33-01M in Monroe County, Ross and Hamilton townships from Segments 10/0 & 11/0 to Segments 50/0 & 51/0. The project involves milling and resurfacing of approximately 2 miles NB & SB lanes of existing road with superpave asphalt mixture design HMA binder (2 ½ ) and wearing courses (2 ), variable depth milling, shoulder upgrade, concrete joint repair and concrete patching with other miscellaneous items. All work is within the existing Right-of-Way and is 100% state funded. MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion NORTHAMPTON COUNTY SR 611(POC) PROPOSAL:$9.00 The description and location of the project is as follows: For the surface improvement of State Routes 611 with superpave asphalt mixture design, leveling and wearing courses; milling; legends and pavement markings; and other miscellaneous construction as indicated on the approved drawings included in the bid package for GROUP 5-07-POC5E. Drawings approved December 20, 2007 for STATE ROUTE 611, SECTION POC, in Northampton COUNTY in Upper and Lower Mount Bethel Townships from segment 310 offset 0200 to segment 550 offset MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion BLAIR COUNTY SR 99(009) PROPOSAL:$15.84 PLANS:$ X18:$ X36:$42.90 EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: This project is for the cleaning/blasting and painting of the Tyrone Interchange structures including the 13-span I-99 viaduct and 7-span SR 8005 Ramp E&F structures all as indicated on the approved drawings included in the bid package for State Route 0099, Section 009, in Blair County, Snyder Township and Tyrone Borough at the following location: Station to Station Segment 0474 Offset 0079 to Segment 0474, Offset 1721 NB Segment 0475 Offset 0321 to Segment 0475, Offset 1963 SB. DBE 0%, Anticipated Notice to Proceed , Required Completion FAYETTE COUNTY SR 0(MDU) PROPOSAL:$10.80 PLANS:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: This is a project to widen Matthew Drive from what is typically an existing three lane typical section to a five lane typical section in order to provide two through lanes in each direction. The project will also require widening on SR 8005 (Route 119 On/Off Ramp) to accommodate the extra through lanes on Matthew Drive. The project work on Matthew Drive involves full reconstruction of the pavement structure including tie ins with intersecting roads and driveways. Matthew Drive typical section includes curb gutter throughout and mountable curb medians in specific areas. In addition, the overall project will consist of but not be limited to drainage enhancements, maintenance and protection of traffic, guide rail, signing, traffic signals, Erosion and Sediment Control, and other miscellaneous construction, all as indicated on the approved drawings for TOWNSHIP ROUTE 0911, SECTION MDU, in FAYETTE COUNTY, SOUTH UNION TOWNSHIP. Work on Matthew Drive will be from the intersection with SR 0021 to a point approximately 1000 feet south of SR 4006 (New Salem Road) where previous widening completed with the Widewater s development ended for a length of 1760 feet or miles. Work on SR 8005 will be from segment 0010 offset 3618 to segment 0010 offset 3278 and segment 0260 Offset 0000 to 0260 Offset 0942 a length of feet or miles. Total length of project combined between two routes is 2654 feet or miles. DBE 5%, Anticipated Notice to Proceed , Required Completion FAYETTE COUNTY SR 7201(LRR) PROPOSAL:$9.96 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: Replacement of the structure that carries Lynn Road over a Tributary of Redstone Creek with Reinforced Concrete Box Culvert, reconstruction of the roadway approaches and other miscellaneous construction activities, all as indicated on the approved drawings for Lynn Road Bridge on Lynn Road, in BROWNSVILLE AND REDSTONE TOWNSHIP, FAYETTE COUNTY from approximately Station to approximately Station on Lynn Road. DBE 5%, Anticipated Notice to Proceed , Required Completion

12 FAYETTE COUNTY SR 21(07R) PROPOSAL:$25.08 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: The scope of work includes pavement patching, resurfacing, drainage adjustments, and guide rail, signal work and other miscellaneous construction, all as indicated on the drawings approved for STATE ROUTE 0021, SECTION 07R, in FAYETTE COUNTY GERMAN TOWNSHIP from approximately S.R at segment 0070 offset 1914 to approximately S.R at segment 0160 offset DBE 5%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION ASSOCIATED PENNSYLVANIA CONSTRUCTORS ECMS PROJECTS - ADVANCED INFORMATION LETTING APRIL 17, 2008 Updated March 3, 2008 INDIANA COUNTY SR 422(455) PROPOSAL:$9.60 PLANS:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: For the Design/Build of a bridge rehabilitation project for dual three span prestressed concrete spread box beam bridges and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0422, SECTION 455, in Indiana COUNTY Cherryhill TOWNSHIP from approximately a point 3.5 miles east of the SR 422/954 intersection at segment 390 offset 0482 eastbound and segment 0391 offset 2692 westbound to a point 4 miles east of the Sr422/954 intersection at segment 0400 offset 2228 eastbound and segment 0441 offset 1485 westbound. MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 12

PENNSYLVANIA DEPARTMENT OF REVENUE REALTY TRANSFER TAX COMMON LEVEL RATIO (CLR) REAL ESTATE VALUATION FACTORS FOR ADAMS COUNTY CLR FACTOR

PENNSYLVANIA DEPARTMENT OF REVENUE REALTY TRANSFER TAX COMMON LEVEL RATIO (CLR) REAL ESTATE VALUATION FACTORS FOR ADAMS COUNTY CLR FACTOR COMMON LEVEL RATIO () REAL ESTATE VALUATION S ADAMS COUNTY 7-2-1986 6-30-1987 7.94 7-1-2006 6-30-2007 3.98 7-1-1987 6-30-1988 9.01 7-1-2007 6-30-2008 4.53 7-1-1988 6-30-1989 9.35 7-1-2008 6-30-2009 4.55

More information

Nursing Opportunities by County. View the county of your choice below to see a list of nursing job classifications used by facilities in that county.

Nursing Opportunities by County. View the county of your choice below to see a list of nursing job classifications used by facilities in that county. Nursing Opportunities by County View the county of your choice below to see a list of nursing job classifications used by facilities in that county. Please note that not all counties have nursing facilities.

More information

Thomas P. Williams Pennsylvania State Director

Thomas P. Williams Pennsylvania State Director Thomas P. Williams Pennsylvania State Director in fra struc ture [in-fruh-struhk-cher] noun The fundamental facilities and systems serving a country, city, or area, as transportation and broadband systems,

More information

A Snapshot of Pennsylvania s Uninsured Selected Findings from the 2008 Pennsylvania Insurance Department Health Insurance Survey

A Snapshot of Pennsylvania s Uninsured Selected Findings from the 2008 Pennsylvania Insurance Department Health Insurance Survey Size A Snapshot of Pennsylvania s Selected Findings from the 2008 Pennsylvania Insurance Department Health Insurance Survey The Pennsylvania Health Access Network Harrisburg, PA 17101 www.pahealthaccess.org

More information

Pennsylvania s Health Care Marketplace

Pennsylvania s Health Care Marketplace Pennsylvania s Health Care Marketplace Rating Areas: Insurance plans and their cost vary across the state. Pennsylvania is divided into nine rating areas. Rating areas are the geographic component used

More information

DEVELOPMENTAL PROGRAMS BULLETIN COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF PUBLIC WELFARE

DEVELOPMENTAL PROGRAMS BULLETIN COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF PUBLIC WELFARE DEVELOPMENTAL PROGRAMS BULLIN COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF PUBLIC WELFARE DA OF ISSUE December 29, 2011 EFFECTIVE DA July 1, 2011 NUMBER 00-11-09 SUBJECT: Medical Assistance Program Fee Schedule

More information

Interim Final FORM 1: Total Coliform Sample Siting Plan Form Instructions

Interim Final FORM 1: Total Coliform Sample Siting Plan Form Instructions COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF SAFE DRINKING WATER Interim Final FORM 1: Total Coliform Sample Siting Plan Form For Noncommunity Water Systems Collecting

More information

The Commonwealth s Official Source for Population and Economic Statistics. March 9, 2011

The Commonwealth s Official Source for Population and Economic Statistics. March 9, 2011 Research Brief The Commonwealth s Official Source for Population and Economic Statistics March 9, 2011 Local Data Released for Pennsylvania: State Shows Continued Population Growth PENN STATE HARRISBURG

More information

Information 117 Baltimore Street Gettysburg, PA 17325 (717) 337-9834. Court Administrator Adams County Courthouse Gettysburg, PA 17325 717-337-9846

Information 117 Baltimore Street Gettysburg, PA 17325 (717) 337-9834. Court Administrator Adams County Courthouse Gettysburg, PA 17325 717-337-9846 County ADAMS ALLEGHENY ARMSTRONG BEAVER BEDFORD BERKS BLAIR BRADFORD BUCKS BUTLER Office to List on Notice to Defend Office of the, Room 104, Adams County, Gettysburg, Pennsylvania 17325. Department of

More information

HD0344P 2013 ABORTION STATISTICS

HD0344P 2013 ABORTION STATISTICS HD0344P 2013 ABORTION STATISTICS 2013 ABORTION STATISTICS In 2013, there were 32,108 abortions performed in Pennsylvania. The 2013 figure is a 51.2 percent decrease from the 1980 total of 65,777 (the highest

More information

[41 Pa.B. 6163] [Saturday, November 12, 2011]

[41 Pa.B. 6163] [Saturday, November 12, 2011] 1 of 10 11/15/2011 11:17 AM Medical Assistance Program Fee Schedule for Consolidated and Person/Family Directed Support Waiver-Funded Select Services, Targeted Service Management and Community Mental Retardation

More information

CANCER of the CORPUS UTERI

CANCER of the CORPUS UTERI CANCER of the CORPUS UTERI Data Highlights The average annual (1994-98) age-adjusted incidence rate for cancer of the corpus uteri among whites was over 56 percent higher than the rate for blacks (25.6

More information

Please read this letter

Please read this letter Please read this letter December 21, 2009 Dear Family, We are writing this update about Pennsylvania s new Autism Insurance Law. (also known as Act 62). This law requires certain private health insurance

More information

Lawyer Referral Services by County

Lawyer Referral Services by County s by County Adams ADAMS COUNTY ADAMS COUNTY COURTHOUSE GETTYSBURG 17325 717-337-9846 Allegheny ALLEGHENY COUNTY ALLEGHENY COUNTY BAR ASSOCIATION Koppers Bldg., Suite 400 436 Seventh Avenue Pittsburgh,

More information

Straight Line Diagram. Lebanon 38. January 2016

Straight Line Diagram. Lebanon 38. January 2016 Straight Line Diagram Lebanon 38 January 2016 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

ASSISTIVE TECHNOLOGY AND TITLE II AND TITLE III OF THE AMERICANS WITH DISABILITIES ACT (ADA)

ASSISTIVE TECHNOLOGY AND TITLE II AND TITLE III OF THE AMERICANS WITH DISABILITIES ACT (ADA) ASSISTIVE TECHNOLOGY AND TITLE II AND TITLE III OF THE AMERICANS WITH DISABILITIES ACT (ADA) Figure 1: Door knob and key. Prepared by: Disability Rights Network of Pennsylvania www.drnpa.org 1414 N. Cameron

More information

Understanding MATP: The Medical Assistance Transportation Program

Understanding MATP: The Medical Assistance Transportation Program Understanding MATP: The Medical Assistance Transportation Program Prepared by the Pennsylvania Health Law Project Helpline: (800)274-3258 1-866-236-6310 TTY Website: www.phlp.org Copyright 2009 Pennsylvania

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

Benefit Chart of Medicare Supplement Plans Sold on or After June 1, 2010

Benefit Chart of Medicare Supplement Plans Sold on or After June 1, 2010 Benefit Chart of Medicare Supplement Plans Sold on or After June 1, 2010 This chart shows the benefits included in each of the standard Medicare supplement plans. Every company must make available Plans

More information

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs - Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route

More information

Recent Graduate. Q1 Which program did you graduate from? CWEB (1) CWEL (2) Answer Q2-Q10 If Q1 =CWEL

Recent Graduate. Q1 Which program did you graduate from? CWEB (1) CWEL (2) Answer Q2-Q10 If Q1 =CWEL Recent Graduate Q1 Which program did you graduate from? CWEB (1) CWEL (2) Answer Q2-Q10 If Q1 =CWEL Q2 Have you taken the LSW/LCSW examination? Yes (1) No (2) Answer Q3 If Q2 =Yes Q3 Did you pass the LSW/LCSW

More information

Understanding Wraparound Services for Children in HealthChoices

Understanding Wraparound Services for Children in HealthChoices Understanding Wraparound Services for Children in HealthChoices Everyone on Medical Assistance (MA) has an ACCESS card. Most people on MA now receive mental health and drug & alcohol services from a Behavioral

More information

DAUPHIN COUNTY START PERIOD

DAUPHIN COUNTY START PERIOD BASE Bridge Rehabilitation Walker Mill Road over Paxton Creek DAUPHIN Y Bridge Rehabilitation on Township Road 431 (Walker Mill Road) over Paxton Creek in Susquehanna Township 1 $ 865,000 1 0 0.1 BASE

More information

Overview of Presentation

Overview of Presentation Overview of Presentation PA Overview & CWIA Products/Services Workforce Investment Act Cost/Benefit Study Workforce Data Quality Initiative Update Sue Mukherjee Director, Center for Workforce Information

More information

OVR and other state agencies can be accessed through a new 1 stop shop for the PA government on the internet. http://www.cwds.state.pa.

OVR and other state agencies can be accessed through a new 1 stop shop for the PA government on the internet. http://www.cwds.state.pa. Pennsylvania Office of Vocational Rehabilitation Commonwealth of Pennsylvania Department of Labor & Industry OVR and other state agencies can be accessed through a new 1 stop shop for the PA government

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

Paving Capitalization Work Categories and Treatments

Paving Capitalization Work Categories and Treatments Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods

More information

COUNTY: ALLEGHENY 1301 Carlisle Street Natrona Heights, PA 15065 Coal Valley Road Pittsburgh, PA 15236. Alle Kiski Medical Center

COUNTY: ALLEGHENY 1301 Carlisle Street Natrona Heights, PA 15065 Coal Valley Road Pittsburgh, PA 15236. Alle Kiski Medical Center BEHAVIORAL HEALTH PROVIDERS Alle Kiski Medical Center Jefferson Regional Medical Center COUNTY: ALLEGHENY 1301 Carlisle Street Natrona Heights, PA 15065 Coal Valley Road Pittsburgh, PA 15236 Valley Medical

More information

COUNTY: ALLEGHENY 1301 Carlisle Street Natrona Heights, PA 15065 Coal Valley Road Pittsburgh, PA 15236. Alle Kiski Medical Center

COUNTY: ALLEGHENY 1301 Carlisle Street Natrona Heights, PA 15065 Coal Valley Road Pittsburgh, PA 15236. Alle Kiski Medical Center Alle Kiski Medical Center Jefferson Regional Medical Center COUNTY: ALLEGHENY 1301 Carlisle Street Natrona Heights, PA 15065 Coal Valley Road Pittsburgh, PA 15236 Valley Medical Facilities, Inc. COUNTY:

More information

The Pennsylvania State University Student Parent Child Care Subsidy Application and Information Form

The Pennsylvania State University Student Parent Child Care Subsidy Application and Information Form Office of Human Resources The Pennsylvania State University 321 James M. Elliott Building University Park, PA 16802-5032 Please note that this form has been updated to reflect changes for our new CCAMPIS

More information

BID ITEM WORKBOOK COSTARS-6 Software BIDDER/CONTRACTOR DATA

BID ITEM WORKBOOK COSTARS-6 Software BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR'S LEGAL NAME: D/B/A NAME, IF APPLICABLE: BIDDER ADDRESS: COUNTY LOCATED IN: VENDOR NUMBER: PA Legislative House District Number DGS Self-Certified Small Business

More information

Fact Sheet Commonwealth of Pennsylvania Department of Environmental Protection

Fact Sheet Commonwealth of Pennsylvania Department of Environmental Protection Fact Sheet Commonwealth of Pennsylvania Department of Environmental Protection ASBESTOS PROGRAM FOR CONTRACTORS WORKING IN PENNSYLVANIA The Pennsylvania asbestos program includes federal and state regulations

More information

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County

More information

An Equal Opportunity Employer

An Equal Opportunity Employer The ARAMARK Tower 1101 Market Street Philadelphia, Pennsylvania 19107-2994 Howard M. Neukrug, P.E. Commissioner SEWAGE FACILITIES PLANNING FOR DEVELOPMENTS LOCATED WITHIN THE CITY OF PHILADELPHIA The Pennsylvania

More information

IssuesPA Workforce Poll: 10 Major Findings (9/30/05)

IssuesPA Workforce Poll: 10 Major Findings (9/30/05) IssuesPA Workforce Poll: 10 Major Findings (9/30/05) 1. Most Pennsylvanians see the job situation in their region of state as only fair, at best. Job Situation in Own Area of State Excellent/Good Only

More information

CREDIT ENROLLMENT TRENDS

CREDIT ENROLLMENT TRENDS CREDIT ENROLLMENT TRENDS Fall 2015 Heads 4000 3500 3000 3120 3116 3180 3150 3452 2500 2000 1500 1000 500 0 2011 2012 2013 2014 2015 Institutional Research October 2015 Credit Enrollment Trends Fall 2015

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

FACT SHEET. Instructions for Completing Form MV-4ST, Vehicle Sales and Use Tax Return/Application for Registration

FACT SHEET. Instructions for Completing Form MV-4ST, Vehicle Sales and Use Tax Return/Application for Registration FACT SHEET Instructions for Completing Form MV-4ST, Vehicle Sales and Use Tax Return/Application for Registration (FOR PENNDOT AUTHORIZED AGENTS USE ONLY) This form is used to obtain a Pennsylvania Certificate

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Drop-In Centers by County

Drop-In Centers by County Drop-In Centers by County Allegheny, Armstrong, Beaver, Bedford, Berks, Bradford, Bucks, Butler, Cambria, Cameron/Elk/McKean, Carbon, Centre, Chester, Clarion, Clearfield Jefferson, Columbia, Crawford,

More information

HEALTHCHOICES BEHAVIORAL HEALTH PERFORMANCE-BASED CONTRACTING REPORT 2011 COMMONWEALTH OF PENNSYLVANIA MARCH 20, 2012

HEALTHCHOICES BEHAVIORAL HEALTH PERFORMANCE-BASED CONTRACTING REPORT 2011 COMMONWEALTH OF PENNSYLVANIA MARCH 20, 2012 PERFORMANCE-BASED CONTRACTING REPORT 2011 MARCH 20, 2012 CONTENTS 1. Stakeholder introduction... 1 2. Executive summary... 5 3. Access performance indicators... 7 4. Quality of process performance indicators...

More information

IWG Pilot Certification & Testing Program. Tuesday, March 3, 2015

IWG Pilot Certification & Testing Program. Tuesday, March 3, 2015 IWG Pilot Certification & Testing Program Tuesday, March 3, 2015 Hear today: - The Case for Interoperability - Three trusted brands : One powerful program - IWG Certification Specifics - Learn how to move

More information

INSTRUCTIONS FOR COMPLETING PWS INVENTORY & BRIEF DESCRIPTION FORM (For Use at NCWSs With ONLY Disinfection or No Treatment)

INSTRUCTIONS FOR COMPLETING PWS INVENTORY & BRIEF DESCRIPTION FORM (For Use at NCWSs With ONLY Disinfection or No Treatment) COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF SAFE DRINKING WATER INSTRUCTIONS FOR COMPLETING PWS INVENTORY & BRIEF DESCRIPTION FORM (For Use at NCWSs With ONLY Disinfection

More information

Transportation Network Analysis. A. Overview

Transportation Network Analysis. A. Overview Transportation Network Analysis A. Overview The goal of this analysis is to evaluate existing roadways and specific intersections within the County. The focus will be on areas identified as probable growth

More information

Alliance Medical Services, Inc. Ensign I. Alliance Medical Services, Inc. Ensign II. Alliance Medical Services, Inc. Smallman.

Alliance Medical Services, Inc. Ensign I. Alliance Medical Services, Inc. Ensign II. Alliance Medical Services, Inc. Smallman. Alliance Medical Services, Inc. Ensign I Alliance Medical Services, Inc. Ensign II Alliance Medical Services, Inc. Smallman Gateway Rehabilitation Center Squirrel Hill Progressive Medical Specialists,

More information

Portway Extensions Concept Development Study APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES

Portway Extensions Concept Development Study APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES Portway Extensions Concept Development Study Final Report APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES Portway Extensions Concept Development Study Final Report In advance of an economic impact analysis

More information

Aggressive Transitioning from. ACGME/AOA Teaching Hospital

Aggressive Transitioning from. ACGME/AOA Teaching Hospital Aggressive Transitioning from Community Hospital to ACGME/AOA Teaching Hospital Joseph Stella, DO FACOS Mary Elizabeth Roth, M.D. FACPE, Linda Famiglio, M.D., John Bulger, DO Geisinger Health System Academic

More information

A Parent s Guide to Choosing Quality Child Care

A Parent s Guide to Choosing Quality Child Care A Parent s Guide to Choosing Quality Child Care Building relationships with families to encourage development of Pennsylvania s children and stability of care for Pennsylvania s families. We believe in

More information

Rising STARS Tuition Assistance Program Application (Effective July 1, 2014)

Rising STARS Tuition Assistance Program Application (Effective July 1, 2014) PA Keys to Professional Development c/o BCIU P.O. Box 16050 Reading, PA 19612-6050 FAX: 610-987-8400 Rising STARS Tuition Assistance Program Application (Effective July 1, 2014) INSTRUCTIONS: Complete

More information

For additional information regarding the project, please contact Harvey Odens at or by phone at (605)367-5680.

For additional information regarding the project, please contact Harvey Odens at or by phone at (605)367-5680. SIOUX FALLS CONSTRUCTION PROJECTS UPDATED: September 9, 2016 Highway: I-90 near Brandon Location: I-90 at MRM 404 and at the Brandon Exit Description of Work: Construct Crossovers Work in Progress: Loiseau

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

California University of Pennsylvania. Application for Admission School of Graduate Studies and Research

California University of Pennsylvania. Application for Admission School of Graduate Studies and Research California University of Pennsylvania Application for Admission School of Graduate Studies and Research 250 University Avenue California, PA 15419 Phone: 724-938-4187 Fax: 724-938-5712 E-mail: gradschool@cup.edu

More information

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

DATE OF LETTING: February 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD

DATE OF LETTING: February 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: February 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD Sealed proposals for certain highway improvements as described

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: October 03, 2007 TIME OF LETTING: 10:00 AM EASTERN DST Sealed proposals for certain highway improvements as described

More information

Gateway Rehabilitation Center South Fayette Township Gaudenzia, Inc. - Pittsburgh. Pyramid Healthcare, Inc. - Wilkinsburg.

Gateway Rehabilitation Center South Fayette Township Gaudenzia, Inc. - Pittsburgh. Pyramid Healthcare, Inc. - Wilkinsburg. Gateway Rehabilitation Center South Fayette Township Gaudenzia, Inc. - Pittsburgh Pyramid Healthcare, Inc. - Wilkinsburg Sojourner House Summit School COUNTY: ALLEGHENY 331 Hickory Grade Road South Fayette

More information

Gateway Rehabilitation Center South Fayette Township Gaudenzia, Inc. - Pittsburgh. Pyramid Healthcare, Inc. - Wilkinsburg.

Gateway Rehabilitation Center South Fayette Township Gaudenzia, Inc. - Pittsburgh. Pyramid Healthcare, Inc. - Wilkinsburg. Gateway Rehabilitation Center South Fayette Township Gaudenzia, Inc. - Pittsburgh Pyramid Healthcare, Inc. - Wilkinsburg Sojourner House Summit School COUNTY: ALLEGHENY 331 Hickory Grade Road South Fayette

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

Highway & Bridge. Municipality: Exempt Code: Widen narw. pave. or recon brdgs (No addtl lanes)

Highway & Bridge. Municipality: Exempt Code: Widen narw. pave. or recon brdgs (No addtl lanes) FFY 2013 TIP MPMS #: 87792 Title: Bridge Reserve Route: Section: A/Q Status: Exempt Improvement Type: Miscellaneous Geographic Limits: County RPO area Narrative: Federal and State bridge Reserve County

More information

2014 Rankings. Pennsylvania

2014 Rankings. Pennsylvania 2014 Rankings Pennsylvania INSIDE FRONT COVER INTENTIONALLY BLANK INTRODUCTION The County Health Rankings & Roadmaps program helps communities identify and implement solutions that make it easier for people

More information

CONTACT: FOR IMMEDIATE RELEASE

CONTACT: FOR IMMEDIATE RELEASE NEWS RELEASE CONTACT: Steve Schell, Communications Coordinator FOR IMMEDIATE RELEASE 717-795-2000 ext. 3269 E-mail steve.schell@pacourts.us WWW.COURTS.STATE.PA.US Statewide Criminal Court Computer Systems

More information

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement) VDOT Project s from 4/1/13-6/30/14 (by advertisement) Description UPC Project Manager Phone RTE 85 - BRIDGE SYSTEM PRESERVATION (Richmond District-wide) BOYD ST - RECONSTR BETWEEN 2ND & 3RD ST & IMPR DRAINAGE

More information

METHODS USED TO ASSURE TRANSPORTATION OF BENEFICIARIES TO AND FROM PROVIDERS

METHODS USED TO ASSURE TRANSPORTATION OF BENEFICIARIES TO AND FROM PROVIDERS Page 1 Transportation of beneficiaries to and from providers of services is available in two categories: ambulance and non-ambulance. Coverage of ambulance transportation is limited to the transportation

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

REQUEST TO QUALIFY (RTQ) INFORMATION FOR

REQUEST TO QUALIFY (RTQ) INFORMATION FOR I. INTRODUCTION: REQUEST TO QUALIFY (RTQ) INFORMATION FOR GEORGE WASHINGTON BRIDGE REPLACEMENT OF THE PIP HELIX RAMP AND REHABILITATION OF UPPER LEVEL SPANS OVER NJ ANCHORAGE AND HUDSON TERRACE CONTRACT

More information

Crash data may not contain complete information, some elements may be unknown

Crash data may not contain complete information, some elements may be unknown Crash Data Introduction: Crash data are information that comes from a reportable crash. A reportable crash according to Title 75, Pennsylvania Consolidated Statutes, Section 3746(a) is: an incident that

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

11 p.m. to. Tuesday, June. will remain open. 14. closed

11 p.m. to. Tuesday, June. will remain open. 14. closed June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Cove Forge Behavioral System Pittsburgh. Gateway Rehabilitation Center Allegheny Valley. Gateway Rehabilitation Center Monroeville

Cove Forge Behavioral System Pittsburgh. Gateway Rehabilitation Center Allegheny Valley. Gateway Rehabilitation Center Monroeville Cove Forge Behavioral System Pittsburgh Allegheny Valley Monroeville Pleasant Hills Squirrel Hill South Hills Out-Patient Squirrel Hill Out-Patient Monroeville Out-Patient Robinson Out-Patient Wexford

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

Single County Authority List (Bureau of Drug & Alcohol Programs) (Approved County Drug & Alcohol Agencies by Regions)

Single County Authority List (Bureau of Drug & Alcohol Programs) (Approved County Drug & Alcohol Agencies by Regions) Northwestern Region Cameron Cameron/Elk/McKean Counties D&A Abuse Services, 120 Chestnut Street Port Allegany, PA 16743 (814) 642-9541 FAX (814) 642-9596 Andrew Lehman, SCA Executive Director Clarion Clarion

More information

Maryland Invests $845 Million in New Highway and Bridge Projects

Maryland Invests $845 Million in New Highway and Bridge Projects Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years $350 $490 $520 $0 $0 $0. FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years

FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years $350 $490 $520 $0 $0 $0. FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years MPMS #: 70188 Title: ACTA - Operations Route: Section: A/Q Status: Exempt Improvement Type: Transit System Improvement Exempt Code: Operating assistance to transit agencies Geographic Limits: Gettysburg

More information

- Frequently Asked Questions - Emissions and Safety Inspection Program Changes

- Frequently Asked Questions - Emissions and Safety Inspection Program Changes 11-03 C - Frequently Asked Questions - Emissions and Safety Inspection Program Changes BACKGROUND In 2002, Citizens For Pennsylvania s Future (PennFuture) and the Clean Air Council initiated two lawsuits

More information

Infrastructure assets are distinguished from other capital assets because they normally:

Infrastructure assets are distinguished from other capital assets because they normally: 4. REPORTING 4.2 Government-Wide Financial Statements 4.2.6 Infrastructure Reporting 4.2.6.10 Governments are required to report all of their capital assets in the statement of net position. Infrastructure

More information

PENNSYLVANIA SCHOOLS SURVEY SUMMARY REPORT

PENNSYLVANIA SCHOOLS SURVEY SUMMARY REPORT PENNSYLVANIA SCHOOLS SURVEY SUMMARY REPORT Pennsylvania Historical and Museum Commission, Bureau of Historic Preservation Preservation Pennsylvania D AN N TE IO CI EG RA S R TH NO AN CO PO ALLEGHENY

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Pavement Management Program

Pavement Management Program Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1

More information

CONSTRUCTION AND REHABILITATION COST GUIDE

CONSTRUCTION AND REHABILITATION COST GUIDE Ministry of Transportation CONSTRUCTION AND REHABILITATION COST GUIDE June 2007 National Library of Canada Cataloguing in Publication Data Main entry under title: Construction and rehabilitation cost guide

More information

REHABILITATION PACKAGE 1-a

REHABILITATION PACKAGE 1-a 1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

Planning Level Cost Estimation Tool. User s Manual

Planning Level Cost Estimation Tool. User s Manual Planning Level Cost Estimation Tool User s Manual Atlanta Regional Commission Submitted By: User s Manual Table of Contents 1. INTRODUCTION... 1 2. OBJECTIVE... 1 3. FRAMEWORK OF THE TOOL... 2 4. HOW TO

More information

III. LOCAL PROGRAMS. Housing Trust Funds

III. LOCAL PROGRAMS. Housing Trust Funds III. LOCAL PROGRAMS County and municipal housing and community development offices are recipients of funds for local housing initiatives from state and federal sources and act in a grantor or lender capacity

More information

Pennsylvania Commission on Crime and Delinquency

Pennsylvania Commission on Crime and Delinquency Juvenile Justice and Delinquency Prevention Program Profile Welcome to the Pennsylvania Juvenile Justice Program Profile. The Program Profile is a series of questions where service providers and juvenile

More information

Collision diagrams are used to display and identify similar accident patterns. They

Collision diagrams are used to display and identify similar accident patterns. They Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

Pennsylvania ehealth Partnership Authority. Health Information Organization Survey. December 2013

Pennsylvania ehealth Partnership Authority. Health Information Organization Survey. December 2013 Pennsylvania ehealth Partnership Authority Health Information Organization Survey December 2013 Pennsylvania ehealth Partnership Authority 613 North Street l Harrisburg, PA 17120 l 717.214-2490 l Fax 717.346.6772

More information

THE CENTER FOR. Rural Pennsylvania

THE CENTER FOR. Rural Pennsylvania THE CENTER FOR Rural Pennsylvania A Legislative Agency of the Pennsylvania General Assembly November 2001 A Retrospective of Pennsylvania s Economic Development s 200 North Third St, Suite 600, Harrisburg,

More information

Robson Forensic Engineers, Architects, Scientists & Fire Investigators

Robson Forensic Engineers, Architects, Scientists & Fire Investigators PROFESSIONAL EXPERIENCE 2012 to Robson Forensic, Inc. present Associate Provide technical services to attorneys, insurance companies, public authorities, road and street owners, trucking and railroad companies,

More information

Jim Lee, President. All Media and Interested Parties. PA Presidential Statewide Poll Results. DATE: October 8, 2012

Jim Lee, President. All Media and Interested Parties. PA Presidential Statewide Poll Results. DATE: October 8, 2012 10 N. Progress Avenue Harrisburg, PA 17109 Phone: (717) 233-8850 Cell Phone: (717) 215-1122 Email: james@susquehannapolling.com www.susquehannapolling.com James Lee, President To: FROM: RE: All Media and

More information

BUILDING A STRONGER PA PennDOT District 6 Highway/Bridge Projects

BUILDING A STRONGER PA PennDOT District 6 Highway/Bridge Projects BUILDING A STRONGER PA PennDOT District 6 Highway/Bridge Projects (+ = Act 89 Funding) Cowpath Road/Godshall Road/Broad Street Intersection Improvement, Montgomery County - $3.9 Million (M) (In Construction)

More information