FFY 2007 York TIP. Highway & Bridge. Draft. Current Date: 05/02/2006. York

Size: px
Start display at page:

Download "FFY 2007 York TIP. Highway & Bridge. Draft. Current Date: 05/02/2006. York"

Transcription

1 FFY 2007 TIP Title: STU Reserve (Lancaster) Route: Section: Improvement Type: Miscellaneous Geographic Limits: County Narrative: Creation of a 2005/06 STU Reserve Line item on the TIP for Co. Partial funding 1% is from Lancaster County. This is a result of the spill over of the urbanized areas into Co. FY 2007 FY 2008 CON STU $37 $38 $38 $38 $37 $38 $38 $38 Total FY Cost $ Title: STU Reserve (HATS) Route: Section: Improvement Type: Miscellaneous Geographic Limits: Co. Narrative: Creation of a 2005 STU Reserve Line item on the TIP for Co. Partial funding 7.1% is from HATS. This is a result of the spill over of the urbanized areas into Co. FY 2007 FY 2008 CON STU $295 $94 $304 $295 $0 $94 $304 Total FY Cost $ Title: Project Delivery Assist. Route: Section: Improvement Type: Miscellaneous Geographic Limits: County Narrative: County Consultant assistance in project delivery Phase Fund FY 2007 FY 2008 PE 581 $300 $300 $0 $0 $0 Total FY Cost $300 Page 1 of 29

2 FFY 2007 TIP Title: SRTP Commuter Services Route: Section: Improvement Type: Transit System Improvement Geographic Limits: County Narrative: This project is for Counties proportionate share of the SRTP Commuter Services program costs based upon population percentage. FY 2007 FY 2008 CON CAQ $188 $ $188 $188 $0 $0 Total FY Cost $375 Title: BairsMillRd Brdg/CO#64 Route: Section: BR Geographic Limits: Over Kreutz Creek in Hellam Township Narrative: Replace Bridge. Bair's Mill Rd over Kreutz Creek. Hellam TWP. FY 2007 FY 2008 $512 $384 CON 183 $96 $72 CON LOC $32 $ $640 $480 $0 $0 Total FY Cost $1,120 Title: OrchardRdBrdg T-462 Replc Route: Section: BRG Geographic Limits: Over a tributary to Lake Pahagaco in Jackson Township (T-462) Narrative: Replace Bridge. Orchard Road bridge over tributary to Lake Pahagaco. Jackson TWP (T-462) FY 2007 FY 2008 CON 183 $276 CON LOC $69 $0 $345 $0 $0 Total FY Cost $345 Page 2 of 29

3 FFY 2007 TIP Windsor (Twp) Title: WGaySt. Brdg. #312 Replc Route: Section: BRG Geographic Limits: Bridge Replacment Over Fishing Creek (BR # 312) in Windsor Township Narrative: Replace Bridge. West Gay Street over Fishing Creek. Windsor TWP (BR #312). Phase Fund FY 2007 FY 2008 $322 CON 183 $60 CON LOC $20 $403 $0 $0 $0 Total FY Cost $ Manheim (Twp) Title: Wolfgang School Rd Bridge Route: Section: BRG Geographic Limits: Bridge over East branch of Codorus Creek in Manheim TWP. Narrative: Remove Existing Structure and Replace with Precast Concrete Culvert. Over East Branch of Codorus Creek. Manheim TWP. FY 2007 FY 2008 FD 183 $20 FD LOC $5 UTL 183 $8 UTL LOC $2 ROW 183 $8 ROW LOC $2 CON 183 $196 CON LOC $49 $0 $45 $245 $0 Total FY Cost $290 Page 3 of 29

4 FFY 2007 TIP Manheim (Twp) Title: Water Tank Road Bridge Route: Section: BRG Improvement Type: New Bridge Geographic Limits: Replace one lane bridge over the East Branch of Codorus Creek in Manheim & Codorus Twps. Narrative: Replace One Lane Bridge. Over East Branch of Codorus Creek. Manheim & Codorus Twps. FY 2007 FY 2008 FD BOF $40 FD 183 $8 FD LOC $3 UTL 183 ROW 183 $196 CON 183 $37 CON LOC $12 $0 $70 $245 $0 Total FY Cost $315 Page 4 of 29

5 FFY 2007 TIP (Twp) Title: Gettysburg Pike Br. Route: Section: BRG Improvement Type: Bridge Preservation Activities Geographic Limits: County Bridge #345 Restoration on Old Gettysburg Pike Over Yellow Breeches Creek in Carroll Twp. Narrative: County Bridge #345 Preventative Maintenance and Minor Restoration. Old Gettsyburg Pike over Yellow Breeches Creek. Carroll Twp. FY 2007 FY 2008 FD BOF $160 FD 183 $30 FD LOC UTL BOF $24 UTL 183 $5 UTL LOC $2 ROW BOF $32 ROW 183 $6 ROW LOC $2 $1,360 CON 183 $255 CON LOC $85 $0 $270 $0 $1,700 Total FY Cost $1, Title: Ridge Road Br (C236) Route: Section: BRG Geographic Limits: County Bridge #236 over North Branch Bermudian Creek, Franklin Twp. Narrative: Replace bridge. County Bridge #236 over North Branch Bermudian Creek. Franklin Twp, County. FY 2007 FY 2008 FD LOC $38 UTL LOC ROW LOC $15 CON BOO $325 CON 183 $61 CON LOC $20 $63 $406 $0 $0 Total FY Cost $469 Page 5 of 29

6 FFY 2007 TIP Title: CMAQ Line Item Route: Section: CMQ Improvement Type: Miscellaneous Geographic Limits: Countywide Narrative: Countywide CMAQ Line Item FY 2007 FY 2008 CON CAQ $2,576 $1,868 $2,411 $3,627 $2,576 $1,868 $2,411 $3,627 Total FY Cost, Title: ENH line Item Route: Section: ENH Improvement Type: Transportation Enhancement Geographic Limits: Countywide Narrative: Countywide ENH line Item FY 2007 FY 2008 CON STE $741 $764 $793 $793 $741 $764 $793 $793 Total FY Cost $3, Title: HRST Reserve Route: Section: HRP Improvement Type: Miscellaneous Geographic Limits: Countywide Narrative: Countywide HRST Reserve FY 2007 FY 2008 CON STP $1,295 5 $1,295 5 $0 $0 Total FY Cost $1,400 Page 6 of 29

7 FFY 2007 TIP Title: Safety Reserve Route: Section: HSP Improvement Type: Safety Improvement Geographic Limits: Countywide Narrative: Countywide Hwy Safety Reserve FY 2007 FY 2008 CON HSIP $992 $1,003 $1,026 $1,026 $992 $1,003 $1,026 $1,026 Total FY Cost $4, Title: Concord Rd Ext.-2 Ln Rd Route: Section: RDW Improvement Type: New Roadway Geographic Limits: Mt. Zion Road to Northern Way Narrative: New Road; Two-lane Concord Road Extension. PA 24 Mt. Zion Road to Northern Way. Springettsbury TWP. FY 2007 FY 2008 CON SXF $ CON STP $ $ $0 Total FY Cost $900 Title: RRX Line Item Route: Section: RRX Improvement Type: Safety Improvement Geographic Limits: Countywide Narrative: Countywide RRX Line Item FY 2007 FY 2008 CON STX $420 $420 $420 $420 $420 $420 $420 $420 Total FY Cost $1,680 Page 7 of 29

8 FFY 2007 TIP Penn (Twp) Title: Center Street Upgrade Route: Section: RWY Improvement Type: Restoration Geographic Limits: Newberry Street to Twp/ Boro Line, Penn Township Narrative: Upgrade to Improve Roadway and Intersection. FromTwp/Boro Line to Newberry Street. Penn TWP. FY 2007 FY 2008 FD STP $240 FD LOC $60 UTL STP $24 UTL LOC $6 ROW STP $80 ROW LOC $20 CON STP $1,176 CON LOC $ $300 $130 $1,470 $0 Total FY Cost $1,900 Title: Express Bus Service Route: Section: YTA Improvement Type: Transit System Improvement Geographic Limits: Transit Authority County Narrative: Transit Authority County Establish express bus service Phase Fund FY 2007 FY 2008 CON CAQ $155 CON LOC $39 $194 $0 $0 $0 Total FY Cost $194 Page 8 of 29

9 FFY 2007 TIP Carroll (Twp) Title: US15/PA 74 Interchange Route: 15 Section: 000 Improvement Type: Safety Improvement Geographic Limits: US 15 intersection with PA 74 and surrounding area Narrative: US 15 new interchange that follows the US 15 Corridor Study completed in This grade seperation is anticipated to cross PA 74 traffic with US 15. Located in the Dillsburg and surrounding area. FY 2007 FY 2008 PE CAQ $560 PE 581 $140 $0 $0 $700 $0 Total FY Cost $ Carroll (Twp) Title: PA-74 Realignment at US15 Route: 15 Section: 016 Improvement Type: Safety Improvement Geographic Limits: Carroll TWP Narrative: Realignment improvements to PA-74 at US-15. Follows the recommendations for the US 15 Corridor study completed in 2001 for the realignment only in Carroll Township and Dillsburg. FY 2007 FY 2008 FD CAQ $256 FD 581 $64 UTL 581 $30 ROW CAQ $400 ROW $0 $0 $850 $0 Total FY Cost $850 Page 9 of 29

10 FFY 2007 TIP Title: PA 24 Widening Route: 24 Section: 011 Improvement Type: Widen Geographic Limits: Edgewood Road /Cape Horn Road Between Carol Road and Windsor Road and Route 124 from Chambers Road Narrative: Widen and Add Lanes. Edgewood Road/Cape Horn Road between Carol Road and Windsor Road and Route 124 from Chambers Road to SR 24. FY 2007 FY 2008 FD STP $284 FD 581 $71 UTL STP $960 UTL 581 $240 ROW STP $887 $313 ROW 581 $222 $78 CON STP $1,470 CON SXF $640 $160 CON 581 $160 $408 $2,664 $1,192 $2,038 $0 Total FY Cost $5, Red Lion (Boro) Title: Main & High Streets Route: 24 Section: 013 Improvement Type: Corridor Safety Improvement Geographic Limits: PA-24/PA-624 IntersectionRed Lion Boro Narrative: PA-24/PA-624 Intersection Red Lion Boro Safety Improvement, eliminate parking lane & improve radius FY 2007 FY 2008 FD CAQ $118 FD 581 $29 UTL 581 $35 ROW 581 $30 CON CAQ $231 CON 581 $58 $212 $289 $0 $0 Total FY Cost $501 Page 10 of 29

11 FFY 2007 TIP Red Lion (Boro) Title: Main & Prospect Streets Route: 24 Section: 014 Improvement Type: Corridor Safety Improvement Geographic Limits: PA-24/Prospect IntersectionRed Lion Boro Narrative: PA-24/Prospect Intersection Red Lion Boro Safety Improvement, eliminate parking & add left turn lanes on PA-24 FY 2007 FY 2008 FD CAQ $118 FD 581 $29 UTL 581 $60 ROW CAQ $120 ROW 581 $30 CON CAQ $474 CON 581 $118 $357 $592 $0 $0 Total FY Cost $ Springettsbury (Twp) Title: Mount Zion Road Route: 24 Section: 015 Improvement Type: Resurface Geographic Limits: PA-24 Mt Zion Rd from Market St to N Sherman StSpringettsbury Twp Narrative: PA-24 Mt Zion Rd from Market St to N Sherman St Springettsbury Twp Mill, base repair, overlay, drainage, guiderail, concrete patching, joint repair and bridge PM work Phase Fund FY 2007 FY 2008 CON STP $2,065 $2,065 $0 $0 $0 Total FY Cost $2,065 Page 11 of 29

12 FFY 2007 TIP Springettsbury (Twp) Title: Memory Lane Route: 30 Section: 000 Improvement Type: Interchange Improvement Geographic Limits: US-30 from Memory Lane to Whiteford RoadSpringettsbury Twp Narrative: US-30 from Memory Lane to Whiteford Road Springettsbury Twp Add westbound off-ramp from US-30 Phase Fund FY 2007 FY 2008 PE 581 $750 $750 $0 $0 $0 Total FY Cost $ West Manchester (Twp) Title: US-30 Lincoln HWY PM Route: 30 Section: 055 Improvement Type: Resurface Geographic Limits: PA-74 to PA-462West Manchester Twp Narrative: SR 0074 TO SR 0462 WEST MANCHESTER TWP RESURFACE, REHABILITATE HWY, BRIDGE PRESERVATION Phase Fund FY 2007 FY 2008 CON NHS $2,800 $2,800 $0 $0 $0 Total FY Cost $2, West Manchester (Twp) Title: Sunset/High St Int Align Route: 74 Section: 029 Improvement Type: Safety Improvement Geographic Limits: PA-74West Manchester TWP Narrative: Align Sunset Ln with High St, PA 74. Two alternatives to review. Mainline left turn lanes being built in 2002 with SR West Manchester TWP. Phase Fund FY 2007 FY 2008 CON STS $900 CON $1,000 $0 $0 $0 Total FY Cost $1,000 Page 12 of 29

13 FFY 2007 TIP Red Lion (Boro) Title: Delta Road Route: 74 Section: 033 Improvement Type: Corridor Safety Improvement Geographic Limits: PA-74 Delta Rd from Camp St to School entrancewindsor Twp, Red Lion Boro Narrative: PA-74 Delta Rd from Camp St to School entrance Windsor Twp, Red Lion Boro Safety Improvement, widen & overlay, add center turn lane on PA-74 FY 2007 FY 2008 FD CAQ $137 FD 581 $34 UTL 581 $20 ROW CAQ $120 ROW 581 $30 CON CAQ $796 CON 581 $ $341 $995 $0 $0 Total FY Cost $1,336 Title: Carlisle Road Route: 74 Section: 041 Improvement Type: Resurface Geographic Limits: PA-74 Carlisle Rd from SR 4014 Harmony Grove Rd to PA-194 Baltimore RdCarrol, Warrington & Washing Narrative: PA-74 Carlisle Rd from SR 4014 Harmony Grove Rd to PA-194 Baltimore Rd Carroll, Warrington & Washington Twps Pave shoulders, base repair, minor drainage & guidrail updates, resurface, minor bridge PM work FY 2007 FY 2008 CON STP $2,600 $0 $2,600 $0 $0 Total FY Cost $2,600 Page 13 of 29

14 FFY 2007 TIP Fairview (Twp) Title: I-83 Ramp Improvements Route: 83 Section: 020 Improvement Type: Miscellaneous Geographic Limits: PA 114 interchange (Exit 39A) in Fairview TWP Narrative: I-83 & PA 114 INTERCHANGE (EXIT 39A) FAIRVIEW TWP INTERCHANGE AND ROADWAY IMPROVEMENTS FY 2007 FY 2008 CON SXF $3,075 $0 $0 $3,075 $0 Total FY Cost $3, Springfield (Twp) Title: I-83 Exit 10 Improvements Route: 83 Section: 029 Improvement Type: Interchange Improvement Geographic Limits: Exit 10 (3) in Springfield Township. Narrative: I-83 Exit 10 Interchange Improvements. Raise new structure over I-83. New ramp confiiguration to meet design criteria. Springfield TWP. FY 2007 FY 2008 FD NHI $1,800 FD 581 $200 $0 $0 $0 $2,000 Total FY Cost $2,000 Page 14 of 29

15 FFY 2007 TIP Hanover (Boro) Title: PA 94 (N) Widening Route: 94 Section: 014 Improvement Type: Widen Geographic Limits: Kuhn Drive in County to Adams County line Narrative: Widen to five lanes. Kuhn Drive in County to Appler Road in Adams County. Hanover Boro, Penn, Oxford and Conewago TWPs. FY 2007 FD SXF $816 FD NHS $800 FD 581 $404 UTL NHS $400 UTL ROW SXF $1,005 FY 2008 ROW NHS $816 ROW 581 $455 CON SXF $2,400 CON NHS $2,398 $1,202 CON 581 $600 $600 $300 $4,796 $3,000 $2,998 $1,502 Total FY Cost $12, Title: /Jefferson/Lehman St Route: 116 Section: 011 Improvement Type: Intersection Improvement Geographic Limits: Intersection of, Jefferson and Lehman streets in North Codorus Township Narrative: Realign Intersection. Add new traffic signal. PA 116, Jefferson and Lehman Streets. North Codorus TWP. FY 2007 FY 2008 CON STS $720 CON 581 $80 $0 $800 $0 $0 Total FY Cost $800 Page 15 of 29

16 FFY 2007 TIP Title: Road Bridge Route: 116 Section: 019 Geographic Limits: PA-116 Road over Codorus CreekNorth Codorus Twp & Spring Grove Boro Narrative: PA-116 Road over Codorus Creek North Codorus Twp & Spring Grove Boro Replace bridge FY 2007 FY 2008 FD BOO $209 $52 $35 $30 CON BOO $1,548 $456 $387 $114 $0 $0 $2,260 $571 Total FY Cost $2, Springettsbury (Twp) Title: Mt Rose/East Prospect Rd Route: 124 Section: 005 Improvement Type: Safety Improvement Geographic Limits: Mt. Rose Avenue From Haines Road to Edgewood Road in Springettsbury Township Narrative: Reconstruct and Widen. Mt. Rose Avenue from Haines Road to Edgewood Road. Springettsbury TWP. FY 2007 FY 2008 FD STP $300 FD 581 $75 UTL STP $160 UTL 581 $40 ROW STP $1,198 $402 ROW 581 $300 0 CON STP $1,858 $3,426 CON 581 $464 $857 $0 $2,073 $2,824 $4,283 Total FY Cost $9,180 Page 16 of 29

17 FFY 2007 TIP Windsor (Twp) Title: E Prospect Rd Imprv. Route: 124 Section: 006 Improvement Type: Shoulder Improvement Geographic Limits: East Prospect Road in Windsor Township Narrative: Upgrade Shoulder Widths & Reduce "S" curve. between Christensen Rd and Miller Dr. East Prospect Road. Windsor TWP. FY 2007 FY 2008 FD STP $200 FD 581 $50 UTL 581 $40 ROW STP $480 ROW 581 $120 CON STP $782 CON 581 $196 $0 $290 $600 $978 Total FY Cost $1, Fairview (Twp) Title: PA 262 &177 Interstection Route: 177 Section: 003 Improvement Type: Intersection Improvement Geographic Limits: Intersection with PA 262 in Fairview Township Narrative: PA 177 AND PA 262 INTERSECTION FAIRVIEW TWP REALIGN AND IMPROVE INTERSECTION FY 2007 FY 2008 CON STU $590 $210 CON 581 $148 $52 $0 $738 $262 $0 Total FY Cost $1,000 Page 17 of 29

18 FFY 2007 TIP Manchester (Twp) Title: North George Street Brdg Route: 181 Section: 010 Geographic Limits: PA-181 North George St over Trib Codorus CreekManchester Twp Narrative: PA-181 North George St over Trib Codorus Creek Manchester Twp Replace bridge FY 2007 FY 2008 FD STP $184 $46 $25 $15 CON STP $684 $171 $0 $0 $270 $855 Total FY Cost $1, Title: Loganville Road Route: 214 Section: 006 Improvement Type: New Roadway Geographic Limits: Loganville Borough Narrative: Construct New Two-lane Roadway (SR ). Realigning North Street (SR 3010) intersection to the north. This intersects with SR 3001, Susquehanna Trail. Loganville Borough. FY 2007 FY 2008 CON STP $1,963 $3,038 $2,073 $0 $1,963 $3,038 $2,073 Total FY Cost $7,073 Page 18 of 29

19 FFY 2007 TIP Seven Valleys (Boro) Title: Main Street Bridge Route: 214 Section: 007 Geographic Limits: Over Codorus Creek BranchSeven Valleys Borough Narrative: Main Street Bridge, Seven Valleys FY 2007 FY 2008 FD BOO $173 $43 $20 $20 CON BOO $1,774 $444 $0 $0 $256 $2,218 Total FY Cost $2, Jackson (Twp) Title: East Berlin Road Bridge Route: 234 Section: 015 Geographic Limits: PA-234 East Berlin Rd over Paradise CreekJackson Twp Narrative: PA-234 East Berlin Rd over Paradise Creek Jackson Twp Replace bridge FY 2007 FY 2008 FD STP $158 $40 $5 $0 $0 $213 $0 Total FY Cost $213 Page 19 of 29

20 FFY 2007 TIP Title: Susquehanna Trail Bridge Route: 295 Section: 001 Geographic Limits: Bridge Over Big Conewago Creek in Newberry and Conewago Townships Narrative: Replace Bridge. PA 295 Susquehanna Trail over Conewago Creek. Newberry and Conewago TWPs. FY 2007 FY 2008 $2,800 $2,795 $700 $699 $0 $3,500 $3,494 $0 Total FY Cost $6, Fawn (Twp) Title: Woodbine Road Bridge Route: 425 Section: 003 Geographic Limits: Over Bald Eagle CreekFawn Twp Narrative: PA 425 WOODBINE RD FY 2007 FY 2008 FD BOF $195 $49 $20 $888 $222 $0 $0 $274 $1,110 Total FY Cost $1,384 Page 20 of 29

21 FFY 2007 TIP Springettsbury (Twp) Title: Market St Widening Imprv Route: 462 Section: 012 Improvement Type: Widen Geographic Limits: PA-462 from SR-24 Mt. Zion/Edgewood Road to SR 2013 Locust Grove RoadSpringettsbury Twp Narrative: Widen PA 462 Market Street. Look at five lanes. Review options to improve offset intersection at Locust Grove Road. From SR-24 Mt. Zion Road and Edgewood Road to SR 2013 Locust Grove Road. Springettsbury TWP. Phase Fund FY 2007 FY 2008 CON STP $1,200 CON 581 $300 $1,500 $0 $0 $0 Total FY Cost $1, Fairview (Twp) Title: Bridge Street Bridge Route: 1003 Section: 013 Improvement Type: Bridge Rehabilitation Geographic Limits: SR 1003 Bridge St over Yellow Breeches CreekNew Cumberland Boro & Fairview Twp Narrative: SR 1003 Bridge St over Yellow Breeches Creek New Cumberland Boro & Fairview Twp Rehab FY 2007 FY 2008 FD BOO $152 $38 $25 $15 CON BOO $2,091 $523 $0 $0 $230 $2,614 Total FY Cost $2,844 Page 21 of 29

22 FFY 2007 TIP Conewago (Twp) Title: Locust Point Road Bridge Route: 1021 Section: 004 Geographic Limits: Over trib to Little Conewago CreekConewago Township Narrative: Locust Point Road Brg FY 2007 FY 2008 FD BOF $146 $37 $15 $818 $204 $0 $0 $208 $1,022 Total FY Cost $1, Windsor (Twp) Title: Freysville Rd. Bridge Route: 2001 Section: 005 Geographic Limits: Bridge Over Kreutz Creek in Windsor Township Narrative: Replace Bridge. Freysville Road over Kreutz Creek. Windsor TWP. FY 2007 FY 2008 $673 $240 $168 $60 $841 $300 $0 $0 Total FY Cost $1,141 Page 22 of 29

23 FFY 2007 TIP (Twp) Title: Springwood Road Bridge Route: 2002 Section: 008 Geographic Limits: SR 2002 Springwood Rd over Mill CreekTownship Narrative: SR 2002 Springwood Rd over Mill Creek Township Replace bridge FY 2007 FY 2008 FD BOO $183 $46 $5 CON BOO $813 $203 $0 $0 $244 $1,016 Total FY Cost $1, Lower Windsor (Twp) Title: Cool Creek Road Route: 2011 Section: 003 Improvement Type: Reconstruct Geographic Limits: Nursery Road to Mt. Pisgah Road. Narrative: Reconstruct and Realign Road. Scope is for minor realignments at curve locations, not a major realignment of the entire road. From SR 2025 Nursery Road to SR 2009 Mt.Pisgah Road. Hellam and Lower Windsor TWP. FY 2007 FY 2008 FD UTL STP $80 UTL 581 $20 ROW STP $600 ROW 581 $150 CON SXF $640 $160 CON STP $1,628 $268 CON 581 $607 $67 $950 $2,875 $495 $0 Total FY Cost $4,320 Page 23 of 29

24 FFY 2007 TIP Chanceford (Twp) Title: Gum Tree Road Bridge Route: 2020 Section: 003 Geographic Limits: SR 2020 Gum Tree Rd over south fork of Otter CrChanceford Twp Narrative: SR 2020 Gum Tree Rd over south fork of Otter Cr Chanceford Twp Replace bridge FY 2007 FY 2008 FD BOF $146 $36 $627 $157 $0 $0 $202 $784 Total FY Cost $ Lower Windsor (Twp) Title: Snyder Corner Road Bridge Route: 2033 Section: 003 Geographic Limits: SR 2033 Bridge over Fishing CreekLower Windsor Twp Narrative: SR 2033 Bridge over Fishing Creek Lower Windsor Twp Replace Bridge FY 2007 FY 2008 FD BOF $160 $40 $677 $169 $0 $0 $220 $846 Total FY Cost $1,066 Page 24 of 29

25 FFY 2007 TIP Title: Fissels Church Road Brdg Route: 3015 Section: 010 Geographic Limits: SR 3015 Fissels Church Rd over Centerville CreekCodorus & Shrewsbury Twps Narrative: SR 3015 Fissels Church Rd over Centerville Creek Codorus & Shrewsbury Twps Replace bridge FY 2007 FY 2008 FD BOF $154 $39 $15 $15 $823 $206 $0 $0 $223 $1,029 Total FY Cost $1, Title: City Streets Route: 3054 Section: 005 Improvement Type: Resurface Geographic Limits: SR 3054 Richland Ave/Country Club Rd from W College Ave to Grantley Ave. SR 4001 Roosevelt Ave from W Narrative: College Ave to Grantley Ave. SR 4001 Roosevelt Ave from W College Ave to Marbrook Lane. SR 3046 Highland Ave, King St, Hoke St from W College Ave to Bannister St. SR 3048 Bannister St from Ridgeway Dr to Adams St. City of, W Boro, Manchester, W Manchester, Spring Garden Twps. Mill, base repair, overlay, drainage, guiderail, concrete patching, joint repair and bridge PM work Phase Fund FY 2007 FY 2008 CON STP $2,280 $2,280 $0 $0 $0 Total FY Cost $2,280 Page 25 of 29

26 FFY 2007 TIP West Manheim (Twp) Title: Furman's Mill Road Bridge Route: 3066 Section: 001 Geographic Limits: SR 3066 Furman's Mill Road Bridge over West Branch of Codorus CreekWest Manheim Twp Narrative: SR 3066 Furman's Mill Road Bridge over West Branch of Codorus Creek West Manheim Twp Replace bridge FY 2007 FY 2008 FD BOF $158 $40 $15 $660 $165 $0 $0 $223 $825 Total FY Cost $1, West Manheim (Twp) Title: Westminister Road Bridge Route: 3073 Section: 001 Geographic Limits: Over S Branch of Conewago CreekPenn & W Manheim Twps Narrative: Westminster Road Bridge Over S Branch of Conewago Creek Penn & W Manheim Twps FY 2007 FY 2008 FD BOF $146 $37 UTL BOF $8 $2 $15 $1,094 $274 $0 $0 $208 $1,368 Total FY Cost $1,576 Page 26 of 29

27 FFY 2007 TIP Dover (Twp) Title: South Salem Church Brdg Route: 4003 Section: 007 Improvement Type: Bridge Rehabilitation Geographic Limits: SR 4003 South Salem Church over Little Conewago CreekDover Twp Narrative: SR 4003 South Salem Church over Little Conewago Creek Dover Twp Replace bridge deck & superstructure FY 2007 FY 2008 FD BOO $179 $45 $20 $20 CON BOO $1,131 $283 $0 $0 $264 $1,414 Total FY Cost $1, Title: Lewisberry/ Rd Bridge Route: 4009 Section: 003 Geographic Limits: Bridge Over Conewago Creek in Conewago & Newberry Townships Narrative: Replace Bridge. SR 4009 Road over Conewago Creek. Conewago & Newberry Twps FY 2007 FY 2008 $640 $1,608 $160 $402 $800 $2,010 $0 $0 Total FY Cost $2,810 Page 27 of 29

28 FFY 2007 TIP Newberry (Twp) Title: Sheep Bridge Rd. Bridge Route: 4021 Section: 005 Geographic Limits: Bridge Over Conewago Creek in Newberry Township Narrative: Replace Bridge. SR 4021 Sheep Bridge Road over Conewago Creek. Newberry TWP. FY 2007 FY 2008 $828 $207 $0 $1,035 $0 $0 Total FY Cost $1, Washington (Twp) Title: Bermudian Creek Bridge Route: 4032 Section: 003 Geographic Limits: Over BR. of Bermudian CR. : Washington Township Narrative: BERMUDIAN CR. BR. Washington Twp FY 2007 FY 2008 FD BOO $160 $40 $830 $208 $0 $0 $221 $1,038 Total FY Cost $1,259 Page 28 of 29

29 FFY 2007 TIP Franklin (Twp) Title: Meadow View Rd Brdge Route: 4038 Section: 001 Geographic Limits: SR 4038 over Bermudian CkFranklin Twp Narrative: Replace Bridge Meadow View Rd Brg over N branch Bermudian Franklin Twp FY 2007 FY 2008 FD BOO $167 $42 $15 $20 $604 $151 $0 $0 $244 $755 Total FY Cost $ Washington (Twp) Title: Conewago Creek Bridges Route: 4051 Section: 001 Geographic Limits: Bridge Over Conewago Creek in Dover Township and Bridge Over Conewago Creek in Dover & Washington Tw Narrative: Replace Two Bridges. SR 4051 Big Mount Road over Conewago Creek. Dover and Washington TWPs. FY 2007 FY 2008 $1,380 $2,024 $345 $506 $1,725 $2,530 $0 $0 Total FY Cost $4,255 Page 29 of 29

Highway & Bridge. Municipality: Exempt Code: Widen narw. pave. or recon brdgs (No addtl lanes)

Highway & Bridge. Municipality: Exempt Code: Widen narw. pave. or recon brdgs (No addtl lanes) FFY 2013 TIP MPMS #: 87792 Title: Bridge Reserve Route: Section: A/Q Status: Exempt Improvement Type: Miscellaneous Geographic Limits: County RPO area Narrative: Federal and State bridge Reserve County

More information

YORK COUNTY. Warrington Township 1 $ 650,000 1 1 0

YORK COUNTY. Warrington Township 1 $ 650,000 1 1 0 Bridge rehabilitation on State Route 4014 (Harmony Grove Road) over Doe Run in BASE Bridge Rehabilitation Harmony Grove Road Bridge over Doe Run Warrington Township 1 $ 650,000 1 1 0 Browntown Road Bridge

More information

FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years $350 $490 $520 $0 $0 $0. FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years

FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years $350 $490 $520 $0 $0 $0. FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years MPMS #: 70188 Title: ACTA - Operations Route: Section: A/Q Status: Exempt Improvement Type: Transit System Improvement Exempt Code: Operating assistance to transit agencies Geographic Limits: Gettysburg

More information

Nonresident. Resident. Municipal PSD Code School District Name EIT

Nonresident. Resident. Municipal PSD Code School District Name EIT PSD Code School District Name ADAMS ABBOTTSTOWN BORO 010201 CONEWAGO VALLEY S D 1.00 1.50 York Adams Tax Bureau PO Box 15627 York PA 17405 (717) 845-1584 www.yatb.com ADAMS ARENDTSVILLE BORO 010601 UPPER

More information

School District Taxes

School District Taxes School District Taxes www.ycea-pa.org 19 Education School System Location Elementary Middle High Public School Enrollment in York County Total Enrollment Central York York 2,638 1,462 1,712 5,812 Crispus

More information

DAUPHIN COUNTY START PERIOD

DAUPHIN COUNTY START PERIOD BASE Bridge Rehabilitation Walker Mill Road over Paxton Creek DAUPHIN Y Bridge Rehabilitation on Township Road 431 (Walker Mill Road) over Paxton Creek in Susquehanna Township 1 $ 865,000 1 0 0.1 BASE

More information

INSTRUCTIONS Individual Taxpayer Annual Local Earned Income Tax Return Tax Year 2015

INSTRUCTIONS Individual Taxpayer Annual Local Earned Income Tax Return Tax Year 2015 INSTRUCTIONS Individual Taxpayer Annual Local Earned Income Tax Return Tax Year 2015 FILING: **DO NOT STAPLE OR TAPE DOCUMENTS TO YOUR RETURN** YATB offers two methods of filing your Local Earned Income

More information

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement) VDOT Project s from 4/1/13-6/30/14 (by advertisement) Description UPC Project Manager Phone RTE 85 - BRIDGE SYSTEM PRESERVATION (Richmond District-wide) BOYD ST - RECONSTR BETWEEN 2ND & 3RD ST & IMPR DRAINAGE

More information

BUILDING A STRONGER PA PennDOT District 6 Highway/Bridge Projects

BUILDING A STRONGER PA PennDOT District 6 Highway/Bridge Projects BUILDING A STRONGER PA PennDOT District 6 Highway/Bridge Projects (+ = Act 89 Funding) Cowpath Road/Godshall Road/Broad Street Intersection Improvement, Montgomery County - $3.9 Million (M) (In Construction)

More information

Maryland Invests $845 Million in New Highway and Bridge Projects

Maryland Invests $845 Million in New Highway and Bridge Projects Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD

More information

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County

More information

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Lucas County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

Transportation Network Analysis. A. Overview

Transportation Network Analysis. A. Overview Transportation Network Analysis A. Overview The goal of this analysis is to evaluate existing roadways and specific intersections within the County. The focus will be on areas identified as probable growth

More information

FY 2009 Economic Stimulus List

FY 2009 Economic Stimulus List FY 2009 Economic Stimulus List The Projects in this List are "Ready to Advertise" within 30-90 days of a Bills Enactment Pavement Preservation Projects Region County PIN Project Location Concept Estimate

More information

SCDOT TENTATIVE LETTINGS Rehabilitation & Resurfacing March 2016 - February 2017 Subject To Change Without Notice

SCDOT TENTATIVE LETTINGS Rehabilitation & Resurfacing March 2016 - February 2017 Subject To Change Without Notice SCDOT TENTATIVE LETTINGS Rehabilitation & Resurfacing March 2016 - February 2017 Subject To Change Without Notice 1 of 9 Date Generated: 01/25/2016 Projects Returned: 56 Let Date Contract ID Project ID

More information

Action on Amendment Five to the FFYs 2015-18 TIP Page 1 of 8 Boston Region MPO Staff - 9/3/2015

Action on Amendment Five to the FFYs 2015-18 TIP Page 1 of 8 Boston Region MPO Staff - 9/3/2015 Project ID Project Description Funding District Funds Funds Information Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another

More information

RESOLUTION NO. 1539 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, PIERCE COUNTY, WASHINGTON, APPROVING THE 192 ND CORRIDOR STUDY AND DIRECTING THE MAYOR TO PROCEED WITH PARTIAL DESIGN AND

More information

2014 CONSTRUCTION PLAN

2014 CONSTRUCTION PLAN 2014 CONSTRUCTION PLAN Local CSAH 24 CSAH 10 to CSAH 5 440 1987 $575,000 $575,000 Shoulder Widening (3.0 Miles) CSAH 24 CSAH 10 to CSAH 5 440 1987 $1,115,000 $144,045 $1,259,045 Bituminous Reclamation

More information

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING TEC has performed many GPS/GIS inventory projects and studies for the Ohio Department of Transportation (ODOT), Counties, and municipalities.

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Williamson County Major Thoroughfare Plan Projects

Williamson County Major Thoroughfare Plan Projects Williamson County Major Thoroughfare Plan Projects Capacity related projects (C #) have been identified because of the need for increased roadway capacity in existing corridors due to existing or future

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

General Obligation Bond Projects FYE 2013-2018

General Obligation Bond Projects FYE 2013-2018 General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

John Holland Boathouse. N Surrey Ave & Calvert Ave Ventnor City, NJ 08406

John Holland Boathouse. N Surrey Ave & Calvert Ave Ventnor City, NJ 08406 John Holland Boathouse N Surrey Ave & Calvert Ave Ventnor City, NJ 08406 Take Rt. 40 East, The Blackhorse Horse Pike, towards Atlantic City. After Atlantic City High School but before you cross the last

More information

PRIORITIZATION PROCESSES

PRIORITIZATION PROCESSES PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take

More information

"Saving Lives / Saving Time" Roadway Connections $ 21,548

Saving Lives / Saving Time Roadway Connections $ 21,548 A Project List $ 285,001 "Taking Care of What We've Got" Bridge Reconstruction $ 42,022 Academy over Cottonwood Creek Bridge Rehabilitation $ 1,280 Airport Rd. over Spring Creek Bridge Replacement $ 1,584

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated March 31, 2008 BUTLER COUNTY SR 79(254) PROPOSAL:$6.12 PLANS:$6.84 EXSTRUCT:$14.96 12X18:$18.36 24X36:$265.20 The description and location of the project is

More information

REST HOME & ASSISTED LIVING CABARRUS COUNTY

REST HOME & ASSISTED LIVING CABARRUS COUNTY REST HOME & ASSISTED LIVING CABARRUS COUNTY Updated 7/3/08 BIG ELM RETIREMENT CENTER 1310 Glenn Avenue Medicaid (704) 932-0000 (ask for Admissions Director) Directions: Depart NorthEast Medical Center

More information

STATUS. DESCRIPTION New Road Construction 6 to 8 lanes Flexible Pavement Reconstruction CST 2016/17 CST 2014/15. Resurfacing CST 2014/15

STATUS. DESCRIPTION New Road Construction 6 to 8 lanes Flexible Pavement Reconstruction CST 2016/17 CST 2014/15. Resurfacing CST 2014/15 4338801 Gateway Express/118 th Ave N/CR 296 (Future 690) from US 19 (SR 55) to E of 28 th St N 4271421 SR 586 (Curlew Rd) from E of Countrybrook Dr to W of Countryside Blvd 4306601 Alt US 19 (SR 595) from

More information

DESIGN ASSISTANCE APPLICATION

DESIGN ASSISTANCE APPLICATION DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015

More information

Leg 1 - http://goo.gl/maps/o7yuc From Starting Line and UTA Park & Ride in Roy to PARC Center in Clearfield

Leg 1 - http://goo.gl/maps/o7yuc From Starting Line and UTA Park & Ride in Roy to PARC Center in Clearfield Drivers Maps for River Rail Relay 2013 Leg 1 - http://goo.gl/maps/o7yuc From Starting Line and UTA Park & Ride in Roy to PARC Center in Clearfield Leg 2 - http://goo.gl/maps/t6pgu From PARC Center to Kaysville

More information

SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY

SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY Draft 7/2/08 The SAFETEA-LU Technical Corrections Bill (HR 1195) was enacted on June 6, 2008 (P.L. 110-244). The Bill can be found at: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=110_cong_bills&docid=f:h1195enr.txt.pdf

More information

MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, 2011. TIP Public Review Meeting

MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, 2011. TIP Public Review Meeting MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, 2011 TIP Public Review Meeting Meeting Agenda New York Metropolitan Transportation Council Major Products Transportation Improvement Program

More information

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Executive Summary. Transportation Needs CHAPTER. Existing Conditions CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Draft Transportation Management Plan for Via Verdi Repair Project

Draft Transportation Management Plan for Via Verdi Repair Project for Via Verdi Repair Project prepared for City of Richmond This report was prepared by: This report was reviewed by: Ryan McClain, P.E. Fehr & Peers TABLE OF CONTENTS 1.0 INTRODUCTION & PROJECT DESCRIPTION...

More information

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to

More information

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS Please provide the following information when applying to RPA 14/ATURA for Surface Transportation Program (STP) funding for projects

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

IDOT Suspends Non-Emergency Road Work for Fourth of July Holiday Weekend

IDOT Suspends Non-Emergency Road Work for Fourth of July Holiday Weekend State of Illinois Bruce Rauner, Governor Illinois Department of Transportation Randall S. Blankenhorn, Secretary FOR IMMEDIATE RELEASE: CONTACT: June 30, 2015 Brian Williamsen 309.671.4854 Carson Quinn

More information

CITY COUNCIL WORKSHOP MAY 24, 2016

CITY COUNCIL WORKSHOP MAY 24, 2016 1 CITY COUNCIL WORKSHOP MAY 24, 2016 Capital Budget FY 2016-2017 & 2017-2018 Robert Ovadia, PE, City Engineer 2 Overview FY 2015-16 Accomplishments Projects Completed during FY 2015-16 Projects Under Construction

More information

Road and Bridge Closure Report

Road and Bridge Closure Report Page 1 of 7 New Closures Date Anticipated DIST COUNTY ROUTE NUM LOCALNAME Closed OpeningDate CO 005/00 ELKHURST ROAD comments Slip/Rock Fall WV 016/00 BETWEEN BIG OTTER AND IVYDALE CO 015/04 MAIN STREET

More information

MONROE COUNTY'S POLLING PLACE LIST

MONROE COUNTY'S POLLING PLACE LIST BARRETT ONE BARRETT MUNICIPAL TOWNSHIP BUILDING 01-1 993 ROUTE 390 CRESCO, PA 18326 BARRETT TWO MOUNTAINHOME UNITED METHODIST CHURCH ANNEX 6680 ROUTE 191 MOUNTAINHOME, PA 18342 CHESTNUTHILL ONE WEST END

More information

2012 Supplemental Project Compare: House Proposal (2/16/12) vs. Senate Proposal (2/21/12)

2012 Supplemental Project Compare: House Proposal (2/16/12) vs. Senate Proposal (2/21/12) Highway Management & Facilities Program (D) Northwest Region Traffic Management Center Improvements 2012 Senate Chair Proposed Budget 1,575 12,700 725 0 0 0 15,000 Difference 1,575 12,700 725 0 0 0 15,000

More information

Directions to The MITRE Corporation

Directions to The MITRE Corporation Building (H) 755 Colshire Drive McLean, VA 10-7539 Phone: (703) 983-6000 From Reagan National Airport Take George Washington Parkway North approx. 6 miles to Route 13 South, McLean exit. Exit onto Route

More information

SAN ANTONIO CATEGORY 7 RECAP FY 2011

SAN ANTONIO CATEGORY 7 RECAP FY 2011 CATEGORY 7 RECAP FY 2011 A + B = C D + E = F C + F = G G - H = I A B C D E F G H I FY Balance Carryover from FY 10 FY 11 (includes all adjustments) Total Available of Funds Funds Obligated On Projects

More information

Star Ratings From Medicare For Utah Nursing Homes 2014

Star Ratings From Medicare For Utah Nursing Homes 2014 Federal Provider Number Provider Name 6003 HERITAGE PARK CARE CENTER 6006 MT OLYMPUS REHABILITATION CENTER 6009 KINDRED NURSING & REHABILITATION - WASATCH CARE 6020 PIONEER CARE CENTER 609 SPRING CREEK

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

Surface Transportation Program (STP)

Surface Transportation Program (STP) Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

The Transportation Package

The Transportation Package The Transportation Package The transportation package raises $4.2 billion over 10 years, to invest in highway, rail, mobility, ferry, and transit projects throughout the state. These new revenues, combined

More information

Transportation Services

Transportation Services Transportation Services Cross Keys Village - The Brethren Home Community 2990 Carlisle Pike P.O. Box 128 New Oxford, PA 17350 717-624-2161 Updated 7/1/2014 1 Transportation Services The Transportation

More information

City of Santa Ana. FY 2014/2015 Capital Improvement Program. Broadway/Anahurst to 1 st Improvements. First Street Bridge Replacement

City of Santa Ana. FY 2014/2015 Capital Improvement Program. Broadway/Anahurst to 1 st Improvements. First Street Bridge Replacement Broadway/Anahurst to 1 st Improvements First Street Bridge Replacement MacArthur Rehabilitation/Bristol to Flower Fisher Park Butterfly Garden Improvements 1 Finance, PRCSA, CDA and PWA Data Gathering

More information

2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations. Amount Requested

2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations. Amount Requested 2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations Name Overlay s Applicant Amount Requested Recommended Funding Amount Coupeville, Langley $411,661

More information

South Carolina Department of Transportation Design-Build Projects Section

South Carolina Department of Transportation Design-Build Projects Section July 10, 2016 DESIGN-BUILD ACTIVE PROPOSALS: I-85 REHAB AND WIDENING REHAB FROM MM 77 TO MM 80, PHASE 1 WIDENING FROM EXIT 80 (S- 57) TO EXIT 90 (SC 105) & PHASE 2 WIDENING FROM EXIT 90 (SC 105) TO EXIT

More information

CELL TOWERS CELL SITES

CELL TOWERS CELL SITES CELL TOWERS The facility will not pollute, will not create noise, or vibration, will not create an increase of traffic or cause environmental problems, it will not be detrimental to adjoining property

More information

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013 Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement

More information

York County Pennsylvania. Economic and Community Profile

York County Pennsylvania. Economic and Community Profile York County Pennsylvania Economic and Community Profile October 2014 York County, PA 1990* Population 2000 Population 2010* Population 2013** Population 2020*** Population York City 42,192 40,862 43,718

More information

2012-2013 Transition from SAFETEA-LU to the new MAP-21 Federal Transportation Act

2012-2013 Transition from SAFETEA-LU to the new MAP-21 Federal Transportation Act C h a p t e r 9 - F i n a n c i a l P l a n a n d R e c o m m e n d a t i o n s f o r T r a n s p o r t a t i o n S y s t e m I m p r o v e m e n t P r o j e c t s A major component of the Plan (T2040)

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON The Corporation of the TOWN OF MILTON Report to: From: Mayor G. A. Krantz & Members of Council M. Paul Cripps, P. Eng., Director, Engineering Services Date: November 11, 2013 Report No. ENG-039-13 Subject:

More information

Public Meeting/ Open House. Minnehaha County

Public Meeting/ Open House. Minnehaha County Public Meeting/ Open House October 21, 2014 Minnehaha County Environmental Assessment and Section 4(f) De Minimis Analysis Northern Segment of Hwy 100 I-90 to South of Madison Street Minnehaha County The

More information

Department of Transport and Main Roads Road Priorities in North Queensland Region

Department of Transport and Main Roads Road Priorities in North Queensland Region Department of Transport and Main Roads Road Priorities in North Queensland Region Townsville North Ward Peter Sakkas Manager (Project Planning & Corridor Management) 16 April 2013 North Queensland - Snapshot

More information

Emergency Planning for the. Three Mile Island Area. Important Safety Information For Your Community And Annual Special Needs Survey 2015/2016

Emergency Planning for the. Three Mile Island Area. Important Safety Information For Your Community And Annual Special Needs Survey 2015/2016 Emergency Planning for the Three Mile Island Area Important Safety Information For Your Community And Annual Special Needs Survey 2015/2016 Please read the entire brochure or have someone translate it

More information

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 RICK SCOTT GOVERNOR Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 JIM BOXOLD SECRETARY Tips for Professional Services Prequalification Resume Submission In an effort

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must

More information

FY 2014 2023 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions

FY 2014 2023 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions Delaware River Joint Toll Bridge Commission Authority Easton Phillipsburg (Route 22) Toll Bridge Easton Phillipsburg (Route 22) Toll Bridge Rehabilitation Anticipated rehabilitation project elements include:

More information

THE YORK WATER COMPANY

THE YORK WATER COMPANY Supplement No. 119 To THE YORK WATER COMPANY RATES, RULES AND REGULATIONS GOVERNING THE DISTRIBUTION OF WATER IN THE CITY OF YORK BOROUGHS OF EAST PROSPECT, GLEN ROCK, HALLAM, JACOBUS, JEFFERSON, LOGANVILLE,

More information

ALLIED. Securing the Future ROOFING AND SHEETMETAL INC. PROFESSIONAL ROOFING - SHEETMETAL - WATERPROOFING CONTRACTOR

ALLIED. Securing the Future ROOFING AND SHEETMETAL INC. PROFESSIONAL ROOFING - SHEETMETAL - WATERPROOFING CONTRACTOR ALLIED ROOFING AND SHEETMETAL INC. 750 EAST PRATT STREET INNER HARBOR BALTIMORE MD HIGHRISE Securing the Future PROFESSIONAL ROOFING - SHEETMETAL - WATERPROOFING CONTRACTOR A MESSAGE FROM THE PRESIDENT

More information

Fixing America s Surface Transportation (FAST)Act

Fixing America s Surface Transportation (FAST)Act Fixing America s Surface Transportation (FAST)Act Active Transportation Forum March 23 rd 2016 1 Replaces the Moving Ahead for Progress in the 21 st Century Act (MAP-21) of 2012 5-year bill (FY 2016-2020)

More information

Greater Johnstown/Cambria County Chamber of Commerce, Inc. 245 Market Street, Suite 100 Johnstown, PA 15901 (814) 536-5107 or (800) 790-4522

Greater Johnstown/Cambria County Chamber of Commerce, Inc. 245 Market Street, Suite 100 Johnstown, PA 15901 (814) 536-5107 or (800) 790-4522 Greater Johnstown/Cambria County Chamber of Commerce, Inc. 245 Market Street, Suite 100 Johnstown, PA 15901 (814) 536-5107 or (800) 790-4522 chamber@johnstownchamber.com www.johnstownchamber.com www.johnstownbusiness.com

More information

FY 2016 2025 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions

FY 2016 2025 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions Bridge Electrical Upgrades Burlington County Bridge Commission Burlington Bristol Bridge This project includes the replacement of the existing 480 volt power feed from the Pennsylvania power house to the

More information

Sewalls Falls Road Bridge. Cultural Resource Meeting April 4, 2013

Sewalls Falls Road Bridge. Cultural Resource Meeting April 4, 2013 Sewalls Falls Road Bridge Cultural Resource Meeting April 4, 2013 Meeting Purpose Review of the project process to date Project replacement vs. rehabilitation Review of recent public process Review of

More information

DE 8 Concept Plan and Operations Study. Dover Safety Advisory and Transportation Committee October 23, 2007

DE 8 Concept Plan and Operations Study. Dover Safety Advisory and Transportation Committee October 23, 2007 DE 8 Concept Plan and Operations Study Dover Safety Advisory and Transportation Committee October 23, 2007 Purpose Develop a concept plan describing the aesthetic qualities of the corridor as a gateway

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

Site Information Bridgeway House - 2 Sites Site 1-615 North Broad St., Elizabeth, NJ 07208

Site Information Bridgeway House - 2 Sites Site 1-615 North Broad St., Elizabeth, NJ 07208 Site Information Bridgeway House - 2 Sites Site 1-615 North Broad St., Elizabeth, NJ 07208 Date: Name of Facility Facility Address Facility Contact Name Contact Email/Phone Utility Company Utility Bill

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

2007-2008 Act 44 Projects. District 1. *MPMS # - Multi-modal Project Management System project number. Page 1 of 92. 1.00 Crawford.

2007-2008 Act 44 Projects. District 1. *MPMS # - Multi-modal Project Management System project number. Page 1 of 92. 1.00 Crawford. District 1 2007-2008 Act 44 Projects 1.00 Crawford 1 493 CON 2008 BRDG 916 Hunter Hill Rd/Mill Run 200,000 Bridge Rehabilitation - Dept. Force SR 2012 (Hunter Hill Road) over Mill Run West Mead Twp Bridge

More information

06-13-400-001 CITY OF BLOOMINGTON,109 E OLIVE ST BLOOMINGTON IL 61701 06-13-400-004 CITY OF BLOOMINGTON,109 E OLIVE ST BLOOMINGTON IL 61701

06-13-400-001 CITY OF BLOOMINGTON,109 E OLIVE ST BLOOMINGTON IL 61701 06-13-400-004 CITY OF BLOOMINGTON,109 E OLIVE ST BLOOMINGTON IL 61701 06-13-400-109 E OLIVE ST BLOOMINGTON 06-13-400-109 E OLIVE ST BLOOMINGTON 08-06-304-08-06-354- 109 E OLIVE ST BLOOMINGTON 24032 RON SMITH MEMORIAL HWY HUDSON 08-07-300-61748 08-07-300-08-18-100- EXEMPT

More information

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments

More information

Transportation Management Plan. 150th Anniversary of the Battle of Gettysburg June 28, 2013 to July 7, 2013

Transportation Management Plan. 150th Anniversary of the Battle of Gettysburg June 28, 2013 to July 7, 2013 Transportation Management Plan 150th Anniversary of the Battle of Gettysburg June 28, 2013 to July 7, 2013 Gettysburg 150th Committee June 10, 2013 reflections of history Table of Contents SECTION 1: EXECUTIVE

More information

2015 2019 METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM. Lewis Clark Valley Metropolitan Planning Organization

2015 2019 METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM. Lewis Clark Valley Metropolitan Planning Organization 2015 2019 METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM Lewis Clark Valley Metropolitan Planning Organization Public Comment Period July 6, 2014 through August 13, 2014 Recommended Approval by MPO TAC:

More information

Information 117 Baltimore Street Gettysburg, PA 17325 (717) 337-9834. Court Administrator Adams County Courthouse Gettysburg, PA 17325 717-337-9846

Information 117 Baltimore Street Gettysburg, PA 17325 (717) 337-9834. Court Administrator Adams County Courthouse Gettysburg, PA 17325 717-337-9846 County ADAMS ALLEGHENY ARMSTRONG BEAVER BEDFORD BERKS BLAIR BRADFORD BUCKS BUTLER Office to List on Notice to Defend Office of the, Room 104, Adams County, Gettysburg, Pennsylvania 17325. Department of

More information

MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE EXPRESSWAY AUTHORITY (MDX)

MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE EXPRESSWAY AUTHORITY (MDX) XA10016 10016 SR 112 Toll System Conversion LeJeune Road I-95 4.1 Toll System Conversion 4,811 1,723 Activity - - DSB MDX 3,088 0 0 0 0 XA10017 10017 SR 836 Toll System Conversion NW 137th Avenue I-95

More information

Traveling to ARL and Penn State

Traveling to ARL and Penn State Traveling to ARL and Penn State Driving time/mileage to ARL and Penn State: Harrisburg (1.5 hrs., 90 mi.) Pittsburgh (3 hrs., 137 mi.) Philadelphia (3.5 hrs., 194 mi.) Baltimore (3.5 hrs., 155 mi.) Washington

More information

Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT

Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT Comprehensive Asset Management Planning What Is Your Asset Management Organization? What Do You

More information

11 p.m. to. Tuesday, June. will remain open. 14. closed

11 p.m. to. Tuesday, June. will remain open. 14. closed June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access

More information

YORK COUNTY CRIMINAL JUSTICE TRENDS REPORT. A joint effort of the York County Criminal Justice Advisory Board and the York County Planning Commission

YORK COUNTY CRIMINAL JUSTICE TRENDS REPORT. A joint effort of the York County Criminal Justice Advisory Board and the York County Planning Commission YORK COUNTY CRIMINAL JUSTICE TRENDS REPORT A joint effort of the York County Criminal Justice Advisory Board and the York County Planning Commission 2010 York County Criminal Justice Trends Report 2010

More information

The State of Michigan Transportation Asset Management Council 2005 PASER Survey Of Genesee County

The State of Michigan Transportation Asset Management Council 2005 PASER Survey Of Genesee County The State of Michigan Transportation Asset Management Council 2005 PASER Survey Of Genesee County Prepared by the Genesee County Metropolitan Planning Commission Staff The State of Michigan Transportation

More information

Alternatives Design Report. Draft

Alternatives Design Report. Draft Draft 3/4/2014 TABLE OF CONTENTS I Introduction... 1 A. HISTORY... 1 B. PROJECT BACKGROUND... 1 II. ALTERNATIVES DEVELOPMENT... 8 A. ALTERNATE 1 NO BUILD... 8 B. ALTERNATE 2 IMPROVE ROADWAY ON EXISTING

More information

Nashville Area MPO Regional Freight Study fast action projects

Nashville Area MPO Regional Freight Study fast action projects Project #1 Beechcroft road (sr 247) at csx crossing Motor carrier survey location Maury County (Spring Hill, Tn) / City of Spring Hill Current at-grade railway crossing causes traffic delays as a result

More information

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage

More information