1 Pentagon Solar Heating, Air Conditioning, Lighting, and Power System October 2004 Produced by: American Solar, Inc. Annandale, VA

2 Foreword This document is the final deliverable under Pentagon contract MDA C The contract was initiated in March 2003 with funding from the Energy Conservation Investment Program. The purpose of the contract was to demonstrate several first ever applications of solar energy, while reducing the energy use of a guard station at the Pentagon Heating and Refrigeration Plant. Among the first ever applications demonstrated were: Solar air conditioning using solar heated air and a new desiccant-evaporative cooling cycle. Solar dehumidification of outside air using solar heated air for desiccant regeneration. High temperature solar air heating tile roofing with operating temperatures above 212 degrees Fahrenheit. Solar electricity generation and solar air heating from a single high temperature solar roof. Solar pre-heating and solar pre-cooling of an air source heat pump outdoor coil to reduce heat pump electricity use. Off-peak electricity for air conditioning and battery charging controlled by roof integrated daylight sensing solar electric panels. The project was initiated by the Pentagon Energy Manger, Mr. Robert Billak (retired). Ms. Terry Watson was the project manager and technical lead (currently with the Smithsonian Institution) and Ms. Terri Robertson continued as project manager and technical lead upon her selection as Pentagon Energy Manager. Ms. Tina Jenkins was the contracting officer. Many others provided support and guidance toward the completion of this project. The staff of the Heating and Refrigeration Plant and Technical Division of Washington Headquarters Services and The Pentagon Force Protection Agency all provided support as the project progressed. EMO Energy, LLC performed many of the calculations necessary to refine the new solar air conditioning cycle from American Solar s first guidance. Capital Sun Group installed the photovoltaics and battery power system. It is our hope that the advances made with the sponsorship of the Pentagon will help educate others on the opportunities available to use simple solar heat recovery techniques from our building roofs and walls to provide savings in heating and cooling energy use. We thank all the parties involved for their co-operation and support. John Archibald President, American Solar, Inc.

3 Introduction The solar heating, air conditioning, power and lighting system installed at the guard station of the Pentagon Heating and Refrigeration Plant is one of the most advanced solar energy systems in the United States. Despite its modest appearance, the system incorporates 12 advanced features that demonstrate new and improved ways of using solar energy to reduce fossil and electrical energy use. It demonstrates these new and advanced technologies in a way that hides the advances within the conventional construction of a small 400 square foot building. The guard station solar project incorporates the following 12 unique, advanced technologies: 1. Solar thermal tile air heating roof system 2. Reflective roofing laminates and selective surface absorbers to boost solar roof air temperature 3. High temperature, multistage solar roof with peak operating temperature above 212 degree F 4. Photovoltaics (PV) beneath solar thermal tiles for electricity generation and heat production 5. PV panels separate from the solar roof for grid independent power generation and operation 6. Grid connected, off-peak, supplemental battery charging controlled by PV sensing relays 7. PV powered cooling fans for PV temperature control, switch gear cooling, and solar roof heat recovery 8. Desiccant dehumidification of outside air using solar waste heat in the summer 9. Solar heat driven desiccant-evaporative cooling of outside air 10. Solar pre-heating and pre-cooling of a heat pump to boost heat pump performance and cut electrical energy use 11. Rainwater recovery from the solar roof to supply the indirect evaporative cooling stages 12. Automatic winter tank drain-down to prevent freezing. 1

4 Many of these features have never before been demonstrated, such as the solar air heating tiles with PV absorbers below for electricity and heat production in one weather tight roof. The desiccant evaporative cooling system is also a unique development, since it relies on solar air heating to drive an air conditioning system using desiccant regeneration. The high temperature solar hot air is an ideal energy source since desiccant regeneration is accomplished with hot summer airflow. In the wintertime, the solar roof supplies heating energy to the guard station. The new, use of photovoltaic materials in a heating system is made possible by the use of air as the heat transfer fluid under the solar thermal tiles. Sunlight passing through the tiles hits the PV materials, which simultaneously generate heat and electricity. The electricity runs the heating and cooling fans that collect solar heated air from the surfaces below the tiles. The electricity from the PV also energizes controls in the lighting and battery charging circuits. Placing the PV system below the tiles keeps it warm, which improves the electric generating capacity of the amorphous PV panels. The fans also keep the PV cool enough (below 180 deg. F) during peak summer conditions, to protect the panels from damage. The 68 watts of PV deployed below the roof surface represent just 3% of the total roof collector area. The PV panel surface area also contributes 345 watts of thermal air heating to the roof s peak summer heating capacity of 11,700 Watts thermal (40,000 BTU/hr). The new solar-desiccant-evaporative (SOLAR-DES-EVAP) air conditioning system is designed to reduce summer humidity levels of outside air and to cool the air before supplying it to the guard station. The desiccant drying stage removes the humidity from the air. The dry air allows ultra-efficient evaporative cooling to take place even in humid climates from the mid-atlantic to the Gulf coast. This aspect of the system demonstrates how outside air can be pre-conditioning before entering an existing building HVAC system, using excess solar heat in the summer. This is particularly important for buildings like laboratories or industrial facilities with l00% outside airflow and high energy use and cost in dehumidifying and cooling the air. 2

5 The SOLAR-DES-EVAP system has reduced dewpoint temperatures by as much as 16 degrees and reduced dry bulb temperatures by 10 deg F during a mid-day test in July. When minor adjustments are made to the water flow and airflow between stages, a 20+ degree drop in dry bulb temperature is expected. At peak performance, the existing system has demonstrated 3.6 units of cooling/dehumidification output for every unit of electrical input and all of the electrical input from the utility grid is at night, during off-peak hours. Solar Thermal Tiles Reflective Roofing Other advanced features of the system are modern updates of several older solar heating technologies that were conceived during the 1970s and early 1980s, but never commercialized. At that time, technologies such as solar assisted heat pumps were recognized as beneficial ways to cut energy use by heat pumps. Solar professionals understood that when solar heated air preheats the air entering a heat pump, the heat pump uses much less energy. When the solar heat pump studies were done in the late 1970s, heat pump technology was at an early development stage and showed marginal efficiency improvement from solar pre-heating. However, modern heat pumps, located at ground level and on the rooftops of many buildings, have overcome those inefficiencies and can substantially reduce energy use with solar preheating. During cold weather, heat pump energy use can be cut by 35% or more with the addition of solar air pre-heating systems. In many cases, there is ample flat roof space next to the roof top heat pumps to install simple solar air heating systems. Similarly, cooler air supplied to the heat pump in summer will cut electricity use by the heat pump in delivering air conditioning. The Pentagon system was designed to demonstrate how solar air pre-heating and pre-cooling of heat pumps can cut high electricity use in the winter and summer. The Pentagon system collects rainwater for the evaporative cooling stages because the guard station s remote location has no ready source of water. Rainwater recovery was actually the lowest cost option, since installation of a city water system would have required hand digging 3

6 200 feet of trench over other utility lines buried under asphalt. However, the rainwater system offers other benefits, such as reduced storm water runoff from the roof, and reduced consumption of city water. This feature is even more important for arid, drought prone, locations, which can gain the greatest advantage from the evaporative cooling systems and which have the greatest need for water management. The PV system provides automatic pumping for the evaporative cooling stages and drain down for winter freeze protection. The PV system is sized to supply all the power needed during the winter months. Power is delivered at 24 volts DC to a battery bank within the building. All fans and pumps are DC powered. The use of DC power instead of AC power saves energy in 3 ways. First it eliminates conversion losses from converting DC to AC power in an inverter. Second, the external rotor DC motors use about 1/3 of the power of comparable AC motors to moving the same amount of air. The third reason DC power saves energy is related to the use of peak demand reduction during summer cooling season. During the peak air conditioning season in the summer, the SOLAR-DES-EVAP system will often consume more power than the PV panels can generate. The batteries provide the necessary capacity to operate the SOLAR-DES-EVAP system throughout the day. When the sun sets, the PV system activates a 110 Volt AC to 24 Volt DC battery charger that brings the batteries up to full charge during the nighttime hours. This hybrid battery charging approach makes the maximum use of the PV output during the peak electric demand and shifts the grid connected battery charging to an off peak period when electrical demand on the utility grid is lower. The project also provides several hundred square feet of usable covered storage space within the shed buildings. 4

7 SHEET Dumpster Pad Feet South Roof W True South Reflective Roof True North E Air duct trunk North Roof PV panels 110 VAC Panel board Heat Pump Guard station American Solar, Inc Chippendale Court Annandale, Va. (703) TITLE DWG NO REV SCALE Site Plan DATE Aug

8 DWG NO REV SHEET True North W E True South Desiccant Evaporative Cooling System Indirect Evap Cooler, IEVP1 fan Guard Station Supply Fan Sump Drain Pump & Switch (inside bottom) Indirect Evap Cooler, IEVP2 fan Winter Heating Fan (wall) Storage Tank Draindown Thermostat (wall) Head Tank Fill Pump Switch (rafter) Head Tank Fill Pump & Run Dry Switch (floating in tank) Storage Tank Draindown Manual Switch & Relay (wall) Storage Tank Draindown Solenoid (floor) Solar Roof Temperature Snap Switch (roof deck) PV Shingles in Solar Tile Roof (4 in 2 lower courses) PV Shingle leads (2 pair below roof) PV Shingle Heat Recovery Exhaust Fan (below roof) PV Shingle Heat Recovery Supply Fans (2 below roof) South shed east wall Interior Light Switch (beam) Solar Charge Controller (beam) PV (+) disconnect switch Building and system ground 110 VAC wall outlet North Desiccant Regeneration Fan (wall) South Desiccant Regeneration Fan (wall) Exterior Light Head Tank & Float Switch (overhead) North Desiccant Supply Fan South Desiccant Supply Fan Fan-Pump-Wheel Switches, See Switch Arr'g't dwg Interior Light Heat Exchanger, HX1 fan Winter Heating Fan Switch (wall) Rainwater Storage Tank Solar Roof Fan & Switch (rafter) 110 Volt AC Panel Board Head Tank Fill Relay (rafter) Exterior light Interior light (rafter) 110 VAC wall outlet Building & system ground See details on elevation below SCALE DATE PV shingle volt DC disconnect switch AC-DC Battery Charger (floor) Batteries (floor) PV Shingle Heat Recovery Exhaust Fan (below roof) PV Shingle Leads (2 pair below roof) Electrical Panels upper and lower Air conditioning solenoid cooling fan PV Shingle 9-13 Volt DC Disconnect Switch Battery (+) disconnect switch Cooling SystemThermostat (1' above floor) Heating System Thermostat (1' above floor) Photovoltaic Panels (2) American Solar, Inc Chippendale Court Annandale, Va. (703) TITLE Equipment Location Plan View Aug A Plan View North Elevation Electrical Controls

9 American Solar, Inc Chippendale Court Annandale, Va. (703) TITLE DWG NO REV SCALE Equipment Location West Elevation DATE Aug SHEET Guard Station Heat Pump Air Duct Fence Sliding Gate Air duct trunk Head tank Solar Desiccant Evaporative System West Elevation North Roof solar tiles with high temp absorber below 120 inin Reflective laminate over standing seam metal roof Reflective Roof Water Storage Pump & Piping Concrete Slab on Grade Elec. Panels 180 inin South Roof AC-DC Battery Ch'rg'r solar tiles with PV below Battery Storage solar tiles with high temp absorber below Rainwater collection at gutters

10 American Solar, Inc Chippendale Court Annandale, Va. (703) TITLE Side Elevation Dimensions & Sun Angles DWG NO REV SCALE DATE 3/16"=1'-0" 9 /24/03 SHEET 49.25in 86in solar tiles with high temp selective surface 80in 30in solar tiles with high temp selective surface in 120in Sun angle 21st of june Example roof angles reflection lines reflection line from opposite roof may,jun,jul for summer AC heat boost 123.3in Assumes 400 sq ft at 16 ft long incl reflectors 24in apr,aug 324in 78.76in 82.5in Valley shaded Nov, Dec, Jan Generalized Roof and Sun Angle Diagram, approximate dimensions reflective roof 166in 53.2 reflective roof in aug apr solar tiles PV below in solar tiles PV below Concrete Slab on Grade Sun angle 21st of june 100in nov jan Sun angle 21st of December solar tiles with black absorber surface below solar tiles with black absorber surface below

11 American Solar, Inc Chippendale Court Annandale, Va. (703) TITLE DWG NO REV SCALE DATE None 8/29/04 SHEET Battery Solar Charge Controller Electrical Schematic To loads Air Conditioner Fans Air Conditioner Pumps Water Tank Drain Down Solenoid Interior Lights Heater Fan Relays and Contactors PV panels 300 watt 24 Volt DC volt daylight sensing bus 24 Volt DC bus Disconnect Disconnect PV Shingles under solar tiles, 2 wired in series, volt nominal, zero volts night PV Battery Load Disconnect Batteries 24 Volt DC 4 7 A 6 9 B 24 Volt DC Daylight Sensing Relay 9-13 Volt DC Exterior Lights PV shingle heat recovery fans and cooling fans for solenoids AC-DC Battery Charger 110 Volt AC Battery Charging Solenoid Note See specific electrical circuits drawings for wiring connections 1 3

12 American Solar, Inc Chippendale Court Annandale, Va. (703) TITLE DWG NO REV SCALE Pentagon Solar Des. Evap Air Handler 1/32" = 1" DATE Aug Sheet 1 SHEET A To Guard Station To solar roof HX1 fan HX1 From Solar Roof South Elevation, Solar Des. Evap Air Handler South Wall Panel Removed to show air flows IEVAP 1 recirc air Outside Air Section at HX1 cross flow heat exchanger showing air flow IEVAP 1 evap media Outside Air Exhaust to Outside From Outside Air Exhaust to outside air Outside Air drip pan Section at EVAP 1 heat exchanger showing air flow

13 American Solar, Inc Chippendale Court Annandale, Va. (703) TITLE DWG NO REV SCALE Pentagon Solar Des. Evap Air Handler 1/32" = 1" DATE Aug Sheet 2 SHEET A water drip piping Guard station] supply fan transition evap media IEVAP 2 Sump Drain Pump and Float Switch evap media Drain pan IEVAP 2, recirc fan IEVAP 1 open screen, north and south sides IEVAP 1 fan recirc duct to North Side HX1 inlet open screen, north side and below desiccant cassette HX1 cross flow plate heat xchngr Desiccant regen exhaust duct connection to solar roof /regen fan Desiccant Supply Air Fan desiccant wheel South Elevation, Solar Des. Evap Air Handler South Wall Panel Removed to show component location

14 American Solar, Inc Chippendale Court Annandale, Va. (703) TITLE Solar Desiccant Evaporative Cooling Cycle Schematic DWG NO REV SCALE DATE SHEET 187 CFM 188 CFM Outside Air Stage 1 Roof Stage 2 Roof CFM CFM CFM Silica Gel Desiccant Wheel Type: WSG 440 x CFM CFM 319 CFM 10/10/03 0 Outside Air #1 Regenerative Air Stream #3 #2 319 CFM #5 AHU Evaporative Cooling Air H -24S-.012 Performance During Design Conditions # CFM 3 IEVAP-1 PHE H-24S Cooling Mode Schematic Regeneration Air Evaporative Cooling Air Supply Air IEVAP-2 PHE H-24S CFM CFM Secondary Air Stream 188 CFM #6 Primary Supply Air Stream CELdeck 5090 CELdeck CFM HX-1 PHE Supply Air Stage T F DB T F WB Hum. Gr/# DA SCFM IEVAP-2 IEVAP-1 Stage T F DB T F WB Hum. Gr/# DA SCFM Stage T F DB T F WB Hum. Gr/# DA SCFM Regeneration Air Stage T F DB T F WB Hum. Gr/# DA SCFM

15 Pentagon guard sta solar des evap Guard Sta supply Grd sta supply Dew Pt Solar roof (178.6) Room floor temp (88.01) 06/29/04 14:10: *F :00:00 12:00:00 14:00:00 16:00:00 18:00:00 06/29/04 09:56:20 06/29/04 19:56:20

16 pentagon guard sta solar des evap wb probe F db probe F grd sta sup T F (78.71) Dew Point (*F) c:1 2 (64.96) HX1 outlet T F floor temp F HX1 inlet T F solar roof regen temp F /15/04 13:37: *F :00:00 14:00:00 15:00:00 16:00:00 07/15/04 12:48:31 07/15/04 16:48:31

17 Pentagon guard sta S roof 2' cl Air temp in absorber air flow channel (226.8) PV outlet fan west exhaust temp (99.39) PV upper course supply fan inlet air temp (78.01) PV outlet fan east exhaust temp (108.43) South building interior air temp 1' abv floor (73.15) South wall metal panel temp (109.29) air temp 1" below absorbers abv air duct outlet /05/04 13:51: Temperature (*F) c: *F :40:00 13:00:00 13:20:00 13:40:00 14:00:00 03/05/04 12:38:39 03/05/04 14:18:39

18 Pentagon guard sta3/5-8/04 South roof 2' cl & PV fans Air temp in absorber air flow channel PV outlet fan west exhaust temp (97.82) PV upper course supply fan inlet temp (80.12) PV outlet fan east exhaust temp (105.06) 03/07/04 12:49: Temperature (*F) c: *F :00:00 00:00:00 00:00:00 03/05/04 12:00:00 03/08/04 12:00:00

19 Operating Instructions The following Operating Instruction are provided to give both the theory of operations and the specific switch and controls alignments for successful operation of the systems. The entire system is set to run automatically throughout the year without intervention by maintenance personnel. Occasional observations of normal operations such as: air flow from the heat pump supply air duct, nighttime lighting, battery voltage levels read from the solar charge controller display, PV charging current read from the solar charge controller display, PV cooling fan operation as evidenced by indicator flag motion, Solenoid cooling fan operation as evidenced by airflow at the fan inlets rain gutter drainage during rainstorms, tank drain water flow to the pavement during the initial onset of cold weather and after any subsequent warm-cold cycles, and tank water levels, will provide evidence of routine automatic operation.

20 Operating Instructions Multiple voltage sources There are 5 different power sources within the solar shed. The 300 Watt 24 Volt DC solar panels mounted outside the shed, The 68 watts of PV shingles installed within the solar roof supplying both 9-13 volt DC and volt DC circuits, The 700 amp hour 24 volt DC battery bank, The 110 AC to 24 volt DC battery charger, and The 110 Volt AC convenience outlet powered from the nearby power panel Use caution when working on any circuit to ensure that all power sources are disconnected and exposed wires do not contact other circuits. TO DISCONNECT POWER TO THE SYSTEM, turn OFF the following switches Turn OFF the PV Panel Disconnect Switch located on the horizontal beam below the electrical panels in the south building Turn OFF the AC-DC Battery Charger at the switch on the front cover of the charger. (For added protection, unplug the charger from the 110Volt AC outlet.) Turn OFF the Battery Disconnect switch located on the horizontal beam below the electrical panels in the south building. (The solar charge controller LCD display should go blank, indicating no power to the load circuits) Turn OFF the circuit breaker in the AC power panel located to the east of the solar shed buildings. Turn off the 9-13 Volt DC disconnect switch located on the exterior of the lower electrical panel west (tank) side. Turn off the volt DC disconnect switch located on the exterior of the upper electrical panel east (door) side. Note: Several wires are still energized within the building, up to the switches. These include: The PV panel leads, The PV shingle leads from the roof integrated PV shingles, and The Battery leads USE CAUTION when working on any system and confirm a lack of voltage by proper use of test equipment. Grounding All DC circuits are negative ground. The negative battery terminal is grounded. The PV panels are grounded. The metal building is grounded. Two ground rods are placed near the fence and the air duct trunk. The 110 Volt AC circuit is grounded at the AC power panel to the east of the building. Use caution when working with any positive circuit to avoid contact with the metal building. 5

21 Operation of Systems Interior Lights All lights are 24 volt DC, 20 watt halogen lamps A manual switch is located on the horizontal beam below the electric panels. The one switch controls the interior lights in both parts of the shed. Turn the light off when finished to preserve battery charge. Exterior Lights All lights are 24 volt DC, 20 watt halogen lamps. The exterior lights are switched on and off automatically by a Daylight Sensing Relay in the bottom of the Upper electrical panel. The relay is activated by power from two PV shingles installed in the southwest corner of the solar tile roof. The shingles are wired in series to power the volt bus. The coil voltage is volts nominal during daylight hours and will drop to 0 volts at night. When the coil voltage drops to about 5 volts, the relay releases and the lighting circuit contacts are made. The lights are powered from the 24 Volt DC bus which is energized by the batteries, and the solar charger, and the AC-DC charger. To remove power from the exterior lighting circuit, turn the disconnect switch for the Volt DC bus to the OFF position. The switch is located on the exterior of the upper electrical panel on the east side. This removes power to the daylight sensing relay. It will also energize the AC-DC battery charger which is connected to the relay. 6

22 Batteries There are (14) 12 volt, 100 amp hour sealed, advanced glass mat, deep cycle batteries. The batteries are wired in series to create 700 amp hours capacity at 24 volts DC Battery Charging The batteries are charged by a combination of solar energy and 110Volt AC 24 volt DC battery charger. The battery bank is charged by the 300 Watt separate solar panels during daylight hours and by the AC-DC battery charger at night. The solar panels are constantly connected to the solar charge controller located on the beam near the electrical panels. The solar charge controller will provide charging power whenever there is sufficient sunlight to energize the solar panels. The solar charge controller operates on a monthly charging cycle with varying voltage to the batteries to maintain peak performance. The AC-DC battery charger is constantly turned on. The AC-DC battery charger is constantly connected to the battery negative lead. The positive lead of the AC-DC charger is connected via a disconnect switch, to a DC solenoid (contactor) located in the lower electrical panel. The contactor is energized by the daylight sensing relay (relay is also used for exterior lighting control) During daylight hours, the solenoid contacts are open and the AC-DC battery charger positive lead is disconnected from the batteries. During night time, the daylight sensing relay releases and the relay contact to the solenoid is broken, releasing the solenoid, which closes the contact for the AC-DC battery charger positive lead to the batteries. The AC-DC battery charger will provide the finishing charging of the batteries that the solar panels may not have provided during the day. Caution: The Solar panels may still provide a positive charge even when the AC- DC battery charger is operating. However, in most cases, the AC-DC charger will operate at higher voltage than the solar panels when operating at dawn and dusk. Always assume the solar panels are providing a positive charge to the batteries unless the solar panels are disconnected from the charge controller. Caution: The battery charging solenoid (contactor) consumes about 2.4 watts of power when energized during the daytime. Heat buildup in the solenoid is dissipated by the cooling fan. Cooling airflow is from outside the panel, across the solenoid, and out the edges of the front cover of the panel. DO NOT close the front covers of the electrical panels tightly or cooling air flow will be greatly reduced and the solenoid will fail prematurely. 7

23 Solar PV Shingles in Solar Roof There are (4) 17 watt PV shingles in the south solar roof. The PV shingles are located under the first two courses of solar tiles in the south roof, two per course. The active area of the shingle is approximately 5 inches high and 86 inches long. The PV shingles generate 9 volts at max power and 13 volts open circuit. The electric leads from the PV shingles penetrate through the metal roof deck in ½ metal conduit. The PV shingles provide both solar heat and electric power for controls and cooling. The temperature of the PV shingles must not exceed 200 degrees F or the encapsulating laminate will degrade. The solar roof has been configured with supply and exhaust fans arranged to ventilate the PV shingle to ensure the temperatures do not reach 200 F. Supply fans are in the middle of the roof. Exhaust fans are at the ends of the roof. The fans are directly connected to the PV shingle leads and operate at a nominal 12 volt DC (9-13 VDC). Two fans in the electrical panels are powered by one of the PV shingles on the door (east) side of the shed. The fans in the electrical panels provide cooling air for the solenoids (contactors) in the panels. To disconnect the power to the fans in the electrical panel, turn the 9-13 volt DC disconnect switch to the OFF position. The switch is located on the outside of the lower electrical panel on the west side. To disconnect the power to the supply and exhaust fans that are installed below the PV shingles, remove the wire nuts at the PV shingle leads. Use caution to protect the disconnected wire from inadvertent contact with other circuits or metal building components. 8

24 Solar Heat The north solar roof is used to provide heat in the winter to the guard station heat pump. Solar heated air is drawn from the solar tile roof system and sent to the outdoor coil of the heat pump. The heat is controlled by a thermostat located about 1 above the floor, near the door below the electrical panel. Note: There are two thermostats below the electrical panels. The heating thermostat is nearest the door. The cooling thermostat is nearest the center of the building. The thermostat energizes a relay located in the lower electrical panel. The relay powers the solar heating fan. The thermostat and relay coil circuit are energized from the 24VDC bus. The heating fan is energized from the 24 Volt DC bus and is protected by an in-line fuse located in the lower electrical panel. When the thermostat senses temperature in the building below the set point (~50F) the thermostat closes a relay to energize the heating fan. The fan will run even during nighttime hours as long as the temperature is below the thermostat set point. Through the evening, this will extract all the heat built up within the roof during the day, and will begin the extraction earlier in the morning than would occur with more complicated on off roof temperature controls. However, the 120 watt fan may run for several hours during cold nights when the roof has reached ambient temperatures and no useful heating is provided. This causes no harm to the system. During sunny daytime hours, the heater will provide air to the heat pump that is about 40 degrees above ambient temperatures. To turn the fan off, there is a local toggle switch on the south wall of the north shed, near the duct and cable trunk. The toggle switch should be left on for automatic operation using the thermostat and relay. Caution: Do not set the heating thermostat above the minimum setting as it will cause the heater fan to run during warm days when no heating is required. Excessively high temperature across the heat pump outdoor coil during the heating season can be detrimental to the heat pump. 9

25 Solar air conditioning The solar air conditioning system uses solar heated air from the solar roof a desiccant wheel plate heat exchangers, and evaporative cooling using collected rainwater, to provide cool dry air across the guard station heat pump outdoor coil. This solar desiccant evaporative (SOLAR-DES-EVAP) cooling system uses solar heated air to reduce humidity and lower temperature with less electricity use than conventional air conditioning systems. Power The solar air conditioning system is powered by the 24 volt bus. Most fans and pumps and the desiccant wheel are separate circuits with separate local toggle switches near the device and a separate fuse located in the 2 fuse blocks on the rear wall of the upper electrical panel. The exception is the three small fans for the Indirect Evaporative Cooler #1 (IEVP1), Heat Exchanger #1 (HX!) and the Guard Station Supply Fan. These three fans are on a single circuit fed by one fuse in the lower fuse block. Each fan has a local toggle switch on the south east corner of the SOLAR-DES-EVAP system. Both fuse blocks are connected to a single solenoid (contactor) located on the lower right side of the upper electrical panel. When the solenoid is energized, the entire air conditioning system is activated. Caution: The air conditioning solenoid (contactor) consumes about 2.4 watts of power when energized during the summer daytime hours. Heat buildup in the solenoid is dissipated by the cooling fan. Cooling airflow is from outside the panel, across the solenoid, and out the edges of the front cover of the panel. DO NOT close the front covers of the electrical panels tightly or cooling air flow will be greatly reduced and the solenoid will fail prematurely. The total load on the system with all circuits energized is 750 watts. ON-OFF Control The system operates in response to a cooling thermostat located 1 above the floor below the electrical panels toward the center of the south shed. Note: There are two thermostats below the electrical panels. The heating thermostat is nearest the door. The cooling thermostat is nearest the center of the building. The thermostat set point is 88 degrees F. The thermostat circuit also contains a snap switch below the center of the solar roof in the south shed and a relay located on the upper right side of the upper electrical panel to power the solenoid. The roof snap switch closes at 110F and above and opens at 90F and below. The thermostat, snap switch, and relay coil circuit is energized from the 24VDC bus. The fans and pumps are energized at the fuse block terminals from the Solar Charge Controller (+) & (-) LOAD connections, which are at 24 Volt DC. 10

26 The fuse block (-) terminals are wired directly to the (-) LOAD terminal. The Fuse block (+) terminals are connected via the Air Conditioning Solenoid (contactor) to the (+) LOAD terminal. When the thermostat senses a room temperature above 88 degrees and a roof temperature of at least 110 degrees, the thermostat circuit is closed and the relay coil is energized. The relay contacts complete the circuit to the Air Conditioning Solenoid (contactor) to close the solenoid and connect the (+) wire to the fuse blocks, energizing all the air conditioning components. The entire air conditioning system can be turned off by turning the thermostat Off-Cool switch to OFF. This opens the thermostat circuit and prevents the relay coil from energizing the solenoid. Note: The Fan-Auto switch on the thermostat is disconnected and inactive. All fan and pump switches in the air conditioning system should be left ON, with the exception of the Sump Drain Pump Manual Switch which should be left OFF. Water System The Sump Drain Pump Manual Switch is provided to reduce the water level in the sump. It will only operate when the air conditioning solenoid is energized. It will not pump the sump dry. Caution: DO NOT run the Sump Drain Pump continuously using the Manual Switch when the sump is dry or at the lowest pumping level, as the pump can be damaged. Monitor pump flow at the return to the storage tank to determine an appropriate manual shut off time. When the air conditioning system is running, water is pumped from the storage tank to the head tank until the head tank float switch indicates full and closes the internal switch in the float. The switch energizes a relay coil located in an electrical box in the rafter below the reflective roof of the south shed. The relay opens the contact for the head tank fill pump to shut the pump off. The water in the head tank flows by gravity into the evaporative coolers and to the sump. When the sump is full, a float switch in the sump energizes the Sump Drain Pump to pump water back to the storage tank. Air System Room air is blown in to the Solar Desiccant Evaporative (SOLAR DES EVAP) Cooling System from two blowers at the front of the unit near the door. This supply air passes through the bottom half of a rotating desiccant wheel which removes the humidity from the air but heats the air in the process. Simultaneously, solar heated air from the solar roof is drawn through the upper half of the rotating desiccant wheel to continuously regenerate the desiccant and carry away the moisture taken out of the supply air. The warm moist air is exhausted out the north side of the shed by two blowers located on the north wall. 11

27 The warm dry supply air within the Solar Des Evap passes through a plate heat exchanger (HX1) which uses room air on one side of the plate to cool the supply air. The hot exhaust air from this process is carried to the south building where it is used to raise the entering air temperature of the first stage of the solar roof. A small fan mounted on the north wall/roof of the south shed draws solar heated air from the south roof to raise the entering air temperature of the north solar roof. The north solar roof air is used for the desiccant regeneration. The supply air within the SOLAR DES EVAP continues to move through the first indirect evaporative cooler (IEVP1) composed of another plate heat exchanger which is above an evaporative cooling pad. Water is sprayed into the heat exchanger and falls down over the pad. Room air flows up through the pad and heat exchanger and is cooled to near the wet bulb temperature by the evaporating water. The exhaust of this moist air is sent out the North wall of the North shed. The supply air is separated from the moist air so it remains dry and is cooled slightly. The supply air is then divided into two air streams. One air stream continues through the next evaporative cooler (IEVP2) to the guard station supply fan and on to the heat pump outdoor coil. The other air stream is used to drive the evaporative cooling process to cool the first air stream. The evaporative stream descends below and then up through an evaporative pad and a plate heat exchanger and is exhausted back to the air intake for the first heat exchanger, HX1. This cool dry air moving though IEVAP2 provides deeper cooling of the supply air stream headed toward the guard station and the exhaust of the moist air from IEVAP2 is cooler than the room air, so it adds to the cooling of HX1. 12

28 Storage Tank, Drain Down and Run Dry The Storage Tank collects rainwater from the three roof gutters. It is sized to collect and store enough water during a month to operate the evaporative coolers for one month, using typical monthly rainfall. During uncommonly dry months, the tank may be pumped down to a low level in the course of supplying water for the SOLAR DES EVAP system. The Head Tank Fill Pump, floating with in the storage tank, is not designed to run dry continuously. To prevent damage to the pump at low tank water levels, a float switch has been attached to the pump platform, which will shut the pump off when the water level falls below the pump minimum pumping level. To prevent freezing damage to the tank, the tank is designed to be drained dry when temperatures go below 40 F. The tank has been sloped to the drain on the south west corner and is supported on a combination of wood blocks and foam pads at several points. The drain down circuit uses a solenoid operated valve in a low point drain line on the floor at the west wall of the south shed. The valve is normally closed and the solenoid is not energized. When a thermostat senses the temperature is below 40F, the thermostat closes and energizes a relay installed in an electrical box on the west wall above the solenoid valve. The thermostat is located on the North Wall of the south shed near the piping. The relay energizes the solenoid valve which opens and drains the tank. A manual switch is available on the cover of the relay electrical box to manually drain the tank. Note: Be sure the solenoid switch is turned off when not manually draining the tank. The thermostat and relay and solenoid valve are energized by the 24 Volt DC bus. The circuit is constantly energized and has an inline fuse on the bottom of the upper electrical panel. 13

A NEW DESICCANT EVAPORATIVE COOLING CYCLE FOR SOLAR AIR CONDITIONING AND HOT WATER HEATING

A NEW DESICCANT EVAPORATIVE COOLING CYCLE FOR SOLAR AIR CONDITIONING AND HOT WATER HEATING A NEW DESICCANT EVAPORATIVE COOLING CYCLE FOR SOLAR AIR CONDITIONING AND HOT WATER HEATING John Archibald American Solar Roofing Company 8703 Chippendale Court Annandale, Va. 22003 e-mail: jarchibald@americansolar.com

More information

Energy Efficiency. Energy Efficient Home Cooling:

Energy Efficiency. Energy Efficient Home Cooling: Energy Efficiency Energy Efficient Home Cooling: Choosing an air conditioning system is an important decision. A poor choice may be costly to purchase and operate and yet fail to provide the desired cooling

More information

HVAC Processes. Lecture 7

HVAC Processes. Lecture 7 HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump

More information

HEAT PUMP FREQUENTLY ASKED QUESTIONS HEAT PUMP OUTDOOR UNIT ICED-UP DURING COLD WEATHER:

HEAT PUMP FREQUENTLY ASKED QUESTIONS HEAT PUMP OUTDOOR UNIT ICED-UP DURING COLD WEATHER: HEAT PUMP FREQUENTLY ASKED QUESTIONS HEAT PUMP OUTDOOR UNIT ICED-UP DURING COLD WEATHER: It is normal for a heat pump to have a build up of white frost on the outside coil during cold damp weather. The

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities.

A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities. A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities. Richard L. Dornfeld, BSME, P.E. Staff Engineer September 25, 2014 Moisture can be a problem

More information

SWIMMING POOL HEAT PUMP

SWIMMING POOL HEAT PUMP SWIMMING POOL HEAT PUMP Installation & User Manual Model HP40B HP50B HP65B Hayward Pool Products Canada, Inc. T: 1-888-238-7665 www.haywardpool.ca CONTENT I. Application 4 II. Features 4 III. Technical

More information

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Cooling Small Server Rooms Can Be. - Jim Magallanes Computer Room Uptime: www.cruptime.com Uptime Racks: www.uptimeracks.com

Cooling Small Server Rooms Can Be. - Jim Magallanes Computer Room Uptime: www.cruptime.com Uptime Racks: www.uptimeracks.com Cooling Small Server Rooms Can Be Inexpensive, Efficient and Easy - Jim Magallanes Computer Room Uptime: www.cruptime.com Uptime Racks: www.uptimeracks.com Server Rooms Description & Heat Problem Trends

More information

SERVICE MANUAL 12VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOFTOP UNITS ONLY

SERVICE MANUAL 12VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOFTOP UNITS ONLY SERVICE MANUAL 12VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOFTOP UNITS ONLY! WARNING - SHOCK HAZARD! TO PREVENT THE POSSIBILITY OF SEVERE PERSONAL INJURY, DEATH, OR EQUIPMENT DAMAGE DUE TO ELECTRICAL

More information

Glossary of Heating, Ventilation and Air Conditioning Terms

Glossary of Heating, Ventilation and Air Conditioning Terms Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment

More information

Please read this owner s Manual carefully before operating the unit. - Cooling - Heating - Dehumidifying - Fan

Please read this owner s Manual carefully before operating the unit. - Cooling - Heating - Dehumidifying - Fan Please read this owner s Manual carefully before operating the unit. - Cooling - Heating - Dehumidifying - Fan TABLE OF CONTENTS INTRODUCTION 2 IMPORTANT SAFEGUARDS...2 PACKAGE CONTAINS..2 NAMES OF PARTS.3

More information

Programmable Thermostat MODEL 3312026.XXX With Dehumidify 3312024.XXX With Out Dehumidify

Programmable Thermostat MODEL 3312026.XXX With Dehumidify 3312024.XXX With Out Dehumidify Comfort Control Center 2 Thermostat Operating Instructions Programmable Thermostat MODEL 3312026.XXX With Dehumidify 3312024.XXX With Out Dehumidify TABLE OF CONTENTS About your new thermostat Features...2

More information

USER S MANUAL HSC-24A

USER S MANUAL HSC-24A AIRREX AIR CONDITIONER USER S MANUAL HSC-24A Thank you for purchasing an AIRREX AIR CONDITIONER. BEFORE operation please read this user s manual carefully. Keep this manual readily available. It is ESSENTIAL

More information

Chilled Water HVAC Systems

Chilled Water HVAC Systems Chilled Water HVAC Systems By Ron Prager, Brinco Mechanical Services, Inc. Types of water based systems: There are three types of HVAC systems that utilize water as a heat transfer medium. The first system,

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

NSN 4120-01-21 4-3692

NSN 4120-01-21 4-3692 *TM 9-4120-388-14 TECHNICAL MANUAL Operator s, Unit, Direct Support, And General Support Maintenance Manual AIR CONDITIONER, VERTICAL, COMPACT, 18,000 BTU/HR 208 VOLT, 3 PHASE, 50/60 HERTZ NSN 4120-01-21

More information

Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS

Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS Ducted System RECORD THIS UNIT INFORMATION FOR FUTURE REFERENCE: Model Number: Serial Number: Date Purchased: This manual must be read and

More information

SERVICE MANUAL FOR 6535 SERIES TWO TON HIGH EFFICIENCY PACKAGED HEAT PUMPS

SERVICE MANUAL FOR 6535 SERIES TWO TON HIGH EFFICIENCY PACKAGED HEAT PUMPS SERVICE MANUAL FOR 6535 SERIES TWO TON HIGH EFFICIENCY PACKAGED HEAT PUMPS TABLE OF CONTENTS 1. Warnings...2 2. Accessibility Of Appliance...3 3. Unit Dimensions And Specifications...3 4. Unit Specifications

More information

How To Plan Out An Array Of Solar Panels

How To Plan Out An Array Of Solar Panels CITY OF DOWNEY COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 11111 Brookshire Avenue Downey, CA 90241 562.904.7142 (www.downeyca.org) B SECTION 01/01/2011 EFFECTIVE DATE PHOTOVOLTAIC 032 FORM NUMBER 2013

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

Portable Air Conditioner

Portable Air Conditioner Portable Air Conditioner Owner's Manual Model:3 in 1 12,000 Btu/h Series 3 Please read this owner s manual carefully before operation and retain it for future reference. CONTENTS 1. SUMMARY...1 2. PORTABLE

More information

Thermwire. Selection Guide. Freeze Protection Heating Cable. Thermwire -Wrap. Pre-Assembled. Thermwire-Comp. Thermwire-Melt.

Thermwire. Selection Guide. Freeze Protection Heating Cable. Thermwire -Wrap. Pre-Assembled. Thermwire-Comp. Thermwire-Melt. Thermwire Freeze Protection Heating Cable Selection Guide Pipe Freeze Protection Heating Cable Pre-Assembled Pipe Freeze Protection Heating Cable with Attached Cord & Plug Thermwire-Comp Refrigeration

More information

Lesson 36 Selection Of Air Conditioning Systems

Lesson 36 Selection Of Air Conditioning Systems Lesson 36 Selection Of Air Conditioning Systems Version 1 ME, IIT Kharagpur 1 The specific objectives of this chapter are to: 1. Introduction to thermal distribution systems and their functions (Section

More information

Green Building Handbook for South Africa Chapter: Heating, Ventilation and Cooling Luke Osburn CSIR Built Environment

Green Building Handbook for South Africa Chapter: Heating, Ventilation and Cooling Luke Osburn CSIR Built Environment Green Building Handbook for South Africa Chapter: Heating, Ventilation and Cooling Luke Osburn CSIR Built Environment The heating, ventilation and cooling loads of typical commercial office space can range

More information

A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW

A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW WE BRING GREEN SOLUTIONS TO YOU A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW Provided by A COOLER PLANET A Cooler Planet 1 The Complete Solar Guide WHY GO SOLAR? TOP FIVE FACTORS TO CONSIDER FOR ADDING

More information

Why is my air conditioner dripping on my customers?

Why is my air conditioner dripping on my customers? De-Mystifying HVAC Why is my air conditioner dripping on my customers? By Ron Prager One of the most frequent emergency service requests is a call for an air conditioner leaking water into the store. These

More information

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MN12CES / MN10CESWW

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MN12CES / MN10CESWW Portable Air Conditioner OWNER S MANUAL Read these instructions before use 8 Model: MN12CES / MN10CESWW Voltage rating: 120V~60Hz Power rating : 1100W (MN12CES) Power rating : 900W (MN10CESWW) Customer

More information

Integrated Solar Radiant Systems

Integrated Solar Radiant Systems Integrated Solar Radiant Systems William Shady PE President Topics Radiant heating Indoor air quality Radiant Cooling Project Photos Questions and answers The goal for our clients Healthy Comfort Why Radiant

More information

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C. CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front

More information

Transport Air Conditioning TRANSPORT AIR CONDITIONING OPERATOR S MANUAL. for SPLIT SYSTEM. Bus Air Conditioning Units.

Transport Air Conditioning TRANSPORT AIR CONDITIONING OPERATOR S MANUAL. for SPLIT SYSTEM. Bus Air Conditioning Units. R Transport Air Conditioning TRANSPORT AIR CONDITIONING OPERATOR S MANUAL for SPLIT SYSTEM Bus Air Conditioning Units T--326 Rev -- OPERATOR S MANUAL BUS AIR CONDITIONING UNITS GEN IV & GEN V CONTENTS

More information

Energy Efficiency. Energy Efficient Water Heating: Purchasing a new electric water heater. Hot water use has a significant impact on your bill.

Energy Efficiency. Energy Efficient Water Heating: Purchasing a new electric water heater. Hot water use has a significant impact on your bill. Energy Efficiency Energy Efficient Water Heating: Purchasing a new electric water heater. Water heating accounts for about 18 percent of your home energy bill. Only space heating and cooling account for

More information

TIPS ON ENERGY SAVING

TIPS ON ENERGY SAVING TIPS ON ENERGY SAVING IN HOME APPLIANCES AND ELECTRICITY SAFETY The Domestic Sector accounts for 30% of total energy consumption in the country. There is a tremendous scope to conserve energy by adopting

More information

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings *** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not

More information

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MM14CCS. Voltage rating: 115V~60Hz Power rating : 1400W

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MM14CCS. Voltage rating: 115V~60Hz Power rating : 1400W Portable Air Conditioner OWNER S MANUAL Read these instructions before use Model: MM14CCS Customer Support : 1-800-474-2147 Voltage rating: 115V~60Hz Power rating : 1400W For product inquiries or support

More information

Single Zone LCD Thermostat Operating Instructions

Single Zone LCD Thermostat Operating Instructions Fan Cool Furnace *Heat Pump or Heat Strip On/Off F Single Zone LCD Thermostat Operating Instructions MODEL 3313192.XXX Cool/Furnace 3313193.XXX Cool/Furnace/Heat Pump 3313194.XXX Cool/Furnace/Heat Strip

More information

SAVE ENERGY AT HOME INSULATE AND AIR SEAL

SAVE ENERGY AT HOME INSULATE AND AIR SEAL SAVE ENERGY AT HOME INSULATE AND AIR SEAL Check the roof insulation level and add insulation to maintain minimum R-38 (6 of blown cellulose or equal). Use R-19 between frame or R-10 rigid insulation for

More information

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION. WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:

More information

HVAC Systems: Overview

HVAC Systems: Overview HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct

More information

How much do you know about HVAC? Try testing yourself with the following questions and then take a look at the answers on the following page.

How much do you know about HVAC? Try testing yourself with the following questions and then take a look at the answers on the following page. Demystifying HVAC Test Your HVAC Knowledge By Ron Prager How much do you know about HVAC? Try testing yourself with the following questions and then take a look at the answers on the following page. 1)

More information

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Presented by: Liberty Engineering, LLP 1609 Connecticut Avenue

More information

Basic Technology Series

Basic Technology Series Basic Technology Series Fundamentals of Car Air Conditioning 2007 Air Conditioning #003 The Rear Cooler Construction Fan Fan Filter Figure A : Trunk Figure B : Overhead Dual Air-Conditioner In This Issue

More information

APC APPLICATION NOTE #112

APC APPLICATION NOTE #112 #112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.

More information

Failure code manual. content

Failure code manual. content Failure code manual content 一 wall split AC series 2 二 floor standing AC series. 4 三 portable AC series.. 5 四 dehumidifer 6 五 DC inverter single split series...7 六 DC inverter multi-split series 10 1 一

More information

Water Management & Damage Prevention:

Water Management & Damage Prevention: Water Management & Damage Prevention: A Guide for Homeowners This article provides homeowners with basic information to make these decisions and take the appropriate actions to keep their homes dry and

More information

Energy'Saving,'Thermal'Comfort'and'Solar'Power'Information'Sheet'

Energy'Saving,'Thermal'Comfort'and'Solar'Power'Information'Sheet' Energy'Saving,'Thermal'Comfort'and'Solar'Power'Information'Sheet' We ve prepared this information sheet to help you to minimise energy consumption and energy costs while maximising thermal comfort at home.

More information

Section 7. Evaporator thermistor. Under-and-over pressure safety switches. Connections to the ECU

Section 7. Evaporator thermistor. Under-and-over pressure safety switches. Connections to the ECU Automatic Temperature Control Diagnosis and Repair Diagnosis of Automatic A/C Systems The most common automatic A/C system malfunctions tend to be the result of basic air conditioning problems. These problems

More information

Dehumidification Frequently Asked Questions

Dehumidification Frequently Asked Questions Dehumidification Basics Why do you want to keep indoor Rh between 30-60%? ASHRAE recommends keeping the relative humidity in a home between 30-60% to limit the effects of many unwanted conditions and harmful

More information

Pool Dehumidification Basics

Pool Dehumidification Basics Copyright 2009 Wescor. All rights reserved. Permission granted to reproduce for personal and educational use only. When energy costs were low, many pool owners considered only first cost when choosing

More information

Facts About Home Cooling

Facts About Home Cooling Facts About Home Cooling Energy Savings When keeping cool means air conditioning, keeping comfortable can often be expensive. Especially since air conditioning can add up to over 11% of your bill. But

More information

RVR Hybrid System Installer Instructions - 10052012. RVR Hybrid System Controller Installation Instructions

RVR Hybrid System Installer Instructions - 10052012. RVR Hybrid System Controller Installation Instructions RVR Hybrid System Controller Installation Instructions 1 Introduction to Hybrid Systems The RVR Hybrid system uses a combination of the Immergas Audax range of heat pumps with gas or oil boilers to create

More information

01-3 0000-00 6810-20 AIR CONDITIONING SYSTEM 1. FFH SPECIFICATION AIR CONDITIONING SYSTEM RODIUS 2004.09

01-3 0000-00 6810-20 AIR CONDITIONING SYSTEM 1. FFH SPECIFICATION AIR CONDITIONING SYSTEM RODIUS 2004.09 0000-00 01-3 6810-20 1. FFH SPECIFICATION 01-4 0000-00 2. SYSTEM LAYOUT AND COMPONENTS 0000-00 01-5 01-6 0000-00 3. FFH GENERAL INFORMATION The system is to increase the coolant temperature quickly by

More information

GEOTHERMAL HEATING AND COOLING INTRODUCTION

GEOTHERMAL HEATING AND COOLING INTRODUCTION GEOTHERMAL HEATING AND COOLING INTRODUCTION Geothermal Heating and Cooling Systems provide space conditioning -- heating, cooling, and humidity control. They may also provide water heating -- either to

More information

Dehumidifier Users manual. For Models: DH45S DH65S

Dehumidifier Users manual. For Models: DH45S DH65S Dehumidifier Users manual For Models: DH45S DH65S 950-0062-revD Jan. 9 2007 FORWARD The appearance of the units that you purchase might be slightly different from the ones described in the Manual, but

More information

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program

More information

A Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses

A Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses A Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses Robert L Crosby Jr, Biorealis Systems, Inc. Abstract: Bristol Bay Housing Authority (BBHA) currently

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

Installation Questions

Installation Questions Installation Questions How do I determine what type of heat I have? There may be several ways to determine what type of heat you have. First, if you can access the unit that is responsible for creating

More information

Preventing Ice Dams on Roofs

Preventing Ice Dams on Roofs Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the

More information

PV THERMAL SYSTEMS - CAPTURING THE UNTAPPED ENERGY

PV THERMAL SYSTEMS - CAPTURING THE UNTAPPED ENERGY PV THERMAL SYSTEMS - CAPTURING THE UNTAPPED ENERGY John Hollick Conserval Engineering Inc. 200 Wildcat Road Toronto Ontario jhollick@solarwall.com ABSTRACT PV modules generate electricity, but the electrical

More information

Each icon on this map represents the physical location of a station.

Each icon on this map represents the physical location of a station. ABBOTSFORD SCHOOL DISTRICT: GREEN TOUR TOMORROW S SUSTAINABLE SOLUTIONS TODAY Welcome to the Abbotsford School District: Green Tour. Our goal is to create an interactive learning experience for visitors

More information

The Basics of Solar Power for Producing Electricity An excellent place to start for those just beginning. The basics of solar power: 1000 W/m²

The Basics of Solar Power for Producing Electricity An excellent place to start for those just beginning. The basics of solar power: 1000 W/m² The Basics of Solar Power for Producing Electricity Learn the essential basics of using solar power so you can understand your project. Planning your project begins with understanding the basics found

More information

White Paper: Residential HVAC Split System Basics

White Paper: Residential HVAC Split System Basics St White Paper: Residential HVAC Split System Basics Prepared by: Bracken Engineering, Inc. 2701 W. Busch Blvd, Ste 200 Tampa, Florida 33618 April, 2011 2 White Paper: HVAC-Split Systems INTRODUCTION In

More information

Photovoltaic Solar Energy Unit EESFB

Photovoltaic Solar Energy Unit EESFB Technical Teaching Equipment Photovoltaic Solar Energy Unit EESFB Products Products range Units 5.-Energy Electronic console PROCESS DIAGRAM AND UNIT ELEMENTS ALLOCATION Worlddidac Member ISO 9000: Quality

More information

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MM14CHCSCS

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MM14CHCSCS Portable Air Conditioner OWNER S MANUAL Read these instructions before use Model: MM14CHCSCS Voltage rating: 120V~60Hz Power rating : 1400W(Cooling) Power rating : 1350W(Heating) Customer Support : 1-800-474-21477

More information

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Air Conditioner Water Heater - A Product of HotSpot Energy LLC Air Conditioner Water Heater - A Product of HotSpot Energy LLC PLEASE READ THIS BEFORE YOU INSTALL THE UNIT 1. This air conditioner must be installed and/or repaired by a qualified technician. If you perform

More information

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling Data Center Design Guide featuring Water-Side Economizer Solutions with Dynamic Economizer Cooling Presenter: Jason Koo, P.Eng Sr. Field Applications Engineer STULZ Air Technology Systems jkoo@stulz ats.com

More information

Harvesting Solar Energy

Harvesting Solar Energy Harvesting Solar Energy Overview of Systems, options and benefits of Solar Energy Systems By:John Miggins Harvest Solar Energy renewable solutions to everyday needs www.harvestsolar.net 1 Solar Energy

More information

Solar Photovoltaic Frequently Asked Questions

Solar Photovoltaic Frequently Asked Questions Table of Contents 1. What is Solar Energy?... 2 2. What are the basic component of a Solar PV system?.2 3. What are the different types of PV systems ATL offers?...2 4. What is the difference between mono-crystalline

More information

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw 4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and

More information

Heat Pumps for Swimming Pools

Heat Pumps for Swimming Pools Page 1 of 5 Heat Pumps for Swimming Pools This factsheet provides members with invaluable information about heat pumps and their use for heating swimming pool water. There is a consumer factsheet already

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

Heater and Air Conditioner, Blend Air System, Troubleshooting 83.06

Heater and Air Conditioner, Blend Air System, Troubleshooting 83.06 A/C Performance Diagnosis Problem Warm Airflow When the Air Conditioner is On, A/C Not Working, or Poor A/C Performance (dash outlet temperature is too high) Problem Warm Airflow When the Air Conditioner

More information

Drives and motors. A guide to using variable-speed drives and motors in retail environments

Drives and motors. A guide to using variable-speed drives and motors in retail environments Drives and motors A guide to using variable-speed drives and motors in retail environments Improving energy efficiency and lowering the carbon footprint Retailers across the UK take their corporate responsibility

More information

Installation, operation and maintenance manual TX 35A

Installation, operation and maintenance manual TX 35A Installation, operation and maintenance manual TX 35A Rev.10 may 2012 Page 1 of 18 1.0.0 Table of contents INSTALLATION, OPERATION AND MAINTENANCE MANUAL...1 1.0.0 TABLE OF CONTENTS...2 2.0.0 ILLUSTRATIONS...2

More information

Data Bulletin. Mounting Variable Frequency Drives in Electrical Enclosures Thermal Concerns OVERVIEW WHY VARIABLE FREQUENCY DRIVES THERMAL MANAGEMENT?

Data Bulletin. Mounting Variable Frequency Drives in Electrical Enclosures Thermal Concerns OVERVIEW WHY VARIABLE FREQUENCY DRIVES THERMAL MANAGEMENT? Data Bulletin April 2001 Raleigh, NC, USA Mounting Variable Frequency Drives in Electrical Enclosures Thermal Concerns OVERVIEW Variable frequency drives are available from manufacturers as enclosed engineered

More information

Table of Contents. 1 - Specifications...3. 2 - Installation...3. 3 - Wiring...5. 4 - User controls...7

Table of Contents. 1 - Specifications...3. 2 - Installation...3. 3 - Wiring...5. 4 - User controls...7 THERMOSTATS Table of Contents Page 1 - Specifications...3 1.1 - Product range...3 ARTTH001 (DSL-610)...3 ARTTH002 (DSL-700)...3 ARTTH003 (DSL-600)...3 1.2 - Technical data...3 1.3 - Power failures...3

More information

Passive and Active Solar Domestic Hot Water Systems

Passive and Active Solar Domestic Hot Water Systems SOLAR CENTER INFORMATION NCSU Box 7401 Raleigh, NC 27695 (919) 515-3480 Toll Free 1-800-33-NC SUN Introduction Passive and Active Solar Domestic Hot Water Systems Solar hot water heaters can provide households

More information

foundation ventilation systems for moisture and termite control

foundation ventilation systems for moisture and termite control foundation ventilation systems for moisture and termite control Help Protect Foundations with Temp-Vent The foundation is critical to the integrity of the home. That s why foundation ventilation is crucial.

More information

Building Integrated Combined Solar Thermal and Electric Generation Demonstration Project at Concordia University

Building Integrated Combined Solar Thermal and Electric Generation Demonstration Project at Concordia University Building Integrated Combined Solar Thermal and Electric Generation Demonstration Project at Concordia University Summary An innovative solar energy installation has been installed at Concordia University

More information

Service manual. Website: www.andico.com.au CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL.

Service manual. Website: www.andico.com.au CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL. Website: www.andico.com.au Service manual CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL. - ONLY FOR AUTHORISED SERVICE PERSONNEL. MODELS: MPK1-09CR-QB8 MPK1-12ER-QB6

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

HIGH EFFICIENCY RTU. www.reznorhvac.com HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons

HIGH EFFICIENCY RTU. www.reznorhvac.com HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons Capacities 10-25 Tons 100-400 MBH HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING DX System IEER> 13.2 Gas Heat Efficiency > 92% HIGH EFFICIENCY RTU 30-120 kw 3,000-11,550 CFM Comfort Comfort is determined

More information

Fan and Pad Greenhouse Evaporative Cooling Systems 1

Fan and Pad Greenhouse Evaporative Cooling Systems 1 CIR1135 Fan and Pad Greenhouse Evaporative Cooling Systems 1 R. A. Bucklin, J. D. Leary, D. B. McConnell, and E. G. Wilkerson 2 Temperatures can easily exceed 100 F in Florida greenhouses during the summer

More information

CONCEPTUALIZATION OF UTILIZING WATER SOURCE HEAT PUMPS WITH COOL STORAGE ROOFS

CONCEPTUALIZATION OF UTILIZING WATER SOURCE HEAT PUMPS WITH COOL STORAGE ROOFS CONCEPTUALIZATION OF UTILIZING WATER SOURCE HEAT PUMPS WITH COOL STORAGE ROOFS by Dr. Bing Chen and Prof. John Bonsell Passive Solar Research Group University of Nebraska-Lincoln Omaha campus and Richard

More information

Innovent LASER Packaged Fresh Air Conditioning Units

Innovent LASER Packaged Fresh Air Conditioning Units LASER Latent And Sensible Energy Reduction Latent And Sensible Energy Reduction For Outside Air Innovent LASER Packaged Fresh Air Conditioning Units Innovent LASER units provide both sensible and latent

More information

Analysis of data centre cooling energy efficiency

Analysis of data centre cooling energy efficiency Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe

More information

PHOTOVOLTAIC (PV) solar panels. Specification. Electricity - CE & ISO 9000 certified. 83W panel. 180W panel Maximum power:

PHOTOVOLTAIC (PV) solar panels. Specification. Electricity - CE & ISO 9000 certified. 83W panel. 180W panel Maximum power: PHOTOVOLTAIC (PV) solar panels Electricity - CE & ISO 9000 certified Photovoltaic solar panels convert sunlight into useful electricity. ZEDfabric supplies high quality mono-crystalline silicon cell PV

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Make Your Own SNOWBREEZE AC For Rs.1500 ($30) Can be converted into an energy saving and humidified room heater in winter

Make Your Own SNOWBREEZE AC For Rs.1500 ($30) Can be converted into an energy saving and humidified room heater in winter Make Your Own SNOWBREEZE AC For Rs.1500 ($30) Can be converted into an energy saving and humidified room heater in winter You can now assemble Snowbreeze, a mild air conditioner in your house with materials

More information

Water Fired Chiller/Chiller-Heater. WFC-S Series: 10, 20 and 30 RT Cooling

Water Fired Chiller/Chiller-Heater. WFC-S Series: 10, 20 and 30 RT Cooling Water Fired Chiller/Chiller-Heater WFC-S Series: 1, 2 and 3 RT Cooling W E A R E F R I E N D L Y T O T H E E A R T H Water Fired SINGLE-EFFECT Chiller or Chiller-Heater Absorption Principle Cooling Cycle

More information

Optimum Solar Orientation: Miami, Florida

Optimum Solar Orientation: Miami, Florida Optimum Solar Orientation: Miami, Florida The orientation of architecture in relation to the sun is likely the most significant connection that we can make to place in regards to energy efficiency. In

More information

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained).

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained). CITY OF MILPITAS Building & Safety Department 455 E. Calaveras Blvd. Milpitas, CA 95035 408-586-3240 www.ci.milpitas.ca.gov RESIDENTIAL AIR CONDITIONING, REPLACEMENT 1. PERMIT INFORMATION: The replacement

More information

Solving Persistent Moisture Problems and Moisture Damage

Solving Persistent Moisture Problems and Moisture Damage B etter buildings Solving Persistent Moisture Problems and Moisture Damage Summary This three-storey, 15-unit, 1,300 square metre (13,993 sq. ft) walk-up was built in 1958. In the 1980s, the building started

More information

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MF08CESWW. Voltage rating: 115V~60Hz Power rating : 800W

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MF08CESWW. Voltage rating: 115V~60Hz Power rating : 800W MODE ALARM Portable Air Conditioner OWNER S MANUAL Read these instructions before use 8 Model: MF08CESWW Voltage rating: 115V~60Hz Power rating : 800W Customer Support : 1-800-474-2147 For product inquiries

More information

DC REFRIGERATORS 12/24 VOLTS INSTALLATION AND OWNER S MANUAL

DC REFRIGERATORS 12/24 VOLTS INSTALLATION AND OWNER S MANUAL DC REFRIGERATORS 12/24 VOLTS INSTALLATION AND OWNER S MANUAL Service Information If service or parts are required, contact the nearest Norcold Service Center. To find an authorized Norcold Service Center

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

SERVICE MANUAL RESIDENTIAL ELECTRIC AND LIGHT DUTY COMMERCIAL ELECTRIC WATER HEATERS. Troubleshooting Guide and Instructions for Service

SERVICE MANUAL RESIDENTIAL ELECTRIC AND LIGHT DUTY COMMERCIAL ELECTRIC WATER HEATERS. Troubleshooting Guide and Instructions for Service RESIDENTIAL ELECTRIC AND LIGHT DUTY COMMERCIAL ELECTRIC WATER HEATERS SERVICE MANUAL Troubleshooting Guide and Instructions for Service (To be performed ONLY by qualified service providers) Models Covered

More information