1 Salt Lake County June 2010 Flooding and Restoration Little Cottonwood (LCC) and Big Cottonwood (BCC) Kade Moncur, PE, CFM Salt Lake County Engineering August 10 th - 12 th SLCo Symposium 2011

2 August 10 th - 12 th SLCo Symposium 2011

3 Cause of the June 2010 Flooding Cool temperatures during early to mid Spring, which delayed snowmelt runoff from LCC and BCC June rainfall along with rapidly increasing temperatures for several days in a row Resulting in higher than average spring runoff of LCC and BCC August 10 th - 12 th SLCo Symposium 2011

4 LCC & BCC Peak Flows Drainage Area FEMA FIS Q100 June 2010 Peak Q June 2011 Peak Q Flooding Source (sqmi) (cfs) (cfs) (cfs) Little Cottonwood Creek 46 A bo ve Wheeler F arm D ebris B asin - 1, B elo w Wheeler F arm D ebris B asin - 1, Big Cottonwood Creek 50 1, Overbank flooding of Little Cottonwood Creek below the Wheeler Farms Debris Basin will start around 700 cfs The 1983 flood peak runoff for LCC was 1,135 cfs. August 10 th - 12 th SLCo Symposium 2011

5 Emergency Response Efforts and Costs 2010 & 2011 Emergency Response Efforts 24-hr Flood Watch Sandbagging in Critical Areas Placement of Riprap Along the Channel Banks Clearing of Debris Blocking Culverts and Bridges 2010 Flood Response Cost: 2011 Flood Response Cost: $571, Agency Agency Total Unified Fire Authority $382, Unified Police Department $43, Midvale City $46, Sandy City $17, Murray City $2, Salt Lake City $ VECC $2, August 10 th - 12 th Total: SLCo $492, Symposium 2011

6 Disaster Relief No Relief from FEMA Needed Approximately 2.9 million in Damage to Public Infrastructure. Funding from NRCS under National Emergency Watershed Protection Program (EWP) 3.3 million for 2010 Maybe 3.3 million more in 2011 SLCo will match funding to 25% EWP funds will not be used for any of the following: Increase the pre-disaster capacity of a channel by constructing a new channel, enlarging the old channel or relocating the stream. Modifying the channel based upon regional curve data which maintains the same channel capacity upstream and downstream, and is necessary to stabilize the channel, is allowable. Sediment and debris removal is not considered new construction. August 10 th - 12 th SLCo Symposium 2011

7 Wasatch Resort August 10 th - 12 th SLCo Symposium 2011

8 3700 E to 4000 E Above Wasatch Blvd August 10 th - 12 th SLCo Symposium 2011

9 Upper Rails Debris Structure Below Wasatch Blvd. August 10 th - 12 th SLCo Symposium 2011

10 Cobble Canyon Lane to Willow Creek Drive August 10 th - 12 th SLCo Symposium 2011

11 LCC at Crestwood Park August 10 th - 12 th SLCo Symposium 2011

12 Through Union Park Ave & Fort Union Blvd August 10 th - 12 th SLCo Symposium 2011

13 LCC Wheeler Farm August 10 th - 12 th SLCo Symposium 2011

14 LCC Murray Pk tovine Street August 10 th - 12 th SLCo Symposium 2011

15 August 10 th - 12 th SLCo Symposium 2011

16 August 10 th - 12 th SLCo Symposium 2011

17 Elevation (ft) LCC Flood Damage Assessment Upper Reach Structure Capacity (Flood Insurance Study Model) Little Cottonwood Creek Plan: Little Cottonwood Creek 8/18/2010 Will ow Green Ci rcle Station (ft) August 10 th - 12 th SLCo Symposium 2011 Legend EG 500-year WS 500-year Crit 500-year EG 100 ENC EG 100-year WS 100 ENC WS 100-year EG 50-year WS 50-year EG 10-year Crit 100-year Crit 100 ENC WS 10-year Crit 50-year Crit 10-year 2 ft/s 4 ft/s 6 ft/s 8 ft/s 10 ft/ s Ground Levee Bank Sta Encroachment

18 LCC Flood Damage Assessment Upper Reach Structure Capacity August 10 th - 12 th SLCo Symposium 2011

19 LCC Flood Damage Assessment Field Reconnaissance August 10 th - 12 th SLCo Symposium 2011

20 LCC Flood Damage Assessment Damage Classification -- Debris August 10 th - 12 th SLCo Symposium 2011

21 LCC Flood Damage Assessment Damage Classification -- Erosion August 10 th - 12 th SLCo Symposium 2011

22 LCC Flood Damage Assessment Damage Classification -- Scour August 10 th - 12 th SLCo Symposium 2011

23 LCC Flood Damage Assessment Damage Classification Riprap and/or Rock Displacement August 10 th - 12 th SLCo Symposium 2011

24 LCC Flood Damage Assessment Damage Classification Structural Damage August 10 th - 12 th SLCo Symposium 2011

25 LCC Flood Damage Assessment Damage Classification Gabion Damage August 10 th - 12 th SLCo Symposium 2011

26 LCC Flood Damage Assessment Damage Classification -- Deposition August 10 th - 12 th SLCo Symposium 2011

27 LCC Flood Damage Assessment Damage Assessment Parameters Public infrastructure impact Pre-existing conditions contributing to damage Private encroachment Restoration work sites August 10 th - 12 th SLCo Symposium 2011

28 LCC Flood Damage Assessment Damage Prioritization High priority Debris pond deposition Structural damage Total gabion failure Severe undercutting Threat to adjacent home, infrastructure, etc. August 10 th - 12 th SLCo Symposium 2011

29 LCC Flood Damage Assessment August 10 th - 12 th SLCo Symposium 2011

30 LCC Flood Damage Assessment August 10 th - 12 th SLCo Symposium 2011

31 E to 4000 E Channel Repair

32 E to 4000 E Channel Repair - Flood

33 E to 4000 E Channel Repair - Post Flood

34 E to 4000 E Channel Repair - Construction

35 E to 4000 E Channel Repair - Construction

36 Upper Rails Access Road and Repairs Site 2 & 3 Access Road Upper Rails Repairs

37 2 & 3 Upper Rails Access Road and Repairs

38 2 Upper Rails Access Road Repairs - Construction

39 2 Upper Rails Access Road Repairs - Construction

40 2 Upper Rails Access Road Repairs - Construction

41 3 Upper Rails Repairs Pre Flood

42 3 Upper Rails Repairs Pre Flood

43 3 Upper Rails Repairs Flood

44 3 Upper Rails Repairs Construction

45 3 Upper Rails Repairs Construction

46 4 Cobble Canyon Ln. to Willow Creek Dr. Channel Repair

47 4 Cobble Canyon Ln. to Willow Creek Dr. Channel Repair

48 4 Cobble Canyon Ln. to Willow Creek Dr. Channel Repair

49 4 Cobble Canyon Ln. to Willow Creek Dr. Channel Repair -Flood

50 4 Cobble Canyon Ln. to Willow Creek Dr. Channel Repair -Flood

51 4 Cobble Canyon Ln. to Willow Creek Dr. Channel Repair -Flood

52 4 Cobble Canyon Ln. to Willow Creek Dr. Channel Repair -Construction

53 4 Cobble Canyon Ln. to Willow Creek Dr. Channel Repair -Construction

54 5 Highland Drive Gabion Repairs

55 5 Highland Drive Gabion Repairs

56 5 Highland Drive Gabion Repairs - Construction

57 5 Highland Drive Gabion Repairs - Construction

58 6 Waterside Cove Concrete Wall Repair

59 6 Waterside Cove Concrete Wall Repair

60 6 Waterside Cove Concrete Wall Repair - Flood

61 6 Waterside Cove Concrete Wall Repair - Flood

62 6 Waterside Cove Concrete Wall Repair - Construction

63 6 Waterside Cove Concrete Wall Repair - Construction

64 E Gabion Repair

65 E Gabion Repair - Post Flood

66 E Gabion Repair - Post Flood

67 E Gabion - Construction

68 E Gabion - Construction

69 8 Wheeler Farm Dredging

70 8 Wheeler Farm Dredging

71 8 Wheeler Farm Dredging - Flood

72 8 Wheeler Farm Dredging - Flood

73 8 Wheeler Farm

74 9 900 E Gabion Repair

75 9 900 E Gabion Repair

76 9 900 E Gabion Repair Flood

77 9 900 E Gabion Repair - Construction

78 9 900 E Gabion Repair Construction

79 9 900 E Gabion Repair Construction

80 10 Murray Park Channel

81 10 Murray Park Channel

82 10 Murray Park Channel Flood

83 10 Murray Park Channel Flood

84 10 Murray Park Channel Post Flood

85 10 Murray Park Channel Construction

86 10 Murray Park Channel Construction

87 Questions or Comments?

FLOOD PROTECTION BENEFITS

FLOOD PROTECTION BENEFITS IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the

More information

EMERGENCY WATERSHED PROTECTION

EMERGENCY WATERSHED PROTECTION Understanding the EMERGENCY WATERSHED PROTECTION Program EWP Program Overview Natural Resources Conservation Service (NRCS) administers the EWP Program EWP responds to emergencies created by natural disasters,

More information

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer

More information

Mitigating Post-Fire Runoff from the Schultz Fire. ASCE/ASHE 2015 Annual State Conference

Mitigating Post-Fire Runoff from the Schultz Fire. ASCE/ASHE 2015 Annual State Conference Mitigating Post-Fire Runoff from the Schultz Fire ASCE/ASHE 2015 Annual State Conference Revisiting the Schultz Fire Burned ~15,000 acres (23.4 sm) in June/July 2010 2 Revisiting the Schultz Fire Burn

More information

Wildfire & Flash Flood Recovery Emergency Watershed Protection (EWP) Flood Mitigation Efforts April 2014. Fall 2013

Wildfire & Flash Flood Recovery Emergency Watershed Protection (EWP) Flood Mitigation Efforts April 2014. Fall 2013 Wildfire & Flash Flood Recovery Emergency Watershed Protection (EWP) Flood Mitigation Efforts April 2014 Fall 2013 Recovery Specific to Incident Recovery Efforts Depend on: Population Impacted Topography

More information

Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners

Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners In recent years, multiple flood events in the New York City

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012 King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers Public Meeting December 5, 2012 Goals of the Presentation Cedar and Sammamish R. Plan Update Context - Brief summary info about the

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

The answers to some of the following questions are separated into two major categories:

The answers to some of the following questions are separated into two major categories: Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the

More information

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town MEETING NOTES April 16, 2015 6:00 8:00 PM VERI Project Overview With funding from the US Economic Development Administration

More information

Disaster Recovery Managing and Leveraging Multiple Funding Sources

Disaster Recovery Managing and Leveraging Multiple Funding Sources Disaster Recovery Managing and Leveraging Multiple Funding Sources Jordan Williams, CFM June 3, 2015 Overview Programs FEMA Public Assistance (PA) and Hazard Mitigation Grant Program HUD s Community Development

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

Emergency Streambank Restoration/Stabilization. Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance

Emergency Streambank Restoration/Stabilization. Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance Emergency Streambank Restoration/Stabilization Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance Due to the severity of the recent rains and flooding occurrences, the

More information

Attendees: Notes: Affiliation. Boschmann, Nate. Kampf, Stephanie Kovecses, Jen. Rhoades, Chuck Strevey, Hally

Attendees: Notes: Affiliation. Boschmann, Nate. Kampf, Stephanie Kovecses, Jen. Rhoades, Chuck Strevey, Hally CPRW/Co Conservation Exchange Science & Monitoring Team Meeting Tuesday, 9/1/2015 9:00 to 12:00 pm Innosphere Building 320 East Vine Drive Fort Collins, CO North Conference Room Attendees: Notes: Name

More information

Building Olive s Flood Resiliency

Building Olive s Flood Resiliency Building Olive s Flood Resiliency Informed Flood Mitigation Planning The Local Flood Analysis Flood Advisory Committee Meeting #1 Town of Olive s Community Room 4/14/15 What is an LFA? 1. Uses science

More information

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway Presentation to the Inland Waterways Users Board Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway by Gary Loss, P.E. Rock Island District July 13, 2006 Chicago Sanitary and Ship Canal A

More information

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning

More information

California Alluvial Fan Task Force

California Alluvial Fan Task Force California Alluvial Fan Task Force County of San Diego Alluvial Fan Flooding and Risk Reduction Sara Agahi, PE, CFM January 4, 2008 Outline of Presentation Show location of San Diego County Alluvial Fan

More information

Local hazard mitigation plans Disaster recovery plans Flood preparedness activities/public education Mitigation projects (construction) Post-disaster

Local hazard mitigation plans Disaster recovery plans Flood preparedness activities/public education Mitigation projects (construction) Post-disaster Local hazard mitigation plans Disaster recovery plans Flood preparedness activities/public education Mitigation projects (construction) Post-disaster recovery and mitigation efforts Others? We have a significant

More information

Homeowner s Guide to Drainage

Homeowner s Guide to Drainage Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage

More information

City of Austin Stream Restoration Program Mid-Atlantic Stream Restoration Conference, Rocky Gap, MD November 2011

City of Austin Stream Restoration Program Mid-Atlantic Stream Restoration Conference, Rocky Gap, MD November 2011 Welcome City of Austin Stream Restoration Program Mid-Atlantic Stream Restoration Conference, Rocky Gap, MD November 2011 Morgan Byars, P.E. City of Austin Watershed Protection Department Environmental

More information

Concepts for Post Flood River Corridor Restoration

Concepts for Post Flood River Corridor Restoration Concepts for Post-Flood River Corridor Restoration Dave Rosgen, P.H., Ph.D. Wildland Hydrology Fort Collins, Colorado A Special Thanks to our Sponsors: Copyright 2014 Wildland Hydrology 1 Workshop Goals

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

Wildfire & Flash Flood Recovery NACo Justice & Public Safety Symposium January 2014

Wildfire & Flash Flood Recovery NACo Justice & Public Safety Symposium January 2014 Wildfire & Flash Flood Recovery NACo Justice & Public Safety Symposium January 2014 Fall 2013 Jim Reid Executive Director Public Service El Paso County, Colorado Recovery Specific to Incident Recovery

More information

Neversink River East Branch

Neversink River East Branch Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station

More information

IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA

IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA David Chastant AUTHORS:DeKalb County, 330 West Ponce De Leon Ave, Decatur, Georgia 30030 REFERENCE:Proceedings

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

Topic 8: Open Channel Flow

Topic 8: Open Channel Flow 3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

Post-Flood Assessment

Post-Flood Assessment Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of

More information

BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT

BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT Department of Environmental Conservation Region 7 Counties: Broome, Cayuga, Chenango, Cortland, Madison, Onondaga, Oswego, Tioga, Tompkins Operated and Maintained

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

TROPICAL STORM ALLISON. Prepared by: John P. Ivey, PE, CFM Halff Associates, Inc. ASCE

TROPICAL STORM ALLISON. Prepared by: John P. Ivey, PE, CFM Halff Associates, Inc. ASCE TROPICAL STORM ALLISON June 5-9, 5 2001 Prepared by: John P. Ivey, PE, CFM Halff Associates, Inc. ASCE Spring 2002 Meeting Arlington, Texas March 27-30, 2002 Tropical Storm Allison (TSA) The most extensive

More information

RESTORING streams to reduce flood loss

RESTORING streams to reduce flood loss RESTORING streams to reduce flood loss Flood Loss Reduction the Natural Way Flood disasters have become a regular Floods can devastate local occurrence. One in your community may have communities. threatened

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

Floodplain Mapping. Vision. Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts

Floodplain Mapping. Vision. Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts Floodplain Mapping 28 General Approaches to Reducing Flooding Risks Reducing Upstream

More information

Assessing Rivers for Restoration Purposes. Ann L. Riley Waterways Restoration Institute

Assessing Rivers for Restoration Purposes. Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration Purposes Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration Purposes Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Shooks Run Drainage Study Basic Terminology

Shooks Run Drainage Study Basic Terminology Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs

More information

How To Check For Scour At A Bridge

How To Check For Scour At A Bridge Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway

More information

Swannanoa River Flood Risk Management Study

Swannanoa River Flood Risk Management Study Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River

More information

FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...

More information

Town of Amherst Flood Plan Annex

Town of Amherst Flood Plan Annex Town of Amherst Flood Plan Annex The following document is an annex to the Town of Amherst Disaster Plan and is specifically used as a guideline for Flooding events Flood Plans can enable a flexible response

More information

Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012

Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012 Mark Shea Watershed Planning Supervisor August 23, 2012 Fire Started: Saturday June 23, 2012 Fire Progression June 23 2500 acres June 24 3600 acres June 25 4500 acres June 26 15622 acres June 27-28

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

LOS ANGELES COUNTY S FLOODING HISTORY:

LOS ANGELES COUNTY S FLOODING HISTORY: LOS ANGELES COUNTY S FLOODING HISTORY: Since 1975, Los Angeles County has experienced twelve federally, declared flood disasters, with three of those disasters coming under El Niño conditions (1983, 1998,

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape

Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape Spring 2014 The flood of September 2013 changed the landscape of the Boulder and Canyon Lakes Ranger Districts.

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Flood Risk Reduction and Streambank Restoration

Flood Risk Reduction and Streambank Restoration Mission Creek: Flood Risk Reduction and Streambank Restoration On June 19th, 2012, the residents of Duluth, Minnesota experienced a storm event for the record books. Over the course of 24 hours, approximately

More information

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in

More information

Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12)

Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12) Appendix C Project Opportunities Middle Twisp River (RM 7.8 18.12) This table describes project opportunities by project area. Locator maps of the project opportunities are included below the table. Reach

More information

HEADWATERS CONTROL STRUCTURE MANAGEMENT POLICY AND OPERATING PROCEDURES

HEADWATERS CONTROL STRUCTURE MANAGEMENT POLICY AND OPERATING PROCEDURES HEADWATERS CONTROL STRUCTURE MANAGEMENT POLICY AND OPERATING PROCEDURES INTRODUCTION The Headwaters Control Structure at Gray's Bay is the outlet of Lake Minnetonka to Minnehaha Creek. It is an adjustable

More information

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas Flood Protection in Garland Past, Present, and Future Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas A few facts about Garland: Originally incorporated in 1891 Population 226,876 (2010

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

Saving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS)

Saving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS) Saving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS) Today s Discussion 1. FEMA s Flood Insurance Program: A Brief Overview 2. Flood Insurance Rates: Are they rising?

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

APPLICATION PROCESS FOR LAND DISTURBING PERMIT PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

The Teton Creek Restoration Project Summary:

The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens

More information

2012 Program Report. Agricultural Group Drainage Program

2012 Program Report. Agricultural Group Drainage Program 2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout

More information

A. Flood Management in Nevada

A. Flood Management in Nevada Nevada Division of Water Planning A. Flood Management in Nevada Introduction Flooding has been a concern for Nevada communities since the first settlers moved to the territory in the mid-1800 s. Fourteen

More information

ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT

ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT Joy D. Blackmon, P.E. Director, County Engineer Public Works Department ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT EXECUTIVE SUMMARY One year after the devastating April 2014 floods hit

More information

Community Outreach Kickoff Summaries. Boulder Creek and South Boulder Creek Meeting held Jan. 8, 2014, approximately 80 attendees

Community Outreach Kickoff Summaries. Boulder Creek and South Boulder Creek Meeting held Jan. 8, 2014, approximately 80 attendees Boulder Creek and South Boulder Creek Meeting held Jan. 8, 2014, approximately 80 attendees Key issues Discussed Roads & Access Damaged roads. The Oil & Gas company access roads acted like dams Public

More information

City of Salinas Flood Response Preparations

City of Salinas Flood Response Preparations City of Salinas Flood Response Preparations Winter Preparations Goals for 2015/2016 Community Preparedness in the event of flooding Media cooperation on safety and preparedness, public information sharing

More information

COLORADO FRONT RANGE FLOOD OF 2013:

COLORADO FRONT RANGE FLOOD OF 2013: USDA NATURAL RESOURCES CONSERVATION SERVICE COLORADO COLORADO FRONT RANGE FLOOD OF 2013: Peak Flow Estimates at Selected Mountain Stream Locations December 2013 James Creek in Jamestown North Fork of the

More information

NYSDEC Optional Additional Language Model Local Law for Flood Damage Prevention Optional Additional Language

NYSDEC Optional Additional Language Model Local Law for Flood Damage Prevention Optional Additional Language NYSDEC General Comments. The contains language that complies with the floodplain management requirements of the National Flood Insurance Program (NFIP) contained in federal regulations 44 CFR 60.3 through

More information

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently

More information

DRAFT SOUTH FORK SKYKOMISH RIVER

DRAFT SOUTH FORK SKYKOMISH RIVER DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach

Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach October 5 2011 Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach 2011 SESWA Annual Conference 2011 Southeast Stormwater Associated Annual Conference Presentation Overview

More information

Drainage Design and Stormwater Pollution Prevention Manual

Drainage Design and Stormwater Pollution Prevention Manual , Texas Drainage Design and Stormwater Pollution Prevention Manual 2001 Teague Nall and Perkins, Inc. Engineers Consultants Fort Worth Irving Denton CITY OF DESOTO DRAINAGE DESIGN AND STORM WATER POLLUTION

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

a '3 m. . Washout of guardrails and mad surface. . Upper Darby, Peizxylvania 19062

a '3 m. . Washout of guardrails and mad surface. . Upper Darby, Peizxylvania 19062 UNITED STATES DEPART-!E?n OF AGRICULTUXE Soil Conservztior Service Regional Technical Service Center Upper Darby, Peizxylvania 19062 June 30, 1969 TSC TECHNICAL NOTE - WATERSHEDS UD-22 SUBJECT: Economics

More information

Sims Bayou Federal Flood Damage Reduction Project

Sims Bayou Federal Flood Damage Reduction Project Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD

More information

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N Submitted by the National Park Service Point Reyes National Seashore Point Reyes Station, California, 94956 Project Description: Muddy

More information

7.0 Stream Restoration

7.0 Stream Restoration 7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational

More information

1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal

1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal Lecture 21 Culvert Design & Analysis Much of the following is based on the USBR publication: Design of Small Canal Structures (1978) I. Cross-Drainage Structures Cross-drainage is required when a canal

More information

Presented by: Michael DePue, PE, CFM Annual Georgia Association of Floodplain Management Conference Lake Lanier Islands, Georgia March 23, 2010

Presented by: Michael DePue, PE, CFM Annual Georgia Association of Floodplain Management Conference Lake Lanier Islands, Georgia March 23, 2010 Flood Types and Characteristics Presented by: Michael DePue, PE, CFM Annual Georgia Association of Floodplain Management Conference Lake Lanier Islands, Georgia March 23, 2010 Agenda Why study flood types?

More information

St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m.

St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m. St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m. City Council Study Session Room City of Longmont Civic Center, 350 Kimbark Street, Longmont Minutes 1. Introductions a. Jeff Crane

More information

Town of Union Community Rating System News

Town of Union Community Rating System News own of Union Community Rating System News own of Union Department Of Planning FEMA BUYOU AND CDBG DR ACQUISIION FOR REVELOPMEN PROGRAMS NOW COMPLEED I n November of 2013 the own of Union began acquiring

More information

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 PRESENTATION TOPICS Analysis Objectives Analysis Dam Removal Plan Dam Remediation Plan Effects Analysis Permit Requirements Decision

More information

Development of Technical Data For Long Term Flood Solutions For the Red River Basin

Development of Technical Data For Long Term Flood Solutions For the Red River Basin IDENTIFYING WHAT WE DIDN T KNOW Development of Technical Data For Long Term Flood Solutions For the Red River Basin LTFS Study Area U.S. Portion of Red River Basin (MN, ND & SD) Main Stem Red River Tributaries

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA

EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA René Leclerc Geomorphologist Robert C. MacArthur, Ph.D., P.E. Principal Headwaters

More information

Burnt River Black River and Gull River Flood Contingency Plan

Burnt River Black River and Gull River Flood Contingency Plan Burnt River Black River and Gull River Flood Contingency Plan Objective: The objective of this plan is to preplan and prepare for flooding events in the Burnt River, Black River and Gull River area of

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

Bentle Branch Storm Water and Stream Bank Stability Study ABSTRACT

Bentle Branch Storm Water and Stream Bank Stability Study ABSTRACT Bentle Branch Storm Water and Stream Bank Stability Study Walter Skipwith, PE 1, Jeffrey Alvarez, EIT 2 and Dr. Peter Allen, PhD 3 ABSTRACT In the summer of 2004, flooding caused 2 deaths and an estimated

More information