1 CUSTOMER-FACING PERFORMANCE MEASURES CUSTOMER FEEDBACK AND RESPONSE Transpower New Zealand Limited March 2013 Customer-facing performance measures Transpower New Zealand Limited All rights reserved. i

2

3 Table of Contents Executive Summary... iv 1 Introduction and purpose Note on terminology Overview of original proposal Overview of feedback Our general approach Our proposed measures Proposed categories Number and duration of unplanned interruptions Information provision Comparisons with distribution Other issues and possible measures Voltage sags Economic impact Planned outages and the impact on the market Risks of non-supply Qualitative customer service Feedback: other issues Customer-facing performance measures Transpower New Zealand Limited All rights reserved. iii

4 Executive Summary We are developing new measures and targets for grid performance based on what matters to our customers and to end consumers. We published proposed new measures at the end of October 2012 and invited customers and their representatives to provide feedback either at meetings or in writing. This document provides a summary of customer views on the proposed measures and targets. It outlines the way we intend to develop grid performance measures in light of the feedback. We experienced widespread support for our approach and the measures we proposed. The key measures focus on the number and duration of interruptions and the information we provide during interruptions. Customers provided suggestions for improving the measures and highlighted other areas that are important to them. Key issues raised by customers were: Whether interruptions caused by extreme events and those that are less than one minute long should be included. The importance of power quality, in particular voltage sags. The impact on the market of both planned and unplanned outages this was of particular importance to generator-retailers. The financial impact of interruptions. Information on the risks of non-supply and improved communication after interruptions. A separate paper describes our revised proposal, how the performance measures fit with our next regulatory control period proposal and the next steps. It is available on our website iv Customer-facing performance measures Transpower New Zealand Limited. All rights reserved.

5 1 Introduction and purpose We are introducing new measures and targets for grid performance based on what performance matters to our customers and end consumers. These targets will be used to report our performance, to prioritise our expenditure and to inform the revenue incentive regime applying to Transpower in our next regulatory control period ( ). We prepared a draft proposal 2 for review by our customers and end-consumer representatives in October We met with representatives of 30 customers over a series of meetings, and received written feedback from 13 parties. We also met with Commerce Commission representatives to discuss the proposal and consultation process. Written feedback is available on our website 3. Our customers generally supported the overall approach we are taking in introducing measures focusing more directly on the service that customers receive and the shift away from system average-based measures. Customers welcomed the opportunity to comment and we would like to thank all those customers and their representatives for their time and expertise. These performance measures involve a change in emphasis for us and the consultation has been a critical part of making sure that we target efforts and spending on performance that our customers value. This paper summarises the feedback, discusses issues raised by customers or consumer representatives and outlines the way we intend to progress these measures and targets in light of the feedback. A separate paper describes our revised proposal, how the performance measures fit with our next regulatory control period proposal and the next steps. It is available on our website Note on terminology In our proposal we used the term outage to mean an event that causes a loss of supply or loss of generation connection. We used this term because we thought it was more relevant to consumers and is often used by distributors in communication with their customers. This confused some customers because the term outage is often used to mean when assets are out of service, but there is no loss of supply, and it can be used to describe both planned and unplanned outages. The term interruption is used internationally and by the Commerce Commission to refer to a loss of supply. 2 Transpower: Customer-facing grid performance measures consultation paper, October 2012, available at: ibid Customer-facing performance measures Transpower New Zealand Limited. All rights reserved. 5

6 In this paper we have reverted to the standard terminology to avoid confusion. An interruption is a loss of supply; an outage is an equipment outage. Both interruptions and outages can be planned or unplanned. 1.2 Overview of original proposal The proposal that we set out in our consultation paper described performance measures and targets that are significantly different from our existing measures. The main differences were: A change in emphasis from measures that are focused on the performance of our assets to measures of the service received by customers. Different targets reflecting different categories of customers at grid connections. Forward-looking targets that reflect what customers expect rather than targets based on historical performance. The measures focused on the ability of the grid to transmit power without interruption and not on power quality aspects of grid performance or power losses or constraints. Table 1 provides an overview of the original proposal. For a more detailed description of the proposal refer to the consultation paper 5. Table 1 Overview of original proposal Proposed customer-facing measures (Measured at the customer point of service) Number of unplanned interruptions Average and 90 th percentile duration of unplanned interruptions Information provision during unplanned interruptions: - Time to provide first notice - Time to provide updates - Accuracy of restoration estimates Comparisons with distribution companies Proposed long-term targets Different for different categories: highpriority, important, standard, generator and N security connections. Common targets for all customers. A national target for number and duration of unplanned interruptions relative to distribution networks Customer-facing performance measures Transpower New Zealand Limited. All rights reserved.

7 1.3 Overview of feedback Both the customer meetings and the written feedback support the direction and emphasis that we proposed in the consultation paper. Distributors and large users support concentrating on the number and duration of interruptions but some have suggested improvements or further measures. Generator-retailers also consider these measures are appropriate for off-take, but want to see development of market impact measures and consideration of planned outages. All customers value the information provision measures. For these reasons, we will continue with the core parts of our published proposal measures focused on the number of interruptions, the duration of interruptions and information provision. We will refine these measures to reflect suggestions. In addition, we will look at ways to develop our performance measures and targets in the future to respond to customer feedback through consultations and trials. The three following sections summarise customers views and our response. Customer-facing performance measures Transpower New Zealand Limited. All rights reserved. 7

8 2 Our general approach Customer views There was significant support from distributors and large users for our overall approach which involves: a change in emphasis to measures of the service received by customers rather than system averages using different targets for different categories of customers using forward-looking targets that reflect what customers expect rather than targets based solely on historical performance, and concentrating on the number and durations of unplanned interruptions. The generator-retailers supported the approach for off-take, but would like to see measures that reflect the impact of both planned and unplanned outages on the market. Individual customers made the following comments about our general approach. Measures should be meaningful to Transpower and our contractors as well as to customers. Measures should encourage learning from all events, not just high profile events. We should be mindful of the end-plan and trial reporting and measures that customers would like to see in the future Our response Reflecting on the feedback, we consider that our measures and targets should first be meaningful to our customers and ensure we are managing our assets to deliver the service valued by our customers. They should focus on measurable outcomes, not on inputs. Efforts to achieve these outcomes will be embedded into our asset management approach and will be important in driving improvements. We have structured the measures so that they are meaningful to both us and our contractors. 8 Customer-facing performance measures Transpower New Zealand Limited. All rights reserved.

9 3 Our proposed measures 3.1 Proposed categories Customer views: categories Customers were generally supportive of introducing categories for different customer loads. We proposed a relatively simple method of categorisation that most customers or their representatives thought was broadly sensible. Customers widely supported treating N security sites separately. However, customers made the following comments or suggestions: Finer differentiation or use of an economic metric. Some customers said we should introduce further categories and one suggested we should have individual customer targets. Some recommended a closer alignment of the categories with an economic metric such as the Value of Lost Load (VOLL). Price-quality trade-off. A small number of customers commented that with different performance categories customers should be able to make a pricequality trade-off. Feedback on categories and targets. Some customers asked for more transparency on how we will determine categories and the opportunity to discuss their categories and targets with us before they are finalised. Use of the term essential. At one of the customer meetings, customers pointed out that ranking a point of service as essential implies that it should never lose supply. One customer suggested high priority may be better. Generation targets. Two generators objected to the generator targets being set at the same level as the standard off-take categories. One generator suggested that the generator performance targets should reflect the different securities at generator points of connection and the other considered that the targets should be the same as the important or essential load categories, as least for those Grid Injection Points (GIPs) where the loss of generation would have a significant impact on the market (eg 100 MW or greater) Our response: categories Finer differentiation or an economic metric We think the proposed three off-take and one generator categories, with particular consideration of N security sites, is a pragmatic way to introduce different targets for different customers. It is easily understood and relevant to customers as well as being relatively easily translated into objectives for our asset management strategy, staff and contractors. Some customers suggested using size of load (eg peak demand in MW) or value of the load (ie based on some value of VOLL) as the basis for defining criticality. Using size of load alone does not take into account the different values of the supply to different customers. Explicitly using VOLL values that reflect the different values to Customer-facing performance measures Transpower New Zealand Limited. All rights reserved. 9

10 different customers may be theoretically correct but is limited by the approximations inherent in VOLL calculations and does not capture effects not currently considered in VOLL calculations. VOLL will vary hugely by season, time, length of outage and type of customer and we doubt that the classification which results would be either significantly different or any more correct. The Electricity Authority is undertaking a study to determine a value, or range of values, for VOLL that is relevant to New Zealand electricity consumers. When this is completed, we will consider integrating VOLL into the off-take criticality framework - providing the overall VOLL framework is sufficiently robust. In the meantime, our proposed categories provide a proxy for economic impact. They take into account the number of customers connected at a point, whether there are large industrial customers or CBDs connected for whom an interruption is more costly, and whether there are loads of national significance connected. Price-quality trade-off The nature of transmission networks means that the same assets are often used to supply many customers, and the grid is designed as an interconnected network. This makes it difficult to provide different levels of service at different points of within the grid, beyond negotiated connection assets. The different categories may invite useful discussions on price and quality and potentially open up further development of price-quality trade-offs. Feedback on categories and targets During the consultation period, we published a spreadsheet showing the full list of points of service and the method of allocating categories to points of service. We received very little feedback on the detail in the spreadsheet. We have made this spreadsheet available again and invite more detailed feedback by Tuesday 16 April A copy of the spreadsheet including details of how to provide feedback are provided on our website 6. Use of the word essential We agree that high priority is a better term to describe the essential category. Generator targets We have ignored the nature of the network when categorising off-take points of service and considered solely the nature of the customer and therefore the impact of an interruption. We will do the same for generation. However, there is already some reflection of the different security levels at different generators as N and N-1 points of service are treated differently as they are for off-take. We will set the generator targets at the level of the standard off-take category rather than important or high priority as generally the impact of an interruption on a Customer-facing performance measures Transpower New Zealand Limited. All rights reserved.

11 generator is lower than on off-take as foregone revenue is partly offset by avoided costs. The instantaneous reserves regime already provides financial incentives on Transpower to maintain the performance of grid assets connecting large generating units. The causer of under-frequency events is liable for the event charge. Transpower is the causer when the unplanned outage of transmission assets causes the under-frequency event through the disconnection of generation. 3.2 Number and duration of unplanned interruptions All customers supported the use of the number and duration of unplanned interruptions as performance measures. Customers made the following comments or suggestions on three key aspects of the definitions of the two measures. Whether interruptions less than one minute should be included. Whether interruptions caused by extreme events should be included. How back-feeding and load management should be considered when measuring the duration of an interruption Customer views: less than one minute interruptions Our consultation paper proposed that only those unplanned interruptions longer than 1 minute should be reported and included in the targets. This would be consistent with the definition of an interruption for information disclosure and other Commerce Commission and Electricity Authority purposes. It is clear from the feedback that shorter interruptions are a problem, particularly for both directly connected large users and for industrial and other customers embedded in the distribution networks. For example, Powerco noted that: for some major process-intensive industrial connections, momentary outages of as little as thirty seconds can have a substantial negative impact on their business operations. NZSteel commented: after only 0.5s, NZSteel loses load and the damage is done. The large users and a number of distributors all requested that interruptions less than one minute be included. Other distributors considered that definitions of interruptions should be consistent with those used by distribution companies the SAIDI and SAIFI measures which exclude interruptions less than one minute Our response: less than one minute interruptions Over the last five years, we have recorded 289 interruptions of less than one minute these are known as momentary interruptions. This compares with 712 longer interruptions over the same period. We do not measure the length of interruptions less than one minute and they are recorded with a duration of zero (All durations are rounded down to the nearest minute). However, most 281 out of 289 of the momentary interruptions were the result of protection systems acting to remove faulted circuits from service followed by Customer-facing performance measures Transpower New Zealand Limited. All rights reserved. 11

12 a successful autoreclose operation. The vast majority of these momentary interruptions will have durations of 1 to 2 seconds 7. These momentary interruptions generally have little impact on all but sensitive consumer loads. We report these momentary interruptions to our customers under the Benchmark Agreement requirements, and we will continue to do so. At this stage, we will not include these interruptions in our targets, but will investigate how we could do so in the future. Customer concern about momentary interruptions was related to concerns about voltage sags (which are covered in section 4.1.) Momentary interruptions and voltage sags can have similar impacts on our customers. We will set up an industry working group to look at how we might introduce voltage sag, momentary interruptions and other power quality reporting Customer views: extreme events Our proposal raised the issue of whether we should include unplanned interruptions caused by extreme events in our measures and targets. Customers held different views but generally agreed that whether the events were included or excluded, we should provide information on them. For example Meridian commented: We consider it is reasonable to exclude outages caused by extreme conditions with respect to targets for outage frequency and duration, however we consider targets relating to information provision should still apply. Further, we consider that it is important to measure the frequency and duration of outages caused by extreme conditions in order to track long-term system resilience, even if such measures are not used as targets. Customers supporting the inclusion of the events said that since, in at least some cases, an economic solution to mitigating the impact of extreme conditions can be found, these interruptions should be included in the performance measures. While it is accepted that extreme conditions can and do have an impact on interruptions, it is possible to at least mitigate the impact of some extreme conditions. Customers supporting the exclusion of the events recognised that in some cases such as earthquakes our assets are not designed to withstand severe events. To exclude extreme events, we would need to develop a definition of what comprises an extreme event. Customers had suggestions about how to define an extreme event, however some noted the difficulties in agreeing a definition and that the present extreme events regime used by the Commerce Commission is causing problems for distributors Our response: extreme events We agree that we should report all events, and on balance consider that it is appropriate to include all events in our targets partly due to the problems in defining 7 The majority of the reclose time delays on our protection relays are set for 1s. 12 Customer-facing performance measures Transpower New Zealand Limited. All rights reserved.

13 extreme events and because it is possible to take account, at least partly, for extreme events in our asset management Customer views: measuring duration (back-feeding and load management) We sometimes restore supply gradually through load management or a staged restoration. In other cases, distributors have arrangements in place to back-feed from other grid connections or from generators within their own network until we can restore supply. Our proposal raised the issue of how to measure the duration of an interruption. Customers responded with a range of suggestions: Interruption duration should end when the issues with Transpower assets are resolved. Duration should not be measured to the time when restoration is achieved through customer back-feeds and load management as this distorts Transpower s interruption duration statistics. The duration should be measured from when the customer loses supply to when the customer has full supply restored (ie no load management is required, but supply may be by back-feed or alternate configuration). Transpower could report to the customer when the supply is restored, but have an internal KPI to restore assets to service. It would be more appropriate to weight the restoration based on time to restore and customers affected rather than when first restoration occurs. In addition, customers made related comments: Back-feeding through the network places strain on distributor equipment which has a cost. If customers incur an additional cost of back-feeding or load management as a result of a transmission service fault, then that cost should be measured. The measurement should be in economic terms; though a time lapsed measure could be designed initially. Do unplanned interruptions include planned interruptions that are extended? Where a distribution solution is used to provide supply an avoided customer minutes could be recorded to provide an indication of how severe the interruption could have been if a distribution solution was not available/present Our response: measuring duration (back-feeding and load management) We record two different durations; initial duration (which we generally report) and final duration. Initial duration is the elapsed time until the first significant tranche of customers have their supply restored, whether through bring assets back into service or through backfeeding. This is typically at least 50 percent of the load lost and possibly 80 to 100 percent. Customer-facing performance measures Transpower New Zealand Limited. All rights reserved. 13

14 Final duration is the elapsed time until, for example, the last feeder is closed or, if restoration is by backfeed, all of our assets are back in service. Back-feeding or load management is often a cost-effective alternative to investing in N-1 reliability. We discuss these options with customers, and take account of them in our planning. There may be a cost associated with providing the backfeed, but there is also the avoided cost of paying for higher security. For this reason, it makes sense to measure the duration of an interruption to the initial restoration even though our assets may not be restored to full operation. That reflects the outcome to the customer: to use an intermediary measure, such as our restoration time, could encourage us to invest when there is no change in outcome to the customer. In addition, the nature and speed of our response to an interruption is sometimes governed by the availability of a backfeed, so the duration to final restoration might be longer than would be the case without a backfeed being in place. We will continue to measure final duration but propose to continue reporting initial restoration. Unplanned interruptions include all interruptions with less than 24 hours notice. Planned interruptions that overrun are not included in the unplanned interruptions. It is appropriate to report planned overruns separately from unplanned interruptions. Planned outage overruns are covered in more detail in section Information provision Customer views: information provision Customers strongly valued clear and timely information provision and generally supported the proposed information provision measures and targets. Some noted that the quality of the information is more important than the timing and that information should be given as soon as it is available regardless of targets. Customers made the following suggestions: Information should include information on what is the worst that can happen. There should be a target for providing post-event information including what happened and what we are doing to prevent it happening again. There is a need to coordinate and avoid parallel paths of communication (distributors/retailers/system operator/grid operator). Information should be available even if it is not in the customer s area as out-ofarea customers may experience voltage sags. Information provision targets should also track communications when planned outages are delayed unexpectedly. Although customers widely supported the proposed measures, they differed in their views on the proposed targets. Here is a sample of views: The proposed targets for accuracy of restoration time might be too challenging with one customer suggesting that a window of two hours is more realistic. 14 Customer-facing performance measures Transpower New Zealand Limited. All rights reserved.

15 The target should be to provide some information within 15 minutes, with updates every 30 minutes. 30 minutes to get information on estimated restoration time is too long as most interruptions are restored in less than 30 minutes. Provision of information about the interruption as soon as possible after the event is critical preferably in a timeframe much less than the 15 minutes proposed Our response: information provision We propose to report the information provision measures for unplanned interruptions as described in the consultation paper which were: Time to provide an initial notice. Time to provide follow-ups. Accuracy of restoration estimate. We will set targets for the first of these two measures, but at this point we are proposing to report the accuracy of the restoration estimates without targets. We expect that reporting these measures will provide both us and our customers with useful information and will encourage discussions around the types of information customers value during unplanned interruptions. Reporting accuracy of restoration estimates is new for us and we want to build experience in reporting this measure. Setting targets now may drive compliance with targets at the expense of quality and timely information. Customers provided useful feedback on other aspects of our communication and we propose to include these concerns in a wider review of what we communicate and how we communicate to customers. The review should involve: discussions with customers on coordination of communication and on post-event information, and discussions with the Electricity Authority on the requirements set out in the Benchmark Agreement and Part 12 of the Electricity Industry Participation Code. 3.4 Comparisons with distribution Customer views We received mixed views on this proposed measure. Some customers saw these measures as interesting but we received the following feedback: Cross-New Zealand averages hold little relevance; different regions may have very different performance. We could consider comparisons by distribution company region, but these may not be statistically significant. It is not clear how these measures would influence behaviour. If these measures are to be used we need to ensure we are comparing like with like. Horizon summed up the pitfalls in interpretation of this measure: With the addition of relative cost comparisons the measure may help inform future investment decision making, however without access to a lot of background material it will be interpreted incorrectly. For example it does not provide a valid Customer-facing performance measures Transpower New Zealand Limited. All rights reserved. 15

16 comparison of relative asset performance due to the differing nature of transmission and distribution grids Our response There are some practical problems in calculating these measures. As they are comparisons with distribution company numbers and durations of interruptions we need to ensure that we are comparing like with like. For example, SAIDI and SAIFI calculations require knowledge of the number of ICPs (Installation Control Points) connected to the point of service. For small remote points of service this is sometimes straightforward, but if the customer has a meshed system and routinely transfers customers to one point of service or the other, we would not know how many ICPs are affected. Our discussions with customers suggested that it is unlikely that these measures will provide information we or our customers can usefully act on. We are not proceeding with these measures. 16 Customer-facing performance measures Transpower New Zealand Limited. All rights reserved.

17 4 Other issues and possible measures 4.1 Voltage sags Customer views: voltage sags A number of customers cited power quality and voltage sags in particular as just as important an issue as losses of supply. Voltage sags are caused mainly by faults or large, sudden changes in load. A fault can depress voltages a long distance away for up to several seconds until the fault is removed. Large changes in load can cause voltage drops which will remain until voltage regulating equipment can act to improve voltages. Some equipment and appliances cannot ride out these voltage sags and either operation is affected for a short time, protection systems trip, or the equipment itself fails. These types of voltage sags can occur more frequently than full losses of supply. This comment from Carter Holt Harvey was typical of comments from large users: For many customers, a momentary loss or even a momentary voltage dip has an impact on them that is similar to a total loss of supply of a minute or more so these types of outage should be included in any assessment or measure of outages. Whilst voltage quality is not a problem for all distributors, a number gave examples of problems: a voltage fluctuation can turn lights off in freezing works causing injuries, cause flaws in weave at a woollen mill, or cause wastage for a preserving works. Distributed generation can also be affected. One customer said that it is essential to include measures on voltage sags and suggested reporting against statistical limits. Other customers commented that it is important to at least start reporting and providing information on voltage quality Our response: voltage sags We will not include voltage sag as part of our RCP2 performance measures and targets. We do not yet have enough understanding about voltage sag to be able to set meaningful targets. While we currently have a fully developed, formal system for recording and reporting primary equipment outages and interruptions, there is nothing similar in place for voltage sags or other aspects of power quality such as harmonics or transients. However, we are installing new revenue meters at grid exit points that come complete with the built-in capability to automatically record (and analyse) power quality. The nationwide meter replacement programme will be completed by around May We already have access to the power quality information from some of the meters. There is also a back-office software system we have deployed to manage access to the power quality information. Customer-facing performance measures Transpower New Zealand Limited. All rights reserved. 17

18 Given the infrastructure that is in place, or will shortly be in place, it would be possible to design and develop a power quality monitoring and reporting service. This might take a range of forms, and we need to identify what would be of most use to customers. At this point, we will not include voltage quality in our performance measures and targets for the next regulatory control period (RCP2) because there are too many uncertainties around what would be the most useful, our ability to record and report any measures and our only partial of control over power quality. We will set up an industry working group to analyse the voltage disturbance information becoming available with the end goal of determining voltage sag measurements and targets that are meaningful and valuable to customers and end consumers. This working group will also look at reporting and targets for momentary interruptions. We may trial some measures and targets and incorporate them in a later regulatory control period proposal. 4.2 Economic impact Customer views: economic impact A number of customers (including generator-retailers, distributors and large industrials) would like to see a measure that more closely reflects the financial impact of interruptions. Customers suggested that we include a financial loss measure based on VOLL. One suggested that every event should be followed up and a financial impact recorded. Another suggested a MWh or unserved energy measure would be useful 8. Customers acknowledge the limitations of VOLL. For example, MEUG made the following comment in its feedback: We accept that. VOLL is prone to wide error bounds. Nevertheless publication of a dollar impact range with wide probability distributions provides another measure to prioritise effort to reduce USE [Unserved Energy] in the future Our response: economic impact Ideally, our performance measures should reflect the economic impacts on our customers and the wider impacts on New Zealand. At present, the Electricity Authority and Commerce Commission use a $20,000/MWh value for VOLL, but as mentioned in section 3.1.2, the Electricity Authority is undertaking a study to establish appropriate VOLL ranges for New Zealand electricity consumers. When this study is complete, assuming it provides a more robust and wider assessment of VOLL, we can report the value of lost load for interruptions in order to provide an indication of the potential economic impact of interruptions. 8 We report annual unserved energy for planned and unplanned interruptions under the Benchmark Agreement, although this report does not show the unserved energy for individual events. We also report to customers breaches of the service levels for unserved energy. 18 Customer-facing performance measures Transpower New Zealand Limited. All rights reserved.

19 4.3 Planned outages and the impact on the market Customer views: planned outages and impact on the market The three generator-retailers who provided feedback were concerned that our proposed measures did not cover planned equipment outages and the impacts that our performance can have on the electricity market. In summary, their concerns were: That asset availability can have impacts on the electricity market and therefore our customers. When assets are not available through planned or unplanned outages, this can restrict generators ability to provide electricity to the market and can increase prices. Over time, any market impacts faced by generators are likely to be passed on to end consumers. Outage frequency and duration will contribute to the size of market impacts, but outage timing (eg peak or offpeak) is also critical. Meridian particularly mentioned the impact on the market from the unavailability of the HVDC. Minimising and avoiding planned outages is important; these outages comprise a majority of total outages. Unplanned extensions to planned outages should be included as unplanned outages. The existing net-benefit test 9 applying to grid outage decisions does not provide sufficient incentive for Transpower to take account of market impacts. Generators suggested possible measures that could be introduced: Targets for planned outages completed on time. Targets for information provision for planned as well as unplanned outages, including the quality and notice period of information provided. Such targets might include churn (i.e. how many times an outage schedule is revised), and variations between actual and estimated return times Our response: planned outages and the impact on the market In our proposal we did not include measures that related to market impact. This is not because we do not recognise the importance of optimising grid availability with respect to the market: rather, it is because of the difficulty in doing it so it positively influences our performance. Losses and constraints are heavily affected by the behaviour of generators and retailers - not just Transpower performance - and the wholesale market includes pricing mechanisms to take account of losses and constraints. In addition, the Electricity Authority is implementing Financial Transmission Rights which will enable the market to better manage some costs and risks associated with constraints. 9 The net benefit test is specified in part 2 of Appendix A of the Outage Protocol. If an interested participant does not think a planned outage meets the net benefit principle, Transpower must carry out a net benefit test on the planned outage. Customer-facing performance measures Transpower New Zealand Limited. All rights reserved. 19

20 We also did not include measures related to planned outages as the outage protocol 10 prescribes the process and considerations involved in planning outages 11. However, general availability measures provide reporting that covers both planned and unplanned outages. We are required to have at least one asset performance measure in our RCP2 performance targets. We intend to include HVDC branch availability targets as the availability of the HVDC link has a major effect on market outcomes. We will also include some availability measures for some other core grid branches with a significant market impact as part of our RCP2 proposal. Possible branches are the 220kV circuits from Haywards to Bunnythorpe through to Whakamaru (including those that are part of the Wairakei Ring.) We recognise that extensions to planned interruptions can be disruptive to customers, but it is appropriate to report them separately from unplanned interruptions. They have different impacts on customers than unplanned interruptions and they are driven by different aspects of our performance. Currently, we notify customers directly when a planned interruption overruns through the interruption to connection notices. We also report planned interruption restoration performance, under information disclosure requirements. We do not at present compile reports on planned outage overruns but we will introduce reporting planned outage restoration and set targets. We have some work to do to develop the measure and to set targets. 4.4 Risks of non-supply Customer views: risk of non-supply Both through discussions at meetings and written feedback it is clear that understanding the risks of non-supply is an important matter to customers. Customers commented that they want to know when planned or unplanned equipment outages place them at higher risk of interruption. A number of customers suggested we report when the security of their supply moves from N-1 to N Our response: risk of non-supply We consider the ability to signal future risks of non-supply to be more valuable to customers and end customers than analysis of historic risks (although these are informative). We communicate our upcoming outage plans to customers as part of our outage planning processes. However, the risks of non-supply that these outages pose are not necessarily presented clearly. Upon request we can arrange notice of upcoming outages that cause individual customers to be placed on N security to be provided. As part of a wider review of 10 The Outage Protocol is incorporated into the Code bv reference and is available at: 11 Planned outages and interruptions are those for which at least 24 hours notice has been given, all remaining outages and interrupions are unplanned. 20 Customer-facing performance measures Transpower New Zealand Limited. All rights reserved.

21 what and how we communicate to customers, we intend to look at options for communicating risks of future non-supply to customers. We will also report on a national time on N security measure and are investigating ways to measure and report this. 4.5 Qualitative customer service Customer views: customer service Powerco suggested that we should include a measure that reflects our customer service and interactions with customers. Powerco commented that meaningful interaction with customers, the on-going provision of information even when no particular problem exists and the perception that a constructive approach is being taken to customer relationships are all important. Powerco proposed that an overall target rating from Transpower s annual customer satisfaction survey should form part of the set of customer-facing grid performance measures but should not be linked to revenue Our response: customer service We already include this as an important internal performance indicator and plan to continue to do so rather than include it in our grid performance measures. 4.6 Feedback: other issues There were a number of issues that customers provided views on that we will consider as we progress our work. These are summarised here Customer views: targets We did not ask customers specifically about the proposed targets, however, customers made the following comments and we will take these into account as we finalise the targets: The objective should be to target a downwards trend in interruptions or an improvement in service. One approach may be to have both average and maximum targets. Targets should be what we tell you, not what you tell us. Targets should be driven by business targets, not historical performance. Indicative targets shown for generation connection locations are broadly in line with those for standard (rural) loads. Many generation connection locations, particularly those on the 220 kv grid and interconnected grid, enjoy a high level of transmission security via multiple circuits. In comparison, many rural connection locations would fall into the category of relatively low security connection grid spurs. Performance targets should therefore be relatively ambitious for high security generation connection locations, scaling downwards as the level of redundancy decreases. Customer-facing performance measures Transpower New Zealand Limited. All rights reserved. 21

22 4.6.2 Customer views: Benchmark agreements Transmission customers Transmission Agreements (based on the Benchmark Agreement) currently include a schedule on service measures. A number of customers noted that they would support Transpower and the Electricity Authority amending these service measures to align with the final performance measures that we develop. Some customers were dissatisfied with the current Benchmark Agreement measures noting that: They were imposed on both customers and Transpower rather than negotiated. They are based on historic performance rather than forward-looking objectives. The performance reporting required under the Benchmark Agreement is not of value Customer views: price-quality and getting the incentives right Customers have concerns that: Incentives should be aligned with the costs of interruptions and not encourage inefficient spending. That the performance targets will be different for different points of service, so customers should be given the ability to make price quality trade-offs. That there is no direct compensation to individual customers for poor performance. 22 Customer-facing performance measures Transpower New Zealand Limited. All rights reserved.

DISCLOSURE OF ELECTRICITY PRICING METHODOLOGY PURSUANT TO REQUIREMENT 22 OF THE ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004

DISCLOSURE OF ELECTRICITY PRICING METHODOLOGY PURSUANT TO REQUIREMENT 22 OF THE ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004 DISCLOSURE OF ELECTRICITY PRICING METHODOLOGY PURSUANT TO REQUIREMENT 22 OF THE ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004 Effective 1 April 2010 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 DESCRIPTION

More information

Security Policy Review: Credible Event Management. Scope and Methodology Draft for Industry 2014

Security Policy Review: Credible Event Management. Scope and Methodology Draft for Industry 2014 Security Policy Review: Credible Event Management Scope and Methodology Draft for Industry 2014 Version Date Change 1 26/03/2014 Draft for industry Position Date Prepared By: Reviewed By: Ina Ilieva, Senior

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3

More information

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology 2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our

More information

Review of Electricity Distribution Network Minimum Service Standards and Guaranteed Service Levels to apply in Queensland from 1 July 2010

Review of Electricity Distribution Network Minimum Service Standards and Guaranteed Service Levels to apply in Queensland from 1 July 2010 Final Decision Review of Electricity Distribution Network Minimum Service Standards and Guaranteed Service Levels to apply in Queensland from 1 July 2010 April 2009 Level 19, 12 Creek Street Brisbane Queensland

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

NETWORK MANAGEMENT STRATEGY

NETWORK MANAGEMENT STRATEGY ABN 85 082 464 622 NETWORK MANAGEMENT STRATEGY DOCUMENT NUMBER: NW-#30065608-V6 DATE: 12 MAY 2011 NW-#30065608-v6-Network_Management_Strategy.DOC Page 1 of 20 This page is intentionally blank. NW-#30065608-v6-Network_Management_Strategy.DOC

More information

16 West Coast Regional Plan

16 West Coast Regional Plan 16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast

More information

Electricity Networks Service Standards: An Overview

Electricity Networks Service Standards: An Overview Electricity Networks Service Standards: An Overview A Report for the NSW Department of Premier and Cabinet 2 September 2014 Final Report HoustonKemp.com Report Author/s Ann Whitfield Tom Graham Contact

More information

Dispatch of Instantaneous Reserve

Dispatch of Instantaneous Reserve RULE CHANGE PROPOSAL May 2008 Dispatch of Instantaneous Reserve Executive Summary This paper proposes a rule change to enable the partial dispatch of reserves when there is a shortage of energy and reserve

More information

ASSET MANAGEMENT STRATEGY Approved

ASSET MANAGEMENT STRATEGY Approved Approved Document TP.TG 01.01 30/10/2014 Approved Transpower New Zealand Limited 2014. All rights reserved. Page 1 of 25 C O P Y R I G H T 2014 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A

More information

6.0 Procurement procedure 1 Infrastructure

6.0 Procurement procedure 1 Infrastructure Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement

More information

Electricity Distribution Business. Pricing Methodology

Electricity Distribution Business. Pricing Methodology Electricity Distribution Business Pricing Methodology Effective 1 April 2015 1. GLOSSARY Commerce Commission (Commission) EDB Electricity Authority (EA) Responsible for the regulation of EDBs as provided

More information

Rule change request. 18 September 2013

Rule change request. 18 September 2013 Reform of the distribution network pricing arrangements under the National Electricity Rules to provide better guidance for setting, and consulting on, cost-reflective distribution network pricing structures

More information

Power products and systems. Intelligent solutions for power distribution Zone concept

Power products and systems. Intelligent solutions for power distribution Zone concept Power products and systems Intelligent solutions for power distribution Zone concept Securing continuous power supply ABB is one of the world's leading power and automation technology companies whose products,

More information

2016 2020 Price Reset. Appendix H Service target performance incentive scheme

2016 2020 Price Reset. Appendix H Service target performance incentive scheme Appendix H Service target performance incentive scheme April 2015 Table of contents 1 SERVICE TARGET PERFORMANCE INCENTIVE SCHEME... 3 1.1 Reliability of supply targets... 3 1.2 SAIFI definition... 5 1.3

More information

TRANSMISSION BUSINESS PERFORMANCE

TRANSMISSION BUSINESS PERFORMANCE Filed: 0-0- Tx 0-0 Rates Tab Schedule Page of TRANSMISSION BUSINESS PERFORMANCE.0 INTRODUCTION 0 Hydro One is focused on the strategic goals and performance targets in the area of safety, customer satisfaction,

More information

Updated SCER Demand Side Participation Program December 2013

Updated SCER Demand Side Participation Program December 2013 Updated SCER Demand Side Participation Program December 2013 The Standing Council on Energy and Resources (SCER) has adopted this framework to guide its demand side participation (DSP) work. The framework

More information

AER reference: 52454; D14/54321 ACCC_09/14_865

AER reference: 52454; D14/54321 ACCC_09/14_865 Commonwealth of Australia 2014 This work is copyright. In addition to any use permitted under the Copyright Act 1968, all material contained within this work is provided under a Creative Commons Attribution

More information

NETWORK OUTPUT MEASURES CONSULTATION

NETWORK OUTPUT MEASURES CONSULTATION NETWORK OUTPUT MEASURES CONSULTATION Great Britain s electricity transmission network transmits high-voltage electricity from where it is produced to where it is needed throughout the country. It broadly

More information

Data Communications Company (DCC) price control guidance: process and procedures

Data Communications Company (DCC) price control guidance: process and procedures Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required

More information

PROJECT NO. 40269 ORDER ADOPTING AMENDMENTS TO 25.52 AS APPROVED AT THE OCTOBER 12, 2012 OPEN MEETING

PROJECT NO. 40269 ORDER ADOPTING AMENDMENTS TO 25.52 AS APPROVED AT THE OCTOBER 12, 2012 OPEN MEETING PROJECT NO. 40269 PRIORITIES FOR POWER RESTORATION TO CERTAIN MEDICAL FACILITIES PUBLIC UTILITY COMMISSION OF TEXAS ORDER ADOPTING AMENDMENTS TO 25.52 AS APPROVED AT THE OCTOBER 12, 2012 OPEN MEETING The

More information

Specific amendments to the Capacity Allocation and Congestion Management Network Code

Specific amendments to the Capacity Allocation and Congestion Management Network Code Annex: Specific amendments to the Capacity Allocation and Congestion Management Network Code I. Amendments with respect to entry into force and application The Network Code defines deadlines for several

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2 2.0

More information

AER Issues Paper Tariff Structure Statement Proposals Victorian Electricity Distribution Network Service Providers

AER Issues Paper Tariff Structure Statement Proposals Victorian Electricity Distribution Network Service Providers 20 January 2016 Australian Energy Regulator GPO Box 520 Melbourne VIC 3001 Via email: AERInquiry@aer.gov.au AER Issues Paper Tariff Structure Statement Proposals Victorian Electricity Distribution Network

More information

Procurement guidance Managing and monitoring suppliers performance

Procurement guidance Managing and monitoring suppliers performance Procurement guidance Managing and monitoring suppliers performance Procurement guidance: Managing and monitoring suppliers performance Page 2 of 16 Table of contents Table of contents... 2 Purpose of the

More information

Audit Report Rottnest Island 2015 Network Quality and Reliability of Supply Performance Audit - Operation of Compliance Monitoring Systems

Audit Report Rottnest Island 2015 Network Quality and Reliability of Supply Performance Audit - Operation of Compliance Monitoring Systems ABN 20 009 454 111 Rottnest Island 2015 Network Quality and Reliability of Supply Performance Audit - Operation of Compliance Monitoring Systems Telephone: +61 8 9260 0003 Fax: +61 8 9225 7447 E-Mail:

More information

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com Agenda do Mini-Curso Sérgio Yoshio Fujii sergio.fujii@areva-td.com Ethan Boardman ethan.boardman@areva-td.com Agenda do Mini-Curso Sistemas de Distribuição (DMS) Characteristics of Distribution Network

More information

National Electricity Amendment (Network Support Payments and Avoided TUoS for Embedded Generators) Rule 2011

National Electricity Amendment (Network Support Payments and Avoided TUoS for Embedded Generators) Rule 2011 RULE DETERMINATION National Electricity Amendment (Network Support Payments and Avoided TUoS for Embedded Generators) Rule 2011 Commissioners Pierce Henderson Spalding 22 December 2011 JOHN PIERCE Chairman

More information

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

Establishing Regulatory Incentives To Raise Service Quality in Electricity Networks

Establishing Regulatory Incentives To Raise Service Quality in Electricity Networks Establishing Regulatory Incentives To Raise Service Quality in Electricity Networks Author Rolf Adam June 2011 Cisco Internet Business Solutions Group (IBSG) Cisco IBSG 2011 Cisco and/or its affiliates.

More information

SP Energy Networks 2015 2023 Business Plan

SP Energy Networks 2015 2023 Business Plan Environmental Discretionary Reward Scheme 1 SP Energy Networks 2015 2023 Business Plan Executive summary SP Distribution Ltd SP Manweb plc July 2013 RIIO ED1 Business Plan 2015 to 2023 2 A Message from

More information

Electricity Service Standards

Electricity Service Standards CODE OF PRACTICE Electricity Service Standards Revised August 2015 Contents 1. Preface... 1 Format... 1 2. Application and Objectives... 2 3. Service Standards... 3 3.1 General... 3 3.2 Particular... 3

More information

Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3

Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3 /01 PROJECT ADVISORY Stakeholder management and communication Leadership Series 3 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital programmes,

More information

MANAGING DIGITAL CONTINUITY

MANAGING DIGITAL CONTINUITY MANAGING DIGITAL CONTINUITY Project Name Digital Continuity Project DRAFT FOR CONSULTATION Date: November 2009 Page 1 of 56 Contents Introduction... 4 What is this Guidance about?... 4 Who is this guidance

More information

Auckland Chamber of Commerce Submission to Electricity Commission on Transmission Pricing Methodology: issues and proposal Introduction

Auckland Chamber of Commerce Submission to Electricity Commission on Transmission Pricing Methodology: issues and proposal Introduction 1 Auckland Chamber of Commerce Submission to Electricity Commission on Transmission Pricing Methodology: issues and proposal Introduction 1. The Auckland Chamber of Commerce welcomes the opportunity to

More information

FINANCIAL MANAGEMENT MATURITY MODEL

FINANCIAL MANAGEMENT MATURITY MODEL Definition: Financial management is the system by which the resources of an organisation s business are planned, directed, monitored and controlled to enable the organisation s goals to be achieved. Guidance

More information

Submission on the Consumer Law Reform Bill

Submission on the Consumer Law Reform Bill Vector Limited 101 Carlton Gore Road PO Box 99882, Newmarket Auckland 1149, New Zealand www.vector.co.nz Corporate Telephone +64-9-978 7788 Corporate Facsimile +64-9-978 7799 Todd McClay MP Chairperson

More information

Code Subsidiary Document No. 0007: Business Continuity Management. September 2015

Code Subsidiary Document No. 0007: Business Continuity Management. September 2015 Code Subsidiary Document No. 0007: September 2015 Change History Version Number Date of Issue Reason For Change Change Control Reference Sections Affected 20150511 11 May 2015 For industry consultation

More information

Scorecard - Tillsonburg Hydro Inc.

Scorecard - Tillsonburg Hydro Inc. Scorecard - Tillsonburg Hydro Inc. 9/18/215 Performance Outcomes Performance Categories Measures 21 211 212 213 214 Trend Industry Distributor Target Customer Focus Services are provided in a manner that

More information

Statement of Guidance

Statement of Guidance Statement of Guidance Foreign Exchange Risk Management 1. Statement of Objectives To provide a standard of best practice to banks for the implementation of an effective and sound Foreign Exchange Risk

More information

Asset Management Plan

Asset Management Plan 2013 Asset Management Plan www.topenergy.co.nz INTRODUCTION Introduction It gives me great pleasure to present Top Energy s 2013-2023 Network Asset Management Plan (AMP). The 2013 plan follows on from

More information

Nuclear Power Plant Electrical Power Supply System Requirements

Nuclear Power Plant Electrical Power Supply System Requirements 1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, zeljko.jurkovic@nek.si Abstract Various regulations and standards require from electrical power system of the

More information

GUIDELINE ON THE APPLICATION OF THE OUTSOURCING REQUIREMENTS UNDER THE FSA RULES IMPLEMENTING MIFID AND THE CRD IN THE UK

GUIDELINE ON THE APPLICATION OF THE OUTSOURCING REQUIREMENTS UNDER THE FSA RULES IMPLEMENTING MIFID AND THE CRD IN THE UK GUIDELINE ON THE APPLICATION OF THE OUTSOURCING REQUIREMENTS UNDER THE FSA RULES IMPLEMENTING MIFID AND THE CRD IN THE UK This Guideline does not purport to be a definitive guide, but is instead a non-exhaustive

More information

Developing a Utility/Customer Partnership To Improve Power Quality and Performance

Developing a Utility/Customer Partnership To Improve Power Quality and Performance Developing a Utility/Customer Partnership To Improve Power Quality and Performance Mark McGranaghan Electrotek Concepts Knoxville, TN Abstract Many industrial and commercial electric customers now require

More information

Asset Management Plan

Asset Management Plan 2014 Asset Management Plan www.topenergy.co.nz INTRODUCTION Introduction It gives me great pleasure to present Top Energy s 2014-2024 Network Asset Management Plan (AMP). The 2014 AMP follows on from the

More information

Anthony Price Swanbarton Limited, Dairy Farm, Pinkney, Malmesbury, Wiltshire, SN16 0NX Telephone +44 1666 840948

Anthony Price Swanbarton Limited, Dairy Farm, Pinkney, Malmesbury, Wiltshire, SN16 0NX Telephone +44 1666 840948 SMARTER GRID AND SMARTER STORAGE HOW DO BUSINESS AND TECHNOLOGY MEET? Anthony Price Swanbarton Limited, Dairy Farm, Pinkney, Malmesbury, Wiltshire, SN16 0NX Telephone +44 1666 840948 Introduction The technical

More information

CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.????

CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.???? CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.???? 1 1. PRE-AMBLE All transactions undertaken by the Cape Winelands District Municipality involves a contract whether explicitly

More information

Submission to the Department of Environment Regulation s Draft Guidance Statement on Regulatory Principles December 2014

Submission to the Department of Environment Regulation s Draft Guidance Statement on Regulatory Principles December 2014 Submission to the Department of Environment Regulation s Draft Guidance Statement on Regulatory Principles December 2014 Chamber of Commerce and Industry of Western Australia (Inc) About CCI The Chamber

More information

General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System

General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System Direction Planification des actifs et expertise de transport February 2011 TABLE OF CONTENTS 1. CONDUCTING

More information

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy Innovative Business Models for Market Uptake of Renewable Electricity unlocking the potential for flexibility in the Industrial Electricity Use Main variations of business models for Flexible Industrial

More information

Investing In Electric Reliability and Resiliency

Investing In Electric Reliability and Resiliency Investing In Electric Reliability and Resiliency P R E S E NTED T O NARUC 2014 Summer Meeting Joint Electricity and Critical Infrastructure Committees P R E S E NTED B Y D a l l as, T X J u l y 1 5, 2014

More information

Tasmanian Transmission Revenue Proposal

Tasmanian Transmission Revenue Proposal Tasmanian Transmission Revenue Proposal An overview for Tasmanian electricity consumers Regulatory control period 1 July 2014 30 June 2019 Tasmanian Networks Pty Ltd About TasNetworks We are Tasmania s

More information

FINANCIAL ADVISERS REGULATION: VOLUNTARY AUTHORISATION

FINANCIAL ADVISERS REGULATION: VOLUNTARY AUTHORISATION OFFICE OF THE MINISTER OF COMMERCE The Chair CABINET ECONOMIC GROWTH AND INFRASTRUCTURE COMMITTEE FINANCIAL ADVISERS REGULATION: VOLUNTARY AUTHORISATION PROPOSAL 1 I propose that regulations be promulgated

More information

QUALITY OF SERVICE STANDARDS FOR THE ELECTRICITY TRANSMISSION AND DISTRIBUTION SECTOR DRAFT FOR CONSULTATION

QUALITY OF SERVICE STANDARDS FOR THE ELECTRICITY TRANSMISSION AND DISTRIBUTION SECTOR DRAFT FOR CONSULTATION QUALITY OF SERVICE STANDARDS FOR THE ELECTRICITY TRANSMISSION AND DISTRIBUTION SECTOR DRAFT FOR CONSULTATION January 2008 TABLE OF CONTENTS 1. INTRODUCTION 1 1.1 Purpose of Document 1 1.2 Structure of

More information

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut

More information

ADDITIONAL TERMS FOR VIRTUAL VOICE NETWORK SERVICES SCHEDULE 2L

ADDITIONAL TERMS FOR VIRTUAL VOICE NETWORK SERVICES SCHEDULE 2L ADDITIONAL TERMS FOR VIRTUAL VOICE NETWORK SERVICES SCHEDULE 2L CONTENTS 1 Service Description... 3 2 Definitions... 3 3 Virtual Voice Network terms... 4 4 CHARGES... 4 4.1 Charges payable by the... 4

More information

Risk Management Policy

Risk Management Policy Risk Management Policy Responsible Officer Author Ben Bennett, Business Planning & Resources Director Julian Lewis, Governance Manager Date effective from December 2008 Date last amended December 2012

More information

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.

More information

Virtualizing disaster recovery using cloud computing

Virtualizing disaster recovery using cloud computing IBM Global Technology Services Thought Leadership White Paper January 2012 Virtualizing disaster recovery using cloud computing Transition your applications quickly to a resilient cloud 2 Virtualizing

More information

Appendix 10: Improving the customer experience

Appendix 10: Improving the customer experience Appendix 10: Improving the customer experience Scottish Water is committed to delivering leading customer service to all of our customers. This means we deliver the following activities: We will ensure

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

Electricity Distribution Business Pricing Methodology for Prices Effective 1 April 2015 27 March 2015

Electricity Distribution Business Pricing Methodology for Prices Effective 1 April 2015 27 March 2015 Electricity Distribution Business Pricing Methodology for Prices Effective 1 April 2015 27 March 2015 Page 1 of 40 1 Table of contents 1 Table of contents... 2 2 Introduction... 3 3 Summary of 2015 pricing

More information

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 795 SESSION 2012-13 18 DECEMBER 2012. HM Revenue & Customs. Customer service performance

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 795 SESSION 2012-13 18 DECEMBER 2012. HM Revenue & Customs. Customer service performance REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 795 SESSION 2012-13 18 DECEMBER 2012 HM Revenue & Customs Customer service performance 4 Key facts Customer service performance Key facts 900m spent on

More information

FIXED CHARGE: This is a cost that goes towards making the service available, including

FIXED CHARGE: This is a cost that goes towards making the service available, including ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer

More information

Guidelines for ATS selection: How to choose the right transfer solution for your power application.

Guidelines for ATS selection: How to choose the right transfer solution for your power application. Power topic #7012 Technical information from Cummins Power Generation Inc. Guidelines for ATS selection: How to choose the right transfer solution for your power application. > White Paper By Gary Olson,

More information

Active Smart Grid Analytics Maximizing Your Smart Grid Investment

Active Smart Grid Analytics Maximizing Your Smart Grid Investment Itron White Paper Itron Enterprise Edition Meter Data Management Active Smart Grid Analytics Maximizing Your Smart Grid Investment Sharelynn Moore Director, Product Marketing Itron Stephen Butler Managing

More information

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2

More information

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive

More information

Customer Engagement Program. Stage 1 Report. March 2014. Understanding customer values, needs & expectations. Government of South Australia

Customer Engagement Program. Stage 1 Report. March 2014. Understanding customer values, needs & expectations. Government of South Australia Customer Engagement Program Stage 1 Report Understanding customer values, needs & expectations March 2014 Government of South Australia Welcome to SA Water s Customer Engagement Program This report summarises

More information

Executive summary 2. 1 Introduction 4

Executive summary 2. 1 Introduction 4 Flexible Networks for a Low Carbon Future Future Network Monitoring Strategy September 2015 Contents Executive summary 2 Glossary 3 1 Introduction 4 2 Fundamental principles of monitoring 5 2.1 LCT monitoring

More information

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Centre for Sustainable Electricity and Distributed Generation Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac July 2008 FUNDED BY BERR URN 08/1144

More information

Implementing Low-Cost Distribution Automation Programs

Implementing Low-Cost Distribution Automation Programs Implementing Low-Cost Distribution Automation Programs By: Jai Belagur, P.E. Contact: Jai Belagur Power System Engineering, Inc. 1532 West Broadway, Suite 100, Madison, WI 53713 Phone: 608-268-3544 E-mail:

More information

AGENDA ITEM 5 AYRSHIRE SHARED SERVICE JOINT COMMITTEE 1 MAY 2015 AYRSHIRE ROADS ALLIANCE CUSTOMER SERVICE STRATEGY

AGENDA ITEM 5 AYRSHIRE SHARED SERVICE JOINT COMMITTEE 1 MAY 2015 AYRSHIRE ROADS ALLIANCE CUSTOMER SERVICE STRATEGY AYRSHIRE SHARED SERVICE JOINT COMMITTEE 1 MAY 2015 AYRSHIRE ROADS ALLIANCE CUSTOMER SERVICE STRATEGY Report by the Head of Roads Ayrshire Roads Alliance PURPOSE OF REPORT 1. The purpose of this report

More information

SERVICES. Designing, deploying and supporting world class communications solutions.

SERVICES. Designing, deploying and supporting world class communications solutions. Designing, deploying and supporting world class communications solutions. DESIGN Expertise, technologies, tools and ideas Business environments, regulation, expansion and obsolescence are drivers that

More information

TRANSPOWER NEW ZEALAND LIMITED. Request for Proposals. Demand Response Programme

TRANSPOWER NEW ZEALAND LIMITED. Request for Proposals. Demand Response Programme TRANSPOWER NEW ZEALAND LIMITED Request for Proposals Demand Response Programme Revision 1.0 (Registration Cycle 1) RELEASE DATE: 24 AUGUST 2015 CLOSING DATE: 2PM 02 OCTOBER 2015 RFP No: SUP-12707 Transpower

More information

SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID.

SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID. TITLE XIII--SMART GRID SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID. It is the policy of the United States to support the modernization of the Nation's electricity transmission and

More information

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION

More information

NARUC SERVICE QUALITY WHITE PAPER March 5, 2004. NARUC Service Quality Subgroup "Service Quality White Paper"

NARUC SERVICE QUALITY WHITE PAPER March 5, 2004. NARUC Service Quality Subgroup Service Quality White Paper NARUC SERVICE QUALITY WHITE PAPER March 5, 2004 NARUC Service Quality Subgroup "Service Quality White Paper" I. INTRODUCTION The Telecommunications Act of 1996 ("1996 Act") called for sweeping changes

More information

Contact comments on the TSW Consulting Ltd report Mass Market Load Control its use and its potential use

Contact comments on the TSW Consulting Ltd report Mass Market Load Control its use and its potential use Contact comments on the TSW Consulting Ltd report Mass Market Load Control its use and its potential use Energy efficiency benefits The report states that: [load control] has to be achieved without increasing

More information

Plumbing and Drainage Regulation 2012

Plumbing and Drainage Regulation 2012 Regulatory Impact Statement Subordinate Legislation Act 1989 Plumbing and Drainage Regulation 2012 A regulation under the Plumbing and Drainage Act 2011 April 2012 Enquiries to: NSW Fair Trading Policy

More information

Summary of Submissions Received on the Consultation on Strengthening Statutory Payment Oversight Powers and the Reserve Bank s Responses

Summary of Submissions Received on the Consultation on Strengthening Statutory Payment Oversight Powers and the Reserve Bank s Responses Summary of Submissions Received on the Consultation on Strengthening Statutory Payment Oversight Powers and the Reserve Bank s Responses October 2013 2 SECTION ONE: INTRODUCTION 1. In March 2013, the Reserve

More information

Final decision. Priorities and objectives of electricity transmission network service provider performance reports

Final decision. Priorities and objectives of electricity transmission network service provider performance reports Final decision Priorities and objectives of electricity transmission network service provider performance reports March 2009 Commonwealth of Australia 2009 This work is copyright. Apart from any use permitted

More information

Creating and Embedding a Customer Driven Supply Chain

Creating and Embedding a Customer Driven Supply Chain To get there. Together. Creating and Embedding a Customer Driven Supply Chain Point of view Contents Creating and Embedding a Customer Driven Supply Chain 3 How to Embed a Customer Driven Supply Chain

More information

Module 1 Study Guide

Module 1 Study Guide Module 1 Study Guide Introduction to OSA Welcome to your Study Guide. This document is supplementary to the information available to you online, and should be used in conjunction with the videos, quizzes

More information

Project Governance a board responsibility. Corporate Governance Network

Project Governance a board responsibility. Corporate Governance Network Project Governance a board responsibility Corporate Governance Network November 2015 1 Contents Page Introduction 3 Board responsibilities 3 What is project governance? 4 The boards duties in respect of

More information

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Committee and Date Cabinet 14 th October 2015 Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Responsible Officer

More information

Benefits Realization from IS & IT, and Change Management of roles and the working practices of individuals and teams.

Benefits Realization from IS & IT, and Change Management of roles and the working practices of individuals and teams. : Delivering Value from IS & IT Investments John Ward and Elizabeth Daniel John Wiley & Son Ltd ISBN: 9780470094631, 399 pages Theme of the Book This book explores a process and practical tools and frameworks

More information

Service Improvement. Part 3 The Strategic View. Robert.Gormley@ed.ac.uk http://www.is.ed.ac.uk/itil

Service Improvement. Part 3 The Strategic View. Robert.Gormley@ed.ac.uk http://www.is.ed.ac.uk/itil Service Improvement Part 3 The Strategic View Robert.Gormley@ed.ac.uk http://www.is.ed.ac.uk/itil Service Management House Customers Avail. Mgmt Capacity Mgmt Service Level Mgmt Continuity Mgmt Financial

More information

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK July 2013 1 P age Contents Page 1.0 Definition 3 2.0 Context 3 3.0 Purpose and aim of the policy 4 4.0 Policy Statement 4 5.0 Framework for Performance Management

More information

No. 22 663 SUPPLEMENTARY GAZETTE THE SOUTH AUSTRALIAN GOVERNMENT GAZETTE. www.governmentgazette.sa.gov.au PUBLISHED BY AUTHORITY

No. 22 663 SUPPLEMENTARY GAZETTE THE SOUTH AUSTRALIAN GOVERNMENT GAZETTE. www.governmentgazette.sa.gov.au PUBLISHED BY AUTHORITY No. 22 663 SUPPLEMENTARY GAZETTE THE SOUTH AUSTRALIAN GOVERNMENT GAZETTE www.governmentgazette.sa.gov.au PUBLISHED BY AUTHORITY ALL PUBLIC ACTS appearing in this GAZETTE are to be considered official,

More information

Gas transport tariffs calculation

Gas transport tariffs calculation Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) Gas transport tariffs calculation 1 TABLE OF CONTENTS 1. INTRODUCTION...

More information

The Risk Management strategy sets out the framework that the Council has established.

The Risk Management strategy sets out the framework that the Council has established. Derbyshire County Council Management Policy Statement The Authority adopts a proactive approach to Management to achieve Best Value and continuous improvement and is committed to the effective management

More information

White Paper from Global Process Innovation. Fourteen Metrics for a BPM Program

White Paper from Global Process Innovation. Fourteen Metrics for a BPM Program White Paper from Global Process Innovation by Jim Boots Fourteen Metrics for a BPM Program This white paper presents 14 metrics which may be useful for monitoring progress on a BPM program or initiative.

More information

Guide to the National Safety and Quality Health Service Standards for health service organisation boards

Guide to the National Safety and Quality Health Service Standards for health service organisation boards Guide to the National Safety and Quality Health Service Standards for health service organisation boards April 2015 ISBN Print: 978-1-925224-10-8 Electronic: 978-1-925224-11-5 Suggested citation: Australian

More information

Review of the Energy Savings Scheme. Position Paper

Review of the Energy Savings Scheme. Position Paper Review of the Energy Savings Scheme Position Paper October 2015 Contents Executive summary... 3 Energy Savings Scheme Review Report package... 3 Expanding to gas... 3 Target, penalties and duration...

More information

A guide to the water charge (infrastructure) rules: Tier 2 requirements

A guide to the water charge (infrastructure) rules: Tier 2 requirements A guide to the water charge (infrastructure) rules: Tier 2 requirements June 2011 Australian Competition and Consumer Commission 23 Marcus Clarke Street, Canberra, Australian Capital Territory, 2601 Commonwealth

More information

1. Terms and Conditions

1. Terms and Conditions TRADING AGREEMENT The Trading Agreement (hereinafter referred to as the Agreement ) is made and entered into by and between Simple Trading Corporation Limited (hereinafter referred to as Simple Trade )

More information