Transmission rate treatments to recover electric transmission related investments

Size: px
Start display at page:

Download "Transmission rate treatments to recover electric transmission related investments"

Transcription

1 Bulletin August 25, 2016 Transmission rate treatments to recover electric transmission related investments On January 31, 2013, the Alberta Utilities Commission issued a letter stating it was initiating a coordinated process to examine alternative approaches and rate treatments that might mitigate or smooth the impact on consumers of rate or bill increases, while ensuring regulated utilities continue to have an opportunity to earn a fair return on capital. 1 The Commission has concluded its process and provides its final determinations on this initiative in this bulletin. 2 1 Forecast transmission additions Significant transmission capacity additions to the bulk electric system 3 are underway in Alberta. The Alberta Electric System Operator s (AESO) five-year 2013 long-term plan, released on January 31, 2014, 4 identified 37 transmission projects to be constructed. The report estimated the cost for these projects to be $11.6 billion in 2013 dollars, of which $7.5 billion in projects had been approved by the AUC and the remaining $4.1 billion in projects had yet to receive regulatory approval. In November 2015, the AESO updated its five-year long term plan and provided the following updates: 5 Southern Alberta Transmission Reinforcement (SATR) project this project was initially scheduled to be implemented in three stages. Stage 1 was completed; some projects within Stage 2 were deferred and Stage 3 was cancelled. Foothills Area Transmission Development (FATD) east project this project was approved by the AUC in October This project includes a new 240/138-kilovolt (kv) substation, a new 240-kV line and enhancements to the related 138-kV system; all of which were expected to be completed by fall Alberta Utilities Commission efiling System, Proceeding 2421, Exhibit AUC In addition to this bulletin, the report Alternative Approaches and Rate Treatments to Recover Electric Transmission Related Investments and the appendices are available on the AUC s efiling System, Proceeding The bulk electric system generally includes transmission lines and associated equipment generally operated at voltages of 100 kv or higher. AESO 2013 Long-Term Transmission Plan, January 31, AESO 2015 Long-Term Transmission Plan, November 23, 2015.

2 Page 2 The Edmonton to Calgary Transmission System Reinforcement project this project includes the Eastern Alberta Transmission Line (EATL) and the Western Alberta Transmission Line (WATL). Both lines were expected to be in service by the end of Heartland Transmission System Reinforcement (Heartland) project this project was initially energized at 240 kv in December 2013 and then energized at 500 kv in mid Fort McMurray Transmission System Reinforcement project this project includes two major components, the west and east 500-kV transmission projects. The west project was awarded in 2014 through the AESO s competitive procurement process and the in-service date is forecast for The AESO has deferred the in-service date for the east project. The actual costs for the completed projects have yet to be finalized. However, given the number of announcements 6 about increasing costs, it is anticipated that the combined total cost for these projects will be higher than originally forecast in the 2013 long-term plan. The AESO also identified a number of regional transmission projects in the 2015 long-term plan and indicated that, while the near-term (to 2020) regional transmission projects are likely to proceed, many other regional projects will likely be deferred for several years. 7 In its low-growth scenario, the AESO proposed 11 near-term regional transmission projects with projected costs of $800 million; in its main outlook for growth, the number of transmission projects increased to 17 at a projected cost of approximately $2.5 billion. 8 The added costs for new transmission infrastructure will result in higher rates for consumers. The higher transmission costs may have implications for the way in which these costs are allocated to end-use customers. 2 The rate impact of new transmission on consumers In the Commission s view, the allocation of capital costs associated with new transmission investment should be clear, predictable and based on sound principles. In general, beneficiaries of the new transmission investment, or those that cause the costs, should pay for new transmission, and prices should reflect the cost of the transmission services that are being provided. In practice, the allocation of capital costs associated with new transmission investment must also be consistent with governing legislation which may be influenced more by public policy than by economic principles. A number of principles have been relied upon in past decisions in assessing cost allocation. These principles are at times in conflict with one another and, in specific circumstances, For example, the AUC posts correspondence it receives on matters that are to be dealt with in future proceedings on its website under the link Items of Interest and then Items related to future proceedings. AESO Long-Term Transmission Plan, November 23, 2015, page 4. Ibid., page 4.

3 Page 3 judgment must be exercised in determining the relative weighting to be assigned to individual principles. The following concepts should be considered in an examination of the rate impact of new transmission investment on consumers: A principled basis for cost allocation. Intergenerational equity. Balancing rate mitigation with the provision of price signals that support efficient outcomes. The opportunity for regulated utilities to earn a fair return on capital. 2.1 Principled basis for cost allocation In Alberta, the AESO applies to the AUC under Section 30 of the Electric Utilities Act, SA 2003, c. E-5.1 for approval of the Independent System Operator (ISO) tariff. The rates, and terms and conditions in the tariff determine how costs are to be recovered from customers. Under the tariff, the costs are recovered from all electricity load customers (residential, commercial, farm and industrial) largely in proportion to their use of the transmission system, and the costs for transmission are included as part of the delivery charges on a customer s bill. Section 30(3)(a) of the Electric Utilities Act stipulates that the rates set out in the tariff shall not be different for customers as a result of their location on the transmission system. 9 This is commonly referred to as a postage stamp rate. The AESO applies cost causation principles to the rate design set out in the ISO tariff application 10 and relies upon a cost causation study and a point of delivery cost function to determine the functionalization and classification of costs for rates set out in the ISO tariff. 11 In previous decisions, the Commission has found that rates based on cost causation should provide price signals that result in fair, objective, and equitable outcomes, and should minimize or eliminate inter-customer subsidies. 12 The Commission determined that cost causation is the primary consideration when evaluating a rate design proposal and, barring unusual regulatory events such as regulatory lag or dramatic changes in cost structure, has found that rates that reflect cost causation should generally prevail over other secondary considerations, including rate shock, when assessing the AESO s rate design Electric Utilities Act. Proceeding 2718, 2014 ISO tariff application, Exhibit AESO-2718, Section 6.2, paragraph 257, page 47. Ibid., Section 5.0, pages Ibid., paragraph 254, page 47. The application of these principles to the AESO s rate design was discussed in both Decision : Alberta Electric System Operator (AESO), 2005/2006 General Tariff Application, Application , August 28, 2005, and in Decision : Alberta Electric System Operator, 2007 General Tariff Application, Application , December 21, Ibid., paragraphs , page 47.

4 Page 4 Consideration of the principles governing the allocation of costs for new transmission development was beyond the scope of this initiative. Nevertheless, the concepts that support the allocation of costs for transmission are discussed below, as they will continue to be considered by the Commission with respect to future ISO tariff applications. 2.2 Intergenerational equity New transmission capacity is generally built in large increments, which often include surplus capacity to allow for future increased load. For this reason, the addition of new transmission capacity tends to be lumpy in nature, where significant periods of large investment in transmission are often followed by lengthy periods in which there is little or no increase in transmission capacity. In Alberta, current ratepayers have been benefitting from transmission investments, some of which were made more than 20 years ago, with only limited investment in the late 1980s and 1990s. Consequently, in the recent past, transmission costs in Alberta have not significantly increased. As multiple large transmission projects are completed and put into service, customers will necessarily face increasing rates. The principle of intergenerational equity requires that both present and future customers bear a fair share of the costs of new transmission. The assessment of which customers benefit from the use of transmission assets determines the timing and basis for cost recovery. If benefits are not properly considered, current customers could pay for capacity put in place to serve future customers. Correspondingly, future customers that benefit from additional transmission capacity may not pay their fair share of its cost if, for example, the cost recovery period is too short. Applying the regulatory principle that there should not be a transfer of equity between different generations of customers, dictates that the costs associated with the transmission additions should be allocated over the economic life of a transmission asset proportionate to the consumption of the service potential of the asset. However, it is difficult to apply this principle in practice. First, it is difficult to determine the total capacity of a transmission network, let alone the contribution of an individual asset. Second, it is challenging to develop a rational methodology to allocate service potential to current and future customers for a number of reasons, including the difficulty in forecasting future use given the expected longer service lives of recent investments in bulk transmission. In addition, because Alberta has an interconnected electric system, any change in the configuration of the system could alter the network interactions and may affect the pattern of usage on the transmission system. The Commission considers the interests of all customer classes and the transmission facility owners (TFOs) in light of the principle of intergenerational equity in determining the revenue requirements of the TFOs and ultimately, the rates to be paid by customers for transmission service through the ISO tariff. 2.3 Balancing rate mitigation with the provision of price signals that support efficient outcomes Rate treatments that might mitigate or smooth the impact on consumers of large investments in transmission must be balanced with the need to provide price signals that reflect the true cost of the transmission services that are being provided. The manner in which costs are recovered and,

5 Page 5 in turn, the incentives that the resultant price signals provide, should support efficient outcomes. The Commission recognizes that care must also be taken not to distort the underlying principles with respect to cost causation or to distort how different customers use the transmission system. The Commission understands that providing price signals that support efficient outcomes can often be in conflict with rate mitigation or rate smoothing measures, and can also be in conflict with the objective of minimizing intergenerational inequity. Nevertheless, the importance of providing economic signals has been extensively discussed in prior AESO tariff proceedings and the Commission remains of the view that giving price signals that support efficient outcomes should be given more weight relative to other objectives An opportunity for regulated utilities to earn a fair return on capital When the Commission launched this initiative, it clearly stated that an examination of alternative approaches and rate treatments to mitigate or smooth the impact on consumers must also ensure that regulated utilities continue to have an opportunity to earn a fair return on capital. The rate mitigation alternatives examined in this initiative represent a significant departure from current practices and therefore, would need to be considered in a comprehensive tariff application or in a separate Commission-initiated proceeding. In this way, all factors, including any risks, would be examined in a full and transparent manner and all stakeholders, including a regulated utility that may be affected by a change, would have an opportunity to comment on the proposed changes. 3 Alternative approaches and rate treatments that might mitigate or smooth the impact on consumers In a letter dated November 28, 2013, the Commission indicated that this initiative would focus on two alternatives that offered the greatest potential for mitigating or smoothing the rate impact on consumers in the Alberta context: (1) a rate cap and deferral account mechanism and (2) the use of depreciation alternatives to delay capital recovery. 15 Other alternatives were identified at a stakeholder conference 16 and considered by the Commission, but rather than analyze a large number of alternatives, the Commission determined that the two options selected would allow it the flexibility to vary the inputs and test the level of rate mitigation that could be achieved relative to the status quo. If the analysis showed promise in achieving the desired objective, the two options could then be examined in greater detail and Decision : Alberta Electric System Operator, 2012 Construction Contribution Policy, Proceeding 1162, Application , December 28, 2012, paragraph 40; other decisions include Decision : ESBI Alberta Ltd, 1999/2000 Phase I and II, Application , Files and , February 2, 2000, and Decision : Alberta Electric System Operator (AESO), 2005/2006 General Tariff Application, Application , August 28, Proceeding 2421, Exhibit AUC The Commission invited parties to participate in a stakeholder conference to provide input on: the scope of the initiative, the process for conducting the initiative and any timing considerations. The stakeholder conference was held on March 18, 2013 at the AUC Calgary offices.

6 Page 6 further refined for possible implementation. However, if this objective could not be achieved, the exercise could provide insight into the potential effectiveness of other alternatives that offered a lesser degree of rate mitigation or rate smoothing. 3.1 Rate cap and deferral account mechanism The rate cap and deferral account mechanism was proposed in a report prepared by the Transmission Cost Recovery Subcommittee (TCRS); a subcommittee of the Transmission Facilities Cost Monitoring Committee. 17 A copy of the TCRS report is available on the Commission s efiling System, under Proceeding The TCRS report concluded that, of the several alternatives examined, a cap on the transmission costs passed on to consumers, combined with a deferral account mechanism, would be an effective method of shifting costs from current to future customers. 18 Under the rate cap and deferral account mechanism, the transmission costs to be included in the ISO tariff would be capped and increased each year by the forecast rate of inflation. However, the AESO would continue to pay the TFOs their approved revenue requirements. The differences between the capped transmission costs and the actual revenue requirements would be accumulated in a deferral account that would be increased by the accrual of carrying costs. In later years, the transmission rate would be increased as the balance in the deferral account is drawn down. 3.2 Depreciation alternatives to delay capital recovery Given the changes in technology and design associated with new transmission capital additions, and changes in transmission reliability standards, the Commission considered that recent investments in transmission assets may have much longer lives than existing transmission assets. Therefore, the Commission examined the rate mitigation impact of changes in depreciation methods and changes in service lives that might be implemented to reflect the new investments. A utility s revenue requirement is the sum of operating expenses, including depreciation, income taxes and a return component, representing a fair rate return on the assets employed to provide utility service (rate base). The depreciation method adopted by a utility affects not only its depreciation expense, but its rate base and return and, for a company using the flow-through method, its income taxes. The selection of the depreciation method should reflect the loss in service potential of the asset not restored by ongoing maintenance. Depreciation methods may be flat over the life of the asset, increase over time or decrease over time. Regulators examine the depreciation component of the revenue requirement to ensure that rates reflect the loss in service potential of the assets Proceeding 2421, Exhibit 2421-X0001. The Transmission Facilities Cost Monitoring Committee, Transmission Cost Recovery Subcommittee Report, June 8, bullet number 3, page 4.

7 Page 7 Depreciation methods that delay capital recovery for transmission assets that have been built to include capacity for future users, reflect a greater loss in service potential in later years, as the asset s capacity is utilized. The Commission retained Foster Associates Inc. (Foster) to examine depreciation alternatives that would delay capital recovery. The objective of the study was to evaluate depreciation alternatives that delay capital recovery without abandoning generally accepted depreciation and ratemaking principles. In its report, Evaluating Depreciation Alternatives for Delaying Capital Recovery (Foster report), 19 Foster concluded that regulatory practices that defer recognition and recovery of depreciation are not necessarily in conflict with cost allocation and accounting theory, as long as the opportunity for capital recovery is preserved and any unrecovered investment from early retirements is allowed to remain in rate base and earn an authorized rate of return. A copy of the Foster report is available on the Commission s efiling System, under Proceeding The Foster report explained that, both from an accounting and a valuation perspective, depreciation can be used to represent the service potential of an asset, or group of assets, that is consumed during an accounting interval (e.g., year). The dual objective of depreciation accounting is cost allocation over the economic life of an asset in proportion to the consumption of service potential. The economic life of an asset is the time period over which economic benefits or service potential are realized. Ideally, the cost of an asset should be allocated to future periods of operation in proportion to the amount of service potential expended during each accounting interval. Depreciation expense is an estimate of the cost of the service potential consumed. It follows that, if it is predictable that the net revenue generated by an asset will either increase or decrease over time, an accelerated or decelerated time-based method should be used to approximate the rate at which service potential is actually consumed. Foster explained that a compound interest method using a zero discount rate produces the equivalent of the straight-line method currently used in Alberta, but when used with positive discount rates the compound interest method achieves a delay of capital recovery and thus could provide rate mitigation. 4 Scenario testing results To assist with this initiative, the Office of the Utilities Consumer Advocate (UCA) agreed to work with stakeholders to test the two mitigation alternatives using the AESO s Transmission Rate Impact Projection (TRIP) model. The UCA engaged EDC Associates Ltd. (EDC) to review the TRIP model, run sensitivity analyses, make any necessary adjustments to the model and run scenarios to test the impact of each mitigation alternative. A copy of the Commission s report, prepared with input from EDC and the UCA, which details the results of the analysis 20 (Analysis report) is available on the Commission s efiling System, under Proceeding Proceeding 2421, Exhibit 2421-X0002. Proceeding 2421, Exhibit 2421-X0003.

8 Page 8 As described in the Analysis report, under the rate cap and deferral account alternative, the rate associated with the transmission wires cost, 21 or TFO cost, was capped at $26/MWh in 2015 and escalated annually by inflation. In the analysis, the deferral account balance was constrained such that it would be eliminated in 20 years. Under this constraint, the balance grew to a peak of $2 billion. This analysis also assumed a government of Alberta-backed carrying cost of 3.8 per cent. The table below is reproduced from the Analysis report and summarizes the extent of the mitigation or smoothing of the rates using the rate cap and deferral account alternative, under the assumptions in the Analysis report. Table 1. Typical customer Extent of the mitigation or smoothing of the rate rate cap and deferral account Maximum savings per month (2018) TFO cost per month Savings as a percentage of TFO cost per month Total delivered cost per month Savings as a percentage of total delivered cost per month Residential $3.38 $ % $ % Large industrial $129,192 $1,212, % $3,226, % The maximum rate reduction relative to the baseline monthly electricity bill for a residential customer was $3.38 per month in 2018, a savings of 11 per cent on the transmission component of the bill, but only a 2.6 per cent saving relative to the total delivered cost. 22 A large industrial customer would experience a similar percentage saving on the transmission component of its electricity bill and a four per cent saving relative to its total delivered cost. 23 However, the Analysis report states that the use of the rate cap and deferral account mechanism would result in average costs being higher than customers would otherwise pay beyond 2024, as the deferral account balance was drawn down. The analysis performed by EDC demonstrated that a deferral account balance would be very sensitive to changes in several input assumptions; specifically, load forecast, capital costs, and interest rate. Further, if it were to become necessary to increase the rate cap to ensure the deferral account balance would be contained within acceptable limits, this would serve to counteract any rate mitigation achieved. The depreciation alternative was tested for the four largest Alberta transmission development projects. 24 The analysis included extending the average service lives from 40 years to 50 years; switching from straight-line to a compound interest method of depreciation using a discount rate of 6.37 per cent (assumed weighted average cost of capital); and testing the compound interest The transmission wires cost or TFO cost are those costs paid by the AESO to the TFOs for the use of a TFO s transmission facilities, it represents only a portion of the total transmission cost, which also includes the cost of operating reserves, ancillary services and the AESO s own general and administrative costs. The total delivered cost for a residential customer (or distribution connected customers) includes the total transmission cost, distribution cost, local access fee, retail charge and the cost of energy used. The total delivered cost for a large industrial customer (or transmission-connected customer) includes the total transmission cost plus the cost of energy used. The large transmission development projects include: EATL, WATL, SATR and FATD.

9 Page 9 method of depreciation using a discount rate of 15 per cent. The assumption of a 15 per cent discount rate was an extreme case to test the limits of the method. The table below is reproduced from the Analysis report. It demonstrates the aggregate extent of rate mitigation associated with using a compound interest depreciation method for the four largest transmission development projects, with a 50-year asset life and a 15 per cent discount rate. Table 2. Typical customer Extent of the mitigation or smoothing of the rate compound interest depreciation Maximum savings per month (2018) TFO cost per month Savings as a percentage of TFO cost per month Total delivered cost per month Savings as a percentage of total delivered cost per month Residential $1.48 $ % $ % Large industrial $56,894 $1,212, % $3,226, % Using the 50-year compound interest depreciation method instead of the 40-year straight-line depreciation method reflected in the status quo resulted in a maximum rate reduction of $1.50 per month in 2018 (a five per cent reduction) for a residential customer. The reduction for a residential customer relative to the total delivered cost of electricity was 1.2 per cent. A large industrial customer would also experience a maximum five per cent saving in 2018 on the transmission component of its monthly electricity bill but less than a two per cent saving relative to its total delivered cost. Again, similar to the rate cap and deferral method, using a compound interest depreciation method to mitigate rates in the short term would result in consumers paying more than they otherwise would beyond The Analysis report also states that should the depreciation alternative be implemented to achieve these monthly savings, other factors must also be taken into consideration: The financial implications for the transmission facility owners of delaying capital recovery (e.g., credit metric concerns, higher risk). Delaying recovery of depreciation expense nearer to the end-of-life raises the risk that the asset may become no longer physically used or useful in providing utility service before the asset is fully depreciated, thus increasing the potential for a stranded cost. The compound interest method is a significant departure from the depreciation methodology that is currently used in Alberta (generally a straight-line, equal life group or whole life approach) and there will likely be concerns raised with respect to implementation costs. The rate cap and rate deferral account methodology resulted in a larger percentage reduction in a typical customer s rates than the compound interest methodology. However, in terms of the total delivered cost per month, the percentage mitigating effects on consumer rates with either method are relatively small. While the two methods do achieve some level of rate mitigation, these small

10 Page 10 benefits associated with the rate reductions achieved must be weighed against the risks contemplated above. 5 Future considerations This initiative set out to examine alternative approaches and rate treatments that might mitigate or smooth the impact on consumers of rate or bill increases, while ensuring regulated utilities continue to have an opportunity to earn a fair return on capital. The Commission chose to examine two alternatives, each of which represented a significant departure from current practices in Alberta to test whether taking certain actions could result in an overall smoothing of rate increases and in turn, mitigate the rate or bill impact on consumers. The results of the analysis suggest that no one method, on its own, is likely to produce a meaningful reduction or significant smoothing of the impact on consumers rates or bill increases. In addition, the analysis suggests that the adoption of either alternative would mean that consumers would pay more over time than they would if the Commission were to retain the status quo. The Commission is also mindful that if the alternatives considered were to be adjusted to further mitigate short-term rate increases, consumers would pay even more over time than they would if the Commission were to retain the status quo. This does not mean that the Commission cannot seek to mitigate the rate effects occasioned by the addition of the capital investments in transmission to the rate bases of the TFOs. Rate impacts are routinely considered by the Commission as part of ISO and TFO tariff applications. The Commission considers the existing regulatory framework will continue to be the best way to address the regulatory treatment of transmission investment in the future. This approach recognizes that the ISO tariff is subject to periodic review to determine whether the beneficiaries from the investment have changed in any major way that would require a change to the method by which costs are attributed to rate classes, in order to ensure that the incentives provided by price signals support efficient outcomes. Examples where the Commission has already taken steps to mitigate rate impacts in past applications include: In the AltaLink Management Ltd general tariff proceeding, AltaLink was encouraged to separately track the large bulk system assets currently being placed into service. The ability to maintain the actuarial data for these distinct assets will assist in determining whether the service life data indicates that the substantial engineering improvements implicit in recent plant additions result in extending useful service life. Similarly, in the EPCOR Distribution & Transmission Inc. (EPCOR) general tariff proceeding, EPCOR was directed by the Commission to maintain the accounting and depreciation records for its Heartland transmission line assets and assets of a similar nature in a manner that would allow for the isolation of depreciation and net book value of those assets at some future time. EPCOR was also directed to explore the effects of ISO Rule as they relate to EPCOR s transmission lines and towers and consider the requirements of enhanced functional specifications, and the impact that any new design

11 Page 11 and selection requirements may have on the expected service lives of newly constructed assets falling under this rule. In Decision , 25 the compliance filing for the AltaLink general tariff application, the Commission stated that its directive to AltaLink to review its project inservice dates with the AESO was intended to address any cost mitigation opportunities that might be available through delaying projects during this period of significant transmission capital investment. In Decision , 26 related to the AESO 2014 ISO tariff proceeding, the Commission directed the AESO to develop revised language in its tariff terms and conditions pertaining to the designation of system versus market participant costs. As stated in that decision, the purpose of this direction was to ensure that, if there is advancement in the in-service requirement of an end-use customer dependent on a system project that does not provide congestion relief, the end-use customer may be required to pay for some or all of the incremental costs associated with that advancement. In Bulletin , 27 the Commission stated that Proceeding was initiated to address the customer advancement cost component of the ISO tariff. In Decision and Decision , 29 the Commission suspended the construction work in progress (CWIP) accounting treatment in place at that time for ATCO Electric Ltd. and AltaLink, respectively. This allowed the utilities to recover construction-related financing costs as they were incurred during construction rather than waiting until after the asset was constructed and placed into service. This treatment is commonly referred to as CWIP in rate base. This relief was granted by the Commission primarily as a means of addressing credit metric concerns due to abnormally high balances in the utilities CWIP accounts as a result of the large investment in transmission. However, in Decision , the Commission also recognized that CWIP in rate base treatment would result in a more gradual increase in customer rates over time, which would smooth out and help to mitigate the sudden large increases in revenue requirement that would occur under the traditional treatment. In the recent AltaLink and ATCO Electric general tariff applications (proceedings 3524 and respectively) rate relief was an issue in both proceedings. The Commission approved certain aspects of the rate relief measures proposed in the AltaLink proceeding Decision : AltaLink Management Ltd., Refiling Pursuant to Decision and Decision , Proceeding 3024, Application , September 8, Decision : Alberta Electric System Operator, 2014 ISO Tariff Application and 2013 ISO Tariff Update, Proceeding 2718, Application , August 21, Bulletin , Commission-initiated proceeding to address the customer advancement cost component of the Alberta Electric System Operator s tariff, October 22, Decision : ATCO Electric Ltd Phase I Distribution Tariff, Transmission Facility Owner Tariff, Proceeding 650, Application , April 13, Decision : AltaLink Management Ltd., General Tariff Application, Proceeding 1021, Application , November 18, 2011.

12 Page 12 The Commission has determined that it will not, as a policy, adopt either of the rate mitigation proposals it has considered in this initiative. Rather, alternative approaches and rate treatments to mitigate or smooth the impact on consumer rates will be considered on a case-by-case basis, from time to time, in the context of comprehensive tariff applications. Should parties wish to pursue the alternatives examined in this report or to pursue other alternatives, a proposal must be brought forward in either an ISO tariff application, in the case of a rate cap and deferral account mechanism or a similar proposal, or a TFO general tariff application in the case of depreciation alternatives. (original signed by) Robert D. Heggie Chief Executive

To learn more about Berkshire Hathaway Energy s commitment, please visit their website.

To learn more about Berkshire Hathaway Energy s commitment, please visit their website. A new look with a new owner On Monday, December 1, 2014 Berkshire Hathaway Energy completed the purchase of AltaLink. The sale received the provincial approval from the Alberta Utilities Commission (AUC)

More information

Chapter 3 Province of New Brunswick Audit: Accounting for Pensions and NB Power

Chapter 3 Province of New Brunswick Audit: Accounting for Pensions and NB Power PNB Audit: Accounting for Pensions and NB Power Chapter 3 Province of New Brunswick Audit: Accounting for Pensions and NB Power Contents Introduction... 41 Provincial Pension Plans... 41 Accounting for

More information

FSC Guidance Note No. 31 Provisioning for Deferred Tax Assets. 19 December 2012

FSC Guidance Note No. 31 Provisioning for Deferred Tax Assets. 19 December 2012 FSC Guidance Note No. 31 Provisioning for Deferred Tax Assets 19 December 2012 Purpose of this Guidance Note: To provide industry participants with guidance in the provisioning for deferred tax assets

More information

What is Cost of Service Regulation? Basic Issues in Rate Proceedings. Basic COS Component: Operating Expenses

What is Cost of Service Regulation? Basic Issues in Rate Proceedings. Basic COS Component: Operating Expenses Tariff Development I: The Basic Ratemaking Process The Ratemaking Formula and Basic Components Darryl Tietjen Public Utility Commission of Texas Briefing for the NARUC/INE Partnership 1 2 What is Cost

More information

The Alberta Electricity Market Frequently Asked Questions

The Alberta Electricity Market Frequently Asked Questions The Alberta Electricity Market Frequently Asked Questions NOTE: Responses have been gathered from the official websites and public materials of the Government of Alberta, Alberta Utilities Commission,

More information

DEPRECIATION AND AMORTIZATION EXPENSES

DEPRECIATION AND AMORTIZATION EXPENSES Filed: September, 00 Exhibit C Tab Schedule Page of DEPRECIATION AND AMORTIZATION EXPENSES.0 INTRODUCTION The depreciation and amortization expense for Hydro One s Distribution business in its 00 test

More information

THE ENMAX ENERGY BILL

THE ENMAX ENERGY BILL Bites of ENMAX and industry information THE ENMAX ENERGY BILL 1 ENMAX Corporation Each month, ENMAX Energy Corporation customers receive a bill (also called an invoice or statement) outlining their costs

More information

Instructions for use:

Instructions for use: TRANSMISSION MONTHLY PROJECT PROGRESS REPORT INSTRUCTIONS FOR COMPLETION TEMPLATE Instructions for use: PURPOSE OF FORM: The Transmission monthly Project Progress Report form is to be used by the Transmission

More information

Rule change request. 18 September 2013

Rule change request. 18 September 2013 Reform of the distribution network pricing arrangements under the National Electricity Rules to provide better guidance for setting, and consulting on, cost-reflective distribution network pricing structures

More information

SOA 2012 Annual Meeting & Exhibit October 14-17, 2012. Session 114 PD, Rapid Retirement Research. Moderator: Andrew J. Peterson, FSA, EA, FCA, MAAA

SOA 2012 Annual Meeting & Exhibit October 14-17, 2012. Session 114 PD, Rapid Retirement Research. Moderator: Andrew J. Peterson, FSA, EA, FCA, MAAA SOA 2012 Annual Meeting & Exhibit October 14-17, 2012 Session 114 PD, Rapid Retirement Research Moderator: Andrew J. Peterson, FSA, EA, FCA, MAAA Presenter: Joseph J. Silvestri, FSA, EA, FCA, MAAA Primary

More information

MANAGEMENT S DISCUSSION AND ANALYSIS

MANAGEMENT S DISCUSSION AND ANALYSIS MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2013 MANAGEMENT S DISCUSSION AND ANALYSIS This MD&A should be read in conjunction with the Corporation s unaudited interim consolidated

More information

New York s Transmission Challenges and Opportunities: An Overview

New York s Transmission Challenges and Opportunities: An Overview New York s Transmission Challenges and Opportunities: An Overview By: Dr. Matthew Cordaro 2012 is shaping up to be the year of the grid. Governor Cuomo has proposed an energy highway aimed at finding ways

More information

The City of Calgary. Customer and Implementation Issues Arising from Business Tax Consolidation

The City of Calgary. Customer and Implementation Issues Arising from Business Tax Consolidation The City of Calgary Customer and Implementation Issues Arising from Business Tax Consolidation This page is intentionally left blank. Table of Contents Introduction... 1 A. Implementation time frame...

More information

Alice Miller Energy Consultant September 28, 2011

Alice Miller Energy Consultant September 28, 2011 Rate Design and Billing Systems Alice Miller Energy Consultant September 28, 2011 What is Rate Design? Principal goals of rate design Meet revenue requirement Equity among service classes Customer impacts

More information

British Steel Pension Scheme: Public Consultation Response from the Pension Protection Fund

British Steel Pension Scheme: Public Consultation Response from the Pension Protection Fund British Steel Pension Scheme: Public Consultation Response from the Pension Protection Fund Summary The PPF recognises the Government s commitment to securing a sustainable future for the UK steel industry

More information

Gas transport tariffs calculation

Gas transport tariffs calculation Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) Gas transport tariffs calculation 1 TABLE OF CONTENTS 1. INTRODUCTION...

More information

AUC Information. How does Alberta s electric industry work?

AUC Information. How does Alberta s electric industry work? AUC Information How does Alberta s electric industry work? Electricity and the AUC Getting electrical power to consumers involves three major steps: Generation (power plants) Transmission high voltage

More information

SCHEDULE A TO THE REGINA CIVIC EMPLOYEES SUPERANNUATION AND BENEFIT PLAN

SCHEDULE A TO THE REGINA CIVIC EMPLOYEES SUPERANNUATION AND BENEFIT PLAN SCHEDULE A TO THE REGINA CIVIC EMPLOYEES SUPERANNUATION AND BENEFIT PLAN FUNDING POLICY as of January 1, 2015 TABLE OF CONTENTS Page I. BACKGROUND...1 II. FUNDING OBJECTIVES...3 III. RISK MANAGEMENT...5

More information

ENERGY ADVISORY COMMITTEE. Electricity Market Review: Return on Investment

ENERGY ADVISORY COMMITTEE. Electricity Market Review: Return on Investment ENERGY ADVISORY COMMITTEE Electricity Market Review: Return on Investment The Issue To review the different approaches in determining the return on investment in the electricity supply industry, and to

More information

CHAPTER 26. SUBSTANTIVE RULES APPLICABLE TO TELECOMMUNICATIONS SERVICE PROVIDERS.

CHAPTER 26. SUBSTANTIVE RULES APPLICABLE TO TELECOMMUNICATIONS SERVICE PROVIDERS. 26.201. Cost of Service. (a) (b) (c) Application. Unless the context clearly indicates otherwise, in this section the term "utility," insofar as it relates to telecommunications utilities, shall refer

More information

Washington Utilities and Transportation Commission

Washington Utilities and Transportation Commission Mission Statement: The UTC protects consumers by ensuring that utility and transportation services are fairly priced, available, reliable, and safe. Washington Utilities and Transportation Commission Principles

More information

Network Code on Harmonised Transmission Tariff Structures for Gas

Network Code on Harmonised Transmission Tariff Structures for Gas Network Code on Harmonised Transmission Tariff Structures for Gas ENTSOG s Network Code for Re-Submission to ACER ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: +32 2 894 5100; Fax: +32 2 894

More information

Electricity Rates and Prices

Electricity Rates and Prices 4Chapter Electricity Rates and Prices 58 In this chapter, electricity rates are the prices that retail electricity customers pay for the power they use and for the additional services involved in delivering

More information

REVIEW OF THE COST STATUS OF MAJOR TRANSMISSION PROJECTS IN ALBERTA

REVIEW OF THE COST STATUS OF MAJOR TRANSMISSION PROJECTS IN ALBERTA REVIEW OF THE COST STATUS OF MAJOR TRANSMISSION PROJECTS IN ALBERTA From The Transmission Facilities Monitoring Committee DECEMBER 2014 REPORT Review of the Status of Major Transmission Projects in Alberta

More information

Memo. AESO Board. Should you have any questions or additional information requirements please let me know. Yours truly, Todd Fior

Memo. AESO Board. Should you have any questions or additional information requirements please let me know. Yours truly, Todd Fior Memo To: AESO Board From: Vice-President, Finance Date: October 29, 2015 Subject: AESO 2016 Busines Plan Enclosed is the AESO 2016 Business Plan (Business Plan). This document was prepared by AESO Management

More information

AESO 2014 Business Plan and Budget Proposal

AESO 2014 Business Plan and Budget Proposal AESO 2014 Business Plan and Budget Proposal November 1, 2013 Table of Contents Section 1 Section 2 Section 3 Board Decision Items Executive Summary Stakeholder Presentations to the AESO Board Stakeholder

More information

Comments of the Edison Electric Institute Net Benefits and Costs of Distributed Solar Energy and Innovative Solar Deployment Models, DOE-EERE

Comments of the Edison Electric Institute Net Benefits and Costs of Distributed Solar Energy and Innovative Solar Deployment Models, DOE-EERE Comments of the Edison Electric Institute Net Benefits and Costs of Distributed Solar Energy and Innovative Solar Deployment Models, DOE-EERE Category 2 - Innovative Solar Deployment Models Edward H. Comer,

More information

It s Time to Save for Retirement. The Benefit of Saving Early and the Cost of Delay

It s Time to Save for Retirement. The Benefit of Saving Early and the Cost of Delay It s Time to Save for Retirement The Benefit of Saving Early and the Cost of Delay November 2014 About the Insured Retirement Institute: The Insured Retirement Institute (IRI) is the leading association

More information

DISCLOSURE OF ELECTRICITY PRICING METHODOLOGY PURSUANT TO REQUIREMENT 22 OF THE ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004

DISCLOSURE OF ELECTRICITY PRICING METHODOLOGY PURSUANT TO REQUIREMENT 22 OF THE ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004 DISCLOSURE OF ELECTRICITY PRICING METHODOLOGY PURSUANT TO REQUIREMENT 22 OF THE ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004 Effective 1 April 2010 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 DESCRIPTION

More information

The Levy Control Framework

The Levy Control Framework Report by the Comptroller and Auditor General Department of Energy & Climate Change The Levy Control Framework HC 815 SESSION 2013-14 27 NOVEMBER 2013 4 Key facts The Levy Control Framework Key facts 2bn

More information

GN5: The Prudential Supervision outside the UK of Long-Term Insurance Business

GN5: The Prudential Supervision outside the UK of Long-Term Insurance Business GN5: The Prudential Supervision outside the UK of Long-Term Insurance Business Classification Recommended Practice MEMBERS ARE REMINDED THAT THEY MUST ALWAYS COMPLY WITH THE PROFESSIONAL CONDUCT STANDARDS

More information

Pricing Methodology 1. 1 July 2009 to 30 June 2014. April 2010

Pricing Methodology 1. 1 July 2009 to 30 June 2014. April 2010 Pricing Methodology 1 1 July 2009 to 30 June 2014 April 2010 1 TransGrid s Pricing Methodology as approved by the Australian Energy Regulator ( AER ). This document outlines the pricing methodology that

More information

Report on the Status of Net Energy Metering In the State of Maryland. Prepared by The Public Service Commission of Maryland

Report on the Status of Net Energy Metering In the State of Maryland. Prepared by The Public Service Commission of Maryland Report on the Status of Net Energy Metering In the State of Maryland Prepared by The Public Service Commission of Maryland Prepared for the General Assembly of Maryland Under Public Utilities Article 7-306(h)

More information

TAMPA ELECTRIC COMPANY UNDOCKETED: SOLAR ENERGY IN FLORIDA STAFF S REQUEST FOR COMMENTS INTRODUCTION PAGE 1 OF 1 FILED: JUNE 23, 2015.

TAMPA ELECTRIC COMPANY UNDOCKETED: SOLAR ENERGY IN FLORIDA STAFF S REQUEST FOR COMMENTS INTRODUCTION PAGE 1 OF 1 FILED: JUNE 23, 2015. INTRODUCTION PAGE 1 OF 1 Introduction Solar power is an important part of Florida s energy future and can provide a number of benefits to Florida and its citizens by generating power without emissions

More information

PENSION COMMUNICATION RESOURCES

PENSION COMMUNICATION RESOURCES PENSION COMMUNICATION RESOURCES Contents Two Sets of Pension Measures Separating Accounting and Funding for Pensions Has the ARC Disappeared? Two Sets of Numbers Financial Statement Impact of New Standards

More information

PROJECT FINANCIAL EVALUATION

PROJECT FINANCIAL EVALUATION Introduction to Financial Figures of Merit PROJECT FINANCIAL EVALUATION An investor, energy policy analyst, or developer may use a variety of figures of merit to evaluate the financial attractiveness of

More information

BUSINESS PLAN: 2012 2013 to 2014 2015

BUSINESS PLAN: 2012 2013 to 2014 2015 BUSINESS PLAN: 2012 2013 to 2014 2015 ALBERTA UTILITIES COMMISSION The Alberta Utilities Commission (AUC) is an independent, quasi-judicial agency of the Government of Alberta. While the Minister of Energy

More information

Toscana Resource Corporation Condensed Consolidated Interim Financial Statements

Toscana Resource Corporation Condensed Consolidated Interim Financial Statements TOSCANA RESOURCE CORPORATION Toscana Resource Corporation Condensed Consolidated Interim Financial Statements March 31, 2012 and 2011 Condensed Consolidated Interim Statements of Financial Position As

More information

Decision 2013-417. Utility Asset Disposition. November 26, 2013

Decision 2013-417. Utility Asset Disposition. November 26, 2013 Decision 2013-417 Utility Asset Disposition November 26, 2013 The Alberta Utilities Commission Decision 2013-417: Utility Asset Disposition Application No. 1566373 Proceeding ID No. 20 November 26, 2013

More information

2015 ASSESSMENT RATES

2015 ASSESSMENT RATES 2015 ASSESSMENT RATES FOREWORD WorkSafeNB determines employers assessment rates annually. Several factors influence rates, such as WorkSafeNB s current financial obligations, the prevailing economic environment,

More information

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY Consolidated Financial Statements of BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY Consolidated Financial Statements Management Report Auditors' Report Consolidated Financial Statements Consolidated Statement

More information

Rate Regulation Initiative

Rate Regulation Initiative Decision 2012-237 Distribution Performance-Based Regulation September 12, 2012 The Alberta Utilities Commission Decision 2012-237: Distribution Performance-Based Regulation Application No. 1606029 Proceeding

More information

Sri Lanka Accounting Standard-LKAS 19. Employee Benefits

Sri Lanka Accounting Standard-LKAS 19. Employee Benefits Sri Lanka Accounting Standard-LKAS 19 Employee Benefits CONTENTS paragraphs SRI LANKA ACCOUNTING STANDARD-LKAS 19 EMPLOYEE BENEFITS OBJECTIVE SCOPE 1 6 DEFINITIONS 7 SHORT-TERM EMPLOYEE BENEFITS 8 23 Recognition

More information

COLLEGE RETIREMENT EQUITIES FUND RULES OF THE FUND

COLLEGE RETIREMENT EQUITIES FUND RULES OF THE FUND COLLEGE RETIREMENT EQUITIES FUND RULES OF THE FUND Effective as of April 24, 2015 Attached to and made part of the CREF Contract or Certificate at its Date of Issue Note to participants: CREF's rules of

More information

ELECTRICITY FINAL BUDGET AND FEES: 2015-16

ELECTRICITY FINAL BUDGET AND FEES: 2015-16 ELECTRICITY FINAL BUDGET AND FEES: 2015-16 PUBLISHED MAY 2015 CONTENTS EXECUTIVE SUMMARY 4 Introduction 4 2015-16 fees 4 Contacts 5 Energy consumption 6 National Electricity Market (NEM) 6 Revenue requirement

More information

ELECTRICITY FINAL BUDGET AND FEES: 2016-17

ELECTRICITY FINAL BUDGET AND FEES: 2016-17 ELECTRICITY FINAL BUDGET AND FEES: 2016-17 Published: May 2016 CONTENTS EXECUTIVE SUMMARY 4 1.1 Introduction 4 1.2 Key messages 4 1.3 2016-17 fees 5 1.4 Budget contacts 5 NATIONAL ELECTRICITY MARKET 6

More information

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Public October 16, 2015 ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update In August 2015, the U.S. Environmental

More information

PRINCIPLES AND PRACTICES OF FINANCIAL MANAGEMENT.

PRINCIPLES AND PRACTICES OF FINANCIAL MANAGEMENT. PPFM JULY 2013 PRINCIPLES AND PRACTICES OF FINANCIAL MANAGEMENT 1 PRINCIPLES AND PRACTICES OF FINANCIAL MANAGEMENT. This is an important document, which you should read and keep. 2 PRINCIPLES AND PRACTICES

More information

Requests and inquiries concerning this document should be addressed to:

Requests and inquiries concerning this document should be addressed to: ENERGEX Limited trading as ENERGEX ABN 40 078 849 055 26 Reddacliff Street NEWSTEAD QLD 4006 http://www.energex.com.au Requests and inquiries concerning this document should be addressed to: Network Pricing

More information

Energy and Consumer Impacts of EPA s Clean Power Plan. Prepared for the American Coalition for Clean Coal Electricity

Energy and Consumer Impacts of EPA s Clean Power Plan. Prepared for the American Coalition for Clean Coal Electricity Energy and Consumer Impacts of EPA s Clean Power Plan Prepared for the American Coalition for Clean Coal Electricity Contents Executive Summary Overview of the Clean Power Plan NERA Methodology Baseline

More information

Before the Department of Energy Washington, D.C. 20585. Smart Grid RFI: Addressing Policy and Logistical Challenges

Before the Department of Energy Washington, D.C. 20585. Smart Grid RFI: Addressing Policy and Logistical Challenges Before the Department of Energy Washington, D.C. 20585 In the Matter of Addressing Policy and Logistical Challenges to Smart Grid Implementation I. Introduction Smart Grid RFI: Addressing Policy and Logistical

More information

GUIDANCE NOTE 253 - DETERMINATION OF LIFE INSURANCE POLICY LIABILITIES

GUIDANCE NOTE 253 - DETERMINATION OF LIFE INSURANCE POLICY LIABILITIES THE INSTITUTE OF ACTUARIES OF AUSTRALIA A.C.N. 000 423 656 GUIDANCE NOTE 253 - DETERMINATION OF LIFE INSURANCE POLICY LIABILITIES APPLICATION Appointed Actuaries of Life Insurance Companies. LEGISLATION

More information

ABI Position paper. Supplement to ED/2009/12 Financial Instruments: Amortised Cost and Impairment

ABI Position paper. Supplement to ED/2009/12 Financial Instruments: Amortised Cost and Impairment ABI Position paper Supplement to ED/2009/12 Financial Instruments: Amortised Cost and Impairment March 2011 Page 1 of 17 Dear Sir/Madam, The Italian Banking Association welcomes the publication of the

More information

NOTES ON AURORA LINE CHARGES FOR NETWORK DESIGNERS, CONSULTANTS AND ELECTRICAL CONTRACTORS

NOTES ON AURORA LINE CHARGES FOR NETWORK DESIGNERS, CONSULTANTS AND ELECTRICAL CONTRACTORS ov 26 OTES O AURORA LIE CHARGES FOR ETWORK DESIGERS, COSULTATS AD ELECTRICAL COTRACTORS 1. PURPOSE AD SCOPE OF THIS DOCUMET This document provides general advice for personnel involved in the alteration

More information

International Accounting Standard 36 Impairment of Assets

International Accounting Standard 36 Impairment of Assets International Accounting Standard 36 Impairment of Assets Objective 1 The objective of this Standard is to prescribe the procedures that an entity applies to ensure that its assets are carried at no more

More information

Corporate Renewable Energy Procurement: Industry Insights

Corporate Renewable Energy Procurement: Industry Insights Corporate Renewable Energy Procurement: Industry Insights June 2016 AMERICAN COUNCIL ON RENEWABLE ENERGY ACORE is a national non profit organization dedicated to advancing the renewable energy sector through

More information

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional

More information

The Water and Power Employees Retirement Disability and Death Benefit Insurance Plan

The Water and Power Employees Retirement Disability and Death Benefit Insurance Plan The Water and Power Employees Retirement Disability and Death Benefit Insurance Plan Review of the Death Benefit Fund as of July 1, 2014 Family Death Benefit Allowance Fund Supplemental Family Death Benefit

More information

Tasmanian Transmission Revenue Proposal

Tasmanian Transmission Revenue Proposal Tasmanian Transmission Revenue Proposal An overview for Tasmanian electricity consumers Regulatory control period 1 July 2014 30 June 2019 Tasmanian Networks Pty Ltd About TasNetworks We are Tasmania s

More information

Article by Martin Kelly, BSc (Econ) Hons, DIP. Acc, FCA, MBA, MCMI. Examiner in Professional 2 Advanced Corporate Reporting

Article by Martin Kelly, BSc (Econ) Hons, DIP. Acc, FCA, MBA, MCMI. Examiner in Professional 2 Advanced Corporate Reporting IMPAIRMENT - IAS 36 Article by Martin Kelly, BSc (Econ) Hons, DIP. Acc, FCA, MBA, MCMI. Examiner in Professional 2 Advanced Corporate Reporting Introduction Intangible assets, particularly goodwill, have

More information

Introduction to Regulatory Accounting

Introduction to Regulatory Accounting Introduction to Regulatory Accounting John Caldwell, Ph.D. Director of Economics EEI Advanced Rates Training Course July 23, 2012 Agenda for Today s Presentation 1. Review of General Ratemaking Concepts

More information

Public Authority Debt Structure and New York s Future Generations

Public Authority Debt Structure and New York s Future Generations Public Authority Debt Structure and New York s Future Generations September 2010 Thomas P. DiNapoli New York State Comptroller Additional copies of this report may be obtained from: Office of the State

More information

NV Energy ISO Energy Imbalance Market Economic Assessment

NV Energy ISO Energy Imbalance Market Economic Assessment March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,

More information

Estimated Impact of Medicare Part D On Retiree Prescription Drug Costs

Estimated Impact of Medicare Part D On Retiree Prescription Drug Costs Estimated Impact of Medicare Part D On Retiree Prescription Drug Costs By Richard Marchel, FSA, MAAA Kevin Dolsky, FSA, MAAA Table of Contents Sections I. Description and Purpose... 1 II. Data and Methodology...

More information

Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) -

Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) - Glossary of Terms Avoided Cost - The incremental cost Flint Energies would pay for the next kilowatt-hour of power in the open marketplace for energy. Flint Energies Board of Directors sets this Avoided

More information

THE COMBINED CODE PRINCIPLES OF GOOD GOVERNANCE AND CODE OF BEST PRACTICE

THE COMBINED CODE PRINCIPLES OF GOOD GOVERNANCE AND CODE OF BEST PRACTICE THE COMBINED CODE PRINCIPLES OF GOOD GOVERNANCE AND CODE OF BEST PRACTICE Derived by the Committee on Corporate Governance from the Committee s Final Report and from the Cadbury and Greenbury Reports.

More information

Retail Operating Costs A REPORT PREPARED FOR THE ECONOMIC REGULATION AUTHORITY OF WESTERN AUSTRALIA. March 2012

Retail Operating Costs A REPORT PREPARED FOR THE ECONOMIC REGULATION AUTHORITY OF WESTERN AUSTRALIA. March 2012 Retail Operating Costs A REPORT PREPARED FOR THE ECONOMIC REGULATION AUTHORITY OF WESTERN AUSTRALIA March 2012 Frontier Economics Pty. Ltd., Australia. i Frontier Economics March 2012 Public Retail Operating

More information

Foreign Currency Translation

Foreign Currency Translation Statement of Accounting Standards Foreign Currency Translation Prepared by the Accounting Standards Board and the Public Sector Accounting Standards Board of the Australian Accounting Research Foundation

More information

rising Electricity Costs:

rising Electricity Costs: rising Electricity Costs: A Challenge For Consumers, Regulators, And Utilities Electricity is the lifeblood of the U.S. economy. It powers our homes, offices, and industries; provides communications, entertainment,

More information

NIGERIAN ELECTRICITY REGULATORY COMMISSION. Presentation at the ELECTRIC POWER INVESTORS FORUM

NIGERIAN ELECTRICITY REGULATORY COMMISSION. Presentation at the ELECTRIC POWER INVESTORS FORUM NIGERIAN ELECTRICITY REGULATORY COMMISSION Tariff Design and Regulation Presentation at the ELECTRIC POWER INVESTORS FORUM February 2011 OUTLINE Establishment and Functions of NERC MYTO as an Incentive

More information

FEDERAL RESERVE BULLETIN

FEDERAL RESERVE BULLETIN FEDERAL RESERVE BULLETIN VOLUME 38 May 1952 NUMBER 5 Business expenditures for new plant and equipment and for inventory reached a new record level in 1951 together, they exceeded the previous year's total

More information

Changes in regulated electricity prices from 1 July 2012

Changes in regulated electricity prices from 1 July 2012 Independent Pricing and Regulatory Tribunal FACT SHEET Changes in regulated electricity prices from 1 July 2012 Based on Final Determination, 13 June 2012 The Independent Pricing and Regulatory Tribunal

More information

2016 ASSESSMENT RATES

2016 ASSESSMENT RATES 2016 ASSESSMENT RATES FOREWORD WorkSafeNB determines employers assessment rates annually. Several factors influence rates, such as WorkSafeNB s current financial obligations, the prevailing economic environment,

More information

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut

More information

Natural Gas Pipeline Penalty Recovery Issue Paper

Natural Gas Pipeline Penalty Recovery Issue Paper Natural Gas Pipeline Penalty Recovery Issue Paper September 16, 2014 Table of Contents I. Introduction and Background... 3 II. Scope of Initiative and Plan for Stakeholder Engagement... 4 III. The Approved

More information

CLOSING SUBMISSION OF DR. ROLAND R. CLARKE

CLOSING SUBMISSION OF DR. ROLAND R. CLARKE CLOSING SUBMISSION OF DR. ROLAND R. CLARKE BARBADOS NO. 02/09 BL&P - RADJ THE FAIR TRADING COMMISSION IN THE MATTER of the Utilities Regulation Act, Cap 282 of the Laws of Barbados; IN THE MATTER of the

More information

Pricing methodology Electricity distribution network. From 1 April 2014

Pricing methodology Electricity distribution network. From 1 April 2014 Pricing methodology Electricity distribution network From 1 April 2014 Pursuant to: The Electricity Distribution Information Disclosure Determination 2012 1. TABLE OF CONTENTS 1. Table of contents... 2

More information

Economic Concepts for Pricing Electricity Network Services A Report for the Australian Energy Market Commission

Economic Concepts for Pricing Electricity Network Services A Report for the Australian Energy Market Commission Economic Concepts for Pricing Electricity Network Services A Report for the Australian Energy Market Commission 21 July 2014 Project Team Adrian Kemp Oliver Nunn Martin Chow Stephanie Gainger NERA Economic

More information

Electricity Costs White Paper

Electricity Costs White Paper Electricity Costs White Paper ISO New England Inc. June 1, 2006 Table of Contents Executive Summary...1 Highlights of the Analysis...1 Components of Electricity Rates...2 Action Plan for Managing Electricity

More information

Construction Work in Progress: An Effective Financial Tool to Lower the Cost of Electricity

Construction Work in Progress: An Effective Financial Tool to Lower the Cost of Electricity February 2012 Construction Work in Progress: An Effective Financial Tool to Lower the Cost of Electricity Executive Summary New nuclear power plants are large, capital-intensive projects. They provide

More information

Electricity network services. Long-term trends in prices and costs

Electricity network services. Long-term trends in prices and costs Electricity network services Long-term trends in prices and costs Contents Executive summary 3 Background 4 Trends in network prices and service 6 Trends in underlying network costs 11 Executive summary

More information

Property, Plant and Equipment

Property, Plant and Equipment Indian Accounting Standard (Ind AS) 16 Property, Plant and Equipment Property, Plant and Equipment Contents Paragraphs OBJECTIVE 1 SCOPE 2-5 DEFINITIONS 6 RECOGNITION 7 14 Initial costs 11 Subsequent costs

More information

Office of the Rail Access Regulator. Contents

Office of the Rail Access Regulator. Contents 1 A Brief Comparison of the WA Rail Access Code approach to calculating ceiling cost with the conventional Depreciated Optimised Replacement Cost methodology 18 July 2002 Contents 1. Purpose Of Paper 2.

More information

CONDENSED INTERIM FINANCIAL STATEMENTS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2015 (UNAUDITED)

CONDENSED INTERIM FINANCIAL STATEMENTS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2015 (UNAUDITED) CONDENSED INTERIM FINANCIAL STATEMENTS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2015 (UNAUDITED) STATEMENTS OF FINANCIAL POSITION (Unaudited; in thousands of Canadian dollars) ($000s) Note September

More information

Internal Revenue Service Number: 200632006 Release Date: 8/11/2006 Index Number: 167.22-01

Internal Revenue Service Number: 200632006 Release Date: 8/11/2006 Index Number: 167.22-01 Internal Revenue Service Number: 200632006 Release Date: 8/11/2006 Index Number: 167.22-01 ------------------------------------------------------------ ------------- --------------------------------------------

More information

SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID.

SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID. TITLE XIII--SMART GRID SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID. It is the policy of the United States to support the modernization of the Nation's electricity transmission and

More information

European Distribution System Operators for Smart Grids

European Distribution System Operators for Smart Grids European Distribution System Operators for Smart Grids Integrating electricity storage in distribution grids May 2016 Introduction Since the start of mass-electrification, the electricity industry has

More information

Wisconsin Energy Corporation Plan

Wisconsin Energy Corporation Plan Wisconsin Energy Corporation Plan Disclaimer All statements in this presentation other than historical facts are forward-looking statements that involve risks and uncertainties which are subject to change

More information

APPENDIX VIII FORMULA FOR CALCULATING ANNUAL BASE TRANSMISSION REVENUE REQUIREMENTS UNDER SDG&E S TRANSMISSION OWNER TARIFF

APPENDIX VIII FORMULA FOR CALCULATING ANNUAL BASE TRANSMISSION REVENUE REQUIREMENTS UNDER SDG&E S TRANSMISSION OWNER TARIFF APPENDIX VIII FORMULA FOR CALCULATING ANNUAL BASE TRANSMISSION REVENUE REQUIREMENTS UNDER SDG&E S TRANSMISSION OWNER TARIFF This Appendix VIII sets forth the formula for calculating the annual Base Transmission

More information

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS May 1, 2015 The following ( MD&A ) of FortisAlberta Inc. (the Corporation ) should be read in conjunction with the following: (i) the unaudited interim

More information

PENNSYLVANIA 529 GUARANTEED SAVINGS PLAN

PENNSYLVANIA 529 GUARANTEED SAVINGS PLAN PENNSYLVANIA 529 GUARANTEED SAVINGS PLAN Annual Actuarial Report on the Pennsylvania 529 Guaranteed Savings Plan Fund June 30, 2015 Prepared by John T. Condo, FSA, MAAA, Ph.D. Actuarial Resources Corporation

More information

INTERNATIONAL STANDARD ON AUDITING 540 AUDITING ACCOUNTING ESTIMATES, INCLUDING FAIR VALUE ACCOUNTING ESTIMATES, AND RELATED DISCLOSURES CONTENTS

INTERNATIONAL STANDARD ON AUDITING 540 AUDITING ACCOUNTING ESTIMATES, INCLUDING FAIR VALUE ACCOUNTING ESTIMATES, AND RELATED DISCLOSURES CONTENTS INTERNATIONAL STANDARD ON AUDITING 540 AUDITING ACCOUNTING ESTIMATES, INCLUDING FAIR VALUE ACCOUNTING ESTIMATES, AND RELATED DISCLOSURES (Effective for audits of financial statements for periods beginning

More information

Group Exercise I: Calculating the Revenue Requirement

Group Exercise I: Calculating the Revenue Requirement Group Exercise I: Calculating the Revenue Requirement Ron Davis Principal Economist Colorado Department of Regulatory Agencies Public Utilities Commission 1560 Broadway, Suite 250 Denver, CO 80202 P 303.894.2883

More information

Contents of Attachment

Contents of Attachment Contents of Attachment 1.Qualitative Information for the Third Quarter of the Fiscal Year Ending March 31, 2015 2 (1) Qualitative Information on the Consolidated Business Results 2 (2) Qualitative Information

More information

Depreciation Options for ATCO Gas Expert report of Gregory Houston ATCO Gas Australia

Depreciation Options for ATCO Gas Expert report of Gregory Houston ATCO Gas Australia Expert report of Gregory Houston ATCO Gas Australia 13 March 2014 NERA Economic Consulting Darling Park Tower 3 201 Sussex Street Sydney NSW 2000 Tel: 61 2 8864 6500 Fax: 61 2 8864 6549 www.nera.com NERA

More information

Improving Customer Service

Improving Customer Service May 2012 Improving Customer Service Lori Topp joins AltaLink as Senior Vice President, Customer Service On March 19, 2012, AltaLink welcomed Lori Topp to the team. AltaLink selects two companies to act

More information

ENERGY ADVISORY COMMITTEE. Electricity Market Review : Electricity Tariff

ENERGY ADVISORY COMMITTEE. Electricity Market Review : Electricity Tariff ENERGY ADVISORY COMMITTEE Electricity Market Review : Electricity Tariff The Issue To review the different tariff structures and tariff setting processes being adopted in the electricity supply industry,

More information

Lump-Sum Pension Payments: 2008 and Beyond

Lump-Sum Pension Payments: 2008 and Beyond BENEFITS INFORMATION BULLETIN Milliman Employee Benefits December 14, 2007 BIB 07-01 Effective for plan years beginning in 2008, ERISA-covered defined benefit retirement plans that offer participants lump-sum

More information

Memorandum. This memorandum requires Board action. Executive Summary

Memorandum. This memorandum requires Board action. Executive Summary California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: July 8, 2014 Re: Decision on the Delaney-Colorado

More information

New York s Upstate Nuclear Power Plants Contribution to the State Economy

New York s Upstate Nuclear Power Plants Contribution to the State Economy New York s Upstate Nuclear Power Plants Contribution to the State Economy PREPARED FOR New York State IBEW Utility Labor Council Rochester Building and Construction Trades Council Central and Northern

More information