Assessment and Management of Asbestos Contaminated Land following Removal and Illegal Dumping Activities

Size: px
Start display at page:

Download "Assessment and Management of Asbestos Contaminated Land following Removal and Illegal Dumping Activities"

Transcription

1 Assessment and Management of Asbestos Contaminated Land following Removal and Illegal Dumping Activities Environmental Health Hazards Unit Toxicology

2 Issues Increasing burden of work is associated with demolition, removal and dumping activities. Increased development in Metro locations Deteriorating condition of in situ asbestos building products Presents a risk to public and source of considerable community concern and anxiety Finding contamination Purchasing property with MOT

3

4 Issues demolition/removal Asbestos cement material in soil has been found before demolition works begin During preparation of asbestos removal plans After the removal of asbestos-containing materials/demolition of residential and commercial buildings

5 Contaminated Sites Sites reported under the Contaminated Sites Act 2003 Asbestos contaminated sites may arise from potential non-compliances with existing legislation and control measures Inadequate or incomplete clean-up following asbestos removal/demolition work Illegal dumping Historical land use/fill Uncontrolled fill material

6 Issues Contaminated Sites Works performed on sites between identification of asbestos cement material and final Remediation and Validation After asbestos contamination is found in initial investigations earthworks and vehicle movements may disseminate the contamination throughout the site; creating a larger affected area and subsequent protracted and costly remediation and validation

7 Environmental Health Environmental Health Professionals are often required to respond to a number of complaints They play an important role in responding to complaints, undertaking initial risk assessment and advising on appropriate actions

8 Assessment and Management The assessment and management process requires the interpretation and application of the existing legislation occupational safety and health, public health environmental legislation codes of practice and guidelines and the associated reporting requirements

9 Assessment and Management The recommended approach for assessing asbestos contaminated sites Determine the extent of contamination Understand the process and which regulatory conditions apply Demolition/removal (Code of Practice) Contaminated site (Guidelines) Determine the most appropriate risk management strategies for site cleanup A distinction must be made between asbestos management during removal work and contaminated site reporting, assessment, remediation and management

10 Assessment and Management Actions, responsibilities and reporting requirements First response Administer the Health (Asbestos) Regs Written notice Inform and educate on OHS and environmental requirements Report to applicable regulatory agencies

11 Remediation and Management Remediation and Management has two main objectives Prevent (accidental) release of respirable airborne fibres Deal with aesthetic and perception issues associated with asbestos

12 Health (Asbestos) Regulations 1992 A person who stores, breaks, damages, cuts, maintains, repairs, removes, moves, or disposes of, or uses any material containing asbestos without taking reasonable measures to prevent asbestos fibres entering the atmosphere commits an offence. Reasonable Measures: using water or other practical measures to keep airborne material containing asbestos to a minimum non-powered hand tools using approved vacuum cleaner or wet methods no high pressure water or compressed air ensuring, so far as is reasonably practicable, that material containing asbestos is not broken or abraded disposed in accordance with Environmental Regs, as soon as practicable.

13 Written Notices Written notice served to: the owner of the material or premises a person handling material containing asbestos Can direct that person to maintain, repair, remove, move, dispose of, or handle the material containing asbestos in such manner and within such time as is specified in the direction

14 Prevention need to take action

15 Conditions of Restricted Licence All work to be done in accordance with legislation and Code of Practice Records (5 years) Training Safe Work Method for each job Disposal receipt Above records are subject to audit by WorkSafe WA EHO can ask for above to be provided, but there is no legal obligation for person to comply Asbestos removalists with restricted asbestos removal licence may not understand the implications associated with contaminated sites

16 Expectation When demolition or asbestos removal is occurring at a property it is very important that no suspect material remains on site afterwards. The recommended risk management strategies aim to improve compliance with existing legislative requirements and meet the expectations regarding the classification of contaminated sites.

17 OSH Requirements OSH Regulations 1996 and Code of Practice for the Safe Removal of Asbestos [NOHSC: 2002(2005)] Section of the Code of Practice addresses circumstances where soil may have become contaminated with ACM and requires that If there is a risk of soil contamination, the area should be visually inspected, and if any ACM are detected the soil must be decontaminated Based on a risk assessment The use of professional site remediation advice and/or services should be considered Dust control and pick up of all visible pieces of ACM debris or removal of topsoil The contaminated soil must be disposed of as asbestos waste It is recommended that a site walkover is performed following removal work, to confirm that no soil contamination remains on the soil surface (generally considered to include the top 10 cm of soil)

18 Contaminated Sites Act May require the site to be professionally investigated and, if necessary, cleaned up. If any suspect material has been worked into the soil, this may trigger very lengthy and expensive investigation and clean up costs. If the site cannot be effectively cleaned up it may be necessary to place a memorial on the Certificate of Title indicating that the site is contaminated and identifying any restrictions on the use of the site. All ACM must be taken to a licensed waste facility. It is recommended that disposal receipts are retained that provide information on the quantity of ACM waste material delivered to the waste facility.

19 Prevention Where asbestos contamination is removed in accordance with legislation and guidelines a record must be kept of the details of the removal and disposal (ie. location, type and quantity of material removed, procedures and control measures, photographs and disposal receipt)

20 Local Authority Management Options Building Departments Conditions on building permit - demolitions Hazardous material inspection Compliance with legislation and code of practice Provision of safe work method Provision of disposal receipts. Environmental Health Professionals Health (Asbestos) Regs 1992 Advise of other legal requirements Report to relevant authority

21 References Further information on soil investigation and clean-up is available in the document Guidelines for the Assessment, Remediation and Management of Asbestos-Contaminated Sites in Western Australia (DoH, 2009) Appendix: Management of Small-Scale Low- Risk Soil Asbestos Contamination Other guidance material Public Health Website

22 Restrictions encountered by EHOs in performing their role: Limited power Limited penalties Response from other agencies (with greater powers and penalties) may not be immediate or may be limited

23 Disposal Options Domestic asbestos waste explore options Cost of clean-up can be high (survey results) Feasibility of subsidising disposal costs Hazardous waste collection program that includes asbestos cement waste Making arrangements with local licensed waste disposal facilities

24 Conclusion Role of EHO Education and negotiation Risk Assessment and provide direction or professional advice on remediation and management Enforcement Reporting

25 Department of Environment Regulation Contaminated Sites Branch Hotline: (9am to 5pm Monday to Friday. If calling outside these hours, please contact the 24-hour Pollution Watch Hotline on ) Sign up for alerts. Send your contact details to:

26 Department of Health Environmental Health Hazards Unit (08) The Environmental Health Hazard Unit is concerned with safety, water quality, asbestos and other environmental hazard management, safe chemical and pesticide use, and other factors in the environment that may impact on human health. Click on the link below for further information. Environmental Health Hazards

27 Worksafe WA Next speaker WorkSafe Locked Bag 14, Cloisters Square, PERTH, WA 6850

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT BCIT Safety Manual Contents 1. Purpose... 3 2. Definitions... 3 2.1 Asbestos... 3 2.2 Asbestos Containing Material (ACM)... 3 2.3 Friable Material... 3 2.4 Low Risk Work Activity... 3 2.5 Moderate Risk

More information

Introduction. Comments - Memorandum of Understanding

Introduction. Comments - Memorandum of Understanding Submission to the Department of Health on the Revision of the Health (Asbestos) Regulations 1992 and Supporting Arrangements June 2015 Status of this Submission This Submission has been prepared through

More information

HOW TO SAFELY REMOVE ASBESTOS

HOW TO SAFELY REMOVE ASBESTOS HOW TO SAFELY REMOVE ASBESTOS Code of Practice DECEMBER 2011 Safe Work Australia is an Australian Government statutory agency established in 2009. Safe Work Australia consists of representatives of the

More information

Asbestos removal and licensing

Asbestos removal and licensing Applicant Guide Asbestos removal and licensing Includes: Asbestos removal and asbestos assessor licence and notifications of asbestos removal work, asbestos fibres and emergency demolition of structures

More information

How to Safely Remove Asbestos

How to Safely Remove Asbestos How to Safely Remove Asbestos Code of Practice December 2012 CP113 Workplace Standards Department of Justice This code of practice has been approved by the Tasmanian Minister for Workplace Relations under

More information

ASBESTOS in state and local government

ASBESTOS in state and local government ASBESTOS in state and local government Inspection campaign In 2013/14, WorkSafe WA is conducting a proactive inspection campaign focusing on the management of asbestos in state and local government buildings.

More information

Asbestos frequently asked questions

Asbestos frequently asked questions Asbestos frequently asked questions Asbestos is the name given to a group of fibrous silicate minerals which were mined in Australia and overseas and used for a range of products. All forms of asbestos

More information

Guide for applicants for asbestos removal and asbestos assessor licences and notifications

Guide for applicants for asbestos removal and asbestos assessor licences and notifications Guide for applicants for asbestos removal and asbestos assessor licences and notifications of asbestos removal work, asbestos fibres and emergency demolition of structures containing asbestos March 2013

More information

ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS

ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS GUIDE FOR APPLICANTS ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS TABLE OF CONTENTS INTRODUCTION... 2 WHY YOU NEED A LICENCE... 2 WHY YOU NEED TO NOTIFY... 2 LICENCE TYPES... 2 SCOPE... 2 WHO MAY APPLY

More information

Removing asbestos in workplaces

Removing asbestos in workplaces Edition No. 1 September 2008 Compliance Code Removing asbestos in workplaces Contents Preface 2 Introduction 3 Purpose 3 Scope 3 Application 3 Consultation 4 General requirements of the Occupational Health

More information

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW January 2013 NSW Public Works Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 27, Ernst & Young Centre

More information

ASBESTOS MANAGEMENT POLICY

ASBESTOS MANAGEMENT POLICY ASBESTOS MANAGEMENT POLICY Published : 4th Revision December 2014 1 Table of Contents INTRODUCTION... 3 DUTY TO MANAGE ASBESTOS... 3 DUTIES OF CAMPUS SERVICES... 3 1.0 POLICY OBJECTIVES... 5 2.0 RESPONSIBILITIES...

More information

Asbestos licensing and notification guide for applicants

Asbestos licensing and notification guide for applicants Asbestos licensing and notification guide for applicants Use this guide if you are: applying for an asbestos removal work licence applying for an asbestos assessor licence notifying of asbestos removal

More information

SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS

SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS Within the City of Mandurah many dwellings exist with asbestos cement building products. When removing the asbestos, concerns may be raised

More information

STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure

STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure STANDARD OPERATING INSTRUCTION Safe Handling and Removal of Asbestos Cement Pipes Procedure 1 July 2012 Title System Reference Number Approved By Safe Handling and Removal of Asbestos Cement Pipes People

More information

Statewide Strategic Plan for the Safe Management of Asbestos in Queensland

Statewide Strategic Plan for the Safe Management of Asbestos in Queensland Statewide Strategic Plan for the Safe Management of Asbestos in Queensland 2014 2019 Great state. Great opportunity. Foreword The Statewide Strategic Plan for the Safe Management of Asbestos in Queensland

More information

Asbestos Policy & Procedure

Asbestos Policy & Procedure Asbestos Policy & Procedure 1. Purpose & Introduction This policy and procedure sets out Octavia s commitment and approach to ensuring, so far as reasonably practicable, that residents, contractors and

More information

LIVING WITH FIBRO JUNE 1998 WORKCOVER NSW HEALTH AND SAFETY NOTES. WorkCover. Watching out for you.

LIVING WITH FIBRO JUNE 1998 WORKCOVER NSW HEALTH AND SAFETY NOTES. WorkCover. Watching out for you. LIVING WITH FIBRO JUNE 1998 WORKCOVER NSW HEALTH AND SAFETY NOTES WorkCover. Watching out for you. Disclaimer This publication contains information regarding occupational health, safety, injury management

More information

Before beginning any construction or demolition activities at your construction site,

Before beginning any construction or demolition activities at your construction site, VII. Hazardous Substances (Superfund Liability) Requirements for Construction Activities Before beginning any construction or demolition activities at your construction site, you should evaluate the site

More information

Asbestos in Grounds Management Plan, Matraville Soldiers Settlement Public School, Matraville, NSW

Asbestos in Grounds Management Plan, Matraville Soldiers Settlement Public School, Matraville, NSW Asbestos in Grounds Management Plan, Matraville Soldiers Settlement Public School, Matraville, NSW July 2013 NSW Public Works Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 27, Ernst

More information

University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS

University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations

More information

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos ASBESTOS AND THE HOME RENOVATOR A basic guide on what you need to know about asbestos DISCLAIMER This publication contains information regarding occupational health and safety. It includes some of your

More information

Policy on the Management of Asbestos

Policy on the Management of Asbestos WISHAW AND DISTRICT HOUSING ASSOCIATION Policy on the Management of Asbestos As with all the Association s policies and procedures, this document, where required, may be able to be translated into other

More information

Management of asbestos in recycled construction and demolition waste

Management of asbestos in recycled construction and demolition waste Management of asbestos in recycled construction and demolition waste Guide November 2010 Disclaimer This publication may contain occupational health and safety and workers compensation information. It

More information

Asbestos-Containing Material Window Putty/Mastic

Asbestos-Containing Material Window Putty/Mastic Asbestos-Containing Material Window Putty/Mastic NOTE: Any potential asbestos containing materials should be entered in the ACM site register and the information emailed to asbestos@bmw.wa.gov.au Prepared

More information

ASBESTOS MANAGEMENT REVIEW

ASBESTOS MANAGEMENT REVIEW ASBESTOS MANAGEMENT REVIEW ISSUES PAPER RESPONSE FORM Please complete in RICH TEXT or WORD DOCUMENT Format Individual or Organisational Name: CFMEU Construction and General Division National Office Chapter

More information

UI Procedures for Asbestos Management

UI Procedures for Asbestos Management UI Procedures for Asbestos Management The University of Iowa Rev.12/12/2012 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing

More information

Asbestos Management & Abatement

Asbestos Management & Abatement Asbestos Management & Abatement Latest revised date: October 29, 2012 Page 1 of 18 1.0 LEGAL & LEGISLATIVE REQUIREMENTS This standard provides guidance to meeting the minimum requirements of the Act &

More information

How To Manage Asbestos At A Recycling Facility

How To Manage Asbestos At A Recycling Facility Guidelines for managing asbestos at construction and demolition waste recycling facilities Lead Author: Location/Dept: Industry Regulation Licensing Branch (IRLB) Waste Industries, IRLB Issued Date: 18/12/2012

More information

have been provided with information on whether they do or do not contain asbestos before starting work;

have been provided with information on whether they do or do not contain asbestos before starting work; Health Effects of Asbestos If your work involves possible exposure to asbestos, you should: be aware of the risks from asbestos exposure; understand the importance of keeping exposure as low as possible;

More information

HAVEBURY HOUSING PARTNERSHIP

HAVEBURY HOUSING PARTNERSHIP HS028 HAVEBURY HOUSING PARTNERSHIP POLICY ASBESTOS MANAGEMENT Controlling Authority Director of Resources Policy No. HS028 Issue No. 3 Status Final Date November 2013 Review Date: November 2016 Equality

More information

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy ASBESTOS POLICY Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy This is a controlled document. It should not be altered in any way without the express permission of the author or their representative.

More information

ASBESTOS REGULATIONS 2001. Government Notice No 155 Gazette No 23108 dated 10 February 2002

ASBESTOS REGULATIONS 2001. Government Notice No 155 Gazette No 23108 dated 10 February 2002 ASBESTOS REGULATIONS 2001 Government Notice No 155 Gazette No 23108 dated 10 February 2002 SUMMARY OF THE NEW PROVISIONS: More detailed and streamlined Method of assessment changed (A) INTRODUCTION Exposure

More information

Control of Asbestos Policy

Control of Asbestos Policy Control of Asbestos Policy Version Number: V1D Name of originator/author: Estates Manager 0161 277 1235 Name of responsible committee: Estates and Facilities Committee Name of executive lead: Director

More information

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials. The Administration of Norfolk Island SAFE DISPOSAL OF ASBESTOS AT THE WASTE MANAGEMENT CENTRE The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing

More information

POLICY Contents. 1.0 Introduction Statement

POLICY Contents. 1.0 Introduction Statement POLICY Contents 1.0 Introduction Statement 2.0 Legal Responsibility 2.1 Asbestos Management Hierarchy 2.2 Duty Holders Responsibility 2.3 Employees Responsibility 3.0 Asbestos Management Procedure 4.0

More information

Asbestos Removal and Assessor Licensing Information

Asbestos Removal and Assessor Licensing Information Asbestos Removal and Assessor Licensing Information January 2013 Version 1.0 - GB366 1 2 Contents Introduction 5 Why you need a licence 5 Why you need to notify 5 Licence types 5 Class A asbestos removal

More information

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material Revised November 21, 2013 Application Code of Practice Where asbestos is present or believed to be present in a workplace

More information

Asbestos Disposal in the Northern Territory

Asbestos Disposal in the Northern Territory Information on the requirements for the disposal of Asbestos in the Northern Territory Scope These guidance notes have been developed to assist industry, local government, consultants and other relevant

More information

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW August 2006 NSW Department of Commerce Parsons Brinckerhoff Australia Pty Limited ACN 078 004 798 and Parsons

More information

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date Policy No: RM78 Version: 1.0 Name of Policy: Corporate Asbestos Management Policy, Organisational Arrangements and Procedures Policy Effective From: 24/10/2013 Date Ratified 12/09/2013 Ratified Health

More information

ENVIRONMENTAL ASPECTS REGISTER (ISO 14001)

ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) 1. Scope The scope of this Environmental Aspects Register covers the following operational areas: Aberdeen Region (A); Cumbernauld Region (C); Warrington Region

More information

INTRODUCTION. Alastair Hunter Deputy Director-General, Finance and Infrastructure

INTRODUCTION. Alastair Hunter Deputy Director-General, Finance and Infrastructure INTRODUCTION The health, safety and well-being of students and staff is the highest priority of the NSW Department of Education and Training (DET). This commitment includes ensuring that any asbestos-containing

More information

Asbestos Surveys and Removals Progress Report Financial Year 07/08

Asbestos Surveys and Removals Progress Report Financial Year 07/08 Report title Asbestos Surveys and Removals Progress Report Financial Year 07/08 Agenda item 8 Meeting Date Finance, Procurement & Property Committee 16 June 2008 Report by Document Number (12/05/2008)

More information

Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association

Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association Presented by: Russell E. Stauffer, PE AMEC Environment & Infrastructure, Inc. October 30, 2014 75 East

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate

More information

Asbestos Management Procedure

Asbestos Management Procedure Asbestos Management Procedure Reference: HS/021/2010 Version No: 2.0 Issue Date: July 2010 Document Control Document Ref: HS/021/2010 Date Created: Jan 2010 Version: 2 Date Modified: Revision due December

More information

GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS. BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship

GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS. BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship Effective Date: June 9, 2015 Approved By: EMC Date Reviewed: Date Revised:

More information

Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%)

Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%) Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%) I. Asbestos Survey Requirements Prior to performing any construction,

More information

LEGAL REVIEW & UPDATE

LEGAL REVIEW & UPDATE LEGAL REVIEW & UPDATE There are lots of laws and regulations designed to protect workers, the general public, and the environment. However, not everyone follows the laws. Many people deliberately break

More information

ASBESTOS CONTROL PROGRAM

ASBESTOS CONTROL PROGRAM WESTERN UNIVERSITY OCCUPATIONAL HEALTH AND SAFETY ASBESTOS CONTROL PROGRAM Last Update: August 2012 TABLE OF CONTENTS 1.0 INTRODUCTION AND SCOPE... 3 2.0 DEFINITIONS... 4 3.0 HISTORICAL INFORMATION...

More information

Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards

Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards Part 2. Overview Risk management Workplace health and safety legislation How should asbestos exposure be managed? identify hazards assess risk decide on control measures implement control measures monitor

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes

More information

FACT SHEET - CPC40110 - CERTIFICATE IV IN BUILDING & CONSTRUCTION (BUILDING)

FACT SHEET - CPC40110 - CERTIFICATE IV IN BUILDING & CONSTRUCTION (BUILDING) FACT SHEET - CPC40110 - CERTIFICATE IV IN BUILDING & CONSTRUCTION (BUILDING) This program covers building theory and practices related to low buildings. This program will provide you with the knowledge

More information

ASBESTOS IN THE HOME

ASBESTOS IN THE HOME J:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.docJ:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.doc ASBESTOS IN THE HOME What

More information

What is Asbestos Cement and how is it identified?

What is Asbestos Cement and how is it identified? Regulatory Services Dealing with Asbestos Cement Every year the Council's Environmental Protection team receives a large number of enquiries about garden sheds, garages and house soffits made of asbestos.

More information

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE BCD.26 STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE DATE: March 2015 Copyright Reserved TESTING, ASSESSMENT AND WORK WITH ASBESTOS CONTAINING MATERIALS (ACM S) REFERENCE This Directive deals

More information

Guidelines for the Assessment, Remediation and Management of Asbestos-Contaminated Sites in Western Australia

Guidelines for the Assessment, Remediation and Management of Asbestos-Contaminated Sites in Western Australia Guidelines for the Assessment, Remediation and Management of Asbestos-Contaminated Sites in Western Australia Produced by Environmental Health Directorate Department of Health 2009 HP11346 MAY 09 23946

More information

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.

More information

Asbestos Policy Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all

Asbestos Policy   Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all Asbestos Policy Lead officer: Jeff Scott Date agreed: May 2013 Review date: May 2016 Working together to deliver quality homes and a better environment for all Page 1 of 11 Contents Page 1 Introduction

More information

THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT S REVISED ASBESTOS-IN-SOILS REGULATIONS AND THE COLORADO BROWNFIELDS TAX CREDIT

THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT S REVISED ASBESTOS-IN-SOILS REGULATIONS AND THE COLORADO BROWNFIELDS TAX CREDIT THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT S REVISED ASBESTOS-IN-SOILS REGULATIONS AND THE COLORADO BROWNFIELDS TAX CREDIT Presented by Polly Jessen Kaplan Kirsch & Rockwell LLP January 22,

More information

DNREC DIVISION OF AIR AND WASTE MANAGEMENT PROGRAM ADMINISTRATION AND ORGANIZATIONAL STRUCTURE

DNREC DIVISION OF AIR AND WASTE MANAGEMENT PROGRAM ADMINISTRATION AND ORGANIZATIONAL STRUCTURE Health & Safety Manual, Section 1-7 Page: 1 DNREC DIVISION OF AIR AND WASTE MANAGEMENT PROGRAM ADMINISTRATION AND ORGANIZATIONAL STRUCTURE The purpose of the Department of Natural Resources and Environmental

More information

Asbestos Safety Management Standard Issue 8 October 2008. www.walsall.org.uk/healthandsafety

Asbestos Safety Management Standard Issue 8 October 2008. www.walsall.org.uk/healthandsafety www.walsall.org.uk/healthandsafety Asbestos Safety Management Standard Issue 8 October 2008 Page 1 of 7 / WMBC/SMS Asb/008/01 UNCONTROLLED WHEN PRINTED Please contact us if you have any difficulty reading

More information

Approved by: UBC ACT Committee

Approved by: UBC ACT Committee The University of British Columbia Asbestos Safety Policy Prepared by: Russell R. English Policy Approved by: UBC ACT Committee Issue Date: April 1, 2004 Replaces: March, 1989 I-B-05 1.0 Policy: This policy

More information

How To Deal With Asbestos In Minster Of Minsteria

How To Deal With Asbestos In Minster Of Minsteria RELATED TO EXPOSURE TO ASBESTOS AT WORK [S.L.424.23 1 SUBSIDIARY LEGISLATION 424.23 RELATED TO EXPOSURE TO ASBESTOS AT WORK REGULATIONS LEGAL NOTICE 323 of 2006. 15th December, 2006 1. (1) The title of

More information

ASBESTOS MANAGEMENT INTRODUCTION

ASBESTOS MANAGEMENT INTRODUCTION SECTION: II. General Hygiene/ Safety Chapter: 7. Asbestos Management Revision Date: 12/05/2013 Review Date: ASBESTOS MANAGEMENT INTRODUCTION PURPOSE This policy has been developed to ensure that hazardous

More information

Occupational Health and Safety. Bulletin. Asbestos Containing Materials in Buildings to be Demolished

Occupational Health and Safety. Bulletin. Asbestos Containing Materials in Buildings to be Demolished Occupational Health and Safety Bulletin Asbestos Containing Materials in Buildings to be Demolished During previous revisions to the occupational health and safety legislation, asbestos requirements from

More information

2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd.

2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd. 2009 Housing Provider Forum A Guide to Asbestos Management - Owner Requirements Regulation respecting Asbestos on Construction Projects and in Buildings and Repair Operations Presented by Jeff Drummond

More information

Asbestos Management Plan

Asbestos Management Plan Harlow Council Asbestos Management Plan Version 4 Scope: This management plan applies to the management of all asbestos containing materials to properties under the ownership/management of Harlow Council

More information

Asbestos Containing Materials Survey And Register Moil Shopping Centre

Asbestos Containing Materials Survey And Register Moil Shopping Centre Asbestos Survey and Register Asbestos Containing Materials Survey And Register Moil Shopping Centre Property Name: Moil Shopping Centre Property Address: 8 Moil Cres. Darwin, NT Prepared for: John Nicolakis

More information

Author G Morton July 2015. Newcastle University Asbestos Management Plan 2015

Author G Morton July 2015. Newcastle University Asbestos Management Plan 2015 Newcastle University Asbestos Management Plan 2015 1 Contents 1.0 Introduction 2.0 Asbestos Management Duty Holder Responsibilities 2.1 Asbestos Manager (Head of Maintenance) 2.2 University Asbestos Survey

More information

Managing Asbestos Policy

Managing Asbestos Policy Managing Asbestos Policy Liverpool Mutual Homes Page 1 of 16 Table of Contents 1. MANAGEMENT INFORMATION 2. POLICY STATEMENT 3. POLICY AIMS AND KEY OBJECTIVES 4. INTRODUCTION 5. DETAIL 6. LINKS TO LMH

More information

Asbestos: Notifiable Non-Licensed Work. A Minor Change or a Significant Challenge

Asbestos: Notifiable Non-Licensed Work. A Minor Change or a Significant Challenge Asbestos: Notifiable Non-Licensed Work A Minor Change or a Significant Challenge John Evans B.Sc., CMIOSH, FRSPH, MIOA, PGCE Technical Director Santia Asbestos Management Limited The Control of Asbestos

More information

How To Manage Asbestos At A University

How To Manage Asbestos At A University DIVISION OF FACILITIES MANAGEMENT Locked Bag 588 Boorooma Street Wagga Wagga NSW 2678 Australia Tel: +61 2 6933 2286 Fax: +61 2 6933 2180 www.csu.edu.au/division/facilitiesm ABN: 83 878 708 551 Asbestos

More information

P404 - Air Sampling of Asbestos and MMMF and Requirements for a Certificate of Reoccupation Following Clearance of Asbestos

P404 - Air Sampling of Asbestos and MMMF and Requirements for a Certificate of Reoccupation Following Clearance of Asbestos Proficiency Module Syllabus P404 - Air Sampling of Asbestos and MMMF and Requirements for a Certificate of Reoccupation Following Clearance of Asbestos Aim To provide candidates with theoretical and practical

More information

Asbestos in your home

Asbestos in your home Asbestos in your home How to dispose of Asbestos safely Telephone Number: 01372 732000 contactus@epsom-ewell.gov.uk www.epsom-ewell.gov.uk If you would like a copy of this document in large print, on tape

More information

Course Guidelines. Occupational Health and Safety for the Asbestos Worker

Course Guidelines. Occupational Health and Safety for the Asbestos Worker Course Guidelines Occupational Health and Safety for the Asbestos Worker February 2013 Table of Contents 1.0 Introduction...................................................... 1 2.0 Course Criteria...................................................

More information

Asbestos Monitoring Plan Former ROF Bishopton

Asbestos Monitoring Plan Former ROF Bishopton Asbestos Monitoring Plan Former ROF Bishopton September 2010 1 Table of Contents 1. Introduction... 3 1.1. Summary of Key Requirements... 3 1.2. Setting... 4 1.3. About Exova... 4 1.4. Scope of this Document...

More information

Re Inspection of Asbestos Containing Materials

Re Inspection of Asbestos Containing Materials Environmental www.bodycote.com www.healthsciences.bodycote.com Re Inspection of Asbestos Containing s Frog Firle Alfriston Polegate East Sussex BN26 5TT Report Number: W07-1749 Page 1 of 11 Client YHA

More information

The Management of Asbestos containing Materials

The Management of Asbestos containing Materials The Management of Asbestos containing Materials Status Owner Approval by University Court Draft Head of Estates and Building 1 Purpose... 1 2 Scope... 3 3 Principles... 4 4 Procedure... 5 5 Accountabilities...

More information

3. Asbestos Abatement Course 1. Introduction and Background to Asbestos Abatement. 4. Health Effects and Medical Surveillance

3. Asbestos Abatement Course 1. Introduction and Background to Asbestos Abatement. 4. Health Effects and Medical Surveillance St. Louis Brownfields Worker Training Program St. Louis Community College Harrison Education Center and St. Louis University Environmental Education & Training 1. Introduction to Environmental Technologies

More information

Asbestos Management Policy

Asbestos Management Policy Asbestos Management Policy Originator: Approval date: Policy and Strategy Team Sovini Board PCHA Board OVH Board/EMT 3 rd December 2012 22 nd November 2012 25 th September 2012 Review date: December 2013

More information

ASBESTOS MANAGEMENT PLAN. Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU

ASBESTOS MANAGEMENT PLAN. Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU ASBESTOS MANAGEMENT PLAN Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU CONTENTS 1. INTRODUCTION 2. HOW DOES THE BOROUGH OF POOLE MANAGE ITS ASBESTOS

More information

Environmental Protection Information Sheet: 2. Advice on Asbestos

Environmental Protection Information Sheet: 2. Advice on Asbestos Environmental Protection Information Sheet: 2 Advice on Asbestos A s b e s t o s Asbestos is a natural mineral, which has been widely used in construction materials and in articles within the home for

More information

What law applies Responsibilities of employers, building owners, householders, renovators and asbestos removalists regarding asbestos

What law applies Responsibilities of employers, building owners, householders, renovators and asbestos removalists regarding asbestos Asbestos Information available on managing and removing asbestos-containing materials has been updated to reflect the changes to legislation effective from 1 January 2006. What law applies Responsibilities

More information

Excerpts from EPA s Mold Remediation in Schools and Commercial Buildings

Excerpts from EPA s Mold Remediation in Schools and Commercial Buildings www.epa.gov/mold/mold_remediation.html Compiled by SUNY Office for Capital Facilities, May 2014 Page 1 Compiled by SUNY Office for Capital Facilities, May 2014 Page 2 Compiled by SUNY Office for Capital

More information

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015 ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015 Prepared For: (School Name) PREPARED BY: DIOCESE OF JOLIET ENVIRONMENTAL OFFICE FOR ANY ENVIRONMENTAL RELATED EMERGENCY CONTACT: RICHARD

More information

Policy. Asbestos Management Version 1.0. Adopted by Council at its meeting on 15 June 2010 Minute No: 390

Policy. Asbestos Management Version 1.0. Adopted by Council at its meeting on 15 June 2010 Minute No: 390 Policy Asbestos Management Version 1.0 Adopted by Council at its meeting on 15 June 2010 Minute No: 390 Division: Planning and Regulation Section: Building and Health File Reference: Council Policies/Protocols/Procedures

More information

CONTRACTOR INDUCTION HANDBOOK

CONTRACTOR INDUCTION HANDBOOK CONTRACTOR INDUCTION HANDBOOK POLICY The health and safety of all school employees and contractor employees is a vital concern at the school. Contract personnel will be treated in a manner consistent with

More information

Policy 7 Management of Asbestos

Policy 7 Management of Asbestos Policy 7 Management of Asbestos 1.0 Introduction Development & Infrastructure recognise both the need to protect their employees from the risks associated with encountering asbestos and the potential for

More information

Master Builders Australia NATIONAL ASBESTOS MANAGEMENT CONTROL AND REMOVAL POLICY

Master Builders Australia NATIONAL ASBESTOS MANAGEMENT CONTROL AND REMOVAL POLICY Master Builders Australia NATIONAL ASBESTOS MANAGEMENT CONTROL AND REMOVAL POLICY 2015 Master Builders Australia Limited 2015. Master Builders Australia Limited ABN 68 137 130 182 Level 1, 16 Bentham Street

More information

HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE

HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE Code of Practice DECEMBER 2011 Safe Work Australia is an Australian Government statutory agency established in 2009. Safe Work Australia consists of

More information

ASBESTOS CONTAINING MATERIALS POLICY

ASBESTOS CONTAINING MATERIALS POLICY ASBESTOS CONTAINING MATERIALS POLICY Document Control Version 3 Ratified by Risk Management Sub Group Date Ratified 19 December 2012 Name of Originator/Author Head of Estates and Facilities Name of Responsible

More information

SECTION 02 8213 ASBESTOS ABATEMENT

SECTION 02 8213 ASBESTOS ABATEMENT PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification sections shall apply to work of this section.

More information

Asbestos Management Policy

Asbestos Management Policy Central Bedfordshire Council www.centralbedfordshire.gov.uk Asbestos Management Policy The Housing Service Version 1.0 Directorate Social Care Health and Housing Service Housing Service Approved by Director

More information

SOUTH COOGEE TRANSPORT MANAGEMENT PLAN

SOUTH COOGEE TRANSPORT MANAGEMENT PLAN SOUTH COOGEE TRANSPORT MANAGEMENT PLAN On behalf of : DEPARTMENT FOR PLANNING & INFRASTRUCTURE Prepared by: ENV Australia A.C.N. 091 839 520 Mezzanine Level, Central Park 152-158 St Georges Terrace Perth

More information

OCCUPATIONAL HEALTH AND SAFETY AUTHORITY ACT (CAP. 424) Protection of Workers from the Risks related to Exposure to Asbestos at Work Regulations, 2006

OCCUPATIONAL HEALTH AND SAFETY AUTHORITY ACT (CAP. 424) Protection of Workers from the Risks related to Exposure to Asbestos at Work Regulations, 2006 L.N. 323 of 2006 B 4649 OCCUPATIONAL HEALTH AND SAFETY AUTHORITY ACT (CAP. 424) Protection of Workers from the Risks related to Exposure to Asbestos at Work Regulations, 2006 IN EXERCISE of the powers

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan Document Number: PLN-00055 Version Date: 24/04/2013 Page: 1 of 23 Table of Contents 1 Introduction... 4 2 Scope... 4 3 Definitions... 5 4 Responsibilities... 7 4.1 Board of Directors...

More information

Policy for the Management of Asbestos in the Workplace

Policy for the Management of Asbestos in the Workplace Southwark Council Management of Asbestos in the Workplace November 2011 Page 1 of 15 CONTENTS 1. INTRODUCTION... 3 2. POLICY STATEMENT... 3 3. ASBESTOS RISK CLASSIFICATION SCHEME... 5 4. SAMPLING OF ASBESTOS

More information

AUDIT OF DET ASBESTOS MANAGEMENT IN QUEENSLAND SCHOOLS

AUDIT OF DET ASBESTOS MANAGEMENT IN QUEENSLAND SCHOOLS AUDIT OF DET ASBESTOS MANAGEMENT IN QUEENSLAND SCHOOLS Conducted By GASKIN CONSTRUCTION SERVICES PTY LTD TABLE OF CONTENTS SECTIONS Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7

More information