ASBESTOS MANAGEMENT PROCEDURE

Size: px
Start display at page:

Download "ASBESTOS MANAGEMENT PROCEDURE"

Transcription

1 ASBESTOS MANAGEMENT PROCEDURE 1.0 General It is the policy of Hitchin Boys School not to allow staff, employees or pupils to sample, remove or work with Asbestos Containing Materials (ACMs). Asbestos products can be extremely hazardous. Asbestos is a known carcinogen and the inhalation of Asbestos fibres can be life threatening. It was used extensively in buildings up until the late 1980 s, being finally banned from the UK in However, newer buildings may also contain ACMs. Legislation and regulation regarding Asbestos is changing constantly, the main relevant regulations being the Control of Asbestos Regulations There are six key activities which need to be managed: Asbestos Management. Surveying, sampling and analysis. Asbestos removal. Work associated with Asbestos, requiring a licence. Work associated with Asbestos, which is notifiable work not requiring a licence. Work associated with Asbestos, not notifiable and not requiring a licence. Any work where Asbestos may be present requires appropriate information, instruction, training, controls and insurance cover. Asbestos can be found in many locations, including (but not limited to) the following: Thermal and acoustic insulation. Fire protective coatings. WC cisterns. Duct and riser panels. Pipe casings / access panels. Ceilings and wallboards. Fascia and soffit boards, gutters and downpipes. Boiler gaskets and ropes. Boiler flues. Roof and cladding sheets and tiles. Floor tiles. Textured coatings (Artex etc). Fuses and meter cupboard boards. Bituminous products (sink pads, flooring adhesive). Paper linings to linoleum floors. 1

2 2.0 Duty Holder The duty to manage asbestos is contained in regulation 4 of the Control of Asbestos Regulations It requires the person who has the duty (i.e. the "duty holder") to: Take reasonable steps to find out if there are materials containing asbestos in non-domestic premises, and if so, its amount, where it is and what condition it is in; Presume materials contain asbestos unless there is strong evidence that they do not; Make, and keep up-to-date, a record of the location and condition of the asbestos containing materials - or materials which are presumed to contain asbestos; Assess the risk of anyone being exposed to fibres from the materials identified; Prepare a plan that sets out in detail how the risks from these materials will be managed; Take the necessary steps to put the plan into action; Periodically review and monitor the plan and the arrangements to act on it so that the plan remains relevant and up-to-date; and Provide information on the location and condition of the materials to anyone who is liable to work on or disturb them. What Does This Mean? The Duty Holder is anyone responsible for maintaining and repairing all or part of a property, or who has control of a building. The Duty Holder must find out whether their building contains asbestos and what condition it is in. The risk must be assessed i.e. if it is likely to release fibres; also to make a plan to manage the risk. The legal duty is about managing any asbestos containing materials in a building, not necessarily removing asbestos. Asbestos Surveys Detailed visual surveys, supplemented by taking samples should be undertaken in all buildings for which the Duty Holder is responsible. Asbestos containing materials which are visible or which are in suspect areas of the building are identified and locations recorded in the Asbestos Log. The Asbestos Log should be kept with the Premises Register. The Asbestos Log should be updated after the following:- When asbestos is removed Where additional areas of asbestos are identified When condition of the asbestos material deteriorates Where it becomes more susceptible to damage because of a change in usage of the area When rooms/areas are altered (e.g. by removal/erection of a partition). 3.0 Site Asbestos Log Introduction Hitchin Boys School Asbestos Policy is designed to ensure that any work undertaken in any of the buildings which they own or manages is carried out under the safest of working conditions. The Site Asbestos Log (SAL) is the principal mechanism for ensuring that this is the case. 2

3 The Permission to Work System Any person carrying out work on the premises which will affect the buildings fabric, finishes or fixed equipment i.e. equipment connected directly to the mains supply of gas or electricity (e.g. heaters, kilns, ovens) must sign this record sheet to confirm that they have consulted, read and understood the asbestos log for the site. It is essential that each time work is undertaken this procedure is implemented. If the plans of works change in anyway, the asbestos log must be consulted again. To become an Authorising Officer it is necessary to have attended the Asbestos Awareness Seminar and received a certificate to that effect. It should be noted that the person carrying out the work is not allowed to authorise their own Permission to Work. A second signature from another Authorising Officer would be required. Appendix 1 will list all the people at the site who can give permission to work. It is the responsibility of the Manager of the site to ensure that this system is used on every occasion when maintenance is carried out. The Manager, or Authorising Officer, must identify with whoever is to undertake the work (the maintainer) the room/area in which the proposed maintenance is to be carried out. The Manager and the maintainer will consult the SAL and ensure the maintainer is fully aware of the location of any known asbestos in the area of the work being carried out. Consideration must be given to the nature of the work and its possible effect on known asbestos, e.g. heavy vibration of roofing work above rooms with asbestos ceilings may cause disturbance of asbestos materials. If intrusive works are to be carried out then further surveys of the work area are likely to be necessary. Subject to paragraph above, if there is no known asbestos present or if it will not be disturbed by work (as shown on the Site Asbestos Log) the work may start once the Permission to Work record has been completed, signed and countersigned. For an example of the Permission to Work record sheet see Appendix 2. NB If the maintainer is also an Authorising Officer he/she must not sign and countersign the permission to work record. Two different people must sign and countersign that job record. If asbestos is noted on the Asbestos Site Log and it will be disturbed by the work to be carried out NO WORK MAY PROCEED. The Manager or Authorising Officer should then seek professional guidance and request their assistance on what the next steps should be. If it is agreed that the work should go ahead with the necessary safety arrangements in place, the permission to work must be completed with the agreed details. Once the work has been started if any asbestos material, or suspected asbestos material is found either in a room/area not shown to contain asbestos or, additional to the information in the SAL work MUST STOP IMMEDIATELY. 3

4 Lock the room or area if possible. If the material has been disturbed, this must be treated as an incident. At this point refer immediately to the Section on - Asbestos Incident. The Site Asbestos Log A copy of the site asbestos log (SAL) is held in the Premises Register. It should be noted that the room numbers on the asbestos log are particular to the asbestos survey and may not match the premises numbering system. It is necessary to use the numbers on the site plans and on the asbestos log to avoid any confusion when reading the log and giving permission to work. The Site Asbestos Log must be kept in an appropriate place on each site, as it will be checked by everyone who is intending to undertake maintenance on the site. The SAL will comprise: A list of people authorised and trained to give permission for work to be undertaken on the site. Training and instruction received will also be recorded. The 'Permission to Work' system record sheets. A contents page. A section detailing how to use the SAL. A non-scale plan of the site showing all rooms and areas numbered with all known. asbestos denoted by the symbol A Blank copies of other relevant documentation (e.g. changes to site plans, Asbestos Incident Report forms, monitoring forms). A complete copy of the Asbestos Policy - Arrangements and Procedures. The SAL will be subject to revision or updating either because the site information has changed or the Arrangements and Procedures have been altered. The Site Plans The site asbestos log contains a not-to-scale plan of this property with all rooms and spaces numbered. All known asbestos is noted on the plan with the letter A in a triangle. It is essential that the plan is read in conjunction with the Site Asbestos Log. NB: It should be noted that the room/area numbering on the plan may differ from the numbering or naming scheme currently in use at the premises. All correspondence relating to asbestos must refer to the numbering system used on the asbestos site plan. Asbestos Surveys The asbestos survey undertaken between 1998 and 2000 by Hertfordshire County Council was an inspection and sampling of visible materials. They were non-intrusive survey of all areas which could be accessed and inspected without using specialist equipment or without causing significant damage to or affecting the performance of building elements or services. 4

5 The following details were recorded: The location of the asbestos containing material. The type of the asbestos. The form of the asbestos. The amount of asbestos. Whether the asbestos is vulnerable to damage. The present condition of the asbestos. Action to be taken. Frequency of inspection. Responsibility for inspection. Items not included in the Asbestos Survey or not sampled Floor Tiles Toilet Cisterns Mastic Pads Bitumen Products (Roof Felts, damp proof courses etc.) Applied Coatings Areas not included in the Asbestos Surveys Ceiling voids without access hatches. Areas above 3m high or where height restrictions apply. Floor and wall ducts and voids. Other concealed areas. Site Asbestos Log Update and Auditing A system to ensure regular monitoring is in place. Responsibility is with the Site Manager to ensure that the monitoring is carried out by the relevant person, at the intervals stated in the SAL. All asbestos containing materials must be inspected at least once in a 12 month period or more frequently if necessary. If at any time, it is apparent that the condition of the asbestos has deteriorated or changed, then the Asbestos Log should be updated as a matter of urgency. Fixed Equipment Fixed equipment is equipment connected directly to main supplies of gas or electricity that may contain asbestos; this would include types of kilns, ovens, heaters, steamers, sterilizing sinks, fryers etc. Fixed equipment which is shown in the SAL, or is known (by any other means) to contain asbestos should be maintained or repaired by a competent person. Conclusion The four major points of effective management of asbestos as contained within these Asbestos Management Procedures are as follows: The training and instruction given to site management The efficient use and updating of the Site Asbestos Log The Permission to Work system being used on every occasion by anyone who undertakes maintenance work Regular monitoring of the condition of asbestos material 5

6 4.0 Roles and Responsibilities Treatment of Known Asbestos Priority and methods of action undertaken are determined according to the type of asbestos containing material, its condition, and whether it is liable to damage. Asbestos containing materials are retained if in a sound condition, unlikely to be damaged, and where an adequate seal can be maintained. Asbestos Removal Contractors Any work on asbestos containing materials will be carried out by HCC approved licensed asbestos removal contractors, in accordance with the relevant and current Regulations. The asbestos removal contractor and their staff must: Comply with all relevant legislation, HSE guidance and Hertfordshire County Council Asbestos Policy Arrangements and Procedures. Provide site-specific method statements, risk assessment and plan of works. Liaise with the Duty Holder, the appointed environmental consultant and any other contractors on site as directed by the School or the appointed Contract Administrator. Liaise with the Principal Contractor and Planning Supervisor where a project falls under the requirements of the CDM Regulations, and provide any relevant documentation as required under these regulations. Adopt a pro-active attitude to safety at all times while engaged on Hitchin Boys school premises. Ensure the current copies of all relevant documentation is available, including HSE license, insurance, risk assessments, certificate of registration under the Control of Asbestos Regulations Environmental Consultants Asbestos surveys will be carried out by an competent surveyors with personal certification to BOHS P402 or equivalent and whose organisation should be accredited by UKAS to BS EN The assessment of risk and recommendations will take into account the following: Present and future usage of the area. Planned or proposed maintenance, alteration or refurbishment works. Condition, friability of the material. Location and accessibility of the material. Susceptibility for disturbance and damage. Environmental conditions. All air monitoring carried out by the Environmental Consultant must be in accordance with the HSE document HSG 248 and The Control of Asbestos at Work Regulations In the absence of analytical evidence, there must be an assumption that a material contains asbestos, unless there is strong evidence to support a reasoned argument that they are unlikely to contain asbestos. Where materials are presumed to contain the asbestos, they must be checked for condition on a regular basis in accordance with Site Asbestos Log. All checks must be recorded and held in the Site Asbestos Log. 6

7 Environmental Consultant must:- Liaise with the Duty Holder, the appointed asbestos removal contractor and any other contractors on site. Liaise with the Principal Contractor and Planning Supervisor where a project falls under the requirements of the CDM Regulations, and provide any relevant documentation as required under these regulations. On completion of all asbestos works or when requested, provide certification detailing the works undertaken, all air monitoring results and clearance certification confirming the suitability of an area for re-occupation, to include all parts of the four stage clearance procedure CAR Regs Provision of bulk sample results, risk assessments and recommendations as requested. Adopt a pro-active attitude to safety at all times while engaged on HBS sites. Ensure the current copies of all relevant documentation, including UKAS accreditations etc. are provided on request. General Contractor's and Measured Term Contractors Responsibilities Contractors undertaking work who discover asbestos material, or possible asbestos material, must:- Stop work immediately Seal the site in an effective manner. Report the situation to the employing officer/body who will take appropriate further action. Site Manager The success of these arrangements and procedures is dependent upon key employees recognizing and carrying out their responsibilities: The Site Manager has the responsibility to ensure that:- All appropriate officers and employees in their Department or non-employees involved in the management of premises understand and comply with the Asbestos Policy, the arrangements and procedures and are trained accordingly. All appropriate employees/non-employees are fully aware of the contents of their site Asbestos Log and are trained accordingly. They and their appropriate employees understand the lines of communication with Hitchin Boys School on matters associated with asbestos. The Site Manager is also responsible for:- The development, monitoring and review of the Asbestos Policy. The Commissioning, development, implementation and monitoring of effective asbestos arrangements and procedures. The Asbestos Register (including all previous asbestos information) and ensuring that arrangements are in place to keep it up to date, its monitoring and review. Commissioning asbestos surveys of Hitchin Boys School owned buildings, and where appropriate, those that are hired/leased. Ensuring the provision of training for employees who have responsibilities for property related matters involving the asbestos policy/procedures. Introducing mechanisms/ensuring that other senior staff are informed of changes in the asbestos policy, arrangements and procedures and the preparation of all training/instruction material. 7

8 Ensuring that all ongoing work, including periodic checking, is carried out and the Asbestos Register and Site Asbestos Logs are updated accordingly. Ensure that a review of Arrangements and Procedures is carried out annually, or whenever there are changes in legislative requirements, or when an incident has shown the need to incorporate any amendments. Ensure the companies are professionally and technically competent and carry out their work to the highest possible standards. The Site It is the responsibility of the Site Manager to ensure that the following is understood and carried out: Attend the training specified to ensure they understand and comply with The Asbestos Policy, Arrangements and Procedures. The contents of the Asbestos Log must be made familiar to all parties working within the premises. This will include assurance that advice in the log, in particular the Permission to Work arrangements are strictly adhered to. Occupants of all properties are to be made aware that any interference with asbestos that may release fibres is not permitted under any circumstances. Carry out the required regular inspections of all asbestos containing materials at the site and record the inspection in the Site Asbestos Log. Actively manage asbestos containing materials at the site and put together a site specific Asbestos Management Plan. 5.0 Working on or around Asbestos Containing Materials The HCC Asbestos Team can arrange the asbestos works process on behalf of the premises or on behalf of HCC or other partners. The Asbestos Removal Contractors are to be selected from the HCC approved list, the Environmental Consultants to be arranged through Asbestos Team, again selected from the HCC approved list. These Asbestos Arrangements and Procedures will operate for all works. NB - The term Contract Administrator has been used as a generic title for a competent person who will be specifying the work to be carried out. To ensure the continuing effective management of asbestos, it is absolutely essential that the systems and practices set out in this document are adhered to on all occasions. The term maintenance is defined as:- Any work undertaken (either planned or unplanned) which may disturb the fabric or finishes of the building or specified equipment. This covers all planned or emergency work including redecoration. This excludes routine cleaning of floors, furniture or windows. 6.0 Maintenance Work at the School Responsive Maintenance Work This procedure is illustrated in the flow chart in Appendix 3. The Site Asbestos Log must be checked by the authorising officer and in addition any individual who is carrying out responsive maintenance work at the site. 8

9 All people working on site e.g. contractors and maintenance staff, caretakers etc working on Hitchin Boys School premises must be informed of these procedures and provided with relevant contact details. Should any suspect materials be identified during works, they shall immediately stop work and contact the Duty Holder. When responsive maintenance works are instructed, the contractor must carry out the following:- Consult the Site Asbestos Log to identify if there are any asbestos containing materials in close proximity to the maintenance work to be carried out. The permission to work procedure must be followed and appropriate forms signed. If there are no asbestos containing materials present and intrusive works are not taking place then the maintenance contractor can proceed with the works with caution. If suspect materials are discovered, then work must stop and the Duty Holder notified. When asbestos containing materials are identified on the site asbestos log and will be disturbed during the course of the works, an alternative course of action should be considered e.g. avoiding asbestos containing materials. Refurbishment/Planned Maintenance Work When any planned maintenance works are instructed the contract administrator must review all available asbestos information for the area of works. The scope of works must be checked against the Site Asbestos Log, all voids affected by the works may be checked by an Environmental Consultant if deemed required or necessary. Where any intrusive works will be undertaken which breaches areas outside the scope of asbestos survey information, a refurbishment/demolition asbestos survey must be carried out in accordance with HSG 264. If there are no asbestos containing materials identified then the planned works can proceed with caution. If suspect materials are identified at any stage of the works then work must stop and the Duty Holder notified. When the full extent of accessible asbestos containing materials is known then a risk assessment must be carried out to determine whether asbestos removal or enabling works are required. A scope of works must be agreed between the removal contractor, environmental consultant (where appointed) and the School. Once the full extent of the work has been identified the environmental consultant will prepare a specification and scope of works - if appropriate. The asbestos removal contractor will prepare a method statement and will notify the work where applicable to the Health and Safety Executive (14 day notification period). On completion of works, a clearance certificate (4 stage clearance testing) must be provided by the environmental consultant confirming that the area is suitable for re-occupation. All other works may then proceed with caution. Should any further suspect asbestos materials be identified, work must cease. On conclusion of the works, the asbestos records should be updated to reflect changes. 9

10 7.0 Procedure for an Asbestos Incident This procedure is illustrated on the flowchart at Appendix 3. This Section deals with:- The actions required following an incident. How these actions must be undertaken. By whom. In what time-frame. It is imperative that these instructions are carried out. If they are not complied with the individual involved may be liable to disciplinary action, or individual prosecution by the HSE, or both. What is an incident? An incident will be deemed to have occurred when the uncontrolled release of asbestos fibres has taken place or is thought to have taken place. For example: an asbestos ceiling tile is damaged by impact, a wall panel is kicked and holed. If a material is suspected of containing asbestos then it must be treated in the same way. IF THERE IS ANY SUSPICION THAT AN ASBESTOS CONTAINING MATERIAL HAS BEEN DAMAGED, THEN THIS MUST BE TREATED AS AN INCIDENT Action All works must stop and the area vacated immediately, doors and windows locked if possible, or the area cordoned off. The incident must be reported in the first instance to the Premises Manager. No attempt should be made to clean up. The Site Asbestos Log will be checked, if the damaged material contains asbestos or there is insufficient information, then the Premises Manager must notify the Duty Holder. The Duty Holder will arrange for an approved Environmental Consultant to visit site either the same day or early the next day to take bulk samples and carry out reassurance air tests to establish the airborne fibre levels. If necessary the Duty Holder will arrange for an approved Licensed Asbestos Removal Contractor to attend site to clean up any debris and carry out localised repair/removal. An "Asbestos Incident Report (AIR)" form should be prepared by the Site Manager with assistance from the Asbestos Team. Blank copies of these can be found in the Site Asbestos Log and a copy is included at Appendix 4. The Duty Holder will ensure that the work required is completed as safely and effectively as possible so that the area/room can be brought back into use as quickly as possible. The Manager of the site will be kept informed of the situation at all times during any remedial action. The site should receive an air clearance or reassurance test prior to resuming normal use of the area. Approved at the Governors Main Board meeting 13 th February

11 Appendix 1 Hitchin Boys School Asbestos Management Procedures Authorisation to Give Permission to Work Form The people listed below have attended the HCC training course on Management of Asbestos - Arrangements and Procedures or another suitable course and are Authorising Officers able to give Permission to Work. NAME (Please print your full name using capital letters) SIGNATURE Date of Training Course attended 11

12 Appendix 2 Hitchin Boys School Asbestos Management Procedures Permission to Work Page No.. This is to certify that before carrying out the works noted below I have examined the asbestos log and understand the actions that are required in relation to existing or newly found asbestos. Job No. Date Works to be undertaken Location (Block Nos. and Room Nos. as shown on Asbestos Plan) Asbestos Present Y/N If yes, will the asbestos be affected by the work (if in doubt contact your Building Surveyor) Name of company and tradesman (Block Capitals) If not company state position (i.e. caretaker) Signature of Person Carrying out Works Authorising Officer* Name/ Signature Permission to Work given? (YES/NO) Comments/Details of call to Asbestos Helpline if necessary ( ) PERMISSION TO WORK RECORD 12

13 Appendix 3 Hitchin Boys School Asbestos Management Procedures ASBESTOS INCIDENT FLOWCHART Accidental Damage of Suspect Material Close Room/Area Call Asbestos Helpdesk Environmental Consultant instructed to assess / sample material and conduct air monitoring Is material asbestos? Yes No No further Action with respect to Asbestos Open area Determine scope of works to either: Clean, Make safe and seal Or Appoint HSE Licensed Asbestos Removal Contractor Appoint Environmental Consultant to carry out further air tests. Re-open area following obtaining a successful air test result. Details of any changes to be added to Asbestos Log Programme further asbestos works if necessary. 13

14 Appendix 4 Hitchin Boys School Asbestos Management Procedures Asbestos Incident Report Form Ref: Make a copy for Site Asbestos Log Site: Address: Hitchin Boys School Grammar School Walk, Hitchin, Herts SG5 1JB Asbestos Register/Log Block No: Description of Incident Immediate Actions Taken Floor No: Room No: Incident Reported by: To: Date: Building Surveyor Contacted Name: Date: Time: Time: Report Form: Prepared by: Date: Time: Building Surveyor s Report Name: Date Visited: Time: Actions Taken Date Time 14

ASBESTOS CONTAINING MATERIALS POLICY

ASBESTOS CONTAINING MATERIALS POLICY ASBESTOS CONTAINING MATERIALS POLICY Document Control Version 3 Ratified by Risk Management Sub Group Date Ratified 19 December 2012 Name of Originator/Author Head of Estates and Facilities Name of Responsible

More information

Author G Morton July 2015. Newcastle University Asbestos Management Plan 2015

Author G Morton July 2015. Newcastle University Asbestos Management Plan 2015 Newcastle University Asbestos Management Plan 2015 1 Contents 1.0 Introduction 2.0 Asbestos Management Duty Holder Responsibilities 2.1 Asbestos Manager (Head of Maintenance) 2.2 University Asbestos Survey

More information

Asbestos Policy & Procedure

Asbestos Policy & Procedure Asbestos Policy & Procedure 1. Purpose & Introduction This policy and procedure sets out Octavia s commitment and approach to ensuring, so far as reasonably practicable, that residents, contractors and

More information

ASBESTOS MANAGEMENT POLICY AND GUIDANCE

ASBESTOS MANAGEMENT POLICY AND GUIDANCE ASBESTOS MANAGEMENT POLICY AND GUIDANCE Belvoir High School Policy and Procedures Date approved 08/10/2013 Signed by Chair of Governors (Mr B Lovegrove Date approved 08/10/2013 Signed by Executive Principal

More information

ASBESTOS MANAGEMENT POLICY

ASBESTOS MANAGEMENT POLICY ASBESTOS MANAGEMENT POLICY Published : 4th Revision December 2014 1 Table of Contents INTRODUCTION... 3 DUTY TO MANAGE ASBESTOS... 3 DUTIES OF CAMPUS SERVICES... 3 1.0 POLICY OBJECTIVES... 5 2.0 RESPONSIBILITIES...

More information

Control of Asbestos Policy

Control of Asbestos Policy Control of Asbestos Policy Version Number: V1D Name of originator/author: Estates Manager 0161 277 1235 Name of responsible committee: Estates and Facilities Committee Name of executive lead: Director

More information

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 0.2 Jul 2013 Initial draft for comment Jon Fahie 0.3 Sep

More information

Policy for the Management of Asbestos in the Workplace

Policy for the Management of Asbestos in the Workplace Southwark Council Management of Asbestos in the Workplace November 2011 Page 1 of 15 CONTENTS 1. INTRODUCTION... 3 2. POLICY STATEMENT... 3 3. ASBESTOS RISK CLASSIFICATION SCHEME... 5 4. SAMPLING OF ASBESTOS

More information

Asbestos Management Procedure

Asbestos Management Procedure Asbestos Management Procedure Reference: HS/021/2010 Version No: 2.0 Issue Date: July 2010 Document Control Document Ref: HS/021/2010 Date Created: Jan 2010 Version: 2 Date Modified: Revision due December

More information

Policy for the Management of Asbestos in Buildings

Policy for the Management of Asbestos in Buildings in Buildings Health and Safety Services 1 A1. Introduction If asbestos fibres enter the lungs they can cause cancer or incurable disease. Consequently the University is committed to ensure that all reasonably

More information

Asbestos Awareness Syllabus (Category A)

Asbestos Awareness Syllabus (Category A) Asbestos Awareness Syllabus (Category A) Introduction This syllabus sets out the guidance issued by the UK Asbestos Training Association (UKATA) for the provision of asbestos awareness training as contained

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ASBESTOS MANAGEMENT PLAN PREPARED BY: Scott Gregory: Estates - Property Services DATE: 18/04/2014 STATUS: Draft ISSUE: 2014 (02) September 2014 NEXT REVISION DATE: April 2014 Contents 1.0 Introduction

More information

ASBESTOS MATERIALS IN SCHOOLS

ASBESTOS MATERIALS IN SCHOOLS CODE OF PRACTICE FOR MANAGEMENT OF ASBESTOS MATERIALS IN SCHOOLS CONTENTS 1. Introduction 1.1 Scope 1.2 The OPW Health and Safety Unit 2 Background 2.1 General Information 2.2 Main Risks 2.3 Main Risk

More information

Asbestos Management Plan

Asbestos Management Plan Health and Safety Services Asbestos Management Plan Policy, Organisation and Arrangements Sean Callaghan Issue number 3 April 2014 Issue Date Nature of revision Prepared by Approved by 2 April 2013 First

More information

The Management of Asbestos containing Materials

The Management of Asbestos containing Materials The Management of Asbestos containing Materials Status Owner Approval by University Court Draft Head of Estates and Building 1 Purpose... 1 2 Scope... 3 3 Principles... 4 4 Procedure... 5 5 Accountabilities...

More information

BEDFORD DESIGN GROUP REPORT NUMBER 61892 ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD

BEDFORD DESIGN GROUP REPORT NUMBER 61892 ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD BEDFORD DESIGN GROUP REPORT NUMBER ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD CARRIED OUT BY: VINTEC LABORATORIES LTD SURVEY DATE: 08-01-2009 PREPARED BY: JAMES BROTHERTON CHECKED BY: ANDREW

More information

Asbestos Management Policy

Asbestos Management Policy Central Bedfordshire Council www.centralbedfordshire.gov.uk Asbestos Management Policy The Housing Service Version 1.0 Directorate Social Care Health and Housing Service Housing Service Approved by Director

More information

HAVEBURY HOUSING PARTNERSHIP

HAVEBURY HOUSING PARTNERSHIP HS028 HAVEBURY HOUSING PARTNERSHIP POLICY ASBESTOS MANAGEMENT Controlling Authority Director of Resources Policy No. HS028 Issue No. 3 Status Final Date November 2013 Review Date: November 2016 Equality

More information

Version 1 2010. Introduction page 3. Our Commitment Page 4. Will I be exposed? Page 6. Where will it be? Page 8. Translation page 12

Version 1 2010. Introduction page 3. Our Commitment Page 4. Will I be exposed? Page 6. Where will it be? Page 8. Translation page 12 A t e n a n t s G u i d e t o A s b e s t o s Version 1 2010 Introduction page 3 Our Commitment Page 4 Will I be exposed? Page 6 Where will it be? Page 8 Translation page 12 Contents Introduction Page

More information

Asbestos Survey Report

Asbestos Survey Report 0340 Asbestos Survey Report Sunnyside Court Avondale Road Southport PR9 0NU Client Contact: Gary Rostron The Regenda Group Regenda House Enterprise Business Park Northgate Close Horwich, Bolton BL6 6PQ

More information

H2 Opening Statement Asbestos

H2 Opening Statement Asbestos H2 Opening Statement Asbestos Every year there are thousands of asbestos related deaths. Asbestos fibres accumulate in the lungs, therefore several diseases can occur, among these are two main types of

More information

ASBESTOS POLICY AND PROCEDURES

ASBESTOS POLICY AND PROCEDURES ASBESTOS POLICY AND PROCEDURES a CORPORATE RESOURCES DEPARTMENT PROPERTY SERVICES POLICY FOR THE MANAGEMENT OF ASBESTOS IN BUILDINGS OWNED AND/OR OPERATED BY LEICESTERSHIRE COUNTY COUNCIL LCC ASB/001 ISSUE

More information

Control of Asbestos. Blue crocidolite Brown amosite White chrysotile

Control of Asbestos. Blue crocidolite Brown amosite White chrysotile Control of Asbestos Asbestos has been the main cause of occupational ill health from about 1950 onwards and is still the greatest single work related cause of death from ill health. Past exposure is now

More information

Property Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house.

Property Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house. Property Services information sheet - number 3 Asbestos December 2008 rev 1 You may have materials that contain asbestos in your house. A. What is asbestos B. What do you do if you have asbestos in your

More information

Asbestos Policy Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all

Asbestos Policy   Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all Asbestos Policy Lead officer: Jeff Scott Date agreed: May 2013 Review date: May 2016 Working together to deliver quality homes and a better environment for all Page 1 of 11 Contents Page 1 Introduction

More information

Asbestos at work guide

Asbestos at work guide Asbestos at work guide Contents Introduction.... 2 Frequently asked questions.... 4 The Control of Asbestos Regulations 2006... 5 Types of asbestos survey.... 7 1 Introduction This document provides a

More information

FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com. Asbestos Awareness. Toolbox Talk

FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com. Asbestos Awareness. Toolbox Talk FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com Asbestos Awareness Toolbox Talk ASBESTOS AWARENESS Why is it a Problem Asbestos was extensively used as a building material in the UK from the

More information

ASBESTOS POLICY MANAGEMENT PLAN

ASBESTOS POLICY MANAGEMENT PLAN ASBESTOS POLICY & MANAGEMENT PLAN HS20 Version V2 Approved by: Health, Safety and Security Committee Date approved: March 2011 Ratified by: Hospital Executive Committee Date ratified 24 th April 2012 Document

More information

LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition

LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition 1 INDEX QM78 SECTION 1 RECOMMENDATIONS SECTION 2 METHOD OF RISK ASSESSMENT SECTION 3 DEFINITION OF TERMS SECTION 4 LEGISLATION, CODES OF PRACTICE AND

More information

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy ASBESTOS POLICY Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy This is a controlled document. It should not be altered in any way without the express permission of the author or their representative.

More information

Policy on the Management of Asbestos

Policy on the Management of Asbestos WISHAW AND DISTRICT HOUSING ASSOCIATION Policy on the Management of Asbestos As with all the Association s policies and procedures, this document, where required, may be able to be translated into other

More information

Asbestos Management Policy (Version 3)

Asbestos Management Policy (Version 3) Asbestos Management Policy (Version 3) Contents Page Introduction 3 College Policy Statement for Asbestos Management 3 Objectives (of this Policy and Procedure) 3 Application of Policy 4 Licensed Asbestos

More information

The Control of Asbestos Regulations 2006

The Control of Asbestos Regulations 2006 The Control of Asbestos Regulations 2006 A guide for safety representatives Asbestos has been the main cause of occupational ill health from about 1950 onwards and is still the greatest single work-related

More information

MANAGEMENT OF ASBESTOS POLICY

MANAGEMENT OF ASBESTOS POLICY MANAGEMENT OF ASBESTOS POLICY The application of this policy and procedure ensures that no employee receives less favourable treatment on grounds of sex, trans-gender status, sexual orientation, religion

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan Document title Asbestos Management Plan Document author and department Jonathan Latter Health and Safety Compliance Manager Approving body Responsible person and department Fiona

More information

Summary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2)

Summary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2) Asbestos The University s asbestos management procedure follows the stages set out in guidance provided by the HSE (HSG64), as follows. (The numbers in the boxes below refer to the subsequent sections

More information

WYG Asbestos Demolition Survey Report

WYG Asbestos Demolition Survey Report Rossendale Borough Council The WYG Asbestos Demolition Survey Report November 2 www.wyg.com creative minds safe hands Document Control Project: Client: Job Number: File Origin: The,, Asbestos Demolition

More information

ASBESTOS MANAGEMENT PLAN. Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU

ASBESTOS MANAGEMENT PLAN. Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU ASBESTOS MANAGEMENT PLAN Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU CONTENTS 1. INTRODUCTION 2. HOW DOES THE BOROUGH OF POOLE MANAGE ITS ASBESTOS

More information

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE BCD.26 STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE DATE: March 2015 Copyright Reserved TESTING, ASSESSMENT AND WORK WITH ASBESTOS CONTAINING MATERIALS (ACM S) REFERENCE This Directive deals

More information

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division Management of Asbestos Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division Getting it Wrong! Asbestos What is it? With the Naked Eye! Naturally occurring silicates

More information

Bield Housing and Care POLICY, PROCEDURES. and MANAGEMENT PLAN ASBESTOS CONTAINING MATERIALS

Bield Housing and Care POLICY, PROCEDURES. and MANAGEMENT PLAN ASBESTOS CONTAINING MATERIALS Bield Housing and Care POLICY, PROCEDURES and MANAGEMENT PLAN for ASBESTOS CONTAINING MATERIALS Approved on: 24 April 2014 By Health & Safety Management Group Implementation date: 1 June 2014 Review Date

More information

ABClean Frequently Asked Questions (FAQ)

ABClean Frequently Asked Questions (FAQ) ABClean Frequently Asked Questions (FAQ) 1. How can I recognize asbestos containing products during cleaning, renovation, demolition or dismantling task? Considering construction date, which buildings

More information

managing asbestos in church buildings

managing asbestos in church buildings managing asbestos in church buildings A joint briefing paper produced by Church Growth Trust and Stewardship April 2013 Briefing Paper 1 Lamb s Passage, London EC1Y 8AB t: 020 8502 5600 e: enquiries@stewardship.org.uk

More information

Asbestos Management Policy

Asbestos Management Policy Asbestos Management Policy Originator: Approval date: Policy and Strategy Team Sovini Board PCHA Board OVH Board/EMT 3 rd December 2012 22 nd November 2012 25 th September 2012 Review date: December 2013

More information

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date Policy No: RM78 Version: 1.0 Name of Policy: Corporate Asbestos Management Policy, Organisational Arrangements and Procedures Policy Effective From: 24/10/2013 Date Ratified 12/09/2013 Ratified Health

More information

Contents. 04 What is asbestos? 05 How we manage asbestos. 08 Are you at risk? 11 Things to remember

Contents. 04 What is asbestos? 05 How we manage asbestos. 08 Are you at risk? 11 Things to remember Asbestos advice This guide explains what asbestos is, why it might be a problem, where it might be found, how we survey your home for it and how to deal with asbestos. Asbestos advice If you would like

More information

PROJECT BRIEF Version (insert number)

PROJECT BRIEF Version (insert number) PROJECT BRIEF Version (insert number) 1 Project Name ------------------------------------------------------------------- 1.1 The Project Project Address Nature of Work Location 1.2 DCC Client for Project

More information

The asbestos crisis Why Britain needs an eradication law

The asbestos crisis Why Britain needs an eradication law Why Britain needs an eradication law All-Party Parliamentary Group on Occupational Safety and Health The All-Party Parliamentary Group on Occupational Safety and Health believes that the time has come

More information

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE KEEP THIS GUIDE ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET Asbestos could be in the house or building you are working on right now. Left alone, it isn t dangerous. However, once disturbed, tiny

More information

Asbestos in the home. A guidance booklet for tenants. Please keep this document as a reference guide- It contains important safety information

Asbestos in the home. A guidance booklet for tenants. Please keep this document as a reference guide- It contains important safety information Asbestos in the home A guidance booklet for tenants Please keep this document as a reference guide- It contains important safety information Introduction This guide is all about asbestos: what it is, its

More information

Asbestos Information

Asbestos Information Advice for Harlow Council tenants Asbestos Information June 2015 Harlow Council Civic Centre, The Water Gardens, Harlow, Essex CM20 1WG Tel: 01279 446655 www.harlow.gov.uk Council Asbestos in the home

More information

ROYAL HOLLOWAY, UNIVERSITY OF LONDON

ROYAL HOLLOWAY, UNIVERSITY OF LONDON ROYAL HOLLOWAY, UNIVERSITY OF LONDON ASBESTOS MANAGEMENT POLICY (Version 2) This Policy defines the College s arrangements for the management of asbestos and the measures to be taken for the protection

More information

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy Accommodation Officers Information Booklet Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy This Guideline has been produced solely for use by State Authorities that come within

More information

Efficiently Maintaining Commercial Buildings. Asbestos Awareness

Efficiently Maintaining Commercial Buildings. Asbestos Awareness Efficiently Maintaining Commercial Buildings Asbestos Awareness What are the risks? Asbestos was used extensively between the 1950s and 1980s in both domestic and commercial buildings and although its

More information

Asbestos in the home. www.tworivershousing.org.uk. for you - for your community - not for profit

Asbestos in the home. www.tworivershousing.org.uk. for you - for your community - not for profit Asbestos in the home www.tworivershousing.org.uk for you - for your community - not for profit Facts about asbestos, where it may be used and what to do if you find it. Introduction This leaflet addresses

More information

Caution Asbestos. Asbestos advice for residents

Caution Asbestos. Asbestos advice for residents Caution Asbestos Asbestos advice for residents Customer Approved This leaflet has been designed to address concerns and questions about asbestos in homes. It explains what it is, where it could be found,

More information

Asbestos. life. together. Improving

Asbestos. life. together. Improving Asbestos Improving life together This leaflet is about how to find out if you have asbestos in your home and what we will do to keep you safe. What is asbestos? Why can asbestos be dangerous? Asbestos

More information

The asbestos crisis. Why Britain needs an eradication Law. Background. Levels of mortality

The asbestos crisis. Why Britain needs an eradication Law. Background. Levels of mortality The asbestos crisis. Why Britain needs an eradication Law. The All-Party Parliamentary Group on Occupational Safety and Health believes that the time has come to put in place regulations requiring the

More information

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff.

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff. Appendix 1 Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust Asbestos Policy Approved by Date Review Date Target Audience Trust Board November 2007 November 2008 All

More information

Asbestos - Frequently Asked Questions

Asbestos - Frequently Asked Questions Asbestos - Frequently Asked Questions 1. What is asbestos? Asbestos is the name given to a group of fibrous minerals which occur naturally in the earth. These are grouped into two mineral types known as

More information

Managing Asbestos Policy

Managing Asbestos Policy Managing Asbestos Policy Liverpool Mutual Homes Page 1 of 16 Table of Contents 1. MANAGEMENT INFORMATION 2. POLICY STATEMENT 3. POLICY AIMS AND KEY OBJECTIVES 4. INTRODUCTION 5. DETAIL 6. LINKS TO LMH

More information

AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk

AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk Mencap Office, 4 Mount Folly Square, Bodmin, Cornwall. PL31 2DG. Management Survey and Asbestos Register January 2011 (Two of the samples

More information

www.suttonhousingpartnership.org.uk Asbestos

www.suttonhousingpartnership.org.uk Asbestos www.suttonhousingpartnership.org.uk Asbestos images courtesy of www.sxc.hu and/or www.morguefile.com Asbestos Asbestos was widely used until the 1980 s to improve the performance of materials and to provide

More information

ASBESTOS MANAGEMENT SURVEY REPORT

ASBESTOS MANAGEMENT SURVEY REPORT ASBESTOS MANAGEMENT SURVEY REPORT for THE MORAY COUNCIL of B3239-1140002 Produced by ESG Asbestos Ltd, a wholly owned subsidiary of ESG Bretby Business Park, Ashby Road, Bretby, Burton upon Trent, Staffordshire

More information

A Guide to Asbestos in your Home

A Guide to Asbestos in your Home A Guide to Asbestos in your Home IL25 A Guide to Asbestos in your Home A Guide to Asbestos in your home South Derbyshire District Council Housing Services Civic Offices, Civic Way, Swadlincote, Derbyshire

More information

Policy on Asbestos Safety

Policy on Asbestos Safety Policy on Asbestos Safety November Index. Aims and Objectives. Policy Reference. Asbestos Safety Policy Statement 4. Responsibilities 5. Asbestos Register 6. Asbestos Survey 7. Staff Asbestos Training

More information

UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS

UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS APPROVED BY: UHL H&S Committee and UHL H&S Committee TRUST REF: B27/2005 DATE APPROVED: March 2008 ORIGINATOR: Glyn Lambley

More information

Beech Housing Association Asbestos Management Policy

Beech Housing Association Asbestos Management Policy Beech Housing Association Asbestos Management Policy Policy Statement The aim of this document is to define a policy for the control and management of the risk of exposure to asbestos within the dwellings

More information

Asbestos: Notifiable Non-Licensed Work. A Minor Change or a Significant Challenge

Asbestos: Notifiable Non-Licensed Work. A Minor Change or a Significant Challenge Asbestos: Notifiable Non-Licensed Work A Minor Change or a Significant Challenge John Evans B.Sc., CMIOSH, FRSPH, MIOA, PGCE Technical Director Santia Asbestos Management Limited The Control of Asbestos

More information

Appendix 1: Asbestos Register 5 High Wycombe Campus 5 Windsor House 6 Brook Street 6 Hughenden Student Village 6 Missenden Abbey 6 Uxbridge Campus 6

Appendix 1: Asbestos Register 5 High Wycombe Campus 5 Windsor House 6 Brook Street 6 Hughenden Student Village 6 Missenden Abbey 6 Uxbridge Campus 6 Policy Policy Contents General Statement 2 Assessment 2 A Written Plan 2 Control of Access to -containing Materials 2 Monitoring and Maintenance 2 -related Emergencies 3 Arrangements for Controlling Work

More information

Asbestos Awareness Training Requirements

Asbestos Awareness Training Requirements Asbestos Awareness Training Requirements Guidance Note 3 Jan 14 1 Introduction This Guidance Note gives practical information about asbestos awareness training. Sample wording for a tool box talk briefing

More information

Asbestos Policy and Management Plan 2013-16

Asbestos Policy and Management Plan 2013-16 Policy reviewed by Thomas Eggar Solicitors, January 2013 Equality Assessment completed January 2013 Policy reviewed by the Health and Safety Committee, February 2013 Policy reviewed and adopted by the

More information

Dealing with. www.stroud.gov.uk. Dealing with Asbestos STROUD DISTRICT COUNCIL WARNING CONTAINS ASBESTOS

Dealing with. www.stroud.gov.uk. Dealing with Asbestos STROUD DISTRICT COUNCIL WARNING CONTAINS ASBESTOS www.stroud.gov.uk Dealing with Management of Asbestos containing materials Many building materials may contain asbestos fibres, often this does not mean that they pose any danger if they are not disturbed.

More information

Asbestos Management Plan. April 2011

Asbestos Management Plan. April 2011 Reviewed by: Approved by: Health & Safety Management Committee Management Board -. R3. Part 1: Introduction Part 2: Policy Part 3: Organisation and Responsibilities Part 4: Procedures Appendices: 1 Management

More information

Facilities Management. Facilities Management Asbestos Policy & Management Plan

Facilities Management. Facilities Management Asbestos Policy & Management Plan Facilities Management Facilities Management Asbestos Policy & Management Plan PP&T code FM00174 Version 1.0 Last updated 01 Feb 12 Review Date 08 Aug 13 Owner Unit Approved by Mike Eastwood Facilities

More information

ASBESTOS AWARENESS. Steve Adamthwaite PEHO City of York Council

ASBESTOS AWARENESS. Steve Adamthwaite PEHO City of York Council ASBESTOS AWARENESS Steve Adamthwaite PEHO City of York Council ASBESTOS AWARENESS WHAT IS ASBESTOS? WHERE DOES IT COME FROM? WHY IS ASBESTOS CONSIDERED TO BE POTENTIALLY DANGEROUS? WHERE COULD WE POSSIBLY

More information

2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd.

2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd. 2009 Housing Provider Forum A Guide to Asbestos Management - Owner Requirements Regulation respecting Asbestos on Construction Projects and in Buildings and Repair Operations Presented by Jeff Drummond

More information

Your guide to. Asbestos. Home safety information for tenants. Better homes, better lives

Your guide to. Asbestos. Home safety information for tenants. Better homes, better lives Your guide to Asbestos Home safety information for tenants. Better homes, better lives What is asbestos? Asbestos is a material made up of strong fibres which are resistant to both heat and chemicals.

More information

REVISION 9 January 2015 ASBESTOS MANAGEMENT PLAN

REVISION 9 January 2015 ASBESTOS MANAGEMENT PLAN REVISION 9 January 2015 ASBESTOS MANAGEMENT PLAN ULSTER UNIVERSITY - ASBESTOS MANAGEMENT PLAN CONTENTS PAGE 1. Introduction 4 2. Background 4 2.1 Types of Asbestos 2.2 Hazards of Asbestos dust 2.3 Use

More information

Northwards Housing. Asbestos Management Plan. October 2014

Northwards Housing. Asbestos Management Plan. October 2014 rthwards Housing Asbestos Management Plan October 2014 Last Review October 2014 Reviewed by Simon Roffey Issued by Larry Patrick Next Review Due October 2015 1 Table of Content Section Content 1.0 Purpose

More information

WASTE ASBESTOS. Asbestos is often bonded into a matrix of cement or resins. Typical bonded asbestos products include -

WASTE ASBESTOS. Asbestos is often bonded into a matrix of cement or resins. Typical bonded asbestos products include - Page 1 of 5 Version No. 2 Date of issue: HAZARDOUS WASTE REGULATIONS (NI) 2005 HAZARDOUS WASTE GUIDANCE DOCUMENT Introduction WASTE ASBESTOS Hazardous waste is subject to the requirements of the European

More information

Asbestos Information and advice for residents

Asbestos Information and advice for residents Asbestos Information and advice for residents Asbestos Information and advice for residents Introduction This leaflet gives you important information on how we manage asbestos which may be in your home.

More information

Policy for the Management of Asbestos in Council Premises (Corporate and Housing)

Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Page 1 of 14 1. Policy Statement 1.1 This policy is designed to provide a clear acknowledgement of the responsibilities

More information

UKATA. Certificate in Asbestos Awareness. Category A

UKATA. Certificate in Asbestos Awareness. Category A UKATA Certificate in Asbestos Awareness Category A Page 1 of 7 Introduction This syllabus sets out the guidance issued by the United Kingdom Asbestos Awareness Association (UKATA) for the provision of

More information

Policy for the Management of Asbestos

Policy for the Management of Asbestos CARDIFF AND VALE NHS TRUST YMDDIRIEDOLAETH GIG CAERDYDD A R FRO Policy for the Management of Asbestos Author Keith Jones Estate Controls Assurance Officer / Environmental Management Co-ordinator Policy

More information

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211) Asbestos Policy Reference Number: NHSCT/09/192 Responsible Directorate: Planning, Performance Management and Support Services Replaces (if appropriate): Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

More information

Asbestos Update on Regulations, Risks, Management and Obligations

Asbestos Update on Regulations, Risks, Management and Obligations Asbestos Update on Regulations, Risks, Management and Obligations Steve Shutler BSc(Hons), CMCIEH, CMIOSH, CoC (Asbestos) SB Asbestos Management Ltd 5 Reasons to take asbestos seriously CAR 2012 Legislation

More information

The Management of Asbestos. County Council Occupied Premises

The Management of Asbestos. County Council Occupied Premises The Management of Asbestos in County Council Occupied Premises Policy, Strategy and Management Procedures Corporate Building Services November 2005 Policy, Strategy, and Implementation Plan for the Management

More information

Facts about Asbestos. Council policy

Facts about Asbestos. Council policy Facts about Asbestos Winchester City Council has produced this leaflet to give its tenants advice and information about the possible presence of asbestos in and around their homes. Its content gives general

More information

Asbestos in your home

Asbestos in your home Asbestos in your home Is it a problem? BVT RESIDENT A P P R O V E D This leaflet aims to address any concerns that you may have regarding asbestos and where it may be found in your home. It will cover

More information

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004 Estates Division Imperial College London Room 503 Sherfield Building South Kensington Campus London SW7 2AZ, UK Tel: +44 (0)20 7594 9832 Fax: +44 (0)20 7594 9050 r.mayne@imperial.ac.uk www.imperial.ac.uk

More information

Derby City Council. Asbestos Management Plan

Derby City Council. Asbestos Management Plan Derby City Council Asbestos Management Plan April 2014 Page 1 of 44 Index of Contents 1.1 Introduction 3 1.2 Glossary of Terms 4 2.0 Action Plan 2.1 Scope and purpose 6 2.2 Competent persons who they are

More information

Asbestos management in schools

Asbestos management in schools Asbestos management in schools Advice for school leaders and governing bodies in maintained schools, academies and free schools November 2013 Contents Summary 3 What asbestos is and when it becomes a risk

More information

Vibixa Ltd, Vibixa Ltd, Kingsditch Lane, Cheltenham, GL51 9FG

Vibixa Ltd, Vibixa Ltd, Kingsditch Lane, Cheltenham, GL51 9FG Based on a Management Survey Site Address: Site Code: Survey : Survey Ref: Updated: Register Ref: Prepared For: Prepared By: Vibixa Ltd, Kingsditch Lane, Cheltenham, GL51 9FG J38033 20 th to 23 rd May

More information

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room 201 44 Newhall Street Birmingham B3 3PL

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room 201 44 Newhall Street Birmingham B3 3PL ASBESTOS SAMPLING REPORT Urban Design Louisa Ryland House Sampling to Ceiling in Room 01 44 Newhall Street Birmingham B PL TECHNICAL REPORT: 09H/56 150 Phoenix House Valepits Road Garretts Green Birmingham

More information

Asbestos is found naturally in rock formations around the world. It is made up of lots of small fibres.

Asbestos is found naturally in rock formations around the world. It is made up of lots of small fibres. Your Guide to Asbestos March 2010 Many people worry about the health risks of asbestos, but as long as it is not damaged it is unlikely to cause problems. This booklet tells you what you need to know.

More information

Asbestos Management Plan

Asbestos Management Plan Harlow Council Asbestos Management Plan Version 4 Scope: This management plan applies to the management of all asbestos containing materials to properties under the ownership/management of Harlow Council

More information

Detailed Survey Inspection Reports & Photographs. Material Assessment Algorithm & Asbestos Register

Detailed Survey Inspection Reports & Photographs. Material Assessment Algorithm & Asbestos Register HSE/S/137/01 CONTENTS Section 1.0 Section 2.0 Section 3.0 Section 4.0 Survey Report Details Survey Types Limitations and Restrictions Materials ssessment lgorithm Section 5.0 Section 6.0 Detailed Survey

More information

Asbestos management in schools

Asbestos management in schools Asbestos management in schools Guidance Guidance document no: 138/2014 Date of issue: May 2014 Replaces guidance document no: 130/2014 Asbestos management in schools Audience Overview Action required Further

More information