1 EEA Grants Norway Grants Annual Programme Report Template Trine Eriksen, Results and Evaluation Financial Mechanism Office 12 December 2013
2 Reporting cycle November Donors reports to EFTA October NMFA Annual Report to Parliament YEAR January FMO status reports (NMFA, EFTA) February 15 Annual Prog. Report March 31 NFP Strategic Report 31 March (except CY, MT & SI) June Donors Annual Report 2
3 Annual Programme Report Programme Operators are expected to produce concise, results-based programme reports that will give an account of progress and results that contribute to the expected outcomes and the programme objective. The main body of the report should not exceed 20 pages, excluding any attachments (ref Annex 9 in the Reg) 3
4 Highlight achievements 4
5 Timeline Annual deadline 15 February The FMC shall inform the National Focal Point and the Programme Operator of its opinion on the annual programme report within two months of the date of receipt. If the FMC does not respond within the time limit laid down, the report shall be considered to have been accepted (ref. Reg 5.11) 5
6 Report structure 1. Executive summary 2. Programme area specific developments 3. Reporting on Programme outcome 4. Reporting on Outputs 5. Project selection 6. Progress of bilateral relations 7. Monitoring 8. Need for adjustments 9. Risk management 10. Information and publicity 11. Cross cutting issues 12. Reporting on sustainability
7 Template 1. Executive summary This section shall provide a short summary of the principal findings and points of the report. Main trends that may have affected the context where the programme is implemented Key achievements towards the two overall objectives, using concrete examples from the programme / projects Key management issues Challenges (risks) and opportunities Write this section last.
8 Template 2. Programme area specific developments Describe important developments in the Programme area, also in respect of policy, financial or administrative changes. Please refer to the justification in your programme proposal and provide any updates in your programme area that may have an effect on the planned programme results. Include statistics and analyse trends in the sector and/or the programme area where possible. If conditions in the programme area have changed since you wrote the programme proposal (ref. chapter 3.3 of the proposal), consider if the changes might present risks to the achievement of programme objectives and how these might be handled.
9 Template 3. Reporting on Programme outcome Analyse how the projects and Programme s outputs [are expected to] contribute to the expected outcome(s) defined in the Programme proposal. For the analysis, use the indicators that have been agreed for the programme. Refer to possible baseline studies or provide a situation analysis aiming to describe the baseline. Include a brief summary of the main risks that the programme will not achieve its expected outcomes as well as the mitigating actions put in place/needed to address these risks. (This should be based on the risk assessment in section 9/attachment). Please remember to consider risks factors beyond the operational risks concerned with programme implementation, such as programme strategy, the economic or legislative countrycontext or institutional support. Progress on horizontal concerns Please also use this section to report on relevant horizontal concerns. To what extent does the programme address the horizontal concerns related to promoting tolerance, multicultural understanding, respect for the rights of minorities including the Roma, and combatting hate speech, extremism, racism, xenophobia, homophobia, anti-semitism, sexual harassment, violence against women and trafficking.
10 Template 4. Reporting on Outputs 3.1 Give a summary and analysis of how the selected projects have contributed or are contributing to each of the Programme outputs set out in the Programme proposal. Analyse progress towards the defined outputs, and explain any deviation from the plan. 3.2 Give a summary of the implementation of each pre defined project. When projects have been completed give a summary of their actual contributions to the output targets. 3.3 Give a summary of the implementation of small grant schemes. If this is a Final Report, provide a summary of their actual contributions to the Programme output. Assess the project selection and provide an analysis of how the selected projects are expected to contribute to the programme outputs set out in the programme proposal.
11 Template 5. Project selection With reference to the Programme proposal list the calls carried out during the reporting period. Include a summary of the call(s) and describe the level of interest. Please provide a brief analysis of where the interest during the call was with reference to achieving the expected outcomes and indicators e.g. to what extent are the projects proposed in line with the expected outcomes?
12 Template 6. Progress of bilateral relations Give a summary of how partnerships between the Beneficiary States and the Donor State(s) have been facilitated during the reporting period. In cases of donor partnership programmes, the cooperation between the Programme Operator and the donor programme partner shall be assessed.
13 The Annual Programme Report Bilateral aspects of programme Example of report elements Overall bilateral strategy: - What were the expectations/plans, what has been achieved (progress)? Bilateral indicators: - No. of partnerships established - Need for revision of indicators? Assessment of cooperation with DPP Assessment of bilateral cooperation at project level Use of bilateral fund at programme level - How were partnerships facilitated? - Who is supported? - Events Use of complimentary actions fund - Key meetings Bilateral thinking (Outcomes) Extent of cooperation Shared results Improved knowledge and mutual understanding Wider effects
14 Bilateral thinking Outcomes / types of results Extent of cooperation - Who cooperate? (types of institutions, sectors, etc.) - Level of cooperation and contact? - Nature of partnerships? Shared results - Are partners working together for joint results development of policies, laws, strategies? - Do partners share experience, knowledge, know-how and technology? Improved knowlede and mutual understanding (between individuals, institutions, states and the wider public) - Do partnerships lead to increased awareness about common challenges? - What do we learn about each other? (working methods, approaches, institutional structures etc.) Wider effects - Do partnerships lead to cooperation beyond project and programme spesific tasks?
15 Template Complementary action If funds have been set aside for complementary action use this section to provide a brief summary of results coming from cooperation and exchange of experience with others. What are the complementarities and how have the actions strengthened the programme?
16 Template 7. Monitoring With reference to the monitoring plan for the current reporting period, describe the monitoring activities that have been carried out and give a summary of the findings. Provide a monitoring plan for the next reporting period, following the format given in Chapter 7.3 of the Programme Operators Manual.
17 Template 8. Need for adjustments All planning is to a certain extent based on assumptions, and the assumptions made when designing a Programme plan might change over time. This might again imply a need to adjust the plan. If the Programme Operator has made use of a possibility to modify the Programme in line with Article 5.9 of the Regulations and the Programme Agreement during the reporting period, the modifications shall be described in this section.
18 Template 9. Risk management With reference to the risks identified in the Programme proposal (and in sections 2 and 3 above) give an analysis of the situation and any mitigating actions carried out or planned. If any new risks have been identified, then they shall also be discussed in this section. Please keep in mind that it is necessary to have a broad perspective when identifying risks. There will often be risk factors beyond the direct control of the programme such as policy, the economic or legislative country-context, institutional support or others. These may affect the achievement of the programme objective, outcome and outputs, and should be included in the risk identification, assessment and risk mitigation actions where possible. Identified risks should be clearly formulated and indicate how they may affect specific objectives/outcomes. The importance of individual risks must be assessed according to likelihood and consequence. Mitigating actions must not be presented in general terms, but relate to the specific risk they are intended to address.
19 Proposed risk assessment template Annex: Risk assessment of the programme Programme # Relevance to Grants (cohesion objective, bilateral objective, operational issue) Description of risk Likelihood [1-4] Consequence [1-4] Mitigation [1] The risks should be categorised in one of 3 ways, depending on whether it poses a risk to the cohesion objective, the bilateral objective, or is more of an operational issue. [2] 4 = Almost certain (75 99% likelihood); 3 = Likely (50 74%); 2 = Possible (25 49%); 1 = Unlikely (1 24%) [3] The aim is to assess whether the risk could make a particular programme fail to meet its expected results. The following scores and descriptors can be used with respect to consequence: 4 = severe; 3 = major; 2 = moderate; 1 = minor; n/a = not relevant or insignificant.
20 Template 10. Information and publicity With reference to the Communication Plan provided in the Programme proposal (ref. Chapter 3.13 of the Programme Operators Manual) give a summary of the activities carried out during the reporting period. Please provide a summary of the main activities here, rather than a detailed list/account of all.
21 Template 11. Cross cutting issues Describe how the Programme has performed (positively or negatively) in relation to the three crosscutting issues (ref. Chapter 3.11 of the Programme Operators Manual), and which measures, if any, that have been put in place to improve performance.
22 Template 12. Reporting on sustainability If this is a Final Report, provide an assessment of the extent to which the positive effects of the Programme will continue after the funding period.
23 Template 13. Attachments to the Annual Programme Report Monitoring Plan, see section 7.3 in the Programme Operators Manual Risk assessment of the programme
24 Upload in DoRIS 1. Fill in results achieved for the year (indicators); 2. Submit information on calls; 3. Upload Annual Report. User guide coming soon
25
26
27
28
29
30
EEA Grants Norway Grants Risk management. Alex Stimpson and Trine Eriksen Results and Evaluation, FMO Vilnius 11 December 2013
EEA Grants Norway Grants Risk management Alex Stimpson and Trine Eriksen Results and Evaluation, FMO Vilnius 11 December 2013 What are we aiming for? Managing Risk for Results Reducing economic and social
More informationRisk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013.
Risk Management Strategy EEA & Norway Grants 2009-2014 Adopted by the Financial Mechanism Committee on 27 February 2013. Contents 1 Purpose of the strategy... 3 2 Risk management as part of managing for
More informationRegulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014
the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed
More informationNorwegian Financial Mechanism Memorandum of Understanding Hungary MEMORANDUM OF UNDERSTANDING
MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM 2009 2014 between THE REPUBLIC OF HUNGARY hereinafter referred to as the Beneficiary State and THE KINGDOM OF NORWAY,
More informationRegulation on the implementation of the Norwegian Financial Mechanism 2009-2014
Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 adopted by the Norwegian Ministry of Foreign Affairs pursuant to Article 8.8 of the Agreement between the Kingdom of Norway
More informationCALL FOR PROPOSALS. Fund for Non-Governmental Organisations (NGO Fund) in the framework of the EEA Financial Mechanism 2009-2014 for Spain
CALL FOR PROPOSALS Fund for Non-Governmental Organisations (NGO Fund) in the framework of the EEA Financial Mechanism 2009-2014 for Spain National Operator: NGO S PLATFORM FOR SOCIAL ACTION GOALS, OBJECTIVES
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE CALL FOR PROPOSALS JUST/2013/DAP/SAG/CAAM FOR CHILD ABDUCTION ALERT MECHANISMS SPECIFIC ACTION GRANTS
EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE Directorate A: Civil justice Unit A.4: Programme management SPECIFIC PROGRAMME "DAPHNE III (2007 2013) CALL FOR PROPOSALS JUST/2013/DAP/SAG/CAAM FOR CHILD
More informationProject Completion Report (PCR) User Guide
Project Completion Report (PCR) User Guide FM0027-GDL-00041-EV17 8 February 2010 Page 2 of 10 1. Introduction The Project Completion Report (PCR) is a structured reporting format provided by the Financial
More informationRISK MANAGEMENT POLICY
RISK MANAGEMENT POLICY Nuffield College s Risk Management Policy defines the College's approach to risk and how risk management should be embedded into management processes to ensure that the major risks
More informationThird EU Health Programme 2014-2020
Third EU Health Programme 2014-2020 THE CHALLENGES - increasingly challenging demographic context threating the sustainability of health systems - fragile economic recovery limiting the resources available
More informationEEA FINANCIAL MECHANISM THE NORWEGIAN FINANCIAL MECHANISM
EEA FINANCIAL MECHANISM THE NORWEGIAN FINANCIAL MECHANISM New partnerships for cohesion 2004-2009 THE EEA ENLAGREMENT The EEA EFTA states have a history of cohesion funding: - The Financial Mechanism 1994-1998
More informationANNUAL MEETING ON THE EEA AND THE NORWEGIAN FINANCIAL MECHANISMS 2009-2014 MINUTES
ANNUAL MEETING ON THE EEA AND THE NORWEGIAN FINANCIAL MECHANISMS 2009-2014 Tuesday, 2 June 2015 Venue: Radisson Blu Hotel Lietuva, Konstitucijos pr. 20, Vilnius 11.00 15.50 h MINUTES Donor countries: Ms.
More informationMEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM 2009-2014. between THE KINGDOM OF NORWAY,
MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM 2009-2014 between THE KINGDOM OF NORWAY, hereinafter referred to as Norway and THE REPUBLIC OF POLAND hereinafter
More informationOrganization for Security and Co-operation in Europe
Organization for Security and Co-operation in Europe Aide-Mémoire on Gender Mainstreaming Projects 1. Purpose This Aide-Mémoire aims to provide you with a practical tool to gender mainstream the OSCE programmes
More informationTOOL. Project Progress Report
TOOL SUMMARY: PROJECT PROGRESS REPORT The purpose of the is to compile information from the analysis done by project participants, partners and LWR country staff about the progress or advances the project
More informationMEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE EEA FINANCIAL MECHANISM 2009-2014. between ICELAND, THE PRINCIPALITY OF LIECHTENSTEIN,
MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE EEA FINANCIAL MECHANISM 2009-2014 between ICELAND, THE PRINCIPALITY OF LIECHTENSTEIN, THE KINGDOM OF NORWAY, hereinafter referred to as the Donor
More informationThe EU Aid Budget 2014-2020 Fit to Ensure Human Rights, Gender Equality and Women s and Girls Empowerment?
The EU Aid Budget 2014-2020 Fit to Ensure Human Rights, Gender Equality and Women s and Girls Empowerment? Report written by Hanna Hansson (CONCORD Sweden). CONCORD S Multiannual Financial framework Steering
More informationProject Implementation Plan (PIP) User Guide
eea financial mechanism Project Implementation Plan (PIP) User Guide 23 November 2007 norwegian financial mechanism Page 2 of 20 1 Introduction The Project Implementation Plan (PIP) is a representation
More informationJUST/2014/SPOB/OG/NETW
EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE Call for proposals for framework partners CALL FOR PROPOSALS ESTABLISHMENT OF THREE-YEAR FRAMEWORK PARTNERSHIP AGREEMENTS WITH EU-LEVEL NETWORKS & OPERATING
More informationCOMMUNICATION STRATEGY of the Interreg IPA Cross-border Cooperation programme Croatia Serbia 2014-2020
COMMUNICATION STRATEGY of the Interreg IPA Cross-border Cooperation programme Croatia Serbia 2014-2020 Contents 1. Introduction... 3 2. objectives and communication objectives... 4 3. communication activities
More informationEE05 - EEA FM - Programme Agreement
EEA Financial Mechanism 2009-2014 PROGRAMME AGREEMENT between The Financial Mechanism Committee established by Iceland, Liechtenstein and Norway and The Ministry of Finance, hereinafter referred to as
More informationPREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS
THE GENERAL SECRETARIAT FOR RESEARCH AND TECHNOLOGY AS PROGRAMME OPERATOR OF THE GREEK-EEA RESEARCH PROGRAMME IMPLEMENTED UNDER THE GREEK FINANCIAL MECHANISM 2009-2014 PREANNOUNCES RESEARCH WITHIN PRIORITY
More informationYouth Promotion Initiative I
UN Peacebuilding Fund Youth Promotion Initiative I Call for Concept Notes Deadline for Submission of Concept Notes: 17 June 2016 1. Introduction The Peacebuilding Fund (PBF) is pleased to announce the
More information64/180. 2 A/CONF.213/RPM.1/1, A/CONF.213/RPM.2/1, A/CONF.213/RPM.3/1 and
Salvador Declaration on Comprehensive Strategies for Global Challenges: Crime Prevention and Criminal Justice Systems and Their Development in a Changing World We, the States Members of the United Nations,
More informationSurrey Compact. Volunteering Code
Surrey Compact The Surrey Compact is a commitment to continually improve relationships between the public, voluntary, community and faith sector and organisations representing service users and carers.
More informationEUROPEAN PARLIAMENT 2009-2014. Committee on Civil Liberties, Justice and Home Affairs. Committee on Civil Liberties, Justice and Home Affairs
EUROPEAN PARLIAMT 2009-2014 Committee on Civil Liberties, Justice and Home Affairs 17.12.2013 2013/2183(INI) REPORT on the EU Roadmap against homophobia and discrimination on grounds of sexual orientation
More informationTOOL. Project Progress Report
Purpose TOOL SUMMARY: LOGFRAME CHEAT SHEET The purpose of the is to compile information from the analysis done by project participants, partners and LWR country staff about the progress or advances the
More informationGUIDELINES FOR PILOT INTERVENTIONS. www.ewaproject.eu ewa@gencat.cat
GUIDELINES FOR PILOT INTERVENTIONS www.ewaproject.eu ewa@gencat.cat Project Lead: GENCAT CONTENTS A Introduction 2 1 Purpose of the Document 2 2 Background and Context 2 3 Overview of the Pilot Interventions
More informationPDNPA Project Management Peak District National Park Authority Internal Audit Report 2014/15
Audit, Resources and Performance Committee 20 March 2015 Item 10 Appendix 2 PDNPA Project Management Peak District National Park Authority Internal Audit Report 2014/15 Business Unit: Project Management
More informationNations publication, Sales No. E.96.IV.8), chap. I, resolution 1, annex I. 3 Ibid., annex II.
United Nations General Assembly Distr.: Limited 11 December 2003 Original: English A/C.2/58/L.77 Fifty-eighth session Second Committee Agenda item 93 (c) Sustainable development and international economic
More informationAn Introduction to Risk Management. For Event Holders in Western Australia. May 2014
An Introduction to Risk Management For Event Holders in Western Australia May 2014 Tourism Western Australia Level 9, 2 Mill Street PERTH WA 6000 GPO Box X2261 PERTH WA 6847 Tel: +61 8 9262 1700 Fax: +61
More informationPACIFIC ISLANDS FORUM SECRETARIAT FEMM BIENNIAL STOCKTAKE 2012
PACIFIC ISLANDS FORUM SECRETARIAT PIFS(12)FEMK.05 FORUM ECONOMIC MINISTERS MEETING Tarawa, Kiribati 2-4 July 2012 SESSION 2 FEMM BIENNIAL STOCKTAKE 2012 The attached paper, prepared by the Forum Secretariat,
More informationFINAL. World Education Forum. The Dakar Framework for Action. Education For All: Meeting our Collective Commitments. Revised Final Draft
28/04/2000, 3 P.m. FINAL The Dakar Framework for Action Education For All: Meeting our Collective Commitments Revised Final Draft World Education Forum Dakar, Senegal, 26-28 April 2000 1 1 The Dakar Framework
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE and CONSUMERS CALL FOR PROPOSALS JUST/2014/RDAP/AG/HARM
EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE and CONSUMERS Call for proposals for action grants CALL FOR PROPOSALS Action grants to support transnational projects aiming to prevent, inform about and
More informationExamining Options to Enhance Common Understanding to Strengthen End Use/r Controls. A Menu of Options
Examining Options to Enhance Common Understanding to Strengthen End Use/r Controls A Menu of Options What this project seeks to achieve The harmonization of end use/r control systems to prevent arms diversion
More informationThe tool covers three key processes under three sections: selection of applicants (worksheet 1 of the spread-sheet);
Annex 1 1.1. HOW TO USE THE SELF-ASSESSMENT TOOL The tool covers three key processes under three sections: selection of applicants (worksheet 1 of the spread-sheet); implementation of the projects by the
More informationGuidance for Industry: Quality Risk Management
Guidance for Industry: Quality Risk Management Version 1.0 Drug Office Department of Health Contents 1. Introduction... 3 2. Purpose of this document... 3 3. Scope... 3 4. What is risk?... 4 5. Integrating
More informationMainstreaming Cross-Cutting Outcomes: Gender Equality, Environmental Sustainability, Cultural Respect and Understanding. A Toolkit
Mainstreaming Cross-Cutting Outcomes: Gender Equality, Environmental Sustainability, Cultural Respect and Understanding A Toolkit January 2014 Introduction The Commonwealth Foundation has adopted a Cross-Cutting
More informationINTERREG IVA 2 Mers Seas Zeeën. Cross-border Cooperation Programme 2007-2013. Programme Manual. Guidance on Eligibility and Project Management
INTERREG IVA 2 Mers Seas Zeeën Cross-border Cooperation Programme 2007-2013 Programme Manual Guidance on Eligibility and Project Management Version 06/02/2013 Operational programme of the European Territorial
More informationTender Evaluation and Contract Award
Brief 9 January 2011 Public Procurement Tender Evaluation and Contract Award C O N T E N T S Key principles governing the process of evaluation of tenders How does an evaluation panel operate? How does
More informationBuilding Public Trust: Ethics Measures in OECD Countries
Building Public Trust: Ethics Measures in OECD Countries Annex 1998 Recommendation of the OECD Council on Improving Ethical Conduct in the Public Service, 36 Including Principles for Managing Ethics in
More informationList of actions by the Commission to. advance. LGBTI equality #EU4LGBTI. Justice and Consumers
List of actions by the Commission to advance LGBTI equality #EU4LGBTI Justice and Consumers I II III IV V VI Foreword Vĕra Jourová Commissioner for Justice, Consumers and Gender Equality I magine if you
More informationGuidelines for the mid term evaluation of rural development programmes 2000-2006 supported from the European Agricultural Guidance and Guarantee Fund
EUROPEAN COMMISSION AGRICULTURE DIRECTORATE-GENERAL Guidelines for the mid term evaluation of rural development programmes 2000-2006 supported from the European Agricultural Guidance and Guarantee Fund
More informationSeminar Young People s responses to Homophobic and Transphobic Hate Speech
DDCP-YD/Sem IDAHO (2014) 2 updated 26 March 2014 Seminar Young People s responses to Homophobic and Transphobic Hate Speech In cooperation with the Council of Europe Equality Division (SOGI Unit) and the
More informationGuidelines for Narrative and Financial Reporting
Guidelines for Narrative and Financial Reporting Project reporting is designed to benefit first and foremost the project itself. It should enable you to review changes that you faced or you yourself brought
More informationCEI Know-how Exchange Programme (KEP) KEP AUSTRIA APPLICATION FORM
To be completed by the CEI Executive Secretariat Project Ref. No.: 1206.XXXA-14 CEI Know-how Exchange Programme (KEP) KEP AUSTRIA APPLICATION FORM IMPORTANT The Application Form, other submitted documents,
More information1. Background and business case
1. Background and business case This section explains the context and why the project is being undertaken. It provides the justification for investing the time and resources in the project. 1.1 Reasons
More informationPROJECT MONITORING, REPORTING, REVISION AND EXTENSION GUIDELINES
PROJECT MONITORING, REPORTING, REVISION AND EXTENSION GUIDELINES For all reporting templates, please visit the UNDEF website: http://www.un.org/democracyfund/information-grantees This document outlines
More informationDUCACIÓN N IGUALDAD GENERAL REPORT
DUCACIÓN N IGUALDAD GENERAL REPORT INDICE INTRODUCTION... 1 BACKGROUND AND RATIONALE... 3 PARTICIPANTS... 9 OBJECTIVES... 11 Overall objective... 11 Specific objectives... 12 WORK PLAN... 13 PROJECT PHASES...
More informationCouncil of the European Union Brussels, 10 November 2015 (OR. en)
Council of the European Union Brussels, 10 November 2015 (OR. en) 13645/1/15 REV 1 CULT 76 RELEX 871 DEVG 215 NOTE From: To: General Secretariat of the Council Permanent Representatives Committee/Council
More informationGood Governance Guide. www.accs.ie. Risk Management in Community and Comprehensive Schools
www.accs.ie Cumann na Scoileanna Pobail is Cuimsitheacha Association of Community and Comprehensive Schools Risk Management in Community and Comprehensive Schools Good Governance Guide 2013 Association
More informationMULTI ANNUAL WORK PLAN 2013 2015
MULTI ANNUAL WORK PLAN 2013 2015 Translation into English: Elena Arrebola 1. CONTEXT a) Mandate The Council promotes the principle of equal treatment and non-discrimination of persons on racial or ethnic
More informationMinistry of Science and Technology Strategy and Research Division
Job Title: Director, Strategy and Research The Job: A three (3) year contract position. Job Summary: The incumbent is responsible, at an Executive level, for the technical, operational and administrative
More informationSpace project management
ECSS-M-ST-80C Space project management Risk management ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of ECSS Standards
More informationUSING THE EVALUABILITY ASSESSMENT TOOL
USING THE EVALUABILITY ASSESSMENT TOOL INTRODUCTION The ILO is committed to strengthening the Office-wide application of results-based management (RBM) in order to more clearly demonstrate its results
More informationUNIÃO AFRICANA Addis Ababa, Ethiopia, P.O. Box: 3243 Tel.: (251-11) 5513 822 Fax: (251-11) 5519 321 Email: situationroom@africa-union.
AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA Addis Ababa, Ethiopia, P.O. Box: 3243 Tel.: (251-11) 5513 822 Fax: (251-11) 5519 321 Email: situationroom@africa-union.org ACTION PLAN FOR THE IMPLEMENTATION
More informationThis Constitution establishes the principles and values of the NHS in England.
NHS Constitution 1 Introduction The NHS is founded on a common set of principles and values that bind together the communities and people it serves patients and public and the staff who work for it. This
More informationThe Foundation Examination
The Foundation Examination Sample Paper 2 January 2013 Release Multiple Choice 1-hour paper Instructions 1. All 75 questions should be attempted. 2. 5 of the 75 questions are under trial and will not contribute
More informationHEALTH CARE DATA IN QATAR
HEALTH CARE DATA IN QATAR Daoud Al-Badriyeh, PhD President, ISPOR Qatar Chapter and Assistant Professor of Pharmacoeconomics College of Pharmacy, Qatar University Doha, Qatar Health Care Data The problem:
More informationGuidance Note on Developing Terms of Reference (ToR) for Evaluations
Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim
More informationpm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development
More informationRisk Management Basics - ISO 31000 Standard. Louis Kunimatsu, CRISC IT Security & Strategy, Ford Motor Company
Risk Management Basics - ISO 31000 Standard Louis Kunimatsu, CRISC IT Security & Strategy, Ford Motor Company Risk Management Basics - ISO 31000 Standard 1. Risk Management Basics 2. ISO 31000 Risk Management
More informationResolution 11/3. Trafficking in persons, especially women and children
Human Rights Council Eleventh Session Resolution 11/3. Trafficking in persons, especially women and children The Human Rights Council, Reaffirming all previous resolutions on the problem of trafficking
More informationQTC Training & Education. Certificate IV of Project Management BSB41507 Study by Correspondence
Certificate IV of Project Management BSB41507 Study by Correspondence Career-relevant, Accredited and Industry Endorsed Because QTC vocational courses are developed in consultation with relevant industry
More informationCurrent Employment Opportunities Full Time Staff
Current Vacancies: I. Senior Project Manager - Project Management Unit (PMU)... 2 II. Human Development and Social Inclusion Consultant and Senior Consultant... 6 I. Senior Project Manager - Project Management
More informationEquality between women and men
Equality between women and men Gender equality means an equal visibility, empowerment, responsibility and participation of women and men in all spheres of public and private life. It also means an equal
More informationJob Profile. Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda
Job Profile Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda Reference number: DK-00237-2016/UGA.01-W 1. Preliminary 1.1. Short background: In 2011, eight
More informationProject Planning Worksheet
Project Planning Worksheet Project Name: Prepared by: Department: Date: Background and Overview Give the business reason for requesting this project, and an overview of the work to be completed. Risks
More informationMinistry for Foreign Affairs
Ministry for Foreign Affairs Concessional Credit Scheme Guidelines for the Preparation of Feasibility Studies May 2010 Tanecon Oy 1 Table of Contents 1. INTRODUCTION... 3 2. GENERAL CONDITIONS... 4 2.1
More informationInformation Call for participants
DDCP YD/NHSM (2015) 24 Strasbourg, 3 December 2015 In cooperation with the Gender Equality Unit Combating Sexist Hate Speech A seminar bringing together youth and human rights activists, researchers and
More informationCall for expression of interest Pilot Coordination Actions (PCA)
Network of the European Union, Latin America and the Caribbean Countries on Joint Innovation and Research Activities Call for expression of interest Pilot Coordination Actions (PCA) Promoting mutual opening
More informationModule 2: Introduction to M&E frameworks and Describing the program
Module 2: Introduction to M&E frameworks and Describing the program Learning Objectives Understand the 4 basic steps required to develop M & E plans Learn to develop goals and objectives Learn to develop
More informationDraft conclusions proposed by the Chair. Recommendation of the Subsidiary Body for Implementation
United Nations FCCC/SBI/2012/L.47 Distr.: Limited 1 December 2012 Original: English Subsidiary Body for Implementation Thirty-seventh session Doha, 26 November to 1 December 2012 Agenda item 14 Article
More informationEEA AND NORWEGIAN FINANCIAL MECHANISMS: OPEN CALL FOR INDIVIDUAL PROJECTS
EEA AND NORWEGIAN FINANCIAL MECHANISMS: OPEN CALL FOR INDIVIDUAL PROJECTS Informal translation Approved by the Monitoring Committee at 24. May 2006 TABLE OF CONTENTS Norwegian and EEA financial mechanisms
More informationCOMMITTEE FOR MEDICINAL PRODUCTS FOR HUMAN USE (CHMP)
European Medicines Agency Evaluation of Medicines for Human Use London, 19 July 2007 Doc. Ref: EMEA/27170/2006 COMMITTEE FOR MEDICINAL PRODUCTS FOR HUMAN USE (CHMP) GUIDELINE ON COMPASSIONATE USE OF MEDICINAL
More informationProject Risk Analysis toolkit
Risk Analysis toolkit MMU has a corporate Risk Management framework that describes the standard for risk management within the university. However projects are different from business as usual activities,
More informationQUALITY RISK MANAGEMENT (QRM): A REVIEW
Lotlikar et al Journal of Drug Delivery & Therapeutics; 2013, 3(2), 149-154 149 Available online at http://jddtonline.info REVIEW ARTICLE QUALITY RISK MANAGEMENT (QRM): A REVIEW Lotlikar MV Head Corporate
More informationIndependent Evaluation of Project Childhood MANAGEMENT RESPONSE
Independent Evaluation of Project Childhood MANAGEMENT RESPONSE Initiative Summary Initiative Name AidWorks initiative number INI940 Commencement date August 2010 Completion date June 2014 Total Australian
More informationECOWAS COMMON APPROACH ON MIGRATION - The current and future policy framework of ECOWAS
ECOWAS COMMON APPROACH ON MIGRATION - The current and future policy framework of ECOWAS ABIDJAN, COTE D IVOIRE, 13TH MAY, 2014 Mr. Tony Luka Elumelu, Principal Program Officer Migration Objective of the
More information(Acts whose publication is obligatory) DECISION No 1855/2006/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 12 December 2006
27.12.2006 EN Official Journal of the European Union L 372/1 I (Acts whose publication is obligatory) DECISION No 1855/2006/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 12 December 2006 establishing
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE
EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE CALL FOR PROPOSALS Action grants to support projects on non-discrimination and Roma integration RIGHTS, EQUALITY AND CITIZENSHIP PROGRAMME (2014-2020) TABLE
More informationThe Logical Framework Approach An Introduction 1
The Logical Framework Approach An Introduction 1 1. What is the Logical Framework Approach? 1.1. The background The Logical Framework Approach (LFA) was developed in the late 1960 s to assist the US Agency
More informationPreparing for Mandatory Carbon reporting webinar questions
Please note the following are responses made immediately after the webinar on 22 nd May - it is not formal guidance / should not be regarded as such (please treat as verbal response to webinar and suggest
More informationSeed Fund Proposal Application Form Template
Seed Fund Proposal Application Form Template Cover Page JSF Seed Fund Proposal Title: Name of implementing agency(s): Proposal location: Implementation Period : Start ---------- Completion----------------
More informationTerms of Reference for LEAP II Final Evaluation Consultant
UNESCO Office Kabul, Afghanistan November 2015 Terms of Reference for LEAP II Final Evaluation Consultant Post Title: Final Evaluation Specialist Organization: UNESCO Office Kabul Location: Kabul, Afghanistan
More informationNational Standards for Disability Services. DSS 1504.02.15 Version 0.1. December 2013
National Standards for Disability Services DSS 1504.02.15 Version 0.1. December 2013 National Standards for Disability Services Copyright statement All material is provided under a Creative Commons Attribution-NonCommercial-
More informationRISK ASSESSMENT. Australian Risk Management Standard AS/NZS 4360:200 defines a risk as;
RISK ASSESSMENT Australian Risk Management Standard AS/NZS 4360:200 defines a risk as; the possibility of something happening that impacts on your objectives. It is the chance to either make a gain or
More informationCULTURE PROGRAMME (2007-2013) Guidance Notes for Experts. Strand 1.3.5
Education, Audiovisual and Culture Executive Agency Culture CULTURE PROGRAMME (2007-2013) Guidance Notes for Experts Strand 1.3.5 Version January 2012 Education, Audiovisual & Culture Executive Agency
More informationREPORT 2016/066 INTERNAL AUDIT DIVISION. Audit of management of technical cooperation projects in the Economic Commission for Africa
INTERNAL AUDIT DIVISION REPORT 2016/066 Audit of management of technical cooperation projects in the Economic Commission for Africa Overall results relating to the effective management of technical cooperation
More informationA Risk Assessment Checklist for Medicaid State Agencies
PProject Management Checklist Tool for the HIPAA Privacy Rule A Risk Assessment Checklist for Medicaid State Agencies Checklist Information g to gauge where they are in the overall picture of HIPAA Privacy
More informationContract for Individual Consultant (other Specialists) Request for written proposal. Net-Med youth Project in Jordan
Contract for Individual Consultant (other Specialists) Request for written proposal Net-Med youth Project in Jordan Date: 7 January 2015 1 Request to submit a written proposal for a work assignment with
More informationInitial Equality Impact Assessment
Initial Equality Impact Assessment Department Service Area Date 20/10/11 This Initial EqIA will help you to analyse equality in the context of your policy, practice or function. The assessment is a useful
More informationPROPOSAL PREPARATION USING THE LOGICAL FRAMEWORK APPROACH DAY 4
PROPOSAL PREPARATION USING THE LOGICAL FRAMEWORK APPROACH DAY 4 Cook Islands Facilitators: Damien Sweeney & Martin Pritchard Pacific Research & Evaluation Associates 1 Recap Day 3 http://office.microsoft.com/en-au/images/?ctt=97
More informationCALL FOR PROPOSALS. Reinforce learning networks for a more effective implementation of transnational actions under the ESF 2007-2013
EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Social Market Economy in Member States II : ESF Geographical & financial support, Thematic reporting, CELFI CALL FOR PROPOSALS VP/2012/005
More informationInternational Advocacy Capacity Tool for organizational assessment
International Advocacy Capacity Tool for organizational assessment Please e: Key terms throughout the survey (in bold) are defined in the terminology page on the Alliance for Justice website To access
More informationPart-time/Sessional Economics Tutor
Job description and person specification Job Title: Sessional Economics Tutor Department: Academic Reports to: Centre Head Sally Romary Location: Amsterdam FoundationCampus Start Date: March 2015 The Company
More informationAccreditation at Highly Accomplished and Lead Teacher. Information for Referees
Accreditation at Highly Accomplished and Lead Teacher Information for Referees Contents Introduction... 3 Candidate s evidence for accreditation... 3 Importance of referee statements... 3 Candidate s selection
More informationProject Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee
Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Page 1 2 Contents 1. Introduction... 3 1.1 Definition of a... 3 1.2 Why have
More informationReport on: Strategic and operational planning 2016/17 to 2020/21
To: The Board For meeting on: 25 February 2016 Agenda item: 7 Report by: Bob Alexander Report on: Strategic and operational planning 2016/17 to 2020/21 Purpose 1. The purpose of this paper is to invite
More information