Information & Communication Technology Infrastructure Strategy

Size: px
Start display at page:

Download "Information & Communication Technology Infrastructure Strategy"

Transcription

1 gla.cs/ipsc/it-strategy-final-05/ /1 UNIVERSITY OF GLASGOW FINAL Information Policy and Strategy Committee - Monday 21 November 2005 Information & Communication Technology Infrastructure Strategy Technology Review Group October 2005 Contents Executive Summary Introduction Vision Guiding Principles Technical infrastructure to realise the vision o Core Infrastructure services: Process to realise the vision Management of Process Awareness and training Roadmap for IT evolution Appendix 1 - Roadmap for IT Infrastructure Development o Roadmap 2005/06 o Summary of Costs for 2005/06 o Roadmap 2006/07 o Summary of Costs for 2006/07 o Roadmap 2007/08 o Summary of Costs for 2007/08 Appendix 2 TRG short life working group reports o Future TRG reports will include Appendix 3 ICT Infrastructure Policies o Core Infrastructure Policies o Core Services Policies Appendix 4 Roadmap History o Roadmap 2003/04 o Summary of Costs for 2003/04 o Roadmap 2004/05 o Summary of Costs for 2004/05

2 Executive Summary This Information & Communication Technology (ICT) Infrastructure Strategy sets out a medium to long-term vision of how the ICT infrastructure will develop to support the University in its increasing dependency on Information Technology (IT) and help enhance the performance of the University in achieving its mission. The ICT strategy consists of the following elements: A vision and set of guiding principles to shape the strategy Building blocks for the technical (IT) infrastructure A framework of processes to guide the implementation and evolution of the strategy A methodology for implementation of University wide activities A mechanism for enabling the most effective use and support of information technology and systems through timely and effective training Integral to the ICT Strategy is a rolling three-year IT roadmap presented as an appendix for ease of annual update. The roadmap identifies the proposed work programmes that would be required to meet the strategic aims of the ICT strategy and includes budgetary estimates of cost for each of three financial years (current year and two subsequent years). This appendix will be updated and presented to IPSC each year for approval. The strategy as a whole is intended to provide a clear articulation of the evolving ICT infrastructure to permit effective planning of central and faculty development. The University IT Strategy is the set of documents comprising this ICT Infrastructure Strategy and the Faculty IT Strategies. Introduction The University s ICT Infrastructure Strategy underpins the Information Strategy and identifies how IT resources can be utilised in such a manner that they are made to work towards the greater organisational objectives. The strategy is also a key element in the realisation of the University s Strategic Plan. Technological provision must be well planned and well targeted to get good value from the investment. The ICT Infrastructure Strategy is designed to achieve this as it provides a framework and set of processes for maximising the effectiveness of limited budgets.

3 Vision The Technical Review Group (TRG) a group formed to report to IPSC on IT related issues, prepared this ICT Infrastructure Strategy The rate of change of technology churn shows no signs of abating, indeed rather the reverse. The IT industry displays an increasing drive towards technology integration and personalisation. The widespread deployment of PCs in the early 90 s was the first step in the chain. This is the context in which the IT Strategy is set. In formulating the ICT Infrastructure Strategy, the Technical Review Group (TRG) has: Engaged with faculties so that the ICT Strategy is based on clearly evidenced needs Drawn from the recommendations made by Information Strategy Working groups Taken account of feedback received Taken account of external influences or initiatives The University will provide a feature rich, integrated, supportable and secure technological environment that provides staff and students with seamless, any time, any place, access to the Information Technology resources that support and enhance their activities. This environment may be categorised as follows: Guiding Principles Persistent through an infrastructure that provides the facilities, security and support structures that facilitates always on services Transparent through services that are integrated, easy to use and reliable Dynamic will remain relevant in line with technological advances Borderless accessible from any where, at any time and to anyone within prevailing technology and security limits Flexible within agreed frameworks Community based - to enhance learning, teaching, research and administration activities The University is committed to the following set of guiding principles The University recognises the strategic importance of information technology and is prepared to invest in the continual development of its IT resources

4 The University will develop and communicate policies and strategies that will govern the use of IT and provide direction on support of IT resources The University sees value for money as an important consideration in all IT investments and will seek to take advantage of economies of scale and solutions that reduce overall support costs wherever possible The University will implement industry standards, best practice and supportable solutions The University will promote an ICT Service ethos supported by the most appropriate technology The University is a major research led institution and as such places demands on the technical infrastructure The University will seek to maximise the opportunities offered by external funding where the activities to be undertaken can be properly resourced in terms of staffing and which dovetail with the IT roadmap IT resources must be of a high quality, secure and universally available to authorised users The University recognises that support overheads must be addressed when costing IT investments The University will increasingly adopt IT to support its core functions, users will become increasingly IT aware and expect access to feature rich, reliable, secure, integrated and easy to use services Users will increasingly require access to IT resources via a variety of devices including personal computers, portable computers, PDAs and other mobile devices Communities will be established to promote effective consultation, knowledge transfer, sharing of best practice and avoidance of duplicated effort The University recognises the need for user and IT support staff training Technical infrastructure to realise the vision The following are the strategic building blocks that must be in place to establish the technical infrastructure that underpins the vision: A pervasive communications infrastructure that must continue to be developed Standard platforms to host services with server and file store consolidation where practical A system for identity management, namely a directory service that links architectures as the basis for many future developments

5 A security framework to preserve the integrity of the University s information assets and systems A secure and consistent desktop environment as the norm for standard IT activities A set of standard applications for University wide functions that are site licensed wherever feasible Integration of standard applications, core services and infrastructure to provide a feature rich IT environment General Information Technology policies and guidelines covering security, core service direction and standards Strategic infrastructure direction will be to support and improve a set of generic core services, identified in the Roles and Responsibilities of the Central and Faculty Staff Working Group as being the responsibility of Computing Service and including: Core Infrastructure services: The campus network supporting high speed Local Area Networks, Routing services and external connectivity with ClydeNET and SuperJANET Flexible network access services including; o VPN over Broadband and GPRS/3G networks o On campus self service facilities Web servers/caches DNS services and IP address management File store services including backup and retrieval services relays, servers and SPAM filtering End user personal communications services including standard e- mail and diary management Network Directory services for network operating system and resource management Network Directory service integration to synchronise relevant information between directories Authentication and authorisation systems providing near single sign on and federated services between authentication domains including partner institutions Serviced Desktops providing a secure and productive environment for administrative, academic and student support Information Technology security services including policies, advice, training, best practises and incident handling Help Desk service Virtual Learning Environment to support new methods in learning and teaching Application support and training for standard packages Training programmes for IT support staff

6 Negotiation and management of University-wide agreements e.g. Microsoft and other software licences All of these services will be the subject of Service Definition Agreements (reference Service Levels and Expectations Working Group). This set of generic core services will be augmented in response to demand and changing technology and will provide the basis for faculties and departments to develop added value or subject specific services. Examples of new services that will be developed within the planning horizon are Portals Virtual/Managed Learning Environments (VLE/MLE) Web Content Management Systems (CMS) Records management IP telephony and other integrated communications solutions Unified messaging e-science support services All of these institution wide developments will depend on the core infrastructure elements to underpin their delivery and support. All services, whether centrally or faculty provided, will require to be monitored and managed effectively in order to maximise service delivery to the user community and reduce the support burden on IT support staff. Process to realise the vision The Technical Review Group (TRG), a group of nominated technology experts from AIMS and each faculty who have the authority to speak on technical issues, developed and maintains the ICT Infrastructure strategy. TRG operates by establishing short life working groups of experts to investigate and report on various technologies as and when required and make recommendations to IPSC on the costs, timing and manner of technology adoption. TRG reports will be published on the Web for a period of consultation allowing time for formal stakeholder feedback before they are submitted to IPSC for approval. Working in partnership to identify, research and evaluate technologies that are potentially important to the University s ICT strategy results in a broad consensus, helps develop commonality of purpose and promotes standard practice for implementation. This process enables faculties to develop their IT planning in a way that interlocks with the University ICT Strategy and is consistent with it.

7 TRG and the Information Strategy Development Group (ISDG) cross link, with ISDG providing strategic direction on faculties needs and TRG proposing technological solutions that may shape the aspirations of ISDG. The critical importance of working partnerships to effective service delivery is being augmented by the continued development of links with the wider distributed support community through the Distributed IT Forum organised by the Computing Service Deputy Director for Distributed Support. Management of Process The implementation processes of many IT infrastructure activities are major projects affecting the entire University. For such projects TRG is the natural Programme Board as it is representative of all faculties. The TRG ensures openness and transparency in the work of the Project Teams. Awareness and training In a rapidly evolving technology environment there is a need for continual development of skills so that the University can fully realise the benefits that proper and confident use of technology can bring. This truism applies as much to IT support staff as to those using technological solutions as a tool to perform their daily work. Computing Service, The Staff Development Service and other training agencies currently offer a range of courses from introductory to task orientated and will continue to develop new courses and appropriate delivery methods in response to user feedback and evolving needs. Whilst such training is essential, these courses are designed to meet end user requirements. Commensurate resources must be targeted at IT support staff allowing them to engage in continual professional development so that they have a recognised level of skill before being able to undertake certain tasks. There is an obvious analogy with the function of staff recruitment where there is a requirement to attend a recruitment course before serving on an Interview Panel. Roadmap for IT evolution The roadmap is a summary of developments underway in the current year and looking forward to the next two years. They are explained and costed in Appendix 1. The developments are being done in a particular order because of dependencies of one area on another. Collectively they are crucial activities that underpin IT service delivery and enhancements e.g., the introduction of Portals, Virtual Learning Environments (VLEs) and content management all of which the

8 University recognises as important developments. The availability of external funding also has an obvious influence on the timing of some developments. The details of the roadmap are presented as an appendix to facilitate annual update. Appendix 1 - Roadmap for IT Infrastructure Development This Appendix details the work programmes required over a three year planning horizon to meet the aspirations of the ICT strategy. The planning horizon includes the current financial year and the two following financial years. Appendix 2 provides a history of previous work programmes. Note that in the summary tables for each year, items that currently do not have funding allocated are highlighted in italics. Roadmap 2005/06 The items for 2005/06 have been extended and modified to take account of new strategic priorities and the opportunities presented by changes in the external environment and funding Enhancement of Building Networking Infrastructure Status Ongoing Continue to improve the network infrastructure within University buildings through the replacement of ageing equipment. The benefits will be dedicated bandwidth to the desktop, particularly for researchers, and specialised research facilities and enhanced Network security, quality of service and management tools (Ref. Information Strategy Universal Access Working Group, e-science and the Grid working group, University Strategic Plan 1.6.3). Network Segmentation (continued) Status Ongoing Continue to implement Network segmentation to limit the exposure of key services and provide inherent containment measures against hacking, viruses, worms etc. (Ref. Information Strategy Information Systems Security Working Group and Universal Access Working Group; University Strategic Plan 3.3.5) IP Only Network Target summer 2006 Work with the community to phase out proprietary network protocols in order to reap the benefits of high-speed routing

9 services. (Ref. Information Strategy Universal Access Working Group; University Strategic Plan 3.3.4) Campus Backbone Network Upgrade Target summer 2006 Replace backbone routing equipment in order to deliver increased bandwidth to support more demanding applications and enhance security, quality of service and management tools. (Ref. Information Strategy Universal Access Working Group; University Strategic Plan 3.3.4) Directory Integration Status ongoing Continue to develop the infrastructure that will provide secure authentication and authorised access to IT resources for the individuals who are entitled to use them. New developments will include JISC sponsored Shiibboleth federated services and Public Key Infrastructure PKI investigations. (Ref. Information Strategy Authentication and Access Control Working Group; University Strategic Plan 3.3.4) Serviced Desktop for Staff and Students Status ongoing Continue to develop solutions for desktop system management that will improve security, productivity and reduce the support overheads so that some resources can be redeployed to added value activities at the faculty/departmental level (Ref Information Strategy Working Group Common Baselines and Delivery Platforms; University Strategic Plan 3.3.4) Flexible Access Provision Status ongoing Continue to develop flexible access solutions to allow staff & students to use their own personal systems to access IT services in accordance with the University s Universal Access Policy (Ref. Information Strategy Universal Access Working Group; University Strategic Plan 3.3.4) Software Licence Policy Management Status ongoing Implement the recommendations on software licence policy management to reduce the University s exposure to the risk of litigation. (Ref. Implementation of Software Licensing Policy approved by Court)

10 Replacement of Proprietary Video-Conferencing Technology Status ongoing Build on the success of existing University provided video conferencing and teaching facilities by replacing obsolescent and proprietary systems with industry standard equipment that provides compatibility with the rest of the academic community. (Ref University Strategic Plan 3.3.6) Service Sustainability Status ongoing Service sustainability is about designing and improving services to ensure that they are: Robust and resilient Scale to meet user demand and legitimate expectations over time Provide continued high performance, availability and reliability Provide service assurance metrics that indicate when improvements, upgrades and replacements are required. Nb this implies that suitable funding is made available to for example effect server upgrades and replacements when required. This would be analogous to the agreed workstation four-year replacement cycle. Are supportable and secure Designing sustainable services will require a higher initial investment however the expectation is that over the lifetime of the service the benefits in terms of the service levels provided will be greater and overall costs in terms of management and other support costs will be less. All to often services evolve from a basic level supporting a few users to a critical mass with many watersheds along the way that require significant support efforts, service downtime for upgrades and user dissatisfaction during periods of poor service performance. The IS and ICT strategies provide a framework for a new approach to service delivery and continuity. (Ref Information/Continuity Security Working groups) Lifecycle Replacement and Enhancement of Student Clusters Target summer 2006 Continue to replace workstations that have passed their useful life (over 4 years old) to ensure that reliable, up to date workstations are available and to improve the workstation to student ratio. (Ref.

11 Information Strategy Provision of on-campus Student C&IT Facilities Working Group; University Strategic Plan 3.3.6) Patch Management Service Implement the TRG working group recommendations on Patch Management for Microsoft and other operating systems and applications. The benefits will include improved desktop and server security and a reduction in the staff effort required to deal with compromised systems IT Staff Training Implement the TRG working group recommendations on training for IT support staff. The benefits would be improved skill sets, IT staff morale and productivity Improve e-science support Network Status Ongoing Build on existing relationships between the National e-science centre, e-science researchers, GRID computing systems administrators and other GRID support personnel to establish an e- Science support team that will provide a significant support network for GRID computing at the University IP Telephony Pilot Status ongoing Investigate and gain experience of IP telephony solutions in-order to assess the potential benefits and problems associated with a move from traditional PABX solutions to IP telephony (Ref CS/E&B/Telecomm Committee joint project). Refine ClydeNETs Five-year Plan Submit ClydeNETs five-year plan to the funding council to obtain funding to upgrade the ClydeNET communications infrastructure in-line with SuperJANET 5 developments. This will be pivotal with respect to the University s external communications requirements and e-science research aspirations. (Ref ClydeNETs Five year plan, UKERNA Guidelines for allocation of SuperJANET funds to Regional Networks in Scotland) Summary of Costs for 2005/06 Activity Cost Source

12 Enhance Networks in University Buildings 100K University Network segmentation 100K University Campus backbone network upgrade 410K SRIF-3/LTIF Service Sustainability 100K University Video Conferencing replacement 200K LTIF Flexible Access 40K University Student clusters 500K University Patch Management 10K University Software licence policy management 50K University IT Staff Training 50K University Totals Roadmap 2006/07 University 950K Other 610K The items for 2006/07 will be extended and modified to take account of new strategic priorities and the opportunities presented by changes in the external environment and funding Enhancement of Building Networking Infrastructure Status Ongoing Continue to improve the network infrastructure within University buildings through replacement of ageing equipment. The benefits will be dedicated bandwidth to the desktop, particularly for researchers, and specialised research facilities and enhanced Network security, quality of service and management tools. (Ref. Information Strategy Universal Access Working Group, e-science and the Grid working group, University Strategic Plan 1.6.3) Network Segmentation (continued) Status Ongoing Continue to implement Network segmentation to limit the exposure of key services and provide inherent containment measures against hacking, viruses, worms etc. (Ref. Information Strategy Information Systems Security Working Group and Universal Access Working Group; University Strategic Plan 3.3.5)

13 Campus Backbone Network Upgrade Target summer 2006 may slip to 2007 Replace backbone routing equipment in order to deliver increased bandwidth to support more demanding applications and enhance security, quality of service and management tools. (University Strategic Plan 3.3.4) Directory Integration Status ongoing Continue to develop the infrastructure that will provide secure authentication and authorised access to IT resources for the individuals who are entitled to use them. New developments will include Shiibboleth and PKI investigations. (Ref. Information Strategy Authentication and Access Control Working Group; University Strategic Plan 3.3.4) Serviced Desktop for Staff and Students Status ongoing Continue to develop solutions for desktop system management that will improve security, productivity and reduce the support overheads so that some resources can be redeployed to added value activities at the faculty/departmental level (Ref Information Strategy Working Group Common Baselines and Delivery Platforms; University Strategic Plan 3.3.4) Flexible Access Provision Status ongoing Continue to develop flexible access solutions to allow staff & students to use their own personal systems to access IT services in accordance with the University Universal Access Policy (Ref. Information Strategy Universal Access Working Group; University Strategic Plan 3.3.4) Service Sustainability Status ongoing Service sustainability is about designing and improving services to ensure that they are: Robust and resilient Scale to meet user demand and legitimate expectations over time Provide continued high performance, availability and reliability Provide service assurance metrics that indicate when improvements, upgrades and replacements are

14 required. Nb this implies that suitable funding is made available to for example effect server upgrades and replacements when required. This would be analogous to the agreed workstation four-year replacement cycle. Are supportable and secure Designing sustainable services will require a higher initial investment however the expectation is that over the lifetime of the service the overall costs in terms of the service levels provided, management and other support costs will be less. All to often services evolve from a basic level supporting a few users to a critical mass with many watersheds along the way that require significant support efforts, service downtime for upgrades and user dissatisfaction during periods of poor service performance. The IS and ICT strategies provide a framework for a new approach to service delivery and continuity. (Ref Information security/continuity working groups) Improve e-science support Network Continue to develop e-science/grid support network Implement Disaster recovery and Business continuity solutions for Core infrastructure services Expand the Boyd ORR DR site to include systems that will provide DR and BC solutions for critical services. (Ref Information security/continuity working groups) Lifecycle Replacement and Enhancement of Student Clusters Target summer 2007 Review workstation replacement Policy in-line with TRG report on Student Clusters. Implement University decision on the level of Central Cluster provision versus Student Laptop provision. IP Telephony Pilot Status ongoing Review IP telephony Pilot and investigate alternative IP telephony solutions. It is expected that alternatives to traditional handset/pabx IP solutions will emerge. Extend dark fibre contracts for communications links to the Glasgow teaching hospitals.

15 The University provides (leased) high-speed communications links to Yorkhill, Royal Infirmary, Gartnavel, Southern General, Victoria and the Dental school. The contracts for these leased circuits will terminate from April We wish to extend all the leased circuits such that they co-terminate at an agreed future date (target 2016) to provide for service sustainability and predictable annual rental charges. (Ref Universal Access working group) Review File store and Server consolidation strategy Report on the effects of the Storage Area Network (SAN) file store consolidation and server consolidation strategy and define future strategy Review of Computer room provisions on campus Server and file store consolidation, Service sustainability and HPC cluster provisions are placing heavy demands on existing computer room facilities including space, floor loadings, electrical provision/protection and air conditioning/handling. A review of existing provisions is required to determine whether or not University strategies with respect to Disaster recovery, Business continuity, service sustainability and e-science is likely to be compromised by inadequate computer room provision. Unified messaging review Investigate and propose strategic solutions for end user access to integrated , diary management, telephony, fax, IM and other forms of personal communications. National Middleware Initiatives JISC is planning to announce a roadmap for the rollout (from summer 2006) of national middleware services based on the open source, open standards Shibboleth framework that will integrate with institutional directories to support robust authentication and authorisation services for staff and student access to institutional services and also datasets and other sources of electronic information which are held externally. It is intended that the X.509 certificates used by Grid middleware will be integrated into the national middleware initiative. Whilst HEFCE have allocated 3.2M for the rollout of Shibboleth in England, SHEFC have not indicated, as yet, that there will be commensurate financial commitment for Scotland. Unless external funding becomes

16 available in 2005/06, we propose tracking such developments with a view to implementation in 06/07. ClydeNET development Status ongoing Commence implementing ClydeNET upgrades to take advantage of SuperJANET 5 improvements in bandwidth and resilience. These upgrades will follow ClydeNETs five-year plan developed in 2004/2005 and refined in 2005/2006. (Ref ClydeNETs Five year plan, UKERNA Guidelines for allocation of SuperJANET funds to Regional Networks in Scotland) Summary of Costs for 2006/07 Activity Cost Source Enhance Networks in University Buildings 100K University Network segmentation 100K University Campus backbone network upgrade 410K SRIF-3/LTIF if slippage Service Sustainability 100k University Disaster recovery/business continuity 50k University Flexible Access 50K University File store and server consolidation 100K University Student clusters 500K University Extend dark fibre contracts for teaching hospitals 20K per annum onto CS unavoidable expenditure ClydeNET Upgrades 870K covering 4 years Totals Roadmap 2007/08 University 1020K University SHEFC/UKERNA Other 1280K

17 The items for 2007/08 will be extended and modified to take account of new strategic priorities and the opportunities presented by changes in the external environment and funding Enhancement of Building Networking Infrastructure Status Ongoing Continue to improve the network infrastructure within University buildings through replacement of ageing equipment. The benefits will be dedicated bandwidth to the desktop, particularly for researchers, and specialised research facilities and enhanced Network security, quality of service and management tools (Ref. Information Strategy Universal Access Working Group, e-science and the Grid working group, University Strategic Plan 1.6.3). Network Segmentation (continued) Status Ongoing Continue to implement Network segmentation to limit the exposure of key services and provide inherent containment measures against hacking, viruses, worms etc. (Ref. Information Strategy Information Systems Security Working Group and Universal Access Working Group; University Strategic Plan 3.3.5) Serviced Desktop for Staff and Students Status ongoing Continue to develop solutions for desktop system management that will improve security, productivity and reduce the support overheads so that some resources can be redeployed to added value activities at the faculty/departmental level (Ref Information Strategy Working Group Common Baselines and Delivery Platforms; University Strategic Plan 3.3.4) Flexible Access Provision Status ongoing Continue to develop flexible access solutions to allow staff & students to use their own personal systems to access IT services in accordance with the University Universal Access Policy (Ref. Information Strategy Universal Access Working Group; University Strategic Plan 3.3.4) Service Sustainability Status ongoing Continue to provide service sustainability Improve e-science support Network

18 Continue to develop e-science/grid support network Implement Disaster recovery and Business continuity solutions for Core infrastructure services Continue to provide DR and BC solutions for critical services. (Ref Information security/continuity working groups) Lifecycle Replacement and Enhancement of Student Clusters Target summer 2008 Implement University decision on the level of Central Cluster provision versus Student Laptop provision. IP Telephony Possible start of replacement project for University PABX telephone system Unified messaging Implement University decision on unified messaging system. This could integrate various forms of personal communications i.e., e- mail, diary, fax, telephone and IM and provide users with a more flexible and productive approach to personal communications handling. Computer room enhancements Implement decisions on Computer room review ClydeNET development Status ongoing Continue implementing ClydeNET upgrades to take advantage of SuperJANET 5 improvements in bandwidth and resilience. These upgrades will follow ClydeNETs five-year plan developed in 2004/2005 and refined in 2005/2006. (Ref ClydeNETs Five year plan, UKERNA Guidelines for allocation of SuperJANET funds to Regional Networks in Scotland) Summary of Costs for 2007/08 Activity Cost Source Enhance Networks in University Buildings 100K University

19 Network segmentation 100K University Computer room enhancements New Builds University Service Sustainability 100k University Disaster recovery/business continuity 50k University Flexible Access 50K University File store and server consolidation 75K University Student clusters? University Unified Messaging 75K University ClydeNET Upgrades 870K covering 4 years ( ) Totals University 550K (+) SHEFC/UKERNA Other Part of 870K Appendix 2 TRG short life working group reports The following TRG reports have been produced: Report on Professional Development of Distributed IT Support Staff Report on Software Audit Tool Report on Student Clusters Report on Patch Management Report on Platform Flexibility Report on Multimedia Communications Future TRG reports will include Report on , Diary Management and unified messaging direction Report on Domain Name Service and IP address management direction Report on Apple OSX requirements and support Report on Linux requirements and support Report on Open Source Software solutions Report on Authentication and Authorisation services on campus and with other Institutions Report on Network and Information systems security Report on e-science support

20 Report on Flexible access provisions for teaching, research and administration support Appendix 3 ICT Infrastructure Policies This Appendix provides links to the relevant ICT Infrastructure Policies that support the ICT infrastructure strategy. Core Infrastructure Policies Connection Policy- for connecting systems to the University s campus network Universal Access Policy- for the provision of Universal access to the University s Information Technology resources Wireless LAN Policy- for wireless network deployments Core Services Policies Incident Handling Policy- for handling security incidents and breaches of information security policies Monitoring Policy- for network and systems monitoring Bastion Host Policy- for the configuration, ongoing security and management of servers Sys & Net Admin Guidelines- for system and network administrators Password Policy- for creating and maintaining strong passwords Appendix 4 Roadmap History This Appendix details the work programmes for previous years. Where entries appear in successive years this will be due to one of the following: Or The work programme was not funded and has been rolled over The work programme requires more than one year to complete Roadmap 2003/04 The items for 2003/04 were early responses to the Information Strategy work of 2002/03 and external influences. Resilience in JANET Access Status complete

21 Implementation of second access point to the SuperJANET academic network to mitigate the loss of the primary connection (Ref. Information Strategy Resilience and Business Continuity Working Group, mitigation of single point of failure; University Strategic Plan 1.6.3) Network Segmentation Status ongoing Begin implementing Network segmentation to limit the exposure of key services and provide inherent containment measures against hacking, viruses, worms etc. (Ref. Information Strategy Information Systems Security Working Group and Universal Access Working Group; University Strategic Plan 3.3.5) Information Systems Security Status complete Establish a University Information Security Team to spearhead the implementation of an Information Security Management System to protect individual and University information assets (Ref. Information Strategy Information Systems Security Working Group; University Strategic Plan 3.3.5) Yearly Lifecycle Replacement and Enhancement of Student Clusters Status complete Replace workstations that have passed their useful life (over 4 years old) to ensure that reliable, up to date workstations are available and to improve the workstation to student ratio. (Ref. Information Strategy Provision of on-campus Student C&IT Facilities Working Group; University Strategic Plan 3.3.6) Directory Integration Status ongoing Provide the infrastructure to enable secure authentication for access to each of the services that individuals are entitled to use e.g. portals, VLE, content management systems, information resources, , the network, etc. (Ref. Information Strategy Authentication and Access Control Working Group; University Strategic Plan 3.3.4) Enhancement of Networking for Researchers Status ongoing Improve the network infrastructure for researchers to provide dedicated bandwidth to the desktop and to specialist research facilities. (Ref Information Strategy Working Group e-science and the Grid; University Strategic Plan 1.6.3)

22 Software Licence Policy Management Status ongoing Investigate and propose solutions to demonstrate university wide compliance with software licensing policy (Ref. Implementation of Software Licensing Policy approved by Court) Summary of Costs for 2003/04 Activity Cost Source Status JANET Access resilience Information Systems Security 143.5K SRIF-2 Complete 2 posts University Complete Student clusters 500K University Complete Networking for researchers Roadmap 2004/05 100K SRIF Complete The items for 2004/05 represented the priorities articulated by a wide range of constituencies in the University and address many of the recommendation of Information Strategy working groups. Implementation of SAN Status ongoing Procure a scalable network storage facility to consolidate file store and provide efficient and effective data management including reliable backup (Ref. Technology Review Working Group; University Strategic Plan 1.6.3) Implementation of HPC Cluster Status complete Provision of a generic high performance computing facility to augment other more specialised systems in the University and enable smaller groups to enter the e-research field. (Ref Information Strategy Working Group e-science and the Grid; University Strategic Plan 1.6.3) Enhancement of Networking for Researchers Status ongoing Continue to improve the network infrastructure for researchers to provide dedicated bandwidth to the desktop and to specialist research facilities. (Ref Information Strategy Working Group e- Science and the Grid; University Strategic Plan 1.6.3)

23 Network Segmentation Status ongoing Continue to implement Network segmentation to limit the exposure of key services and provide inherent containment measures against hacking, viruses, worms etc. (Ref. Information Strategy Information Systems Security Working Group and Universal Access Working Group; University Strategic Plan 3.3.5) IP Only Network Status ongoing Work with the community to phase out proprietary network protocols in order to reap the benefits of high-speed routing services. (Ref. Information Strategy Universal Access Working Group; University Strategic Plan 3.3.4) Platform Flexibility Status ongoing Enable faculties and departments to connect any devices to the Campus network that meet minimum University requirements for technology, security and authentication in order to meet their specific IT requirements (Ref University Strategic Plan 3.3.6). Location Independent Networking (LIN) Status Complete Computing Service was awarded funds by UKERNA to participate in a national trial of location independent networking (LIN). The trial. LIN is a co-operative initiative amongst the academic community with the aim of enabling staff visiting a participating institution to make use of the networking facilities there to gain access to services and facilities at Glasgow e.g. . IT Staff Development Status complete TRG will establish a working group to investigate professional development of IT support staff and make recommendations (Ref University Strategic Plan 4.3.2, 4.3.3) Active Directory Status complete Implement a Campus wide Microsoft Active Directory service to improve the serviced desktop and Microsoft server environments (Ref. Information Strategy Authentication and Access Control Working Group; University Strategic Plan 3.3.4) Directory Integration Status ongoing

24 Continue to provide the infrastructure to enable secure authentication for access to each of the services that individuals are entitled to use. (Ref. Information Strategy Authentication and Access Control Working Group; University Strategic Plan 3.3.4) Serviced Desktop for Staff and Students Status ongoing Continue to develop solutions for desktop system management that will improve security, productivity and reduce the support overheads so that some resources can be redeployed to added value activities at the faculty/departmental level (Ref Information Strategy Working Group Common Baselines and Delivery Platforms; University Strategic Plan 3.3.4) Flexible Access Provision Status ongoing Develop flexible access areas to allow staff & students to use their own personal systems to access IT services in accordance with the University Universal Access Policy (Ref. Information Strategy Universal Access Working Group; University Strategic Plan 3.3.4) Replacement of Proprietary Video-Conferencing Technology Status ongoing Build on the success of existing University provided video conferencing facilities by replacing obsolescent and proprietary systems with industry standard equipment that provides compatibility with the rest of the academic community. (Ref University Strategic Plan 3.3.6) Software Licence Policy Management Status ongoing Implement the recommendations on software licence policy management to reduce the University s exposure to the risk of litigation. (Ref. Implementation of Software Licensing Policy approved by Court) Lifecycle Replacement and Enhancement of Student Clusters Status complete Continue to replace workstations that have passed their useful life (over 4 years old) to ensure that reliable, up to date workstations are available and to improve the workstation to student ratio. (Ref. Information Strategy Provision of on-campus Student C&IT Facilities Working Group; University Strategic Plan 3.3.6)

25 E-learning development The Glasgow Environment for Learning (GEL), which is provided by Moodle a public domain VLE application, has been implemented on a number of dedicated servers for early adopters to commence developing material for the start of session. GEL (Moodle) makes extensive use of the pervasive (NDS) e-directory service for authentication & authorisation. GEL will be further developed to take account of feedback received. IT Staff Training The working group established by TRG to investigate training of IT support staff and make recommendations has now reported. Its recommendations specifically focus on staff training and are the subject of a separate paper to IPSC. Given the strength of feeling about this topic, failure to make some provision for staff training would undoubtedly adversely impact morale. Summary of Costs for 2004/05 Activity Cost Source Status Implementation of SAN & HPC cluster Location Independent Networking 350K SRIF 2 Complete 5K UKERNA Complete Networking for researchers 30K SRIF 2 Complete Student clusters 500K University Complete E-Learning development 20K University Complete Flexible access provision 50K University Started part funded 12k Replace video conferencing kit Directory Integration, Active Directory Software licence policy management 200K University Started funding 05/06 40K University Not Funded 50K University Not Funded TRG report IT Staff Training 50K University Not Funded Prepared by: Rolly Gilmour Last modified on 29 th October 2005

26

Information & Communication Technology Infrastructure Strategy. November 2012

Information & Communication Technology Infrastructure Strategy. November 2012 UNIVERSITY OF GLASGOW Information & Communication Technology Infrastructure Strategy Executive Summary November 01 Technology Review Group This Information & Communication Technology (ICT) Infrastructure

More information

Universal Network Access Policy

Universal Network Access Policy Universal Network Access Policy Purpose Poynton Workmens Club makes extensive use of network ed Information Technology resources to support its research and administration functions and provides a variety

More information

Swansea University. ICT Infrastructure Strategic Plan: 2015 2017

Swansea University. ICT Infrastructure Strategic Plan: 2015 2017 Swansea University ICT Infrastructure Strategic Plan: 2015 2017 Context ICT is essential for the University to achieve its ambitious expansion plans and to operate on a day today basis. IT underpins our

More information

Information Technology: Principles and Strategic Aims

Information Technology: Principles and Strategic Aims Information Technology: Principles and Strategic Aims As observed in the University of Cambridge IT Strategy, the University is a complex and diverse organization whose IT requirements vary depending on

More information

Transforming public services in Scotland Value Added Services

Transforming public services in Scotland Value Added Services Transforming public services in Scotland Value Added Services Maximising your investment in SWAN Dedicated to connecting Scotland The Scottish Wide Area Network (SWAN) is the only secure network available

More information

The changing face of global data network traffic

The changing face of global data network traffic The changing face of global data network traffic Around the turn of the 21st century, MPLS very rapidly became the networking protocol of choice for large national and international institutions. This

More information

University of Strathclyde: Information Services Directorate Operational Plan for 2014/15

University of Strathclyde: Information Services Directorate Operational Plan for 2014/15 University of Strathclyde: Information Services Directorate Operational Plan for 2014/15 Enabling the future: transforming our information systems and technology 2014/15 2014/2015 CONTENTS 1 DRIVERS, STRATEGIC

More information

University of Auckland IT Strategic Plan 2013-2015

University of Auckland IT Strategic Plan 2013-2015 University of Auckland IT Strategic Plan 2013-2015 Final 21 February 2013 Table of Contents 2 TABLE OF CONTENTS TABLE OF CONTENTS... 2 EXECUTIVE SUMMARY... 3 STRATEGIC SUMMARY... 4 INTRODUCTION... 4 PRIORITY

More information

INFORMATION COMMUNICATION TECHNOLOGY PLAN

INFORMATION COMMUNICATION TECHNOLOGY PLAN Part 3 ICT Pages 59-64 5/7/03 8:36 AM Page 59 59 PART THREE INFORMATION COMMUNICATION TECHNOLOGY PLAN INTRODUCTION There is an urgent need for the Department of Foreign Affairs to transform its current

More information

Oxford City Council ICT Strategy 2015 2018

Oxford City Council ICT Strategy 2015 2018 Oxford City Council ICT Strategy 2015 2018 1 Contents 2 Overview... 2 3 OCC Business Drivers... 2 4 ICT Principles... 3 4.1 Business Requirements... 3 4.2 Information Management... 3 4.3 Applications...

More information

Information Technology Plan 2010 2011

Information Technology Plan 2010 2011 Information Technology Plan 2010 2011 September 2010 The FY10-11 IT plan was developed through collaboration with IT staff and engagement with IT governance groups. In the budget-constrained environment,

More information

Dublin City University

Dublin City University Asset Management Policy Asset Management Policy Contents Purpose... 1 Scope... 1 Physical Assets... 1 Software Assets... 1 Information Assets... 1 Policies and management... 2 Asset Life Cycle... 2 Asset

More information

Information Governance Committee. Scope for the BCU Telephony Infrastructure development. Underpinning BCU Three Year operational plan

Information Governance Committee. Scope for the BCU Telephony Infrastructure development. Underpinning BCU Three Year operational plan Betsi Cadwaladr University Health Board Committee Paper Item IGC/14/26 Name of Committee: Subject: Information Governance Committee Scope for the BCU Telephony Infrastructure development Summary or Issues

More information

2.0 RECOMMENDATIONS Members of the Committee are asked to note the information contained within this report.

2.0 RECOMMENDATIONS Members of the Committee are asked to note the information contained within this report. REPORT TO: SCRUTINY COMMITTEE 25 JUNE 2013 REPORT ON: REPORT BY: INTERNAL AUDIT REPORTS CHIEF INTERNAL AUDITOR REPORT NO: 280-2013 1.0 PURPOSE OF REPORT To submit to Members of the Scrutiny Committee a

More information

Griffith IT Plan 2013-2017 Delivering alignment and agility

Griffith IT Plan 2013-2017 Delivering alignment and agility Griffith IT Plan 2013-2017 Delivering alignment and agility Sir Samuel Griffith Centre Nathan Campus Background IT Plan 2013-2017: Delivering alignment and agility In August 2012 the University Council

More information

Appendix A: ICT and Information Management Strategy

Appendix A: ICT and Information Management Strategy Appendix A: ICT and Information Management 2014 2019 Head of Information and Business Change Sarah Caulkin October 2014 1 Version Control: Date Version Author Comments 04/08/14 0.1 Jo Harley First draft

More information

ICT Category Sub Category Description Architecture and Design

ICT Category Sub Category Description Architecture and Design A A01 Architecture and Design Architecture and Design Enterprise & Business Architecture A02 Architecture and Design Information Architecture A03 Architecture and Design Solution Architecture B Benchmarking

More information

ICT Strategy 2010-2013

ICT Strategy 2010-2013 ICT Strategy 2010-2013 If you would like to receive this publication in an alternative format (large print, tape format or other languages) please contact us on 01832 742000. East Northamptonshire Council

More information

CiCS INFORMATION TECHNOLOGY STRATEGY 2008 2013 1. PURPOSE 2. CONTEXT. 2.1 Information Technology. 2.2 Changing Environment. 2.

CiCS INFORMATION TECHNOLOGY STRATEGY 2008 2013 1. PURPOSE 2. CONTEXT. 2.1 Information Technology. 2.2 Changing Environment. 2. CiCS INFORMATION TECHNOLOGY STRATEGY 2008 2013 1. PURPOSE This strategy replaces the previous IT strategy and is an integral part of the overall strategy being developed by Corporate Information and Computing

More information

JOB DESCRIPTION CONTRACTUAL POSITION

JOB DESCRIPTION CONTRACTUAL POSITION Ref #: IT/P /01 JOB DESCRIPTION CONTRACTUAL POSITION JOB TITLE: INFORMATION AND COMMUNICATIONS TECHNOLOGY (ICT) SECURITY SPECIALIST JOB SUMMARY: The incumbent is required to provide specialized technical

More information

Information Strategy 2013-2016 Supporting Innovation and Excellence

Information Strategy 2013-2016 Supporting Innovation and Excellence Information Strategy 2013-2016 Supporting Innovation and Excellence Introduction This strategy sets out the vision and direction for information and communication services to support the realisation of

More information

Deputy Director IT Solutions (Projects, Design and Development)

Deputy Director IT Solutions (Projects, Design and Development) Deputy Director IT Solutions (Projects, Design and Development) Corporate Services IT Services Salary Grade 10 in the region of 70k per annum Open Ended Contract Ref: CSE00884 At Leicester we re going

More information

1 Executive Summary... 3. 2 Document Structure... 5. 3 Business Context... 6

1 Executive Summary... 3. 2 Document Structure... 5. 3 Business Context... 6 Contents 1 Executive Summary... 3 2 Document Structure... 5 3 Business Context... 6 4 Strategic Response... 8 4.1 Platform... 8 4.2 Network... 10 4.3 Unified Communications... 11 5 Implementation status...

More information

FUNDING APPROVAL FOR IMPLEMENTATION OF CLOUD-BASED PRODUCTIVITY AND COLLABORATION TOOLS (OFFICE 365)

FUNDING APPROVAL FOR IMPLEMENTATION OF CLOUD-BASED PRODUCTIVITY AND COLLABORATION TOOLS (OFFICE 365) London Borough of Hammersmith & Fulham CABINET 2 NOVEMBER 2015 FUNDING APPROVAL FOR IMPLEMENTATION OF CLOUD-BASED PRODUCTIVITY AND COLLABORATION TOOLS (OFFICE 365) Report of the Leader - Councillor Stephen

More information

Information Services Strategy 2011-2013

Information Services Strategy 2011-2013 Information Services Strategy Issue 1 1 Introduction The States of Jersey public sector is facing significant pressure for efficiencies and savings. This has created the context to take a fresh look at

More information

The Cloud Case Study - Student Software Development

The Cloud Case Study - Student Software Development Learner Focused Applications in the Cloud Case Study Colleges and Projects Barnsley College Blackburn College Grimsby Institute Leeds City College North East Worcestershire College Oxford and Cherwell

More information

INFORMATION TECHNOLOGY & MEDIA SERVICES

INFORMATION TECHNOLOGY & MEDIA SERVICES INFORMATION TECHNOLOGY & MEDIA SERVICES Head of IT Operations Permanent, Full-time Grade SENIOR STAFF: Salary to be determined by the Vice Chancellor De Montfort University is home to more than 27,000

More information

University Services. IT Services. Strategic Plan to 2016/17 incorporating Annual Plan 2012-13

University Services. IT Services. Strategic Plan to 2016/17 incorporating Annual Plan 2012-13 University Services IT Services Strategic Plan to 2016/17 incorporating Annual Plan 2012-13 Contents Introduction and high level description of service 3 Overview 3 IT Services Structure 4 Networking and

More information

Agenda Item No.6 (j) DERBYSHIRE COUNTY COUNCIL CABINET. Report of the Director of Transformation

Agenda Item No.6 (j) DERBYSHIRE COUNTY COUNCIL CABINET. Report of the Director of Transformation DERBYSHIRE COUNTY COUNCIL CABINET 26 th September 2012 Report of the Director of Transformation Agenda Item No.6 (j) INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) STRATEGY Purpose of Report To seek Cabinet

More information

Information security controls. Briefing for clients on Experian information security controls

Information security controls. Briefing for clients on Experian information security controls Information security controls Briefing for clients on Experian information security controls Introduction Security sits at the core of Experian s operations. The vast majority of modern organisations face

More information

Cloud computing is a way of delivering IT services to users without the need to buy, install or manage any infrastructure.

Cloud computing is a way of delivering IT services to users without the need to buy, install or manage any infrastructure. hosted services dynamic Increased flexibility and cost saving The benefits employees can access information wherever they are, rather than having to remain at their desks. Reduced costs our hosted services

More information

INFRASTRUCTURE SOLUTIONS OVERVIEW

INFRASTRUCTURE SOLUTIONS OVERVIEW INFRASTRUCTURE SOLUTIONS OVERVIEW CONTACT US Head Office Comtec House Albert Road North Reigate Surrey RH2 9EL T: 0800 008 7599 E: infrastructure@comtec.com www.comtec.com infrastructure datacentre communications

More information

Information Technology Department Work Plan 2015-2016

Information Technology Department Work Plan 2015-2016 Council, 25 March 2015 Information Technology Department Work Plan 2015-2016 Executive summary and recommendations Introduction The Information Technology Department Work Plan for the period 1 April 2015

More information

ICT budget and staffing trends in the UK

ICT budget and staffing trends in the UK ICT budget and staffing trends in the UK Enterprise ICT investment plans to 2013 January 2013 TABLE OF CONTENTS 1 Trends in ICT budgets... 1 1.1 Introduction... 1 1.2 Survey demographics... 1 1.3 IT budget

More information

Secondary School 1/04/2015. ICT Service Specification by: Andrea Warburton ONE IT SERVICES AND SOLUTIONS

Secondary School 1/04/2015. ICT Service Specification by: Andrea Warburton ONE IT SERVICES AND SOLUTIONS 1/04/2015 Secondary School ICT Service Specification by: 1 Andrea Warburton ONE IT SERVICES AND SOLUTIONS SERVICE SPECIFICATION One IT Services and Solutions offer a one stop shop ICT support service,

More information

[Type text] SERVICE CATALOGUE

[Type text] SERVICE CATALOGUE [Type text] SERVICE CATALOGUE IT Services 1 IT Support and Management Services SERVICE AREA: SERVICE DESK Users can contact the Service Desk via the phone or an online web form for all their ICT service

More information

Joint ICT Service ICT Strategy 2014-17

Joint ICT Service ICT Strategy 2014-17 Document History Document Location This document is only valid on the day it was printed. The source of the document will be found in (see footer) Revision History Date of this revision: 19 th May 2014

More information

ISEB MANAGER S CERTIFICATE IN ITIL INFRASTRUCTURE MANAGEMENT. Guidelines for candidates who are taking the ICT Infrastructure Examination

ISEB MANAGER S CERTIFICATE IN ITIL INFRASTRUCTURE MANAGEMENT. Guidelines for candidates who are taking the ICT Infrastructure Examination ISEB MANAGER S CERTIFICATE IN ITIL INFRASTRUCTURE MANAGEMENT Guidelines for candidates who are taking the ICT Infrastructure Examination This qualification is based on ITIL Infrastructure Management as

More information

Information and Communications Technology Strategy 2014-2017

Information and Communications Technology Strategy 2014-2017 Contents 1 Background ICT in Geoscience Australia... 2 1.1 Introduction... 2 1.2 Purpose... 2 1.3 Geoscience Australia and the Role of ICT... 2 1.4 Stakeholders... 4 2 Strategic drivers, vision and principles...

More information

ONLINE SERVICES. Business and ICT Service Delivery Redefined

ONLINE SERVICES. Business and ICT Service Delivery Redefined ONLINE SERVICES Business and ICT Service Delivery Redefined RULES AND ROLES Even ten years ago, the rules and roles which governed the provision of ICT business services were very different. Business demands

More information

UICT Document 2014/111. Information Technology Services 2015-2017 Program of Works: IT Infrastructure Summary

UICT Document 2014/111. Information Technology Services 2015-2017 Program of Works: IT Infrastructure Summary UICT Document 2014/111 Information 2015-2017 Program of Works: IT Infrastructure Summary Introduction Information (ITS) provides IT based services and infrastructure to ANU staff and students to support

More information

Microsoft Exchange Online from BT. Service Description (Shared Platform)

Microsoft Exchange Online from BT. Service Description (Shared Platform) Microsoft Exchange Online from BT Version 5.1 January 2004 Confidentiality statement All information contained in this document is provided in confidence for the sole purpose of adjudication, and shall

More information

Connecting UK Schools to JANET

Connecting UK Schools to JANET Connecting UK Schools to JANET Rob Symberlist Schools Networking Coordinator United Kingdom Education & Research Networking Association r.symberlist@ukerna.ac.uk 22 February 2005 TERENA Workshop on Connecting

More information

Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 16 September 2015 Item No. 11

Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 16 September 2015 Item No. 11 For Publication REPORT AUTHOR(S): Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 16 September 2015 Item No. 11 ASSISTANT CHIEF OFFICER (HUMAN RESOURCES AND ORGANISATIONAL

More information

Karen Winter Service Manager Schools and Traded Services 01823 355267 KWinter@somerset.gov.uk

Karen Winter Service Manager Schools and Traded Services 01823 355267 KWinter@somerset.gov.uk Somerset Services to Education Providers 2014-2015 SOUTHWEST ONE TECHNOLOGY SERVICES Service Provider: Southwest One Service Category: Academy Schools - Chargeable Contact: Karen Winter Service Manager

More information

Strategy 2012 2015. Providing resources for staff and students in higher and further education in the UK and beyond

Strategy 2012 2015. Providing resources for staff and students in higher and further education in the UK and beyond Providing resources for staff and students in higher and further education in the UK and beyond Strategy 2012 2015 EDINA is a JISC National Datacentre Table of Contents Introduction... 1 Vision... 1 Mission

More information

Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change

Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change For Decision Member Champion(s): Cllr A Alford, Corporate - Director:

More information

Mitel Professional Services UK Catalogue for Unified Communications and Collaboration

Mitel Professional Services UK Catalogue for Unified Communications and Collaboration Mitel Professional Services UK Catalogue for Unified Communications and Collaboration JUNE 2015 DOCUMENT RELEASE# 1.0 CATALOGUE SERVICES OVERVIEW... 3 TECHNICAL CONSULTING & DESIGN... 5 NETWORK ASSESSMENT...

More information

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University.

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University. Data Sheet Cisco Optimization s Optimize Your Solution using Cisco Expertise and Leading Practices Optimizing Your Business Architecture Today, enabling business innovation and agility is about being able

More information

Is your business still wasting time and money on PCs and Servers?

Is your business still wasting time and money on PCs and Servers? Hosted Managed Desktop Cloud Computing Is your business still wasting time and money on PCs and Servers? Our service is a cheaper and simpler alternative to owning and managing your own business IT network.

More information

G Cloud 6. Service Definition: Platform as a Service (PaaS)

G Cloud 6. Service Definition: Platform as a Service (PaaS) G Cloud 6 Service Definition: Platform as a Service (PaaS) Introduction to Centerprise International Limited Centerprise International Limited was established in 1983 as an engineering and manufacturing

More information

Information & Communication Technology Strategy 2012-15

Information & Communication Technology Strategy 2012-15 Information & Communication Technology Strategy 2012-15 Information & Communication Technology (ICT) 2 Our Vision To provide a contemporary and integrated technological environment, which sustains and

More information

STRATEGIC POLICY. Information Security Policy Documentation. Network Management Policy. 1. Introduction

STRATEGIC POLICY. Information Security Policy Documentation. Network Management Policy. 1. Introduction Policy: Title: Status: 1. Introduction ISP-S12 Network Management Policy Revised Information Security Policy Documentation STRATEGIC POLICY 1.1. This information security policy document covers management,

More information

IT Strategy 2013 2017

IT Strategy 2013 2017 IT Strategy 2013 2017 V3.2 August 2013 Contents Part I Context Drivers Workplace Strategy Benefits of the Strategy Contents Part II Business Strategy Strategic Themes: Strong Line of Business Applications

More information

G Cloud 6. Service Definition: Unified Communications as a Service (UCaaS)

G Cloud 6. Service Definition: Unified Communications as a Service (UCaaS) G Cloud 6 Service Definition: Unified Communications as a Service (UCaaS) Introduction to Centerprise International Limited Centerprise International Limited was established in 1983 as an engineering and

More information

IT Networking and Security

IT Networking and Security elearning Course Outlines IT Networking and Security powered by Calibrate elearning Course Outline CompTIA A+ 801: Fundamentals of Computer Hardware/Software www.medallionlearning.com Fundamentals of Computer

More information

Making Knowledge Work 2009-14 Planning and Resources Framework IT Strategy

Making Knowledge Work 2009-14 Planning and Resources Framework IT Strategy Making Knowledge Work 2009-14 Planning and Resources Framework IT Strategy Author: Graham Hill, Director of IT Services Version: v1.5 September 2010 1. Executive Summary IT Strategy 2009-14 A new IT Strategy

More information

IT Services. We re the IT in OrganIsaTion. Large Organisations

IT Services. We re the IT in OrganIsaTion. Large Organisations IT Services. We re the IT in OrganIsaTion Large Organisations IT for Large Organisations. As the world of business technology has changed, so have we. From designing, building and optimising tailored

More information

ICT budget and staffing trends in Healthcare

ICT budget and staffing trends in Healthcare ICT budget and staffing trends in Healthcare Enterprise ICT investment plans November 2013 ICT budget and staffing trends in Healthcare P a g e 1 www.kable.co.uk / The id Factor Ltd / + 44 (0) 207 936

More information

The Scottish Wide Area Network Programme

The Scottish Wide Area Network Programme The Scottish Wide Area Network Release: Issued Version: 1.0 Date: 16/03/2015 Author: Andy Williamson Manager Owner: Anne Moises SRO Client: Board Version: Issued 1.0 Page 1 of 8 16/04/2015 Document Location

More information

DIVISION OF ENGINEERING COMPUTING SERVICES DECS SERVICE DESK. Fall & Spring: Monday Thursday 8am to 9pm. Summer & Breaks:

DIVISION OF ENGINEERING COMPUTING SERVICES DECS SERVICE DESK. Fall & Spring: Monday Thursday 8am to 9pm. Summer & Breaks: DECS Community IT Michigan State University College of Engineering DIVISION OF ENGINEERING COMPUTING SERVICES DECS SERVICE DESK For all questions and requests visit www.egr.msu.edu/decs or 1325EB, e mail

More information

Core Data Service 2015 IT Domain Definition Change Overview

Core Data Service 2015 IT Domain Definition Change Overview Core Data Service 2015 IT Domain Definition Change Overview Administration and Management of IT Administration of central IT organization CIO or CTO position Institutional IT planning Financial planning

More information

CHOOSING A RACKSPACE HOSTING PLATFORM

CHOOSING A RACKSPACE HOSTING PLATFORM CHOOSING A RACKSPACE HOSTING PLATFORM Rackspace has years of experience in hosting and has learnt that the unique needs of our customers businesses often determines the level of accountability and project

More information

Cyber Essentials Scheme

Cyber Essentials Scheme Cyber Essentials Scheme Requirements for basic technical protection from cyber attacks June 2014 December 2013 Contents Contents... 2 Introduction... 3 Who should use this document?... 3 What can these

More information

Essex County College INFORMATION TECHNOLOGY MASTER PLAN 2009-2012

Essex County College INFORMATION TECHNOLOGY MASTER PLAN 2009-2012 Essex County College INFORMATION TECHNOLOGY MASTER PLAN 2009-2012 TABLE OF CONTENTS Introduction... 3 Guiding Principles... 4 Alignment... 5 Projected Annual Costs... 6 Goals and Objectives... 7 Page 2

More information

BRENT COUNCIL IT STRATEGY 2010-13

BRENT COUNCIL IT STRATEGY 2010-13 BRENT COUNCIL IT STRATEGY 2010-13 Contents 1 Introduction... 2 2 Empowering our customers... 3 2.1 Client Index... 3 2.2 Customer contact... 3 3 Tools for the Job... 4 3.1 Printing and scanning... 4 3.2

More information

Summary of Technical Information Security for Information Systems and Services Managed by NUIT (Newcastle University IT Service)

Summary of Technical Information Security for Information Systems and Services Managed by NUIT (Newcastle University IT Service) Introduction This document provides a summary of technical information security controls operated by Newcastle University s IT Service (NUIT). These information security controls apply to all NUIT managed

More information

Support & Field Services

Support & Field Services Support & Field Services The Right Engineer, In the Right Place, With the Right Skills, At the Right Time, With the Right Parts 2 At, we work with a wide range of customers across the UK delivering flexible

More information

Information Technology Strategic Plan 2013 9/23/2013

Information Technology Strategic Plan 2013 9/23/2013 Information Technology Strategic Plan 2013 9/23/2013 Unit Mission Statement: Information Technology Shared Services is dedicated to providing unparalleled service and support to the UC Davis College of

More information

IP Telephony Management

IP Telephony Management IP Telephony Management How Cisco IT Manages Global IP Telephony A Cisco on Cisco Case Study: Inside Cisco IT 1 Overview Challenge Design, implement, and maintain a highly available, reliable, and resilient

More information

BT One. Analyst and consultant update, September 2012. BT One. Communications that unify 1

BT One. Analyst and consultant update, September 2012. BT One. Communications that unify 1 BT One Analyst and consultant update, September 2012 BT One. Communications that unify 1 BT One Agenda Introductions Neil Sutton Vice President Global Portfolio BT One Overview Andrew Small Vice President

More information

AUSTRALIAN GOVERNMENT INFORMATION MANAGEMENT OFFICE CYBER SECURITY CAPABILITY FRAMEWORK & MAPPING OF ISM ROLES

AUSTRALIAN GOVERNMENT INFORMATION MANAGEMENT OFFICE CYBER SECURITY CAPABILITY FRAMEWORK & MAPPING OF ISM ROLES AUSTRALIAN GOVERNMENT INFORMATION MANAGEMENT OFFICE CYBER SECURITY CAPABILITY FRAMEWORK & MAPPING OF ISM ROLES Final Report Prepared by Dr Janet Tweedie & Dr Julie West June 2010 Produced for AGIMO by

More information

Standard Information Communications Technology. Videoconferencing. January2013 Version 1.4. Department of Corporate and Information Services

Standard Information Communications Technology. Videoconferencing. January2013 Version 1.4. Department of Corporate and Information Services Standard Information Communications Technology January2013 Version 1.4 Corporate and Information Services Document details Document Title Contact details File name Version 1.4 Document Control Information

More information

POSITION DESCRIPTION

POSITION DESCRIPTION Organisation Division St. John s Regional College St. John s Regional College, established in 1958, is a catholic college providing secondary education to boys and girls in the parishes located in the

More information

HEALTHCARE SOLUTIONS

HEALTHCARE SOLUTIONS HEALTHCARE SOLUTIONS Healthcare solutions HEALTHCARE COMMUNICATIONS THE CHALLENGES The organisation is asking for improved communications, but resources and budget will not extend to a huge IP communications

More information

Unified Communications. The Technologies, Features & Benefits

Unified Communications. The Technologies, Features & Benefits Unified Communications The Technologies, Features & Benefits Unified Communications 2 Table of Contents Executive Summary 2 Introduction 3 What s Trending? 4 Workforce Mobility 4 Desktop Virtualisation

More information

PROGRAMME OVERVIEW: G-CLOUD APPLICATIONS STORE FOR GOVERNMENT DATA CENTRE CONSOLIDATION

PROGRAMME OVERVIEW: G-CLOUD APPLICATIONS STORE FOR GOVERNMENT DATA CENTRE CONSOLIDATION PROGRAMME OVERVIEW: G-CLOUD APPLICATIONS STORE FOR GOVERNMENT DATA CENTRE CONSOLIDATION 1. Introduction This document has been written for all those interested in the future approach for delivering ICT

More information

REDCENTRIC MANAGED EXCHANGE SERVICE SERVICE DEFINITION

REDCENTRIC MANAGED EXCHANGE SERVICE SERVICE DEFINITION REDCENTRIC MANAGED EXCHANGE SERVICE SERVICE DEFINITION SD052 V1.2 Issue Date 01 July 2014 1) OVERVIEW The Redcentric Managed Exchange Service (MEX) is an email messaging service, hosted and managed by

More information

HSCIC Audit of Data Sharing Activities:

HSCIC Audit of Data Sharing Activities: Directorate / Programme Data Dissemination Services Project Data Sharing Audits Status Approved Director Terry Hill Version 1.0 Owner Rob Shaw Version issue date 21/09/2015 HSCIC Audit of Data Sharing

More information

Migrating to the Cloud. Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services

Migrating to the Cloud. Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services Migrating to the Cloud Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services Organisations are looking for new ways to deliver IT services and demanding that ICT

More information

RAS Associates, Inc. Systems Development Proposal. Scott Klarman. March 15, 2009

RAS Associates, Inc. Systems Development Proposal. Scott Klarman. March 15, 2009 Systems Development Proposal Scott Klarman March 15, 2009 Systems Development Proposal Page 2 Planning Objective: RAS Associates will be working to acquire a second location in Detroit to add to their

More information

GLASGOW KELVIN COLLEGE BOARD OF MANAGEMENT LEARNING AND TEACHING COMMITTEE ICT PROJECTS PROGRESS REPORT. Report by ICT Technical Manager 19/02/15

GLASGOW KELVIN COLLEGE BOARD OF MANAGEMENT LEARNING AND TEACHING COMMITTEE ICT PROJECTS PROGRESS REPORT. Report by ICT Technical Manager 19/02/15 GLASGOW KELVIN COLLEGE BOARD OF MANAGEMENT LEARNING AND TEACHING COMMITTEE ICT PROJECTS PROGRESS REPORT Report by ICT Technical Manager 19/02/15 1. Introduction This report seeks to provide members with

More information

Convergence: The Foundation for Unified Communications

Convergence: The Foundation for Unified Communications Convergence: The Foundation for Unified Communications Authored by: Anthony Cimorelli, Senior Product Marketing Manager Onofrio Norm Schillaci, Principal Sales Engineer Michelle Soltesz, Director, Marketing

More information

G-Cloud Managed Exchange SaaS. Service Description

G-Cloud Managed Exchange SaaS. Service Description G-Cloud Managed Exchange SaaS Service Description Version No: 5.0g Date: 08/04/2014 Table of Contents FEATURES... 3 OPTIONAL FEATURES... 4 BENEFITS... 4 CONNECTED SERVICES... 4 SERVICE REQUIREMENTS...

More information

support Professional IT Support

support Professional IT Support support Professional IT Support At interfuture we not only plan, install and rollout our clients systems we also provide a full range of maintenance and support packages to suit their requirements and

More information

Web Sites. Software Development

Web Sites. Software Development Web Sites With a web site, your product or service is accessible globally to prospective customers 24 hours a day, 365 days a year. Most people these days are using the internet as a first port of develop

More information

Aberdeen City Council IT Security (Network and perimeter)

Aberdeen City Council IT Security (Network and perimeter) Aberdeen City Council IT Security (Network and perimeter) Internal Audit Report 2014/2015 for Aberdeen City Council August 2014 Internal Audit KPIs Target Dates Actual Dates Red/Amber/Green Commentary

More information

Equality Impact Assessment in Audit Scotland

Equality Impact Assessment in Audit Scotland Equality Impact Assessment in Audit Scotland New Desk Phones and Phone System This form should be completed by following the guidance including in the supporting document: Equality Impact Assessment in

More information

Managed Hosted IP Telephony Services shared services for Government One Network. One Planet. Infinite Possibilities.

Managed Hosted IP Telephony Services shared services for Government One Network. One Planet. Infinite Possibilities. Managed Hosted IP Telephony Services shared services for Government One Network. One Planet. Infinite Possibilities. www.globalcrossing.com Managed Hosted IP Telephony Services Government organisations

More information

Linexcom Sdn Bhd. ict Group of Companies ver1.2

Linexcom Sdn Bhd. ict Group of Companies ver1.2 Linexcom Sdn Bhd No. 9B, 1 st Floor, Jalan PJS 1/27, 46150 Petaling Jaya, Selangor, MALAYSIA General : +603.7781 6020 Fax : +603.7781 6022 Web Page : http://www.linexcom.com Email : info@linexcom.com ict

More information

Portfolio: Transformation, Modernisation and Regulation

Portfolio: Transformation, Modernisation and Regulation Portfolio: Transformation, Modernisation and Regulation Procurement Committee 19 October 2006 Procurement of E-mail, Calendar and Archiving System Report by: Ward Implications: Head of City Service and

More information

assessments, for example, form part of the standard process of adoption. Introduction

assessments, for example, form part of the standard process of adoption. Introduction A service designed to deliver more efficient operations and impressive economies of scale from your Linux infrastructure through the application of best practice. Higher ratios of servers and users per

More information

Guardian365. Managed IT Support Services Suite

Guardian365. Managed IT Support Services Suite Guardian365 Managed IT Support Services Suite What will you get from us? Award Winning Team Deloitte Best Managed Company in 2015. Ranked in the Top 3 globally for Best Managed Service Desk by the Service

More information

Enterprise Governance and Planning

Enterprise Governance and Planning GEORGIA TECHNOLOGY AUTHORITY Title: Enterprise Operational Environment PSG Number: SO-10-003.02 Topical Area: Operations / Performance and Capacity Document Type: Standard Pages: 5 Issue Date: July 15,

More information

Bridging the gap between local IT and Cloud services, keeping you in control

Bridging the gap between local IT and Cloud services, keeping you in control Bridging the gap between local IT and Cloud services, keeping you in control The majority of Small and Mid-Sized Businesses (SMB s) are expected to operate in a hybrid IT environment (part on-premise,

More information

Service Schedule 2 MS Lync Terms & Conditions v1.0

Service Schedule 2 MS Lync Terms & Conditions v1.0 Service Schedule 2 MS Lync Terms & Conditions v1.0 Overriding provisions All quotations are made and all orders are accepted subject to these conditions ( these Schedule Terms ) and our Active Support

More information

Implementing an Electronic Document and Records Management System. Key Considerations

Implementing an Electronic Document and Records Management System. Key Considerations Implementing an Electronic Document and Records Management System Key Considerations Commonwealth of Australia 2011 This work is copyright. Apart from any use as permitted under the Copyright Act 1968,

More information

Procuring PSN Services through National Frameworks

Procuring PSN Services through National Frameworks Procuring PSN Services through National Frameworks The Public Services Network (PSN) is a secure network of networks established through adherence to industry defined common and open standards. By working

More information

The UK Access Management Federation

The UK Access Management Federation Connecting People to Resources The UK Access Management Federation Nicole Harris Programme Manager Joint Information Systems Committee 19/10/2006 Slide 1 Federations within the UK: Unique Issues The need

More information

EXCHANGE SERVER 2013 MESSAGING

EXCHANGE SERVER 2013 MESSAGING EXCHANGE SERVER 2013 MESSAGING WINDOWS SERVER 2012, 70-341, 70-342 Module-1: Introduction to Windows Server 2012 Overview of Windows Sever 2012 Installing Windows Server 2012 Configuring Windows Server

More information